Cast slab guiding equipment of twin roll type continuous casting equipmentInfo
- Publication number
- JPH067896A JPH067896A JP16609692A JP16609692A JPH067896A JP H067896 A JPH067896 A JP H067896A JP 16609692 A JP16609692 A JP 16609692A JP 16609692 A JP16609692 A JP 16609692A JP H067896 A JPH067896 A JP H067896A
- Authority
- JP
- Japan
- Prior art keywords
- coupling
- molten metal
- continuous casting
- slab
- dummy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Continuous Casting (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は双ドラム式連続鋳造設備
において、鋳造開始時の帯状鋳片を巻取り機に先導する
装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a twin drum type continuous casting facility for leading a strip-shaped slab at the start of casting to a winding machine.
【0002】[0002]
【従来の技術】図5は、従来の鋳片先導装置の概念を示
す側面図である。図5に示すように、従来の鋳片先導装
置は、長尺のダミーシート60を搬送ローラ55上に載
置してタンゼンシャルロール57及びピンチロール56
によってこれを挟持し、その後端部を巻取りボビン58
にボルト59によって連結する。2. Description of the Related Art FIG. 5 is a side view showing the concept of a conventional slab leading device. As shown in FIG. 5, in the conventional slab leading device, a long dummy sheet 60 is placed on a conveying roller 55 and a tangential roll 57 and a pinch roll 56 are placed.
This is clamped by the bobbin 58
Are connected with bolts 59.
【0003】そして、ダミーシート60を、その先端部
が一対の冷却ドラム51とサイド堰52とから成る湯溜
り部53に突出するように、双方の冷却ドラム51によ
って挟持し、帯状鋳片の連続鋳造に備える。Then, the dummy sheet 60 is sandwiched by both cooling drums 51 so that the leading end of the dummy sheet 60 projects into the molten metal pool 53 consisting of the pair of cooling drums 51 and the side dams 52, and the strip-shaped cast pieces are continuously formed. Prepare for casting.
【0004】次に湯溜り部53に溶湯を連続して供給
し、冷却ドラム51、ピンチロール56及び巻取りボビ
ン58を回転すると、冷却ドラム51によって冷却され
て凝固し、ダミーシート60の先端部に溶着した帯状鋳
片40がダミーシート60に先導されて、巻取りボビン
58に供給される。巻取りボビン58は、ダミーシート
60と共に、前記帯状鋳片を巻取る。Next, when the molten metal is continuously supplied to the molten metal pool portion 53 and the cooling drum 51, the pinch roll 56 and the winding bobbin 58 are rotated, the molten drum is cooled and solidified, and the leading end portion of the dummy sheet 60. The strip-shaped cast slab 40 welded to is led by the dummy sheet 60 and supplied to the winding bobbin 58. The winding bobbin 58 winds the strip-shaped cast piece together with the dummy sheet 60.
【0005】[0005]
【発明が解決しようとする課題】冷却ドラム51と巻取
りボビン58とは互いに離して配置されているので、従
来の鋳片先導装置では非常に長尺のダミーシート60を
必要とする。従って、ダミーシート60のタンゼンシャ
ルロール57、搬送ローラ55、ピンチロール56、巻
取りボビン58への設定や、その先端部を双方の冷却ド
ラム51で挟持する際の作業には多大の労力を必要とし
能率が悪く長時間を要するものであった。Since the cooling drum 51 and the winding bobbin 58 are arranged apart from each other, the conventional cast slab leading device requires a very long dummy sheet 60. Therefore, a great amount of labor is required for setting the dummy sheet 60 on the tangential roll 57, the transport roller 55, the pinch roll 56, and the winding bobbin 58, and for the work of sandwiching the leading end of the dummy sheet 60 between the cooling drums 51. It was necessary, inefficient, and required a long time.
【0006】本発明は、従来の装置にみられたこのよう
な欠点がなく、簡単に設定できて作業時間を大幅に短縮
することのできる鋳片先導装置を提供することを課題と
している。It is an object of the present invention to provide a cast slab leading device which does not have the above-mentioned drawbacks found in the conventional device and which can be easily set and can significantly reduce the working time.
【0007】[0007]
【課題を解決するための手段】本発明では、先端部が冷
却ドラム間の湯溜り部に突き出し後端部が冷却ドラムの
下方へ懸吊されるダミーシートと、同ダミーシートの下
端に装着されるカップリングと、同カップリングの下方
に配置され下降して来るカップリング、ダミーシート及
び帯状鋳片の進行を水平方向に変更するガイドシュート
と、水平に列設された搬送ローラ上を走行可能に配設さ
れ前記カップリングと装着されるスレッドで鋳片先導装
置を構成する。According to the present invention, a dummy sheet having a tip portion protruding from a pool of water between cooling drums and a rear end portion suspended below the cooling drum, and a dummy sheet mounted on the lower end of the dummy sheet are provided. It is possible to run on a horizontal coupling roller, and a coupling chute that is arranged below the coupling, a guide chute that changes the progress of the dummy sheet and the strip-shaped slab in the horizontal direction. A slab leading device is constituted by a thread which is arranged in the above and is attached to the coupling.
【0008】また、本発明では、前記ダミーシートとし
て、先端部は前記湯溜り部に突出するが後端部は帯状鋳
片を水平方向に送給するピンチロールで挟持される長め
のものを使い、前記ダミーシートの後端部に装着される
カップリングとこれに着脱されるスレッドを設けて鋳片
先導装置を構成する。Further, in the present invention, as the dummy sheet, a long sheet whose front end projects into the molten metal pool and whose rear end is sandwiched by pinch rolls for horizontally feeding strip-shaped slabs is used. A casting attached to the rear end of the dummy sheet and a thread attached to and detached from the coupling are provided to form a slab leading device.
【0009】[0009]
【作用】本発明によれば、帯状鋳片の連続鋳造開始に際
し、ダミーシートの後端部にカップリングを装着し、こ
のダミーシートを先端部が湯溜り部に突出するように双
方の冷却ドラムによって挟持し、このダミーシート及び
カップリングを冷却ドラムの下方に懸吊する。According to the present invention, at the start of continuous casting of strip-shaped slabs, a coupling is attached to the rear end portion of the dummy sheet, and the dummy sheet is provided on both cooling drums so that the front end portion thereof protrudes into the molten metal pool. The dummy sheet and the coupling are suspended below the cooling drum.
【0010】次に、冷却ドラム対によって形成された湯
溜り部に溶湯を連続して供給し、冷却ドラムによって冷
却して帯状鋳片に凝固させながら冷却ドラムを回転し、
カップリング、ダミーシート及びこのダミーシートの先
端部に溶着した帯状鋳片を下降させ、ガイドシュートに
よってその進行を水平方向に変更する。そして、前記カ
ップリングを搬送ローラ上で待機しているスレッドに迅
速に連結し、次工程に送給する。Next, the molten metal is continuously supplied to the molten metal pool formed by the pair of cooling drums, and the cooling drum is rotated while being cooled by the cooling drum to solidify into strip-shaped cast pieces,
The coupling, the dummy sheet, and the strip-shaped slab welded to the tip of this dummy sheet are lowered, and the progress thereof is changed in the horizontal direction by the guide chute. Then, the coupling is quickly connected to the thread waiting on the conveying roller and is fed to the next step.
【0011】また、先端部は前記湯溜り部に突出する
が、後端部は水平方向に送給するピンチロールで挟持さ
れるようにした長めのダミーシートを使うようにした本
発明による鋳片先導装置によるときは、帯状鋳片の連続
鋳造開始に際し、ダミーシートの先端部が湯溜り部に突
出するように双方の冷却ドラムによって挟持すると共
に、後端部を搬送ローラ上に載置し、カップリングを装
着する。そして、ピンチロールによってこのダミーシー
トを挟持し、搬送ローラ上で待機しているスレッドを移
動して、カップリングに連結する。The slab according to the present invention uses a long dummy sheet whose front end projects into the basin, but whose rear end is sandwiched by pinch rolls that feed horizontally. When using the leading device, at the start of continuous casting of strip-shaped slabs, the dummy sheet is pinched by both cooling drums so that the tip portion projects into the molten metal pool portion, and the trailing edge portion is placed on the transport roller. Fit the coupling. Then, the dummy sheet is pinched by the pinch rolls, and the sled waiting on the transport roller is moved to be coupled to the coupling.
【0012】次に、溶湯を湯溜り部に連続して供給し、
冷却ドラムによって冷却して帯状鋳片に凝固させながら
冷却ドラムを回転し、ピンチロールによってダミーシー
ト、カップリング及びスレッドを次工程に送給する。以
上のようにしてカップリングとスレッドの着脱を迅速に
行い鋳片先導を少い労力、時間で完了することができ
る。Next, the molten metal is continuously supplied to the pool,
The cooling drum is rotated while being cooled by the cooling drum to be solidified into a strip-shaped slab, and the dummy sheet, the coupling and the thread are fed to the next step by the pinch roll. As described above, the coupling and the thread can be quickly attached and detached, and the slab leading can be completed with a little labor and time.
【0013】[0013]
【実施例】以下、本発明による装置を図示した実施例に
基いて具体的に説明する。図5を用いて説明した従来の
装置と同一の部材には同一の符号を付し、重複する説明
を省略する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The apparatus according to the present invention will be specifically described below based on the illustrated embodiments. The same members as those of the conventional apparatus described with reference to FIG. 5 are designated by the same reference numerals, and duplicated description will be omitted.
【0014】図1は本発明の第1実施例に係る鋳片先導
装置を設定した状態の概念を示す側面図、図2は帯状鋳
片の連続鋳造を開始した状態の概念を示す側面図、図3
は図2の要部を拡大し、板幅方向の中央部を破断した側
面図である。FIG. 1 is a side view showing the concept of a slab leading apparatus according to a first embodiment of the present invention in a set state, and FIG. 2 is a side view showing the concept in a state in which continuous casting of strip-shaped slabs is started, Figure 3
FIG. 3 is a side view showing an enlarged main part of FIG.
【0015】図1から図3において、1はカップリング
であり、該カップリング1は、コネクタ2と、このコネ
クタ2に螺合された皿ねじ3と、このコネクタ2に上方
へ回動するように枢着されたフック4とによって構成さ
れている。In FIGS. 1 to 3, reference numeral 1 denotes a coupling, and the coupling 1 is adapted to rotate upward with respect to the connector 2, the flat head screw 3 screwed to the connector 2, and the connector 2. And a hook 4 pivotally attached to the.
【0016】11はスレッドであり、その先端部にはラ
ッチ12が自重によって回動するように枢着され、搬送
ローラ55上に載置されている。7はガイドシュートで
あり、冷却ドラム51の下方に配置されている。8はガ
イドロールである。20は、回転ドラム式の走間シャ
ー、30は巻取り機である。Reference numeral 11 is a sled, and the latch 12 is pivotally attached to the leading end of the sled so as to rotate by its own weight, and is placed on the conveying roller 55. A guide chute 7 is arranged below the cooling drum 51. 8 is a guide roll. Reference numeral 20 is a rotary drum type running shear, and 30 is a winder.
【0017】次に本実施例による装置の作用について説
明する。図1に示すように、後端部にカップリング1を
装着したダミーシート10を双方の冷却ドラム51によ
って挟持し、その先端部を湯溜り部53に突出させ、連
続鋳造開始の準備をする。Next, the operation of the apparatus according to this embodiment will be described. As shown in FIG. 1, the dummy sheet 10 having the coupling 1 mounted at the rear end is sandwiched by both cooling drums 51, and the front end thereof is projected into the molten metal pool 53 to prepare for starting continuous casting.
【0018】次に、湯溜り部53に溶湯を連続して供給
し、冷却ドラム51を回転すると、図2に示すように溶
湯は冷却ドラム51によって冷却されて凝固し、ダミー
シート10の先端部に溶着した帯状鋳片40がカップリ
ング1及びダミーシート10によって先導されて下降
し、ガイドシュート7によってタンゼンシャルロール5
7から搬送ローラ55に送給される。このとき、図3に
示すカップリング1のコネクタ2とフック4は、ガイド
シュート7の曲面に沿って折れ曲る。Next, when the molten metal is continuously supplied to the molten metal pool 53 and the cooling drum 51 is rotated, the molten metal is cooled and solidified by the cooling drum 51 as shown in FIG. The strip-shaped slab 40 that has been welded to is guided and lowered by the coupling 1 and the dummy sheet 10, and is guided by the guide chute 7 to the tangential roll 5
It is fed from 7 to the transport roller 55. At this time, the connector 2 and the hook 4 of the coupling 1 shown in FIG. 3 are bent along the curved surface of the guide chute 7.
【0019】次に、搬送ローラ55上を進行するカップ
リング1は、ピンチロール56、ガイドロール8を通過
し、そのフック4が待機しているスレッド11の先端部
に当接してラッチ12を押上げて通過すると、ラッチ1
2がその自重で下降してフック4と係合し、カップリン
グ1とスレッド11とが連結される。Next, the coupling 1 which advances on the conveying roller 55 passes through the pinch roll 56 and the guide roll 8, and its hook 4 comes into contact with the tip end portion of the thread 11 waiting and pushes the latch 12. Latch 1 when raised and passed
2 descends by its own weight and engages with the hook 4, and the coupling 1 and the thread 11 are connected.
【0020】このスレッド11を搬送ローラ55上を進
行させ、走間シャー20によって、帯状鋳片40の板厚
増加部41から所定の板厚になる切断部42を切断す
る。そして、スレッド11、カップリング1、ダミーシ
ート10及び切断した板厚増加部41を、巻取機30の
図中右方の搬送ローラ55上へ通過させ、ピンチロール
56及び搬送ローラ55によって送給される帯状鋳片4
0を巻取り機30によってコイル状に巻取る。The thread 11 is advanced on the transport roller 55, and the running shear 20 cuts the cut portion 42 of the strip-shaped cast piece 40 from the plate thickness increasing portion 41 having a predetermined thickness. Then, the thread 11, the coupling 1, the dummy sheet 10 and the cut sheet thickness increasing portion 41 are passed over the conveying roller 55 on the right side of the winder 30 in the drawing, and fed by the pinch roll 56 and the conveying roller 55. Strip-shaped slab 4
0 is wound into a coil by the winder 30.
【0021】本実施例では、カップリング1のフック4
とスレッド11のラッチ12とを簡単な構造で容易に係
合させることができるので、進行するダミーシート10
を、待機しているスレッド11と迅速に連結することが
可能になる。In this embodiment, the hook 4 of the coupling 1 is used.
Since the latch 12 of the sled 11 and the sled 11 can be easily engaged with each other with a simple structure, the dummy sheet 10 that advances
Can be quickly connected to the waiting thread 11.
【0022】図4は、本発明の第2実施例に係る鋳片先
導装置を設定した状態の概念を示す側面図である。この
第2実施例では、ダミーシート15をその後端部がピン
チロール56の先方まで届くように長くしてその先端部
を双方の冷却ドラム51で挟持すると共に、後端部に搬
送ローラ55上に載置して第1実施例と同一のカップリ
ング1を装着し、ピンチロール56及びタンゼンシャル
ロール57によってダミーシート15を挟持する。FIG. 4 is a side view showing the concept of a state in which the cast slab leading apparatus according to the second embodiment of the present invention is set. In the second embodiment, the dummy sheet 15 is lengthened so that its rear end reaches the end of the pinch roll 56, and its front end is sandwiched by both cooling drums 51, and its rear end is placed on the transport roller 55. The same coupling 1 as in the first embodiment is mounted and mounted, and the dummy sheet 15 is sandwiched by the pinch roll 56 and the tangential roll 57.
【0023】そして、搬送ローラ55上のスレッド11
をカップリング1に移動して連結するものである。その
他の構成及び作用は、第1実施例の装置と同じである。Then, the thread 11 on the transport roller 55
Is moved to the coupling 1 for connection. Other configurations and operations are the same as those of the device of the first embodiment.
【0024】この第2実施例では、第1実施例と比較し
て、ガイドシュート7が不要になり、カップリング1を
ガイドシュート7、タンゼンシャルロール57、ピンチ
ロール56に通過させなくてよいので、連続鋳造の開始
時の帯状鋳片の先導が容易になる。In the second embodiment, the guide chute 7 is unnecessary as compared with the first embodiment, and the coupling 1 does not have to pass through the guide chute 7, the tangential roll 57, and the pinch roll 56. Therefore, leading of the strip-shaped cast piece at the start of continuous casting becomes easy.
【0025】以上本発明を図示した実施例に基いて具体
的に説明したが、カップリングやスレッド等の具体的構
造、形状などは図示したものに限定されず本発明の範囲
内で種々の変更を加え、或は別の機構のものを採用して
良いことはいうまでもない。Although the present invention has been specifically described based on the illustrated embodiments, the specific structures and shapes of the couplings and threads are not limited to the illustrated ones, and various modifications can be made within the scope of the present invention. It is needless to say that other mechanism may be added.
【0026】[0026]
【発明の効果】本発明では、搬送ローラ上を水平方向に
移動するスレッドと、ダミーシートをスレッドに着脱す
るカップリングと、下降するカップリング及びダミーシ
ートを水平方向にガイドするガイドシュートとを設けた
ことにより、ダミーシートの長さを大幅に短かくするこ
とができるので、このダミーシートを冷却ドラムに簡単
に設定することができる。従って、鋳片先導装置の設定
する作業が容易になり、その作業時間を大幅に短縮する
ことができる。According to the present invention, a sled horizontally moving on the conveying roller, a coupling for attaching / detaching a dummy sheet to / from the sled, a descending coupling and a guide chute for horizontally guiding the dummy sheet are provided. As a result, the length of the dummy sheet can be significantly shortened, and the dummy sheet can be easily set on the cooling drum. Therefore, the work for setting the slab leading device becomes easy, and the working time can be greatly shortened.
【図1】本発明の第1実施例に係る、鋳片先導装置を設
定した状態を示す双ドラム式連続鋳造設備の側面概念
図。FIG. 1 is a side conceptual view of a twin-drum type continuous casting facility showing a state in which a cast slab leading apparatus according to a first embodiment of the present invention is set.
【図2】連続鋳造を開始した状態を示す側面概念図。FIG. 2 is a side view conceptual diagram showing a state where continuous casting is started.
【図3】図2の要部を拡大した破断側面図。FIG. 3 is a cutaway side view in which an essential part of FIG. 2 is enlarged.
【図4】本発明の第2実施例に係る、鋳片先導装置を設
定した状態を示す側面概念図。FIG. 4 is a side conceptual view showing a state in which the cast slab leading apparatus according to the second embodiment of the present invention is set.
【図5】従来の鋳片先導装置を設定した状態を示す側面
概念図。FIG. 5 is a side conceptual view showing a state in which a conventional cast slab leading device is set.
1 カップリング 7 ガイドシュート 10 ダミーシート 11 スレッド 15 ダミーシート 40 帯状鋳片 50 溶湯 51 冷却ドラム 52 サイド堰 53 湯溜り部 55 搬送ローラ 56 ピンチロール DESCRIPTION OF SYMBOLS 1 Coupling 7 Guide chute 10 Dummy sheet 11 Thread 15 Dummy sheet 40 Strip cast 50 Molten metal 51 Cooling drum 52 Side dam 53 Hot water pool 55 Conveying roller 56 Pinch roll
───────────────────────────────────────────────────── フロントページの続き (72)発明者 岡 秀毅 山口県光市大字島田3434 新日本製鐵株式 会社光製鐵所内 (72)発明者 芳賀 裕充 山口県光市大字島田3434 新日本製鐵株式 会社光製鐵所内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Hideki Oka 3434 Shimada, Hikari-shi, Yamaguchi Prefecture Nippon Steel Co., Ltd. Hikari Steel Co., Ltd. (72) Yumitsu Haga 3434 Shimada, Hikari-shi, Yamaguchi Prefecture Nippon Steel Co., Ltd. Inside the Hikari Steel Works
Claims (2)
ムと、同冷却ドラムの両端面に当接された一対のサイド
堰とによって形成された湯溜り部に溶湯を供給して凝固
させ、帯状鋳片を連続して鋳造する双ドラム式連続鋳造
設備において、前記双方の冷却ドラムに挟持され、先端
部が前記湯溜り部に突出し、後端部が前記冷却ドラムの
下方へ懸吊されたダミーシートと、同ダミーシートの下
端に装着されるカップリングと、同カップリングの下方
に配置され下降して来る前記カップリング、ダミーシー
ト及び帯状鋳片の進行を水平方向に変更するガイドシュ
ートと、水平方向に列設された搬送ローラ上を走行可能
に配置され前記カップリングと着脱されるスレッドとを
設けて成ることを特徴とする双ドラム式連続鋳造設備の
鋳片先導装置。1. A molten metal is supplied to a molten metal pool portion formed by a pair of cooling drums that rotate in opposite directions and a pair of side dams that abut on both end surfaces of the cooling drum to solidify the molten metal and form a strip shape. In a twin-drum type continuous casting facility for continuously casting slabs, a dummy held between both of the cooling drums, a front end of which protrudes into the molten metal pool, and a rear end of which is suspended below the cooling drum. A seat, a coupling attached to the lower end of the dummy sheet, a guide chute that horizontally changes the progress of the coupling, the dummy sheet, and the strip-shaped slab that are arranged below the coupling and descend. A slab leader for twin-drum type continuous casting equipment, characterized in that the coupling and the thread to be attached / detached are provided so as to be able to travel on conveying rollers arranged in a row in a horizontal direction.
ムと、同冷却ドラムの両端面に当接された一対のサイド
堰とによって形成された湯溜り部に溶湯を供給して凝固
させた帯状鋳片を下方へ排出し、同帯状鋳片をピンチロ
ールによって搬送ローラ上を水平方向に送給する双ドラ
ム式連続鋳造設備において、前記双方の冷却ドラムに挟
持され、先端部が前記湯溜り部に突出し、後端部が前記
ピンチロールに挟持されるダミーシートと、同ダミーシ
ートの後端部に装着されるカップリングと、同カップリ
ングと着脱されるスレッドとを設けて成ることを特徴と
する双ドラム式連続鋳造設備の鋳片先導装置。2. A band shape in which molten metal is supplied to a molten metal pool formed by a pair of cooling drums rotating in opposite directions and a pair of side dams abutting both end surfaces of the cooling drum to solidify the molten metal. In a twin-drum type continuous casting facility that discharges the slab downward and feeds the same strip slab horizontally with a pinch roll on the conveying roller, it is sandwiched between both cooling drums, and the tip part is the basin part. A dummy sheet having a rear end portion sandwiched between the pinch rolls, a coupling attached to the rear end portion of the dummy sheet, and a thread detachable from the coupling. A twin-drum type continuous casting equipment slab leading device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4166096A JP3064104B2 (en) | 1992-06-24 | 1992-06-24 | Slab leader for twin-drum continuous casting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4166096A JP3064104B2 (en) | 1992-06-24 | 1992-06-24 | Slab leader for twin-drum continuous casting equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH067896A true JPH067896A (en) | 1994-01-18 |
JP3064104B2 JP3064104B2 (en) | 2000-07-12 |
Family
ID=15824931
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4166096A Expired - Fee Related JP3064104B2 (en) | 1992-06-24 | 1992-06-24 | Slab leader for twin-drum continuous casting equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3064104B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7165709B2 (en) | 2003-07-07 | 2007-01-23 | Max Co., Ltd. | Electrically driven stapler |
-
1992
- 1992-06-24 JP JP4166096A patent/JP3064104B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7165709B2 (en) | 2003-07-07 | 2007-01-23 | Max Co., Ltd. | Electrically driven stapler |
Also Published As
Publication number | Publication date |
---|---|
JP3064104B2 (en) | 2000-07-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0460655B1 (en) | Method of and apparatus for joining hot materials to be rolled to each other as well as continuous hot rolling method and system | |
US2214618A (en) | Continuously operating strip mill | |
JPH067896A (en) | Cast slab guiding equipment of twin roll type continuous casting equipment | |
JP2004050220A (en) | Facility for producing strip | |
JPH04294802A (en) | Method and device for joining hot rolled stocks | |
JPH0753284B2 (en) | Hot rolling equipment | |
JPS5936333Y2 (en) | Steel billet fusing metal removal equipment | |
JP3660124B2 (en) | Ingot processing method using wire saw and wire saw | |
JPS63286251A (en) | Metal strip continuous casting apparatus having belt exchanging function | |
JPS61249650A (en) | Method and apparatus for continuous casting | |
KR900006656B1 (en) | Rolling method and rolling apparatus for metal strips | |
JP2002066632A (en) | Operating method for steel strip continuously processing line | |
JPS60111713A (en) | Guiding device at inlet side of rolling mill | |
JP2877339B2 (en) | Check scarf method and device | |
JP2000126811A (en) | Plate transfer method and device therefor | |
JPH06335819A (en) | Thin plate manufacturing facility | |
JPH02133150A (en) | Continuous casting equipment | |
JPH0555218B2 (en) | ||
JPS59156553A (en) | Method and device for direct casting of thin plate | |
JPH07276013A (en) | Method for fitting dummy sheet in twin roll type continuous casting and device for inserting the same dummy sheet | |
JPS6039146Y2 (en) | Slab cutting device in continuous casting machine | |
JP2587803Y2 (en) | Center scoring line device for strip material | |
JPH04228207A (en) | Method and device for welding hot rolling material and equipment for continuous hot rolling | |
JPS63309316A (en) | Cooling apparatus for hot rolled strip | |
JPS61186152A (en) | Method and device for winding-up quenched thin strip |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20000328 |
|
LAPS | Cancellation because of no payment of annual fees |