JPH0673790A
JPH0673790A JP29893691A JP29893691A JPH0673790A JP H0673790 A JPH0673790 A JP H0673790A JP 29893691 A JP29893691 A JP 29893691A JP 29893691 A JP29893691 A JP 29893691A JP H0673790 A JPH0673790 A JP H0673790A
Authority
JP
Japan
Prior art keywords
pillar
holding member
frame structure
steel frame
auxiliary beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP29893691A
Other languages
Japanese (ja)
Other versions
JP2736576B2 (en
Inventor
Yoji Urushibara
洋二 漆原
Kazuya Yamada
一也 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIBATA KENSETSU KOGYO KK
Original Assignee
SHIBATA KENSETSU KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIBATA KENSETSU KOGYO KK filed Critical SHIBATA KENSETSU KOGYO KK
Priority to JP3298936A priority Critical patent/JP2736576B2/en
Publication of JPH0673790A publication Critical patent/JPH0673790A/en
Application granted granted Critical
Publication of JP2736576B2 publication Critical patent/JP2736576B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

PURPOSE:To easily and rapidly carry out a series of construction work. CONSTITUTION:In a construction way of a steel frame structure in which a beam is installed between two columns erected, a holding member 7 is fitted at a required position of at least one of columns 1. After that, one end of an auxiliary is placed and retained on the holding member 7 beam 13 and in that condition, the auxiliary beam 13 is jointed to the column 1. Next, after both columns 1, 1a are erected almost parallelly, the main beam 19 is jointed to the auxiliary beam 13 and the other column 1a for the erection.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は鉄骨骨組構造の施工法と
これに使用する柱、さらに詳しくは、例えば梁と柱とを
接合して構築される比較的大規模な建造物の鉄骨骨組構
造を施工する場合に適用される施工法とこれに使用する
柱に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a steel frame structure and a column used for the method, and more particularly, a steel frame structure for a relatively large-scale building constructed by joining beams and columns. The construction method applied when constructing and the pillar used for this.

【0002】[0002]

【従来の技術】従来、この種鉄骨骨組構造物の施工法と
しては、例えば図4に示すようなものが存在する。
2. Description of the Related Art Conventionally, as a method of constructing this kind of steel frame structure, for example, there is one as shown in FIG.

【0003】即ち、この従来のものは、先ず工場に於い
て梁19aの両端部上下面にフランジ20を溶接しておき、
この状態で現場に搬入される。そして、地上に複数本の
柱21…を立設せしめ、該柱21…間に前記梁19aが架設さ
れる。
That is, in this conventional type, first, flanges 20 are welded to the upper and lower surfaces of both ends of the beam 19a in a factory.
In this state, it is delivered to the site. Then, a plurality of columns 21 ... Is erected on the ground, and the beams 19a are installed between the columns 21.

【0004】この場合は、本梁19aが接合される部位の
下方位置に別途枠組足場22を設けておき、クレーン等に
より吊下せしめた本梁19aを柱21間の接合位置の近傍に
まで移動させ、前記枠組足場22に乗った作業員が本梁19
aの端部に設けたフランジ20…の背面部を当接させた状
態でボルト及びナット等により本梁19aの両端を柱21,2
1 に固定して行われる。
In this case, a frame scaffold 22 is separately provided below the portion where the main beam 19a is joined, and the main beam 19a hung by a crane or the like is moved to the vicinity of the joining position between the columns 21. Then, the worker who got on the frame scaffolding 22 made the main beam 19
With the back surface of the flange 20 provided at the end portion of a abutting, the both ends of the main beam 19a are fixed to the columns 21, 2 with bolts and nuts or the like.
It is fixed at 1.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、柱21と
本梁19aの接合位置ごとに大層な枠組足場22を設置し除
去する作業は極めて煩雑であり、また多数の枠組足場22
を使用するものであるために、その取扱いも非常に厄介
なものとなり、これが作業効率の低下を生ぜしめて工期
の遅延化を助長するという致命的な問題点を有していた
のである。
However, the work of installing and removing the large-scale frame scaffolding 22 at each joining position of the column 21 and the main beam 19a is extremely complicated, and a large number of frame scaffolds 22 are required.
However, it is very troublesome to handle, and this has a fatal problem that the work efficiency is lowered and the construction period is delayed.

【0006】また、フランジ20は予め工場等に於いて本
梁19aに溶接されるため、このフランジ20が突出して柱
21の保管や搬送作業に支障を与えるという不都合もあっ
た。
Further, since the flange 20 is previously welded to the main beam 19a in a factory or the like, the flange 20 protrudes and the pillar
There was also the inconvenience that it hindered the storage and transportation of 21.

【0007】さらに、クレーン等により吊下状態にある
本梁19aは極めて不安定であるために、柱21への接合作
業も煩雑なものであった。
Further, since the main beam 19a which is suspended by a crane or the like is extremely unstable, the work of joining it to the column 21 is also complicated.

【0008】それ故に、本発明は上記従来の問題点を解
消するためになされたものであり、一連の施工作業を簡
易且つ迅速に行えるようにすることを課題とする。
Therefore, the present invention has been made in order to solve the above-mentioned conventional problems, and an object thereof is to make it possible to perform a series of construction work easily and quickly.

【0009】[0009]

【課題を解決するための手段】即ち、上記課題を解決す
るために、本発明は少なくとも一方の柱1の所望位置に
保持部材7を取付け、その後該保持部材7に補助梁13の
一端部を載置して保持させた状態で該補助梁13を前記柱
1に接合し、次に両柱1,1aを略平行に立設せしめた
後、本梁19を前記補助梁13と柱1aに接合して架設する鉄
骨骨組構造の施工法である。
That is, in order to solve the above-mentioned problems, the present invention attaches a holding member 7 to a desired position of at least one of the columns 1 and then attaches one end of an auxiliary beam 13 to the holding member 7. The auxiliary beam 13 is joined to the column 1 in a state of being placed and held, and then both columns 1 and 1a are erected substantially in parallel, and then the main beam 19 is attached to the auxiliary beam 13 and the column 1a. This is a construction method of a steel frame structure that is joined and installed.

【0010】また、本発明に係る鉄骨骨組構造用柱は、
柱本体2の所望位置に少なくとも1以上の保持部材7が
設けられると共に、該保持部材7に載置させた状態で補
助梁13が前記柱本体2に接合して設けられなるものであ
る。
The column for steel frame structure according to the present invention is
At least one holding member 7 is provided at a desired position of the column main body 2, and an auxiliary beam 13 is provided by being joined to the column main body 2 while being placed on the holding member 7.

【0011】[0011]

【作用】従って、上記構成を特徴とする鉄骨骨組構造の
施工法にあっては、補助梁13が柱1に接合されるため、
その後立設される柱1と他方の柱1aとの間に梁19を架設
する際には、作業員が前記補助梁13を足場として利用で
きることとなり、よってかかる架設作業の便に大いに寄
与しうるのである。
Therefore, in the construction method of the steel frame structure characterized by the above construction, since the auxiliary beam 13 is joined to the column 1,
When the beam 19 is erected between the column 1 and the other column 1a that are erected thereafter, the worker can use the auxiliary beam 13 as a scaffolding, which can greatly contribute to the convenience of the erection work. Of.

【0012】[0012]

【実施例】以下、本発明に係る鉄骨骨組構造用柱の一実
施例について図面に従って説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a steel frame structure column according to the present invention will be described below with reference to the drawings.

【0013】図1及び図2に於いて、2は角形鋼管から
なる柱本体で、その所定位置には角形の補強管3が外嵌
されてなる。4は柱本体2の一側面に軸長方向2列に所
定間隔隔てて形成されたネジ孔である。5は鍔部5aの外
周面に前記柱本体2のネジ孔4に螺着可能なネジ部6が
形成されたナットで、その頭部5bは六角形状をしてい
る。
In FIGS. 1 and 2, reference numeral 2 denotes a column main body made of a rectangular steel pipe, and a rectangular reinforcing pipe 3 is externally fitted at a predetermined position thereof. Reference numeral 4 is a screw hole formed on one side surface of the column main body 2 in two rows in the axial direction at predetermined intervals. Reference numeral 5 is a nut in which a screw portion 6 that can be screwed into the screw hole 4 of the pillar main body 2 is formed on the outer peripheral surface of the collar portion 5a, and the head portion 5b has a hexagonal shape.

【0014】7は板状の基部7aの一側面に板状の載置部
7bを突設せしめた正面略T字状のTフランジであり、基
部7a及び載置部7bには夫々複数の穿設孔8a,8bが所定間
隔隔てて形成されてなる。9は両端にネジ部9aが形成さ
れた植込みボルトで、その一端部はネジ部9aの終端まで
前記ナット5に螺入され且つ他端部は補強管3の穿設孔
3a及びTフランジ7の穿設孔8aに挿通されて座金10を介
してナット11が締着されてなる。この場合、植込みボル
ト9の一端部はそのネジ部9aの終端まで螺入されてなる
ため、ナット11の締着時に植込みボルト9が共に回転す
るような不都合はない。尚、前記植込みボルト9の他端
部にはトルク設定用の締付部9bが設けられ、特殊工具に
て該締付体9aに一定の締付力を加えると、その切欠部9c
より破断するように構成してなる。
Reference numeral 7 denotes a plate-shaped mounting portion on one side surface of the plate-shaped base portion 7a.
The front flange 7a is a T-shaped flange having a substantially T-shape, and a plurality of holes 8a and 8b are formed in the base 7a and the mount 7b at predetermined intervals. Reference numeral 9 is a stud bolt having threaded portions 9a formed at both ends, one end of which is screwed into the nut 5 up to the end of the threaded portion 9a and the other end is a hole for forming a reinforcing pipe 3.
The nut 11 is inserted through the hole 3a and the hole 8a of the T-flange 7, and the nut 11 is tightened through the washer 10. In this case, since one end of the stud 9 is screwed to the end of the threaded portion 9a, there is no inconvenience that the stud 9 rotates together with the nut 11. A tightening portion 9b for setting torque is provided at the other end of the stud 9, and when a certain tightening force is applied to the tightening body 9a with a special tool, the notch 9c is formed.
It is configured to break more.

【0015】12は補強管3の一側面に取付けられた補強
プレートであり、前記Tフランジ7と同様に、ナット5
に螺入した植込みボルト9の一端部を補強管3の穿設孔
3a,Tフランジ7の穿設孔8a及び補強プレート12の穿設
孔12aに挿通せしめ、座金10を介してナット11を締着し
て固定される。
Reference numeral 12 is a reinforcing plate attached to one side surface of the reinforcing pipe 3, and like the T flange 7, the nut 5 is used.
One end of the stud bolt 9 screwed into the
3a, the nut 11 is inserted through the hole 8a of the T flange 7 and the hole 12a of the reinforcing plate 12, and the nut 11 is tightened and fixed via the washer 10.

【0016】13はH形鋼からなる短寸の補助梁で、その
一方のフランジ部15をTフランジ7の載置部7bに載置保
持した状態で、ボルト14を補助梁13のフランジ部15に形
成した複数の穿設孔15a…及びTフランジ7の載置部7b
の穿設孔8bに挿通して座金16を介してナット17を締着す
ると共に、他方のフランジ部18の先端部を前記補強プレ
ート12に溶接して固定されている。
Reference numeral 13 is a short-sized auxiliary beam made of H-shaped steel, and one of the flange portions 15 is mounted and held on the mounting portion 7b of the T-flange 7, and the bolt 14 is attached to the flange portion 15 of the auxiliary beam 13. A plurality of perforated holes 15a formed in and the mounting portion 7b of the T-flange 7
The nut 17 is inserted through the hole 8b to fasten the nut 17 via the washer 16, and the tip of the other flange portion 18 is welded and fixed to the reinforcing plate 12.

【0017】本実施例は以上のような構成からなるが、
前記柱本体2と補助梁13との接合作業は現場でも簡易に
行えるものであるため、角管形状からなる柱本体2をそ
のままの状態で保管及び搬送等できることとなり、かか
る一連の作業に於ける取扱いが極めて簡易なものとなる
利点がある。
Although this embodiment has the above-mentioned configuration,
Since the work of joining the pillar main body 2 and the auxiliary beam 13 can be easily performed on site, the pillar main body 2 having a square tube shape can be stored and transported as it is. It has the advantage of being extremely easy to handle.

【0018】次に、これを使用して鉄骨骨組構造を施工
する場合について説明する。先ず、図3に示すように上
述の柱1と、該柱1のTフランジ7に対応する所望位置
に同じ構成からなるTフランジ7のみを取付けた柱1aと
を所定間隔隔てて地上に略平行に立設せしめる。
Next, a case of constructing a steel frame structure using this will be described. First, as shown in FIG. 3, the above-described pillar 1 and a pillar 1a having only the T-flange 7 of the same structure attached at a desired position corresponding to the T-flange 7 of the pillar 1 are substantially parallel to the ground with a predetermined space therebetween. Stand upright.

【0019】その後、接合すべきH形鋼からなる本梁19
をクレーン等により略水平に吊下せしめた状態で前記柱
1,1a間に配置し、その一端部を他方の柱1aのTフラン
ジ7の載置部7bにより保持させた状態で、作業員が一方
の柱1の補助梁13を足場として、本梁19の他端部を補助
梁13に接合せしめる。
Thereafter, the main beam 19 made of H-shaped steel to be joined is used.
Is hung substantially horizontally by a crane or the like, and is placed between the pillars 1 and 1a, and one end of the pillar 1a is held by the mounting portion 7b of the T flange 7 of the other pillar 1a. The other end of the main beam 19 is joined to the auxiliary beam 13 using the auxiliary beam 13 of the one pillar 1 as a scaffold.

【0020】この場合は、継目板20を補助梁13と本梁19
とに跨がらせた状態でボルト21及びナット22を使用して
接合すればよい。而して、かかる本梁19の他端部の接合
により一端部も安定するため、作業員が本梁19の一端部
にてこれを他方のTフランジ7にボルト21等により接合
することができるのである。
In this case, the joint plate 20 is connected to the auxiliary beam 13 and the main beam 19.
The bolts 21 and the nuts 22 may be used to join them while straddling them. Since one end of the main beam 19 is also stabilized by joining the other end of the main beam 19, an operator can join the other end of the main beam 19 to the other T-flange 7 with a bolt 21 or the like. Of.

【0021】このように、本梁19の一端部を他方の柱1a
のTフランジ7にて保持した状態で補助梁13が足場用と
して有効利用できるため、クレーン等の操作や本梁19の
接合作業が極めて簡易且つ迅速に行える結果、作業能率
が大幅に向上することとなる。
In this way, one end of the main beam 19 is connected to the other pillar 1a.
Since the auxiliary beam 13 can be effectively used for scaffolding while being held by the T-flange 7, the operation of the crane and the joining work of the main beam 19 can be performed very easily and quickly, resulting in a significant improvement in work efficiency. Becomes

【0022】そして、同様の作業を行って、鉄骨骨組構
造を形成するのである。
Then, the same work is performed to form a steel frame structure.

【0023】尚、上記実施例に於いては、柱本体2に角
形鋼管を使用し且つ補助梁13及び本梁19にH形鋼を使用
してなるが、その他の鉄骨部材の使用も勿論可能であ
り、その具体的な構成は問わない。
In the above embodiment, a square steel pipe is used for the column main body 2 and H-shaped steel is used for the auxiliary beam 13 and the main beam 19, but it is of course possible to use other steel members. However, the specific configuration does not matter.

【0024】また、補助梁13と柱本体2、補助梁13と本
梁19との接合手段は必ずしも該実施例のように構成する
必要はない。
Further, the joining means for joining the auxiliary beam 13 to the column body 2 and the auxiliary beam 13 to the main beam 19 does not necessarily have to be constructed as in this embodiment.

【0025】さらに、柱本体2に設ける補助梁13の数や
位置も任意に変更可能である。
Further, the number and positions of the auxiliary beams 13 provided on the column main body 2 can be arbitrarily changed.

【0026】また、補助梁13は必ずしも現場で接合する
必要はなく、工場等に於いて予め接合しておくことも可
能である。
The auxiliary beam 13 does not necessarily have to be joined on site, but can be joined in advance in a factory or the like.

【0027】[0027]

【発明の効果】叙上の様に、本発明は予め柱本体に補助
梁を接合して設けてなるために、施工後には梁の一部を
構成するこの補助梁を作業用の足場として利用できるこ
ととなり、別途大層な枠組足場を柱と梁との接合部分ご
とに多数設けて施工していた従来のような足場の設置や
除去作業の必要がなくなると共に、その取扱いも煩雑に
なることなく、一連の施工作業が極めて簡易且つ迅速に
行える結果、工期の短縮化に大いに寄与しうるという格
別の効果を得るに至ったのである。
As described above, according to the present invention, since the auxiliary beam is preliminarily joined to the column main body, the auxiliary beam forming a part of the beam is used as a scaffold for work after construction. As a result, there is no need to install and remove scaffolding as in the conventional case where a large number of large-scale frame scaffolds were separately installed for each joint between the pillar and the beam, and its handling is not complicated. As a result of being able to perform a series of construction work extremely simply and quickly, we have come to obtain a particular effect that it can greatly contribute to shortening the construction period.

【0028】特に、補助梁を取付けた柱に対応する他方
の柱にも保持部材を設けておくと、本梁の架設時に於い
てその一端部を保持しつつ他端部を補助梁に接合するこ
とができるため、かかる接合作業がより一層安全且つ簡
易に行える利点がある。
In particular, if a holding member is also provided on the other pillar corresponding to the pillar to which the auxiliary beam is attached, one end of the main beam is held and the other end is joined to the auxiliary beam when the main beam is installed. Therefore, there is an advantage that the joining work can be performed more safely and easily.

【0029】また、本発明に係る柱は上述の如く簡易な
構成からなるため、安価に且つ容易に製作できるという
実用的な効果がある。
Further, since the pillar according to the present invention has a simple structure as described above, it has a practical effect that it can be easily manufactured at low cost.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る柱の一実施例を示す要部拡大正面
図。
FIG. 1 is an enlarged front view of an essential part showing an embodiment of a pillar according to the present invention.

【図2】同要部拡大断面図。FIG. 2 is an enlarged cross-sectional view of the relevant part.

【図3】本発明に係る鉄骨骨組構造の施工法の一例を示
す正面図。
FIG. 3 is a front view showing an example of a method of constructing a steel frame structure according to the present invention.

【図4】従来例を示す施工状態の正面図。FIG. 4 is a front view of a conventional example in a construction state.

【符号の説明】[Explanation of symbols]

1,1a…柱 2…柱本体 4…ネジ孔 5…ナット 6…ネジ部 7…保持部材 7a…基部 7b…載置部 8a…貫通孔 9…植込みボルト 11…ナット 13…補助梁 19…本梁 1, 1a ... Pillar 2 ... Pillar main body 4 ... Screw hole 5 ... Nut 6 ... Screw portion 7 ... Holding member 7a ... Base portion 7b ... Mounting portion 8a ... Through hole 9 ... Implant bolt 11 ... Nut 13 ... Auxiliary beam 19 ... Book Beam

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 立設される2本の柱間に梁を架設する鉄
骨骨組構造の施工法に於いて、少なくとも一方の柱1の
所望位置に保持部材7を取付け、その後該保持部材7に
補助梁13の一端部を載置して保持させた状態で該補助梁
13を柱1に接合し、次に両柱1,1aを略平行に立設せし
めた後、本梁19を前記補助梁13と他方の柱1aに接合して
架設することを特徴とする鉄骨骨組構造の施工法。
1. A method for constructing a steel frame structure in which a beam is erected between two vertically installed columns. A holding member 7 is attached to a desired position of at least one of the columns 1, and then the holding member 7 is attached to the holding member 7. With one end of the auxiliary beam 13 placed and held, the auxiliary beam
Steel frame characterized in that 13 is joined to the pillar 1, and then both pillars 1 and 1a are erected substantially parallel to each other, and then the main beam 19 is joined to the auxiliary beam 13 and the other pillar 1a to be erected. Construction method of frame structure.
【請求項2】 前記保持部材7が、柱1に接合される基
部7aと、該基部7aの一側面に突設されて前記補助梁13の
一端部を載置可能な載置部7bとからなるTフランジであ
る請求項1記載の鉄骨骨組構造の施工法。
2. The holding member 7 comprises a base portion 7a joined to the pillar 1 and a mounting portion 7b projecting from one side surface of the base portion 7a and capable of mounting one end portion of the auxiliary beam 13 thereon. The method for constructing a steel frame structure according to claim 1, which is a T-flange.
【請求項3】 前記補助梁13が、ボルト及びナットによ
り柱1及び本梁19と接合可能に構成されてなる請求項1
又は2記載の鉄骨骨組構造の施工法。
3. The auxiliary beam 13 is configured so that it can be joined to the pillar 1 and the main beam 19 with bolts and nuts.
Or the construction method of the steel frame structure according to 2.
【請求項4】 外周面にネジ部6を有するナット5が前
記柱1に複数形成されたネジ孔4に螺着され、且つ該ナ
ット5に一端部を螺入した植込みボルト9の他端部を前
記保持部材7に形成した貫通孔8aに挿通してナット11を
締着せしめることにより該保持部材7を前記柱1に取付
けてなる請求項1記載の鉄骨骨組構造の施工法。
4. A nut 5 having a threaded portion 6 on its outer peripheral surface is screwed into a threaded hole 4 formed in the pillar 1, and the other end of the stud bolt 9 is screwed into the nut 5 at one end. The method for constructing a steel frame structure according to claim 1, wherein the holding member 7 is attached to the pillar 1 by inserting the nut into the through hole 8a formed in the holding member 7 and tightening the nut 11.
【請求項5】 柱本体2の所望位置に少なくとも1以上
の保持部材7が取付けられると共に、該保持部材7に載
置させた状態で補助梁13が前記柱本体2に接合して設け
られなることを特徴とする柱。
5. At least one holding member 7 is attached to a desired position of the pillar main body 2, and an auxiliary beam 13 is provided by being joined to the pillar main body 2 while being placed on the holding member 7. A pillar characterized by that.
JP3298936A 1991-11-14 1991-11-14 Construction method of steel frame structure and column used for it. Expired - Lifetime JP2736576B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3298936A JP2736576B2 (en) 1991-11-14 1991-11-14 Construction method of steel frame structure and column used for it.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3298936A JP2736576B2 (en) 1991-11-14 1991-11-14 Construction method of steel frame structure and column used for it.

Publications (2)

Publication Number Publication Date
JPH0673790A true JPH0673790A (en) 1994-03-15
JP2736576B2 JP2736576B2 (en) 1998-04-02

Family

ID=17866108

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3298936A Expired - Lifetime JP2736576B2 (en) 1991-11-14 1991-11-14 Construction method of steel frame structure and column used for it.

Country Status (1)

Country Link
JP (1) JP2736576B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08144368A (en) * 1994-11-25 1996-06-04 Daiwa House Ind Co Ltd Structure and method for connecting end plate type steel frame structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6062369A (en) * 1983-09-17 1985-04-10 清水建設株式会社 Pillar and beam iron skeletal

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6062369A (en) * 1983-09-17 1985-04-10 清水建設株式会社 Pillar and beam iron skeletal

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08144368A (en) * 1994-11-25 1996-06-04 Daiwa House Ind Co Ltd Structure and method for connecting end plate type steel frame structure

Also Published As

Publication number Publication date
JP2736576B2 (en) 1998-04-02

Similar Documents

Publication Publication Date Title
JPH0673790A (en) Construction of steel frame structure and pillar used for it
JPH0581403U (en) Joint structure of reinforced concrete columns and steel beams
JP3528910B2 (en) How to lay the deck plate
JPH0449340A (en) Lay-in joint structure for column and beam
JPH071426Y2 (en) Hollow scaffolding support hardware
JPH08144368A (en) Structure and method for connecting end plate type steel frame structure
JP3247749B2 (en) Construction method of long span truss beams
JP3103294B2 (en) Pillar steel frame, jig used for the connection, and steel frame connection method
JPH08113982A (en) Device for joining column and beam of steel framed building
JP4116586B2 (en) Bracket for structure
JPH0736004Y2 (en) Hollow scaffolding support hardware
JPH037471Y2 (en)
JPH0423156Y2 (en)
JPH0327166Y2 (en)
JPH0460037A (en) Fitting connecting structure of column and beam
JPH0728247Y2 (en) Joint structure of columns and beams
JP3328398B2 (en) Fall prevention device for roof construction
JP2668616B2 (en) Steel frame construction method
JPH0333846Y2 (en)
JPH0630967Y2 (en) Connection structure of columns and beams
JPH10317501A (en) Connector of building, building unit, and unit building
JP2784546B2 (en) Connection metal fittings for shoring
JP2548359Y2 (en) Mounting structure for steel frame scaffolding
JP3031181U (en) Joining structure of steel structure
JPH0285445A (en) Fixture and method for assembling framework wall panel of wood structure