JPH07166545A - Drilling device - Google Patents

Drilling device

Info

Publication number
JPH07166545A
JPH07166545A JP31306693A JP31306693A JPH07166545A JP H07166545 A JPH07166545 A JP H07166545A JP 31306693 A JP31306693 A JP 31306693A JP 31306693 A JP31306693 A JP 31306693A JP H07166545 A JPH07166545 A JP H07166545A
Authority
JP
Japan
Prior art keywords
drive shoe
ball
slide tube
casing pipe
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP31306693A
Other languages
Japanese (ja)
Inventor
Norio Yamakado
憲雄 山門
Masakazu Fujita
雅一 藤田
Akira Higuchi
彰 樋口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HIGUCHI GIKOU KK
Japan Foundation Engineering Co Ltd
Original Assignee
HIGUCHI GIKOU KK
Japan Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HIGUCHI GIKOU KK, Japan Foundation Engineering Co Ltd filed Critical HIGUCHI GIKOU KK
Priority to JP31306693A priority Critical patent/JPH07166545A/en
Publication of JPH07166545A publication Critical patent/JPH07166545A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To improve the execution property by providing a ball valve, a slide tube and the like in a drilling bit, connecting the drilling bit and a drive shoe with a ball key, and separating the bit when a casing tube is extracted. CONSTITUTION:A drilling bit 17 provided with a ball valve 29 excited by springs 27, 33 and a slide tube 35 is connected to a drive shoe 13 connected to a casing tube via a ball key 53. Water is ejected from a jet hole to excavate the ground 45, and an earth anchor hole 47 is formed. When water feed is stopped, the ball valve 29 is closed to prevent the back flow of slurry, and a ball 49 is inserted to block a valve seat 43. An anchor cable is inserted, a grout material is injected by pressure, the slide tube 35 is pressed down, the ball key 53 is released, and the coupling between the drive shoe 13 and the drilling bit 17 is released. When the casing tube is extracted, the drilling bit 17 is left in the hole 47. The execution of an earth anchor can be efficiently performed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、アースアンカーの施工
に用いる削孔装置の改良に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an improvement of a drilling device used for construction of an earth anchor.

【0002】[0002]

【従来の技術】擁壁や橋脚の転倒防止、或いはドック床
板の浮力防止や地スベリ防止等の目的で、従来、アース
アンカー工法が広く用いられている。
2. Description of the Related Art Conventionally, the earth anchor construction method has been widely used for the purpose of preventing falls of retaining walls and bridge piers, buoyancy of dock floor boards, and ground slip.

【0003】このアースアンカー工法は、削孔機に接続
したケーシング管内に削孔用水を注入し乍ら地盤をケー
シング管先端の削孔ビットで削孔し、削孔したアンカー
孔にアンカーケーブル(鋼線)を挿入した後、ケーシン
グ管を引き抜き乍ら、グラウト材をアンカー孔内に加圧
注入して地盤中にアンカー体を造成していくことにより
地盤と構造物との連結を図るもので、ケーシング管は削
孔深さに応じて順次接続される。
In this earth anchor construction method, water for drilling is poured into a casing pipe connected to a drilling machine, and the ground is drilled with a drilling bit at the tip of the casing pipe, and an anchor cable (steel) is drilled in the drilled anchor hole. After inserting the wire, pull out the casing pipe and pressurize the grout material into the anchor hole to create an anchor body in the ground to connect the ground and the structure. The casing pipes are sequentially connected according to the drilling depth.

【0004】而して、従来、軟弱地盤でアースアンカー
を施工する場合、内部に逆止弁を組み込んだクローネン
ビットが削孔ビットとして使用されている。図6に示す
ように、クローネンビット1はケーシング管3の挿入側
先端に螺着されるドライブシュー5を介してケーシング
管3に装着され、ドライブシュー5に挿入される筒状部
1aとドライブシュー5の先端に配置される頭部1bと
で構成されている。そして、筒状部1aをドライブシュ
ー5に挿入し乍ら、頭部1bの後端に設けた切欠き部7
をドライブシュー5先端の切欠き部9に軸方向(削孔方
向)に噛み合わせてドライブシュー5に接続すること
で、ケーシング管3の回転がクローネンビット1に伝わ
るようになっている。
Thus, conventionally, when constructing an earth anchor on soft ground, a Kronen bit incorporating a check valve inside is used as a drilling bit. As shown in FIG. 6, the Kronen bit 1 is attached to the casing tube 3 via a drive shoe 5 screwed to the insertion side end of the casing tube 3, and is inserted into the drive shoe 5 with a cylindrical portion 1 a and a drive. It is composed of a head 1b arranged at the tip of the shoe 5. Then, the cylindrical portion 1a is inserted into the drive shoe 5, and the cutout portion 7 provided at the rear end of the head portion 1b is inserted.
Is engaged with the notch 9 at the tip of the drive shoe 5 in the axial direction (drilling direction) and connected to the drive shoe 5, whereby the rotation of the casing pipe 3 is transmitted to the Kronen bit 1.

【0005】そして、上記クローネンビット1は、グラ
ウト材を注入し乍らケーシング管3を引き抜くと、ドラ
イブシュー5と離脱してアンカー孔内に残され、グラウ
ト材によって埋没されるようになっている。尚、図中、
11は削孔用水の噴出孔である。
When the casing pipe 3 is pulled out by injecting the grout material, the Kronen bit 1 is separated from the drive shoe 5 and is left in the anchor hole, and is buried by the grout material. There is. In the figure,
Reference numeral 11 is a jetting water ejection hole.

【0006】[0006]

【発明が解決しようとする課題】このように、従来、ク
ローネンビット1は、アースアンカーの施工の際に、ド
ライブシュー5と軸方向に噛み合わせて接続し、又、ケ
ーシング管3の引抜きに伴いドライブシュー3と離脱す
る構造になっている。
As described above, conventionally, the Kronen bit 1 is connected to the drive shoe 5 by meshing with it in the axial direction at the time of construction of the earth anchor, and is also used for pulling out the casing pipe 3. Along with this, the drive shoe 3 is separated.

【0007】然し、地盤の削孔時に例えば硬い岩盤に突
き当たったような場合、ケーシング管3をフラッシング
動作させて掘り進めていく必要があり、上述の如き従来
のクローネンビット1とドライブシュー5との接続構造
では、フラッシング動作をさせることによってクローネ
ンビット1がドライブシュー5から離脱してしまい、
又、一旦外れたクローネンビット1をドライブシュー5
に接続するのは困難で、フラッシング動作が可能なクロ
ーネンビットとドライブシューの接続構造が望まれてい
た。
However, in the case of hitting a hard rock, for example, when drilling the ground, it is necessary to carry out the flushing operation of the casing pipe 3 to proceed with the digging, and the conventional Kronen bit 1 and the drive shoe 5 as described above. In the connection structure of, the flushing operation causes the Kronen bit 1 to separate from the drive shoe 5,
Also, remove the Kronen bit 1 once, and drive shoe 5
Since it is difficult to connect to the disk, the connection structure of the Kronen bit and the drive shoe capable of flushing operation has been desired.

【0008】本発明は斯かる実情に鑑み案出されたもの
で、アンカー孔の削孔時にケーシング管のフラッシング
動作が可能であると共に、ケーシング管の引抜き時に削
孔ビットとドライブシューとの離脱を容易に行うことの
できるアースアンカー施工用の削孔装置を提供すること
を目的とする。
The present invention has been devised in view of the above circumstances, and it is possible to perform the flushing operation of the casing pipe when the anchor hole is drilled, and to separate the drill bit and the drive shoe when the casing pipe is pulled out. An object of the present invention is to provide a drilling device for earth anchor construction that can be easily performed.

【0009】[0009]

【課題を解決するための手段】斯かる目的を達成するた
め、本発明に係る削孔装置は、削孔機に接続するケーシ
ング管の先端に螺着され、その内周に係合溝が形成され
たドライブシューと、当該ドライブシューと軸方向に噛
み合ってその先端に接続され、ケーシング管の引抜き時
にドライブシューと離脱してアンカー孔内に残される削
孔ビットと、ケーシング管へのグラウト材の注入に先立
って地上からケーシング管内に投下される鋼製ボールと
からなり、削孔ビットは、その頭部に削孔用水の噴出孔
が形成されると共に、ドライブシューに挿入される筒状
部内に、逆止弁と、スプリングによって筒状部の後端側
へ付勢され、投下された上記鋼製ボールを保持する弁座
を有するスライド管が組み込まれ、筒状部の周壁に設け
た複数のボールキー装着孔には、上記スライド管により
筒状部の周壁から外方へ押圧されてドライブシューの係
合溝に係合し、スプリングのばね力に抗するスライド管
の移動で係合溝との係合が解除されて、スライド管の後
端からスライド管内に落下するボールキーを装着したも
のである。
In order to achieve such an object, a boring device according to the present invention is screwed to the tip of a casing pipe connected to a boring machine, and an engaging groove is formed on the inner circumference thereof. Drive shoe, the drill bit that meshes with the drive shoe in the axial direction and is connected to the tip of the drive shoe, and is left in the anchor hole by being separated from the drive shoe when the casing tube is pulled out. It consists of steel balls that are dropped from the ground into the casing pipe prior to pouring, and the boring bit has a jetting water ejection hole formed in its head and a tubular part that is inserted into the drive shoe. , A check valve and a slide tube having a valve seat that holds the dropped steel balls that are urged toward the rear end side of the tubular portion by a spring, Bolki The mounting hole is pushed outward from the peripheral wall of the cylindrical portion by the slide tube to engage with the engagement groove of the drive shoe, and the engagement of the engagement groove with the engagement of the slide tube against the spring force of the spring. It is equipped with a ball key that is released from the rear end of the slide tube and falls into the slide tube from the rear end.

【0010】[0010]

【作用】本発明に係る削孔装置によれば、削孔ビットを
ドライブシューと軸方向に噛み合わせてボールキーを係
合溝に係合させれば、ドライブシューと削孔ビットが連
結されることとなる。
According to the boring device of the present invention, the drive shoe and the boring bit are connected by meshing the boring bit with the drive shoe in the axial direction and engaging the ball key with the engaging groove. It will be.

【0011】従って、斯様に削孔ビットを連結したドラ
イブシューをケーシング管の先端に螺着して、削孔用水
をケーシング管内に送水し乍ら地盤を削孔していけば、
地盤にアンカー孔が削孔されることとなる。
Therefore, if the drive shoe having the drill bit thus connected is screwed to the tip of the casing pipe and the drilling water is fed into the casing pipe, the ground is drilled.
Anchor holes will be drilled in the ground.

【0012】そして、削孔時にケーシング管をフラッシ
ング動作させても、ボールキーが係合溝と係合している
ため削孔ビットがドライブシューから外れることがな
い。又、削孔用水は、削孔ビットの噴出孔から地盤中に
噴出されるが、送水を止めると、逆止弁が削孔ビット内
への泥水の逆流を防止する。
Even when the casing pipe is flushed during drilling, the drill bit does not come off the drive shoe because the ball key is engaged with the engaging groove. Further, the drilling water is jetted into the ground through the jet holes of the drilling bit, but when the water supply is stopped, the check valve prevents the backflow of muddy water into the drilling bit.

【0013】そして、削孔完了後、地上から鋼製ボール
をケーシング管内に投下すると、鋼製ボールはスライド
管の弁座に達してその送水通路を閉塞する。しかる後、
アンカー孔内にアンカーケーブルを挿入してグラウト材
を加圧注入すると、鋼製ボールによって弁座の送水通路
が閉塞されているため、ドライブシュー内にグラウト材
が溜まってドライブシュー内の圧力が上昇し、その結
果、スライド管がスプリングのばね力に抗して下方へ移
動し、各ボールキー装着孔内のボールキーがフリーとな
ってスライド管の後端からスライド管内に落下し、係合
溝との係合が解除される。
When the steel balls are dropped into the casing pipe from the ground after completion of the drilling, the steel balls reach the valve seat of the slide pipe and close the water supply passage. After that,
When the anchor cable is inserted into the anchor hole and the grout material is injected under pressure, the water supply passage of the valve seat is blocked by the steel ball, so the grout material accumulates in the drive shoe and the pressure inside the drive shoe rises. As a result, the slide tube moves downward against the spring force of the spring, the ball keys in each ball key mounting hole become free and fall from the rear end of the slide tube into the slide tube, and the engaging groove Is disengaged.

【0014】従って、斯かる状態でグラウト材の注入を
続行してケーシング管を引き抜けば、削孔ビットはドラ
イブシューと離脱してアンカー孔内に残され、グラウト
材によってアンカー孔内に埋没されることとなる。
Therefore, if the grout material is continuously injected in this state and the casing pipe is pulled out, the drill bit is separated from the drive shoe and remains in the anchor hole, and is buried in the anchor hole by the grout material. The Rukoto.

【0015】[0015]

【実施例】以下、本発明の実施例を図面に基づき詳細に
説明する。図1は本発明の一実施例に係る削孔装置の断
面図を示し、図中、13は従来と同様、ケーシング管の
先端に螺着されたドライブシューで、その内周には一本
の係合溝15が設けられている。そして、その先端に、
削孔ビット17が当該ドライブシュー13と軸方向に噛
み合って装着されている。
Embodiments of the present invention will now be described in detail with reference to the drawings. FIG. 1 is a cross-sectional view of a hole drilling device according to an embodiment of the present invention. In the figure, 13 is a drive shoe screwed to the tip of a casing tube as in the conventional case, and one drive shoe is provided on the inner periphery thereof. An engagement groove 15 is provided. And at the tip,
The drill bit 17 is mounted so as to mesh with the drive shoe 13 in the axial direction.

【0016】削孔ビット17は、ドライブシュー13の
先端に配置される頭部17aと、ドライブシュー13に
挿入される筒状部17bとで構成されており、頭部17
aには削孔用水の噴出孔19が複数設けられている。
The drill bit 17 comprises a head portion 17a arranged at the tip of the drive shoe 13 and a cylindrical portion 17b inserted into the drive shoe 13, and the head portion 17
A plurality of jet holes 19 for drilling water are provided in a.

【0017】そして、筒状部17b内には、先ず、従来
と同様な逆止弁21が頭部17aの裏面側に装着されて
いる。図中、23は下方に向かってテーパ状に拡開する
送水通路25が設けられた弁座で、当該弁座23は筒状
部17bの内周に固着されている。そして、二点鎖線で
示すように、頭部17aの裏面との間に張設したスプリ
ング27に付勢されてボール弁29が弁座23に当接し
て送水通路25を閉塞しており、ケーシング管内に削孔
用水が注入されると、実線で示すようにその水圧でボー
ル弁29がスプリング27のばね力に抗して下方へ移動
し、送水通路25が開放されるようになっている。尚、
図中、31はスプリング27とボール弁29の保持部材
である。
In the tubular portion 17b, first, a check valve 21 similar to the conventional one is mounted on the back side of the head portion 17a. In the figure, 23 is a valve seat provided with a water supply passage 25 that expands downwardly in a tapered shape, and the valve seat 23 is fixed to the inner periphery of the tubular portion 17b. Then, as shown by the chain double-dashed line, the ball valve 29 abuts the valve seat 23 by being urged by the spring 27 stretched between the head 17a and the back surface of the head 17a to close the water supply passage 25, and the casing When the drilling water is injected into the pipe, as shown by the solid line, the water pressure causes the ball valve 29 to move downward against the spring force of the spring 27, so that the water supply passage 25 is opened. still,
In the figure, 31 is a holding member for the spring 27 and the ball valve 29.

【0018】そして、上記逆止弁21の上部にスプリン
グ33を介してスライド管35が配置されている。スラ
イド管35は後端側が開口し、上記筒状部17bの内径
と略同一の外径に成形されている。そして、その先端に
は、スプリング33が嵌合する凹部37が設けられてお
り、当該凹部37の中央に削孔用水の送水孔39が形成
されている。又、スライド管35の後端の開口周縁部に
は、上方へテーパ状に拡開する送水通路41が形成され
た弁座43が取り付けられており、地盤45の削孔を終
えてアンカー孔47内にグラウト材を注入する際に、地
上から鋼製ボールを投入すると、図2に示すように鋼製
ボール49が弁座43で保持されて、送水通路41が当
該鋼製ボール49で閉塞されるようになっている。
A slide tube 35 is arranged above the check valve 21 via a spring 33. The slide tube 35 has an opening on the rear end side and is formed to have an outer diameter substantially the same as the inner diameter of the cylindrical portion 17b. Further, a recess 37 into which the spring 33 is fitted is provided at the tip thereof, and a water supply hole 39 for drilling water is formed in the center of the recess 37. A valve seat 43 having a water supply passage 41 that expands upward in a tapered shape is attached to the peripheral edge of the rear end of the slide pipe 35, and the anchor hole 47 is formed after the drilling of the ground 45 is completed. When the steel balls are thrown in from the ground when pouring the grout material into the inside, the steel balls 49 are held by the valve seat 43 and the water supply passage 41 is closed by the steel balls 49 as shown in FIG. It has become so.

【0019】一方、筒状部17bの周壁には、その周方
向へ所定の間隔を開けて複数のボールキー装着孔51が
設けられている。そして、各ボールキー装着孔51に
は、夫々、図1に示すようにスライド管35により筒状
部17bの周壁から外方へ押圧されて上記係合溝15に
係合するボールキー53が装着されており、斯様にボー
ルキー53が係合溝15に係合することによってドライ
ブシュー13と削孔ビット17とが連結されて、地盤4
5の削孔時にケーシング管がフラッシング動作してもド
ライブシュー13から削孔ビット17が外れないように
なっている。
On the other hand, on the peripheral wall of the cylindrical portion 17b, a plurality of ball key mounting holes 51 are provided at predetermined intervals in the peripheral direction. Then, in each ball key mounting hole 51, a ball key 53, which is pressed outward from the peripheral wall of the cylindrical portion 17b by the slide tube 35 and engages with the engaging groove 15 as shown in FIG. 1, is mounted. By engaging the ball key 53 with the engaging groove 15 in this way, the drive shoe 13 and the drill bit 17 are connected, and the ground 4
Even if the casing pipe is flushed during the drilling of No. 5, the drill bit 17 does not come off from the drive shoe 13.

【0020】尚、ボールキー装着孔51は、筒状部17
bの内方へ向かって傾斜部51aが設けられ、又、筒状
部17bの外周に開口するその直径は、ボールキー53
の直径よりも小さく設定されている。更に又、図1に示
すように筒状部17bの後端17b′は、地上から投下
された鋼製ボール49が弁座43の送水通路41に確実
に案内されるようにテーパ状に成形されている。
The ball key mounting hole 51 has a cylindrical portion 17
An inclined portion 51a is provided inward of b, and a diameter of the inclined portion 51a which opens to the outer periphery of the cylindrical portion 17b is equal to that of the ball key 53.
It is set smaller than the diameter of. Further, as shown in FIG. 1, the rear end 17b 'of the tubular portion 17b is formed in a tapered shape so that the steel ball 49 dropped from the ground is reliably guided to the water supply passage 41 of the valve seat 43. ing.

【0021】そして、上述の如く鋼製ボール49で送水
通路41を閉塞した後、後述するように注入されたグラ
ウト材によってドライブシュー13内の圧力が上昇する
と、図3に示すようにスライド管35がスプリング33
のばね力に抗して下方へ移動するようになっており、ス
ライド管35が弁座23に当接すると、各ボールキー装
着孔51内のボールキー53がフリーとなって図4の如
くスライド管35の後端からスライド管35(弁座4
3)内に落下し、係合溝15との係合が解除されるよう
になっている。
After the water supply passage 41 is closed by the steel balls 49 as described above, when the pressure inside the drive shoe 13 is increased by the injected grout material as described later, the slide pipe 35 is provided as shown in FIG. Spring 33
When the slide pipe 35 comes into contact with the valve seat 23, the ball keys 53 in the ball key mounting holes 51 become free and slide as shown in FIG. From the rear end of the pipe 35, the slide pipe 35 (valve seat 4
3) It falls into the inside and the engagement with the engagement groove 15 is released.

【0022】従って、この状態でケーシング管を引き抜
くと、図5に示すように削孔ビット17はドライブシュ
ー13と離脱してアンカー孔47内に残されることとな
る。その他、図1中、55は図6に示す従来例と同様、
削孔ビット17の頭部17aの後端に形成された切欠き
部、57はドライブシュー13の先端に形成された切欠
き部で、両切欠き部55,57を軸方向(削孔方向)に
噛み合わせることで、ケーシング管の回転が削孔ビット
17に伝わるようになっている。
Therefore, when the casing pipe is pulled out in this state, the drill bit 17 is separated from the drive shoe 13 and is left in the anchor hole 47 as shown in FIG. In addition, 55 in FIG. 1 is similar to the conventional example shown in FIG.
A notch portion formed at the rear end of the head portion 17a of the drill bit 17 and a notch portion 57 formed at the tip of the drive shoe 13. Both notch portions 55 and 57 are axially (drilling direction). The rotation of the casing pipe is transmitted to the drill bit 17 by engaging with.

【0023】本実施例に係る削孔装置59はこのように
構成されているから、当該削孔装置59を用いてアース
アンカーを施工するには、図1に示すように先ず、削孔
ビット17の切欠き部55とドライブシュー13の切欠
き部57を軸方向に噛み合わせ、そして、ボールキー5
3をボールキー装着孔51に装着し、スライド管35を
ドライブシュー13の後端側から削孔ビット17内に挿
入してボールキー53を係合溝15に係合させる。これ
で、ドライブシュー13と削孔ビット17が連結する。
Since the drilling device 59 according to the present embodiment is constructed in this way, in order to construct an earth anchor using the drilling device 59, as shown in FIG. The notch 55 of the drive shoe 13 and the notch 57 of the drive shoe 13 are axially engaged with each other, and the ball key 5
3 is mounted in the ball key mounting hole 51, the slide tube 35 is inserted into the drill bit 17 from the rear end side of the drive shoe 13, and the ball key 53 is engaged with the engagement groove 15. The drive shoe 13 and the drill bit 17 are now connected.

【0024】そして、ドライブシュー13を削孔機に接
続したケーシング管の先端に螺着して、削孔用水をケー
シング管内に送水し乍ら、従来と同様、削孔深さに応じ
てケーシング管を順次接続して地盤45を削孔していけ
ばよく、このとき、ケーシング管をフラッシング動作さ
せても、ボールキー53が係合溝15と係合しているた
め、削孔ビット17がドライブシュー13から外れるこ
とがない。
Then, the drive shoe 13 is screwed to the tip of the casing pipe connected to the drilling machine to feed the drilling water into the casing pipe. It suffices to sequentially connect the holes to drill the ground 45. At this time, even if the casing pipe is flushed, the ball key 53 is engaged with the engaging groove 15, so that the drill bit 17 is driven. It does not come off from the shoe 13.

【0025】又、削孔用水は、削孔ビット17の噴出孔
19から地盤45中に噴出されるが、送水を止めると、
地下水圧とスプリング27のばね力によってボール弁2
9が弁座23の送水通路25を閉塞し、削孔ビット17
内への泥水の逆流を防止することとなる。
Further, the drilling water is jetted into the ground 45 from the jet holes 19 of the drill bit 17, but when the water supply is stopped,
Ball valve 2 by ground water pressure and spring force of spring 27
9 blocks the water supply passage 25 of the valve seat 23, and the drill bit 17
It will prevent the backflow of muddy water.

【0026】そして、削孔完了後、地上から鋼製ボール
49をケーシング管内に投下すると、図2に示すように
投下された鋼製ボール49は弁座43に達して送水通路
41を閉塞する。
When the steel balls 49 are dropped into the casing pipe from the ground after the boring is completed, the dropped steel balls 49 reach the valve seat 43 and close the water supply passage 41 as shown in FIG.

【0027】しかる後、アンカー孔47内にアンカーケ
ーブルを挿入してグラウト材Gを加圧注入すると、鋼製
ボール49によって弁座43の送水通路41が閉塞され
ているため、ドライブシュー13内にグラウト材Gが溜
まってドライブシュー13内の圧力が上昇し、その結
果、図3に示すようにスライド管35がスプリング33
のばね力に抗して下方へ移動し、各ボールキー装着孔5
1内のボールキー53がフリーとなって図4の如くスラ
イド管35の後端からスライド管35(弁座43)内に
落下し、係合溝15との係合が解除される。
After that, when the anchor cable is inserted into the anchor hole 47 and the grout material G is injected under pressure, the water supply passage 41 of the valve seat 43 is blocked by the steel ball 49, so that the drive shoe 13 is closed. The grout material G accumulates and the pressure in the drive shoe 13 rises. As a result, as shown in FIG.
Moves downward against the spring force of each ball key mounting hole 5
The ball key 53 in 1 becomes free and falls from the rear end of the slide tube 35 into the slide tube 35 (valve seat 43) as shown in FIG. 4, and the engagement with the engagement groove 15 is released.

【0028】従って、斯かる状態でグラウト材Gの注入
を続行してケーシング管を引き抜けば、図5に示すよう
に、削孔ビット17はドライブシュー13と離脱してア
ンカー孔47内に残され、グラウト材Gによってアンカ
ー孔47内に埋没されることとなる。
Therefore, if the grout material G is continuously injected in this state and the casing pipe is pulled out, the drill bit 17 is separated from the drive shoe 13 and remains in the anchor hole 47 as shown in FIG. Then, it is buried in the anchor hole 47 by the grout material G.

【0029】このように、本実施例に係る削孔装置59
は、地盤45の削孔時にボールキー53を係合溝15に
係合させてドライブシュー13と削孔ビット17を連結
し、ケーシング管の引抜き時にその係合を解除させるよ
うにしたので、斯かる削孔装置59をアースアンカーの
施工に用いることによって削孔時にケーシング管のフラ
ッシング動作が可能となると共に、ケーシング管の引抜
き時に削孔ビット17とドライブシュー13との離脱を
容易に行うことができ、その結果、従来に比しアースア
ンカーの施工性が飛躍的に向上することとなった。
As described above, the drilling device 59 according to this embodiment.
When the ground 45 is drilled, the ball key 53 is engaged with the engaging groove 15 to connect the drive shoe 13 and the drill bit 17 and the engagement is released when the casing pipe is pulled out. By using the light boring device 59 for construction of the earth anchor, the flushing operation of the casing pipe can be performed at the time of boring, and the boring bit 17 and the drive shoe 13 can be easily separated when the casing pipe is pulled out. As a result, the workability of the earth anchor has improved dramatically compared to the conventional one.

【0030】[0030]

【発明の効果】以上述べたように、本発明に係る削孔装
置をアースアンカーの施工に用いることによって、地盤
の削孔時にケーシング管のフラッシング動作が可能とな
ると共に、ケーシング管の引抜き時に削孔ビットとドラ
イブシューとの離脱を容易に行うことができるので、従
来に比しアースアンカーの施工性が飛躍的に向上するこ
ととなった。
As described above, by using the hole drilling device according to the present invention for constructing the ground anchor, the flushing operation of the casing pipe is enabled when drilling the ground, and the drilling operation is performed when the casing pipe is pulled out. Since the hole bit and the drive shoe can be easily separated from each other, the workability of the ground anchor is dramatically improved compared to the conventional one.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例に係る削孔装置による地盤削
孔時の断面図である。
FIG. 1 is a cross-sectional view at the time of ground drilling by a drilling device according to an embodiment of the present invention.

【図2】鋼製ボールが投下された後の状態を示す削孔装
置の断面図である。
FIG. 2 is a cross-sectional view of the hole drilling device showing a state after the steel balls have been dropped.

【図3】スライド管が移動した状態を示す削孔装置の断
面図である。
FIG. 3 is a cross-sectional view of the hole drilling device showing a state where the slide tube has moved.

【図4】スライド管が移動してドライブシューと削孔装
置との連結が解除された状態を示す削孔装置の断面図で
ある。
FIG. 4 is a cross-sectional view of the drilling device showing a state where the slide tube has moved and the connection between the drive shoe and the drilling device has been released.

【図5】ケーシング管の引抜き時に伴うドライブシュー
と削孔ビットの離脱状態を示す削孔装置の断面図であ
る。
FIG. 5 is a cross-sectional view of the drilling device showing a detached state of the drive shoe and the drilling bit when the casing pipe is pulled out.

【図6】従来のクローネンビットとドライブシュー及び
ケーシング管の斜視図である。
FIG. 6 is a perspective view of a conventional Kronen bit, a drive shoe, and a casing tube.

【符号の説明】[Explanation of symbols]

13 ドライブシュー 15 係合溝 17 削孔ビット 17a 頭部 17b 筒状部 19 噴出孔 21 逆止弁 23,43 弁座 27,33 スプリング 29 ボール弁 35 スライド管 45 地盤 47 アンカー孔 49 鋼製ボール 51 ボールキー装着孔 53 ボールキー 59 削孔装置 13 Drive Shoe 15 Engagement Groove 17 Drill Bit 17a Head 17b Cylindrical Part 19 Jet Hole 21 Check Valve 23,43 Valve Seat 27,33 Spring 29 Ball Valve 35 Slide Pipe 45 Ground 47 Anchor Hole 49 Steel Ball 51 Ball key mounting hole 53 Ball key 59 Drilling device

───────────────────────────────────────────────────── フロントページの続き (72)発明者 樋口 彰 東京都江戸川区篠崎町2丁目35番地 株式 会社樋口技工内 ─────────────────────────────────────────────────── ─── Continued Front Page (72) Inventor Akira Higuchi 2-35 Shinozaki-cho, Edogawa-ku, Tokyo Higuchi Engineering Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 削孔機に接続するケーシング管の先端に
螺着され、その内周に係合溝が形成されたドライブシュ
ーと、当該ドライブシューと軸方向に噛み合ってその先
端に接続され、ケーシング管の引抜き時にドライブシュ
ーと離脱してアンカー孔内に残される削孔ビットと、ケ
ーシング管へのグラウト材の注入に先立って地上からケ
ーシング管内に投下される鋼製ボールとからなり、削孔
ビットは、その頭部に削孔用水の噴出孔が形成されると
共に、ドライブシューに挿入される筒状部内に、逆止弁
と、スプリングによって筒状部の後端側へ付勢され、投
下された上記鋼製ボールを保持する弁座を有するスライ
ド管が組み込まれ、筒状部の周壁に設けた複数のボール
キー装着孔には、上記スライド管により筒状部の周壁か
ら外方へ押圧されてドライブシューの係合溝に係合し、
スプリングのばね力に抗するスライド管の移動で係合溝
との係合が解除されて、スライド管の後端からスライド
管内に落下するボールキーを装着したことを特徴とする
削孔装置。
1. A drive shoe, which is screwed to the tip of a casing pipe connected to a hole drilling machine and has an engagement groove formed in the inner periphery thereof, and which is axially meshed with the drive shoe and connected to the tip thereof, It consists of a drill bit that is separated from the drive shoe and remains in the anchor hole when the casing pipe is pulled out, and a steel ball that is dropped from the ground into the casing pipe before pouring the grout material into the casing pipe. The bit has a drilling water ejection hole formed in its head, and is urged toward the rear end side of the tubular part by a check valve and a spring inside the tubular part that is inserted into the drive shoe. A slide tube having a valve seat for holding the steel ball is installed, and the plurality of ball key mounting holes provided in the peripheral wall of the tubular portion are pushed outward from the peripheral wall of the tubular portion by the slide tube. Been Engage with the engagement groove of the drive shoe,
A boring device equipped with a ball key which is disengaged from an engaging groove by movement of a slide tube against a spring force of a spring and drops from a rear end of the slide tube into the slide tube.
JP31306693A 1993-12-14 1993-12-14 Drilling device Pending JPH07166545A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31306693A JPH07166545A (en) 1993-12-14 1993-12-14 Drilling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31306693A JPH07166545A (en) 1993-12-14 1993-12-14 Drilling device

Publications (1)

Publication Number Publication Date
JPH07166545A true JPH07166545A (en) 1995-06-27

Family

ID=18036799

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31306693A Pending JPH07166545A (en) 1993-12-14 1993-12-14 Drilling device

Country Status (1)

Country Link
JP (1) JPH07166545A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100419973B1 (en) * 2001-07-18 2004-03-04 주식회사 대창중기계 Ground drilling rigs and method without raising dust
CZ306166B6 (en) * 2015-09-16 2016-08-31 Jennmar Multitex S.R.O. Self-boring hydraulically expandable rock bolt
KR20190055445A (en) * 2017-11-15 2019-05-23 덴버코리아이엔씨 주식회사 Tip device for high pressure injection

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100419973B1 (en) * 2001-07-18 2004-03-04 주식회사 대창중기계 Ground drilling rigs and method without raising dust
CZ306166B6 (en) * 2015-09-16 2016-08-31 Jennmar Multitex S.R.O. Self-boring hydraulically expandable rock bolt
KR20190055445A (en) * 2017-11-15 2019-05-23 덴버코리아이엔씨 주식회사 Tip device for high pressure injection

Similar Documents

Publication Publication Date Title
JPH07166545A (en) Drilling device
JP4738075B2 (en) Pipe installation method and drilling device
JP3198087B2 (en) Drainage method
JP3233183B2 (en) Drilling equipment
JP4138796B2 (en) Steel pipe placing method and steel pipe placing tool
JP2001207771A (en) Burying construction method for underground buried object and noncore boring device
JP2018062805A (en) Core material embedding method
JP3953907B2 (en) Double pipe drilling device under pressure
JP4318603B2 (en) Drilling bit in a steel pipe for ground reinforcement
JP3233181B2 (en) Drilling equipment
JP2000204870A (en) Boring device
JP3333930B2 (en) Ground drilling equipment
JP3506526B2 (en) Drilling machine
JP6521311B2 (en) Chemical solution injection method under pressurized water
JP3048320B2 (en) Ground anchor construction method
JP4431019B2 (en) Underground construction method
JP2014125781A (en) Method for burying outer pipe for chemical injection, and chemical injection method using buried outer pipe
JP2002106279A (en) Excavator with down-the-hole hammer and burying method for buried structure
JP3177409B2 (en) Construction method of double pipe double packer injection
JP4059123B2 (en) Engagement structure and lock bolt construction method
JPH0629510B2 (en) Concrete pile foundation method and equipment used therefor
JP4007219B2 (en) Drilling tool and steel pipe tip receiving method
JPH05295730A (en) Earth anchor driving method
JP2000352290A (en) Excavating bit and anchor construction method
JP2004044294A (en) Leading cutter device for backfill grouting for shield machine