JPH07101670A - Hanging and raising-up method for heavyweight long size material - Google Patents
Hanging and raising-up method for heavyweight long size materialInfo
- Publication number
- JPH07101670A JPH07101670A JP27757693A JP27757693A JPH07101670A JP H07101670 A JPH07101670 A JP H07101670A JP 27757693 A JP27757693 A JP 27757693A JP 27757693 A JP27757693 A JP 27757693A JP H07101670 A JPH07101670 A JP H07101670A
- Authority
- JP
- Japan
- Prior art keywords
- crane
- heavyweight
- hook
- steel material
- hoisting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、例えば、連続壁支持杭
に使用するPC構真柱などの重量長尺物を、地面に載置
した横倒れ姿勢から鉛直姿勢に吊り起こすためのもので
あって、長さが10m以上の重量棒状体の長手方向の少な
くとも一端側に定着用鋼材を突設した重量長尺物の吊り
起こし方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is for lifting a long and heavy object such as a PC structure column used for a continuous wall support pile from a sideways lying position on the ground to a vertical position. The present invention also relates to a method for hoisting a heavy long object in which a fixing steel material is projected on at least one end side in the longitudinal direction of a weight rod having a length of 10 m or more.
【0002】[0002]
【従来の技術】上述のような重量長尺物を吊り起こす場
合、例えば、重量棒状体の長手方向の一端側と定着用鋼
材の先端側の二箇所をクレーンで吊り下げようとする
と、重量棒状体の重量が大きいために定着用鋼材が曲が
ってしまう。そのため、従来一般に、重量棒状体の長手
方向両側それぞれを個別のクレーンで吊り下げ、二台の
クレーンで重量棒状体の重量を支持しながら、別のクレ
ーンで定着用鋼材を吊り上げ、二台のクレーンによるワ
イヤーの巻き取り長さを調整して重量棒状体を横倒れ姿
勢から鉛直姿勢に近い姿勢に変更し、定着用鋼材にそれ
を吊り上げたときに曲げ応力がかからない状態にしてか
ら、別のクレーンにより定着用鋼材を吊り上げ、鉛直姿
勢に吊り起こしていた。2. Description of the Related Art In the case of lifting a heavy long object as described above, for example, when a crane is used to hang one end in the longitudinal direction of the weight rod and the tip of the fixing steel material, Due to the heavy weight of the body, the fixing steel material bends. For this reason, in general, each side of the weight rod in the longitudinal direction is hung by individual cranes, and while the weight of the weight rod is supported by two cranes, another crane lifts the fixing steel material, and two cranes are used. Adjust the winding length of the wire to change the weight rod from a sideways posture to a posture close to a vertical posture so that bending stress is not applied when it is lifted on the fixing steel material, and then another crane is used. The fixing steel material was lifted by and suspended in a vertical position.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、従来の
吊り起こし方法では、重量棒状体の重量支持のために二
台のクレーンが、そして、定着用鋼材の吊り下げのため
に一台のクレーンがそれぞれ必要で、合計三台のクレー
ンならびに操縦者が必要で、機材および人的な面で高価
になり、経済性が低い欠点があった。However, in the conventional hoisting and raising method, two cranes are used to support the weight of the weight rod and one crane is used to suspend the fixing steel material. It was necessary, a total of three cranes and an operator were required, which was expensive in terms of equipment and personnel, and had the disadvantage of low economic efficiency.
【0004】本発明は、このような事情に鑑みてなされ
たものであって、定着用鋼材に曲げ応力を作用させない
状態で重量長尺物を吊り起こすものでありながら、使用
するクレーン台数を少なくして吊り起こし作業を行うこ
とができるようにすることを目的とする。The present invention has been made in view of the above circumstances, and is capable of hoisting a long and heavy object in a state in which bending stress is not applied to the fixing steel material, but the number of cranes used is small. The purpose is to be able to lift and raise the work.
【0005】[0005]
【課題を解決するための手段】本発明は、上述のような
目的を達成するために、長さが10m以上の重量棒状体の
長手方向の少なくとも一端側に定着用鋼材を突設した重
量長尺物の吊り起こし方法において、第1のクレーンの
フックを連結可能な滑車に通した第1の玉掛けワイヤー
の両端それぞれを、重量棒状体の長手方向両端側それぞ
れに一体的に取り付けられた吊り部材それぞれに連結解
除可能に連結するとともに、定着用鋼材の先端側に第2
の玉掛けワイヤーを連結した後、滑車に第1のクレーン
のフックを連結するとともに、第2の玉掛けワイヤーに
第2のクレーンのフックを連結し、第1のクレーンによ
って重量棒状体を横倒れ姿勢で吊り上げてから、第2の
クレーンにより定着用鋼材の先端側を引き上げ、重量棒
状体を鉛直姿勢に吊り起こすことを特徴としている。In order to achieve the above-mentioned object, the present invention has a weight length in which a fixing steel material is projected on at least one end side in the longitudinal direction of a weight rod having a length of 10 m or more. In the method for hoisting a scale, a hanging member in which both ends of a first sling wire, which is passed through a pulley to which a hook of a first crane can be connected, are integrally attached to both longitudinal ends of a weight rod. Releasably connect to each of them, and attach a second
After connecting the sling wire of, the hook of the first crane is connected to the pulley, the hook of the second crane is connected to the second sling wire, and the weight rod is tilted sideways by the first crane. It is characterized in that, after being lifted, the tip end side of the fixing steel material is lifted by the second crane to lift the weight rod-shaped body in a vertical posture.
【0006】[0006]
【作用】本発明の重量長尺物の吊り起こし方法の構成に
よれば、第1のクレーンにより、滑車と第1の玉掛けワ
イヤーとを介して重量棒状体の重量を支持しながら、第
2のクレーンで定着用鋼材の先端側を引き上げて、その
姿勢を代えるに足る力を与えながら、重量棒状体を横倒
れ姿勢から鉛直姿勢に変更し、鉛直姿勢に近い姿勢にな
った状態で第2のクレーンで引き上げ、鉛直姿勢に吊り
起こすことができる。According to the construction of the method for hoisting and raising a heavy long object of the present invention, while the weight of the heavy rod-shaped body is supported by the first crane through the pulley and the first sling wire, While lifting the tip of the fixing steel with a crane and applying sufficient force to change the posture, change the weight bar from the sideways posture to the vertical posture. Can be lifted with a crane and hung in a vertical position.
【0007】[0007]
【実施例】次に、本発明の実施例を図面に基づいて詳細
に説明する。Embodiments of the present invention will now be described in detail with reference to the drawings.
【0008】図1は、本発明に係る重量長尺物の吊り起
こし方法を実施する現場におけるガイドトレンチの配置
を示す全体概略平面図であり、敷地1内に、躯体を支持
する連続壁支持杭を構築するためのガイドトレンチ2が
設置されている。FIG. 1 is an overall schematic plan view showing an arrangement of guide trenches at a site for carrying out a method of hoisting a heavy long object according to the present invention. A continuous wall support pile for supporting a frame is provided in a site 1. A guide trench 2 for constructing is constructed.
【0009】ガイドトレンチ2に沿って、先行ユニット
3と後行ユニット4とが交互に構築され、後行ユニット
4内の中央箇所にPC構真柱5が備えられている。PC
構真柱5は、長さが約17mの重量棒状体6の長手方向両
端側それぞれに、定着用鋼材としてのH形鋼7を突設し
て構成されている。The preceding unit 3 and the succeeding unit 4 are alternately constructed along the guide trench 2, and the PC structure true column 5 is provided at the central portion in the succeeding unit 4. PC
The true column 5 is constructed by projecting H-shaped steel 7 as a fixing steel material on both ends in the longitudinal direction of a weight rod 6 having a length of about 17 m.
【0010】次に、上記重量長尺物としてのPC構真柱
5の吊り起こし方法について、図面を用いて説明する。Next, a method of hoisting the PC structure column 5 as the above-described long and heavy object will be described with reference to the drawings.
【0011】先ず、図2の側面図に示すように、重量棒
状体6の長手方向両端側それぞれに、端部から等距離離
れた位置に、第1の吊り部材8を一体的に取り付けると
ともに、H形鋼7,7の一方のフランジの先端側に第2
の吊り部材9を一体的に取り付ける。これらの第1およ
び第2の吊り部材8,8、9,9それぞれは、PC構真
柱5の製作時に予め取り付けておくものであっても良
い。First, as shown in the side view of FIG. 2, a first suspending member 8 is integrally attached to each of both longitudinal ends of the weight rod 6 at positions equidistant from the end. Second on the tip side of one flange of H-section steel 7,7
The hanging member 9 is integrally attached. Each of these first and second suspension members 8, 8, 9, 9 may be attached in advance when the PC structural column 5 is manufactured.
【0012】次いで、図3の側面図に示すように、第1
の吊り部材8,8それぞれに第1の玉掛けワイヤー10
の両端をシャックル11を介して連結するとともに、第
2の吊り部材9,9に第2の玉掛けワイヤー12を連結
する。Then, as shown in the side view of FIG.
First sling wire 10 on each of the hanging members 8 and 8
The both ends of are connected via shackles 11, and the second sling wires 12 are connected to the second suspension members 9, 9.
【0013】第1の玉掛けワイヤー10は滑車13に通
され、その滑車13に第1のクレーン(図示せず)のフ
ック14を連結するとともに、前記第2の玉掛けワイヤ
ー12に第2のクレーン(図示せず)のフック15を連
結する。The first sling wire 10 is passed through a pulley 13, a hook 14 of a first crane (not shown) is connected to the pulley 13, and the second sling wire 12 is connected to a second crane (not shown). The hook 15 (not shown) is connected.
【0014】シャックル11は、図4の(a)の要部の
縦断面図、および、図4の(b)の要部の平面図それぞ
れに示すように、前記第1の吊り部材8を嵌入するU字
状のシャックル本体16の開口とは反対側に第1の玉掛
けワイヤー10を連結する連結部17が設けられ、一
方、開口側に連結ピン18が摺動可能に設けられるとと
もに、その連結ピン18が連結位置にある状態で固定す
るロックピン19が設けられ、かつ、連結ピン18およ
びロックピン19それぞれに操作ワイヤー20,21が
連結され、第1の吊り部材8に対する連結解除操作を遠
くからでも行うことができるように構成されている。The shackle 11 is fitted with the first suspending member 8 as shown in the longitudinal sectional view of the main part of FIG. 4A and the plan view of the main part of FIG. 4B. A connecting portion 17 for connecting the first sling wire 10 is provided on the side opposite to the opening of the U-shaped shackle body 16, and a connecting pin 18 is slidably provided on the opening side and the connection is made. A lock pin 19 for fixing the pin 18 in the connecting position is provided, and the operation wires 20 and 21 are connected to the connection pin 18 and the lock pin 19, respectively, so that the operation for releasing the connection to the first hanging member 8 can be performed far. It is configured so that it can be performed even from.
【0015】詳述すれば、連結ピン18の頭部18aが
筒体22に摺動可能に内嵌され、かつ、頭部18aに係
止ボルト23が取り付けられるとともに、その係止ボル
ト23の移動を案内するガイド溝24が筒体22に形成
され、連結ピン18の回転を阻止して、第1の吊り部材
8に対して係脱する方向に摺動のみできるように構成さ
れている。また、ガイド溝24のシャックル本体16側
端部に嵌合用凹部25が設けられ、連結ピン18が連結
位置にある状態で係止ボルト23が嵌合用凹部25に強
制的に嵌合され、連結ピン18を連結位置に維持できる
ように構成されている。連結解除時には、その嵌合力に
抗して連結ピン18を操作する。More specifically, the head portion 18a of the connecting pin 18 is slidably fitted in the cylindrical body 22, the locking bolt 23 is attached to the head portion 18a, and the locking bolt 23 moves. A guide groove 24 is formed in the tubular body 22 to guide the rotation of the connecting pin 18 so that the connecting pin 18 can only slide in the direction in which the first hanging member 8 is disengaged. A fitting recess 25 is provided at the end of the guide groove 24 on the shackle body 16 side, and the locking bolt 23 is forcibly fitted into the fitting recess 25 with the connecting pin 18 in the connecting position. It is configured so that 18 can be maintained in the connected position. When the connection is released, the connection pin 18 is operated against the fitting force.
【0016】前記筒体22とは反対側に、ロックピン1
9を摺動可能に内嵌するケーシング26が設けられると
ともに、そのケーシング26内に、ロックピン19を固
定側に変位するように付勢する圧縮コイルスプリング2
7が設けられ、その圧縮コイルスプリング27の付勢力
に抗して固定を解除できるように構成されている。The lock pin 1 is provided on the side opposite to the cylindrical body 22.
A casing 26 into which the 9 is slidably fitted is provided, and the compression coil spring 2 for urging the lock pin 19 so as to displace the lock pin 19 in the casing 26 is provided.
7 is provided so that the fixation can be released against the biasing force of the compression coil spring 27.
【0017】上記構成により、初期に強制的にシャック
ル11を第1の吊り部材8,8に連結しておきながら、
第1および第2の操作ワイヤー20,21を操作するこ
とにより、連結解除操作を遠く離れた箇所から行うこと
ができるように構成されている。With the above structure, while the shackle 11 is forcibly connected to the first suspension members 8 and 8 in the initial stage,
By operating the first and second operation wires 20 and 21, the connection release operation can be performed from a distant place.
【0018】滑車13は、図5の(a)の正面図、およ
び、図5の(b)の側面図それぞれに示すように、一対
のブラケット28,28間に回転のみ可能に設けられ、
かつ、両ブラケット28,28の対向間隔が、シャック
ル本体16の厚みよりも小になるように設定され、シャ
ックル11,11を第1の吊り部材8,8から外した状
態でも第1の玉掛けワイヤー10が外れてしまわないよ
うに構成されている。図中、29は、第1のクレーンの
フック14と第1の玉掛けワイヤー10との接触を防止
する規制ピンを示し、また、30は、第1の玉掛けワイ
ヤー10の巻き付きを防止する巻き付き防止ピンを示し
ている。As shown in the front view of FIG. 5A and the side view of FIG. 5B, the pulley 13 is rotatably provided between the pair of brackets 28, 28.
Also, the opposing distance between the two brackets 28, 28 is set to be smaller than the thickness of the shackle body 16, and the first sling wire is removed even when the shackle 11, 11 is removed from the first hanging member 8, 8. 10 is configured so as not to come off. In the figure, 29 indicates a restriction pin that prevents the hook 14 of the first crane and the first sling wire 10 from coming into contact with each other, and 30 indicates a winding prevention pin that prevents the first sling wire 10 from winding. Is shown.
【0019】そして、前述した、第1および第2のクレ
ーンのフック14,15を連結した後、図6の側面図に
示すように、第1のクレーンにより、PC構真柱5を吊
り上げるとともに、第2のクレーンにより、H形鋼7に
引き上げ力を付与し、横倒れ姿勢から鉛直姿勢に近い姿
勢に変更していき、しかる後に、図7の側面図に示すよ
うに、第1のクレーンによる吊り上げ力を弱め、第2の
クレーンによりPC構真柱5を鉛直姿勢で吊り下げる。After connecting the hooks 14 and 15 of the first and second cranes described above, as shown in the side view of FIG. 6, the PC crane column 5 is lifted by the first crane, and A pulling force is applied to the H-section steel 7 by the second crane to change the sideways posture to a posture close to the vertical posture, and thereafter, as shown in the side view of FIG. 7, the first crane is used. The hoisting force is weakened, and the PC structure column 5 is hung vertically by the second crane.
【0020】その後、図8の側面図に示すように、第1
および第2の操作ワイヤー20,21(この図において
は省略している。図4を参照)を操作し、シャックル1
1,11と第1の吊り部材8,8との連結を解除して第
1の玉掛けワイヤー10を重量棒状体6から外し、PC
構真柱5の一連の吊り起こしを完了する。Then, as shown in the side view of FIG.
Then, the shackle 1 is operated by operating the second operation wires 20 and 21 (omitted in this figure; see FIG. 4).
1 and 11 and the first suspension members 8 and 8 are released from the connection, the first sling wire 10 is removed from the weight rod-shaped body 6, and
A series of hoisting of the true column 5 is completed.
【0021】本発明は、上述のようなPC構真柱5の吊
り起こしに限らず、例えば、同種形状の橋脚など、要す
るに、長さが10m以上の重量棒状体の長手方向の少なく
とも一端側に定着用鋼材を突設した重量長尺物を吊り起
こす場合に適用できる。The present invention is not limited to the hoisting and raising of the PC structure post 5 as described above, and for example, a bridge pier of the same type, that is, at least one end side in the longitudinal direction of a weight rod-shaped body having a length of 10 m or more. It can be applied when suspending heavy long objects with fixing steel materials protruding.
【0022】[0022]
【発明の効果】以上説明したように、本発明の重量長尺
物の吊り起こし方法によれば、第1のクレーンにより、
滑車と第1の玉掛けワイヤーとを介して重量棒状体の重
量を支持するから、重量棒状体を横倒れ姿勢で吊り上げ
るときに、定着用鋼材に吊り上げのための力を掛けなく
ても済み、かつ、定着用鋼材に対しては、第2のクレー
ンにより定着用鋼材の先端側を引き上げて、その姿勢を
代えるに足る力を与えるだけで良く、定着用鋼材に曲げ
応力を作用させない状態で鉛直姿勢に吊り起こすことが
できる。しかも、第1および第2のクレーンという2台
のクレーンを使用するだけで済み、従来3台使用してい
たのに比べ、使用するクレーン台数および操縦者の人数
を少なくでき、全体として、定着用鋼材に曲げ応力を作
用させない状態で重量長尺物を吊り起こすものでありな
がら、使用するクレーン台数を少なくして吊り起こし作
業を行うことができ、経済性を向上できるようになっ
た。As described above, according to the hoisting and raising method for heavy and long objects of the present invention, by the first crane,
Since the weight of the weight rod is supported via the pulley and the first sling wire, when the weight rod is hoisted in a sideways posture, it is not necessary to apply a hoisting force to the fixing steel material, and With respect to the fixing steel material, it suffices to pull up the tip side of the fixing steel material with a second crane and give a sufficient force to change the posture, and the vertical posture without applying bending stress to the fixing steel material. You can hang it up. Moreover, it is only necessary to use two cranes, the first and second cranes, and the number of cranes to be used and the number of operators can be reduced compared to the conventional three cranes used. Even though a long and heavy object is hoisted without applying bending stress to the steel material, the hoisting work can be carried out by reducing the number of cranes to be used, and the economical efficiency can be improved.
【図1】本発明に係る重量長尺物の吊り起こし方法を実
施する現場におけるガイドトレンチの配置を示す全体概
略平面図である。FIG. 1 is an overall schematic plan view showing an arrangement of guide trenches at a site where a method of hoisting a heavy long object according to the present invention is carried out.
【図2】側面図である。FIG. 2 is a side view.
【図3】側面図である。FIG. 3 is a side view.
【図4】(a)はシャックルを示す要部の縦断面図、
(b)は要部の平面図である。FIG. 4A is a vertical cross-sectional view of a main part showing a shackle,
(B) is a plan view of a main part.
【図5】(a)は滑車の正面図、(b)は滑車の側面図
である。5A is a front view of the pulley, and FIG. 5B is a side view of the pulley.
【図6】側面図である。FIG. 6 is a side view.
【図7】側面図である。FIG. 7 is a side view.
【図8】側面図である。FIG. 8 is a side view.
5…重量長尺物としてのPC構真柱 6…重量棒状体 7…定着用鋼材としてのH形鋼 8…第1の吊り部材 10…第1の玉掛けワイヤー 12…第2の玉掛けワイヤー 13…滑車 14…第1のクレーンのフック 15…第2のクレーンのフック 5 ... PC structure true pillar as a heavy long object 6 ... Heavy rod-shaped body 7 ... H-shaped steel as fixing steel material 8 ... First hanging member 10 ... First sling wire 12 ... Second sling wire 13 ... Pulley 14 ... Hook of first crane 15 ... Hook of second crane
───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 E04G 21/14 (72)発明者 原田 敏雄 大阪市中央区本町四丁目1番13号 株式会 社竹中工務店大阪本店内 (72)発明者 原 博 大阪市中央区本町四丁目1番13号 株式会 社竹中工務店大阪本店内─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification code Internal reference number FI Technical display location E04G 21/14 (72) Inventor Toshio Harada 4-1-1 Hommachi, Chuo-ku, Osaka Stock companies Takenaka Corporation Osaka Main Store (72) Inventor Hiroshi Hara 4-1-1 Hommachi, Chuo-ku, Osaka City Stock Company Takenaka Corporation Osaka Main Store
Claims (1)
の少なくとも一端側に定着用鋼材を突設した重量長尺物
の吊り起こし方法であって、 第1のクレーンのフックを連結可能な滑車に通した第1
の玉掛けワイヤーの両端それぞれを、前記重量棒状体の
長手方向両端側それぞれに一体的に取り付けられた吊り
部材それぞれに連結解除可能に連結するとともに、前記
定着用鋼材の先端側に第2の玉掛けワイヤーを連結した
後、前記滑車に前記第1のクレーンのフックを連結する
とともに、前記第2の玉掛けワイヤーに第2のクレーン
のフックを連結し、前記第1のクレーンによって前記重
量棒状体を横倒れ姿勢で吊り上げてから、前記第2のク
レーンにより前記定着用鋼材の先端側を引き上げ、前記
重量棒状体を鉛直姿勢に吊り起こすことを特徴とする重
量長尺物の吊り起こし方法。1. A method for hoisting a heavy long object in which a fixing steel material is projected on at least one end side in the longitudinal direction of a weight rod having a length of 10 m or more, and a hook of a first crane can be connected. No. 1 passing through a pulley
Each end of the sling wire is releasably connected to each of the suspension members integrally attached to both ends of the weight rod in the longitudinal direction, and a second sling wire is attached to the tip end of the fixing steel material. After connecting the hook of the first crane to the pulley, the hook of the second crane is connected to the second sling wire, and the weight rod is laid down sideways by the first crane. A method for hoisting a heavy long object, comprising hoisting in a posture and then hoisting the weight rod in a vertical posture by pulling up a tip end side of the fixing steel material by the second crane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP27757693A JP3199539B2 (en) | 1993-10-07 | 1993-10-07 | How to lift heavy objects |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP27757693A JP3199539B2 (en) | 1993-10-07 | 1993-10-07 | How to lift heavy objects |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH07101670A true JPH07101670A (en) | 1995-04-18 |
JP3199539B2 JP3199539B2 (en) | 2001-08-20 |
Family
ID=17585407
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP27757693A Expired - Fee Related JP3199539B2 (en) | 1993-10-07 | 1993-10-07 | How to lift heavy objects |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3199539B2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102826450A (en) * | 2012-08-31 | 2012-12-19 | 江苏丹帝龙重工有限公司 | Turnover device of pulley of heavy steel structural part |
CN103043526A (en) * | 2012-12-17 | 2013-04-17 | 中国一冶集团有限公司 | Integral hoisting device and method for super-long steel reinforcement cage of underground continuous wall |
CN103072899A (en) * | 2013-01-06 | 2013-05-01 | 中国海洋石油总公司 | Hoisting technology for ultra-large type cylinder block |
CN112978342A (en) * | 2019-12-12 | 2021-06-18 | 沈阳新松机器人自动化股份有限公司 | Gravity clamping and transferring device for shaft-rod workpieces |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101357736B (en) * | 2008-09-03 | 2011-12-28 | 沪东中华造船(集团)有限公司 | Method for hoisting and turning over large articles using frame crane |
KR101795162B1 (en) * | 2015-10-30 | 2017-11-07 | 배헌중 | Liquid level control modules and apparatus including the same |
-
1993
- 1993-10-07 JP JP27757693A patent/JP3199539B2/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102826450A (en) * | 2012-08-31 | 2012-12-19 | 江苏丹帝龙重工有限公司 | Turnover device of pulley of heavy steel structural part |
CN103043526A (en) * | 2012-12-17 | 2013-04-17 | 中国一冶集团有限公司 | Integral hoisting device and method for super-long steel reinforcement cage of underground continuous wall |
CN103072899A (en) * | 2013-01-06 | 2013-05-01 | 中国海洋石油总公司 | Hoisting technology for ultra-large type cylinder block |
CN112978342A (en) * | 2019-12-12 | 2021-06-18 | 沈阳新松机器人自动化股份有限公司 | Gravity clamping and transferring device for shaft-rod workpieces |
Also Published As
Publication number | Publication date |
---|---|
JP3199539B2 (en) | 2001-08-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH07101670A (en) | Hanging and raising-up method for heavyweight long size material | |
JP2531539Y2 (en) | Long lifting equipment | |
JPH09302919A (en) | Transfer platform for columnar body | |
JP2756466B2 (en) | Method for controlling lifting posture of curved plate and hanging tool for curved plate | |
CN111252683A (en) | Bridge deck crane and application method thereof applied to bridge dismantling | |
JPH03192093A (en) | Suspension attitude control for curved plate and suspending tool for curved plate | |
CN210528240U (en) | Lifting appliance for prefabricated part | |
JPH092767A (en) | Lifting method for escalator truss | |
CN219906712U (en) | Box overturning lifting hook | |
JPH0713999U (en) | Hanging jig for plate materials | |
JPH08310783A (en) | Concrete caisson hoisting tool | |
JPH0444568A (en) | Hanging of reinforced steel rods and its device | |
CN211169608U (en) | Hanging basket prismatic sheet hoisting device | |
CN2120840U (en) | Bridging support lift scaffold | |
JPH05105386A (en) | Automatic slinging device for roll | |
CN116425036A (en) | Segment grabbing equipment and segment grabbing method thereof | |
CN210655792U (en) | Auxiliary device is hung with reinforcing bar is erect | |
JPH072549Y2 (en) | Crane lifting equipment | |
JPH072483A (en) | Hoisting picture for concrete secondary product and reversing method or concrete-made u-shaped groove using this hoisting fixture | |
JP3036563U (en) | Jib crane | |
JP2001302171A (en) | Hoisting jig | |
JP2905039B2 (en) | Long pipe hanging method and its equipment | |
JPH07149498A (en) | Counterweight mounting and demounting device for pile driver | |
JPH0986867A (en) | Hanger for construction of brace block | |
CN117673967A (en) | Method for laying cable in vertical shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080615 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 8 Free format text: PAYMENT UNTIL: 20090615 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100615 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100615 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 10 Free format text: PAYMENT UNTIL: 20110615 |
|
LAPS | Cancellation because of no payment of annual fees |