JPH0681658B2 - Assembly equipment for combined sand core manufacturing - Google Patents
Assembly equipment for combined sand core manufacturingInfo
- Publication number
- JPH0681658B2 JPH0681658B2 JP8647688A JP8647688A JPH0681658B2 JP H0681658 B2 JPH0681658 B2 JP H0681658B2 JP 8647688 A JP8647688 A JP 8647688A JP 8647688 A JP8647688 A JP 8647688A JP H0681658 B2 JPH0681658 B2 JP H0681658B2
- Authority
- JP
- Japan
- Prior art keywords
- sand core
- auxiliary
- auxiliary sand
- mounting table
- cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22C—FOUNDRY MOULDING
- B22C9/00—Moulds or cores; Moulding processes
- B22C9/10—Cores; Manufacture or installation of cores
- B22C9/103—Multipart cores
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Molds, Cores, And Manufacturing Methods Thereof (AREA)
- Casting Devices For Molds (AREA)
Description
【発明の詳細な説明】 A.発明の目的 (1) 産業上の利用分野 本発明は組合せ砂中子製造用組付装置、特に、相対向す
る主砂中子および補助砂中子の一方に存する接合凸部
を、他方に存する接合凹部に嵌合すべく、前記補助砂中
子を前記主砂中子に向けて移動させるようにした組付装
置に関する。DETAILED DESCRIPTION OF THE INVENTION A. Object of the Invention (1) Field of Industrial Application The present invention relates to an assembly device for producing a combined sand core, and in particular to one of a main sand core and an auxiliary sand core facing each other. The present invention relates to an assembling apparatus that moves the auxiliary sand core toward the main sand core so that the existing bonding convex portion fits into the other bonding concave portion.
(2) 従来の技術 従来、この種組付装置としては、実公昭61−24350号公
報に記載されたものが公知である。(2) Conventional Technology Conventionally, as this type of assembling apparatus, the one described in Japanese Utility Model Publication No. 61-24350 is known.
(3) 発明が解決しようとする課題 しかしながら前記装置においては主砂中子を固定し、そ
の主砂中子に補助砂中子を押動して組付けるようにして
いるので、それらの接合凹、凸部が位置ずれを生じてい
た場合には前記組付作業をスムーズに行うことができ
ず、また組付け時接合凹、凸部を損傷するおそれもあ
る。(3) Problems to be Solved by the Invention However, in the above apparatus, since the main sand core is fixed and the auxiliary sand core is pushed and assembled to the main sand core, the joining recesses are If the convex portions are displaced, the assembling work cannot be carried out smoothly, and there is a possibility that the joint concave portions and the convex portions may be damaged during the assembling.
本発明は前記不具合を解消することのできる前記組付装
置を提供することを目的とする。An object of the present invention is to provide the assembling device capable of solving the above-mentioned problems.
B.発明の構成 (1) 課題を解決するための手段 本発明は、相対向する主砂中子および補助砂中子の一方
に存する接合凸部を、他方に存する接合凹部に嵌合すべ
く、前記補助砂中子を前記主砂中子に向けて移動させる
ようにした組合せ砂中子製造用組付装置において、基台
と該基台上方に存する主砂中子用載置台との間に、該載
置台をフローティング支持する弾性体および該載置台の
フローティング量を規制する規制部材とを介装したこと
を特徴とする。B. Structure of the Invention (1) Means for Solving the Problem The present invention is to fit a joint convex portion existing in one of the main sand core and the auxiliary sand core facing each other into a joint concave portion existing in the other. In the assembly apparatus for manufacturing a combined sand core, wherein the auxiliary sand core is moved toward the main sand core, between the base and the main sand core mounting table located above the base. In addition, an elastic body that supports the mounting table in a floating manner and a regulating member that regulates the floating amount of the mounting table are interposed.
(2) 作 用 前記構成によれば、主砂中子がフローティング状態にあ
るので、接合凹部と接合凸部との間に多少の位置ずれを
生じていても、その位置ずれを吸収してそれらを確実に
嵌合し、これにより主砂中子に対する補助砂中子の組付
けをスムーズに行うことができ、また接合凹、凸部の損
傷を招くこともない。(2) Operation According to the above-mentioned configuration, since the main sand core is in a floating state, even if there is a slight positional deviation between the joining concave portion and the joining convex portion, the positional deviation is absorbed and Is surely fitted, so that the auxiliary sand core can be assembled smoothly to the main sand core, and the joining concave and convex portions are not damaged.
(3) 実施例 I.組合せ砂中子の製造 第1図(A)はエンジンのシリンダブロック鋳造用組合
せ砂中子1を示し、その組合せ砂中子1は、主砂中子2
と、その主砂中子2両側の第1,第2接合端面31,32に接
合された板状第1,第2補助砂中子41,42とよりなる。第
1,第2接合端面31,32は実質的に鉛直に形成され、主砂
中子2に第1,第2補助砂中子41,42を組付ける前に、両
接合端面31,32およびそれらに重合する第1,第2補助砂
中子41,42の接合表面51,52には接着剤が塗布される。(3) Example I. Manufacture of combined sand core FIG. 1 (A) shows a combined sand core 1 for cylinder block casting of an engine, the combined sand core 1 being the main sand core 2
And the plate-shaped first and second auxiliary sand cores 4 1 and 4 2 bonded to the first and second bonding end faces 3 1 and 3 2 on both sides of the main sand core 2. First
The first and second joint end faces 3 1 and 3 2 are formed substantially vertically, and both the joint end faces 3 1 and 3 2 are attached to the main sand core 2 before the first and second auxiliary sand cores 4 1 and 4 2 are assembled. An adhesive is applied to the joint surfaces 5 1 and 5 2 of 1 and 3 2 and the first and second auxiliary sand cores 4 1 and 4 2 which are superposed on them.
主砂中子2は両接合端面31,32の上端部および下部に第
1,第2接合凸部61,62をそれぞれ有し、それら第1,第2
接合凸部61,62は第1,第2補助砂中子41,42の接合表面
51,52に形成された第1,第2接合凹部71,72;81,82にそれ
ぞれ嵌合し、これにより主砂中子2に対する第1,第2補
助砂中子41,42の位置決めがなされる。図示例では第1
接合凹部71,81は切欠き状に形成されている。The main sand core 2 is located at the upper and lower parts of both joint end faces 3 1 , 3 2 .
1st, 2nd junction convex part 6 1 and 6 2 respectively, and those 1st, 2nd
The joint protrusions 6 1 , 6 2 are the joint surfaces of the first and second auxiliary sand cores 4 1 , 4 2 .
First and second auxiliary sand cores for the main sand core 2 are fitted into the first and second joint recesses 7 1 , 7 2 ; 8 1 , 8 2 respectively formed in 5 1 , 5 2. 4 1 and 4 2 are positioned. In the illustrated example, the first
The joint recesses 7 1 and 8 1 are formed in a notch shape.
主砂中子2は、第1図(B)にも示すように、上部の水
ジャケット成形ブロック2aと、中間部のバルク成形ブロ
ック2bと、下部のボア成形ブロック2cとを有し、それら
は接着剤を介して一体に接合されている。第1補助砂中
子41はクラッチ側空間を成形するために、また第2補助
砂中子42はウォータポンプ側空間を成形するためにそれ
ぞれ用いられる。As shown in FIG. 1 (B), the main sand core 2 has an upper water jacket forming block 2a, an intermediate bulk forming block 2b, and a lower bore forming block 2c. It is integrally bonded via an adhesive. The first auxiliary sand core 4 1 is used to form the clutch side space, and the second auxiliary sand core 4 2 is used to form the water pump side space.
第1図(C)に示すように、第1補助砂中子41は、組付
状態における上下方向幅w1が左右方向幅w2よりも狭くな
るように成形されている(即ち、w1<w2)。また第1図
(D)に示すように、第2補助砂中子42は、組付状態に
おける上下方向幅w3が左右方向幅w4よりも広くなるよう
に成形されている(即ち、w3>w4)。As shown in FIG. 1 (C), the first auxiliary sand core 4 1 is formed such that the vertical width w 1 in the assembled state is smaller than the horizontal width w 2 (that is, w 1 <w 2 ). Further, as shown in FIG. 1 (D), the second auxiliary sand cores 4 2, the vertical width w 3 is shaped to be wider than the lateral width w 4 in assembled state (i.e., w 3> w 4).
第1,第2補助砂中子41,42において、主砂中子2との接
合側と反対側に存する外端面91,92に、四角形の工具係
合用凹部101,102を画成する枠状突出部111,112と、各突
出部111,112の外側面から延出する複数の補強リブ121,1
22が成形されている。In the first and second auxiliary sand cores 4 1 and 4 2 , the rectangular tool engaging recesses 10 1 and 10 2 are formed in the outer end surfaces 9 1 and 9 2 on the side opposite to the side where the main sand core 2 is joined. the frame-like protrusion 11 defining the 1, 11 2 and, each of the protrusions 11 1, 11 a plurality of reinforcing ribs 12 1 extending from the second outer surface, 1
2 2 is molded.
このように構成すると、第1,第2補助砂中子41,42の位
置矯正および組付過程において各凹部101,102を利用し
て各補助砂中子41,42を工具により直接取扱うことがで
きる。また各凹部101,102回りは、突出部111,112および
複数の補強リブ121,122により強化されているので、各
補助砂中子41,42の取扱い時、それら凹部101,102の損傷
を防止することができる。According to this structure, the first, second auxiliary sand core 4 1, 4 each recess 10 1 in the position correction and assembling process of 2, 10 2 each auxiliary sand cores using a 4 1, 4 2 It can be handled directly with a tool. In addition, since the surroundings of the recesses 10 1 and 10 2 are reinforced by the protrusions 11 1 and 11 2 and the plurality of reinforcing ribs 12 1 and 12 2 , when handling the auxiliary sand cores 4 1 and 4 2 , It is possible to prevent the recesses 10 1 and 10 2 from being damaged.
II.組合せ砂中子1の製造 (A)製造設備の概略 第2〜第4図において、組付装置Aは第1,第2補助砂中
子41,42を主砂中子2組付けるもので、その組付装置A
を挟んで一側に主砂中子2および組合せ砂中子1の搬送
等を行う第1系統Iが配設され、また他側に第1,第2補
助砂中子41,42の搬送等を行う第2系統IIが配設され
る。II. Manufacture of combined sand core 1 (A) Outline of manufacturing equipment In FIGS. 2 to 4, the assembling apparatus A has the first and second auxiliary sand cores 4 1 and 4 2 as two main sand cores. Assembling equipment A
The first system I for carrying the main sand core 2 and the combined sand core 1 and the like is arranged on one side with the first and second auxiliary sand cores 4 1 , 4 2 on the other side. A second system II for carrying and the like is provided.
第1系統Iは、主砂中子2を一方向に搬送する第1搬送
装置B1と、その装置B1から主砂中子2を受取って組付装
置Aに搬入する第1搬入装置C1と、その装置C1から組付
作業後の組合せ砂中子1を受取って乾燥炉13に搬入する
第2搬送装置B2と、第1搬送装置B1から第1搬入装置C1
に主砂中子2を渡し、また第1搬入装置C1から第2搬送
装置B2に組合せ砂中子1を渡す渡し装置Dとを備えてお
り、それら装置B1,B2,C1,Dは一直線状に配設される。The first system I is a first carrying device B 1 for carrying the main sand core 2 in one direction, and a first carrying-in device C for receiving the main sand core 2 from the device B 1 and carrying it into the assembling device A. 1 and a second carrier B 2 that receives the assembled sand core 1 after the assembling work from the device C 1 and carries it into the drying furnace 13, and a first carrier B 1 to the first carrier C 1
And a pass device D passes Shusuna core 2, also passing the combined sand core 1 from the first loading device C 1 into the second conveying device B 2, they device B 1, B 2, C 1 , D are arranged in a straight line.
第2系統IIは、第1,第2補助砂中子41,42を搬送する第
3搬送装置B3と、その装置B3から両補助砂中子41,42を
受取って、それらの位置を矯正する位置矯正装置Eと、
第3搬送装置B3から位置矯正装置Eに、また位置矯正装
置Eから組付装置Aに両補助砂中子41,42をそれぞれ搬
入する第2搬入装置C2とを備え、それら装置B3,E,C2は
第1,第2搬送装置B1,B2の搬送方向と交差する関係に配
設される。The second system II receives a third carrier B 3 for carrying the first and second auxiliary sand cores 4 1 and 4 2 and both auxiliary sand cores 4 1 and 4 2 from the device B 3 . A position correcting device E for correcting those positions,
A second carrying-in device C 2 for carrying in both auxiliary sand cores 4 1 , 4 2 from the third carrying device B 3 to the position correcting device E and from the position correcting device E to the assembling device A, respectively, and these devices are provided. B 3 , E, and C 2 are arranged in a relationship intersecting the transport direction of the first and second transport devices B 1 and B 2 .
(B)製造工程 第4図において、主砂中子2は接着剤を塗布された第1,
第2接合端面31,32を実質的に鉛直状態にし、且つ第2
接合端面32を搬送方向前方に向けて第1搬送装置B1によ
り搬送され、その搬送終端で一旦停止し、次いで渡し装
置Dの作動により第1搬入装置C1に渡され、そこで待機
する。(B) Manufacturing process In FIG. 4, the main sand core 2 is the first sand coated core
The second joint end faces 3 1 , 3 2 are placed in a substantially vertical state, and
The joining end surface 3 2 is conveyed by the first conveying device B 1 toward the conveying direction forward, the temporarily stopped at the conveying end, and then passed to the first loading device C 1 by the operation of the transfer device D, where it waits.
第1,第2補助砂中子41,42は、接着剤を塗布された接合
表面51,52を上向きにして第3搬送装置B3により搬送さ
れてその搬送終端で停止する。The first and second auxiliary sand cores 4 1 and 4 2 are transported by the third transport device B 3 with the bonding surfaces 5 1 and 5 2 coated with the adhesive facing upward, and stop at the transport end.
その搬送時、第1補助砂中子41は、第2接合凹部72近傍
の下縁を搬送方向前側に位置させて搬送される。また第
2補助砂中子42は、第2接合凹部82近傍の下縁を第3搬
送装置B1の中央部に位置させると共に搬送方向に略平行
させ、且つ第1補助砂中子41に近接して搬送される。During its conveyance, the first auxiliary sand core 4 1 is conveyed to the lower edge of the second connecting recess 7 2 vicinity is positioned in the conveying direction front side. The second auxiliary sand core 4 2 has the lower edge near the second joint recess 8 2 located at the center of the third transfer device B 1 and is substantially parallel to the transfer direction, and the first auxiliary sand core 4 2 Transported close to 1 .
このように第1補助砂中子41の幅狭な上下方向および第
2補助砂中子42の幅狭な左右方向をそれぞれ搬送方向に
平行させると、第3搬送装置B3の搬送方向長さを短縮す
ると共に第1,第2補助砂中子41,42の搬送量を増加する
ことができる。In this way, when the narrow vertical direction of the first auxiliary sand core 4 1 and the narrow horizontal direction of the second auxiliary sand core 4 2 are respectively parallel to the transport direction, the transport direction of the third transport device B 3 It is possible to shorten the length and increase the carrying amount of the first and second auxiliary sand cores 4 1 and 4 2 .
第2搬入装置C2の作動により両補助砂中子41,42は位置
矯正装置Eに搬入され、そこで主砂中子2に対する位置
矯正が行われる。次いで、その装置E内で第1補助砂中
子41は、第4図鎖線示のように水平面内において第4図
時計方向に反転(90゜回転)し、組付装置Aへの搬入姿
勢に変換される。即ち、第1補助砂中子41の下縁は第2
補助砂中子42の下縁に対向する。By the operation of the second carry-in device C 2 , both auxiliary sand cores 4 1 and 4 2 are carried into the position correcting device E, where the position of the main sand core 2 is corrected. Then, the apparatus first auxiliary sand core 4 1 in E is Figure 4 chain line inversion in Figure 4 clockwise direction in the horizontal plane as was (90 ° rotation), carrying the posture of the assembling device A Is converted to. That is, the first lower edge of the auxiliary sand core 4 1 second
Facing the lower edge of the auxiliary sand core 4 2.
第2搬入装置C2の作動により両補助砂中子41,42は組付
装置Aに搬入される。By the operation of the second loading device C 2 , both auxiliary sand cores 4 1 and 4 2 are loaded into the assembly device A.
組付装置Aにおいては、(i)〜(iv)に示す手順で主
砂中子2に対して両補助砂中子41,42が組付けられる。In the assembling apparatus A, the subsidiary sand core 4 1, 4 2 is assembled against Shusuna core 2 in the procedure shown in (i) ~ (iv).
先ず、(i)に示すように両補助砂中子41,42は、接合
表面51,52を上向きにした状態で組付装置Aに載置され
る。First, as shown in (i), both auxiliary sand cores 4 1 , 4 2 are placed on the assembling apparatus A with the bonding surfaces 5 1 , 5 2 facing upward.
次いで、(ii)に示すように両補助砂中子41,42は各第
2接合凹部72,82が下側に位置するように互に逆方向に
反転(90゜回転)して、両接合表面51,52が相対向す
る。Then, as shown in (ii), both auxiliary sand cores 4 1 and 4 2 are reversed (rotated by 90 °) in opposite directions so that the respective second joint recesses 7 2 and 8 2 are located on the lower side. Thus, the joint surfaces 5 1 and 5 2 face each other.
さらに、(iii)に示すように、第1搬入装置C1の作動
により主砂中子2が両補助砂中子41,42間に搬入され、
第1,第2接合端面31,32が第1,第2補助砂中子41,42の接
合表面51,52にそれぞれ対向する。Furthermore, as shown in (iii), the operation of the first loading device C 1 causes the main sand core 2 to be loaded between the two auxiliary sand cores 4 1 and 4 2 ,
First, second joining end face 3 1, 3 2 is first, second auxiliary sand core 4 1, 4 2 of the joining surface 5 1, 5 2, respectively opposite the.
その後、(iv)に示すように両補助砂中子41,42が主砂
中子2に向け移動して第1,第2接合凸部61,62と第1,第
2接合凹部71,72;81,82の嵌合および両接合端面31,32と
両接合表面51,52の重合が行われ、これにより組合せ砂
中子1が得られる。Then, as shown in (iv), both auxiliary sand cores 4 1 and 4 2 move toward the main sand core 2 to move the first and second joint convex portions 6 1 and 6 2 to the first and second joints. The recesses 7 1 , 7 2 ; 8 1 , 8 2 are fitted and both joint end faces 3 1 , 3 2 and both joint surfaces 5 1 , 5 2 are superposed, whereby the combined sand core 1 is obtained.
第1搬入装置C1の作動により組合せ砂中子1は組付装置
Aより搬出され、次いで渡し装置Dの作動により第2搬
送装置B2に渡される。The combined sand core 1 is carried out of the assembling device A by the operation of the first loading device C 1 , and then transferred to the second transport device B 2 by the operation of the transferring device D.
組合せ砂中子1は第2搬送装置B2により乾燥炉13に搬入
され、そこで接着剤が加熱乾燥される。The combined sand core 1 is carried into the drying furnace 13 by the second transfer device B 2 , and the adhesive is heated and dried therein.
前記製造作業において、第1番目の組合せ砂中子1の第
2搬送装置B2への渡し操作と、第2番目の主砂中子2の
第1搬入装置C1への渡し操作は同時に行われる。In the manufacturing work, the transfer operation of the first combined sand core 1 to the second transfer device B 2 and the transfer operation of the second main sand core 2 to the first transfer device C 1 are performed simultaneously. Be seen.
III.製造設備の詳細 (A)第1,第2搬送装置B1,B2 第3,第5,第6図、特に第3図に示すように、第1,第2搬
送装置B1,B2は略同一の構成を有するので、第1搬送装
置B1について説明し、第2搬送装置B2において第1搬送
装置B1と同一部分には同一符号を付す。III. Details of manufacturing equipment (A) First and second transfer devices B 1 and B 2 As shown in FIGS. 3, 5 and 6, particularly FIG. 3, first and second transfer devices B 1 and B 2 , Since B 2 has substantially the same configuration, the first transport device B 1 will be described, and the same parts of the second transport device B 2 as those of the first transport device B 1 will be denoted by the same reference numerals.
第5,第6図において床面14上に、複数の支柱15が立設さ
れ、それら支柱15の上端部に、一対の長尺なローラ支持
部材16が互に平行に、且つ水平に取付けられる。各ロー
ラ支持部材16は、その上面に長手方向に延びる2枚1組
の軸受板17を2組備え、各軸受板17にその長手方向と交
差する関係の回転軸18を備えた複数の円錐台形駆動ゴム
ローラ19が支持され、一方の軸受板17の各駆動ゴムロー
ラ19と他方の軸受板17の各駆動ゴムローラ19の両短径側
端面は相対向する。各駆動ゴムローラ19は図示しない伝
動チエンにより第5図時計方向に回転する。In FIGS. 5 and 6, a plurality of columns 15 are erected on the floor surface 14, and a pair of long roller supporting members 16 are attached to the upper ends of the columns 15 in parallel and horizontally. . Each roller support member 16 is provided with two sets of two bearing plates 17 extending in the longitudinal direction on the upper surface thereof, and each bearing plate 17 is provided with a plurality of frustoconical shapes provided with a rotary shaft 18 in a relation intersecting the longitudinal direction. The driving rubber rollers 19 are supported, and the driving rubber rollers 19 of the one bearing plate 17 and the driving rubber rollers 19 of the other bearing plate 17 are opposite to each other on both minor diameter side end faces thereof. Each drive rubber roller 19 is rotated clockwise in FIG. 5 by a transmission chain (not shown).
上記構成において、主砂中子2は複数の駆動ゴムローラ
19上に載置されて搬送され、その主砂中子2が第1搬入
装置C1近傍の搬送終端に達すると、各駆動ゴムローラ19
が回転を停止し、これにより主砂中子2は第1搬入装置
C1に渡されるべく待機する。In the above structure, the main sand core 2 is composed of a plurality of driving rubber rollers.
When the main sand core 2 is placed on the sheet 19 and conveyed, and reaches the conveying end near the first carrying-in device C 1 , each driving rubber roller 19
Stops rotating, so that the main sand core 2 is the first loading device.
Wait to be handed to C 1 .
(B)第1搬入装置C1 第2,第3,第5,第7図に示すように、床面14上に一対の支
持板20が、第1,第2搬送装置B1,B2間および位置矯正装
置E近傍にそれぞれ位置させて立設され、それら支持板
20の上端部に、組付装置Aを横切る一対のガイドロッド
21が、互に平行に、且つ第1搬送装置B1の搬送方向と交
差する関係に支持される。両ガイドロッド21の上方に平
面四角形の基台22が配設され、その基台22の下面に取付
けられた複数のスライダ23が両ガイドロッド21に摺動自
在に嵌合される。(B) First carrying-in device C 1 As shown in FIGS. 2, 3, 5, and 7, a pair of support plates 20 are provided on the floor surface 14, and the first and second carrying devices B 1 , B 2 are provided. And the supporting plates that are erected upright in the space and near the position correcting device E.
A pair of guide rods across the assembly device A at the upper end of 20.
21 are supported in parallel with each other and in a relationship intersecting the transport direction of the first transport device B 1 . A base 22 having a planar quadrangle is arranged above both guide rods 21, and a plurality of sliders 23 attached to the lower surface of the base 22 are slidably fitted to both guide rods 21.
基台22上方に平面四角形の主砂中子用載置台24が配設さ
れ、その載置台24の下面四隅に取付けられた下向きの各
ガイド筒25が基台22上面に立設された各ガイドピン26に
嵌合される。A flat rectangular main sand core mounting table 24 is arranged above the base 22, and downward guide tubes 25 attached to the four corners of the lower surface of the mounting table 24 are installed on the upper surface of the base 22. It is fitted to the pin 26.
載置台24は、その上面に第1,第2搬送装置B1,B2の両軸
受板17と平行な一対の軸受板27を備えており、各軸受板
27に、駆動ゴムローラ19の回転軸18と平行な回転軸28を
持つ複数の円錐台形空転ゴムローラ29が、駆動ゴムロー
ラ19と同様にそれらの短径側端面を対向させて支持され
る。The mounting table 24 is provided with a pair of bearing plates 27 parallel to both bearing plates 17 of the first and second transfer devices B 1 and B 2 on the upper surface thereof.
A plurality of frustoconical idler rubber rollers 29 having a rotary shaft 28 parallel to the rotary shaft 18 of the drive rubber roller 19 are supported on the same 27 with their shorter diameter side end faces facing each other, like the drive rubber roller 19.
基台22と載置台24との間に、その載置台24をフローティ
ング支持する弾性体としての空気入りゴム袋30が介装さ
れ、そのゴム袋30は制御器31に接続される。その制御器
31は、制御弁32と空気ポンプ33とよりなる。A pneumatic rubber bag 30 as an elastic body that supports the mounting table 24 in a floating manner is interposed between the base 22 and the mounting table 24, and the rubber bag 30 is connected to a controller 31. Its controller
31 is composed of a control valve 32 and an air pump 33.
基台22上面に、載置台24の下方へのフローティング量を
規制する規制部材としての複数の第1規制ピン341が立
設され、それらの各大径上端部34aが載置台24下面に衝
合し得るようになっている。また載置台24下面に、載置
台24の上方へのフローティング量を規制する規制部材と
して複数の第2規制ピン342が下向きに取付けられる。
各第2規制ピン342は、それが昇降し得るように基台22
を貫通し、その大径下端部34bが基台22下面に衝合し得
るようになっている。On the upper surface of the base 22, a plurality of first restricting pins 34 1 as restricting members for restricting the downward floating amount of the mounting table 24 are erected, and their large-diameter upper end portions 34a collide with the lower surface of the mounting table 24. Are ready to go together. Further, on the lower surface of the mounting table 24, a plurality of second restriction pins 34 2 are attached downward as restriction members for restricting the amount of floating of the mounting table 24 upward.
Each second regulating pin 34 2 is attached to the base 22 so that it can be raised and lowered.
The large-diameter lower end portion 34b thereof can abut the lower surface of the base 22.
前記構成において、ゴム袋30内の気圧を制御器31により
調節して、各第1規制ピン341の大径上端部34aを載置台
24下面より離間し、同時に各第2規制ピン342の大径下
端部34bを基台22下面より離間させれば、載置台24は
上、下方向にのみフローティング支持される。In the above structure, the air pressure inside the rubber bag 30 is adjusted by the controller 31, and the large diameter upper end portion 34a of each first regulating pin 34 1 is placed on the mounting table.
Apart from 24 the lower surface, if away from the second restricting pin 34 2 of the large径下end 34b of the base 22 lower surface at the same time, the mounting table 24 is on, is only floating support in the downward direction.
このように載置台24を上、下方向にのみフローティング
支持する理由は、主砂中子2が3個の成形ブロック2a〜
2cを上、下方向に積層したものであるため、第1,第2接
合凸部61,62が上、下方向に位置ずれを生じている場合
を想定したからである。なお、ガイド筒25とガイドピン
26との間に所定のクリアランスを設ける等の手段を採用
して載置台24を前、後および左右方向にもフローティン
グ支持することが可能である。The reason why the mounting table 24 is floatingly supported only in the upward and downward directions is that the main sand core 2 has three molding blocks 2a to
This is because it is assumed that the first and second joint convex portions 6 1 and 6 2 are misaligned in the upper and lower directions because 2c is laminated in the upper and lower directions. The guide tube 25 and the guide pin
The mounting table 24 can be floatingly supported in the front, rear, and left and right directions by adopting a means such as providing a predetermined clearance with the mounting table 26.
載置台24に、主砂中子2用クランプ機構35が次のように
設けられる。A clamp mechanism 35 for the main sand core 2 is provided on the mounting table 24 as follows.
即ち、載置台24の上面両側において、軸受板27の外側に
各一対の短い支柱36が立設され、各支柱36の上端部に小
型の下部作動シリンダ371が取付けられる。また各短い
支柱36の外側に、各一対の長い支柱38が立設され、それ
ら支柱38の上端部に支持板39が取付けられる。その支持
板39下面に、各短い支柱36上方に位置するようにブラケ
ット40が固着され、各ブラケット40に前記と同一構成の
上部作動シリンダ372が取付けられる。That is, the upper surface on both sides of the mounting table 24, short struts 36 of each pair on the outer side of the bearing plate 27 is erected, the lower working cylinder 37 1 of the compact is attached to the upper end of each strut 36. A pair of long columns 38 is erected on the outer side of each short column 36, and a support plate 39 is attached to the upper ends of the columns 38. As the support plate 39 lower surface, the bracket 40 is fixed so as to be positioned in the short strut 36 upwardly, the upper actuating cylinder 37 2 of the same configuration is attached to each bracket 40.
各上、下部作動シリンダ371,372はゴムパッド41を持つ
進退自在の作動子42を備え、相対向する各一対の下部作
動シリンダ371の作動子42によって、主砂中子2におけ
る第1,第2接合端面31,32を挟む両側面33,34下部を把持
し、また相対向する各一対の上部作動シリンダ372の作
動子42によって前記両側面33,34上部を把持するように
なっている。これら上、下部作動シリンダ371,372の把
持操作によって主砂中子2の位置決めがなされる。Each of the upper and lower working cylinders 37 1 and 37 2 is provided with a movable actuator 42 having a rubber pad 41, and by the operators 42 of each pair of lower working cylinders 37 1 facing each other, Then, the lower sides of both side surfaces 3 3 , 3 4 sandwiching the second joint end surface 3 1 , 3 2 are gripped, and the upper side surfaces 3 3 , 3 4 upper side by the operators 42 of the pair of upper operation cylinders 37 2 facing each other. Is designed to be gripped. The main sand core 2 is positioned by gripping the upper and lower working cylinders 37 1 and 37 2 .
両ガイドロッド21間において、それらと平行に搬入兼搬
出用作動シリンダ43が配設され、その作動シリンダ43
は、位置矯正装置E側の支持板20に固定されており、そ
のピストンロッド44先端は連絡部材45を介して基台22に
連結される。A loading / unloading operating cylinder 43 is arranged between the guide rods 21 in parallel with the guide rods 21.
Is fixed to the support plate 20 on the side of the position correcting device E, and the tip of the piston rod 44 is connected to the base 22 via the connecting member 45.
上記構成において、搬入兼搬出用作動シリンダ43のピス
トンロッド44が伸長して載置台24が第1,第2搬送装置
B1,B2間に挿入されると、載置台24は第1搬送装置B1か
ら主砂中子2を受取る受取り装置に在る。In the above-mentioned configuration, the piston rod 44 of the loading / unloading operation cylinder 43 extends so that the mounting table 24 becomes the first and second transfer devices.
When inserted between B 1 and B 2 , the mounting table 24 is in the receiving device that receives the main sand core 2 from the first transfer device B 1 .
ゴム袋30内の気圧は、主砂中子2の第1,第2接合凸部
61,62と第1,第2補助砂中子41,42の第1,第2接合凹部
71,72;81,82を嵌合操作するとき以外は、制御器31によ
り高圧状態に制御され、これにより載置台24が上動し、
各第2規制ピン342の大径下端部34bが基台22下面に衝合
して載置台24のフローティングは解除されている。The air pressure inside the rubber bag 30 is the first and second joining convex portions of the main sand core 2.
6 1 , 6 2 and 1st, 2nd joining recesses of 1st, 2nd auxiliary sand cores 4 1 , 4 2
Except when the fitting operation of 7 1 , 7 2 ; 8 1 , 8 2 is performed, the controller 31 controls to a high pressure state, whereby the mounting table 24 moves upward,
The large-diameter lower end portion 34b of each second regulation pin 34 2 abuts the lower surface of the base 22 to release the floating of the mounting table 24.
したがって、載置台24の受取り位置では、その各列の空
転ゴムローラ29と第1,第2搬送装置B1,B2の各列の駆動
ゴムローラ19とが一直線上に、且つ同一水平面上に配設
され、これにより第1搬送装置B1から主砂中子2を、空
転ゴムローラ29を転動させながら載置台24上に渡すこと
ができる。主砂中子2が載置台24上に渡された後、クラ
ンプ機構35により主砂中子2が把持される。Therefore, at the receiving position of the mounting table 24, the idle rubber rollers 29 of each row thereof and the driving rubber rollers 19 of each row of the first and second conveying devices B 1 and B 2 are arranged in a straight line and on the same horizontal plane. As a result, the main sand core 2 can be transferred from the first transfer device B 1 onto the mounting table 24 while rolling the idle rubber roller 29. After the main sand core 2 is transferred onto the mounting table 24, the main sand core 2 is gripped by the clamp mechanism 35.
作動シリンダ43のピストンロッド44が収縮すると、基台
22が両ガイドロッド21を摺動して載置台24は、第7図鎖
線示のように組付装置A内の組付位置に保持される。When the piston rod 44 of the working cylinder 43 contracts, the base
22 slides on both guide rods 21 and the mounting table 24 is held at the mounting position in the mounting apparatus A as shown by the chain line in FIG.
組付作業終了後、載置台24は受取り位置に再び移送され
るもので、したがってその受取り位置は組合せ砂中子1
を第2搬送装置B2に渡す渡し位置でもある。After the assembling work is completed, the mounting table 24 is transferred to the receiving position again, and therefore the receiving position is the combination sand core 1.
Is also a delivery position for delivering the sheet to the second transfer device B 2 .
(C)渡し装置D 第3,第5,第6図において、第1搬送装置B1の複数の支柱
15に、その搬送方向と平行に、且つ両ローラ支持部材16
の下方に位置させて一対のガイドレール46が支持されて
おり、両ガイドレール46に台車47の複数の車輪48が係合
している。両ガイドレール46の下面側において、相対向
する支柱15間を連結する連結板49の中央部にガイドレー
ル46と平行に渡し用作動シリンダ50が取付けられ、その
ピストンロッド51先端は、台車47の第1搬入装置C1側端
部に連結部材52を介して連結される。これにより台車47
は第1搬入装置C1に接近する前進位置と、第1搬入装置
C1から離間する後退位置との間を往復動することができ
る。(C) Transfer device D In FIGS. 3, 5, and 6, a plurality of columns of the first transfer device B 1
15, both roller support members 16 parallel to the conveying direction
A pair of guide rails 46 are supported below and a plurality of wheels 48 of a carriage 47 are engaged with both guide rails 46. On the lower surface side of both guide rails 46, a transfer operation cylinder 50 is attached in parallel with the guide rail 46 at the center of a connecting plate 49 that connects the columns 15 facing each other, and the tip end of the piston rod 51 is attached to the carriage 47. It is connected to the end of the first loading device C 1 side via a connecting member 52. As a result, the carriage 47
Is the forward position approaching the first loading device C 1 and the first loading device
It can reciprocate between a retracted position away from C 1 .
台車47の上板53下面中央部に小型の昇降用作動シリンダ
54が取付けられ、その上板53を貫通するピストンロッド
55上端に、ガイドレール46と平行で、且つ両ローラ支持
部材16間に存する送出しレバー56が取付けられる。その
送出しバー56の移動方向前後部下面にそれぞれガイドピ
ン57が突設され、各ガイドピン57は台車47の上板53下面
に取付けられたガイド筒58に摺動自在に嵌合する。Small lifting cylinder in the center of the lower surface of the upper plate 53 of the truck 47
Piston rod to which 54 is attached and which penetrates the upper plate 53
A delivery lever 56, which is parallel to the guide rail 46 and is located between both roller support members 16, is attached to the upper end of 55. Guide pins 57 project from the lower surface of the front and rear portions of the delivery bar 56 in the moving direction, and each guide pin 57 is slidably fitted to a guide cylinder 58 attached to the lower surface of the upper plate 53 of the carriage 47.
送出しバー56は、その中間部上面および第1搬入装置C1
側の先端部上面に第1および第2係合部591,592を備え
ている。第1係合部591は第1搬送装置B1の搬送終端に
存する主砂中子2を第1搬入装置C1に渡すために主砂中
子2の搬送方向後側の第1接合端面31下部に係合し、ま
た第2係合部592は、第1搬入装置C1に存する組合せ砂
中子1において、その主砂中子2の第1接合端面31下部
に係合するようになっている。The delivery bar 56 has an upper surface in the middle and a first loading device C 1
The first and second engaging portions 59 1 and 59 2 are provided on the upper surface of the tip portion on the side. The first engaging portion 59 1 is a first joining end surface on the rear side in the transport direction of the main sand core 2 for transferring the main sand core 2 present at the transport end of the first transport device B 1 to the first loading device C 1. 3 1 engages the lower, and the second engagement portion 59 2, in combination sand core 1 existing in the first loading device C 1, engage the first joining end face 3 1 lower portion of its main sand core 2 It is supposed to do.
上記構成において、第1搬送装置B1により主砂中子2を
搬送終端まで搬送するときには、第5図実線示のように
台車47は後退位置に在り、したがって送出しバー56も後
退している。また送出しバー56は下降位置に在って、両
係合部591,592の上端面は第6図実線示のように各駆動
ゴムローラ19の小径部上縁よりも下方に位置している。In the above configuration, when the main sand core 2 is transported to the transport end by the first transport device B 1 , the carriage 47 is in the retracted position as shown by the solid line in FIG. 5, and therefore the delivery bar 56 is also retracted. . Further, the delivery bar 56 is in the lowered position, and the upper end faces of both the engaging portions 59 1 and 59 2 are located below the upper edge of the small diameter portion of each driving rubber roller 19 as shown by the solid line in FIG. There is.
これにより主砂中子2は第1係合部591と干渉すること
なく搬送終端まで搬送されて待機する。As a result, the main sand core 2 is transported to the transport end without waiting for the first engaging portion 59 1 to stand by.
待機状態の主砂中子2を第1搬入装置C1に、また第1搬
入装置C1に存する組合せ砂中子1を第2搬送装置B2にそ
れぞれ渡すときには、昇降用作動シリンダ54の作動によ
り送出しバー56を上昇させて、第1係合部591を主砂中
子2の第1接合端面31下部に、また第2係合部592を組
合せ砂中子1における主砂中子2の第1接合端面31下部
にそれぞれ対向させる。When the main sand core 2 in the standby state is passed to the first loading device C 1 and the combined sand core 1 present in the first loading device C 1 is passed to the second transportation device B 2 , the operation cylinder 54 for raising and lowering is operated. delivery raises the bar 56 by, Shusuna the first engagement portion 59 1 to the first joining end face 3 1 bottom of Shusuna core 2, also a second engagement portion 59 2 in combination sand core 1 The core 2 is made to face the lower part of the first joint end face 3 1 .
そして渡し用作動シリンダ50の作動により台車47、した
がって送出しバー56を前進させると、第1,第2係合部59
1,592を介して主砂中子2が第1搬入装置C1に、また組
合せ砂中子1が第2搬送装置B2にそれぞれ渡される。第
1搬入装置C1においては、送出しバー56が載置台24上
で、且つ両軸受板17間を往復動するので、送出しバー56
と他物とが干渉することはない。When the carriage 47, and thus the delivery bar 56, is moved forward by the operation of the transfer operation cylinder 50, the first and second engaging portions 59
The main sand core 2 is passed to the first loading device C 1 and the combined sand core 1 is passed to the second transporting device B 2 via 1 , 59 2 . In the first carry-in device C 1 , since the delivery bar 56 reciprocates on the mounting table 24 and between the bearing plates 17, the delivery bar 56
Does not interfere with other things.
(D)第3搬送装置B3 第2,第3図において、第3搬送装置B3は、駆動軸60の両
端に存する一対の駆動スプロケット61に、一対の無端チ
エン62をそれぞれ懸回させたチエンコンベヤ式に構成さ
れる。両無端チエン62間に、第1,第2補助砂中子41,42
を載置する載置部材63が架設される。(D) Third Transport Device B 3 In FIGS. 2 and 3, the third transport device B 3 has a pair of endless chains 62 suspended from a pair of drive sprockets 61 present at both ends of a drive shaft 60. It is configured as a chain conveyor type. Between the two endless chains 62, the first and second auxiliary sand cores 4 1 , 4 2
A mounting member 63 for mounting is mounted.
その載置部材63は両無端チエン62間に存する基板64と、
その基板64の搬送方向前後縁に立設されて両補助砂中子
41,42を載置する一対の載置板65とよりなり、両載置板6
5間には第2搬入装置C2により両補助砂中子41,42を把持
する際に用いられるフォーク挿入用空間sが画成され
る。The mounting member 63 is a substrate 64 existing between both endless chains 62,
Both auxiliary sand cores are erected on the front and rear edges of the substrate 64 in the carrying direction.
It consists of a pair of mounting plates 65 on which 4 1 and 4 2 are mounted.
A space s for fork insertion, which is used when the two auxiliary sand cores 4 1 and 4 2 are gripped by the second loading device C 2 , is defined between the five.
上記構成において、両補助砂中子41,42は、それらの接
合表面51,52を上向きにした状態で両載置板65に載置さ
れて搬送され、それら補助砂中子41,42が位置矯正装置
E近傍の搬送終端に達すると、第3搬送装置B3が作動を
停止し、これにより両補助砂中子41,42は第2搬入装置C
2に受取られるべく待機する。In the above configuration, both auxiliary sand cores 4 1 and 4 2 are placed and transported on both mounting plates 65 with their bonding surfaces 5 1 and 5 2 facing upward, and these auxiliary sand cores 4 1 and 4 2 are conveyed. When 1 and 4 2 reach the end of the transport near the position correction device E, the third transport device B 3 stops operating, whereby both auxiliary sand cores 4 1 and 4 2 move to the second loading device C.
Wait to be picked up by 2 .
前記のように両補助砂中子41,42を寝かせた状態にて搬
送すると、両補助砂中子41,42の搬送に当たって特別な
保持具を不要にし、第3搬送装置B3の構造を簡素化する
ことができる。If both auxiliary sand cores 4 1 and 4 2 are conveyed while lying down as described above, a special holder is not required for the transfer of both auxiliary sand cores 4 1 and 4 2 and the third conveying device B 3 The structure of can be simplified.
(E)第2搬入装置C2 第2図に示すように、第2搬入装置C2は第1,第2搬入機
F1,F2を備え、第1搬入機F1は第1,第2補助砂中子41,42
を第3搬送装置B3から位置矯正装置Eに搬入し、また第
2搬入機F2は両補助砂中子41,42を位置矯正装置Eから
組付装置Aに搬入する。(E) Second loading device C 2 As shown in FIG. 2, the second loading device C 2 is the first and second loading devices.
Equipped with F 1 and F 2 , the first loading machine F 1 has the first and second auxiliary sand cores 4 1 and 4 2.
Is carried into the position correcting device E from the third conveying device B 3 , and the second carrying device F 2 carries both auxiliary sand cores 4 1 and 4 2 into the assembling device A from the position correcting device E.
第1,第2搬入機F1,F2を水平移動するために、第3搬入
装置B3、位置矯正装置Eおよび組付装置Aの上方におい
て、一対の構造部材66間に一対のガイドロッド67(第9
図)が架設される。In order to move the first and second loading machines F 1 and F 2 horizontally, a pair of guide rods are provided between the pair of structural members 66 above the third loading apparatus B 3 , the position correcting apparatus E and the assembly apparatus A. 67 (9th
Figure) is erected.
第1,第2搬入機F1,F2は、それぞれ上部の第1,第2走行
部g1,g2と、下部の第1,第2クランプ部h1,h2とよりな
り、第1,第2走行部g1,g2は両ガイドロッド67に摺動自
在に支持される。The first and second loading machines F 1 and F 2 are respectively composed of upper first and second traveling portions g 1 and g 2 and lower first and second clamp portions h 1 and h 2 , The first and second traveling parts g 1 and g 2 are slidably supported by both guide rods 67.
第2,第8図に示すように、第3搬送装置B3上方の構造部
材66下面に支持ブラケット68が取付けられ、その支持ブ
ラケット68に、ガイドロッド67と平行に水平移動用作動
シリンダ69が支持される。その作動シリンダ69のピスト
ンロッド70先端は第1走行部g1に連結部材71を介して連
結される。As shown in FIGS. 2 and 8, a support bracket 68 is attached to the lower surface of the structural member 66 above the third conveyor B 3 , and a horizontal movement working cylinder 69 is provided on the support bracket 68 in parallel with the guide rod 67. Supported. The tip of the piston rod 70 of the operating cylinder 69 is connected to the first traveling portion g 1 via a connecting member 71.
第1,第2走行部g1,g2間は、長さ調節可能な一対の連結
ロッド72(第9図)を介して連結される。これら連結ロ
ッド72の長さを調節することにより、第1クランプ部h1
が第3搬送装置B3の搬送終端に位置するとき、第2クラ
ンプ部h2を位置矯正装置Eに位置させ、また第1クラン
プ部h1が位置矯正装置Eに位置するとき、第2クランプ
部h2を組付装置Aに位置させることができる。The first and second running parts g 1 and g 2 are connected via a pair of connecting rods 72 (FIG. 9) whose length is adjustable. By adjusting the length of these connecting rods 72, the first clamp portion h 1
Is located at the end of conveyance of the third conveying device B 3 , the second clamp part h 2 is located at the position correcting device E, and when the first clamp part h 1 is located at the position correcting device E, the second clamp The part h 2 can be located on the assembly device A.
第1走行部g1 第2,第8,第9図に示すように、基台73上面に両ガイドロ
ッド67に摺動自在に嵌合する一対のスライダ74が設けら
れ、また基台73の下面に水平移動用作動シリンダ69との
連結部材71が取付けられ、さらに基台73の下側部に両連
結ロッド72の一端が連結される。基台73の上面に昇降用
第1作動シリンダ751が立設され、そのピストンロッド7
6は基台73を貫通して下方に延び、その先端に第1クラ
ンプ部h1と連結する連結部材77の上板78が取付けられ
る。上板78の上面に、ピストンロッド76と平行な一対の
ガイドロッド79が立設され、各ガイドロッド79は基台73
の各ガイド筒80に摺動自在に嵌合される。First traveling part g 1 As shown in FIGS. 2, 8 and 9, a pair of sliders 74 slidably fitted to both guide rods 67 are provided on the upper surface of the base 73, and the base 73 A connecting member 71 for connecting to the horizontal movement operating cylinder 69 is attached to the lower surface, and one ends of both connecting rods 72 are connected to the lower portion of the base 73. The first working cylinder 75 1 is erected for elevating the upper surface of the base 73, its piston rod 7
A reference numeral 6 extends through the base 73 and extends downward, and an upper plate 78 of a connecting member 77 for connecting with the first clamp portion h 1 is attached to the tip thereof. A pair of guide rods 79 parallel to the piston rods 76 are erected on the upper surface of the upper plate 78, and each guide rod 79 has a base 73.
Is slidably fitted in each of the guide cylinders 80.
第1クランプ部h1が上昇位置に在るとき、その不意の下
降を防止するため、基台73と連結部材77との間に、次の
ようなロック機構81が設けられる。When the first clamp part h 1 is in the raised position, a locking mechanism 81 as described below is provided between the base 73 and the connecting member 77 in order to prevent its unexpected lowering.
即ち、上板78上面にロック板82が立設され、そのロック
板82の上端部にガイドロッド67と平行な軸線を持つ係合
孔83が形成される。That is, the lock plate 82 is erected on the upper surface of the upper plate 78, and the engagement hole 83 having an axis parallel to the guide rod 67 is formed at the upper end of the lock plate 82.
基台73に、ロック板82の上端部を遊挿させる開口部84が
形成され、基台73上面において、開口部84を挟んで一側
にロックピン85を持つ小型のロック用作動シリンダ86
が、また他側にロックピン85と係脱する係合孔87を持つ
受け部材88がそれぞれ配設される。89はロックピン85の
ガイド筒で、そのガイド筒89を介して作動シリンダ86が
基台73に固定される。An opening 84 for loosely inserting the upper end portion of the lock plate 82 is formed in the base 73, and a small lock operating cylinder 86 having a lock pin 85 on one side across the opening 84 on the upper surface of the base 73.
On the other side, a receiving member 88 having an engaging hole 87 for engaging and disengaging the lock pin 85 is arranged. 89 is a guide tube of the lock pin 85, and the operating cylinder 86 is fixed to the base 73 via the guide tube 89.
第2走行部g2 第2,第10,第11図に示すように基台90の上面に、両ガイ
ドロッド67に摺動自在に嵌合する一対のスライダ90aが
設けられ、また基台90の下側部に両連結ロッド72の他端
が連結される。基台90の上面に昇降用第2作動シリンダ
752が立設され、そのピストンロッド91は基台90を貫通
して下方に延び、その先端に第2クランプ部h2と連結す
る連結板92が取付けられる。連結板92に、それを貫通す
る4本のガイドロッド93が四角形の四隅に位置するよう
に取付けられ、各ガイドロッド93は基台90の各ガイド筒
94に摺動自在に嵌合される。Second traveling part g 2 As shown in FIGS. 2, 10, and 11, a pair of sliders 90 a slidably fitted to both guide rods 67 are provided on the upper surface of the base 90, and the base 90 The other ends of both connecting rods 72 are connected to the lower part of the. Second working cylinder for lifting on the upper surface of the base 90
75 2 is erected, the piston rod 91 extends downward through the base 90, and a connecting plate 92 for connecting to the second clamp portion h 2 is attached to the tip thereof. Four guide rods 93 penetrating the connecting plate 92 are attached to the four corners of the quadrangle, and each guide rod 93 is a guide tube of the base 90.
94 is slidably fitted.
第2クランプ部h2が上昇位置に在るとき、その不意の下
降を防止するため、基台90と連結板92との間に、次のよ
うなロック機構95が設けられる。When the second clamp part h 2 is in the raised position, a locking mechanism 95 as described below is provided between the base 90 and the connecting plate 92 in order to prevent its unexpected lowering.
即ち、連結板92上面にロック板96が立設され、そのロッ
ク板96の上端部にガイドロッド67と平行な軸線を持つ係
合孔97が形成される。That is, the lock plate 96 is erected on the upper surface of the connecting plate 92, and the engagement hole 97 having an axis parallel to the guide rod 67 is formed at the upper end of the lock plate 96.
基台90に、ロック板96の上端部を遊挿させる開口部98が
形成され、基台90上面において、開口部98を挟んで一側
にロックピン99を持つ小型のロック用作動シリンダ100
が、また他側にロックピン99と係脱する係合孔101を持
つ受け部材102がそれぞれ配設される。103はロックピン
99のガイド筒で、そのガイド筒103を介して作動シリン
ダ100が基台90に固定される。The base 90 is formed with an opening 98 for loosely inserting the upper end of the lock plate 96, and on the upper surface of the base 90, a small lock working cylinder 100 having a lock pin 99 on one side across the opening 98.
However, receiving members 102 having engaging holes 101 for engaging and disengaging the lock pins 99 are arranged on the other side, respectively. 103 is a lock pin
The guide cylinder 99 allows the working cylinder 100 to be fixed to the base 90 via the guide cylinder 103.
前記,項記載の構成において、昇降用第1,第2作動
シリンダ751,752のピストンロッド76,91が収縮し、また
水平移動用作動シリンダ96のピストンロッド70が収縮し
ているときには、第2図に示すように第1クランプ部h1
は第3搬送装置B3の搬送終端上方に、また第2クランプ
部h2は位置矯正装置Eの上方にそれぞれ配置される。In the above-mentioned configuration, when the piston rods 76, 91 of the lifting first and second working cylinders 75 1 , 75 2 are contracted and the piston rod 70 of the horizontal movement working cylinder 96 is contracted, As shown in FIG. 2, the first clamp part h 1
Is arranged above the end of conveyance of the third conveying device B 3 , and the second clamp part h 2 is arranged above the position correcting device E.
昇降用第1作動シリンダ751のピストンロッド76が伸長
すると、第1クランプ部h1が下降してそれは両補助砂中
子41,42を第3搬送装置B3から受取る受取り位置に保持
され、また昇降用第2作動シリンダ752のピストンロッ
ド91が伸長すると、第2クランプ部h2が下降してそれは
両補助砂中子41,42を位置矯正装置Eから受取る受取り
位置に保持される。When the piston rod 76 of the first lifting / lowering working cylinder 75 1 is extended, the first clamp part h 1 is lowered, which holds both auxiliary sand cores 4 1 and 4 2 in the receiving position for receiving from the third transfer device B 3. When the piston rod 91 of the second lifting / lowering operation cylinder 75 2 is extended, the second clamp part h 2 is lowered to the receiving position for receiving both auxiliary sand cores 4 1 and 4 2 from the position correcting device E. Retained.
その後、昇降用第1,第2作動シリンダ751,752により第
1,第2クランプ部h1,h2が上昇し、それらの上昇限でロ
ック板82,96の係合孔83,97、ロックピン85,99および受
け部材88,102の係合孔87,101が合致すると、ロック用作
動シリンダ86,100の作動によりロックピン85,99が両係
合孔83,97および87,101に係合して第1,第2クランプ部h
1,h2の下降が阻止される。次いで水平移動用作動シリン
ダ69とピストンロッド70が伸長すると、第1クランプ部
h1は位置矯正装置E上方に、また第2クランプ部h2は組
付装置A上方にそれぞれ配置される。After that, the first and second working cylinders 75 1 and 75 2 for lifting and lowering
When the first and second clamp parts h 1 and h 2 rise, and the engaging holes 83 and 97 of the lock plates 82 and 96, the lock pins 85 and 99, and the engaging holes 87 and 101 of the receiving members 88 and 102 are aligned at their ascending limits, The lock pins 85 and 99 are engaged with the engagement holes 83, 97 and 87, 101 by the operation of the lock operation cylinders 86 and 100, and the first and second clamp parts h
The fall of 1 and h 2 is blocked. Then, when the horizontal movement working cylinder 69 and the piston rod 70 extend, the first clamp portion
h 1 is arranged above the position correcting device E, and the second clamp part h 2 is arranged above the assembling device A.
前記ロックピン85,99等によるロックが解除されて、昇
降用第1作動シリンダ751のピストンロッド76が伸長す
ると、第1クランプ部h1が下降してそれは両補助砂中子
41,42を位置矯正装置Eに渡す渡し位置に保持され、ま
た昇降用第2作動シリンダ752のピストンロッド91が伸
長すると第2クランプ部h2が下降してそれは両補助砂中
子41,42を組付装置Aに渡す渡し位置に保持される。When the lock by the lock pins 85, 99 and the like is released and the piston rod 76 of the first lifting / lowering operation cylinder 75 1 extends, the first clamp part h 1 descends, and both auxiliary sand cores
4 1, 4 2 are held in a passing position to pass to the position correction device E, also the second operating cylinder 75 2 of the piston rod 91 for raising and lowering the extending second clamping portion h 2 is lowered it is the subsidiary sand core It is held at the transfer position where 4 1 and 4 2 are transferred to the assembling apparatus A.
前記のように第1,第2クランプ部h1,h2は同時に両受取
り位置に、また同時に両渡し位置にそれぞれ移動し、し
たがって水平移動用作動シリンダ69および昇降用第1,第
2作動シリンダ751,752は両クランプ部h1,h2の移動源を
構成する。As described above, the first and second clamp parts h 1 and h 2 move to both receiving positions at the same time and to both delivery positions at the same time, and therefore, the horizontal moving working cylinder 69 and the lifting first and second working cylinders. 75 1 and 75 2 form a moving source of both clamp parts h 1 and h 2 .
前記構成によれば、第1,第2クランプ部h1,h2および移
動源の協働により、第3搬送装置B3および位置矯正装置
E間、ならびに位置矯正装置Eおよび組付装置A間にお
ける両補助砂中子41,42の搬送を迅速に行うことができ
る。According to the above configuration, the cooperation between the first and second clamp parts h 1 and h 2 and the movement source allows the third conveying device B 3 and the position correcting device E to be connected, and the position correcting device E and the assembling device A to be connected. Both auxiliary sand cores 4 1 and 4 2 can be quickly transported.
第1クランプ部h1 第2,第8,第9図に示すように、第1クランプ部h1は第1,
第2補助砂中子41,42を別別にクランプする第1,第2ク
ランプ構造1041,1042を備えており、それらの構成およ
び作用は略同一であるから第1補助砂中子41の搬入に用
いられる第1クランプ構造1041について詳述する。First clamp part h 1 As shown in FIGS. 2, 8 and 9, the first clamp part h 1 is
The first auxiliary sand core is provided with the first and second clamp structures 104 1 and 104 2 for separately clamping the second auxiliary sand cores 4 1 and 4 2 and their configurations and actions are substantially the same. The first clamp structure 104 1 used for loading 4 1 will be described in detail.
連結部材77の4本の脚部105下端に基台106が取付けら
れ、その基台106の相対向する両側壁部間に、第3搬送
装置B3の搬送方向と交差する関係に一対のガイドロッド
107が架設される。両ガイドロッド107に、フォーク取付
板108上面の一対のスライダ109が摺動自在に嵌合され
る。基台106の一方の側壁部外面において、両ガイドロ
ッド107間に位置するようにブラケット110が突設され、
そのブラケット110にフォーク移動用作動シリダン111が
ガイドロッド107と平行に取付けられる。作動シリンダ1
11のピストンロッド112先端はフォーク取付板108上面の
連結部材113に連結される。A base 106 is attached to the lower ends of the four legs 105 of the connecting member 77, and a pair of guides are provided between the opposite side walls of the base 106 so as to intersect with the transfer direction of the third transfer device B 3. rod
107 is erected. A pair of sliders 109 on the upper surface of the fork mounting plate 108 are slidably fitted to both guide rods 107. On one outer surface of the side wall of the base 106, a bracket 110 is provided so as to be located between the guide rods 107,
A fork-moving operating silidin 111 is attached to the bracket 110 in parallel with the guide rod 107. Working cylinder 1
The tip of the piston rod 112 of 11 is connected to the connecting member 113 on the upper surface of the fork mounting plate 108.
フォーク取付板108の作動シリンダ111側下面にL字形フ
ォーク114が取付けられ、そのフォーク114下部の載置部
115は水平に保持される。載置部115の先端側上面に第1
補助砂中子41の凹部101に遊嵌される四角形の位置合せ
突起116が設けられる。An L-shaped fork 114 is mounted on the lower surface of the fork mounting plate 108 on the side of the working cylinder 111, and a mounting portion below the fork 114 is mounted.
115 is held horizontally. No. 1 on the top surface of the mounting portion 115
A rectangular alignment protrusion 116 is provided which is loosely fitted in the recess 10 1 of the auxiliary sand core 4 1 .
位置合せ突起116と対向してフォーク取付板108上面に、
押え用作動シリンダ117が立設され、そのピストンロッ
ド118はフォーク取付板108を貫通して下方に延びてい
る。ピストンロッド118下端に支持板119が取付けられ、
その支持板119上面に立設された一対のガイドロッド120
がフォーク取付板108を貫通してその上面の両ガイド筒1
21にそれぞれ摺動自在に嵌合される。On the top surface of the fork mounting plate 108 facing the alignment protrusion 116,
A presser working cylinder 117 is erected, and its piston rod 118 penetrates the fork mounting plate 108 and extends downward. A support plate 119 is attached to the lower end of the piston rod 118,
A pair of guide rods 120 erected on the upper surface of the support plate 119.
Passes through the fork mounting plate 108 and both guide tubes 1 on its upper surface
21 are slidably fitted together.
支持板119下方に、下面にゴムパッド122を有する押え板
123が配設され、その押え板123上面に突設された一対の
ガイドピン124が支持板119下面のガイド筒125および支
持板119をそれぞれ摺動自在に貫通している。各ガイド
筒125上端部と押え板123上面との間にクッションばね12
6が縮設される。A pressing plate having a rubber pad 122 on the lower surface below the supporting plate 119.
123 is provided, and a pair of guide pins 124 projectingly provided on the upper surface of the holding plate 123 slidably penetrates the guide cylinder 125 and the supporting plate 119 on the lower surface of the supporting plate 119. Cushion spring 12 is placed between the upper end of each guide tube 125 and the top surface of pressing plate 123.
6 is reduced.
上記構成において、第1クランプ部h1の受取り位置で
は、先ずフォーク移動用作動シリンダ111のピストンロ
ッド112が収縮して、第9図2点鎖線示のようにフォー
ク114の載置部115先端が第3搬送装置B3のフォーク挿入
用空間s側方に配置される。次いで作動シリンダ111の
ピストンロッド112が伸長し、同図2点鎖線示のように
載置部115が空間s内に挿入されて位置合せ突起116が第
1補助砂中子41の凹部101に対向する。そして昇降用第
1作動シリンダ751のピストンロッド76が僅かに収縮す
ると、フォーク114が僅かに上昇し、これにより位置合
せ突起116が凹部101に遊嵌されて第1補助砂中子41が載
置部115に対し位置合せされる。In the above-mentioned configuration, at the receiving position of the first clamp portion h 1 , first, the piston rod 112 of the fork movement actuating cylinder 111 contracts so that the tip of the placement portion 115 of the fork 114 is changed as shown by the dashed line in FIG. It is arranged on the side of the fork insertion space s of the third carrier B 3 . Then the piston rod 112 of the actuating cylinder 111 is extended, the recess 10 1 alignment projection 116 mounting portion 115 as shown in FIG. 2 dot chain line is inserted into the space s is the first auxiliary sand core 4 1 To face. Then, when the piston rod 76 of the first lifting / lowering operation cylinder 75 1 slightly contracts, the fork 114 slightly rises, whereby the alignment protrusion 116 is loosely fitted in the recess 10 1 and the first auxiliary sand core 4 1 Are aligned with the mounting portion 115.
次いで押え用作動シリンダ117のピストンロッド118が伸
長してゴムパッド122を第1補助砂中子41の接合表面51
に軽く押圧するので、その補助砂中子41はゴムパッド12
2と載置部115との間に挟持される。Then the rubber pad 122 piston rod 118 is extended the presser actuating cylinder 117 first auxiliary sand core 4 1 of the joining surface 5 1
Since lightly pressed on, the auxiliary sand core 4 1 rubber pad 12
It is sandwiched between 2 and the mounting portion 115.
その後、昇降用第1作動シリンダ751のピストンロッド7
6が収縮してフォーク114が上昇し、第1補助砂中子41は
各クッションばね126の弾発力によってゴムパッド122お
よび載置部115間に挟持されて位置矯正装置Eに搬入さ
れ、そこで、第1昇降用作動シリンダ751のピストンロ
ッド76の伸長、その伸長途中における押え用作動シリン
ダ117のピストンロッド118の収縮の各動作が行われて第
1補助砂中子41が位置矯正装置Eに渡される。After that, the piston rod 7 of the first working cylinder 75 1 for lifting and lowering
6 is fork 114 is raised by contraction, the first auxiliary sand core 4 1 is carried into the position correction device E is sandwiched between rubber pad 122 and mounting portion 115 by the elastic force of the cushion spring 126, where , Extension of the piston rod 76 of the first lifting operation cylinder 75 1 and contraction of the piston rod 118 of the pressing operation cylinder 117 during the extension are performed, and the first auxiliary sand core 4 1 is moved to the position correcting device. Passed to E.
第2補助砂中子42の搬入に用いられる第2クランプ構造
1042は第1クランプ構造1041と同時に作動し、したがっ
て第2補助砂中子42は第1補助砂中子41と同時に位置矯
正装置Eに搬入される。Second clamp structure for use in the second input of the auxiliary sand core 4 2
104 2 operates at the same time as the first clamping structure 104 1 , so that the second auxiliary sand core 4 2 is loaded into the position correcting device E at the same time as the first auxiliary sand core 4 1 .
なお、第2クランプ構造1042において、第1クランプ構
造1041と同一構成部品には同一符号を付してある。In the second clamp structure 104 2 , the same components as those of the first clamp structure 104 1 are designated by the same reference numerals.
第2クランプ部h2 第2,第10,第11図に示すように、第2クランプ部h2は第
1,第2補助砂中子41,42を別々にクランプする第1,第2
クランプ構造1271,1272を備えており、それらの構成お
よび作用は略同一であるから第1補助砂中子41の搬入に
用いられる第1クランプ構造1271について詳述する。Second clamp part h 2 As shown in FIGS. 2, 10 and 11, the second clamp part h 2 is
1, 2nd auxiliary sand core 4 1 and 4 2 are clamped separately 1st and 2nd
Comprises a clamp structure 127 1, 127 2, their structure and operation will be described in detail first clamping structure 127 1 used because it is substantially the same in the first auxiliary sand core 4 1 of the carry.
連結板92から突出する2本のガイドロッド93の下方に、
第1クランプ構造1271の構成部材であるアーム支持板12
8が配設され、連結板92とアーム支持板128とは、四角形
の四隅に存する4本のリンク部材129を介して連結され
る。各リンク部材129は上、下端部にそれぞれボールジ
ョイント130を有し、これによりアーム支持板128は水平
面内で全方向に移動自在に第2走行部g2に吊持される。Below the two guide rods 93 protruding from the connecting plate 92,
Arm support plate 12 which is a component of the first clamp structure 127 1.
8 is provided, and the connecting plate 92 and the arm supporting plate 128 are connected via the four link members 129 existing at the four corners of the quadrangle. Each link member 129 has a ball joint 130 at the upper and lower ends thereof, respectively, whereby the arm support plate 128 is suspended on the second traveling part g 2 so as to be movable in all directions in the horizontal plane.
第2クランプ部h2が位置矯正装置E上方に位置し、また
第1補助砂中子41が位置矯正、それに次ぐ反転によって
組付装置Aへの搬入姿勢に変換されている場合におい
て、第1補助砂中子41の第1接合凹部71両側上方に位置
するように、アーム支持板128下面に第1,第2ガイドブ
ロック1311,1312が取付けられ、両ガイドブロック1311,
1312の外側面側に、第1補助砂中子41の第1接合凹部71
両側に存する縁部を把持する第1,第2アーム1321,1322
が支持される。In the case where the second clamp part h 2 is located above the position correcting device E, and the first auxiliary sand core 4 1 is converted to the carrying-in posture to the assembly device A by position correcting and then reversing, 1 auxiliary sand core 4 so as to be positioned on the first joining recess 7 1 on both sides above the 1, first the lower face arm support plate 128, a second guide block 131 1, 131 2 are mounted, the guide block 131 1,
131 second outer surface, the first first joining recess 7 of the auxiliary sand core 4 1 1
First and second arms 132 1 and 132 2 that grip the edges on both sides
Is supported.
即ち、第1,第2アーム1321,1322の上端部に突設された
水平なガイドロッド1331,1332が両ガイドブロック1311,
1312に摺動自在に貫通され、また両ガイドブロック13
11,1312内側面に取付けられた小型のアーム移動用作動
シリンダ1341,1342のピストンロッド1351,1352がガイド
ロッド1331,1332と平行に両ガイドブロック1311,1312を
それぞれ貫通して各先端部が第1,第2アーム1321,1322
に連結される。That is, the horizontal guide rods 133 1 and 133 2 projecting from the upper ends of the first and second arms 132 1 and 132 2 are attached to both guide blocks 131 1 and
131 2 is slidably penetrated and both guide blocks 13
1 1 , 131 2 Piston rods 135 1 , 135 2 of small cylinders for arm movement 134 1 , 134 2 mounted on the inner surface are parallel to guide rods 133 1 , 133 2 Both guide blocks 131 1 , 131 2 Through each of the first and second arms 132 1 and 132 2
Connected to.
第1補助砂中子41の下縁中央部両側の上方に位置するよ
うに、アーム支持板128下面に第3,第4ガイドブロック1
313,1314が取付けられ、両ガイドブロック1313,1314の
外側面側に、第1補助砂中子41の下縁中央部両側を支承
する第3,第4アーム1323,1324が支持される。So as to be positioned above the lower edge center portion on both sides of the first auxiliary sand core 4 1, arm support plate 128 lower surface to the third, fourth guide block 1
31 3, 131 4 are attached on the outer surface side of the guide block 131 3, 131 4, the first auxiliary sand core 4 1 of a lower edge central portion 3 for supporting the both sides, the fourth arm 132 3, 132 4 is supported.
即ち、第3,第4アーム1323,1324の上端部に突設された
水平なガイドロッド1333,1334が両ガイドブロック1313,
1314に摺動自在に貫通され、また両ガイドブロック13
13,1314内側面に取付けられた小型のアーム移動用作動
シリンダ1343,1344のピストンロッド1353,1354がガイド
ロッド1333,1334と平行に両ガイドブロック1313,1314を
それぞれ貫通して各先端部が第3,第4アーム1323,1324
に連結される。That is, the horizontal guide rods 133 3 and 133 4 projecting from the upper ends of the third and fourth arms 132 3 and 132 4 are attached to both guide blocks 131 3 and
131 4 is slidably penetrated and both guide blocks 13
1 3 , 131 4 Piston rods 135 3 , 135 4 of small cylinders for arm movement 134 3 , 134 4 mounted on the inner surface are parallel to the guide rods 133 3 , 133 4 Both guide blocks 131 3 , 131 4 Each of the third and fourth arms 132 3 and 132 4
Connected to.
第1〜第4アーム1321〜1324の内向き下端部に、第1補
助砂中子41に係合する鉤形ゴムパッド136がそれぞれ固
着されている。To the first to inward lower end of the fourth arm 132 1-132 4, hooked rubber pad 136 which engages the first auxiliary sand core 4 1 are fixed respectively.
第1補助砂中子41の接合表面51における略中央部上方に
おいてアーム支持板128上面に、押え用作動シリンダ137
が立設され、そのピストンロッド138はアーム支持板128
を貫通して下方に延びている。ピストンロッド138下端
に支持板139が取付けられ、その支持板139上面に立設さ
れた一対のガイドロッド140がアーム支持板128を貫通し
てその上面のガイド筒141に摺動自在に嵌合される。The arm support plate 128 upper surface in a substantially central portion above the junction surface 5 of the first auxiliary sand core 4 1, for holding the actuating cylinder 137
Is erected, and its piston rod 138 has an arm support plate 128.
And extends downward. A support plate 139 is attached to the lower end of the piston rod 138, and a pair of guide rods 140 provided upright on the upper surface of the support plate 139 penetrates the arm support plate 128 and is slidably fitted to a guide cylinder 141 on the upper surface. It
支持板139下方に、下面にゴムパッド142を有する押え板
143が配設され、その押え板143上面に突設された一対の
ガイドピン144が支持板139下面のガイド筒145および支
持板139を摺動自在に貫通している。各ガイド筒145上端
部と押え板143上面との間にクッションばね146が縮設さ
れる。A support plate having a rubber pad 142 on the lower surface below the support plate 139.
A pair of guide pins 144 provided on the upper surface of the holding plate 143 slidably penetrates the guide cylinder 145 and the supporting plate 139 on the lower surface of the supporting plate 139. A cushion spring 146 is contracted between the upper end of each guide cylinder 145 and the upper surface of the pressing plate 143.
ゴムパッド142の両側に、位置決め部材としての一対の
位置決めピン147が配設され、各位置決めピン147の上端
部がアーム支持板128下面に固着される。各位置決めピ
ン147の下端部は先細りのテーパ部147aに形成される。A pair of positioning pins 147 as positioning members are arranged on both sides of the rubber pad 142, and upper ends of the positioning pins 147 are fixed to the lower surface of the arm support plate 128. The lower end of each positioning pin 147 is formed into a tapered taper portion 147a.
各位置決めピン147に対応して、位置矯正装置Eに位置
決め部材としての位置決め筒148が設けられ、各位置決
め筒148はテーパ部147aと係脱する上向きの孔部149を有
する。A positioning cylinder 148 as a positioning member is provided in the position correcting device E corresponding to each positioning pin 147, and each positioning cylinder 148 has an upward hole 149 that engages with and disengages from the tapered portion 147a.
また連結板92とアーム支持板128との間に、第1補助砂
中子41の搬送過程で、第1クランプ構造1271と各リンク
部材129の起因した水平面内移動を固定する一対のロッ
ク機構150が設けられる。Also between the connecting plate 92 and the arm support plate 128, the first auxiliary sand core 4 first transfer process, a pair of lock to secure the movement resulting from the horizontal plane of the first clamping structure 127 1 and the link members 129 A mechanism 150 is provided.
各ロック機構150は、各ガイドロッド93の下端部に在っ
て下向きに開口するロック孔151と、そのロック孔151の
直下に在ってアーム支持板128上面に立設された、ロッ
クピン152を持つ小型のロック用作動シリンダ153とより
なり、その作動シリンダ153によりロックピン152をロッ
ク孔151に係脱させるようになっている。Each lock mechanism 150 has a lock hole 151 at the lower end of each guide rod 93 that opens downward, and a lock pin 152 that is provided immediately below the lock hole 151 and is erected on the upper surface of the arm support plate 128. The lock cylinder 152 has a small-sized lock operation cylinder 153, and the lock pin 152 is engaged with and disengaged from the lock hole 151 by the operation cylinder 153.
上記構成において、昇降用第2作動シリンダ752のピス
トンロッド91が伸長して第1クランプ構造1271が下降す
ると、各位置決めピン147と各位置決め筒148との間に多
少の心ずれを生じていても、各位置決めピン147のテー
パ部147aが各位置決め筒148の孔部149に僅かでも係合し
た後は各リンク部材129を介して第1クランプ構造1271
が水平面内で移動するので、各位置決めピン147が各位
置決め筒1481に係合し、これにより第1〜第4アーム13
21〜1324を位置矯正後の第1補助砂中子41に対して正し
く位置決めすることができる。In the above structure, when the piston rod 91 of the second lifting cylinder 75 2 extends and the first clamp structure 127 1 descends, a slight misalignment occurs between each positioning pin 147 and each positioning cylinder 148. However, after the tapered portion 147a of each positioning pin 147 slightly engages with the hole 149 of each positioning cylinder 148, the first clamp structure 127 1 is inserted through each link member 129.
Since but moves in a horizontal plane, the positioning pin 147 is engaged with the positioning tube 148 1, thereby the first through fourth arm 13
2 1-132 4 can correctly positioned with respect to the first auxiliary sand core 4 1 after the positioning correcting.
次いで、各アーム移動用作動シリンダ1341〜1344のピス
トンロッド1351〜1354が収縮して各アーム1321〜1324に
より第1補助砂中子41が把持され、また押え用作動シリ
ンダ137のピストンロッド138が伸長してゴムパッド142
を第1補助砂中子41の接合表面51に軽く押圧するので、
その砂中子41は位置矯正状態のまゝゴムパッド142と第
1〜第4アーム1321〜1324との間に挟持される。Then, the respective arm 132 1-132 4 piston rods 135 1 to 135 4 of each arm moving actuating cylinder 134 1-134 4 is contracted first auxiliary sand core 4 1 is grasped and operated cylinder retainer The piston rod 138 of 137 extends and the rubber pad 142
Is lightly pressed against the bonding surface 5 1 of the first auxiliary sand core 4 1 ,
Its sand core 4 1 is sandwiched between the or the position correction stateゝrubber pad 142 and the first through fourth arms 132 1-132 4.
その後昇降用第2作動シリンダ752のピストンロッド91
が収縮して第1〜第4アーム1321〜1324が上昇し、第1
補助砂中子41は各クッションばね146の弾発力によって
ゴムパッド142および第1〜第4アーム1321〜1324に挟
持されて組付装置Aに搬入される。After that, the piston rod 91 of the second working cylinder 75 2 for lifting and lowering
Contract and the first to fourth arms 132 1 to 132 4 rise,
Auxiliary sand core 4 1 is carried into the rubber pad 142 and the first to fourth arm 132 1-132 4 is sandwiched by assembling apparatus A by the elastic force of the cushion spring 146.
各位置決めピン147が各位置決め筒148より離脱した後、
各ロック機構150のロック用作動シリンダ153によりロッ
クピン152が伸長してロック孔151に係合するので、第1
クランプ構造1271の水平面内移動が阻止され、これによ
り第1補助砂中子41の搬送作業の安全性を確保すること
ができる。After each positioning pin 147 is separated from each positioning cylinder 148,
Since the lock pin 152 extends and engages with the lock hole 151 by the lock operation cylinder 153 of each lock mechanism 150,
The clamp structure 127 1 is prevented from moving in the horizontal plane, and thus the safety of the transfer operation of the first auxiliary sand core 4 1 can be ensured.
組付装置Aには、後述するように各位置決めピン147に
対応して前記同様に位置決め部材が設けられ、各ロック
機構150の解除後各位置決めピン147が各位置決め部材の
孔部に係合して、第1補助砂中子41が位置矯正状態のま
ゝ組付装置Aに渡される。As described below, the assembling apparatus A is provided with a positioning member corresponding to each positioning pin 147 in the same manner as described above. After releasing each locking mechanism 150, each positioning pin 147 engages with the hole of each positioning member. Te, the first auxiliary sand core 4 1 is passed betweenゝassembling apparatus a position correction state.
第2補助砂中子42の搬入に用いられる第2クランプ構造
1272は第1クランプ構造1271と同時に作動し、したがっ
て第2補助砂中子42は第1補助砂中子41と同時に組付装
置Aに搬入される。Second clamp structure for use in the second input of the auxiliary sand core 4 2
127 2 operates simultaneously with the first clamping structure 127 1 , so that the second auxiliary sand core 4 2 is loaded into the assembling apparatus A at the same time as the first auxiliary sand core 4 1 .
第2クランプ構造1272は、第3,第4アーム1323,1324お
よびその移動系を持たないことを除いて第1クランプ構
造1271と略同一の構成を有するので、第1クランプ構造
1271と同一構成部品には同一符号を付してある。The second clamp structure 127 2 has substantially the same configuration as the first clamp structure 127 1 except that it does not have the third and fourth arms 132 3 and 132 4 and its moving system.
The same components as those of 127 1 are designated by the same reference numerals.
(F)位置矯正装置E 第2,第3,第12〜第16図に示すように、床面14に4本の支
柱154が四角形の四隅に位置するように立設され、それ
ら支柱154の上端に第1,第2補助砂中子41,42を載置する
載置台155が支持される。(F) Position correction device E As shown in FIGS. 2, 3, and 12 to 16, four columns 154 are erected on the floor surface 14 so as to be positioned at the four corners of the quadrangle. first, second auxiliary sand core 4 1, 4 2 for mounting the mounting table 155 is supported on the upper end.
第14図に明示するように載置台155は、第1補助砂中子4
1を載置する位置に円形窓156を、また第2補助砂中子42
を載置する位置に角形窓157をそれぞれ有する。両窓15
6,157の両側において、載置台155上面にそれぞれ前記位
置決め筒148が立設される。As clearly shown in FIG. 14, the mounting table 155 includes the first auxiliary sand core 4
A circular window 156 is placed at the position where 1 is placed, and the second auxiliary sand core 4 2
Each has a rectangular window 157 at a position for mounting. Both windows 15
The positioning cylinders 148 are erected on the upper surface of the mounting table 155 on both sides of the 6,157.
載置台155上面において、円形窓156の周囲に第2搬入装
置C2から第1補助砂中子41を受けてそれを載置する複数
の第1支持脚1581と、反転後の第1補助砂中子41を載置
する複数の第2支持脚1582が立設される。図示例では両
支持脚1581,1582のうち或るものは第1補助砂中子41の
両状態において共用されている。また角形窓157の周囲
に第2補助砂中子42を載置する複数の支持脚159が立設
される。On the upper surface of the mounting table 155, a plurality of first supporting legs 158 1 for receiving and mounting the first auxiliary sand core 4 1 from the second loading device C 2 on the periphery of the circular window 156, and the first supporting leg 158 1 after being inverted. A plurality of second support legs 158 2 on which the auxiliary sand core 4 1 is placed are erected. In the illustrated example, some of the support legs 158 1 and 158 2 are commonly used in both states of the first auxiliary sand core 4 1 . The plurality of support legs 159 for supporting the second auxiliary sand cores 4 2 around the rectangular window 157 is erected.
各第1,第2支持脚1581,1582および各支持脚159の配設位
置は、第2搬入装置C2の両フォーク114、第1〜第4ア
ーム1321〜1324と干渉しないように設定される。Each first, the arrangement position of the second support leg 158 1, 158 2 and the support leg 159, a second loading device C 2 of the two forks 114, first to fourth so as not to interfere with the arm 132 1-132 4 Is set to.
第12,第13図に明示するように両窓156,157の下方に、第
1,第2補助砂中子41,42の位置矯正を行う第1,第2位置
矯正部1601,1602が配設される。第1位置矯正部160
1は、各支柱154の上下方向中間部に支持された基台161
に設置され、また第2位置矯正部1602は基台161上面に
立設された支持フレーム162に設置される。As shown in FIGS. 12 and 13, below the windows 156 and 157,
First and second position correcting units 160 1 and 160 2 for correcting the positions of the first and second auxiliary sand cores 4 1 and 4 2 are provided. First position correction unit 160
1 is a base 161 supported on the vertical middle part of each pillar 154.
It is installed in, and the second position correcting unit 160 2 is disposed on the support frame 162 erected on the base 161 top surface.
両部1601,1602の構成および作用は第1位置矯正部1601
が第1補助砂中子41を水平面内で90゜回転させる反転機
構を備えている点を除いて略同一であるから、以下第1
位置矯正部1601について詳述する。The structure and operation of both parts 160 1 and 160 2 are the same as the first position correction part 160 1
Because it is substantially the same, or less than the first but except that it includes a reversing mechanism for rotating 90 ° the first auxiliary sand core 4 1 in the horizontal plane
The position correction unit 160 1 will be described in detail.
基台161にピストンロッド163を上向きにした昇降用作動
シリンダ164が取付けられ、そのピストンロッド164先端
にフレーム部材165の底板166が連結される。底板166の
下面に一対のガイドロッド167が突設され、各ガイドロ
ッド167は基台161の各ガイド筒168に摺動自在に嵌合さ
れる。A lifting operation cylinder 164 with a piston rod 163 facing upward is attached to a base 161, and a bottom plate 166 of a frame member 165 is connected to the tip of the piston rod 164. A pair of guide rods 167 are projectingly provided on the lower surface of the bottom plate 166, and each guide rod 167 is slidably fitted in each guide cylinder 168 of the base 161.
底板166上面に反転用回転源としてのロータリアクチェ
エータ169が配設され、その上向きの駆動軸170は継手17
1を介して回転軸172に連結される。回転軸172はフレー
ム部材165上端の支持筒173を貫通すると共にその支持筒
173に複数の軸受174を介して回転可能に支持される。前
記ロータリアクチュエータ169、継手171、回転軸172、
支持筒173等は反転機構175を構成する。A rotary reactor 169 as a reversing rotation source is arranged on the upper surface of the bottom plate 166, and the upward drive shaft 170 has a joint 17
It is connected to the rotating shaft 172 via 1. The rotary shaft 172 penetrates the support cylinder 173 at the upper end of the frame member 165 and also supports the support cylinder.
It is rotatably supported by 173 via a plurality of bearings 174. The rotary actuator 169, the joint 171, the rotary shaft 172,
The support cylinder 173 and the like constitute a reversing mechanism 175.
回転軸172の上端に円形の基板176が水平に取付けられ、
その基板176上面に次のように位置矯正機構177が配設さ
れる。A circular substrate 176 is horizontally attached to the upper end of the rotary shaft 172,
A position correcting mechanism 177 is arranged on the upper surface of the substrate 176 as follows.
第14〜第16図に明示するように基板176上面に一対の支
持ブロック178を有するブロック台179が固定され、それ
ら支持ブロック178に第1,第2矯正爪1801,1802の下端部
が支持ピン181を介してそれぞれ揺動自在に支持され、
両矯正爪1801,1802の対向面側中間部に、外周面の一部
を対向面から露出させたローラ182が支持ピン183を介し
て支持される。両支持ブロック178の対向面間に矯正爪
開き用作動シリンダ184がそのピストンロッド185を上向
きにして配設され、ピストンロッド185先端には大径側
の端面を下向きにした円錐台形作動子186が取付けられ
る。上下の支持ピン181,183間において、両矯正爪1801,
1802に環状をなす矯正爪閉じ用ばね187が装着され、そ
のばね187の収縮力によって両ローラ182が作動子186の
テーパ面186aに当接する。As shown in FIGS. 14 to 16, a block base 179 having a pair of support blocks 178 is fixed to the upper surface of the substrate 176, and the lower ends of the first and second correction claws 180 1 and 180 2 are fixed to the support blocks 178. Each is swingably supported via a support pin 181,
A roller 182, a part of the outer peripheral surface of which is exposed from the facing surface, is supported by a support pin 183 at the facing surface side intermediate portion of both the correction nails 180 1 and 180 2 . An orthodontic pawl opening actuating cylinder 184 is arranged between the opposing surfaces of both supporting blocks 178 with its piston rod 185 facing upward, and at the tip of the piston rod 185 there is a frustoconical actuator 186 with the end face on the large diameter side facing downward. Mounted. Between the upper and lower support pins 181, 183, both correction nails 180 1 ,
180 2 straightening pawls close spring 187 which forms a ring is attached to, the rollers 182 by the contraction force of the spring 187 abuts against the tapered surface 186a of the actuator 186.
したがって、前記矯正爪開き用作動シリンダ184および
作動子186は、矯正爪閉じ用ばね187のばね力に抗して両
矯正爪1801,1802を互に離間する方向に移動させる作動
部材を構成する。Therefore, the actuating cylinder 184 for opening the straightening claw and the actuator 186 constitute an actuating member for moving the straightening claws 180 1 and 180 2 in a direction in which they are separated from each other against the spring force of the spring 187 for closing the straightening claw. To do.
両矯正爪1801,1802は、その先端に、第1補助砂中子41
の凹部101に係脱する係合端部1881,1882を有し、両係合
端部1881,1882は、第1補助砂中子41の凹部101におい
て、対角位置に存する隣接二内側面a1,b1;a2,b2に当接
する一対の傾斜面1891,1892をそれぞれ備えている。Both orthodontic nails 180 1 and 180 2 have the first auxiliary sand core 4 1 at their tips.
Has a recess 10 mating end 188 1 disengaging the 1, 188 2, Ryokakarigotan unit 188 1, 188 2, the first auxiliary sand core 4 first recess 10 1, diagonal positions A pair of inclined surfaces 189 1 and 189 2 that are in contact with the adjacent two inner side surfaces a 1 , b 1 ; a 2 , b 2 .
基台176上面に複数の支持脚190が立設され、各支持脚19
0は第1補助砂中子41の位置矯正時、窓156より突出して
その補助砂中子41を支持する。A plurality of support legs 190 are erected on the upper surface of the base 176, and each support leg 19
When the position of the first auxiliary sand core 4 1 is corrected, 0 projects from the window 156 to support the auxiliary sand core 4 1 .
上記構成において、第1補助砂中子41は、第2搬入装置
C2により第14図に一点鎖線で示すように、下縁を組付装
置Aに向けて各第1支持脚1581上に渡される。In the above structure, the first auxiliary sand core 4 1, the second input device
As indicated by the one-dot chain line in FIG. 14, by C 2 , the lower edge is passed to each of the first supporting legs 158 1 with the lower edge facing the assembling apparatus A.
この渡し時、位置矯正機構177は窓156の下方に在り、ま
た矯正爪開き用作動シリンダ184のピストンロッド185の
収縮により作動子186が下降位置に在って、両矯正爪180
1,1802が矯正爪閉じ用ばね187の収縮力で互に接近する
方向に移動すると共に両ローラ182が作動子186のテーパ
面186a小径側に当接している。さらに第15図に明示する
ように、ロータリアクチュエータ169の作動で、位置矯
正機構177が水平面内で回転して、両係合端部1881,1882
が第1補助砂中子41における凹部101の隣接二内側面a1,
b1;a2,b2により画成される両隅角部c1,c2下方にそれぞ
れ位置する。At the time of this transfer, the position correcting mechanism 177 is located below the window 156, and the actuator 186 is in the lowered position due to the contraction of the piston rod 185 of the actuating cylinder 184 for opening the corrective nail, so that both corrective nails 180 are
1, 180 2 are two rollers 182 while moving in the direction of each other close in contractile force of the orthodontic nail closing spring 187 abuts the tapered surface 186a small diameter side of the actuator 186. Further, as clearly shown in FIG. 15, the operation of the rotary actuator 169 causes the position correcting mechanism 177 to rotate in the horizontal plane, so that both engaging end portions 188 1 and 188 2
Adjacent two inner surfaces a 1 of recess 10 1 but in the first auxiliary sand core 4 1,
It is located below both corners c 1 and c 2 defined by b 1 ; a 2 and b 2 , respectively.
昇降用作動シリンダ164のピストンロッド163が伸長する
と、第16図に示すように位置矯正機構177が上昇して両
矯正爪1801,1802の係合端部1881,1882が第1補助砂中子
41の凹部101に遊挿され、また各支持脚190の上端面が第
1補助砂中子41の外端面91に当接して、その砂中子41は
各第1支持脚1581より持上げられる。When the piston rod 163 of the lifting actuating cylinder 164 extends, the position correcting mechanism 177 rises as shown in FIG. 16 and the engaging ends 188 1 and 188 2 of both correcting pawls 180 1 and 180 2 move to the first auxiliary position. Sand core
It is loosely inserted into the recess 10 1 of 4 1 , and the upper end surface of each support leg 190 abuts the outer end surface 9 1 of the first auxiliary sand core 4 1 , and the sand core 4 1 is attached to each first support leg. Lifted from 158 1 .
矯正爪開き用作動シリンダ184のピストンロッド185の伸
長により作動子186が上昇するので、両矯正爪1801,1802
が矯正爪閉じ用ばね187の収縮力に抗して互に離間する
方向に移動し、両係合端部1881,1882が凹部101の対角位
置に存する隣接二内側面a1,b1;a2,b2にそれぞれ係合す
る。Since the actuator 186 rises due to the extension of the piston rod 185 of the actuating cylinder 184 for opening the corrective nails, both corrective nails 180 1 , 180 2
There against a contractile force of the orthodontic nail closing spring 187 to move in the direction of each other apart, Ryokakarigotan unit 188 1, 188 2 adjacent two inner surfaces a 1 residing within diagonal positions of the recesses 10 1, It engages with b 1 ; a 2 and b 2 , respectively.
これにより第1補助砂中子41の縦および横方向の位置矯
正を一対の第1,第2矯正爪1801,1802により自動的に、
且つ正確に行うことができる。この場合凹部101回りは
枠状突出部111により補強されているので凹部101が両矯
正爪1801,1802との係合によって損傷することがない。Thereby, the vertical and horizontal position correction of the first auxiliary sand core 4 1 is automatically performed by the pair of first and second correction nails 180 1 and 180 2 .
And it can be done accurately. In this case, since the periphery of the recessed portion 10 1 is reinforced by the frame-shaped protruding portion 11 1, the recessed portion 10 1 is not damaged by the engagement with both the correction nails 180 1 and 180 2 .
位置矯正後、ロータリアクチュエータ184の作動により
位置矯正機構177が第14図時計方向に90゜回転し、これ
により第1補助砂中子41が同図二点鎖線示のように水平
面内で反転して組付装置Aへの搬入姿勢に変換される。After position correction, the position correcting mechanism 177 by the operation of the rotary actuator 184 is rotated 90 degrees in FIG. 14 clockwise, whereby the first auxiliary sand core 4 1 reversed in a horizontal plane as chain line two-dot drawing Then, the posture is changed to a loading posture to the assembling apparatus A.
位置矯正機構177の矯正爪開き用作動シリンダ184のピス
トンロッド185の収縮により作動子186が下降するので、
両矯正爪1801,1802が矯正爪閉じ用ばね187の収縮力で互
に接近する方向に移動して凹部101の内側面a1,b1;a2,b2
より離間する。そして昇降用作動シリンダ164のピスト
ンロッド163が収縮することにより位置矯正機構177が下
降して第1補助砂中子41が各第2支持脚1582に載置され
る。Since the actuator 186 descends due to the contraction of the piston rod 185 of the actuating cylinder 184 for opening the corrective claw of the position correcting mechanism 177,
Both of the orthodontic nails 180 1 and 180 2 move toward each other due to the contracting force of the orthodontic nail closing spring 187, and the inner surfaces a 1 , b 1 ; a 2 , b 2 of the recess 10 1 are moved.
Be farther apart. Then, the piston rod 163 of the lifting operation cylinder 164 contracts, so that the position correcting mechanism 177 descends and the first auxiliary sand core 4 1 is placed on each second support leg 158 2 .
第2位置矯正部1602において、第1位置矯正部1601と同
一構成部分には同一符号を付してある。たゞし、第2位
置矯正部1602は前記のように反転機構175を備えておら
ず、したがって昇降用作動シリンダ164のピストンロッ
ド163は八角形状基板176に連結される。In the second position correction unit 160 2 , the same components as those of the first position correction unit 160 1 are designated by the same reference numerals. Was Isuzu, and second position correction unit 160 2 is not provided with a reversing mechanism 175 as described above, thus the piston rod 163 of the elevating working cylinder 164 is connected to the octagonal-shaped substrate 176.
前記のように第1,第2補助砂中子41,42の四角形凹部1
01,102における対角位置にてそれら補助砂中子41,42の
位置矯正を行うと、第1,第2位置矯正部1601,1602にお
ける矯正爪1801,1802の数は各一対のみでよく、したが
って装置の構造を単純化してその製造コストを安価にす
ることができる。As described above, the rectangular recesses 1 of the first and second auxiliary sand cores 4 1 and 4 2
When the positions of the auxiliary sand cores 4 1 and 4 2 are corrected at the diagonal positions of 0 1 and 10 2 , the correction nails 180 1 and 180 2 of the first and second position correction units 160 1 and 160 2 are corrected. Only one pair is required for each number, so that the structure of the device can be simplified and its manufacturing cost can be reduced.
さらに第1,第2補助砂中子41,42には四角形の凹部101,1
02を画成する突出部111,112という単純形状の位置矯正
部を設けるだけであり、それは容易に成形し得るので、
両補助砂中子41,42の成形上の負担を極力抑制すること
ができる。Further, the first and second auxiliary sand cores 4 1 and 4 2 have rectangular recesses 10 1 and 1
It is only necessary to provide a simple-shaped position correcting portion, which is a protruding portion 11 1 or 11 2 defining 0 2 , and since it can be easily molded,
The forming load on both auxiliary sand cores 4 1 and 4 2 can be suppressed as much as possible.
(G)組付装置A 第2,第3,第17〜第19図に示すように、第1搬入装置C1の
両ガイドロッド21の両側において、それらガイドロッド
21と平行に一対の外側支持板191が床面14に立設され、
また両外側支持板191間において、上部に二股状支持部1
92aを有する中間支持板192が床面14に立設される。中間
支持板192の二股状支持部192aおよび下部の平板部192b
を貫通して両外側支持板191間に、上部に2本、下部に
1本のガイドロッド193が倒立2等辺三角形の各頂点に
位置するように架設される。(G) Assembling device A As shown in FIGS. 2, 3, 17 to 19, the guide rods are provided on both sides of both guide rods 21 of the first loading device C 1.
A pair of outer support plates 191 are erected on the floor surface 14 in parallel with 21,
In addition, the bifurcated support portion 1 is provided on the upper portion between the outer support plates 191.
An intermediate support plate 192 having 92a is erected on the floor surface 14. Bifurcated support portion 192a of intermediate support plate 192 and lower flat plate portion 192b
Two guide rods 193 are erected between the outer support plates 191 so as to be located at the vertices of the inverted isosceles triangle.
それらガイドロッド193に第1,第2補助砂中子41,42を主
砂中子2に組付ける第1,第2組付部1941,1942が支持さ
れる。両部1941,1942は略同一の構成および作用を有す
るので、第1補助砂中子41の組付けに用いられる第1組
付部1941について詳述する。The guide rods 193 support the first and second assembling parts 194 1 and 194 2 for assembling the first and second auxiliary sand cores 4 1 and 4 2 to the main sand core 2 . Since both portions 194 1, 194 2 have substantially the same construction and operation will be described in detail first set with 194 1 used in the assembly of the first auxiliary sand core 4 1.
第19図に明示するように支持部材195は、相対向する一
対の第1,第2支柱1961,1962と、それらの下端を連結す
る連結板197とよりU字形に形成される。連結板197には
それを貫通するように3個のスライダ198が取付けら
れ、各スライダ198は各ガイドロッド193に摺動自在に嵌
合される。これにより両支柱1961,1962は上部の両ガイ
ドロッド193上方に位置する。Support member 195 as best shown in FIG. 19, the first pair of opposing, second strut 196 1, 196 2, are formed more U-shaped and the connecting plate 197 connecting them at the lower end. Three sliders 198 are attached to the connecting plate 197 so as to penetrate therethrough, and each slider 198 is slidably fitted to each guide rod 193. As a result, both columns 196 1 and 196 2 are located above the upper guide rods 193.
両支柱1961,1962の上端部間に回転軸199が複数の軸受20
0を介して支持され、その回転軸199の一端は第1支柱19
61を貫通して突出している。Both struts 196 1, 196 rotary shaft 199 a plurality of bearings 20 between the two upper ends
The rotary shaft 199 has one end supported by the first support column 19
6 1 Penetrates and projects.
第1補助砂中子41を載置する載置台201は、その一側に
一対の取付筒202を備えており、両取付筒202が回転軸19
9にキー203を介して回転不能に嵌合される。回転軸199
の突出部199aには外端側にスプライン204が、その内側
に雄ねじ205がそれぞれ形成され、その雄ねじ205に回転
軸抜止め用ナット206が螺着される。Mounting table 201 for mounting the first auxiliary sand core 4 1 is provided with a pair of mounting cylinder 202 on one side, two mounting cylinder 202 rotating shaft 19
It is non-rotatably fitted to the 9 through the key 203. Rotating shaft 199
A spline 204 is formed on the outer end side of the projecting portion 199a and a male screw 205 is formed on the inner side thereof, and a rotary shaft retaining nut 206 is screwed onto the male screw 205.
回転軸199の突出部199a下方において、ピストンロッド2
07を上向きにした反転用作動シリンダ208が配設され、
その作動シリンダ208の下端部は支持部材195の支持ブラ
ケット209に連結ピン210を介して枢着される。またピス
トンロッド207先端に連動リンク211の一端部が連結ピン
212を介して枢着され、その連動リンク211の他端部に在
って、内周面にスプライン213を有する連結筒214が突出
部199aのスプライン204に嵌合される。Below the protruding portion 199a of the rotary shaft 199, the piston rod 2
A reversing working cylinder 208 with 07 facing upward is arranged,
The lower end of the working cylinder 208 is pivotally attached to the support bracket 209 of the support member 195 via a connecting pin 210. Also, one end of the interlocking link 211 is connected to the tip of the piston rod 207 by a connecting pin.
A connecting cylinder 214 pivotally attached via 212 and located at the other end of the interlocking link 211 and having a spline 213 on the inner peripheral surface is fitted to the spline 204 of the protrusion 199a.
第17図において作動シリンダ208のピストンロッド207が
収縮しているときには、載置台201は、第2搬入装置C2
から第1補助砂中子41を受ける実線示の水平位置に在
り、またピストンロッド207が伸長すると、載置台201
は、垂直面内で時計方向に90゜回転して第1補助砂中子
41を組付ける鎖線示の反転位置に至る。したがって作動
シリンダ208、連動リンク211および回転軸199等は、載
置台201の反転機構214を構成する。In FIG. 17, when the piston rod 207 of the working cylinder 208 is contracted, the mounting table 201 is mounted on the second loading device C 2
The first lies in the horizontal position indicated by a solid line for receiving an auxiliary sand core 4 1, also the piston rod 207 is extended from the mounting table 201
Is rotated 90 ° clockwise in the vertical plane and the first auxiliary sand core
4 Reach the inverted position of the chain line where 1 is assembled. Therefore, the working cylinder 208, the interlocking link 211, the rotary shaft 199, and the like form a reversing mechanism 214 of the mounting table 201.
第17,第19図において、反転機構214側に存する一方の取
付筒202外周面にロック板215が固着され、そのロック板
215に回転軸199と平行な軸線を持つ第1,第2係合孔21
61,2162が、回転軸199を中心とする同一円周上に形成さ
れる。ロック板215に近接する第1支柱1961の上端部外
側面に、小型のロック用作動シリンダ217が取付けら
れ、その作動シリンダ217は回転軸199と平行なロックピ
ン218を備え、そのロックピン218は第1支柱1961のガイ
ド孔219を貫通するようになっている。In FIGS. 17 and 19, a lock plate 215 is fixed to the outer peripheral surface of the one mounting cylinder 202 existing on the side of the reversing mechanism 214.
215 has first and second engagement holes 21 having an axis parallel to the rotation axis 199.
6 1 , 2 162 are formed on the same circumference centered on the rotation axis 199. First upper outer side surface of the column 196 1 adjacent to the lock plate 215, locking the actuating cylinder 217 of small is attached, with parallel locking pin 218 that actuating cylinder 217 and the rotary shaft 199, the lock pin 218 It is adapted to pass through the first strut 196 1 of the guide hole 219.
載置台201の水平位置では、ロックピン218が第1係合孔
2161に係合し、また載置台201の反転位置ではロックピ
ン218が第2係合孔2162に係合する。これにより載置台2
01を水平および反転位置にそれぞれ確実に保持すること
ができる。At the horizontal position of the mounting table 201, the lock pin 218 has the first engaging hole.
It engages the 216 1, also the locking pin 218 in the reverse position of the table 201 is engaged to two second engaging holes 216. As a result, the mounting table 2
01 can be reliably held in the horizontal and inverted positions, respectively.
第17,第19図に明示するように支持部材195の連結板197
内面側において、上部の両ガイドロッド193間および二
股状支持部192a間に存する空間の投影面内に位置させて
両ガイドロッド193と平行に組付用作動シリンダ220が取
付けられ、そのピストンロッド221は連結板197を貫通し
てそれに接近する一方の外側支持板191内面に連結され
る。Connecting plate 197 of support member 195 as clearly shown in FIGS.
On the inner surface side, the assembly working cylinder 220 is mounted in parallel with both guide rods 193 while being positioned in the projection plane of the space existing between both upper guide rods 193 and between the forked support portions 192a, and its piston rod 221 Is connected to the inner surface of one outer support plate 191 that penetrates the connection plate 197 and approaches it.
また中間支持板192において、その平板部192bの連結板1
97との対向面に、一対のストッパ部材222がガイドロッ
ド193と平行に突設され、連結板197が両ストッパ部材22
2に衝合することにより支持部材195、したがって反転後
の第1補助砂中子41の第2組付部1942側への移動量が規
制される。Further, in the intermediate support plate 192, the connecting plate 1 of the flat plate portion 192b is
On the surface facing the 97, a pair of stopper members 222 are provided so as to project in parallel with the guide rod 193, and the connecting plate 197 is provided on both stopper members 22.
By abutting against 2 , the amount of movement of the support member 195, and thus the first auxiliary sand core 4 1 after being inverted, toward the second assembly portion 194 2 side is restricted.
第3,第18図において、載置台201の水平位置において、
その上面両側部に、第2搬入装置C2の第1クランプ構造
1271に備えられた一対の位置決めピン147に対応して一
対の位置決め部材223が配設され、各位置決め部材223は
位置決めピン147のテーパ部147aと係脱する孔部224を有
する。また各位置決め部材223は載置台201が反転したと
き、両支柱1961,1962に干渉しないように逃げ225を有す
る。In FIGS. 3 and 18, in the horizontal position of the mounting table 201,
On both sides of the upper surface, the first clamp structure of the second loading device C 2
127 pair of positioning members 223 corresponding to the pair of positioning pins 147 provided in the 1 is provided, the positioning member 223 has a tapered portion 147a and the engagement disengaging hole 224 of the positioning pin 147. Also, when the positioning member 223 to the mounting table 201 is inverted, having both posts 196 1, 196 2 fled 225 so as not to interfere with.
載置台201の上面において、両位置決め部材223間に、第
2搬入装置C2から第1補助砂中子41を受けてそれを載置
する一対の支持脚226が配設される。On the upper surface of the mounting table 201, between the positioning members 223, a pair of support legs 226 for receiving the first auxiliary sand core 4 1 from the second loading device C 2 and mounting the same thereon are disposed.
第3,第17〜第22図に明示するように載置台201に、保持
機構を構成すべく、第1補助砂中子41の凹部101をその
内側から掴むチャック機構227と、第1補助砂中子41の
上、下部(組立状態における)を把持するクランプ機構
228とが備えられている。この場合、チャック機構227が
先に作動して第1補助砂中子41を掴み、次いでクランプ
機構228が作動して第1補助砂中子41を把持するように
なっている。Third, the mounting table 201 as best shown in 17th FIG. 22, in order to constitute a holding mechanism, a chuck mechanism 227 grasping the recessed portion 10 1 of the first auxiliary sand core 4 1 from the inside, the first on the auxiliary sand core 4 1, the clamping mechanism that grips the bottom (in the assembled state)
228 and are provided. In this case, the chuck mechanism 227 operates first to grip the first auxiliary sand core 4 1 , and then the clamp mechanism 228 operates to grip the first auxiliary sand core 4 1 .
チャック機構227は次のように構成される。The chuck mechanism 227 is configured as follows.
第3,第20,第21図に明示するように、両支持脚226の間に
おいて、載置台201上面に箱形押込み部材229が配設さ
れ、その押込み部材229の四角形の環状押圧面230は両支
持脚226と協働して第1補助砂中子41を載置すべく、そ
の被押圧面としての突出部111端面に当接する。押込み
部材229の底壁231中央部下方において、載置台201下面
に押込み用作動シリンダ232が取付けられ、そのピスト
ンロッド233先端は載置台201の貫通孔234内で底壁231の
ボス部235に連結される。底壁231両側に存するフランジ
部236にピストンロッド233と平行な一対のガイドロッド
237が取付けられ、各ガイドロッド237は載置台201の各
ガイド筒238に摺動自在に嵌合される。As clearly shown in FIGS. 3, 20, and 21, a box-shaped pressing member 229 is disposed on the upper surface of the mounting table 201 between the support legs 226, and the rectangular annular pressing surface 230 of the pressing member 229 is in order to place the first auxiliary sand core 4 1 in cooperation with two support legs 226, abuts against the projecting portion 11 one end face of the as pressed surface. Below the center of the bottom wall 231 of the pushing member 229, a pushing operation cylinder 232 is attached to the lower surface of the mounting table 201, and the tip of the piston rod 233 is connected to the boss portion 235 of the bottom wall 231 in the through hole 234 of the mounting table 201. To be done. A pair of guide rods parallel to the piston rod 233 are provided on the flange portions 236 on both sides of the bottom wall 231.
237 is attached, and each guide rod 237 is slidably fitted in each guide cylinder 238 of the mounting table 201.
押込み部材229の一対の対向側壁239間に、一対の支持軸
240が平行に架設され、両支持軸240に一対のチャック爪
241の下端部が揺動自在に支持されている。両チャック
爪241はそれらの下端部に内方へ突出する連結部241aを
有する。両チャック爪241間において、底壁231にチャッ
ク用作動シリンダ242が配設され、そのピストンロッド2
43先端に取付けられた作動板244と両連結部241aとがそ
れぞれ一対の連結ピン245,246および一対のリンク247を
介して連結される。A pair of support shafts are provided between the pair of opposite side walls 239 of the pushing member 229.
240 are installed in parallel, and a pair of chuck claws are attached to both support shafts 240.
The lower end of 241 is swingably supported. Both chuck claws 241 have a connecting portion 241a protruding inward at their lower ends. A chuck working cylinder 242 is arranged on the bottom wall 231 between the chuck claws 241 and the piston rod 2
43 The operating plate 244 attached to the tip end and both connecting portions 241a are connected via a pair of connecting pins 245, 246 and a pair of links 247, respectively.
クランプ機構228は次のように構成される。第3,第17,第
19図に明示するように、載置台201の上面において、回
転軸199近傍の回転端側に支持ブラケット248が立設さ
れ、その支持ブラケット248外面に、ピストンロッド249
を載置台201上面側に位置させた第1作動シリンダ2501
が取付けられる。ピストンロッド249先端に、第1補助
砂中子41の第1接合凹部71および上端面に係脱する鉤形
ゴムパッド251を備えた第1アーム2521が取付けられ、
第1アーム2521の一対のガイドロッド253は支持ブラケ
ット248外面の一対のガイド筒254に摺動自在に貫通して
いる。The clamp mechanism 228 is configured as follows. 3rd, 17th, 3rd
As clearly shown in FIG. 19, on the upper surface of the mounting table 201, a support bracket 248 is erected on the rotation end side near the rotation shaft 199, and the piston rod 249 is provided on the outer surface of the support bracket 248.
1st working cylinder 250 1 with the mounting table 201 positioned on the upper surface side
Is installed. At the tip of the piston rod 249, the first arm 252 1 provided with the first joining recess 7 1 of the first auxiliary sand core 4 1 and the hook-shaped rubber pad 251 engaging and disengaging on the upper end surface is attached,
The first arm 252 one pair of guide rods 253 are slidably penetrating a pair of the guide cylinder 254 of the support bracket 248 an outer surface.
載置台201下面の回転端側に支持ブラケット255が下向き
に固着され、その支持ブラケット255内面に、ピストン
ロッド256を載置台201下面側に位置させた第2作動シリ
ンダ2502が取付けられる。ピストンロッド256先端に連
結板257を介して一対のガイドロッド258が取付けられ、
そのガイドロッド258は載置台201下面の一対のガイド筒
259を摺動自在に貫通している。載置台201の自由端側
に、第1補助砂中子41の下端面および外端面に係脱する
鉤形ゴムパッド260を備えた第2アーム2522が配設さ
れ、その第2アーム2522は両ガイドロッド258に連結さ
れる。Table 201 lower face supporting bracket 255 to the rotation end side of fixed downwardly to the support bracket 255 inside surface, the second actuating cylinder 250 2 is attached that positions the piston rod 256 to the mounting table 201 the lower surface side. A pair of guide rods 258 are attached to the tip of the piston rod 256 via a connecting plate 257,
The guide rod 258 is a pair of guide cylinders on the lower surface of the mounting table 201.
It penetrates 259 slidably. A second arm 252 2 provided with a hook-shaped rubber pad 260 that engages and disengages with the lower end surface and the outer end surface of the first auxiliary sand core 4 1 is arranged on the free end side of the mounting table 201, and the second arm 252 2 Is connected to both guide rods 258.
前記組付用作動シリンダ220、各ガイドロッド193、押込
み部材229、押込み用作動シリンダ232、ガイドロッド23
7等は第1補助砂中子41を主砂中子2に向けて移動させ
るために用いられ、したがってこれら部材は移動機構L
を構成する。Assembling working cylinder 220, each guide rod 193, pushing member 229, pushing working cylinder 232, guide rod 23
7 and the like are used to move the first auxiliary sand core 4 1 toward the main sand core 2, and therefore these members are moved by the moving mechanism L.
Make up.
第2補助砂中子42の取付けに用いられる第2組付部1942
において、第1組付部1941と同一構成部分には同一符号
を付してある。たゞし、載置台201の反転方向および支
持部材195の移動方向は第1組付部1941と逆である。Second set with unit used in the second attachment auxiliary sand core 4 2 194 2
In, the first set with 194 1 and the same components are denoted by the same reference numerals. However, the turning direction of the mounting table 201 and the moving direction of the supporting member 195 are opposite to those of the first assembling portion 194 1 .
上記構成において、第2搬入装置C2により第1,第2補助
砂中子41,42を組付装置Aに搬入するときには、第17図
実線示のように両載置台201は水平位置に在ってロック
ピン218がロック板215の第1係合孔2161に係合してい
る。In the above structure, first by the second loading device C 2, when carried into the second auxiliary sand core 4 1, 4 2 the assembling apparatus A, both the mounting table 201 as shown in FIG. 17 indicated by a solid line is the horizontal position , The lock pin 218 is engaged with the first engagement hole 2161 of the lock plate 215.
第2搬入装置C2における昇降用第2作動シリンダ752の
ピストンロッド91が伸長し、その伸長途中で第1,第2ク
ランプ構造1271,1272の押え用作動シリンダ137のピスト
ンロッド138が収縮してゴムパッド142が第1,第2補助砂
中子41,42より離間する。Second operating cylinder 75 2 of the piston rod 91 for lifting is extended in the second loading device C 2, the first on the way its extended, the piston rod 138 of the second clamp structure 127 1, 127 2 of presser actuating cylinder 137 shrinkage rubber pad 142 and is spaced apart from the first, second auxiliary sand core 4 1, 4 2.
そして各一対の位置決めピン147が両載置台201に存する
各一対の位置決め部材223の孔部224に係合して第1,第2
補助砂中子41,42の位置決めがなされる。この場合、位
置決めピン147が位置決め部材223の孔部224に対して多
少の心ずれを生じているときには、各リンク部材129を
介して第1,第2クランプ構造1271,1272が水平面内で移
動して前記心ずれを吸収する。Then, the pair of positioning pins 147 engages with the holes 224 of the pair of positioning members 223 existing on both the mounting tables 201, and the first and second
The auxiliary sand cores 4 1 and 4 2 are positioned. In this case, when the positioning pin 147 is slightly deviated from the hole 224 of the positioning member 223, the first and second clamp structures 127 1 and 127 2 are in the horizontal plane via the link members 129. Move to absorb the misalignment.
その後、第18図に示すように両補助砂中子41,42は両載
置台201の各支持脚226および押込み部材229に位置矯正
状態のまゝ載置され、次いで第1〜第4アーム1321〜13
24による把持が解除される。この状態にて各チャック機
構227のチャック爪241先端は第1,第2補助砂中子41,42
の凹部101,102内に配設される。Thereafter, the subsidiary sand core 4 1 As shown in FIG. 18, 4 2 is orゝplaced in the position correction state to each support leg 226 and the pushing member 229 of both the mounting table 201, then first through fourth Arm 132 1 ~ 13
The grip by 2 4 is released. Chuck claws 241 tip first the chuck mechanism 227 in this state, the second auxiliary sand core 4 1, 4 2
Are disposed in the recesses 10 1 and 10 2 .
第21図に示すように、各チャック用作動シリンダ242の
ピストンロッド243が伸長し、両チャック爪241が外方に
向け揺動して各チャック爪241が第1,第2補助砂中子41,
42の凹部101,102内側面に係合し、これにより第1,第2
補助砂中子41,42の凹部101,102が各チャック機構227に
より掴まれる。As shown in FIG. 21, the piston rods 243 of the chuck working cylinders 242 extend, the chuck claws 241 swing outward, and the chuck claws 241 move to the first and second auxiliary sand cores 4 respectively. 1 ,
4 second recess 10 1, 10 2 engages the inner surface, whereby the first, second
The recesses 10 1 and 10 2 of the auxiliary sand cores 4 1 and 4 2 are gripped by the chuck mechanisms 227.
各クランプ機構228における第1作動シリンダ2501のピ
ストンロッド249が伸長し、また第2作動シリンダ2502
のピストンロッド256が収縮して、第1,第2アーム2521,
2522により第1,第2補助砂中子41,42の上、下部が把持
される。The piston rod 249 of the first working cylinder 250 1 in each clamp mechanism 228 extends, and the second working cylinder 250 2
Piston rod 256 contracts, and the first and second arms 252 1 ,
The upper and lower parts of the first and second auxiliary sand cores 4 1 and 4 2 are gripped by 252 2 .
各ロックピン218が各ロック板215の第1係合孔2161より
離脱し、次いで各反転機構214における反転用作動シリ
ンダ208のピストンロッド207が伸長して第1補助砂中子
41を保持する載置台201が第17図時計方向に、また第2
補助砂中子42を保持する載置台201が第17図反時計方向
にそれぞれ90゜回転して第22図に示す反転位置に至り、
その位置はロックピン218がロック板215の第2係合孔21
62に係合することにより保持される。Each lock pin 218 is disengaged from the first engagement hole 216 1 of each lock plate 215, then the first auxiliary sand core extends the piston rod 207 of the reversing actuation cylinder 208 in each reversing mechanism 214
4 to 1 table 201 for holding the the Figure 17 clockwise, and the second
Reaches the reversal position where the mounting table 201 hold the auxiliary sand core 4 2 shown in FIG. 22 rotated by 90 degrees in FIG. 17 counterclockwise,
At that position, the lock pin 218 is the second engaging hole 21 of the lock plate 215.
It is held by engaging the 6 2.
このように第1,第2補助砂中子41,42が反転した後、両
補助砂中子41,42間に第1搬入装置C1により主砂中子2
が搬入される。これにより両補助砂中子41,42は主砂中
子2に対し位置決めされ、両補助砂中子41,42の接合表
面51,52が主砂中子2の第1,第2接合端面31,32に対向す
る。After the first and second auxiliary sand cores 4 1 and 4 2 are reversed in this way, the main sand core 2 is inserted between the auxiliary sand cores 4 1 and 4 2 by the first loading device C 1.
Is delivered. As a result, both auxiliary sand cores 4 1 and 4 2 are positioned with respect to the main sand core 2 , and the joining surfaces 5 1 and 5 2 of both auxiliary sand cores 4 1 and 4 2 are the first of the main sand core 2 That is, they face the second joint end faces 3 1 , 3 2 .
第23図(A)に示すように各組付用作動シリンダ220の
ピストンロッド221が伸長して各支持部材195が両ストッ
パ部材222に衝合する。これにより第1,第2補助砂中子4
1,42が主砂中子2に向け移動して、両補助砂中子41,42
の第1,第2接合凹部71,72;81,82が主砂中子2の両第1,
第2接合凸部61,62に近接する。As shown in FIG. 23 (A), the piston rod 221 of each assembling operation cylinder 220 extends and each supporting member 195 collides with both stopper members 222. As a result, the first and second auxiliary sand cores 4
1 , 4 2 moves toward the main sand core 2 and both auxiliary sand cores 4 1 , 4 2
The first and second joint recesses 7 1 , 7 2 ; 8 1 , 8 2 are both the first and second main sand cores 2.
It is close to the second joint convex portions 6 1 and 6 2 .
このように、両接合凹部71,72;81,82と両接合凸部61,62
とを一旦近接状態に保つと、それら接合凹部71,72;81,8
2および接合凸部61,62間に位置ずれを生じていた場合、
直接的に嵌合することによる接合凹部71,72;81,82およ
び接合凸部61,62の損傷を回避することができる。In this way, both joint concave portions 7 1 , 7 2 ; 8 1 , 8 2 and both joint convex portions 6 1 , 6 2
Once and are kept in close proximity, the joint recesses 7 1 , 7 2 ; 8 1 , 8
2 and the joint protrusions 6 1 and 6 2 are misaligned,
It is possible to avoid damage to the joint recesses 7 1 , 7 2 ; 8 1 , 8 2 and the joint protrusions 6 1 , 6 2 due to direct fitting.
第23図(B)に示すように、制御器31によりゴム袋30内
の気圧を減少させて主砂中子用載置台24を上、下方向に
フローティング状態に支持し、また主砂中子2のクラン
プ機構35および両補助砂中子41,42の各クランプ機構228
によるそれら砂中子2,41,42に対する把持を解除した
後、各押込み用作動シリンダ232のピストンロッド233を
伸長して第1,第2補助砂中子41,42を主砂中子2に向け
再び僅か移動し、両補助砂中子41,42の第1,第2接合凹
部71,72;81,82の内縁に第1,第2接合凸部61,62の先端を
係合する。As shown in FIG. 23 (B), the air pressure in the rubber bag 30 is reduced by the controller 31 to support the main sand core mounting table 24 in a floating state in the upward and downward directions. Clamping mechanism 35 of No. 2 and each clamping mechanism 228 of both auxiliary sand cores 4 1 , 4 2
After releasing the grip on those sand cores 2, 4 1 , 4 2 by the above, the piston rod 233 of each pushing working cylinder 232 is extended to make the first and second auxiliary sand cores 4 1 , 4 2 the main sand. It slightly moves toward the core 2 again, and the first and second joint convex portions are formed on the inner edges of the first and second joint concave portions 7 1 , 7 2 ; 8 1 , 8 2 of both auxiliary sand cores 4 1 and 4 2 . Engage the tips of 6 1 , 6 2 .
このように主砂中子2をフローティング状態に支持する
と、両接合凹部71,72;81,82および両接合凸部61,62間に
多少の上、下方向の位置ずれを生じていてもそれを吸収
して両接合凹部71,72;81,82と両接合凸部61,62とを正確
に係合させることができる。When the main sand core 2 is supported in a floating state in this way, a slight upward or downward misalignment occurs between the joint recesses 7 1 , 7 2 ; 8 1 , 8 2 and the joint protrusions 6 1 , 6 2. Even if there is a phenomenon, it can be absorbed and the two joint concave portions 7 1 , 7 2 ; 8 1 , 8 2 and the both joint convex portions 6 1 , 6 2 can be accurately engaged with each other.
第23図(C)に示すように、第1,第2補助砂中子41,42
に対する各チャック機構227の掴みを解除した後、各押
込み用作動シリンダ232のピストンロッド233を伸長して
各押込み部材229の押圧面230により各突出部111,112端
面全体を押圧して両接合凹部71,72;81,82と両接合凸部6
1,62とを完全嵌合すると共に主砂中子2の第1,第2接合
端面31,32と第1,第2補助砂中子41,42の接合表面51,52
とを重合する。As shown in FIG. 23 (C), the first and second auxiliary sand cores 4 1 , 4 2
After releasing the gripping of each chuck mechanism 227 with respect to each other, the piston rod 233 of each pressing working cylinder 232 is extended and the pressing surface 230 of each pressing member 229 presses the entire end surface of each protrusion 11 1 , 11 2 Joint recesses 7 1 , 7 2 ; 8 1 , 8 2 and both joint protrusions 6
1 , 6 2 are completely fitted together, and the joining surfaces 5 1 , of the first and second joining end faces 3 1 , 3 2 of the main sand core 2 and the first and second auxiliary sand cores 4 1 , 4 2 5 2
And polymerize.
このように両補助砂中子41,42に対する各チャック機構2
27の拘束を解除して両補助砂中子41,42の突出部111,112
端面全体を押圧すると、局部的に押圧することに起因し
た両補助砂中子41,42の損傷を回避しつゝ両接合凹部71,
72;81,82と両接合凸部61,62とを確実に完全嵌合するこ
とができる。Thus the subsidiary sand core 4 1, each chuck mechanism for 4 2 2
Release the restraint of 27 and project the protruding parts of both auxiliary sand cores 4 1 , 4 2 11 1 , 11 2
When the entire end surface is pressed, damage to both auxiliary sand cores 4 1 and 4 2 due to local pressing is avoided, and both joint recesses 7 1 ,
7 2 ; 8 1 , 8 2 and both joint convex parts 6 1 , 6 2 can be surely fitted completely.
以上の各工程を経て、主砂中子2に第1,第2補助砂中子
41,42を組付けた組合せ砂中子1を得ることができる。Through the above steps, the first and second auxiliary sand cores are added to the main sand core 2.
It is possible to obtain the combined sand core 1 in which 4 1 and 4 2 are assembled.
第1搬入装置C1のクランプ機構35は、組合せ砂中子1を
組付装置Aより搬出する際その組合せ砂中子1を把持し
て搬出中における組合せ砂中子1の移動を防止するよう
になっている。The clamp mechanism 35 of the first carrying-in device C 1 holds the combined sand core 1 when carrying out the combined sand core 1 from the assembling device A and prevents the combined sand core 1 from moving during carrying out. It has become.
なお、接合凸部を第1,第2補助砂中子に、また接合凹部
を主砂中子にそれぞれ設けるようにしてもよい。The joining convex portion may be provided in the first and second auxiliary sand cores, and the joining concave portion may be provided in the main sand core.
C.発明の効果 本発明によれば、主砂中子をフローティング状態に支持
するという極めて簡単な構成により、接合凹、凸部を損
傷することなく、主砂中子に対して補助砂中子をスムー
ズに取付けることができる。C. Effect of the Invention According to the present invention, by the extremely simple structure of supporting the main sand core in a floating state, the auxiliary sand core is supported with respect to the main sand core without damaging the joint concave and convex portions. Can be installed smoothly.
第1図(A)〜(D)は組合せ砂中子等を示し、第1図
(A)は組合せ砂中子の要部破断側面図、第1図(B)
は主砂中子を示す第1図(A)のb−b矢視図、第1図
(C)は第1補助砂中子を示す第1図(A)のc矢視
図、第1図(D)は第2補助砂中子を示す第1図(A)
のd矢視図、 第2,第3図は組合せ砂中子の製造設備を示し、第2図は
全体の正面図、第3図は第2図3−3矢視図、 第4図は組合せ砂中子の製造工程を示す説明図で第3図
に対応し、 第5ないし第7図は第1,第2搬送装置、第1搬入装置お
よび渡し装置を示し、第5図は第2図5−5線断面図、
第6図は第5図6−6線断面図、第7図は第3図7−7
線断面図、 第8,第9図は第2搬入装置における第1走行部および第
1クランプ部を示し、第8図は要部を破断した第2図の
部分拡大図、第9図は第2,第8図9−9線断面図、 第10,第11図は第2搬入装置における第2走行部および
第2クランプ部を示し、第10図は要部を破断した第2図
の部分拡大図で第11図10−10線矢視図に対応し、第11図
は第2,第10図11−11矢視図、 第12ないし第16図は位置矯正装置を示し、第12図は要部
を破断した第2図の部分拡大図、第13図は第2,第12図13
−13線断面図、第14図は第12図14矢視図、第15図は第14
図の部分拡大図、第16図は第15図16矢視図、 第17ないし第21図は組付装置を示し、第17図は要部を破
断した第2図17−17矢視図、第18図は第17図18−18線断
面図、第19図は載置台反転後の第17図19矢視図、第20図
は第17図20矢視図、第21図は第20図21−21線断面図、 第22,第23図は組付工程説明図 である。 L……移動機構、 1……組合せ砂中子、2……主砂中子、61,62……第1,
第2接合凸部、71,72;81,82……第1,第2接合凹部、22
……基台、24……主砂中子用載置台、30……空気入りゴ
ム袋(弾性体)、31……制御器、32……制御器の制御
弁、33……制御器の空気ポンプ、341,342……第1,第2
規制ピン(規制部材)FIGS. 1 (A) to (D) show a combined sand core, etc., and FIG. 1 (A) is a side view of the essential part of the combined sand core, which is broken away, and FIG. 1 (B).
Is a view of the main sand core taken along the line bb of FIG. 1 (A), and FIG. 1 (C) is a view of the first auxiliary sand core taken along the line c of FIG. 1 (A). FIG. 1 (D) shows the second auxiliary sand core.
FIG. 2 is a front view of the whole, FIG. 3 is a front view of the whole, FIG. 3 is a view of FIG. It is explanatory drawing which shows the manufacturing process of a combination sand core, and corresponds to FIG. 3, 5 thru | or 7 shows the 1st, 2nd conveyance apparatus, the 1st loading apparatus, and the delivery apparatus, and FIG. 5 shows 2nd. Fig. 5-5 sectional view,
FIG. 6 is a sectional view taken along line 6-6 of FIG. 5, and FIG. 7 is FIG.
A line sectional view, FIGS. 8 and 9 show the first traveling portion and the first clamp portion in the second loading device, FIG. 8 is a partially enlarged view of FIG. 2 in which a main portion is broken, and FIG. 2, FIG. 9-9 sectional view taken along line 9-9, FIG. 10 and FIG. 11 show the second traveling portion and the second clamp portion in the second loading device, and FIG. 10 is a portion of FIG. FIG. 11 is an enlarged view corresponding to the view taken along the line 10-10 in FIG. 11, FIG. 11 is a view taken in the direction of arrows 11-11 in FIGS. 2 and 10, and FIGS. 12 to 16 show the position correction device, and FIG. 2 is a partially enlarged view of FIG. 2 with the main part broken, and FIG.
Fig. 13 is a sectional view taken along the line -13, Fig. 14 is a view taken in the direction of arrows in Fig. 14, and Fig. 15 is shown in Fig. 14.
FIG. 16 is a partially enlarged view of the figure, FIG. 16 is a view taken in the direction of arrow in FIG. 15, FIGS. 17 to 21 show an assembling device, and FIG. 17 is a view taken in the direction of arrow 17 in FIG. FIG. 18 is a cross-sectional view taken along the line 18-18 in FIG. 17, FIG. 19 is a view taken in the direction of arrow 19 in FIG. 17 after reversing the mounting table, FIG. 20 is a view in the direction of arrow 20 of FIG. 17, and FIG. 21 to 21 are sectional views, and FIGS. 22 and 23 are explanatory views of the assembling process. L ... Moving mechanism, 1 ... Combination sand core, 2 ... Main sand core, 6 1 , 6 2 ...... First,
2nd joint convex part, 7 1 , 7 2 ; 8 1 , 8 2 ... 1st, 2nd joint concave part, 22
...... Base, 24 ...... Main sand core mounting base, 30 ...... pneumatic rubber bag (elastic body), 31 ...... Controller, 32 ...... Control valve for controller, 33 ...... Air for controller Pump, 34 1 , 34 2 ...... First and second
Control pin (control member)
Claims (3)
方に存する接合凸部を、他方に存する接合凹部に嵌合す
べく、前記補助砂中子を前記主砂中子に向けて移動させ
るようにした組合せ砂中子製造用組付装置において、基
台と該基台上方に存する主砂中子用載置台との間に、該
載置台をフローティング支持する弾性体および該載置台
のフローティング量を規制する規制部材とを介装したこ
とを特徴とする組合せ砂中子製造用組付装置。1. Auxiliary sand core is directed toward the main sand core so that the joining convex portion existing on one of the main sand core and the auxiliary sand core facing each other fits into the joint concave portion existing on the other. In an assembly device for manufacturing a combined sand core, the elastic body for floatingly supporting the mounting table and the mounting table for the main sand core located above the base in the assembly apparatus for manufacturing the combined sand core. An assembling device for manufacturing a combination sand core, which is provided with a regulating member for regulating a floating amount of a mounting table.
(1)項記載の組合せ砂中子製造用組付装置。2. The assembly device for manufacturing a combined sand core according to claim 1, wherein the elastic body is a pneumatic rubber bag.
移動時前記ゴム袋内の気圧を上昇させて前記載置台のフ
ローティングを解除する制御器を前記ゴム袋に接続し
た、第(2)項記載の組合せ砂中子製造用組付装置。3. The base is configured to be movable, and a controller for increasing the atmospheric pressure in the rubber bag when the base is moved to release the floating of the mounting table is connected to the rubber bag. An assembly device for manufacturing a combined sand core according to item (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8647688A JPH0681658B2 (en) | 1988-04-08 | 1988-04-08 | Assembly equipment for combined sand core manufacturing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8647688A JPH0681658B2 (en) | 1988-04-08 | 1988-04-08 | Assembly equipment for combined sand core manufacturing |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH01258846A JPH01258846A (en) | 1989-10-16 |
JPH0681658B2 true JPH0681658B2 (en) | 1994-10-19 |
Family
ID=13888022
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP8647688A Expired - Fee Related JPH0681658B2 (en) | 1988-04-08 | 1988-04-08 | Assembly equipment for combined sand core manufacturing |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0681658B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4100917A1 (en) * | 1991-01-15 | 1992-07-16 | Hottinger Adolf Masch | METHOD AND DEVICE FOR HANDLING CORE PARTS IN ORDER TO PROVIDE A CORE PACKAGE READY TO CAST |
-
1988
- 1988-04-08 JP JP8647688A patent/JPH0681658B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH01258846A (en) | 1989-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2006093228A1 (en) | Method and apparatus for assembling and manufacturing | |
JP3995865B2 (en) | Work transfer device | |
JP2004345025A (en) | Positioning device | |
JP2632539B2 (en) | Method and apparatus for mounting steel beam | |
JPH0681656B2 (en) | Position correction device for auxiliary sand core for combined sand core | |
JPH0718456Y2 (en) | Auxiliary sand core for combination sand core | |
JPH0681658B2 (en) | Assembly equipment for combined sand core manufacturing | |
JPH0681657B2 (en) | Manufacturing method of combined sand core | |
JPH0716757B2 (en) | Combined sand core manufacturing equipment | |
JPH07106424B2 (en) | Material loading device | |
JPH06247547A (en) | Positioning method and device for support table | |
JPH09309473A (en) | Car body position correcting and carrying system | |
JPH063749Y2 (en) | Adhesive coating device for automobile window glass | |
JPH0739850Y2 (en) | Work transfer device | |
JP4296037B2 (en) | Loading / unloading device | |
JPH05185967A (en) | Assembly of automobile body and assembly device of automobile body | |
CN214721863U (en) | Welding tool | |
JPH09131623A (en) | Transport device using pallet | |
JPH065293Y2 (en) | Panel loading equipment | |
JP4272919B2 (en) | Glass mounting method | |
JPH0551582U (en) | Robot hand | |
JP3053240B2 (en) | Panel manufacturing equipment | |
JP3226911B2 (en) | Packaging skid manufacturing equipment | |
JPH058271Y2 (en) | ||
JPH0750125Y2 (en) | Work loading / unloading device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |