JPH0670322B2 - Horizontal burying method for drain material and burying apparatus therefor - Google Patents

Horizontal burying method for drain material and burying apparatus therefor

Info

Publication number
JPH0670322B2
JPH0670322B2 JP28756789A JP28756789A JPH0670322B2 JP H0670322 B2 JPH0670322 B2 JP H0670322B2 JP 28756789 A JP28756789 A JP 28756789A JP 28756789 A JP28756789 A JP 28756789A JP H0670322 B2 JPH0670322 B2 JP H0670322B2
Authority
JP
Japan
Prior art keywords
drain material
burying
guide
embedding
drain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP28756789A
Other languages
Japanese (ja)
Other versions
JPH03147920A (en
Inventor
雄一 谷
博 新舎
正志 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Penta Ocean Construction Co Ltd
Original Assignee
Penta Ocean Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Penta Ocean Construction Co Ltd filed Critical Penta Ocean Construction Co Ltd
Priority to JP28756789A priority Critical patent/JPH0670322B2/en
Publication of JPH03147920A publication Critical patent/JPH03147920A/en
Publication of JPH0670322B2 publication Critical patent/JPH0670322B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、浚渫による埋立地やヘドロ処理地等の超軟弱
地盤中に、水平方向に高さを違えて複数のドレーン材を
埋設する水平ドレーン材の埋設方法及びその装置に関す
る。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention relates to a horizontal method for embedding a plurality of drain materials at different heights in the horizontal direction in ultra-soft ground such as a landfill due to dredging or sludge processing land. The present invention relates to a method for burying a drain material and an apparatus for the method.

(従来の技術) 一般にポンプ浚渫船で海底等の水底に堆積している軟弱
な粘性土を浚渫して埋立地へ投入すると、超軟弱地盤が
形成される。このような超軟弱地盤は従来、自然圧密を
持って、次の浚渫土を投入したり、自然圧密によりある
程度の耐力が発現した後、ドレーン材を上下に打ち込
み、その上に砂等のウエイトを載せた強制圧密方法が採
られていた。
(Prior Art) Generally, when a soft dredged soil deposited on the bottom of a sea such as a seabed is dredged into a landfill by a pump dredger, an ultra-soft ground is formed. Conventionally, such ultra-soft ground has natural consolidation, and the next dredged soil is thrown in, or after a certain amount of proof stress has been developed due to natural consolidation, the drain material is driven up and down and a weight such as sand is placed on it. The forced consolidation method used was adopted.

このような方法では、自然圧密に長時間を要し、従来の
地盤改良工法の施工が可能な状態になるまでに長時間を
要していた。
In such a method, it takes a long time for natural consolidation, and it takes a long time before the conventional ground improvement method can be applied.

かかる点にかんがみ、軟弱地盤中に水平にドレーン材を
埋設し、該ドレーン材を通して軟弱地盤中の水を吸い出
す地盤改良方法が検討され、第9図に示すようにドレー
ン材1を巻取ったリール2を船上に搭載し、かつ、船底
下にドレーン材1を繰り出すためのドレーン材埋設ガイ
ド3を突出させたドレーン材埋設船4を軟弱地盤5上の
水平上に浮かべ、軟弱地盤5中に、ドレーン材埋設ガイ
ド3から繰り出したドレーン材1の先端を杭6等の固定
部材に固定し、この状態でドレーン材埋設船4を移動さ
せつつドレーン材埋設ガイド3からドレーン材1を繰り
出しつつ水平埋設を行う方法及び装置が開発されている
(特開昭64-10813号公報)。
Considering this point, a method for ground improvement in which the drain material is horizontally embedded in the soft ground and the water in the soft ground is sucked through the drain material has been studied. As shown in FIG. 2 is mounted on the ship, and a drain material embedding vessel 4 having a projected drain material embedding guide 3 for feeding the drain material 1 underneath the ship bottom is floated horizontally on the soft ground 5, and in the soft ground 5, The tip of the drain material 1 fed from the drain material burying guide 3 is fixed to a fixing member such as a pile 6, and in this state, the drain material burying ship 4 is moved while the drain material 1 is fed from the drain material burying guide 3 to be horizontally buried. A method and apparatus for performing the above have been developed (Japanese Patent Laid-Open No. 64-10813).

(発明が解決しようとする課題) このような従来のドレーン材の水平埋設方法では、埋設
始端部から埋設終端部まで水平配置にドレーン材が連続
して埋設されるものであるが、第10図に示すように始端
及び終端から築堤7a,7bまでの間にドレーン材が埋設さ
れない部分a,bができ、このため築堤7a,7bに近い部分に
改良効果が出ない部分ができる。このため、耐力にむら
が生じ、その後の覆土等の作業に大きな支障を来すとい
う問題があった。
(Problems to be Solved by the Invention) In such a conventional horizontal burying method for the drain material, the drain material is continuously laid horizontally in a horizontal arrangement from the burying start end portion to the burying end portion. As shown in Fig. 5, there are portions a and b in which the drain material is not buried between the start end and the end to the embankments 7a and 7b, and therefore, portions near the embankments 7a and 7b have no improvement effect. For this reason, there is a problem in that the yield strength becomes uneven, and the subsequent work such as covering the soil is greatly hindered.

本発明はこのような従来の問題にかんがみ、ドレーン材
の埋設始端及び終端においても、均一な密度にドレーン
材を埋設することができ、地盤改良が全域にわたって均
一に行われるドレーン材の水平埋設方法及びその埋設装
置の提供を目的としたものである。
In view of such a conventional problem, the present invention is capable of burying the drain material at a uniform density even at the burying start end and the terminating end of the drain material, and a horizontal burying method for the drain material in which ground improvement is uniformly performed over the entire area. And the purpose of providing the buried device.

(課題を達成するための手段) 上述の如き従来の問題を解決し、所期の目的を達成する
ための本発明方法の特徴は船底より下方に垂下させたド
レーン材埋設ガイドに沿わせて必要な高さ位置にドレー
ン材を繰出し自在な埋設作業船を使用し、前記ドレーン
材埋設ガイドを軟弱地盤中に挿入させた状態で、該地盤
中を進行させ、その進行に伴ってドレーン材を繰り出す
水平ドレーン材の埋設方法において、前記ドレーン材の
埋設始端部分位置にて前記ドレーン材埋設ガイドを軟弱
地盤上より除々に該地盤内に埋設させつつ進行方向側に
移動させ、所定深さまで降下させた状態で作業船ととも
に水平移動させ、埋設終端位置にて前記ドレーン材埋設
ガイドを軟弱地盤表面まで除々に昇降させつつ進行させ
ることにあり、また本発明装置の特徴は上部にリールに
巻き取ったドレーン材を搭載した埋設作業船の略中央
に、該埋設作業船の進行方向側前後に回動自在に上端部
を枢着したドレーン材埋設ガイドを垂下させ、該ドレー
ン材埋設ガイドの複数高さ位置に、前記リールから引き
出したドレーン材を順次繰り出すドレーン材繰出部を備
え、かつ、前記ドレーン材埋設ガイドを、その先端側
を、前方及び後方側に強制回動させるドレーン材埋設ガ
イド姿勢制御手段を備えたことにある。
(Means for Achieving the Object) The features of the method of the present invention for solving the above-mentioned conventional problems and for achieving the intended purpose are required along with a drain material burying guide that is hung below the ship bottom. The draining material can be fed out to a different height position, and the draining material embedded guide is inserted into the soft ground to advance through the ground, and the draining material is fed out along with the progress. In the method of burying a horizontal drain material, the drain material burying guide was gradually moved toward the advancing direction side while being buried in the ground from above the soft ground at the burying start end position of the drain material, and lowered to a predetermined depth. In this state, it is moved horizontally with the work boat, and at the end position of burial, the drain material burying guide is gradually moved up and down to the surface of the soft ground, and the feature of the device of the present invention is as follows. A drain material embedding guide having an upper end rotatably rotatably pivoted forward and backward in the advancing direction of the buried work vessel is hung at approximately the center of the buried work vessel in which the drain material is wound around a reel. A drain material feeding portion that sequentially feeds the drain material drawn from the reel is provided at a plurality of height positions of the material embedding guide, and the tip end side of the drain material embedding guide is forcibly rotated forward and backward. This is because the drain material burying guide posture control means is provided.

(作用) 本発明においてはドレーン材の埋設始端部では、ドレー
ン材埋設船を停止させ、もしくはゆっくり前進させなが
らドレーン材埋設ガイドを埋設作業船の進行方向側に回
動させつつ、その回動長さ分のドレーン材を順次繰出
し、水平埋設しようとする深さまで先端側を回動降下さ
る。なお、このとき、ドレーン材の先端には予め真空引
きホースを連結しておき、ドレーン材が軟弱地盤表面よ
り稍下部位置からその先端が繰り出されるようにする。
(Operation) In the present invention, at the starting end of the drain material burial, the drain material burial vessel is stopped or slowly moved forward while the drain material burial guide is pivoted toward the traveling direction side of the burial work vessel, and its rotation length is increased. The drain material for that amount is sequentially fed out, and the tip side is pivoted down to the depth at which it is about to be embedded horizontally. At this time, a vacuum drawing hose is connected to the tip of the drain material in advance so that the tip of the drain material is fed out from the soft ground surface from the baffle position.

次いでこの状態で埋設作業船を移動させ、これに応じて
ドレーン材を繰出し、水平埋設する。埋設終端部におい
ては、埋設作業船を停止させ、もしくはゆっくり前進さ
せながらドレーン材埋設ガイドを前方に回動させて軟弱
地盤上まで上昇させ、その回動に伴ってドレーン材を繰
出し、ドレーン材の後端を軟弱地盤の表面稍下部位置ま
で導出させる。
Then, the burial work boat is moved in this state, and the drain material is fed out in accordance therewith and horizontally buried. At the terminating end of the burial, while stopping the burial work boat or slowly advancing it, the drain material burial guide is rotated forward and raised to above the soft ground. The rear end is led out to the position of the lower part of the surface soil on the soft ground.

このような動作を埋設作業船の往動作もしくは往復動作
毎に行い、軟弱地盤全域にドレーン材を埋設する。
Such an operation is performed for each forward or reciprocating operation of the buried work ship, and the drain material is buried in the entire soft ground.

また、このようにして始端及び終端でドレーン材端部が
地盤表面近くに導出されることにより埋設されない部分
を残さないでドレーン材の埋設がなされる。
In this way, the drain material ends are led out near the ground surface at the starting end and the terminating end, so that the drain material is buried without leaving unfilled portions.

(実施例) 次に本発明の実施の一例を第1図〜第8図について説明
する。第1図,第2図は本発明の装置の実施例を示して
おり、図において、11は本発明を実施したドレーン材埋
設作業船である。この埋設作業船11は双胴型の船体12を
有し、該船体12には枠体内に発泡スチロール等のフロー
ト13が収容されて構成されている。この船体12の船底に
は、スタビライザ12aが前後方向に向けて突出され、後
述する軟弱地盤にこれを貫入した状態で推進させること
により直進性を維持させるようにしている。
(Embodiment) An embodiment of the present invention will be described with reference to Figs. 1 and 2 show an embodiment of the apparatus of the present invention. In the drawings, 11 is a drain material burying work ship embodying the present invention. This buried work boat 11 has a catamaran-type hull 12, and the hull 12 is configured by accommodating a float 13 such as Styrofoam in a frame body. A stabilizer 12a is projected on the bottom of the hull 12 in the front-rear direction, and the straightness is maintained by propelling the stabilizer 12a while penetrating it into a soft ground described later.

船体12の上面には複数のリール14がブラケット15を介し
て回転自在に搭載されている。
A plurality of reels 14 are rotatably mounted on a top surface of the hull 12 via brackets 15.

各リール14には不織布等よりなる中空のドレーン材16が
それぞれ巻き取られている。ドレーン材16は第3図に示
すように四角形の平型をなしていて、一端16A側は盲キ
ャップ29で閉じられ、基端16Bには真空引き用ホース17
がコネクタ18を介して接続されるようになっている。船
体12の底部には、上端を船体中央部分の枢支部19で枢支
させたドレーン材埋設ガイド20が船体12の前後方向に回
動自在に支持されている。このドレーン材埋設ガイド20
は、片面が開口したチャンネル材等よりなるガイド本体
21がその開口部を後向きにして枢支部19で支持され、こ
のガイド本体21内を経てガイドされる各ドレーン材16が
該ガイド本体21に上下方向に位置を異にして取り付けら
れたガイドロール22で向きを変えて水平に繰り出される
構造になっている。即ち、ガイドロール22の位置により
ドレーン材16の上下方向の埋設位置が定められるように
なっている。
A hollow drain material 16 made of non-woven fabric or the like is wound around each reel 14. The drain member 16 has a rectangular flat shape as shown in FIG. 3, one end 16A side is closed by a blind cap 29, and the base end 16B has a vacuuming hose 17
Are connected via a connector 18. At the bottom of the hull 12, a drain material embedded guide 20 having an upper end pivotally supported by a pivot part 19 in the center of the hull is rotatably supported in the front-rear direction of the hull 12. This drain material burial guide 20
Is a guide body made of channel material with one side open.
21 is supported by a pivot portion 19 with its opening facing rearward, and each drain member 16 guided through the inside of the guide body 21 is attached to the guide body 21 at vertically different positions. The structure is such that the direction is changed by and it is extended horizontally. That is, the position in which the drain member 16 is embedded in the vertical direction is determined by the position of the guide roll 22.

船体12の前後部には一対のドレーン材埋設ガイド用の姿
勢制御手段23A,23Bが設けられている。この各姿勢制御
手段23A,23Bは、それぞれドレーン材埋設ガイド20の中
央より稍先端側の位置に枢軸24A,24Bによって先端部が
枢着された引抜枠25A,25Bを有し、この引抜枠25A,25Bの
後端側が船体12の前後部に枢支された摺動ガイド筒26A,
26Bに摺動自在に挿通されている。各貫入引抜枠25A,25B
は図には詳示してないが、それぞれラックピニオン機構
を介してモータ27A,27Bの駆動により軸方向に往復動作
させるようにしている。
At the front and rear of the hull 12, a pair of attitude control means 23A, 23B for guiding the drain material burying are provided. Each of the attitude control means 23A, 23B has withdrawal frames 25A, 25B whose tip ends are pivotally attached by pivot shafts 24A, 24B at a position on the tip side of the drain material embedding guide 20 from the center thereof. , 25B, the rear end side of which is a sliding guide tube 26A pivotally supported on the front and rear of the hull 12.
It is slidably inserted in 26B. Each penetration drawing frame 25A, 25B
Although not shown in detail in the figure, the motors 27A and 27B are respectively driven via a rack and pinion mechanism to reciprocate in the axial direction.

而して、この姿勢制御手段23A,23Bは前方側の引抜枠25A
を引き上げ、後方側の貫入引抜枠25Bを押し込むことに
よりドレーン材埋設ガイド20が前方側に回動され、逆に
後方側の引抜枠25Bを引上げ、前方側の貫入引抜枠25Aを
押し込むことにより、ドレーン材埋設ガイド20が後方側
に回動されるようになっている。
Thus, the attitude control means 23A and 23B are the front extraction frames 25A.
, The drain material embedded guide 20 is rotated to the front side by pushing in the rear side intrusive pull-out frame 25B, conversely pulling up the rear side inward pull-out frame 25B, and pushing in the front side intrusive pull-out frame 25A, The drain material burying guide 20 is adapted to be rotated rearward.

次に上述した埋設作業船11を使用した本発明方法の実施
例について説明する。
Next, an embodiment of the method of the present invention using the above-mentioned buried work boat 11 will be described.

まず、埋設始端側において、第4図に示すように後方側
の引抜枠25Bを引き上げてドレーン材埋設ガイド20を軟
弱地盤30上まで引き上げ、各ドレーン材16,16……をガ
イドロール22に掛け回して導出させ、各ドレーン材16の
先端にそれぞれコネクタ18を介して真空引きホース17を
連結する。
First, on the burial start end side, as shown in FIG. 4, the drawing frame 25B on the rear side is pulled up to pull up the drain material burying guide 20 onto the soft ground 30, and each drain material 16, 16 ... Is hung on the guide roll 22. It is rotated and led out, and a vacuum hose 17 is connected to the tip of each drain member 16 via a connector 18.

次いで第5図に示すように前方側の引抜枠25Aを引上
げ、ドレーン材埋設ガイド20を直立もしくはそれに近い
状態になるまで貫入させる。このとき、各ホース17もし
くは各ドレーン材16が軟弱地盤30中に引き込まれないよ
うに固定することにより各ドレーン材16はドレーン材埋
設ガイド20の貫入に従って繰り出され、埋設始端部の軟
弱地盤中に築堤31aの前面に沿って円弧状に埋設され
る。
Next, as shown in FIG. 5, the extraction frame 25A on the front side is pulled up, and the drain material burying guide 20 is inserted up to an upright state or a state close thereto. At this time, by fixing each hose 17 or each drain material 16 so as not to be drawn into the soft ground 30, each drain material 16 is fed out according to the penetration of the drain material embedding guide 20, and is inserted into the soft ground at the embedding start end. It is buried in an arc shape along the front surface of the embankment 31a.

このようにドレーン材埋設ガイド20を貫入させた状態で
ドレーン材埋設作業船11を前方側に進行させる。この進
行は、一例として岸上に設置したウインチにより行う。
この進行に伴ってドレーン材16は軟弱士の抵抗によって
順次引き出され、水平方向に埋設される。
In this way, the drain material burying work vessel 11 is moved forward with the drain material burying guide 20 being inserted. This process is performed by a winch installed on the shore as an example.
Along with this progress, the drain member 16 is sequentially pulled out by the resistance of the weak man and is buried in the horizontal direction.

そして、反対側の対岸の築堤31bの前面の埋設終端位置
にて埋設作業船11の進行を止め、船上にて各ドレーン材
16を必要な長さだけ残し、終端に盲キャップ29を装着し
た状態で第6図に示すように前方側の引抜枠25Aを引上
げてドレーン材埋設ガイド20を前方側に回動させ、軟弱
地盤30上まで引き上げる。これによって築堤31bに沿っ
て終端側が円弧状に湾曲され、その先端が軟弱地盤表面
稍下部位置まで到達した状態に埋設される。
Then, at the burying end position on the front side of the embankment 31b on the opposite side, the operation of the burying work vessel 11 is stopped, and each drain material is onboard.
While leaving 16 as long as necessary, with the blind cap 29 attached at the end, pull out the front extraction frame 25A to rotate the drain material burying guide 20 to the front side as shown in FIG. 30 Pull up. As a result, the terminal side is curved in an arc shape along the embankment 31b, and the tip is buried in a state where the tip reaches the lower part of the soft ground surface culvert.

上述の操作によって一埋設工程が終了する。これによっ
て第7図に示すようにドレーン材16の埋設始終端部16a,
16bが弧状に埋設され、前述した従来例のように埋設始
終端部にドレーン材のない部分を残すことなく均一な埋
設がなされる。
The above-mentioned operation completes one burying process. As a result, as shown in FIG.
The 16b is buried in an arc shape, so that it can be uniformly buried without leaving a portion without a drain material at the starting and terminating ends of the embedding as in the above-described conventional example.

なお、埋設の始終端部において、ドレーン材埋設船11全
体をゆっくり移動させつつドレーン材埋設ガイド20を貫
入させることにより、第8図に示すように始終端部16a,
16bを直線的に降下及び上昇させたように埋設すること
もできる。
At the start and end portions of the burial, the drain material burying guide 20 is inserted while slowly moving the entire drain material burying vessel 11, so that as shown in FIG.
It is also possible to bury the 16b as if it were lowered and raised linearly.

次いで埋設作業船11を元の位置に戻し、1ピッチ分だけ
横移動させ、前述と同様に操作し、これを繰り返して軟
弱地盤全面に一定ピッチ毎ドレーン材を埋設する。
Then, the burying work boat 11 is returned to the original position, laterally moved by one pitch, and operated in the same manner as described above. By repeating this, the drain material is buried at a constant pitch on the entire soft ground.

なお、埋設作業完了後は、真空引ホース17を減圧ポンプ
に連結し、ドレーン材16内を減圧して軟弱地盤30中の水
を吸い出し、地盤改良する。
After the burying work is completed, the vacuum hose 17 is connected to a decompression pump to depressurize the drain material 16 to suck out the water in the soft ground 30 to improve the ground.

(発明の効果) 上述したように、本発明方法においては、ドレーン材の
埋設始端においてドレーン材埋設ガイドを前進させつつ
軟弱地盤中に埋設させるようにするとともに、埋設終端
においてドレーン材埋設ガイドを前進させつつ上昇させ
るようにしたことにより、始端及び終端部において築堤
の前面に沿ってドレーン材が埋設されることとなり、軟
弱地盤全域が均一に改良されることとなり、その後の処
理がスムーズに、かつ完全に進めることができる。
(Effect of the invention) As described above, in the method of the present invention, the drain material burying guide is moved forward at the burying start end of the drain material while being laid in the soft ground, and the drain material burying guide is moved forward at the burying end. By doing so, the drain material will be buried along the front surface of the embankment at the start and end portions, and the entire soft ground will be improved uniformly, and the subsequent processing will be smooth and You can proceed completely.

また本発明の装置においては、ドレーン材埋設ガイドの
上端側を船体の中央部分に枢着させ、前後方向に軟弱地
盤上まで回動できるようにしたことにより、埋設作業船
を埋設始端及び終端において進行方向側に回動させると
いう簡単な作業により、両端位置に未改良部分を残さな
いようにドレーン材の埋設が可能となったものである。
Further, in the device of the present invention, the upper end side of the drain material burying guide is pivotally attached to the center portion of the hull so that the drain material burying guide can be rotated in the front-rear direction onto the soft ground. By the simple operation of rotating the drain material in the traveling direction side, the drain material can be buried without leaving unmodified portions at both end positions.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明に係る装置の実施例の平面図、第2図は
同側面図、第3図はドレーン材の端部の斜視図、第4図
〜第6図はそれぞれ本発明の方法の実施例の各工程を示
す側面図、第7図、第8図はそれぞれドレーン材の埋設
状態を示す断面図、第9図は従来装置の側面図、第10図
は従来装置によるドレーン材埋設状態の側面図である。 11……埋設作業船、12……船体、 12a……スタビライザ、13……フロート、 14……リール、15……ブラケット、 16……ドレーン材、17……真空引きホース、 18……コネクタ、19……枢支部、 20……ドレーン材埋設ガイド、 21……ガイド本体、22……ガイドロール、 23A,23B……姿勢制御手段、 24A,24B……枢軸、 25A,25B……引抜枠、 26A,26B……摺動ガイド筒、 27A,27B……モーター、 30……軟弱地盤、31a,31b……築堤。
FIG. 1 is a plan view of an embodiment of an apparatus according to the present invention, FIG. 2 is a side view of the same, FIG. 3 is a perspective view of an end portion of a drain material, and FIGS. FIG. 7 is a side view showing the steps of embodying the present invention, FIG. 7 and FIG. 8 are sectional views showing the buried state of the drain material, FIG. 9 is a side view of the conventional apparatus, and FIG. It is a side view of a state. 11 …… Buried work boat, 12 …… Hull, 12a …… Stabilizer, 13 …… Float, 14 …… Reel, 15 …… Bracket, 16 …… Drain material, 17 …… Vacuum hose, 18 …… Connector, 19 ... Pivot support, 20 ... Drain material embedding guide, 21 ... Guide body, 22 ... Guide roll, 23A, 23B ... Posture control means, 24A, 24B ... Axis, 25A, 25B ... Pull-out frame, 26A, 26B …… Sliding guide tube, 27A, 27B …… Motor, 30 …… Soft ground, 31a, 31b …… Embedment.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】船底より下方に垂下させたドレーン材埋設
ガイドに沿わせて必要な高さ位置にドレーン材を繰出し
自在な埋設作業船を使用し、前記ドレーン材埋設ガイド
を軟弱地盤中に挿入させた状態で、該地盤中を進行さ
せ、その進行に伴ってドレーン材を繰り出す水平ドレー
ン材の埋設方法において、前記ドレーン材の埋設始端部
分位置にて前記ドレーン材埋設ガイドを軟弱地盤上より
除々に該地盤内に埋設させつつ進行方向側に移動させ、
所定深さまで降下させた状態で作業船とともに水平移動
させ、埋設終端位置にて前記ドレーン材埋設ガイドを軟
弱地盤表面まで除々に昇降させつつ進行させることを特
徴としてなるドレーン材の水平埋設方法。
1. A buried work boat in which a drain material can be fed to a required height position along a drain material buried guide that hangs downward from a ship bottom, and the drain material buried guide is inserted into soft ground. In the method of embedding a horizontal drain material that advances in the ground in such a state that the drain material is fed along with the progress, the drain material embedding guide is gradually removed from the soft ground at the embedding start end position of the drain material. While moving in the direction of travel while being embedded in the ground,
A horizontal burying method for a drain material, characterized in that the drain material is horizontally moved together with the work boat while being lowered to a predetermined depth, and the drain material burying guide is gradually moved up and down to the surface of the soft ground at the burying end position.
【請求項2】上部にリールに巻き取ったドレーン材を搭
載した埋設作業船の略中央に、該埋設作業船の進行方向
側前後に回動自在に上端部を枢着したドレーン材埋設ガ
イドを垂下させ、該ドレーン材埋設ガイドの複数高さ位
置に、前記リールから引き出したドレーン材を順次繰り
出すドレーン材繰出部を備え、かつ、前記ドレーン材埋
設ガイドを、その先端側を、前方及び後方側に強制回動
させるドレーン材埋設ガイド姿勢制御手段を備えてなる
ドレーン材の水平埋設装置。
2. A drain material burying guide having an upper end pivotally attached to the front and rear in the traveling direction of the burying work ship at approximately the center of the burying work ship having a drain material wound around a reel on the upper part thereof. The drain material embedding guide is provided at a plurality of height positions of the drain material embedding guide, and the drain material embedding part for sequentially dispensing the drain material drawn out from the reel is provided. A drain material horizontal burying device comprising a drain material burying guide posture control means for forcedly rotating the drain material.
JP28756789A 1989-11-06 1989-11-06 Horizontal burying method for drain material and burying apparatus therefor Expired - Lifetime JPH0670322B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28756789A JPH0670322B2 (en) 1989-11-06 1989-11-06 Horizontal burying method for drain material and burying apparatus therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28756789A JPH0670322B2 (en) 1989-11-06 1989-11-06 Horizontal burying method for drain material and burying apparatus therefor

Publications (2)

Publication Number Publication Date
JPH03147920A JPH03147920A (en) 1991-06-24
JPH0670322B2 true JPH0670322B2 (en) 1994-09-07

Family

ID=17719010

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28756789A Expired - Lifetime JPH0670322B2 (en) 1989-11-06 1989-11-06 Horizontal burying method for drain material and burying apparatus therefor

Country Status (1)

Country Link
JP (1) JPH0670322B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3605163B2 (en) * 1994-12-16 2004-12-22 東急建設株式会社 Method of laying horizontal drain material and laying work boat
JPH11256562A (en) * 1998-03-16 1999-09-21 Toyoha Mining Consolidation accumulating method for use at accumulation site for water-bearing material
CN115075228A (en) * 2022-05-11 2022-09-20 中铁时代建筑设计院有限公司 Connecting device of cast-in-place pipe pile water storage system, water storage system and construction method

Also Published As

Publication number Publication date
JPH03147920A (en) 1991-06-24

Similar Documents

Publication Publication Date Title
US3874182A (en) Method of laying drainage tubing
US3603099A (en) Process of making intraground waterproof baffles and a device therefor
US4445290A (en) Appliance for dredging the bottom of a body of water
US4877355A (en) Underwater cable laying system
JPH0670322B2 (en) Horizontal burying method for drain material and burying apparatus therefor
KR101782456B1 (en) Submarine cable laying apparatus and laying method
US3813888A (en) Apparatus for laying sub-surface irrigation pipe
JPH0786221B2 (en) Horizontal drainage equipment
JPH0445618B2 (en)
US3998065A (en) Horizontal wellpointing method and apparatus
US4787777A (en) Method and device for progressively producing an underwater laying-out channel
JPH0522768B2 (en)
JP2873764B2 (en) How to improve super soft ground
JP2657213B2 (en) Self-propelled dredging equipment
CN210597268U (en) Soft foundation treatment reinforcing apparatus of plastics drain bar
JP2006028748A (en) Dredging equipment and dredging method
JP2751007B2 (en) Underwater walking dredging method and dredging machine
JPS641604B2 (en)
JP2010229816A (en) Vacuum consolidation method using horizontal drain
JP3218525B2 (en) Removal method of existing pile
JP5669040B2 (en) Drain material horizontal burying equipment
KR102425461B1 (en) PBD installing equipment at sea and the PBD installing method
JPH0647964Y2 (en) Gravel pile construction equipment
JP2879116B2 (en) Construction method and construction device of water stop wall
JP2849250B2 (en) Horizontal drain material laying method and laying work boat

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070907

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20080907

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 15

Free format text: PAYMENT UNTIL: 20090907

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 16

Free format text: PAYMENT UNTIL: 20100907

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100907

Year of fee payment: 16