JPH0692804B2 - Boiler automatic number control system - Google Patents

Boiler automatic number control system

Info

Publication number
JPH0692804B2
JPH0692804B2 JP8347488A JP8347488A JPH0692804B2 JP H0692804 B2 JPH0692804 B2 JP H0692804B2 JP 8347488 A JP8347488 A JP 8347488A JP 8347488 A JP8347488 A JP 8347488A JP H0692804 B2 JPH0692804 B2 JP H0692804B2
Authority
JP
Japan
Prior art keywords
boiler
combustion
state
boilers
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP8347488A
Other languages
Japanese (ja)
Other versions
JPH01256704A (en
Inventor
泰寛 宮川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Miura Co Ltd
Original Assignee
Miura Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Miura Co Ltd filed Critical Miura Co Ltd
Priority to JP8347488A priority Critical patent/JPH0692804B2/en
Publication of JPH01256704A publication Critical patent/JPH01256704A/en
Publication of JPH0692804B2 publication Critical patent/JPH0692804B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、ボイラーを複数台設置した多缶設置システ
ムにおける、負荷に対する応答性を向上させた自動台制
御装置に関するものである。
Description: TECHNICAL FIELD The present invention relates to an automatic platform control device having improved response to load in a multi-can installation system in which a plurality of boilers are installed.

〔従来の技術〕[Conventional technology]

一般に、ボイラーを複数台設置した多缶設置システムに
おいては、スチームヘッダーに圧力検出器を設けて負荷
の状態を把握し、負荷量に応じて必要台数を順次燃焼に
移行させ、負荷変動があればそれに合わせてボイラーを
燃焼・停止させることにより、負荷に追随させるように
した自動台数制御方式を採用している。この方式によれ
ば、負荷量に応じて適切なボイラー台数を燃焼させるこ
とができるので、高効率運転を維持することが可能とな
る。
Generally, in a multi-can installation system where multiple boilers are installed, a pressure detector is installed in the steam header to grasp the load condition, and the required number of units are sequentially switched to combustion according to the load amount, if there is a load fluctuation. In accordance with this, an automatic number control system is adopted that follows the load by burning and stopping the boiler. According to this method, since an appropriate number of boilers can be burned according to the load amount, it is possible to maintain high efficiency operation.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

しかしながら、実際のボイラーの稼動に当っては、燃焼
記号が入ってもボイラーは安全を図るために所定時間
(約15秒)のプレパージを行って炉内を掃気するので、
それまでは燃焼に移行できない。そのため、その時間遅
れにより蒸気圧力が低下し過ぎたり、圧力の過低下に伴
って不必要にボイラーが起動し、燃焼状態のハンチング
を起こしやすい。
However, in the actual operation of the boiler, even if the combustion symbol is entered, the boiler performs pre-purge for a predetermined time (about 15 seconds) to scavenging the inside of the furnace for safety.
Until then, it cannot move to combustion. Therefore, the steam pressure is excessively lowered due to the time delay, or the boiler is unnecessarily activated due to the excessive decrease of the pressure, and hunting of the combustion state is likely to occur.

〔問題点を解決するための手段〕[Means for solving problems]

この発明は、上記の問題点に鑑み、プレパージ時間の
間、低燃焼状態の他のボイラーを強制的に高燃焼状態に
して蒸気量の不足分を補うことにより、安定した蒸気量
を供給できるようにしたもので、ボイラー(1)を複数
台設置し、これらのボイラーに共通のスチームヘッダー
(2)に負荷の状態を把握するための圧力検出器(3)
を接続し、この圧力検出器からの信号により、負荷量に
応じて必要台数分のボイラーを燃焼・停止させる台数制
御器(4)を設けた構成において、前記台数制御器から
の新たな指令により停止状態のボイラーを起動させ、燃
焼に移行させるまでの間、低燃焼状態の他のボイラーが
存在する場合、その低燃焼状態の他のボイラーを強制的
に高燃焼状態にするための強制高燃焼信号を発する発信
回路(6)を設けたことを特徴としている。
In view of the above problems, the present invention can supply a stable amount of steam by compensating for the shortage of the amount of steam by forcibly setting another boiler in a low combustion state to a high combustion state during the pre-purge time. A plurality of boilers (1) are installed, and a pressure detector (3) is provided on the steam header (2) common to these boilers to detect the load condition.
In the configuration in which a unit controller (4) for connecting and disconnecting the required number of boilers according to the load amount is connected by the signal from the pressure detector, a new command from the unit controller is used. If there is another boiler in a low combustion state until the boiler in the stopped state is started and transitions to combustion, forced high combustion to force the other boiler in the low combustion state to a high combustion state It is characterized in that a transmission circuit (6) for emitting a signal is provided.

〔実施例〕〔Example〕

以下、この発明の好ましい実施例を図面に基づいて説明
する。図中(1)は複数台設置したボイラーである。そ
れらの各ボイラーは蒸気管で共通のスチームヘッダー
(2)に連結している。このスチームヘッダーには、そ
の内部の蒸気圧力を検出するための圧力検出器(3)を
設けてあって、これによりその圧力信号に基づいて、台
数制御器(4)により予め設定しておいた起動順序に従
って必要台数のボイラーを燃焼・停止させ、負荷に追随
するように制御する。(5)は前記台数制御器の比較演
算回路であり、前記圧力信号により必要燃焼台数を決定
し、燃焼制御の出力信号を出すように動作する。(6)
は強制高燃焼発信回路で、低燃焼状態にある他のボイラ
ーが存在する場合、そのボイラーを所定の時間、強制的
に高燃焼状態に移行させる強制高燃焼信号を発するため
のものである。
Preferred embodiments of the present invention will be described below with reference to the drawings. In the figure, (1) is a boiler with a plurality of units installed. Each of these boilers is connected by steam pipes to a common steam header (2). The steam header is provided with a pressure detector (3) for detecting the steam pressure inside the steam header, and this is preset by the unit controller (4) based on the pressure signal. The required number of boilers are burned and stopped according to the startup sequence, and the load is controlled to follow the load. Reference numeral (5) is a comparison operation circuit of the unit number controller, which operates to determine the required number of combustion units based on the pressure signal and output an output signal for combustion control. (6)
Is a forced high-combustion transmission circuit for issuing a forced high-combustion signal for forcibly shifting the boiler to the high-combustion state for a predetermined time when another boiler in the low-combustion state exists.

ボイラーを3缶(NO.1,NO.2,NO.3)を設置した多缶設置
システムについて、その燃焼制御の一例を説明するが、
停止状態、低燃焼状態(L)、高燃焼状態(H)、の三
位置によって燃焼制御を行う三位置制御方式のボイラー
を用いた場合、第2図に示すように、蒸気圧力によって
7種類の稼動状態に設定される。蒸気圧力が一番低い段
階では、3缶とも高燃焼の状態(HHH)にあり、次の圧
力段階になるとNO.3のボイラーがH→LとなってHHLの
状態に移る。さらに圧力が上昇すると、NO.2,NO.1のボ
イラーが順次H→Lになり、LLLの状態になる。そし
て、さらに圧力が上昇すると、NO.3,NO.2,NO.1の順に燃
焼が停止し、上限の圧力段階に達すると全缶停止する。
また、蒸気圧力が降下すれば、上記の順番とは逆の順番
で起動するように設定している。
An example of combustion control of a multi-can installation system with three boilers (NO.1, NO.2, NO.3) installed will be explained.
When a three-position control-type boiler that performs combustion control by three positions of a stopped state, a low combustion state (L), and a high combustion state (H) is used, as shown in FIG. It is set to the operating state. At the stage where the steam pressure is the lowest, all three cans are in a state of high combustion (HHH), and when it comes to the next pressure stage, the NO.3 boiler goes from H to L and shifts to the HHL state. When the pressure is further increased, the boilers of NO.2 and NO.1 are successively changed from H to L, and become the state of LLL. Then, when the pressure is further increased, the combustion is stopped in the order of NO.3, NO.2, NO.1, and when the upper pressure stage is reached, all the cans are stopped.
In addition, when the steam pressure drops, it is set to start in the reverse order to the above order.

こうして、負荷量に対応した適切燃焼台数のボイラーを
稼動させるわけであるが、負荷量は通常一定ではなく変
動を繰返す。よって負荷量が急増して蒸気圧力が急激に
低下する場合は、前述したような問題点が生じ、それは
例えばLLの状態からLLLの状態に移るときに生じる。し
かし、この発明によれば、第3図に示すような燃焼制御
を行うことができるので、前述の問題点を解消すること
ができる。LLの状態からNO.3のボイラーに起動を指示す
る信号が出たときに、強制高燃焼信号を同時に出して既
に低燃焼状態にあるNO.2のボイラーを強制的に高燃焼に
移行させる。そして、NO.3のボイラーがプレパージを終
了して低燃焼を開始したら、NO.2のボイラーを低燃焼の
状態に戻す。そうすることにより、NO.3のボイラーが燃
焼を開始するまでの間の時間遅れによる蒸気量の不足を
補うことができる。
In this way, the number of boilers appropriate for the load amount is operated, but the load amount is not constant but repeats fluctuations. Therefore, when the load amount rapidly increases and the steam pressure sharply decreases, the above-mentioned problems occur, for example, when the state changes from the LL state to the LLL state. However, according to the present invention, since the combustion control as shown in FIG. 3 can be performed, the above-mentioned problems can be solved. When a signal instructing the NO.3 boiler to start is output from the LL state, the NO.2 boiler already in the low combustion state is forcibly shifted to the high combustion by simultaneously outputting the forced high combustion signal. When the NO.3 boiler ends pre-purge and starts low combustion, the NO.2 boiler is returned to the low combustion state. By doing so, it is possible to compensate for the shortage of the steam amount due to the time delay until the NO.3 boiler starts combustion.

尚、NO.2のボイラーが燃焼を開始しても直ちには起蒸状
態にならないので、NO.3のボイラーを所定時間延長して
高燃焼状態にしてもよいし、蒸気圧力条件によってはHL
Lの状態をそのまま継続するように制御することもでき
る。また、所定時間後の圧力の低下度合を予測すること
により、必要に応じて既に低燃焼状態にある複数台のボ
イラーに強制高燃焼信号を発してもよい。
It should be noted that since the NO.2 boiler does not immediately enter the evaporating state even if it starts burning, the NO.3 boiler may be extended for a predetermined time to a high combustion state.
It is also possible to control the L state to continue as it is. Further, by predicting the degree of pressure decrease after a predetermined time, a compulsory high combustion signal may be issued to a plurality of boilers that are already in a low combustion state, if necessary.

〔発明の効果〕〔The invention's effect〕

この発明は、以上のような構成であるので、負荷に対す
る応答性が向上し、急激な負荷変動が生じても、蒸気圧
力の過低下やハンチングが起こりにくい。よって、この
発明によれば、応答性に優れ、常に安定した蒸気量を供
給可能なボイラーの自動台数制御装置を提供することが
できる。
Since the present invention is configured as described above, the responsiveness to a load is improved, and even if a sudden load change occurs, excessive decrease in steam pressure or hunting does not easily occur. Therefore, according to the present invention, it is possible to provide an automatic number-of-units control device for a boiler, which has excellent responsiveness and can always supply a stable steam amount.

【図面の簡単な説明】[Brief description of drawings]

第1図はこの発明におけるボイラーの自動台数制御シス
テムの一実施例を示す系統図、第2図はこの発明におけ
る、蒸気圧力に対するボイラーの稼動パターンの一実施
例を示すグラフ、第3図はこの発明における燃焼制御の
一実施例を示すタイムチャートである。 (1)…ボイラー、(2)…スチームヘッダー (3)…圧力検出器、(4)…台数制御器 (5)…比較演算回路 (6)…強制高燃焼発信回路
FIG. 1 is a system diagram showing an embodiment of an automatic boiler number control system according to the present invention, FIG. 2 is a graph showing an embodiment of an operation pattern of the boiler with respect to steam pressure according to the present invention, and FIG. It is a time chart which shows one Example of combustion control in the invention. (1) ... Boiler, (2) ... Steam header (3) ... Pressure detector, (4) ... Unit controller (5) ... Comparison operation circuit (6) ... Forced high combustion transmission circuit

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】ボイラー(1)を複数台設置し、これらの
ボイラーに共通のスチームヘッダー(2)に負荷の状態
を把握するための圧力検出器(3)接続し、この圧力検
出器からの信号により、負荷量に応じて必要台数分のボ
イラーを燃焼・停止させる台数制御器(4)を設けた構
成において、前記台数制御器からの新たな指令により停
止状態のボイラーを起動させ、燃焼に移行させるまでの
間、低燃焼状態の他のボイラーが存在する場合、そのボ
イラーを強制的に高燃焼状態にするための強制高燃焼信
号を発する発信回路(6)を設けたことを特徴とするボ
イラー自動台数制御装置。
1. A plurality of boilers (1) are installed, and a pressure detector (3) for grasping a load state is connected to a steam header (2) common to these boilers. In the configuration provided with the unit number controller (4) that burns and stops the required number of boilers according to the load amount by the signal, the boiler in the stopped state is started by a new command from the unit number controller, and combustion is started. When there is another boiler in a low combustion state until the transition, a transmitting circuit (6) for issuing a forced high combustion signal for forcibly bringing the boiler into a high combustion state is provided. Boiler automatic number control system.
JP8347488A 1988-04-04 1988-04-04 Boiler automatic number control system Expired - Lifetime JPH0692804B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8347488A JPH0692804B2 (en) 1988-04-04 1988-04-04 Boiler automatic number control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8347488A JPH0692804B2 (en) 1988-04-04 1988-04-04 Boiler automatic number control system

Publications (2)

Publication Number Publication Date
JPH01256704A JPH01256704A (en) 1989-10-13
JPH0692804B2 true JPH0692804B2 (en) 1994-11-16

Family

ID=13803463

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8347488A Expired - Lifetime JPH0692804B2 (en) 1988-04-04 1988-04-04 Boiler automatic number control system

Country Status (1)

Country Link
JP (1) JPH0692804B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008224084A (en) * 2007-03-09 2008-09-25 Samson Co Ltd Boiler multi-can installation system

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2542408Y2 (en) * 1989-10-11 1997-07-30 川重冷熱工業株式会社 Boiler control device
JP5277849B2 (en) * 2008-10-03 2013-08-28 三浦工業株式会社 Control program, control system, boiler system, and control method
JP5585007B2 (en) * 2009-06-11 2014-09-10 三浦工業株式会社 Boiler group control method, program, controller, and boiler system
JP5465075B2 (en) * 2010-04-23 2014-04-09 パナソニック株式会社 Control method for multi-can boiler system
JP5799574B2 (en) * 2011-05-13 2015-10-28 三浦工業株式会社 Control program, control system, and control method
CA2792823C (en) 2011-10-21 2019-10-15 Cleaver-Brooks, Inc. System and method of controlling condensing and non-condensing boiler firing rates
JP6028608B2 (en) * 2013-02-14 2016-11-16 三浦工業株式会社 Boiler system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008224084A (en) * 2007-03-09 2008-09-25 Samson Co Ltd Boiler multi-can installation system

Also Published As

Publication number Publication date
JPH01256704A (en) 1989-10-13

Similar Documents

Publication Publication Date Title
EP0081974A2 (en) Condition control system for heat transfer
JPH0692804B2 (en) Boiler automatic number control system
US4513910A (en) Adaptive low fire hold control system
JP2799746B2 (en) Automatic boiler unit control method
JP3820621B2 (en) Control device for heat source system
JPH08563Y2 (en) Three-position control type automatic boiler number control device
JP4118206B2 (en) Number control device in boiler multi-can installation system
JP2729401B2 (en) Boiler automatic unit control method
JP3998812B2 (en) How to control the number of boilers with multiple cans
JPH0641801B2 (en) Boiler automatic number control system
JPH09159103A (en) Boiler control device
JP4059728B2 (en) Multi-can boiler
JPH06272802A (en) Device for controlling the number of heat equipment
JP2668441B2 (en) Automatic setting method of number control pattern in boiler automatic number control device
JP3357573B2 (en) Boiler unit control device
JPH0740803Y2 (en) Boiler automatic number control system
JP2000018503A (en) Automatic number of operating set control method of boiler
JPH05288302A (en) Method of controlling number of once-through boiler
JPH073126Y2 (en) Boiler automatic number control system
JPH07109290B2 (en) Automatic number control device for equipment such as boilers
JPH08219550A (en) Control method in multi-can installation system of fluid heater
JPH08219551A (en) Control method in multi-can installation system of fluid heater
JP4533335B2 (en) Control device for heat source system
JP2542408Y2 (en) Boiler control device
JP2792448B2 (en) Abnormal control method in boiler multi-can installation system

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071116

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081116

Year of fee payment: 14

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20081116