JPH0657558A - Device for exchanging roving of fine spinning frame - Google Patents

Device for exchanging roving of fine spinning frame

Info

Publication number
JPH0657558A
JPH0657558A JP21140592A JP21140592A JPH0657558A JP H0657558 A JPH0657558 A JP H0657558A JP 21140592 A JP21140592 A JP 21140592A JP 21140592 A JP21140592 A JP 21140592A JP H0657558 A JPH0657558 A JP H0657558A
Authority
JP
Japan
Prior art keywords
bobbin
roving
arm
small
exchanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP21140592A
Other languages
Japanese (ja)
Inventor
Isao Asai
功 浅井
Haruyoshi Nakamura
晴佳 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyoda Automatic Loom Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyoda Automatic Loom Works Ltd filed Critical Toyoda Automatic Loom Works Ltd
Priority to JP21140592A priority Critical patent/JPH0657558A/en
Publication of JPH0657558A publication Critical patent/JPH0657558A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To eliminate motion different from one during a stationary operation at a bobbin changing arm side without requiring enlargement in size of a roving exchanging device and rise in height of a preliminarily roving winding rail when a slightly wound bobbin is delivered between a bobbin gripping device and the bobbin changing arm. CONSTITUTION:A bobbin gripping device 26 for temporarily holding a pair of slightly wound bobbins removed from a creel at the beginning of a roving exchanging operation until completion of the roving exchanging operation is attached to the rear part, in the advance direction during roving changing operation, of a roving changing machine 12. The bobbin gripping device 26 is arranged on a holding arm 37 and rotated and arranged together with the holding arm 37 at a bobbin delivery position and a waiting position by operation of an air cylinder 39. The bobbin gripping device 26 and the holding arm 37 together with a supporting plate 34 are raised and lowered by a rise and fall mechanism by a stroke larger than the length of a peg to which a slightly wound bobbin is stuck.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は精紡機の粗糸交換装置に
係り、詳しくは精紡機の機台長手方向に沿って移動し、
クリールの前後2列のボビンハンガに吊下されている前
後一対の粗糸使用後のボビン(以下、小玉ボビンとい
う)と、予備粗糸巻レールに搬入されたボビン搬送体の
ボビンハンガに吊下された予備粗糸巻(満ボビン)と
を、昇降及び前後動するボビン交換アームにより交換す
る粗糸交換装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a roving exchange device for a spinning machine, and more specifically, for moving along a longitudinal direction of a machine frame of the spinning machine,
A pair of front and rear roving bobbins that are hung on the bobbin hangers in the front and rear rows of the creel (hereinafter referred to as small ball bobbins), and spares that are hung on the bobbin hangers of the bobbin carrier that has been carried into the spare roving winding rail. The present invention relates to a roving yarn exchange device for exchanging a roving yarn winding (full bobbin) with a bobbin exchange arm that moves up and down and moves back and forth.

【0002】[0002]

【従来の技術】この種の粗糸交換装置は予備粗糸巻が取
り外されたボビンハンガにクリールから取り出された小
玉ボビンを吊下する構成となっている。従って、最初に
取り出した小玉ボビンすなわち予備粗糸巻を取り外す前
に取り出した小玉ボビンを吊架する予備のボビンハンガ
が必要となる。そして、粗糸交換作業終了時、ボビン搬
送体には最後に予備粗糸巻が取り外された空のボビンハ
ンガが存在する。
2. Description of the Related Art This type of roving yarn exchanging device has a structure in which a small bobbin taken out from a creel is suspended from a bobbin hanger from which a preliminary roving winding is removed. Therefore, a spare bobbin hanger for suspending the small bobbin taken out first, that is, the small bobbin taken out before removing the preliminary roving bobbin is required. At the end of the roving exchange operation, the bobbin carrier has an empty bobbin hanger from which the preliminary roving winding is finally removed.

【0003】小玉ボビンが吊下されたボビン搬送体は、
小玉ボビンの残粗糸が処理されて小玉ボビンが空ボビン
となった後、粗紡工程へ搬入される。そして、粗紡工程
で管替機により空ボビンと満ボビンとが交換される。粗
紡工程の管替機による管替作業時には予備のボビンハン
ガは不要で空ボビンが吊下されていたボビンハンガに満
ボビンが吊下される。ところが、空ボビンと満ボビンと
を単純に交換した場合、そのボビン搬送体を予備粗糸巻
レールに搬入すると予備のボビンハンガの位置は最初に
取り出した小玉ボビンを吊下する位置とはならない。従
って、精紡工程における不都合を防止するため、粗紡工
程における管替時にボビン搬送体を移動させて、満ボビ
ンの吊下位置を空ボビンの吊下位置とずらすように制御
する必要がある。
The bobbin carrier in which the small bobbin is suspended is
After the residual roving of the small bobbin is processed to make the small bobbin an empty bobbin, it is carried into the roving process. Then, the empty bobbin and the full bobbin are exchanged by the pipe changer in the roving process. A spare bobbin hanger is not required at the time of pipe changing work by the pipe changing machine in the roving process, and a full bobbin is hung on the bobbin hanger on which an empty bobbin was hung. However, when the empty bobbin and the full bobbin are simply exchanged, if the bobbin carrier is carried into the spare roving winding rail, the position of the spare bobbin hanger does not become the position at which the small bobbin taken out first is suspended. Therefore, in order to prevent inconvenience in the spinning process, it is necessary to move the bobbin carrier at the time of changing pipes in the roving process so as to shift the hanging position of the full bobbin from the hanging position of the empty bobbin.

【0004】又、多数錘の精紡機の場合は1台の粗紡機
で1回に玉揚げされる満ボビンの数より多くの予備粗糸
巻が必要となり、複数のボビン搬送体を予備粗糸巻レー
ルに搬入する必要がある。その際、ボビン搬送体に予備
のボビンハンガがあると、精紡機のクリールに吊下され
ている小玉ボビンとボビン搬送体に吊下されている満ボ
ビンの位置とを粗糸交換に支障を来さないようにするの
が難しいという問題がある。
Further, in the case of a spinning machine having a large number of spindles, a single roving machine requires a larger number of preliminary roving spools than the number of full bobbins to be fried at one time. It is necessary to carry in. At that time, if there is a spare bobbin hanger on the bobbin carrier, it will hinder the roving exchange between the small bobbin hung on the creel of the spinning machine and the full bobbin position hung on the bobbin carrier. The problem is that it's hard not to.

【0005】前記の問題点を解消する粗糸(篠)交換装
置が特開昭62−223328号公報や特開平2−12
7530号公報に提案されている。これらの装置はいず
れも、粗糸交換作業時に最初に取り出した小玉ボビン
を、全部の予備粗糸巻がボビン搬送体から取り外される
まで保持し、最後に取り外された予備粗糸巻が吊下され
ていたボビンハンガにその小玉ボビンを吊下する装置を
装備している。
A roving (shino) exchanging device for solving the above-mentioned problems is disclosed in JP-A-62-223328 and JP-A-2-12.
It is proposed in Japanese Patent No. 7530. In each of these devices, the small bobbin that was first taken out during the roving exchange operation was held until all the preliminary roving rolls were removed from the bobbin carrier, and the last removed roving roll was suspended. The bobbin hanger is equipped with a device that suspends the small bobbin.

【0006】[0006]

【発明が解決しようとする課題】特開昭62−2233
28号公報に提案された装置では、小玉ボビンを全部の
予備粗糸巻がボビン搬送体から取り外されるまで保持す
るボビン把持装置が、前後方向(精紡機機台長手方向と
直交する方向)に移動して、待機位置とボビン交換アー
ムのぺッグ上方と対応するボビン把持開放位置とに移動
可能に構成されている。ところが、ボビン把持装置を前
後動により待機位置とボビン把持開放位置とに移動配置
させる構成では、ボビン把持装置及びその前後動機構と
ボビン交換アームとが干渉しないようにするために粗糸
交換装置の幅(精紡機機台長手方向と直交する方向の長
さ)が大きくなるという問題がある。
Problems to be Solved by the Invention JP-A-62-1233
In the device proposed in Japanese Patent No. 28, the bobbin gripping device that holds the small ball bobbin until all the preliminary roving spools are removed from the bobbin carrier moves in the front-rear direction (direction orthogonal to the longitudinal direction of the spinning machine base). The bobbin holding arm is movable to the standby position and the corresponding bobbin holding / releasing position above the peg of the bobbin exchanging arm. However, in the configuration in which the bobbin holding device is moved and arranged to the standby position and the bobbin holding open position by the forward and backward movement, in order to prevent the bobbin holding device and its forward / backward moving mechanism from interfering with the bobbin exchange arm, There is a problem in that the width (the length in the direction orthogonal to the longitudinal direction of the spinning frame) becomes large.

【0007】又、特開平2−127530号公報に提案
された装置では、ボビン把持装置は水平方向の回動によ
り待機位置とボビン把持開放位置とに移動配置される構
成のため、粗糸交換装置の幅を大きくする必要はない。
ところが、この装置ではボビン交換アームのぺッグ上か
らの小玉ボビンの抜き上げ、あるいはぺッグ上への小玉
ボビンの装着時に、ボビン交換アームの昇降動作が必要
となる。そして、この昇降位置はボビン交換アームの粗
糸交換作業時の定常の昇降位置より下方位置となる。す
なわち、ボビン交換アームの上下方向のストロークをそ
れだけ大きくする必要がある。従って、予備粗糸巻レー
ルの高さを同じにした場合は、粗糸交換装置の下部にボ
ビン交換アームの移動スペースを確保しなければならな
い。しかし、粗糸交換装置の下部にスペースを確保する
のは難しく、定常の昇降位置を上側へ移動させる必要が
ある。その結果、粗糸交換装置が大型化するとともに、
精紡機のクリール及び予備粗糸巻レールの高さを高くし
なければならないという問題がある。又、ボビン把持装
置とボビン交換アームとの間で小玉ボビンの授受を行う
際、ボビン交換アームが前記昇降動作の他に定常作業時
と異なる回動動作を行う必要がある。しかも、その回動
動作が粗糸交換作業の最初にクリールから取り出した小
玉ボビンをボビン把持装置に受け渡すときと、全部の予
備粗糸巻をボビンハンガから取り外した後にボビン交換
アームがボビン把持装置から小玉ボビンを受け取るとき
とで異なり、制御が複雑になるという問題がある。
Further, in the device proposed in Japanese Patent Laid-Open No. 2-127530, the bobbin gripping device is arranged to move between a standby position and a bobbin gripping open position by rotating in the horizontal direction. There is no need to increase the width of.
However, in this device, when the small bobbin is pulled out from the peg of the bobbin exchanging arm, or when the small bobbin is mounted on the peg, the bobbin exchanging arm must be moved up and down. This elevating position is below the steady elevating position of the bobbin exchanging arm during the roving change operation. That is, it is necessary to increase the vertical stroke of the bobbin changing arm. Therefore, when the heights of the preliminary roving winding rails are the same, it is necessary to secure a moving space for the bobbin changing arm below the roving changing device. However, it is difficult to secure a space in the lower part of the roving thread changing device, and it is necessary to move the steady elevating position upward. As a result, the roving changer becomes larger and
There is a problem that the height of the creel and the preliminary roving winding rail of the spinning machine must be increased. Further, when the small bobbin is exchanged between the bobbin gripping device and the bobbin exchanging arm, the bobbin exchanging arm needs to perform a rotating operation different from the normal operation in addition to the ascending / descending operation. Moreover, when the bobbin picked up from the creel is transferred to the bobbin gripping device at the beginning of the roving change operation, the bobbin exchanging arm moves the small ball bobbin from the bobbin gripping device to the bobbin holding device after removing all the preliminary roving bobbins. There is a problem that the control becomes complicated unlike when receiving the bobbin.

【0008】本発明は前記の問題点に鑑みてなされたも
のであって、その目的は粗糸交換装置の大型化や、クリ
ール及び予備粗糸巻レールの高さを高くする必要がな
く、しかもボビン把持装置とボビン交換アームとの間で
小玉ボビンの授受を行う際に、ボビン交換アーム側に定
常作業時と異なる動作を行わせる制御が不要な精紡機の
粗糸交換装置を提供することにある。
The present invention has been made in view of the above problems, and its purpose is not to increase the size of the roving yarn exchanging device and to increase the height of the creel and the spare roving winding rail, and further, to achieve the bobbin. It is to provide a roving thread changing device for a spinning machine that does not require control to cause the bobbin changing arm to perform an operation different from that during a steady work when the small bobbin is transferred between the gripping device and the bobbin changing arm. .

【0009】[0009]

【課題を解決するための手段】前記の目的を達成するた
め本発明では、精紡機の機台長手方向に沿って移動し、
ボビン交換アームの昇降及び前後動により、クリールの
前後2列のボビンハンガに吊下されている前後一対の粗
糸使用後のボビンと、予備粗糸巻レールに吊下された予
備粗糸巻とを交換し、かつ粗糸交換作業の最初にクリー
ルから取り外された一対のボビンを粗糸交換作業終盤ま
で一時的に保持するボビン把持装置を備えた粗糸交換装
置において、前記ボビン把持装置を、前記ボビン交換ア
ームが一連の動作における所定位置に配置された状態
で、ボビン交換アームのペッグと対向するボビン授受位
置と、ボビン交換アームの移動に支障を来さない待機位
置とに水平方向に回動させる回動機構と、前記ボビン把
持装置及び回動機構を前記ペッグに装着されたボビンの
底面がペッグ先端より上となる位置まで移動させる昇降
機構とを設けた。
In order to achieve the above-mentioned object, in the present invention, the spinning machine is moved along the machine base longitudinal direction,
By moving the bobbin exchanging arm up and down and moving back and forth, the bobbin after the pair of front and rear roving threads suspended on the two rows of bobbin hangers on the front and rear of the creel and the spare roving thread suspended on the spare roving winding rail are exchanged. A bobbin gripping device for temporarily holding the pair of bobbins removed from the creel at the beginning of the roving thread replacement work until the end of the roving thread replacement work, wherein the bobbin gripping device is replaced with the bobbin replacement device. When the arm is arranged at a predetermined position in a series of operations, the rotation is made to rotate horizontally between the bobbin transfer position facing the peg of the bobbin exchange arm and the standby position that does not hinder the movement of the bobbin exchange arm. A moving mechanism and an elevating mechanism for moving the bobbin holding device and the rotating mechanism to a position where the bottom surface of the bobbin attached to the peg is above the tip of the peg are provided.

【0010】[0010]

【作用】予備粗糸巻レールには粗糸交換に必要な本数の
予備粗糸巻が吊下される。この状態で粗糸交換装置が精
紡機機台に沿って移動し、粗糸交換作業を行う。ボビン
交換アームが最初にクリールから小玉ボビンを取り出し
て所定位置に配置されると、回動機構の作動によりボビ
ン把持装置が待機位置からボビン授受位置に配置され
る。ボビン把持装置が小玉ボビンを把持した後、昇降機
構及び回動機構が作動され、ボビン把持装置がボビン交
換アームのぺッグから小玉ボビンを抜き上げた後、待機
位置に配置される。次に予備粗糸巻レールから予備粗糸
巻が取り外されて小玉ボビンが吊架されていた位置に吊
架される。以下、予備粗糸巻が取り外された位置にクリ
ールから取り出された小玉ボビンを吊架し、小玉ボビン
が取り外されたクリール位置に予備粗糸巻を吊架する粗
糸交換作業が順次行われる。最後の予備粗糸巻が予備粗
糸巻レールから取り外された後、それまでボビン把持装
置に把持されていた小玉ボビンがボビン交換アームのぺ
ッグに受け渡される。そして、ボビン交換アームの昇降
動作により小玉ボビンが最後の予備粗糸巻が取り外され
た位置に吊架される。
Function: The number of spare roving rolls required for exchanging roving yarns is hung on the spare roving roll rail. In this state, the roving yarn exchange device moves along the spinning machine stand to perform the roving yarn exchange work. When the bobbin exchanging arm first takes out the small bobbin from the creel and arranges it at a predetermined position, the bobbin holding device is arranged from the standby position to the bobbin transfer position by the operation of the rotating mechanism. After the bobbin gripping device grips the small bobbin, the elevating mechanism and the rotating mechanism are operated, and the bobbin gripping device pulls the small bobbin from the peg of the bobbin exchanging arm and then is placed in the standby position. Next, the preliminary roving bobbin is removed from the preliminary roving bobbin rail, and is suspended at the position where the small bobbin was suspended. Hereinafter, the roving thread exchange operation of suspending the small bobbin taken out from the creel at the position where the preliminary roving spool is removed and suspending the preliminary roving spool at the creel position where the small boss is removed is sequentially performed. After the last preliminary roving bobbin is removed from the preliminary roving bobbin rail, the small bobbin previously held by the bobbin holding device is transferred to the peg of the bobbin changing arm. Then, the small bobbin is suspended at the position where the last preliminary roving winding is removed by the raising / lowering operation of the bobbin exchange arm.

【0011】[0011]

【実施例】以下、本発明を精紡機の小玉ボビンと予備粗
糸巻との交換だけでなく、紡出中の小玉ボビンの粗糸と
予備粗糸巻の粗糸との粗糸継ぎ作業をも行う粗糸替機に
具体化した一実施例を図面に従って説明する。
EXAMPLES In the following, the present invention not only replaces the small bobbin of the spinning machine with the preliminary roving spool, but also performs the roving joining operation between the roving of the small bobbin being spun and the roving of the preliminary roving. An embodiment of a roving changer will be described with reference to the drawings.

【0012】図3に示すように、精紡機のクリール1に
は機台の左右両側(片側のみ図示)にそれぞれ内外2列
の粗糸巻レール2,3が機台長手方向(紙面と垂直な方
向)と平行に配設されている。両粗糸巻レール2,3の
間には支持レール4が機台長手方向と平行に配設されて
いる。粗糸巻レール2,3にはそれぞれスピンドルピッ
チの倍の所定間隔でボビンハンガ5が装備され、ボビン
ハンガ5に吊架された粗糸巻から引き出された粗糸が粗
糸ガイド6を経てドラフトパート7に供給されるように
なっている。クリール1には支持ブラケット8が外方へ
延出され、その先端には予備粗糸巻レールとしての搬送
レール9が前記粗糸巻レール2,3と平行に延設されて
いる。搬送レール9にはボビン搬送体10が走行可能に
支持され、ボビン搬送体10にはボビンハンガ11が装
備されている。そして、予備粗糸巻(満ボビンF)がボ
ビンハンガ11に吊架されて予備粗糸巻列を構成してい
る。
As shown in FIG. 3, in the creel 1 of the spinning machine, two rows of inner and outer roving winding rails 2 and 3 are provided on both the left and right sides (only one side is shown) of the machine stand in the machine longitudinal direction (direction perpendicular to the plane of the drawing). ) Is arranged in parallel with. A support rail 4 is arranged between the roving winding rails 2 and 3 in parallel with the machine longitudinal direction. The roving winding rails 2 and 3 are each equipped with bobbin hangers 5 at a predetermined interval which is twice the spindle pitch, and the roving drawn from the roving winding suspended from the bobbin hangers 5 is supplied to the draft part 7 via the roving guide 6. It is supposed to be done. A support bracket 8 extends outwardly from the creel 1, and a conveying rail 9 as a preliminary roving winding rail is provided at the tip end thereof in parallel with the roving winding rails 2 and 3. A bobbin carrier 10 is movably supported on the carrier rail 9, and the bobbin carrier 10 is equipped with a bobbin hanger 11. The spare roving spool (full bobbin F) is suspended on the bobbin hanger 11 to form a spare roving winding train.

【0013】一方、精紡機機台に沿って移動して粗糸替
え作業を行う粗糸替機12は、例えば本願出願人が先に
提案した特開平2−127368号公報に開示された装
置と同様な粗糸継ぎ装置(図示せず)を備えている。粗
糸継ぎ装置は粗糸交換装置による粗糸ボビンの交換作業
の前に、クリール1に吊架された紡出中の小玉ボビンの
粗糸と予備粗糸巻の粗糸との粗糸継ぎ作業を行う。粗糸
交換装置は粗糸替機12の粗糸替え作業時進行方向後部
寄りに配設されている。
On the other hand, the roving changer 12 for moving the roving by moving along the spinning machine base is, for example, the device disclosed in Japanese Patent Application Laid-Open No. 2-127368 previously proposed by the applicant of the present application. A similar roving splicing device (not shown) is provided. The roving splicing device performs the roving splicing work between the roving yarn of the small bobbin being spun suspended on the creel 1 and the roving yarn of the preliminary roving winding before the roving yarn bobbin replacement work by the roving yarn exchanging device. To do. The roving yarn changing device is arranged at the rear of the roving yarn changing machine 12 in the traveling direction during the roving yarn changing operation.

【0014】粗糸交換装置は小玉ボビン移載装置13、
満ボビン移載装置14及びボビン保持装置15で構成さ
れている。小玉ボビン移載装置13及び満ボビン移載装
置14は特開平2−127368号公報に開示された装
置とほぼ同様に構成されている。図3及び図4等に示す
ように、小玉ボビン移載装置13はリンク機構からなる
一組のボビン交換アーム16,17を備え、その先端に
ぺッグ18,19を有する支持板20,21が装備され
ている。そして、ボビン交換アーム16,17の回動、
前後動及び昇降動により、粗糸巻レール2,3のボビン
ハンガ5とボビン搬送体10のボビンハンガ11との間
で小玉ボビンEの移載を行うようになっている。又、満
ボビン移載装置14も小玉ボビン移載装置13とほぼ同
様に構成され、リンク機構からなる一組のボビン交換ア
ーム(図示せず)を備え、その先端にぺッグ22,23
を有する支持板24,25が装備されている。そして、
ボビン交換アームの回動、前後動及び昇降動により、ボ
ビン搬送体10のボビンハンガ11と粗糸巻レール2,
3のボビンハンガ5との間で予備粗糸巻(満ボビン)F
の移載を行うようになっている。
The roving changing device is a small bobbin transfer device 13,
It is composed of a full bobbin transfer device 14 and a bobbin holding device 15. The small bobbin transfer device 13 and the full bobbin transfer device 14 have substantially the same structure as the device disclosed in Japanese Patent Application Laid-Open No. 2-127368. As shown in FIGS. 3 and 4, etc., the small bobbin transfer device 13 is provided with a pair of bobbin exchange arms 16 and 17 composed of a link mechanism, and support plates 20 and 21 having pegs 18 and 19 at their tips. Is equipped with. Then, rotation of the bobbin exchange arms 16 and 17,
The small bobbin E is transferred between the bobbin hanger 5 of the roving winding rails 2 and 3 and the bobbin hanger 11 of the bobbin transporter 10 by back-and-forth movement and vertical movement. Further, the full bobbin transfer device 14 is also configured in substantially the same manner as the small bobbin transfer device 13, is equipped with a pair of bobbin exchange arms (not shown) composed of a link mechanism, and has pegs 22, 23 at the tip thereof.
The support plates 24 and 25 having And
By rotating, moving back and forth, and moving up and down the bobbin exchange arm, the bobbin hanger 11 of the bobbin carrier 10 and the roving winding rail 2,
Preliminary roving winding (full bobbin) F with bobbin hanger 5 of 3
Is being reprinted.

【0015】図4,5等に示すように、ボビン保持装置
15は粗糸替機12の粗糸替え作業時進行方向後部の精
紡機機台中心側に配設されている。ボビン保持装置15
は一対の小玉ボビンEを把持するボビン把持装置26
と、ボビン把持装置26を水平方向に回動させる回動機
構27と、ボビン把持装置26及び回動機構27を昇降
させる昇降機構28とから構成されている。
As shown in FIGS. 4 and 5, the bobbin holding device 15 is arranged on the center side of the spinning machine base at the rear of the roving changer 12 in the traveling direction during the roving change operation. Bobbin holding device 15
Is a bobbin holding device 26 for holding a pair of small bobbins E.
And a rotating mechanism 27 for rotating the bobbin holding device 26 in the horizontal direction, and an elevating mechanism 28 for raising and lowering the bobbin holding device 26 and the rotating mechanism 27.

【0016】昇降機構28を構成するエアシリンダ29
は、粗糸替機12のフレームにブラケット30を介して
上下方向に延びる状態で固定されている。エアシリンダ
29の上方にはハウジング31内部にボールスプライン
が上下方向に延びる状態で配設されている。ボールスプ
ライン軸32の下端が自在継手33を介してピストンロ
ッド29aの先端に連結されている。ボールスプライン
軸32の上端には支持プレート34が水平に固定されて
いる。そして、エアシリンダ29の作動によりボールス
プライン軸32が上下方向に移動され、支持プレート3
4が回動せずに昇降される。ピストンロッド29aのス
トロークは、小玉ボビンEのペッグ18,19に挿入さ
れる長さより大きくなっている。エアシリンダ29には
ピストンロッド29aが突出位置及び没入位置に配置さ
れたことを検知する近接スイッチ(図示せず)が取付け
られている。
Air cylinder 29 which constitutes the lifting mechanism 28
Are fixed to the frame of the roving changer 12 in a state of extending in the vertical direction via a bracket 30. Above the air cylinder 29, a ball spline is arranged inside the housing 31 so as to extend vertically. The lower end of the ball spline shaft 32 is connected to the tip of the piston rod 29a via a universal joint 33. A support plate 34 is horizontally fixed to the upper end of the ball spline shaft 32. Then, the ball spline shaft 32 is moved in the vertical direction by the operation of the air cylinder 29, and the support plate 3
4 is moved up and down without rotating. The stroke of the piston rod 29a is larger than the length inserted into the pegs 18 and 19 of the small bobbin E. The air cylinder 29 is provided with a proximity switch (not shown) that detects that the piston rod 29a is located at the projecting position and the retracted position.

【0017】支持プレート34の上面には回動機構27
が配設されている。回動機構27を構成する支柱35は
支持プレート34の精紡機機台側上面に立設され、支柱
35に円筒状の支持部材36が回動可能に支持されてい
る。支持部材36の上端には平面ほぼL字状の支持アー
ム37が水平状態で一体回動可能に固定されている。支
持部材36の下端にはフランジ部36aが形成されてい
る。支持プレート34の精紡機機台と反対側上面には支
持ピン38が立設されている。支持ピン38には粗糸替
機12の進行方向とほぼ直交する状態でかつ水平に配設
されるエアシリンダ39の基端が回動可能に支持されて
いる。又、エアシリンダ39のピストンロッド39aの
先端がフランジ部36aにピン40を介して回動可能に
連結されている。そして、ピストンロッド39aが没入
位置に配置された際に、支持アーム37が図1,2等に
示すボビン授受位置に配置され、ピストンロッド39a
が突出位置に配置された際に支持アーム37が図8,1
0に示す待機位置に配置されるようになっている。エア
シリンダ39にはピストンロッド39aが突出位置ある
いは没入位置に配置されたことを検知する近接スイッチ
(図示せず)が取付けられている。
On the upper surface of the support plate 34, a rotating mechanism 27 is provided.
Is provided. The support column 35 that constitutes the rotating mechanism 27 is erected on the upper surface of the support plate 34 on the side of the spinning machine stand, and a cylindrical support member 36 is rotatably supported on the support column 35. A support arm 37, which is substantially L-shaped in plan view, is fixed to the upper end of the support member 36 so as to be integrally rotatable in a horizontal state. A flange portion 36a is formed at the lower end of the support member 36. A support pin 38 is provided upright on the upper surface of the support plate 34 on the side opposite to the spinning machine base. A support pin 38 rotatably supports a base end of an air cylinder 39 that is horizontally arranged in a state substantially orthogonal to the traveling direction of the roving changer 12. The tip of the piston rod 39a of the air cylinder 39 is rotatably connected to the flange portion 36a via a pin 40. When the piston rod 39a is placed in the retracted position, the support arm 37 is placed in the bobbin transfer position shown in FIGS.
When the support arm 37 is placed in the projecting position as shown in FIGS.
It is arranged at the standby position indicated by 0. The air cylinder 39 is provided with a proximity switch (not shown) that detects that the piston rod 39a is located at the projecting position or the retracted position.

【0018】図1及び図2等に示すように、ボビン把持
装置26は支持アーム37上に配設され、ボビン搬送体
10に吊架されたボビンハンガ11のピッチと同一ピッ
チで配設された一対の把持機構41,42を備えてい
る。把持機構41,42は支持アーム37に所定間隔で
立設された各一対の支柱43,44を備え、支柱43,
44に支持部材45,46,47,48が回動可能に支
持されている。支持部材45,46の下部には歯車45
a,46aが、支持部材47,48の下部には歯車47
a,48aがそれぞれ互いに噛合する状態で一体的に形
成されている。
As shown in FIGS. 1 and 2, the bobbin gripping device 26 is disposed on the support arm 37 and is arranged at the same pitch as the pitch of the bobbin hangers 11 suspended on the bobbin carrier 10. The gripping mechanisms 41 and 42 are provided. The gripping mechanisms 41, 42 are provided with a pair of support columns 43, 44 standing on the support arm 37 at predetermined intervals.
The support members 45, 46, 47, and 48 are rotatably supported by 44. A gear 45 is provided below the support members 45 and 46.
a, 46a has a gear 47 at the bottom of the support members 47, 48.
a and 48a are integrally formed in a state in which they mesh with each other.

【0019】支持部材45,48の中央には水平方向に
突出する支持片45b,48bが一体的に形成されてい
る。両支持片45b,48b間にエアシリンダ49が支
持アームの長手方向と平行に延びる状態で連結されてい
る。すなわち、支持片45bにはエアシリンダ49のピ
ストンロッド49aが回動可能にピン連結され、支持片
48bにはエアシリンダ49の基端が回動可能にピン連
結されている。そして、ピストンロッド49aが突出位
置と没入位置とに移動配置される際に、支持部材45,
48が互いに逆方向に回動されるとともに歯車45a,
46a、歯車47a,48aを介して支持部材46,4
7が支持部材45,48とともに回動されるようになっ
ている。エアシリンダ49にはピストンロッド49aが
突出位置及び没入位置に配置されたことを検知する近接
スイッチ(図示せず)が取付けられている。
Supporting pieces 45b and 48b projecting in the horizontal direction are integrally formed at the centers of the supporting members 45 and 48. An air cylinder 49 is connected between the support pieces 45b and 48b so as to extend parallel to the longitudinal direction of the support arm. That is, the piston rod 49a of the air cylinder 49 is rotatably pin-connected to the support piece 45b, and the base end of the air cylinder 49 is rotatably pin-connected to the support piece 48b. Then, when the piston rod 49a is moved to the projecting position and the retracted position, the supporting member 45,
48 are rotated in opposite directions, and gears 45a,
46a and gears 47a, 48a through support members 46, 4
7 is rotated together with the support members 45 and 48. The air cylinder 49 is provided with a proximity switch (not shown) that detects that the piston rod 49a is located at the projecting position and the retracted position.

【0020】支持部材46,47の中央には規制片5
0,51が水平方向に突出する状態で一体的に形成され
ている。規制片50,51はピストンロッド49aが突
出位置に配置された際、支持片45b,48bと平行に
延びるように形成されている。規制片50,51には支
持片45b,48bと対応する側に、支持部材46,4
7が所定量回動したときに支持片45b,48bと係合
する係止部50a,51aが形成されている。そして、
ピストンロッド49aが没入位置に配置されたときに、
各係止部50a,51aが支持片45b,48bと係合
するようにピストンロッド49aのストロークが設定さ
れている。
At the center of the support members 46 and 47, a regulating piece 5 is provided.
0 and 51 are integrally formed so as to project in the horizontal direction. The restriction pieces 50 and 51 are formed so as to extend parallel to the support pieces 45b and 48b when the piston rod 49a is arranged at the protruding position. The restricting pieces 50, 51 have support members 46, 4 on the sides corresponding to the supporting pieces 45b, 48b.
Locking portions 50a and 51a are formed which engage with the support pieces 45b and 48b when the device 7 rotates by a predetermined amount. And
When the piston rod 49a is placed in the retracted position,
The stroke of the piston rod 49a is set so that the locking portions 50a and 51a engage with the support pieces 45b and 48b.

【0021】支持部材45,46及び支持部材47,4
8にはその前側に板ばね製の支持ブラケット52が固定
され、支持ブラケット52の先端に把持部材53がねじ
54により固定されている。把持部材53の内側にはゴ
ム製のスリップ防止部材55が固着されている。そし
て、ピストンロッド49aが突出位置に配置された状態
では、図1に実線で示すように把持部材53がボビン把
持位置に配置され、ピストンロッド49aが没入位置に
配置された状態では、図1に鎖線で示すように把持部材
53がボビン開放位置に配置されるようになっている。
支持ブラケット52の長さは、支持アーム37が図1に
示すボビン授受位置に配置された状態で把持部材53が
ボビン把持位置に配置されたとき、把持部材53の中心
がボビン搬送体10のボビンハンガ11と対向する位置
となるように設定されている。
Support members 45, 46 and support members 47, 4
A support bracket 52 made of a leaf spring is fixed to the front side of 8, and a holding member 53 is fixed to the tip of the support bracket 52 with a screw 54. A rubber anti-slip member 55 is fixed to the inside of the grip member 53. Then, in a state where the piston rod 49a is arranged in the projecting position, the gripping member 53 is arranged in the bobbin gripping position as shown by a solid line in FIG. 1, and in a state where the piston rod 49a is arranged in the retracted position, FIG. As shown by the chain line, the gripping member 53 is arranged at the bobbin open position.
The length of the support bracket 52 is such that when the gripping member 53 is arranged at the bobbin gripping position with the support arm 37 arranged at the bobbin transfer position shown in FIG. 1, the center of the gripping member 53 is the bobbin hanger of the bobbin carrier 10. 11 is set so as to face the position.

【0022】次に前記のように構成された装置の作用を
説明する。精紡機では粗糸巻レール2,3に、その長手
方向に沿って一組おきに中玉粗糸巻Mと満ボビンFとを
吊下した状態で紡出が開始される。そして、中玉粗糸巻
Mが空に近い小玉ボビンEとなり、満ボビンFが中玉粗
糸巻Mとなったときに粗糸替えが行われる。粗糸替え時
期になると、粗糸替機12が精紡機機台の一端から間欠
的に移動して粗糸替え作業を開始する。粗糸替機12は
まず最初の作業位置に停止し、同位置でボビン搬送体1
0に吊下されている満ボビンFの粗糸端の口出し作業を
行う。その後、次の作業位置に移動し、前の作業位置で
口出しされた粗糸端を一対の紡出中の小玉ボビンEの粗
糸に粗糸継ぎする粗糸継作業と、粗糸継ぎ後の小玉ボビ
ンEをボビン搬送体10のボビンハンガ11に移すとと
もに、粗糸継ぎされて紡出中の満ボビンFをクリール1
のボビンハンガ5に移す粗糸交換作業を行う。
Next, the operation of the apparatus configured as described above will be described. In the spinning machine, spinning is started in a state in which every other set of roving reels 2 and 3 along the longitudinal direction are hung with a medium ball roving reel M and a full bobbin F suspended. Then, when the medium ball roving spool M becomes the small bobbin E which is almost empty and the full bobbin F becomes the middle ball roving M, the roving change is performed. When it is time to change the roving yarn, the roving yarn changing machine 12 intermittently moves from one end of the spinning machine stand to start the roving yarn changing operation. The roving changer 12 stops at the first working position, and at the same position, the bobbin carrier 1
The roving thread end of the full bobbin F suspended at 0 is fed out. After that, it moves to the next work position, and the roving end spouted at the previous work position is roving-joined to the roving yarn of the pair of small bobbins E being spun. The small bobbin E is moved to the bobbin hanger 11 of the bobbin carrier 10, and the full bobbin F being spun by roving is spun on the creel 1.
Perform the roving exchange work to transfer to the bobbin hanger 5 of.

【0023】図4、図8等に示すように、ボビン把持装
置26は常にはボビン交換アーム16,17の移動に支
障を来さない待機位置に配置されている。粗糸替え作業
の最初のサイクルにおいて、小玉ボビン移載装置13が
作動されてクリール1から一対の小玉ボビンEが取り出
される(図4の状態)。次にボビン交換アーム16,1
7のぺッグ18,19に装着された小玉ボビンEが搬送
レール9と対向する状態に配置される(図5の状態)。
2回目以降のサイクルではこの状態からボビン交換アー
ム16,17の昇降動により、小玉ボビンEがボビン搬
送体10のボビンハンガ11に吊架される。
As shown in FIGS. 4 and 8, the bobbin holding device 26 is always arranged at a standby position where it does not hinder the movement of the bobbin changing arms 16 and 17. In the first cycle of the roving changing operation, the small bobbin transfer device 13 is operated to take out the pair of small bobbins E from the creel 1 (state shown in FIG. 4). Next, bobbin replacement arm 16,1
The small bobbin E mounted on the pegs 18 and 19 of 7 is arranged so as to face the transport rail 9 (state of FIG. 5).
In the second and subsequent cycles, the small bobbin E is suspended from the bobbin hanger 11 of the bobbin carrier 10 by moving up and down the bobbin changing arms 16 and 17 from this state.

【0024】しかし、1回目のサイクルではこの状態で
エアシリンダ39が作動され、ピストンロッド39aが
突出位置から没入位置に配置される。そして、支持アー
ム37が図4,8の時計方向に回動されて図9のボビン
授受位置に配置される。次にエアシリンダ49が作動さ
れてピストンロッド49が突出位置に配置される。ピス
トンロッド49aが突出位置に配置される際、支持部材
45が支柱43を中心に図1の時計方向に回動され、歯
車45a,46aを介して支持部材46が反時計方向に
回動される。又、支持部材48が支柱44を中心に図9
の反時計方向に回動され、歯車48a,47aを介して
支持部材47が時計方向に回動される。その結果、把持
部材53が図9に実線で示す把持位置に配置され、ボビ
ン交換アーム16,17上に載置された小玉ボビンEが
ボビン把持装置26に把持される。
However, in the first cycle, the air cylinder 39 is operated in this state, and the piston rod 39a is arranged from the protruding position to the retracted position. Then, the support arm 37 is rotated clockwise in FIGS. 4 and 8 to be placed at the bobbin transfer position in FIG. Next, the air cylinder 49 is operated and the piston rod 49 is arranged at the protruding position. When the piston rod 49a is arranged at the projecting position, the support member 45 is rotated clockwise around the support column 43 in FIG. 1, and the support member 46 is rotated counterclockwise through the gears 45a and 46a. . In addition, the support member 48 is centered around the support column 44 in FIG.
Is rotated counterclockwise, and the support member 47 is rotated clockwise through the gears 48a and 47a. As a result, the gripping member 53 is arranged at the gripping position shown by the solid line in FIG. 9, and the small bobbin E mounted on the bobbin exchanging arms 16 and 17 is gripped by the bobbin gripping device 26.

【0025】なお、歯車45a,46aと歯車47a,
48aの回動抵抗が異なり、例えば支持部材45が先に
回動された場合は、ピストンロッド49aの突出作動の
途中で支持部材45,46に固定された把持部材53が
小玉ボビンEと当接してその回動が停止される。さらに
ピストンロッド49aの突出作動が継続されると、支持
部材48が支持部材47とともに回動される。そして、
支持部材47,48に固定された把持部材53が小玉ボ
ビンEと当接した状態でピストンロッド49aの作動が
停止される。
The gears 45a and 46a and the gear 47a,
When the rotation resistance of 48a is different and, for example, the support member 45 is rotated first, the gripping member 53 fixed to the support members 45 and 46 comes into contact with the small bobbin E during the protrusion operation of the piston rod 49a. The rotation is stopped. When the projecting operation of the piston rod 49a is further continued, the support member 48 is rotated together with the support member 47. And
The operation of the piston rod 49a is stopped in a state where the gripping member 53 fixed to the support members 47 and 48 is in contact with the small bobbin E.

【0026】次にエアシリンダ29が作動されてピスト
ンロッド29aが突出され、支持プレート34とともに
ボビン把持装置26が上昇位置に配置される。その結
果、小玉ボビンEがぺッグ18,19から抜き上げられ
る。次にエアシリンダ39が作動されてピストンロッド
39aが突出位置に配置される。ピストンロッド39a
の突出作動により支持アーム37が図9の反時計方向に
回動され、ボビン把持装置26が小玉ボビンEを把持し
た状態で支持アーム37とともに待機位置に復帰する
(図10の状態)。
Next, the air cylinder 29 is operated and the piston rod 29a is projected, and the bobbin holding device 26 is arranged in the raised position together with the support plate 34. As a result, the small bobbin E is pulled out from the pegs 18 and 19. Next, the air cylinder 39 is operated and the piston rod 39a is arranged at the protruding position. Piston rod 39a
9 is rotated counterclockwise in FIG. 9, and the bobbin holding device 26 returns to the standby position together with the support arm 37 while holding the small bobbin E (state of FIG. 10).

【0027】次に満ボビン移載装置14が作動され、粗
糸継ぎ完了後の満ボビンFが小玉ボビンEが取り外され
た後のボビンハンガ5に吊架される。次に粗糸替機12
が精紡機機台に沿って所定距離移動して次の粗糸替え作
業位置に停止する。その位置で小玉ボビン移載装置13
が作動されてクリール1から小玉ボビンEが取り出され
た後、小玉ボビン移載装置13の昇降動により該小玉ボ
ビンボビンEが前回満ボビンFが取り外されたボビン搬
送体10のボビンハンガ11に吊架される。以下、同様
にして満ボビンFが取り外されたボビンハンガ11にク
リール1から取り出された小玉ボビンEが吊架され、小
玉ボビンEが取り外されたボビンハンガ5に粗糸継ぎ完
了後の満ボビンFが吊架される。ボビン把持装置26は
満ボビン移載装置14によりボビン搬送体10に吊架さ
れた最後の満ボビンFが取り外されるまで、小玉ボビン
Eを把持した状態で待機位置で待機する。
Next, the full bobbin transfer device 14 is operated, and the full bobbin F after the completion of the roving joining is suspended on the bobbin hanger 5 after the small bobbin E is removed. Next, roving changer 12
Moves along the spinning machine base for a predetermined distance and stops at the next roving changing work position. At that position, the small bobbin transfer device 13
After the small bobbin E is taken out from the creel 1, the small bobbin transfer device 13 moves up and down to suspend the small bobbin bobbin E on the bobbin hanger 11 of the bobbin carrier 10 from which the full bobbin F was previously removed. It Similarly, the small bobbin E taken out from the creel 1 is suspended on the bobbin hanger 11 from which the full bobbin F has been removed, and the full bobbin F after the completion of the roving connection is suspended on the bobbin hanger 5 from which the small bobbin E has been removed. To be hung. The bobbin holding device 26 waits at the standby position while holding the small bobbin E until the last full bobbin F suspended from the bobbin carrier 10 is removed by the full bobbin transfer device 14.

【0028】粗糸替え作業の最終回のサイクルで満ボビ
ンFがクリール1に吊架された後、ボビン交換アーム1
6,17はそのペッグ18,19が満ボビンFが取り外
されたボビン搬送体10のボビンハンガ11と対向する
位置に配置される。次にエアシリンダ39が作動されて
ピストンロッド39aが没入作動される。そして、ボビ
ン把持装置26が支持アーム37とともに図10の時計
方向に回動され、図11に示すボビン授受位置に配置さ
れる。このとき支持プレート34は図2に示すように上
昇位置にあるため、ボビン把持装置26に把持された小
玉ボビンEはぺッグ18,19の上方でぺッグ18,1
9と対向する位置に配置される。次にエアシリンダ29
が作動されてピストンロッド29aが没入作動され、ボ
ビン把持装置26が支持プレート34とともに下降移動
される。そして、小玉ボビンEがぺッグ18,19に装
着される。
After the full bobbin F is suspended on the creel 1 in the final cycle of the roving changing operation, the bobbin changing arm 1
6, 17 are arranged at positions where the pegs 18, 19 face the bobbin hanger 11 of the bobbin carrier 10 from which the full bobbin F has been removed. Next, the air cylinder 39 is operated and the piston rod 39a is retracted. Then, the bobbin holding device 26 is rotated in the clockwise direction in FIG. 10 together with the support arm 37, and is arranged at the bobbin transfer position shown in FIG. At this time, since the support plate 34 is in the raised position as shown in FIG. 2, the small bobbin E gripped by the bobbin gripping device 26 is located above the pegs 18, 19 and the pegs 18,1.
It is arranged at a position opposed to 9. Next, the air cylinder 29
Is operated to retract the piston rod 29a, and the bobbin gripping device 26 is moved downward together with the support plate 34. Then, the small bobbin E is attached to the pegs 18 and 19.

【0029】次にエアシリンダ49が作動されてピスト
ンロッド49aが没入作動され、各ボビン把持部材53
がボビン開放側へ回動される。そして、ボビン把持装置
26による小玉ボビンEの把持が解放される。なお、歯
車45a,46aと歯車47a,48aの回動抵抗が異
なり、例えば支持部材45が先に回動された場合は、ピ
ストンロッド49aの没入作動の途中で支持片45bが
係止部50aと当接してその回動が停止される。さらに
ピストンロッド49aの没入作動が継続されると、支持
部材48が支持部材47とともに回動される。そして、
支持片48bが係止部51と当接した状態でピストンロ
ッド49aの作動が停止される。すなわち、ピストンロ
ッド49aが没入位置に配置された状態では、把持部材
53は常に所定の開放位置に配置される。
Next, the air cylinder 49 is actuated, the piston rod 49a is retracted, and each bobbin holding member 53 is actuated.
Is rotated to the bobbin opening side. Then, the grip of the small bobbin E by the bobbin gripping device 26 is released. When the rotation resistances of the gears 45a and 46a are different from those of the gears 47a and 48a, for example, when the support member 45 is rotated first, the support piece 45b is connected to the locking portion 50a during the retracting operation of the piston rod 49a. It abuts and its rotation is stopped. Further, when the retracting operation of the piston rod 49a is continued, the support member 48 is rotated together with the support member 47. And
The operation of the piston rod 49a is stopped with the support piece 48b in contact with the locking portion 51. That is, in the state where the piston rod 49a is located at the retracted position, the grip member 53 is always located at the predetermined open position.

【0030】次にエアシリンダ39が作動されてピスト
ンロッド39aが突出作動され、ボビン把持装置26が
支持アーム37とともに待機位置に回動配置され、図8
に示す待機状態に復帰する。次に小玉ボビン移載装置1
3が作動されてボビン交換アーム16,17が昇降動さ
れる。そして、ぺッグ18,19に装着されていた小玉
ボビンEがボビン搬送体10のボビンハンガ11に吊架
され、粗糸替え作業が完了する。
Next, the air cylinder 39 is actuated and the piston rod 39a is actuated to project, and the bobbin gripping device 26 is pivotally arranged together with the support arm 37 to the standby position.
Return to the standby state shown in. Next, small ball bobbin transfer device 1
3 is operated and the bobbin changing arms 16 and 17 are moved up and down. Then, the small bobbin E mounted on the pegs 18 and 19 is suspended on the bobbin hanger 11 of the bobbin carrier 10, and the roving changing operation is completed.

【0031】前記のように最初にクリール1から取り出
された小玉ボビンEを粗糸替え作業の終盤まで保持する
ボビン把持装置26は、水平方向の回動によりボビン授
受位置と待機位置とに配置される。又、ぺッグ18,1
9からの小玉ボビンEの抜き上げと、ぺッグ18,19
への小玉ボビンEの装着とは昇降機構28の作動による
ボビン把持装置26の上下動により行われる。一方、ボ
ビン授受位置は、ボビン交換アーム16,17が小玉ボ
ビンEをクリール1から取り出して、搬送レール9と対
向する状態に配置された位置である。すなわち、ボビン
授受位置はボビン交換アーム16,17の一連の動作に
おける所定位置の一つである。従って、ボビン交換アー
ム16,17をボビン授受位置に配置するための特別な
制御は必要なく、小玉ボビン移載装置13の制御が簡単
となる。
As described above, the bobbin holding device 26 for holding the small bobbin E first taken out from the creel 1 until the end of the roving changing operation is arranged at the bobbin transfer position and the standby position by the horizontal rotation. It Also, pegs 18 and 1
Pulling out small bobbin E from 9 and pegs 18 and 19
The mounting of the small bobbin E on the bobbin E is performed by vertically moving the bobbin holding device 26 by the operation of the elevating mechanism 28. On the other hand, the bobbin transfer position is a position where the bobbin exchanging arms 16 and 17 take out the small bobbin E from the creel 1 and are arranged to face the transport rail 9. That is, the bobbin transfer position is one of predetermined positions in a series of operations of the bobbin exchange arms 16 and 17. Therefore, no special control is required for disposing the bobbin changing arms 16 and 17 at the bobbin transfer position, and the control of the small bobbin transfer device 13 is simplified.

【0032】又、この実施例の装置では各エアシリンダ
29,39,49にピストンロッドが突出位置及び没入
位置に配置されたことを検知する近接スイッチが配設さ
れているため、昇降機構28、回動機構27あるいは把
持機構41,42の作動時にその作動が確実になされた
ことの確認ができる。従って、誤動作による小玉ボビン
Eの授受の失敗が回避される。
Further, in the apparatus of this embodiment, since the proximity switches for detecting that the piston rods are arranged in the projecting position and the retracted position are arranged in each of the air cylinders 29, 39, 49, the lifting mechanism 28, When the rotating mechanism 27 or the gripping mechanisms 41, 42 are operated, it can be confirmed that the operation is reliably performed. Therefore, it is possible to avoid a failure in the transfer of the small bobbin E due to a malfunction.

【0033】なお、本発明は前記実施例に限定されるも
のではなく、各把持機構41,42にそれぞれエアシリ
ンダを設けたり、把持機構41,42として歯車を使用
しない他の開閉機構を使用してもよい。又、回動機構2
7、昇降機構28及び把持機構41,42のピストンロ
ッドの突出及び没入を確認するセンサを省略したり、駆
動源としてエアシリンダに代えて油圧シリンダ、ソレノ
イドあるいはモータを使用してもよい。又、ボビン授受
位置はボビン交換アーム16,17のぺッグ18,19
が搬送レール9と対向する位置に限らず他の位置でもよ
い。又、小玉ボビン移載装置13と満ボビン移載装置1
4の両装置を設ける代わりに、一対のボビン交換アーム
で小玉ボビン移載作業と満ボビン移載作業を行う構成と
してもよい。さらには、粗糸継ぎ装置を装備せずに粗糸
交換作業のみを行う粗糸替機に適用してもよい。
The present invention is not limited to the above-mentioned embodiment, and each gripping mechanism 41, 42 is provided with an air cylinder or another gripping mechanism 41, 42 is provided with another opening / closing mechanism not using a gear. May be. Also, the rotating mechanism 2
7. The sensors for confirming the protrusion and depression of the piston rod of the lifting mechanism 28 and the gripping mechanisms 41, 42 may be omitted, or a hydraulic cylinder, a solenoid or a motor may be used as a drive source instead of the air cylinder. Also, the bobbin transfer position is the pegs 18 and 19 of the bobbin exchange arms 16 and 17.
Is not limited to the position facing the transport rail 9, but may be another position. Also, the small bobbin transfer device 13 and the full bobbin transfer device 1
Instead of providing both devices of No. 4, a small bobbin transfer operation and a full bobbin transfer operation may be performed by a pair of bobbin exchange arms. Furthermore, it may be applied to a roving yarn changer that does not include a roving yarn splicing device and performs only the roving yarn exchanging operation.

【0034】[0034]

【発明の効果】以上詳述したように本発明によれば、ボ
ビン交換アーム側に定常作業時と異なる動作を行わせる
ことなく、粗糸交換作業の最初にクリールから取り外さ
れた一対の小玉ボビンを粗糸交換作業終盤まで一時的に
保持するボビン把持装置が水平方向への回動のみでボビ
ン授受位置に移動配置されるため、ボビン交換アームの
制御が簡単となる。又、小玉ボビンの授受はボビン把持
装置側の昇降により行われるので、ボビン交換アームの
最大ストロークを大きくする必要がなく、粗糸交換装置
の大型化や、クリール及び予備粗糸巻レールの高さを高
くする必要がなくなる。
As described above in detail, according to the present invention, the pair of small bobbins removed from the creel at the beginning of the roving exchanging operation without causing the bobbin exchanging arm side to perform an operation different from that in the normal operation. Since the bobbin holding device for temporarily holding the bobbin until the end of the roving exchange operation is moved to the bobbin transfer position only by rotating in the horizontal direction, the bobbin exchange arm can be easily controlled. In addition, since the small bobbin is transferred by raising and lowering the bobbin holding device side, it is not necessary to increase the maximum stroke of the bobbin exchanging arm. There is no need to raise it.

【図面の簡単な説明】[Brief description of drawings]

【図1】ボビン保持装置を示す一部破断平面図である。FIG. 1 is a partially cutaway plan view showing a bobbin holding device.

【図2】ボビン保持装置を示す側面図である。FIG. 2 is a side view showing a bobbin holding device.

【図3】粗糸替機とクリールとの関係を示す側面図であ
る。
FIG. 3 is a side view showing a relationship between a roving changer and a creel.

【図4】小玉ボビン移載装置が小玉ボビンをクリールか
ら取り出したときの、小玉ボビン移載装置とボビン保持
装置の関係を示す概略平面図である。
FIG. 4 is a schematic plan view showing the relationship between the small ball bobbin transfer device and the bobbin holding device when the small ball bobbin transfer device takes out the small ball bobbin from the creel.

【図5】小玉ボビン移載装置が小玉ボビン吊架位置に配
置されたときの、小玉ボビン移載装置とボビン保持装置
の関係を示す概略平面図である。
FIG. 5 is a schematic plan view showing the relationship between the small ball bobbin transfer device and the bobbin holding device when the small ball bobbin transfer device is placed at the small ball bobbin suspension position.

【図6】ボビン把持装置の背面図である。FIG. 6 is a rear view of the bobbin holding device.

【図7】支持プレートが下降位置に配置されたボビン保
持装置の側面図である。
FIG. 7 is a side view of the bobbin holding device in which a support plate is arranged in a lowered position.

【図8】作用を示す一部破断概略平面図である。FIG. 8 is a partially cutaway schematic plan view showing the operation.

【図9】作用を示す一部破断概略平面図である。FIG. 9 is a partially cutaway schematic plan view showing the operation.

【図10】作用を示す一部破断概略平面図である。FIG. 10 is a partially cutaway schematic plan view showing the operation.

【図11】作用を示す一部破断概略平面図である。FIG. 11 is a partially cutaway schematic plan view showing the operation.

【符号の説明】[Explanation of symbols]

1…クリール、2,3…粗糸巻レール、5…ボビンハン
ガ、9…予備粗糸巻レールとしての搬送レール、11…
ボビンハンガ、13…小玉ボビン移載装置、16,17
…ボビン交換アーム、18,19…ペッグ、26…ボビ
ン把持装置、27…回動機構、28…昇降機構。
DESCRIPTION OF SYMBOLS 1 ... Creel, 2, 3 ... roving winding rail, 5 ... Bobbin hanger, 9 ... Conveying rail as a preliminary roving winding rail, 11 ...
Bobbin hanger, 13 ... Small bobbin transfer device, 16, 17
... bobbin exchange arm, 18, 19 ... peg, 26 ... bobbin gripping device, 27 ... turning mechanism, 28 ... lifting mechanism.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 精紡機の機台長手方向に沿って移動し、
ボビン交換アームの昇降及び前後動により、クリールの
前後2列のボビンハンガに吊下されている前後一対の粗
糸使用後のボビンと、予備粗糸巻レールに吊下された予
備粗糸巻とを交換し、かつ粗糸交換作業の最初にクリー
ルから取り外された一対のボビンを粗糸交換作業終盤ま
で一時的に保持するボビン把持装置を備えた粗糸交換装
置において、 前記ボビン把持装置を、前記ボビン交換アームが一連の
動作における所定位置に配置された状態で、ボビン交換
アームのペッグと対向するボビン授受位置と、ボビン交
換アームの移動に支障を来さない待機位置とに水平方向
に回動させる回動機構と、 前記ボビン把持装置及び回動機構を前記ペッグに装着さ
れたボビンの底面がペッグ先端より上となる位置まで移
動させる昇降機構とを設けた精紡機の粗糸交換装置。
1. Moving along the machine longitudinal direction of the spinning machine,
By moving the bobbin exchanging arm up and down and moving back and forth, the bobbin after the pair of front and rear roving threads suspended on the two rows of bobbin hangers on the front and rear of the creel and the spare roving thread suspended on the spare roving winding rail are exchanged. A bobbin gripping device for temporarily holding the pair of bobbins removed from the creel at the beginning of the roving thread replacement work until the end of the roving thread replacement work, wherein the bobbin gripping device is replaced with the bobbin replacement device. When the arm is arranged at a predetermined position in a series of operations, the rotation is made to rotate horizontally between the bobbin transfer position facing the peg of the bobbin exchange arm and the standby position that does not hinder the movement of the bobbin exchange arm. A moving mechanism, and an elevating mechanism for moving the bobbin holding device and the rotating mechanism to a position where the bottom surface of the bobbin attached to the peg is above the tip of the peg. The roving exchange apparatus of the machine.
JP21140592A 1992-08-07 1992-08-07 Device for exchanging roving of fine spinning frame Pending JPH0657558A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21140592A JPH0657558A (en) 1992-08-07 1992-08-07 Device for exchanging roving of fine spinning frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21140592A JPH0657558A (en) 1992-08-07 1992-08-07 Device for exchanging roving of fine spinning frame

Publications (1)

Publication Number Publication Date
JPH0657558A true JPH0657558A (en) 1994-03-01

Family

ID=16605417

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21140592A Pending JPH0657558A (en) 1992-08-07 1992-08-07 Device for exchanging roving of fine spinning frame

Country Status (1)

Country Link
JP (1) JPH0657558A (en)

Similar Documents

Publication Publication Date Title
US4165585A (en) Automatic doffing and donning apparatus
JPH0657558A (en) Device for exchanging roving of fine spinning frame
JP2906735B2 (en) Doffing device in roving machine
JPH0663150B2 (en) Rover replacement device
JPS6014848B2 (en) Shino change method in spinning machine
JP2503963B2 (en) Shining machine for spinning machines
JPH0585658B2 (en)
JPS61119728A (en) Method for doffing sliver in spinning machine
JPH0377291B2 (en)
JPS61119730A (en) Method for doffing in roving frame and apparatus therefor
JP3074945B2 (en) Pipe replacement method and pipe replacement device in roving machine
JP3114429B2 (en) Roof dripping prevention device of roving yarn changer
JPS636122A (en) Apparatus for preventing unwinding of roving end
JPH08113834A (en) Method for changing bobbin in roving frame and apparatus for changing bobbin
JPH086045Y2 (en) Rover replacement device
JP2827731B2 (en) Lifting device of yarn feeder
JPS6366332A (en) Sliver exchanging method and device therefor in spinning machine
JP2557747Y2 (en) Bobbin gripper of roving yarn changer
JPH0754300Y2 (en) Bobbin carriage positioning device
JPS591733A (en) Method for loading roving bobbin transferring magazine with roving bobbin in fine spinning machine and apparatus therefor
JPS62268829A (en) Device for removing remaining yarn from silver doffer
JPH0663151B2 (en) Rover replacement method
JPS61102429A (en) Bobbin changing in speed frame
JPS63315624A (en) Method for taking out residual yarn bobbin from bobbin-exchanger
JPH02104745A (en) Weaving machine, automatic exchange of yarn-feeder and device for holding yarn-feeder used therefor