JPH0693716A - Portable passageway for construction work - Google Patents

Portable passageway for construction work

Info

Publication number
JPH0693716A
JPH0693716A JP4255495A JP25549592A JPH0693716A JP H0693716 A JPH0693716 A JP H0693716A JP 4255495 A JP4255495 A JP 4255495A JP 25549592 A JP25549592 A JP 25549592A JP H0693716 A JPH0693716 A JP H0693716A
Authority
JP
Japan
Prior art keywords
corridor
main
walkway
sub
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4255495A
Other languages
Japanese (ja)
Other versions
JPH0658003B2 (en
Inventor
Takahiro Enoki
孝洋 榎
Takashi Hashida
隆 橋田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nisso Sangyo Co Ltd
Original Assignee
Nisso Sangyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nisso Sangyo Co Ltd filed Critical Nisso Sangyo Co Ltd
Priority to JP4255495A priority Critical patent/JPH0658003B2/en
Publication of JPH0693716A publication Critical patent/JPH0693716A/en
Publication of JPH0658003B2 publication Critical patent/JPH0658003B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G2001/157Extensible platforms, e.g. telescopic platforms

Abstract

PURPOSE:To provide a unitized portable passageway which takes the form of a landing pier and which can be easily installed by the effective use of a space in a construction site, freely extended as a work passage of the construction site, and connected together so as to be usable as a passage or scaffold continuing in any direction. CONSTITUTION:A passageway, erected or suspended between the horizontal supports of beams, etc., to be assembled and enabling workers to walk or perform various work thereon, comprises a main passageway 10 and an auxiliary passageway 20 being held along one or both ends of the main passageway while its length is freely adjusted. The main and auxiliary passageways comprise a pair of frame bodies and scaffolding boards 12, 22 collectively provided between the insides of the frame bodies, and collapsible handrails are attached to the frame bodies of the main and auxiliary passageways. Connecting fittings 30 are mounted on an end portion of the frame body of the auxiliary passageway, and a brace 12a is provided on the upper surface of each scaffolding board.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、例えば、船体建造作業
用、その他工事に用いる可搬式歩廊に関するもので、詳
しくは、任意の場所に任意の接続状態で配設できて作業
員の通路あるいは作業用足場として機能しうる工事用可
搬式歩廊に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a portable walkway used for, for example, hull construction work and other works, and more specifically, it can be installed at any place in any connected state to provide a passageway for workers. A portable walkway for construction that can function as a work scaffold.

【0002】[0002]

【従来の技術】船舶あるいは建物等の被構築物の構築に
あっては、所謂作業足場の確保や作業者の歩行路確保の
ために船腹に突出するピースや建物の梁材等の水平支持
材間に歩廊が架設されたりあるいは吊設されたりする。
2. Description of the Related Art In constructing a building such as a ship or a building, in order to secure a so-called work scaffold and a walking path for workers, a space between a piece of a projecting piece on the side of a ship and a horizontal support member such as a beam of a building. A corridor may be erected or suspended in the.

【0003】この歩廊は、例えば、図1に示すように、
水平支持材間の間隔より長い一対の支持桁1と、この支
持桁1間に適宜間隔で架け渡される複数の単管パイプ2
と、この単管パイプ2上に載置される複数の長尺足場板
3と、支持桁1に下端が固着されて上方に突設されるパ
イプ等からなる複数の支柱4と、この支柱4にクランプ
5利用で固着され支柱4を頭継ぎ状に連結する手摺パイ
プ6とからなるものである。
This corridor is, for example, as shown in FIG.
A pair of support girders 1 longer than the space between the horizontal support members, and a plurality of single-pipe pipes 2 spanning the support girders 1 at appropriate intervals.
A plurality of long scaffolding plates 3 placed on the single-pipe pipe 2, a plurality of columns 4 including pipes or the like having their lower ends fixed to the support girder 1 and protruding upward, and the columns 4 And a handrail pipe 6 which is fixed by using a clamp 5 and connects the stanchions 4 in a head-jointed shape.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、歩廊を
架設等する水平支持材間の距離は、一定でなく、長かっ
たり短かったりするので、歩廊を構成する支持桁1や足
場板3は少なくとも水平支持材間距離より大なるものと
しなければならないとともに多種類の長さの足場板3や
支持桁1部材を用意しなければならない。
However, since the distance between the horizontal support members for constructing the corridor is not constant and is long or short, the supporting girders 1 and the scaffolding plates 3 forming the corridor are at least horizontally supported. It must be larger than the distance between the timbers, and the scaffolding plate 3 and the supporting girder 1 member of various lengths must be prepared.

【0005】従って、所望の歩廊を得るには、他の多数
のパイプ部材等と共に多種類の長さの足場板3及び桁部
材1を用意しなければならないとともに、それらを不使
用時に格納する場合に大きな収納スペースを必要とする
不経済性がある。
Therefore, in order to obtain a desired walkway, it is necessary to prepare scaffolding plates 3 and girder members 1 of various lengths along with a large number of other pipe members, and to store them when not in use. There is an uneconomical need for a large storage space.

【0006】また、これらの部材を利用して所望の歩廊
を組立てる際にも、長い足場板3や桁部材1の移動が不
便である上に、組立作業はいきおい高所作業となるため
慎重にしなければならず、その作業性は極めて悪くな
る。
Also, when assembling a desired corridor using these members, it is inconvenient to move the long scaffolding plate 3 and the girder member 1, and the assembling work becomes a work at a high place, so be careful. Must be done, and the workability becomes extremely poor.

【0007】さらに、一旦組立た歩廊はそのまま他の場
所へ盛り替えることは狭いスペースの工事現場では極め
て困難であり、盛替作業に多大の労力と時間を要する不
便もある。
Further, it is extremely difficult to transfer the assembled corridor to another place as it is at a construction site having a small space, and there is also an inconvenience that a large amount of labor and time are required for the refilling work.

【0008】即ち、足場板3等が長い為に1人で持ち運
ぶことは不可能であり、複数の作業者やクレーンで狭い
場所の中を盛り替える場合、長い足場板3が他の建材、
構築物に衝突し、又進行方向の向きもかえにくく、その
盛替作業が著しく面倒であった。
That is, since the scaffolding board 3 and the like are long, it is impossible for one person to carry it. When the operator relocates a narrow space with a plurality of workers or cranes, the long scaffolding board 3 is used for other building materials,
Since it collided with the structure and the direction of travel was difficult to change, the reassembling work was extremely troublesome.

【0009】そこで、本発明は、工事現場のスペースを
有効に利用し容易に設置でき、且つ工事現場の作業用通
路して自在に継ぎ足し、また、接続して縦横無尽に連続
的な通路もしくは足場として使用できるユニット化した
桟橋状の可搬式歩廊を提供することを目的としてなした
ものである。
Therefore, the present invention makes it possible to effectively use the space at the construction site and to easily install it, and to freely add and connect as a work passage at the construction site, and also to connect it continuously and vertically and horizontally to a continuous passage or scaffold. The purpose is to provide a pier-shaped portable walkway that can be used as a unit.

【0010】[0010]

【課題を解決するための手段】上記の目的を達成するた
め、本発明の構成は被構築物の梁材等の水平支持材間に
架設あるいは吊設されて作業者の歩行あるいは諸作業を
可能にする歩廊において、当該歩廊は主歩廊と主歩廊の
一端あるいは両端に長さ調節自在に副わせて保持した副
歩廊とからなり、主歩廊と副歩廊は一対の枠体と枠体の
内側間に連設された足場板とからなり、主歩廊と副歩廊
の枠体には折り畳み自在な手摺が附設され、副歩廊の枠
体端部には連結金物が取り付けられ、更に前記各足場板
の上面には滑り止めが設けられていることを特徴とする
ものである。
In order to achieve the above-mentioned object, the structure of the present invention is installed or suspended between horizontal support members such as beam members of a construction to enable a worker to walk or perform various works. In this corridor, the corridor consists of a main corridor and a sub corridor held at one or both ends of the main corridor with its length adjustable, and the main corridor and the sub corridor are located between a pair of frames and the inside of the frame. It consists of a series of scaffolding boards, foldable handrails are attached to the main corridor and sub corridor frames, connecting hardware is attached to the end of the sub corridor frame body, and the upper surface of each scaffold plate Is characterized by being provided with a non-slip.

【0011】[0011]

【作用】副歩廊を摺動させることにより歩廊の長さが調
整される。
[Function] The length of the corridor is adjusted by sliding the sub corridor.

【0012】歩廊は連結金物で他の歩廊と結合できる。The corridor can be connected to other corridors by connecting hardware.

【0013】滑り止めは足場板上を歩行する時の滑りを
防止する。
The anti-slip prevents slippage when walking on the scaffolding plate.

【0014】[0014]

【実施例】次に、本発明の工事用可搬式歩廊の実施例を
図面を参照して説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, an embodiment of a portable walkway for construction of the present invention will be described with reference to the drawings.

【0015】図2は本発明の歩廊の一例を示すもので、
主歩廊10と該主歩廊10の一端あるいは両端に出入自
在に組み込んである副歩廊20とから伸縮自在な歩廊と
し、且つ副歩廊20の先端に、他の歩廊への連結用とし
ての連結金物30が一体的に取り付けてあり、更に、上
記連結金物30には、必要に応じてフック状の引掛金物
40が取り付けられるようにしてある。
FIG. 2 shows an example of the walkway of the present invention.
A main corridor 10 and a sub-corridor 20 which is incorporated into one end or both ends of the main corridor 10 so as to be freely expandable and contractible, and at the tip of the sub-corridor 20, a connecting metal piece 30 for connecting to another corridor Is integrally attached, and further, a hook-shaped hooking metal article 40 is attached to the connecting metal article 30 if necessary.

【0016】尚、副歩廊20は、主歩廊10に出入自在
に支持され、自在に歩廊自体の長さを調整できるように
してあるが、伸縮できるものであれば、スライド式その
他任意の方式を採用してもよい。
The sub corridor 20 is supported in the main corridor 10 so that it can be freely moved in and out, and the length of the corridor itself can be freely adjusted. May be adopted.

【0017】詳述すると、主歩廊10は、一対の枠体た
る桁部材11と、この桁部材11の内側間に連設された
水平な足場板12とからなり、桁部材11は、図3にも
示すように、縦長の略函型形状を呈する型材からなり、
内部に副歩廊20の枠体たる桁部材21の挿通を可とす
ると共に上下、外側方向には抜けないように保持するも
のである。
More specifically, the main corridor 10 comprises a pair of frame girder members 11 and a horizontal scaffolding plate 12 connected between the insides of the girder members 11. The girder members 11 are shown in FIG. As shown in, it is composed of a vertical long box-shaped mold material,
The girder member 21, which is the frame body of the sub corridor 20, is allowed to be inserted therein, and is held so as not to come off in the vertical and outer directions.

【0018】また、この桁部材11は他の桁部材11と
互いに対向する内側に長手方向に沿う開口部Pを有して
おり、この開口部Pを介して副歩廊20の桁部材21に
固着される足場板22の挿通を可とするとともに、開口
部Pの上方縁部で対向する他桁部材11に向けて水平突
出する支持部11aを有しており、当該支持部11aに
足場板12を固着させている。
Further, this girder member 11 has an opening P along the longitudinal direction inside which faces other girder members 11, and is fixed to the girder member 21 of the sub corridor 20 through this opening P. The scaffolding plate 22 that can be inserted is provided, and the scaffolding plate 12 is provided on the supporting part 11a so as to horizontally project toward the other girder member 11 that faces the upper edge of the opening P. Is fixed.

【0019】そして、桁部材11の開口部Pの下方縁部
には立ち上り11bが形成されており、内部で摺動する
副歩廊20の桁部材21下端が主歩廊10の桁部材11
内から横方向及び上下方向に脱落するのを防止している
とともに、当該立ち上り11b間には脚固め部材13が
固着され桁部材11の下端間が拡開するのを防止してい
る。
A rise 11b is formed at the lower edge of the opening P of the girder member 11, and the lower end of the girder member 21 of the sub corridor 20 sliding inside is the girder member 11 of the main corridor 10.
The leg fixing member 13 is fixed between the rising portions 11b and the lower ends of the girder members 11 are prevented from widening, while preventing falling from the inside in the lateral direction and the vertical direction.

【0020】なお、桁部材11の外側上下端には補強部
11cが形成されているが、当該補強部11cは桁部材
11の外側胴部11dが充分な自己支持性を有する程に
形成されているものであるときは、その形状が省略され
ているものであっても良いこと勿論である。
Reinforcing parts 11c are formed on the outer upper and lower ends of the girder member 11, but the reinforcing parts 11c are formed so that the outer body part 11d of the girder member 11 has sufficient self-supporting property. Of course, when it is present, the shape may be omitted.

【0021】また、桁部材11の内側開口部Pの上方端
縁に突出形成させている支持部11aは、桁部材11の
内側胴部11bを補強するために突設されているもので
もあるが、この内側胴部11eが充分な自己支持性を有
する程度に形成されているものであれば、その突出形成
を省略しても良い。
Further, the support portion 11a projectingly formed on the upper end edge of the inner opening P of the girder member 11 is also provided so as to reinforce the inner body portion 11b of the girder member 11. As long as the inner body portion 11e is formed to have a sufficient self-supporting property, the protrusion formation may be omitted.

【0022】支持部11aの突出形成を省略する場合に
は、適宜の連結金具利用等により、足場板12を桁部材
11の内側に連絡することとすること勿論である。
Needless to say, when the projecting formation of the supporting portion 11a is omitted, the scaffolding plate 12 is connected to the inside of the girder member 11 by using an appropriate connecting metal fitting or the like.

【0023】主歩廊10の桁部材11に対しては足場板
12を図3のように内側に設けてもよいが、桁部材11
の上部又は下部に設けてもよい。
The scaffold plate 12 may be provided inside the girder member 11 of the main corridor 10 as shown in FIG.
It may be provided above or below.

【0024】更に副歩廊20の足場板22は主歩廊の足
場板12より下方に位置させてもよいが、図13のよう
に主歩廊10の桁部材11の内側下部に足場板12をボ
ルト、溶接等で固定し、又桁部材11内にスライドする
副歩廊20の桁部材21に設けた足場板22は開口部P
より水平方向に延長すると共に主歩廊10の足場板12
の上方に位置させるようにしてもよい。
Further, the scaffolding plate 22 of the sub corridor 20 may be located below the scaffolding plate 12 of the main corridor, but as shown in FIG. 13, the scaffolding plate 12 is bolted to the inside lower part of the girder member 11 of the main corridor 10. The scaffolding plate 22 provided on the girder member 21 of the sub corridor 20 that is fixed by welding or the like and slides into the girder member 11 has an opening P.
The scaffolding plate 12 of the main corridor 10 extends more horizontally.
It may be located above.

【0025】主歩廊10に敷設されている足場板12
は、図4(イ)にも示すように、適宜肉厚の金属板から
なるパネル状に形成されているもので、その上面には適
宜間隔でリブ状に突出形成された滑り止め12aを有し
ている。
A scaffolding plate 12 laid in the main corridor 10.
As shown in FIG. 4 (a), is formed in a panel shape made of a metal plate having an appropriate thickness, and has an anti-slip 12a formed in a rib shape on its upper surface at appropriate intervals. is doing.

【0026】この足場板12は、本実施例では金属製パ
ネル状とされているが、これに代えて、合板等からなる
長尺足場板とすることとしてもよい。
Although the scaffolding plate 12 is made of a metal panel in this embodiment, it may be replaced with a long scaffolding plate made of plywood or the like.

【0027】要は、主歩廊10に作業者のための歩行路
等となるものを確保することができるように構成されて
いれば足りるものである。
The point is that it is sufficient if the main corridor 10 is constructed so as to be able to secure a walkway or the like for workers.

【0028】従って、足場板12の上面に形成される滑
り止め12aも、実施例のリブ状に代えて、ドット状あ
るいは網目状に形成されているものであっても良いこと
勿論である。
Therefore, it is needless to say that the slip stopper 12a formed on the upper surface of the scaffold plate 12 may be formed in a dot shape or a mesh shape instead of the rib shape of the embodiment.

【0029】ただ、本実施例のようにリブ状に形成する
こととすれば、足場板12の上面の曲げに対する耐久力
を増大することができる利点がある。
However, if the ribs are formed as in this embodiment, there is an advantage that durability against bending of the upper surface of the scaffolding plate 12 can be increased.

【0030】なお、本発明における足場板12は、主歩
廊10の端部にあっては図4(ロ)に示すように一端上
面を傾斜面たる彎曲面部12bとし、段差を生じないよ
うに配慮した端部用足場板12cが利用され、桁部材1
1の長さに合せて足場板12,12cを敷設できるよう
に、図4(ハ)に示すような小巾の調整用足場板12d
が利用されるものである。
The scaffolding plate 12 according to the present invention has a curved curved surface portion 12b having an inclined surface at one end as shown in FIG. 4B at the end portion of the main corridor 10 so as not to cause a step. The scaffolding board 12c for the end part is used, and the girder member 1 is used.
The scaffolding board 12d having a narrow width as shown in FIG. 4C so that the scaffolding boards 12 and 12c can be laid according to the length of 1
Is used.

【0031】各足場板12間は、リベットあるいはボル
トナット利用によって連結され、足場板12と桁部材1
1との連結もリベットあるいはボルトナット利用による
ものである。
The scaffolding plates 12 are connected to each other by using rivets or bolts and nuts.
The connection with 1 is also made by using rivets or bolts and nuts.

【0032】次に、副歩廊20は一対の枠体たる桁部材
21と、この桁部材21間に敷設された足場板22とか
らなり、桁部材21を主歩廊10の桁部材11内で摺動
させることによって、主歩廊10に対し副歩廊20を出
し入れ自在とする。
Next, the sub corridor 20 is composed of a pair of girder members 21, which are frame bodies, and scaffold plates 22 laid between the girder members 21, and the girder members 21 are slidable within the girder members 11 of the main corridor 10. By moving it, the sub corridor 20 can be freely moved in and out of the main corridor 10.

【0033】この桁部材21は、図2および図3に示す
ように、全体にI型形状を呈する型材からなり、その中
央やや下方の内側面すなわち他方の桁部材21と互いに
対向する側面に突出形成された支持部21aを有してい
る。
As shown in FIGS. 2 and 3, the girder member 21 is made of a mold material having an I-shape as a whole, and protrudes to the inner side surface slightly below the center thereof, that is, to the side surfaces facing each other with the other girder member 21. It has the support part 21a formed.

【0034】この支持部21aには足場板22がリベッ
ト等によって固着される。
A scaffolding plate 22 is fixed to the supporting portion 21a with rivets or the like.

【0035】また、この桁部材21の外側上下端には補
強部21cが形成されているが、当該補強部21cは桁
部材21の中央軸部21fが充分な自己支持性を有する
程に形成されているものであるときは、その形成が省略
されているものであっても良いこと勿論である。
A reinforcing portion 21c is formed on the upper and lower outer ends of the girder member 21. The reinforcing portion 21c is formed so that the central shaft portion 21f of the girder member 21 has sufficient self-supporting property. Of course, when it is the same, its formation may be omitted.

【0036】ただ、この補強部21cは、その形成をす
ることとする場合には、当該桁部材21を主歩廊10の
桁部材11内に挿通するときのガイドとなり、その挿通
を確実なものとする利点を生じる。
However, when the reinforcing portion 21c is to be formed, it serves as a guide for inserting the girder member 21 into the girder member 11 of the main corridor 10 and ensures its insertion. The advantages of doing so arise.

【0037】この副歩廊20に敷設されている足場板2
2は、前記した主歩廊10に敷設されている足場板12
とその主要な構成において異なるところはない。
The scaffolding board 2 laid in the sub-corridor 20
2 is a scaffolding plate 12 laid in the main walkway 10 described above.
There is no difference in its main composition.

【0038】すなわち、その断面形状においては、図4
(イ)に示すところと異なるところもなく、上面にはリ
ブ状の滑り止め22aを有しており、ただ、その桁部材
21間長さが前記主歩廊10における足場板12の桁部
材11間長さよりやや長くなっているのみである。
That is, in its cross-sectional shape, FIG.
There is no difference from what is shown in (a), and the upper surface has rib-shaped anti-slip 22a, and the length between the girder members 21 is between the girder members 11 of the scaffolding plate 12 in the main corridor 10. It is only slightly longer than the length.

【0039】そして、副歩廊20の端部の足場板12と
して図4(ロ)に示すような彎曲面12bを有した足場
板12cは利用されず、図4(ハ)に示すような小巾の
調整用足場板22dのみが利用されることがある点で差
異があるのみである。
The scaffolding board 12c having the curved surface 12b as shown in FIG. 4B is not used as the scaffolding board 12 at the end of the sub corridor 20, and the small width as shown in FIG. The only difference is that only the adjustment scaffolding plate 22d may be used.

【0040】なお、副歩廊20の端部すなわち桁部材2
1の端部間には、断面波型のパイプ23が介装されてお
り、桁部材21間が横方向に拡開することを防止すると
ともに、当該副歩廊20を主歩廊10から所望長さだけ
引き出すときの把手として役割している(図4および図
3参照)。
The end of the auxiliary corridor 20, that is, the girder member 2
A corrugated pipe 23 is interposed between the end portions of 1 to prevent lateral expansion between the girder members 21 and to extend the auxiliary corridor 20 from the main corridor 10 to a desired length. It functions as a handle when pulling out only (see FIGS. 4 and 3).

【0041】従って、副歩廊20の桁部材21を主歩廊
10の桁部材内から引き出すようにすれば、歩廊全体の
長さが大きくなり、逆に、副歩廊20の桁部材21を主
歩廊10の桁部材11内に押し込むようにすれば、歩廊
全体の長さが短くなることとなり、歩廊を伸縮自在とし
得る。
Therefore, if the girder member 21 of the sub corridor 20 is pulled out from the girder member of the main corridor 10, the length of the entire corridor is increased, and conversely, the girder member 21 of the sub corridor 20 is moved to the main corridor 10. If it is pushed into the girder member 11, the overall length of the corridor will be shortened, and the corridor can be made flexible.

【0042】以上、主歩廊10、副歩廊20について詳
述したが、主歩廊10の桁部材11と副歩廊20の桁部
材21には、それぞれの長手方向に所定の間隔でピン挿
通用孔15と25が穿設されており、例えば、図3に示
す如くピン14を挿通するよあな場合は、主歩廊10と
副歩廊20の伸縮長さを適当に選定し、このとき重なり
合うピン挿通用孔15と25にピン14を挿通させれ
ば、所定の伸縮長さで主歩廊10と副歩廊20とを一体
に保持でき、副歩廊20が主歩廊10から抜け出ること
を防止することができる。
The main corridor 10 and the sub corridor 20 have been described above in detail. The girder members 11 of the main corridor 10 and the girder members 21 of the sub corridor 20 have pin insertion holes 15 at predetermined intervals in their longitudinal directions. And 25 are provided, for example, when the pin 14 is to be inserted as shown in FIG. 3, the extension lengths of the main corridor 10 and the sub corridor 20 are appropriately selected, and the pin insertion holes that overlap at this time are inserted. By inserting the pin 14 into 15 and 25, the main corridor 10 and the sub corridor 20 can be integrally held with a predetermined expansion and contraction length, and the sub corridor 20 can be prevented from coming out of the main corridor 10.

【0043】このピン14は、図3に示すように、先端
を折り曲げ自在にするとともに後端を屈曲し、桁部材1
1,21への貫通操作を容易にし得るとともに、その脱
落を防止し得るようになっているものである。
As shown in FIG. 3, the pin 14 has a front end that is bendable and a rear end that is bent so that the girder member 1
It is possible to facilitate the operation of penetrating into the parts 1 and 21 and prevent them from falling off.

【0044】また、歩廊を所望位置に位置決めする際に
は、その歩廊をクレーン等に吊持させたまま、副歩廊2
0を必要な長さだけ主歩廊10から引き出し、その長さ
を維持するように、上記ピン14を再度桁部材11,2
1を貫通させるこことする。
When the corridor is positioned at a desired position, the sub corridor 2 is kept suspended while being suspended by a crane or the like.
0 is pulled out from the main corridor 10 by a required length, and the pin 14 is again moved so that the length is maintained.
Let's penetrate 1 here.

【0045】また、上記ピン挿通用孔15,20は、吊
具のピンを挿入させて主歩廊10及び副歩廊20を吊り
上げ下げするときにも利用できる。
The pin insertion holes 15 and 20 can also be used when hoisting and lowering the main corridor 10 and the sub corridor 20 by inserting a pin of a suspender.

【0046】次に、連結金物30は、副歩廊20の枠体
端部に固定できるようになっていて、中央部より先端側
の肉厚をやや薄くして段差部31を形成し、且つ連結用
のボルト孔32が穿設してある。
Next, the connecting hardware 30 can be fixed to the end of the frame of the auxiliary corridor 20, and the step portion 31 is formed by forming the step portion 31 by making the thickness of the tip side slightly thinner than the center portion. A bolt hole 32 for use is formed.

【0047】したがって、連結金物30には、図2に示
すように引掛金物40をボルト孔32,41を利用し取
り付けて他の歩廊との接続を行うようにしてもよく、引
掛金物40を取り付けないで、後述する補助歩廊50に
連結させることもできる。
Therefore, as shown in FIG. 2, a hook 40 may be attached to the connecting hardware 30 by utilizing the bolt holes 32 and 41 to connect to another corridor, or the hook 40 may be attached. Alternatively, it may be connected to the auxiliary corridor 50 described later.

【0048】本発明の歩廊は、上記のように構成されて
いるので、工事現場での設置に際しては、所望の設置個
所へ搬送し、被建造物の水平支持部材上に、例えば、船
舶であれば船腹から突出するピース上に、また建物であ
れば梁材上等に主歩廊10あるいは副歩廊20の端部を
載せるとか、あるいは、本発明の歩廊同士を互いに接続
して上記梁材等に近接させて平行に設置する、等任意の
向きで設置して使用する。
Since the corridor of the present invention is constructed as described above, when it is installed on a construction site, it is transported to a desired installation location and placed on a horizontal support member of the building, for example, a ship. For example, the end of the main corridor 10 or the sub corridor 20 may be placed on a piece protruding from the side of the ship, or on a beam material in the case of a building, or the corridors of the present invention may be connected to each other to form the beam material. Install them in any direction, such as in close proximity and in parallel.

【0049】一例を示すと、図5に平面図で示すよう
に、本発明の歩廊Iを鉄骨柱a間にかけ渡されている鉄
骨梁bを利用して、J形A、Y形B、W形C、K形D、
並列形E、直交形F、直列形G、千鳥形H、等の如く互
いに接続して縦横無尽に任意の方向に配設し、作業員の
通路として、あるいは作業用の足場として利用に供する
ようにする。
As an example, as shown in the plan view of FIG. 5, the corridor I of the present invention is used to utilize J-shaped A, Y-shaped B and W by utilizing the steel beam b spanning between the steel columns a. Shape C, K shape D,
Parallel type E, orthogonal type F, series type G, zigzag type H, etc. are connected to each other and arranged vertically and horizontally in any direction so that they can be used as passages for workers or scaffolds for work. To

【0050】これにより作業者にとって工事個所への安
全な最短な通路として活用できると共に、作業個所に面
した足場として活用でき、作業の安全性、能率化を図る
ことができる。
As a result, it can be utilized as a safe and shortest passage to the construction site for the worker, and can also be utilized as a scaffold facing the work site, so that the safety and efficiency of the work can be achieved.

【0051】上記J形は、歩廊I同士を長手方向に連結
金物30を利用して接続すると共に、平面形状が三角形
状の補助歩廊50を用いて歩廊Iを接続したものであ
り、Y形Bは、補助歩廊50を介在させて3つの歩廊I
を放射状に接続し、各歩廊Iを互いに他の歩廊Iに接続
して配設した例である。
The above J-shape connects the corridors I to each other in the longitudinal direction using the connecting hardware 30, and also connects the corridors I using the auxiliary corridor 50 having a triangular planar shape. Is the three corridors I with the auxiliary corridor 50 interposed.
Are connected in a radial manner, and each corridor I is connected to another corridor I and arranged.

【0052】また、W形Cは、平面形状が梯形の補助歩
廊50aを用い、1つの歩廊Iに対して3つの歩廊Iを
接続し、これら3つの歩廊Iは鉄骨梁bや他の歩廊I等
を利用してそれぞれの端部を支持させるようにする例で
あり、K形Dは、上記I形Aの変形であって、三角形状
の補助歩廊50の各面積に歩廊Iを接続した例である。
Further, the W shape C uses the auxiliary corridor 50a having a trapezoidal planar shape, and connects three corridors I to one corridor I. These three corridors I are steel beams b and other corridors I. Is an example in which the respective end portions are supported by utilizing, for example, K shape D is a modification of the above I shape A, and an example in which the corridor I is connected to each area of the triangular auxiliary corridor 50 Is.

【0053】並列形Eは複数個の歩廊Iを並列するもの
であり、直交形Fは、互いに歩廊Iを直角方向に接続し
て配設するものであり、直列形Gは長手方向に歩廊Iを
接続するるものであり、また、千鳥形Hは、歩廊Iの端
と端が横方向に並ぶように配列する例である。
The parallel type E is for arranging a plurality of corridors I in parallel, the orthogonal type F is for connecting and arranging the corridors I at right angles to each other, and the series type G is for the corridor I in the longitudinal direction. The staggered shape H is an example in which the ends of the corridor I are arranged side by side in the lateral direction.

【0054】上記の直列形Gは、各歩廊Iに取り付けた
連結金物30同士を接続することにより長手方向に一体
的に接続することができる。
The above-mentioned series G can be integrally connected in the longitudinal direction by connecting the connecting metal pieces 30 attached to each corridor I.

【0055】直交形Fの詳細は、図6に示す如く、副歩
廊20の端に引掛金物40を取り付け、該引掛金物40
を、主歩廊10の桁部材11が副歩廊20の桁部材21
に上方から落し込むようにして引掛けて接続させるよう
にする。
As for the details of the orthogonal shape F, as shown in FIG. 6, a hook 40 is attached to the end of the sub corridor 20, and the hook 40 is attached.
The girder member 11 of the main corridor 10 corresponds to the girder member 21 of the sub corridor 20.
Hook it down from above and connect it.

【0056】J形A、Y形B、K形D等で用いる補助歩
廊50は、図7及び図8に示すとおりであり、図7に示
す補助歩廊50は、平面三角形状に形成した枠体の少な
くとも上面を閉塞し、枠体の連結金具51を三方の面に
は、それぞれボルト孔52を有するブラケットたる連結
金具51を突設した構成としてあり、また、図8に示す
補助歩廊50は、三方の面のうち1つの面のみに図7に
示す連結金具51に代えてブラケットたるフック状の引
掛金物53を突設した構成としてある。
The auxiliary corridor 50 used in the J-shape A, Y-shape B, K-shape D, etc. is as shown in FIGS. 7 and 8, and the auxiliary corridor 50 shown in FIG. 7 is a frame body formed in a planar triangular shape. At least the upper surface is closed, and the connecting fittings 51 of the frame are configured to have connecting fittings 51, which are brackets having bolt holes 52, on three sides, and the auxiliary corridor 50 shown in FIG. Instead of the connecting fitting 51 shown in FIG. 7, a hook-shaped hooking member 53, which is a bracket, projects from only one of the three surfaces.

【0057】したがって、Y形Bの場合は図7に示す構
成の補助歩廊50を用いて歩廊I同士を接続するように
し、J形AとかK形Dの場合は、図8に示す補助歩廊5
0を用い、図9に示す如く引掛金具53を被接続歩廊I
の桁部材に上方から嵌め込むことにより引掛け、他の歩
廊Iと補助歩廊50との接続は、連結金物30と連結金
具51とをボルト締めすることにより行うようにする。
Therefore, in the case of the Y-shape B, the auxiliary corridors 50 having the structure shown in FIG. 7 are used to connect the corridors I, and in the case of the J-shape A or the K-shape D, the auxiliary corridor 5 shown in FIG.
0, the hook metal fitting 53 is connected to the connected corridor I as shown in FIG.
The auxiliary corridor 50 is connected to the other corridor I by fitting it to the girder member from above by bolting the coupling hardware 30 and the coupling fitting 51.

【0058】また補助歩廊50aは、図10に一例を示
す如く平面台形状の枠体の少なくとも上面を閉塞し、4
つの面のいずれにもボルト孔52aを有する連結金具5
1aを突設させた構成を有し、例えば、Y形Bの変形と
して補助歩廊50に代えて用いW形とする場合に適して
いる。
The auxiliary corridor 50a closes at least the upper surface of a flat trapezoidal frame as shown in FIG.
Connecting fitting 5 having bolt holes 52a on both surfaces
It has a configuration in which 1a is provided in a projecting manner, and is suitable, for example, in the case of using a W shape instead of the auxiliary gallery 50 as a modification of the Y shape B.

【0059】図5において示したW形Cに適用する場合
は、補助歩廊50aの1つの面における連結金具51a
に代えてフック状の引掛金具53aを突設させた構成と
し、図11に示す如く基礎となる歩廊Iに対しては引掛
金具53aで引掛けて接続させるようにする。
When applied to the W shape C shown in FIG. 5, the connecting fitting 51a on one surface of the auxiliary corridor 50a.
Instead of this, a hook-shaped hooking metal fitting 53a is provided so as to project, and as shown in FIG. 11, a hooking metal fitting 53a is hooked and connected to the base gallery I.

【0060】このように各歩廊Iを縦方向に互いに継ぎ
足したり、横方向又は斜め方向に接続することにより、
工事現場における工事個所に近接して空間に桟橋状に自
在に且つ容易に架設することができ、必要な作業用に供
しうる。
In this way, by connecting the corridors I to each other in the vertical direction or connecting them in the horizontal or diagonal direction,
It can be freely and easily erected like a pier in the space near the construction site on the construction site, and can be used for necessary work.

【0061】この際、各歩廊の長さは、主歩廊10に対
し副歩廊20を適宜出入させて作業場所に応じた長さと
し、ピン14で止めておくようにする。
At this time, the length of each corridor is set to a length corresponding to the work place by appropriately moving the sub corridor 20 in and out of the main corridor 10 and stopping it with the pin 14.

【0062】また、図5において、歩廊Iを鉄骨梁b上
に載置させ固定させる場合は、図12のようにする。
Further, in FIG. 5, when the corridor I is placed and fixed on the steel beam b, the procedure is as shown in FIG.

【0063】すなわち、本発明に係る伸縮自在な歩廊の
端部が着脱自在に梁材等の水平支持材に定着された固定
装置60によって保持されているようにする。
That is, the end portion of the expandable corridor according to the present invention is detachably held by the fixing device 60 fixed to the horizontal supporting member such as the beam member.

【0064】この固定装置60は、水平支持材に着脱自
在に定着される複数のクランプ61と、このクランプ6
1に突設されたボルト62と、このボルト62に介装さ
れたナット62aによって固着されるプレート63と、
このプレート63に保持さされて副歩廊20の桁部材2
1下端を教示するクリップ64とからなる。
The fixing device 60 includes a plurality of clamps 61 that are detachably fixed to a horizontal support member and the clamps 6.
1, a bolt 62 projecting from the first plate 63, and a plate 63 fixed by a nut 62a interposed in the bolt 62,
The girder member 2 of the sub corridor 20 is held by the plate 63.
1 and a clip 64 for teaching the lower end.

【0065】そして、プレート63には、ボルト62を
挿通する際にその挿通個所を任意に選択できる長孔63
aが穿設されている。
In the plate 63, when the bolt 62 is inserted, the insertion portion can be arbitrarily selected to have a long hole 63.
a is provided.

【0066】また、この固定装置60は、副歩廊20の
一対の桁部材21のそれぞれの下端を水平支持材の上に
定着させるように構成されているとともに、各固定装置
60は、副歩廊20の横巾が予め設定されているので、
その巾に合うように両固定装置60間にスペーサ65を
配して一体的に構成されている。
Further, the fixing device 60 is constructed so that the lower ends of the pair of girder members 21 of the sub corridor 20 are fixed on the horizontal support member, and each fixing device 60 has the sub corridor 20. Since the width of is preset,
A spacer 65 is arranged between both fixing devices 60 so as to fit the width, and is integrally configured.

【0067】従って、上記した固定装置60を水平支持
材所定の位置に予め定着させておけば、クレーン等によ
って移動される歩廊の副歩廊20端部を簡単に水平支持
材上に固定することができることとなる。
Therefore, by fixing the above-mentioned fixing device 60 to a predetermined position of the horizontal support member, the end of the sub-corridor 20 of the corridor moved by a crane or the like can be easily fixed on the horizontal support member. It will be possible.

【0068】図14は、本発明の歩廊の取扱い時の例を
示すもので、主歩廊10や副歩廊20の各桁部材11,
21に穿設してピン挿通用孔15,25に吊具70をピ
ン71にて結着し、クレーン等にて吊り上げて所定場所
への搬送を行うようにした例を示す。
FIG. 14 shows an example of handling the corridor of the present invention, in which each girder member 11 of the main corridor 10 and the sub corridor 20 is handled.
An example will be shown in which the hoisting tool 70 is attached to the pin insertion holes 15 and 25 by the pin 71, and the hoisting tool 70 is hoisted by a crane or the like to be transported to a predetermined place.

【0069】又この吊具70とピン71を利用して主歩
廊10と副歩廊20を被建造物にワイヤーロープ又は鎖
出等で吊設したまま使用することも出来る。
Further, it is possible to use the hanging tool 70 and the pins 71 while the main corridor 10 and the sub corridor 20 are suspended from the building by a wire rope or a chain.

【0070】また、図15は、本発明の歩廊に、伸縮自
在な手摺を折り畳み自在に取り付けた例で、主歩廊10
側には手摺80を、また、副歩廊20側には手摺90を
それぞれ取り付けたものである。
FIG. 15 shows an example in which a stretchable handrail is foldably attached to the corridor of the present invention.
A handrail 80 is installed on the side, and a handrail 90 is installed on the side of the sub corridor 20.

【0071】主歩廊10に附設されている手摺80は、
図15および図16右方に示すように、その桁部材11
に下端が折り畳み自在に支持された支柱81と、この支
柱81に頭継ぎ状に保持された横材82とからなる。
The handrail 80 attached to the main corridor 10 is
As shown in the right side of FIGS. 15 and 16, the girder member 11
The column 81 includes a column 81 whose lower end is foldably supported, and a horizontal member 82 held by the column 81 in a head-jointed shape.

【0072】そして、副歩廊20に附設されている手摺
90も、図15および図16左方に示すように、その桁
部材21に下端が折り畳み自在に支持された支柱91
と、この支柱91に保持された横材92とからなり、こ
の手摺横材92はその端部を主歩廊10の手摺横材82
内に介装し出入自在に連結されているものである。
The handrail 90 attached to the auxiliary corridor 20 also has a pillar 91 whose lower end is foldably supported by the girder member 21, as shown in the left side of FIGS. 15 and 16.
And a cross member 92 held by the pillars 91. The handrail cross member 92 has its end portion a handrail cross member 82 of the main corridor 10.
It is inserted inside and is connected so that it can freely move in and out.

【0073】支柱81,91は、それぞれ桁部材11の
外側胴部14dあるいは桁部材21の中央軸部21fに
固着されたソケット83,93内にその下端部分が介装
されているもので、各ソケット83,93には縦方向に
形成された長孔83a,93aが穿設されており、当該
長孔83a,93a内には各支柱81,91の下端部分
に形成されたピン84,94が挿通している。
The columns 81 and 91 have lower end portions interposed in sockets 83 and 93 fixed to the outer body portion 14d of the girder member 11 or the central shaft portion 21f of the girder member 21, respectively. Long holes 83a, 93a formed in the vertical direction are formed in the sockets 83, 93, and pins 84, 94 formed at the lower end portions of the columns 81, 91 are formed in the long holes 83a, 93a. It is inserted.

【0074】従って、各支柱81,91をそのピン8
4,94が長孔83a,93aにそって上昇するように
引き上げると、各支柱81,91の下端がソケット8
3,93内から外れ、図17に示すように、各支柱8
1,91はそのピン84,94を中心として回転し歩廊
の長手方向に折り畳まれることとなる。
Therefore, each of the columns 81 and 91 is attached to its pin 8
4 and 94 are pulled up so as to rise along the long holes 83a and 93a, the lower ends of the columns 81 and 91 are located in the socket 8.
3, 93, disengaged, as shown in FIG.
1, 91 will rotate around the pins 84, 94 and will be folded in the longitudinal direction of the corridor.

【0075】この場合にソケット83,93に歩廊の長
手方向にピン84,94を通し、支柱81,91が歩廊
の幅方向に折り畳まれるようにしてもよい。
In this case, the pins 84 and 94 may be passed through the sockets 83 and 93 in the longitudinal direction of the corridor so that the columns 81 and 91 are folded in the width direction of the corridor.

【0076】また、横材82,92は、丸パイプからな
り、各支柱81,91に上下二段に枢着されたクランプ
85,95に保持されている。
The horizontal members 82 and 92 are made of round pipes and are held by clamps 85 and 95 pivotally mounted on the columns 81 and 91 in two stages, one above the other.

【0077】そして、このクランプ85,95は、それ
ぞれ蝶ボルト86,96を有しており、この蝶ボルト8
6,96を締め付けることによって、クランプ84,9
4内に挿通される横材82,92を定着させることとし
ている。
The clamps 85 and 95 have butterfly bolts 86 and 96, respectively.
Clamps 84,9 by tightening 6,96
The horizontal members 82 and 92 that are inserted into the inner wall 4 are fixed.

【0078】なお、主歩廊10の手摺80における手摺
横材82内には副歩廊20の手摺90における手摺横材
92が伸縮自在に挿通されることとなっており、横材9
2の外径は横材82の内径より小とされていること勿論
である。
A handrail cross member 92 of the handrail 90 of the sub corridor 20 is extendably inserted into the handrail cross member 82 of the handrail 80 of the main corridor 10.
Of course, the outer diameter of 2 is smaller than the inner diameter of the cross member 82.

【0079】従って、支柱81,91を一旦わずかに上
昇させその後この支柱81,91を折り畳むようにする
ときは、支柱81,91と横材82,92からなる格子
状の手摺80,90は、平行四辺形状を呈して歩廊の長
手方向に折り畳まれることとなる。
Therefore, when the columns 81 and 91 are raised slightly and then the columns 81 and 91 are folded, the grid-shaped handrails 80 and 90 composed of the columns 81 and 91 and the cross members 82 and 92 are It has a parallelogram shape and is folded in the longitudinal direction of the corridor.

【0080】また、副歩廊20の手摺90における支柱
91を折り畳む際に、その横材92はこれをクランプ9
5から引き抜き、支柱91と分離して折り畳むことがで
き、この場合に横材92は、主歩廊10の手摺80にお
ける横材82内に押し込んで収納しておくことができ
る。
When the pillar 91 of the handrail 90 of the sub corridor 20 is folded, the cross member 92 clamps this.
It can be pulled out from 5, and folded separately from the pillar 91. In this case, the cross member 92 can be pushed into the cross member 82 of the handrail 80 of the main corridor 10 and stored.

【0081】尚、各手摺80,90における支柱81,
91および横材82,92の断面形状は任意とすること
ができる。
The columns 81 of the handrails 80, 90,
The cross-sectional shapes of 91 and the cross members 82, 92 can be arbitrary.

【0082】要は、支柱81,91は、桁部材11,2
1に対して折り畳み自在に保持されていることであり、
その際横材82,92は各支柱81,91に回転自在に
保持されかつ一方の横材82と他方の横材92とは両者
間でその長さが伸縮自在となっていることである。
The point is that the columns 81 and 91 are the beam members 11 and 12.
It is held so as to be foldable with respect to 1.
At this time, the horizontal members 82, 92 are rotatably held by the columns 81, 91, and the length of the one horizontal member 82 and the other horizontal member 92 is expandable.

【0083】また、支柱81,91は、桁部材11,2
1に対してボルトナット利用によって着脱自在に保持さ
れるとともにナットを緩めることによって折り畳み自在
に保持されるとするものであってもよい。
Further, the columns 81 and 91 are composed of the girder members 11 and 12.
Alternatively, it may be detachably held by using a bolt and nut with respect to 1, and foldably held by loosening the nut.

【0084】また、上記した実施例の歩廊において、主
歩廊10の一端または両端に一段の副歩廊20を出入自
在に連設することとしているが、これに代えて、副歩廊
20を多段に伸縮自在に形成し、この多段の副歩廊20
を主歩廊10の一端または両端に出入自在に連設するこ
ととしてもよい。
In addition, in the corridor of the above-mentioned embodiment, one sub-corridor 20 is connected to one end or both ends of the main corridor so that it can freely move in and out, but instead of this, the sub-corridor 20 is expanded and contracted in multiple stages. Freely formed, this multi-tiered sub-corridor 20
May be connected to one end or both ends of the main corridor 10 so as to be freely accessible.

【0085】図18は、本発明の他の実施例に係る伸縮
自在な歩廊を示すものであるが、前記した実施例に係る
歩廊がその手摺を歩廊の長手方向に折り畳み自在に形成
したのに対し、本実施例に係る歩廊はその手摺を歩廊の
足場板上側短手方向に折り畳み自在となるように形成し
たことで差異がある。
FIG. 18 shows a retractable walkway according to another embodiment of the present invention. Although the walkway according to the above-mentioned embodiment has its handrails foldable in the longitudinal direction of the walkway. On the other hand, the walkway according to the present embodiment is different in that the handrails are formed so as to be foldable in the lateral direction above the scaffold plate of the walkway.

【0086】すなわち、この実施例に係る歩廊において
は、主歩廊10の両端に副歩廊20が出入自在に附設さ
れており、副歩廊20を主歩廊10から出し入れするこ
とによって歩廊全体の長さを伸縮できるようにしてい
る。
That is, in the corridor according to this embodiment, the sub-corridor 20 is attached to both ends of the main corridor 10 so that it can be freely moved in and out. I am able to expand and contract.

【0087】そして、主歩廊10は一対の桁部材11間
に足場板12を有し、副歩廊20は一対の桁部材21間
に足場板22を有し、その桁部材21が主歩廊10の桁
部材11内に出入自在に挿通されているものである。
The main corridor 10 has the scaffolding plate 12 between the pair of girder members 11, the sub corridor 20 has the scaffolding plate 22 between the pair of girder members 21, and the girder member 21 of the main corridor 10. It is inserted into and out of the beam member 11.

【0088】また、主歩廊10および副歩廊20にはそ
れぞれ手摺80および手摺90が附設されている。
A handrail 80 and a handrail 90 are attached to the main corridor 10 and the sub corridor 20, respectively.

【0089】手摺80は、下端が桁部材11に折り畳み
自在に附設された支柱81に横材82を一体的に連設し
て枠体を形成するように構成されてなり、支柱81の下
端は、桁部材11に固着されたソケット83内に介装さ
れているものである。
The handrail 80 is constructed so that a horizontal member 82 is integrally connected to a pillar 81 whose lower end is foldably attached to the girder member 11 to form a frame body, and the lower end of the pillar 81 is It is interposed in the socket 83 fixed to the girder member 11.

【0090】そして、支柱81の下端を上昇させるよう
に手摺80を上方に持ち上げると、これを主歩廊10の
足場板12上に載置するようにすなわち歩廊の短手方向
に折り畳むことが可能となるように支柱81下端および
ソケット83が形成されているものである。
When the handrail 80 is lifted upward so as to raise the lower end of the column 81, the handrail 80 can be placed on the scaffolding plate 12 of the main corridor 10, that is, can be folded in the lateral direction of the corridor. The lower end of the column 81 and the socket 83 are formed so that

【0091】また、副歩廊20の手摺90は、下端が桁
部材21に折り畳み自在に附設された支柱91にチエー
ン等の伸縮自在な横材92を保持させてなるものであ
り、支柱91の下端は桁部材21に固着されたソケット
83内に介装されている。
Further, the handrail 90 of the sub corridor 20 is formed by supporting a stretchable cross member 92 such as a chain on a pillar 91 having a lower end foldably attached to the girder member 21, and the lower end of the pillar 91. Is interposed in the socket 83 fixed to the girder member 21.

【0092】そして横材92は、一端が支柱91に係止
されるとともに他端が主歩廊10の手摺80端部に連結
されている。
One end of the horizontal member 92 is locked to the support post 91 and the other end is connected to the end of the handrail 80 of the main corridor 10.

【0093】従って、副歩廊20を主歩廊10の端部か
ら出入すれば、歩廊全体の長さを伸縮できることとな
り、手摺80を引き上げるようにすれば、主歩廊80の
主歩廊80の足場板12上に積み重ねるようにこれを折
り畳むことがでくることとなる。
Therefore, if the sub corridor 20 is moved in and out from the end of the main corridor 10, the length of the entire corridor can be expanded and contracted. If the handrail 80 is pulled up, the scaffolding plate 12 of the main corridor 80 of the main corridor 80 can be extended. It will be possible to fold it so that it stacks on top.

【0094】尚、本実施例における主歩廊10の手摺8
0の横材82は、それ自体に伸縮性がないものが利用さ
れているが、これに代えてチエーン等の伸縮性に富む横
材82としても良いこと勿論である。
Incidentally, the handrail 8 of the main corridor 10 in this embodiment.
As the horizontal member 82 of 0, a member having no elasticity is used, but of course, instead of this, a horizontal member 82 having a high elasticity such as a chain may be used.

【0095】また、支柱81,91はソケット83に対
して着脱自在としてもよく、その他、桁部材11,2
1、足場板12,22の構成については、前記した図2
に示す実施例における桁部材11,21、足場板12,
22の構成と同一である。
The columns 81 and 91 may be detachable from the socket 83.
1. Regarding the constitution of the scaffolding plates 12 and 22, FIG.
Girder members 11 and 21, scaffolding plate 12 in the embodiment shown in
22 has the same configuration.

【0096】図19は、本発明の別の取付例を示すもの
で前述においては桁部材11,21を梁等の上面に載置
させる場合を例示したが、梁bの上面に断面形状C型の
保持金物100を介してねじ桿等の固定取付金物101
を鉛直に建てて固定し、該固定取付金物101の外周に
は、ねじ102が刻設してあって、該ねじ102に螺合
させたナット103,104の間に、桁部材11,21
を載せるための支持金物105と桁部材11,21の下
端をつかむクランプ部材10bを位置させ、ナット10
4の締め付けにより桁部材11,21が固定保持される
ようにしたものである。
FIG. 19 shows another mounting example of the present invention. In the above description, the case where the girder members 11 and 21 are placed on the upper surface of the beam or the like is illustrated. Fixing hardware such as a threaded rod 101 through the holding hardware 100 of
Is vertically built and fixed, and a screw 102 is engraved on the outer periphery of the fixed mounting hardware 101. Between the nuts 103 and 104 screwed onto the screw 102, the girder members 11 and 21 are provided.
The support member 105 for mounting the clamp and the clamp member 10b for grasping the lower ends of the girder members 11 and 21 are positioned, and the nut 10
The girder members 11 and 21 are fixedly held by tightening 4.

【0097】この例では、ナット103と104の高さ
位置を変えることにより桁部材11,21を任意の高さ
にセットすることができる。
In this example, the girder members 11 and 21 can be set to an arbitrary height by changing the height positions of the nuts 103 and 104.

【0098】上記のように手摺付きの歩廊を所定の設置
場所へ移動するときは、手摺80,90はそれぞれ折り
畳んでおき、所望の設置場所に載置し終ると、その手摺
80,90を引き起すとともに各支柱81,91の下端
がそれぞれのソケット83,93内に嵌装されるように
これを下方に押し込むことによって、歩廊に所望の手摺
を設けることが可能となる。
When the corridor with handrails is moved to a predetermined installation place as described above, the handrails 80 and 90 are folded, respectively, and when they have been placed at the desired installation place, the handrails 80 and 90 are pulled. A desired handrail can be provided in the corridor by raising and pushing the columns 81 and 91 downward so that the lower ends of the columns 81 and 91 are fitted into the sockets 83 and 93, respectively.

【0099】また、盛替作業をなすときは、手摺80,
90は、その支柱81,91下端がソケット83,93
内から引き出されるようにこれを上方に押し上げ歩廊の
長手方向あるいは短手方向に折り畳むことによって、所
謂コンパクト化することができるので、その盛替作業は
容易に行ない得る。
In addition, when carrying out the rearrangement work, the handrail 80,
90 has its support posts 81 and 91 whose lower ends are sockets 83 and 93.
Since it can be made so-called compact by pushing it upward so as to be pulled out from the inside and folding it in the longitudinal direction or the lateral direction of the corridor, the refilling work can be easily performed.

【0100】上述した本発明の歩廊は、材質はアルミ合
金とすれば軽量になり取扱い上有利となり、また、屋外
でも耐食性があること、引掛金物40は連結金具30に
取り付けることなく、直接桁部材の一端に取り付けても
よいこと、等は勿論である。
[0100] The corridor of the present invention described above is light in weight when it is made of an aluminum alloy, which is advantageous in handling, and has corrosion resistance even outdoors, and the hook 40 is not attached to the connecting metal fitting 30 directly. Of course, it may be attached to one end of the.

【0101】[0101]

【発明の効果】以上説明したように、本発明の歩廊によ
れば次の効果がある。
As described above, the corridor of the present invention has the following effects.

【0102】あらかじめ主歩廊に対して副歩廊を伸縮
させることにより所望の長さの歩廊に設定しておき、い
ろいろな長さに設定された複数の歩廊を継ぎ足したり接
続して工事個所に応じた任意の形や任意の高さに配設で
きるので、工事現場でのスペースを有効に利用でき、し
かも桟橋状に架設できることから、作業者の通路とした
場合には最短距離を往来できて作業時間の短縮化が図れ
ると共に、作業用足場とした場合は作業の安全性と能率
化を図ることができる。
The auxiliary corridor is expanded and contracted with respect to the main corridor to set the corridor to a desired length beforehand, and a plurality of corridors set to various lengths are added or connected to suit the construction site. Since it can be installed in any shape and at any height, it can effectively use the space at the construction site and can be erected in the shape of a pier. The work can be shortened, and work safety and efficiency can be improved when the work scaffold is used.

【0103】各歩廊が連結金物とを有しているため、
他の歩廊に結合でき、接続状態を変えることにより容易
に配設の仕方を任意に変え得られて、別の作業個所での
作業用にも簡単に対処できる。
Since each corridor has a connecting hardware,
It can be connected to another corridor, and the arrangement can be easily changed arbitrarily by changing the connection state, and it is possible to easily deal with work at another work place.

【0104】その結果、歩廊を設置するための多点数部
材の発注や、その収納さらには組立作業の段取り等の予
備的作業を割愛することができるともに歩廊の組立のた
めの労力や時間を省くことができ、被構築物の構築期間
の短縮や、構築に要する経費の軽減等を図ることができ
る。
As a result, it is possible to omit the ordering of the multipoint members for installing the corridor, the storage thereof, and the preliminary work such as the setup work of the assembling work, and the labor and time for assembling the corridor can be saved. Therefore, it is possible to shorten the construction period of the construction object and reduce the cost required for construction.

【0105】歩廊を伸縮自在な構成としておくことに
より、クレーン等によって吊持し移動させるときや、不
使用時の集積や運搬時にも、歩廊の全体長を短くするこ
とができる。
By making the corridor expandable and contractable, the entire length of the corridor can be shortened even when the corridor is hung and moved by a crane or the like, or when it is collected or transported when not in use.

【0106】折り畳み自在な手摺を組み付けたことに
より、その手摺も折り畳んでおくことができるので、所
謂コンパクト化することができ、クレーンによる吊持、
不使用時の集積や運搬が簡単に行なえることとなる効果
もある。
Since the foldable handrail is assembled, the handrail can also be folded, so that it can be made so-called compact and can be suspended by a crane.
There is also an effect that it can be easily collected and transported when not in use.

【0107】水平支持材間の距離の大小にかかわらず
所望の歩廊が設けられるとともに、複数の歩廊を連結し
て、一層の長大化も可能であり、網目状等に歩廊を設け
ることもでき、作業者の歩行路の確保や所謂作業足場の
確保が簡単確実に行なえる利点もある。
A desired corridor can be provided regardless of the distance between the horizontal support members, and a plurality of corridors can be connected to further lengthen the corridor. There is also an advantage that a worker's walking path and a so-called work scaffold can be secured easily and surely.

【0108】各足場板上に滑り止めが形成されている
から足場板上の歩行の際に滑りが防止され、安全であ
る。
Since the anti-slip is formed on each scaffold plate, it is safe because slippage is prevented when walking on the scaffold plate.

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は従来の架設歩廊を示す縦断面図である。FIG. 1 is a vertical cross-sectional view showing a conventional installation corridor.

【図2】本発明の歩廊の一例を示す部分斜視図であるFIG. 2 is a partial perspective view showing an example of a walkway of the present invention.

【図3】図2における主歩廊と副歩廊を示す断面図であ
る。
FIG. 3 is a cross-sectional view showing a main corridor and a sub corridor in FIG.

【図4(イ)】足場板を示す縦断面図である。FIG. 4 (a) is a vertical cross-sectional view showing a scaffold plate.

【図4(ロ)】他の実施例に係る足場板である。FIG. 4B is a scaffolding board according to another embodiment.

【図4(ハ)】他の実施例に係る足場板を示す縦断面図
である。
FIG. 4C is a vertical cross-sectional view showing a scaffold plate according to another embodiment.

【図5】本発明の歩廊の配設例を示す概略平面図であ
る。
FIG. 5 is a schematic plan view showing an arrangement example of a walkway of the present invention.

【図6】配設の一例を示す斜視図である。FIG. 6 is a perspective view showing an example of arrangement.

【図7】補助歩廊の一例を示す。FIG. 7 shows an example of an auxiliary corridor.

【図8】補助歩廊の一例を示す。FIG. 8 shows an example of an auxiliary corridor.

【図9】図8の補助歩廊を用いた接続状態を示す平面図
である。
9 is a plan view showing a connected state using the auxiliary corridor of FIG. 8. FIG.

【図10】補助歩廊の一例を示す。FIG. 10 shows an example of an auxiliary corridor.

【図11】図10の補助歩廊を用いた接続状態を示す平
面図である。
11 is a plan view showing a connected state using the auxiliary corridor of FIG.

【図12】本発明の歩廊を水平支持材上に固定する固定
装置を示す部分斜視図である。
FIG. 12 is a partial perspective view showing a fixing device for fixing the corridor of the present invention on a horizontal support member.

【図13】他の実施例に係る歩廊の一部切断面図であ
る。
FIG. 13 is a partial cutaway view of a walkway according to another embodiment.

【図14】本発明の歩廊の取扱い例を示す部分斜視図で
ある。
FIG. 14 is a partial perspective view showing an example of handling a corridor of the present invention.

【図15】本発明の歩廊の他の例として手摺を附設した
部分斜視図である。
FIG. 15 is a partial perspective view with a handrail attached as another example of the walkway of the present invention.

【図16】手摺取付部の詳細図である。FIG. 16 is a detailed view of a handrail mounting portion.

【図17】手摺取付部の詳細図である。FIG. 17 is a detailed view of a handrail mounting portion.

【図18】手摺の別の例を示す斜視図である。FIG. 18 is a perspective view showing another example of a handrail.

【図19】本発明の歩廊の取付例図である。FIG. 19 is a diagram showing a mounting example of a walkway according to the present invention.

【符号の説明】[Explanation of symbols]

10 主歩廊 11,21 枠体たる桁部材 12,22 足場板 12a 滑り止め 15,25 ピン挿通用孔 20 副歩廊 30 連結金物 40 引掛金物 50,51a 補助歩廊 60 固定装置 70 吊具 80,90 手摺 81,91 支柱 82,92 横材 10 Main corridor 11,21 Frame member girder member 12,22 Scaffolding plate 12a Non-slip 15,25 pin insertion hole 20 Sub corridor 30 Connecting hardware 40 Hooking hardware 50,51a Auxiliary corridor 60 Fixing device 70 Hanging device 80,90 Handrail 81,91 Supports 82,92 Horizontal members

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成5年9月22日[Submission date] September 22, 1993

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】図面の簡単な説明[Name of item to be corrected] Brief description of the drawing

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は従来の架設歩廊を示す縦断面図である。FIG. 1 is a vertical cross-sectional view showing a conventional installation corridor.

【図2】本発明の歩廊の一例を示す部分斜視図である。FIG. 2 is a partial perspective view showing an example of a walkway of the present invention.

【図3】図2における主歩廊と副歩廊を示す断面図であ
る。
FIG. 3 is a cross-sectional view showing a main corridor and a sub corridor in FIG.

【図4】(イ)は足場板を示す縦断面図である。(ロ)
は他の実施例に係る足場板である。(ハ)は他の実施例
に係る足場板を示す縦断面図である。
FIG. 4A is a vertical sectional view showing a scaffold plate. (B)
Is a scaffolding board according to another embodiment. (C) is a longitudinal sectional view showing a scaffold plate according to another embodiment.

【図5】本発明の歩廊の配設例を示す概略平面図であ
る。
FIG. 5 is a schematic plan view showing an arrangement example of a walkway of the present invention.

【図6】配設の一例を示す斜視図である。FIG. 6 is a perspective view showing an example of arrangement.

【図7】補助歩廊の一例を示す。FIG. 7 shows an example of an auxiliary corridor.

【図8】補助歩廊の一例を示す。FIG. 8 shows an example of an auxiliary corridor.

【図9】図8の補助歩廊を用いた接続状態を示す平面図
である。
9 is a plan view showing a connected state using the auxiliary corridor of FIG. 8. FIG.

【図10】補助歩廊の一例を示す。FIG. 10 shows an example of an auxiliary corridor.

【図11】図10の補助歩廊を用いた接続状態を示す平
面図である。
11 is a plan view showing a connected state using the auxiliary corridor of FIG.

【図12】本発明の歩廊を水平支持材上に固定する固定
装置を示す部分斜視図である。
FIG. 12 is a partial perspective view showing a fixing device for fixing the corridor of the present invention on a horizontal support member.

【図13】他の実施例に係る歩廊の一部切断面図であ
る。
FIG. 13 is a partial cutaway view of a walkway according to another embodiment.

【図14】本発明の歩廊の取扱い例を示す部分斜視図で
ある。
FIG. 14 is a partial perspective view showing an example of handling a corridor of the present invention.

【図15】本発明の歩廊の他の例として手摺を附設した
部分斜視図である。
FIG. 15 is a partial perspective view with a handrail attached as another example of the walkway of the present invention.

【図16】手摺取付部の詳細図である。FIG. 16 is a detailed view of a handrail mounting portion.

【図17】手摺取付部の詳細図である。FIG. 17 is a detailed view of a handrail mounting portion.

【図18】手摺の別の例を示す斜視図である。FIG. 18 is a perspective view showing another example of a handrail.

【図19】本発明の歩廊の取付例図である。FIG. 19 is a diagram showing a mounting example of a walkway according to the present invention.

【符号の説明】 10 主歩廊 11,21 枠体たる桁部材 12,22 足場板 12a 滑り止め 15,25 ピン挿通孔 20 副歩廊 30 連結金物 40 引掛金物 50,51a 補助歩廊 60 固定装置 70 吊具 80,90 手摺 81,91 支柱 82,92 横材[Explanation of Codes] 10 Main corridor 11,21 Frame member girder member 12,22 Scaffolding plate 12a Non-slip 15,25 pin insertion hole 20 Sub corridor 30 Connection hardware 40 Hook 50, 51a Auxiliary corridor 60 Fixing device 70 Lifting tool 80,90 Handrails 81,91 Supports 82,92 Horizontal members

【手続補正2】[Procedure Amendment 2]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】全図[Correction target item name] All drawings

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図1】 [Figure 1]

【図3】 [Figure 3]

【図2】 [Fig. 2]

【図5】 [Figure 5]

【図7】 [Figure 7]

【図8】 [Figure 8]

【図9】 [Figure 9]

【図4】 [Figure 4]

【図6】 [Figure 6]

【図10】 [Figure 10]

【図11】 FIG. 11

【図17】 FIG. 17

【図12】 [Fig. 12]

【図13】 [Fig. 13]

【図14】 FIG. 14

【図15】 FIG. 15

【図16】 FIG. 16

【図19】 FIG. 19

【図18】 FIG. 18

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 被構築物の梁材等の水平支持材間に架設
あるいは吊設されて作業者の歩行あるいは諸作業を可能
にする歩廊において、当該歩廊は主歩廊と主歩廊の一端
あるいは両端に長さ調節自在に副わせて保持した副歩廊
とからなり、主歩廊と副歩廊は一対の枠体と枠体の内側
間に連設された足場板とからなり、主歩廊と副歩廊の枠
体には折り畳み自在な手摺が附設され、副歩廊の枠体端
部には連結金物が取り付けられ、更に前記各足場板の上
面には滑り止めが設けられている工事用可搬式歩廊。
1. A corridor which is erected or hung between horizontal support members such as beam members of a structure to enable workers to walk or perform various works, the corridor being provided at one or both ends of the main corridor and the main corridor. The main corridor and the sub corridor are composed of a pair of frames and a scaffolding plate connected between the insides of the frames. A portable walkway for construction in which a foldable handrail is attached to the body, a connecting metal piece is attached to the end of the frame body of the sub walkway, and a slip stopper is provided on the upper surface of each scaffold plate.
【請求項2】 主歩廊の枠体に対して副歩廊の枠体が摺
動自在沿わせて保持されている請求項1記載の工事用可
搬式歩廊。
2. The portable walkway for construction according to claim 1, wherein the frame body of the auxiliary walkway is slidably held with respect to the frame body of the main walkway.
【請求項3】 手摺が歩廊の長手方向又は足場板上側短
手方向に折り畳まれる請求項1記載の工事用可搬式歩
廊。
3. The portable walkway for construction according to claim 1, wherein the handrails are folded in the longitudinal direction of the walkway or in the lateral direction above the scaffold plate.
【請求項4】 連結金物は中央部より先端側の肉厚をや
や薄くして段差部を形成し、且つ連結用のボルトを備え
ている請求項1記載の工事用可搬式歩廊。
4. The portable walkway for construction according to claim 1, wherein the connecting hardware has a stepped portion formed by making the thickness of the tip end side slightly thinner than the central portion, and further provided with a connecting bolt.
【請求項5】 滑り止めがリブ状、ドット状又は網目状
に形成されている請求項1記載の工事用可搬式歩廊。
5. The portable walkway for construction according to claim 1, wherein the slip stopper is formed in a rib shape, a dot shape, or a mesh shape.
JP4255495A 1992-08-31 1992-08-31 Portable walkway for construction Expired - Lifetime JPH0658003B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4255495A JPH0658003B2 (en) 1992-08-31 1992-08-31 Portable walkway for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4255495A JPH0658003B2 (en) 1992-08-31 1992-08-31 Portable walkway for construction

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP58140207A Division JPS6030760A (en) 1983-07-31 1983-07-31 Portable walking passage for construction

Publications (2)

Publication Number Publication Date
JPH0693716A true JPH0693716A (en) 1994-04-05
JPH0658003B2 JPH0658003B2 (en) 1994-08-03

Family

ID=17279550

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4255495A Expired - Lifetime JPH0658003B2 (en) 1992-08-31 1992-08-31 Portable walkway for construction

Country Status (1)

Country Link
JP (1) JPH0658003B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5685391A (en) * 1994-07-29 1997-11-11 Gundlach; James Triladder

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4421576Y1 (en) * 1964-10-15 1969-09-12
GB1346241A (en) * 1970-05-19 1974-02-06 Western Gear Europ Platform for suspended scaffoldings
JPS49116708U (en) * 1973-02-07 1974-10-04
JPS5025737A (en) * 1973-07-18 1975-03-18
JPS5036823U (en) * 1973-08-01 1975-04-17
US3889779A (en) * 1973-10-23 1975-06-17 Kuemmerlin Walter Length adjustable plank
JPS5129627U (en) * 1974-08-22 1976-03-03
JPS5145880U (en) * 1974-10-02 1976-04-05
JPS5225854U (en) * 1975-08-12 1977-02-23
JPS5229467U (en) * 1975-08-21 1977-03-01
JPS549176U (en) * 1977-06-23 1979-01-22
JPS5544887U (en) * 1979-05-28 1980-03-24
JPS5623025A (en) * 1979-08-01 1981-03-04 Nec Corp Circuit device
JPS5623618A (en) * 1979-08-01 1981-03-06 Dowa:Kk Vaporizing burner
JPS5646058A (en) * 1979-09-25 1981-04-27 Sanki Eng Co Ltd Lift for working at height
JPS57116870A (en) * 1980-12-31 1982-07-21 Japan Suchiirusu Corp Kk Temporarily built staircase
JPS585801U (en) * 1981-07-04 1983-01-14 月星化成株式会社 Rubber-lined boots
JPH025215A (en) * 1988-06-24 1990-01-10 Hitachi Ltd Thin film magnetic head and its manufacture

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4421576Y1 (en) * 1964-10-15 1969-09-12
GB1346241A (en) * 1970-05-19 1974-02-06 Western Gear Europ Platform for suspended scaffoldings
JPS49116708U (en) * 1973-02-07 1974-10-04
JPS5025737A (en) * 1973-07-18 1975-03-18
JPS5036823U (en) * 1973-08-01 1975-04-17
US3889779A (en) * 1973-10-23 1975-06-17 Kuemmerlin Walter Length adjustable plank
JPS5129627U (en) * 1974-08-22 1976-03-03
JPS5145880U (en) * 1974-10-02 1976-04-05
JPS5225854U (en) * 1975-08-12 1977-02-23
JPS5229467U (en) * 1975-08-21 1977-03-01
JPS549176U (en) * 1977-06-23 1979-01-22
JPS5544887U (en) * 1979-05-28 1980-03-24
JPS5623025A (en) * 1979-08-01 1981-03-04 Nec Corp Circuit device
JPS5623618A (en) * 1979-08-01 1981-03-06 Dowa:Kk Vaporizing burner
JPS5646058A (en) * 1979-09-25 1981-04-27 Sanki Eng Co Ltd Lift for working at height
JPS57116870A (en) * 1980-12-31 1982-07-21 Japan Suchiirusu Corp Kk Temporarily built staircase
JPS585801U (en) * 1981-07-04 1983-01-14 月星化成株式会社 Rubber-lined boots
JPH025215A (en) * 1988-06-24 1990-01-10 Hitachi Ltd Thin film magnetic head and its manufacture

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5685391A (en) * 1994-07-29 1997-11-11 Gundlach; James Triladder

Also Published As

Publication number Publication date
JPH0658003B2 (en) 1994-08-03

Similar Documents

Publication Publication Date Title
US7735606B1 (en) Scaffold support platform
US5159993A (en) Self-raising work platform assembly
CA2567141A1 (en) Modular multilevel access platform and method for erecting the same
JP2009541612A (en) Construction site stairs
US11274450B2 (en) System and method of assembling and installing commercial roofing
JP2007046356A (en) Scaffold in bridge structure and its assembling method
JPH06167102A (en) Portable walking way for construction site
JPS6026761A (en) Freely extensible walking passage
JPH0693720A (en) Portable passageway for construction work
JPH0693716A (en) Portable passageway for construction work
JPH0693719A (en) Portable passageway for construction work
JPH0693715A (en) Portable passageway or construction work
JPH0693718A (en) Portable passageway for construction work
JPH0693717A (en) Portable passageway for construction work
JPH0693714A (en) Portable passageway for construction work
JP2004232366A (en) Suspended scaffolding
JPS6030760A (en) Portable walking passage for construction
JP2003147954A (en) Advance handrail of framework scaffold
JP3100574B2 (en) Suspended scaffold and its erection method
CN213171372U (en) Light-duty assembled vertical transportation device
US20020042981A1 (en) System for lifting and assembling re-bar cages
JPH1088786A (en) Scaffold for columnar structure
JP7421784B1 (en) Ladders and installation methods for climbing over trespassing fences
JPH0443141B2 (en)
FI130533B (en) Ground supported scaffolding system

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071213

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20081213

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20081213

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091213

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101213

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101213

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111213

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20111213

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121213

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121213

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131213

Year of fee payment: 11