JPS63315624A - Method for taking out residual yarn bobbin from bobbin-exchanger - Google Patents

Method for taking out residual yarn bobbin from bobbin-exchanger

Info

Publication number
JPS63315624A
JPS63315624A JP14982187A JP14982187A JPS63315624A JP S63315624 A JPS63315624 A JP S63315624A JP 14982187 A JP14982187 A JP 14982187A JP 14982187 A JP14982187 A JP 14982187A JP S63315624 A JPS63315624 A JP S63315624A
Authority
JP
Japan
Prior art keywords
bobbin
roving
remaining
residual yarn
remaining thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14982187A
Other languages
Japanese (ja)
Other versions
JPH0768653B2 (en
Inventor
Isao Asai
功 浅井
Kengo Ohashi
大橋 憲吾
Akio Narumi
成実 明夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyoda Automatic Loom Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyoda Automatic Loom Works Ltd filed Critical Toyoda Automatic Loom Works Ltd
Priority to JP14982187A priority Critical patent/JPH0768653B2/en
Publication of JPS63315624A publication Critical patent/JPS63315624A/en
Publication of JPH0768653B2 publication Critical patent/JPH0768653B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/005Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for removing empty packages or cans and replacing by completed (full) packages or cans at paying-out stations; also combined with piecing of the roving

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

PURPOSE:To take out residual yarn bobbin after pulling out a necessary amount of roving, by stopping the lift of an exchange arm prior to the complete insertion of a peg at an end of an exchange arm into a residual yarn bobbin and making the residual yarn bobbin to be rotatable around a bobbin hanger. CONSTITUTION:In the take-out of a residual yarn bobbin U with bobbin- exchanger arms 30, 31, the lift of the exchange arms is stopped prior to the complete insertion of the pegs 24, 25 of the exchange arms into the residual yarn bobbin. The tip end parts 24a, 25b of the pegs are loosely inserted into the residual yarn bobbin to enable the rotation of the residual yarn bobbin around a bobbin hanger in a state suspended from bobbin hangers 2, 3. the residual yarn bobbin is taken out after pulling out a necessary amount of roving R from the residual yarn bobbin.

Description

【発明の詳細な説明】 C産業上の利用分野〕 本発明は精4413機機台の長手方向に沿って移動し、
ボビン交換腕の昇降および前後動により、クリールの予
備′篠巻列に吊下された予備篠巻と粗糸が使用された後
の残糸ボビンとを交換する篠替機の残糸ボビン取出し方
法に関する。
[Detailed description of the invention] C. Industrial application field] The present invention moves along the longitudinal direction of the Sei 4413 machine,
A method for taking out the remaining thread bobbin of a sinter changing machine, in which the remaining thread bobbin after the roving has been used is exchanged with the spare sintered thread suspended from the spare sintered winding row of the creel by raising and lowering and moving back and forth the bobbin changing arm. Regarding.

(従来の技術〕 精紡機では高い位置のクリールに吊下された篠巻から粗
糸を引出し、下方のドラフトパートへ供給するようにし
ている。
(Prior Art) In a spinning frame, roving is pulled out from a shinomaki suspended from a creel at a high position and is supplied to a draft part below.

VJ巻は精紡機のスピンドルゲージに比べてかなり大き
な径となっているため、一般に内外2列に配設されたク
リールレールに篠巻が吊下されている。そして、粗糸の
ドラフトパートへの供給が進み、篠巻の残糸(支)が少
なくなった時点で新しい篠巻と交換(fJ[替)する必
要がある。この作業は、台車によって運ばれた篠巻を作
業者が手作業によって行うか、予めクリール棚に載置さ
札ている予備篠巻を同じく作業者が交換するということ
が古くから行なわれている。また、前記内外2列のクリ
ールレールとは別にその外側に更に1本のレールを設け
、これに予備jI巻を吊下しておき必要に応じて作業者
が前記交換作業を行うという形式のものもある。
Since the VJ winding has a considerably larger diameter than the spindle gauge of a spinning machine, the Shinomaki is generally suspended from creel rails arranged in two rows, inside and outside. Then, when the supply of roving to the draft part progresses and the remaining yarn (support) of the Shinomaki becomes less, it is necessary to replace it with a new Shinomaki (fJ [replacement]). This work has long been carried out by a worker manually carrying out the shinomaki transported by a trolley, or by having the same worker replace the spare shinomaki that has been placed on a creel shelf in advance. . In addition, in addition to the two inner and outer creel rails, another rail is provided on the outside, and a spare JI volume is suspended from this rail, and an operator performs the replacement work as necessary. There is also.

ところが、篠巻は作業者の背丈よりも高いところに吊下
されるものであり、その重量が近年では3キログラム前
後となりしかも精紡機1台あたり400個前後を必要と
するため、篠巻交換作業は作業者にとって重労働となっ
ている。
However, the shinomaki is hung higher than the worker's height, and in recent years, the weight has increased to around 3 kilograms, and each spinning machine requires around 400 shinomaki, making it difficult to replace the shinomaki. is a hard labor for the workers.

この問題を解消する方法として、特開昭58−8163
1号公報や特開昭60−71724@公報には、予(q
篠巻レールに吊下されている予備篠さと、ドラフトバー
トに粗糸を供給しほぼ空に近付いた残糸ボビンとを自動
的に交換する篠替濾が提供されている。この篠替機は一
対の交換腕の昇降、前後動の作動により残糸ボごンを取
出しかつ予備篠巻レールに吊下し、代りに予備篠巻レー
ルに吊下されている予備篠巻をクリールに吊下させる。
As a method to solve this problem, Japanese Patent Laid-Open No. 58-8163
Publication No. 1 and Japanese Unexamined Patent Application Publication No. 60-71724@
A shin replacement filter is provided that automatically replaces a spare shin suspended from a shin winding rail and a remaining yarn bobbin that supplies roving to a draft bar and is almost empty. This Shinomaki machine takes out the remaining yarn boggon by lifting and lowering and moving back and forth a pair of interchangeable arms, and suspends it on the spare Shinomaki rail. Hang it on a creel.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

前記特開昭58−81631号公報では、残糸ボビンを
クリールから取出す際のドラフトバートに連なる粗糸の
切断について特別の配慮がなされていない。
In the above-mentioned Japanese Patent Application Laid-Open No. 58-81631, no special consideration is given to cutting the roving connected to the draft bar when taking out the remaining yarn bobbin from the creel.

一方、特開昭60−71724号公報においては、交換
腕に装備されたボビン支持体を回転可能とし、残糸ボビ
ンがボビン支持体上に嵌挿された状態でボビン支持体を
回転させ、粗糸カイトを経てドラフトバートに連なる粗
糸を引張って切断するようになっている。
On the other hand, in Japanese Patent Application Laid-Open No. 60-71724, a bobbin support mounted on an exchange arm is made rotatable, and the bobbin support is rotated with the remaining thread bobbin fitted onto the bobbin support, and It is designed to pull and cut the roving thread that passes through the thread kite and connects to the draft bar.

そのため、前記両従来技術においては粗糸の切断位置が
不特定となり糸断ぎ作業がし難くなるばかりではなく、
切断位置がドラフトバートに近付き過ぎると供給粗糸が
なくなり糸継ぎ作業ができずに糸切れとなるという不都
合がある。そして、糸継ぎ作業を入手によらず自動化す
る場合には特に前記不都合が顕著となる。
Therefore, in both of the above conventional techniques, the cutting position of the roving becomes unspecified, which not only makes it difficult to cut the thread, but also makes it difficult to cut the thread.
If the cutting position is too close to the draft bar, there will be no supply of roving, making it impossible to splice the yarn, resulting in yarn breakage. The above-mentioned inconvenience becomes especially noticeable when the yarn splicing work is automated regardless of the availability of yarns.

上)ホの問題を解決するために、本出願人は先に、精紡
機機台の長手方向に沿って移動し、ボビン交換腕の昇降
および前後動により、クリールの予備篠巻列に吊下され
た予備jLJと粗糸が使用された後の残糸ボビンとを交
換する篠替機において、前記ボビン交換腕に該交換腕の
前進位置において残糸ボビンからドラフトバートに連な
る粗糸を所定位置で切断する切断手段を設けた篠替機の
残糸ボごン取出装置を提案した。
In order to solve the above problem (e), the applicant first moved the spinning machine along the longitudinal direction of the spinning machine frame and suspended it from the preliminary winding row of the creel by lifting and lowering the bobbin changing arm and moving it back and forth. In the sash changing machine that exchanges the spare jLJ and the remaining yarn bobbin after the roving has been used, the roving connected from the remaining yarn bobbin to the draft bar is placed in the bobbin exchanging arm at a predetermined position in the forward position of the exchanging arm. We have proposed a device for taking out the remaining yarn boggons of the Shino change machine, which is equipped with a cutting means.

上述の提案技術においては、切断手段により粗糸を切断
することにより、粗糸の切断位置がばらつくという不具
合は解消する。しかしながら粗糸替え後、粗糸継ぎを実
施して精紡機を止めないようにするため、残糸ボビンを
取り出すときには、粗糸継ぎに必要な量の粗糸を予め残
糸ボビンから引き出し粗糸切断する。このとき紡出速度
より早い速度で粗糸を残糸ボビンから引き出すため、残
糸ボビンはボビンハンガーを中心として左右に揺れる。
In the above-mentioned proposed technique, by cutting the roving by the cutting means, the problem of variation in the cutting position of the roving can be solved. However, in order to prevent the spinning machine from stopping due to roving splicing after the roving change, when taking out the remaining yarn bobbin, the amount of roving required for roving splicing is pulled out from the remaining yarn bobbin in advance and the roving is cut. do. At this time, since the roving is pulled out from the remaining yarn bobbin at a speed faster than the spinning speed, the remaining yarn bobbin swings from side to side around the bobbin hanger.

残糸ボビンが揺れているところへ交換腕先端のペッグを
嵌挿させようとすれば、ペッグはボビン底部の凹部にう
まく入らず、ペッグでボビンを突きあげることとなり、
このため交換動作が停止したり、ボビンの損傷をきたす
ことがある。
If you try to insert the peg at the end of the replacement arm where the remaining thread bobbin is shaking, the peg will not fit into the recess at the bottom of the bobbin, and the peg will push the bobbin up.
This may cause the replacement operation to stop or cause damage to the bobbin.

〔発明の目的〕[Purpose of the invention]

本発明は上述した点に鑑み、精紡機の篠替機において、
ボビン交換腕で残糸ボビンを取り出す時、残糸ボビンを
揺らさずに該交換腕先端のペッグで残糸ボビンの突きあ
げを防止したti替機の残糸ボビン取出し方法を提供す
ることを目的とする。
In view of the above-mentioned points, the present invention provides a spinning machine for a spinning machine.
An object of the present invention is to provide a method for taking out a remaining thread bobbin of a TI changing machine, which prevents the remaining thread bobbin from being pushed up by a peg at the tip of the replacing arm without shaking the remaining thread bobbin when taking out the remaining thread bobbin with a bobbin changing arm. do.

〔問題点を解決するための手段〕[Means for solving problems]

本発明においては、上述の目的をボビン交換腕を昇降さ
せて精紡機機台のクリールの予備篠巻列に吊下された予
m篠巻と粗糸が使用された後の残糸ボビンとを交換する
篠N機において、残糸ボビンから粗糸を引出したときに
残糸ボビンがボビンハンガーを中心として回転できるよ
うにボビンハンガーに吊下された残糸ボビン底部の凹部
にボビン交換腕先端に形成されたペッグの先端部を緩係
合させた状態まで交換腕を上昇させ、残糸ボビンからボ
ビン交換時に必要量の粗糸を引出し、次いでボビン交換
腕を最終端まで上昇させて残糸ボごンを取出す篠替態の
残糸ボビン取出し方法により達成する。
In the present invention, the above-mentioned purpose is achieved by raising and lowering the bobbin changing arm to remove the remaining yarn bobbin after the pre-mesh winding and roving yarn suspended from the preliminary winding row of the creel of the spinning frame frame are used. On the Shino N machine to be replaced, the end of the bobbin replacement arm is placed in the recess at the bottom of the remaining thread bobbin suspended from the bobbin hanger so that the remaining thread bobbin can rotate around the bobbin hanger when the roving is pulled out from the remaining thread bobbin. Raise the exchange arm until it loosely engages the tip of the formed peg, pull out the required amount of roving from the remaining thread bobbin when replacing the bobbin, then raise the bobbin exchange arm to the final end to remove the remaining thread bobbin. This is achieved by the method of removing the remaining thread from the bobbin of Shinogaishi.

(作 用〕 本発明では交換腕の先端のペッグが残糸ボビンに完全に
嵌挿される前に交換腕の上昇を停止さぜる。これにより
、ペッグの先端部が残糸ボビン内に緩く挿入されており
、残糸ボビンはボビンハンガーに吊下されたままになっ
ている。従って、残糸ボビンから粗糸を引き出すときに
、残糸ボビンはボビンハンガーを中心として回転でき、
しかもこのときに残糸ボビンが揺れてもペッグを残糸ボ
ビンの凹部に臨ませているため、残糸ボビンがペッグか
ら外れることもない。残糸ボビンから粗糸を必要量引き
出した後、交換腕を最終端まで上昇させて残糸ボビンを
取り出す。引き出し粗糸の切断は必要量の粗糸を引き出
した後、残糸ボビンを取り出すまでに切断手段により行
う。粗糸継ぎは自動的に行ってもよく人手により行って
もよい。
(Function) In the present invention, the lifting of the exchange arm is stopped before the peg at the tip of the exchange arm is completely inserted into the remaining thread bobbin.This allows the tip of the peg to be inserted loosely into the remaining thread bobbin. The remaining thread bobbin remains suspended from the bobbin hanger.Therefore, when pulling out the roving from the remaining thread bobbin, the remaining thread bobbin can rotate around the bobbin hanger.
Furthermore, even if the remaining thread bobbin shakes at this time, the peg faces the recessed portion of the remaining thread bobbin, so the remaining thread bobbin will not come off the peg. After pulling out the required amount of roving from the remaining thread bobbin, the exchange arm is raised to the final end and the remaining thread bobbin is taken out. The drawn-out roving is cut by a cutting means after the required amount of roving is pulled out and before the remaining yarn bobbin is taken out. The roving splicing may be performed automatically or manually.

〔実施例) 以下図面を参照して本発明の詳細な説明する。〔Example) The present invention will be described in detail below with reference to the drawings.

第2図において、精紡機のクリール1には、機台の左右
両側に本[レール4.5が設けられ、本篠巻レール4.
5にはスピンドルピッチの倍のピッチでハンガー2.3
が設けられている。
In FIG. 2, a creel 1 of a spinning machine is provided with book rails 4.5 on both the left and right sides of the machine frame, and book rails 4.5 are provided on both sides of the machine frame.
5 has a hanger 2.3 with a pitch twice the spindle pitch.
is provided.

ハンガー2.3に吊下された篠巻から引出された粗糸R
は、ロービングガイド6を経てドラフトパート7へ供給
される。
The roving thread R pulled out from the Shinomaki hanging from the hanger 2.3
is supplied to the draft part 7 via the roving guide 6.

クリール1から支持ブラケット8が突出され、その先端
に本篠巻レール4.5と平行に搬送レール9が延設され
ている。
A support bracket 8 protrudes from the creel 1, and a conveyor rail 9 is extended from the tip thereof in parallel with the main rail 4.5.

搬送レール9には2列のハンガー10.11を(q^え
たマガジン12が走行可能に吊下され、ハンガー10.
11が予備v11列を構成している。
Two rows of hangers 10 and 11 are suspended from the transport rail 9 so that the magazines 12 are movable.
11 constitutes the spare v11 column.

篠替機13は予備篠巻列の予備篠巻Fと本篠巻レール4
.5の残糸ボビンUとを交換する。篠替機13は、残糸
ボビンUを本篠巻レール4.5から取出してマガジン1
2のハンガー10.11に吊下する残糸ボビン移ev装
置14と、予W4篠巻列すなわちマガジン12のハンガ
ー10.11から予備篠巻Fを取外し前記残糸ボビンU
が取外されたハンガー2.3に予@nmFを吊下する予
備篠巻移載装置15とを装備し、精紡機礪台前面に延設
されたガイドレール16に係合するガイドローラ17を
介して精紡機機台に沿って走行する。
The Shino change machine 13 replaces the spare Shinomaki F and the main Shinomaki rail 4 of the spare Shinomaki row.
.. Replace the remaining thread bobbin U with No. 5. The Shino exchange machine 13 takes out the remaining thread bobbin U from the main Shino winding rail 4.5 and transfers it to the magazine 1.
The remaining thread bobbin transfer device 14 is suspended from the hanger 10.11 of No. 2, and the preliminary Shinumaki F is removed from the hanger 10.11 of the pre-W4 Shinomaki row, that is, the magazine 12, and the remaining thread bobbin U is removed.
The machine is equipped with a spare winding transfer device 15 for suspending the preliminary @nmF on the hanger 2.3 from which the spinning machine has been removed, and a guide roller 17 that engages with a guide rail 16 extended on the front surface of the spinning machine stand. It runs along the spinning machine frame.

篠替機13に昇降基板1つが設けられ、昇降基板1つに
はシリンダ18のピストンロッド18aが連結され、シ
リンダ18の作動により水平状態含保持したまま昇降移
動する。シリンダ18の基端は1lJli13のフレー
ムに固定されている。
The Shino changer 13 is provided with one lifting board, and a piston rod 18a of a cylinder 18 is connected to the lifting board, and the cylinder 18 is operated to move up and down while maintaining a horizontal state. The base end of the cylinder 18 is fixed to the frame of 1lJli13.

昇降基板19上に前記残糸ボビン移載装置14と予備篠
巻移載装置15とが隣接して配設されている。
The remaining yarn bobbin transfer device 14 and the preliminary sash winding transfer device 15 are arranged adjacent to each other on the lifting board 19.

残糸ボビン移載装置14は平行四節からなるリンク四!
ill 26.27を備えている。リンクi ?N26
.27の一辺をなす残糸ボビン交換[1130,31に
は残糸ボビンUの底部に嵌入可能なペッグ24.25が
設けられており、リンク機構26.27に連結されたシ
リンダ38によりペッグ24.25を予備篠巻列と本篠
巻レール4.5との間を移動させる。
The remaining yarn bobbin transfer device 14 has four links consisting of four parallel sections!
ill 26.27. Link i? N26
.. The remaining thread bobbin exchange [1130, 31 forming one side of the remaining thread bobbin U] is provided with a peg 24.25 that can be fitted into the bottom of the remaining thread bobbin U, and the peg 24.25 is connected to the link mechanism 26.27 by a cylinder 38. 25 is moved between the preliminary Shinomaki row and the main Shinomaki rail 4.5.

第4図に示すように、残糸ボごン交換腕30の上部前側
に筒状のブラケット40が固定され、ベアリング41を
介して支軸42がブラケット40に回転自在に支持され
、支軸42の上端にはペッグ24が固着されている。ま
た、ブラケット40とペッグ24との間にはボビン受承
部材43がブラケット40に沿って上下方向に贋動可能
に、且つばね44により鍔部43aがペッグ24の下端
に当接するように付勢されている。支軸42の下端にプ
ーリ46が止着され、残糸ボビン交換腕30の後側に固
定されたモータ45の駆動軸45aにプーリ47が止着
され、両プーリ46.47間にベルト48が巻掛けられ
ている。なお、残糸ボビン交換腕31上のペッグ25も
同(1な構成となっている。
As shown in FIG. 4, a cylindrical bracket 40 is fixed to the upper front side of the remaining thread boggon exchange arm 30, and a support shaft 42 is rotatably supported by the bracket 40 via a bearing 41. A peg 24 is fixed to the upper end of the . Further, a bobbin receiving member 43 is disposed between the bracket 40 and the peg 24 so as to be able to slide in the vertical direction along the bracket 40, and is urged by a spring 44 so that the collar portion 43a comes into contact with the lower end of the peg 24. has been done. A pulley 46 is fixed to the lower end of the support shaft 42, a pulley 47 is fixed to a drive shaft 45a of a motor 45 fixed to the rear side of the remaining thread bobbin exchange arm 30, and a belt 48 is attached between both pulleys 46 and 47. It is wrapped. The peg 25 on the remaining thread bobbin exchange arm 31 also has the same structure.

第6図に示すように、ブラケット40の後側両側にはブ
ラケッl−40の鍔部40aの外面と協働して粗糸Rを
把持する把持部材50a、50bが軸51a、51bに
回動可能に支持されている。
As shown in FIG. 6, on both rear sides of the bracket 40, gripping members 50a and 50b that grip the roving R in cooperation with the outer surface of the flange 40a of the bracket l-40 are rotated about shafts 51a and 51b. Possibly supported.

ブラケット40のモータ45との間にはソレノイド52
が固定され、プランジv52aが前後方向(第4図の左
右方向)に延びている。把持部材50a、50bの後端
からピン53a、53bが互いに対向して水平に突設さ
れ、ビン53a、53bの先端はプランジャ52aの先
端の係合部材54に形成された長孔55に遊挿されてい
る。
A solenoid 52 is installed between the bracket 40 and the motor 45.
is fixed, and the plunger v52a extends in the front-rear direction (left-right direction in FIG. 4). Pins 53a and 53b are horizontally protruded from the rear ends of the gripping members 50a and 50b, facing each other, and the tips of the bottles 53a and 53b are loosely inserted into elongated holes 55 formed in the engagement member 54 at the tip of the plunger 52a. has been done.

把持部材50a、50bおよび係合部材54間にばね5
6a、56bが装着され、把持部材50a、50bがブ
ラケット40方向に付勢されている。また、両把持部材
50a、50bを挟む状態で一対の案内板57が配置さ
れている。
A spring 5 is installed between the gripping members 50a, 50b and the engaging member 54.
6a, 56b are attached, and the gripping members 50a, 50b are biased toward the bracket 40. Further, a pair of guide plates 57 are arranged to sandwich both the gripping members 50a and 50b.

残糸ボビン交換腕30の下方には把持部材51a、50
bに把持された粗糸Rを引張る引張装置58が配設され
ている。すなわち、第4図に示すように、残糸ボビン交
換腕30の前側下部にブラケット59が固定され、ブラ
ケット59には第5図に示すように一対の粗糸ガイド部
59aが形成されている。ブラケット5つの左右両側に
は一対の支持部材60a、60bが固定されている。両
支持部材60a、60bには、ローラ61a、61t)
の支軸62a、62bがベアリング63a、63bによ
り回転自在に支持されている。
Gripping members 51a and 50 are provided below the remaining thread bobbin exchange arm 30.
A tensioning device 58 for pulling the roving R gripped by b is provided. That is, as shown in FIG. 4, a bracket 59 is fixed to the lower front side of the remaining yarn bobbin exchange arm 30, and a pair of roving guide portions 59a are formed on the bracket 59, as shown in FIG. A pair of support members 60a and 60b are fixed to the left and right sides of the five brackets. Both support members 60a and 60b have rollers 61a and 61t).
Support shafts 62a and 62b are rotatably supported by bearings 63a and 63b.

両支持部材60a、60bの互いに対向する側面には、
第7図に示すように、嵌合凹部64a、64bが形成さ
れ、嵌合凹部64a、64bに支持部材65a、65b
が左右に1習動可能に嵌挿され、更に、はね66により
支軸62a、62b側に付勢されている(第5図参照)
。支持部材65a、65bにはローラ67a、67bの
支軸68a、68bがベアリング69a、69bにより
回転自在に支持され、ローラ67a、67bはそれぞれ
ローラ61a、61bに接触している。ローラ61a、
61b、67a、67bは、その先端が円錐状に形成さ
れるとともに、外周面に螺旋溝が形成されている。
On the mutually opposing sides of both support members 60a and 60b,
As shown in FIG. 7, fitting recesses 64a and 64b are formed, and support members 65a and 65b are formed in the fitting recesses 64a and 64b.
are inserted so as to be able to move left and right, and are further urged toward the support shafts 62a and 62b by springs 66 (see Fig. 5).
. Support members 65a, 65b rotatably support spindles 68a, 68b of rollers 67a, 67b by bearings 69a, 69b, and rollers 67a, 67b are in contact with rollers 61a, 61b, respectively. roller 61a,
The tips of 61b, 67a, and 67b are formed into a conical shape, and a spiral groove is formed on the outer peripheral surface.

前記ローラ61a、61bの支軸62a、62bの突出
した端部には、ギヤ70.71およびプーリ72.73
が止着されている。また、ローラ61a、61bの支軸
62b、68aの突出した端部にはギヤ71.70と噛
合するギヤ74.75が止着されている。ブラケット5
9の下方にモータ76が固定され、モータ76の駆動軸
76aにプーリ77が止着されている。プーリ72.7
3およびプーリ77間にはベルト78が巻掛けられてい
る。
A gear 70.71 and a pulley 72.73 are attached to the protruding ends of the support shafts 62a, 62b of the rollers 61a, 61b.
is fixed. Furthermore, gears 74.75 that mesh with gears 71.70 are fixed to the protruding ends of the support shafts 62b, 68a of the rollers 61a, 61b. Bracket 5
A motor 76 is fixed below the motor 9, and a pulley 77 is fixed to a drive shaft 76a of the motor 76. Pulley 72.7
A belt 78 is wound between the pulley 77 and the pulley 77.

予備篠巻移載袋[15も残糸ボビン移載装置14と同様
な構成により前後動されるリンク機構からなり、その上
部に装備された支持部材79.80t面にはペッグ81
.82が回動不能に固定されている。
The spare Shinomaki transfer bag [15] also consists of a link mechanism that is moved back and forth with the same configuration as the remaining yarn bobbin transfer device 14, and a support member 79 and a peg 81 are mounted on the support member 79 and 80t surface mounted on the upper part of the bag.
.. 82 is fixed unrotatably.

次に前記のように構成された装置の作用を説明する。Next, the operation of the apparatus configured as described above will be explained.

第1図において、ボビンハンガー2.3に吊下されたボ
ビンUから解舒された粗糸Rはロービングガイド6を経
てトランペット100からドラフトローラ7に至り、所
定のドラフトが付与される。
In FIG. 1, the roving R unwound from the bobbin U suspended from the bobbin hanger 2.3 passes through the roving guide 6 and reaches the draft roller 7 from the trumpet 100, where it is given a predetermined draft.

クリール1に吊下されたボビンUの粗糸が空に近付くと
、精紡R機台の一端から篠替礪13が走行し所定の篠替
位置に停止する。次いで、残糸ボビン移載装置14のシ
リンダ38が作動されてそのピストンロッド38aが引
込まれ、リンク機構26.27が精紡機機台側へ傾動さ
れ、残糸ボビン交換腕30.31が残糸ボビンUの直下
位置に向かって前進する。
When the roving of the bobbin U suspended from the creel 1 approaches empty, a sash changer 13 runs from one end of the spinning machine R frame and stops at a predetermined sash change position. Next, the cylinder 38 of the remaining yarn bobbin transfer device 14 is activated, its piston rod 38a is retracted, the link mechanism 26.27 is tilted toward the spinning machine stand, and the remaining yarn bobbin exchange arm 30.31 transfers the remaining yarn. Move forward toward the position directly below bobbin U.

シリンダ38の作動信号によりソレノイド52が作動さ
れ、プランジャ52aが突出し、第6図に鎖線で示すよ
うに把持部材50a、50bが軸51a、51bを中心
に回動され把持部が解放状態となる。一方、引張装置5
8のモータ76が同時に駆動されてプーリ72.73.
77およびベルト78を介してローラ61a、67bが
回転され、ギヤ70.75.71.74を介してローラ
67a、61bも回転される。
The solenoid 52 is actuated by the actuation signal of the cylinder 38, the plunger 52a protrudes, and the gripping members 50a, 50b are rotated about the shafts 51a, 51b as shown by chain lines in FIG. 6, and the gripping portions are released. On the other hand, the tension device 5
8 motors 76 are simultaneously driven to pulleys 72, 73 .
The rollers 61a, 67b are rotated via the belt 77 and the belt 78, and the rollers 67a, 61b are also rotated via the gears 70, 75, 71, 74.

第2図(a)に示すように、残糸ボビン交換腕30の前
進途中において、残糸ボビンUからドラフトパート7に
連なる粗糸Rが、把持部材50a、50bとブラケット
40の鍔部40aとの間および2組のローラ61a、6
1b、67a、67bの間に案内され、その状態で更に
残糸ボビン交換腕30が離される(第2図(b)参照)
As shown in FIG. 2(a), while the remaining yarn bobbin exchange arm 30 is moving forward, the roving yarn R that continues from the remaining yarn bobbin U to the draft part 7 touches the gripping members 50a, 50b and the flange 40a of the bracket 40. between and two sets of rollers 61a, 6
1b, 67a, and 67b, and in this state, the remaining thread bobbin exchange arm 30 is further released (see FIG. 2(b)).
.

第2図(C)に示すように、残糸ボビン交換腕30を上
昇させてペッグ24の先端部24aが残糸ボビンUの下
端の凹部jlaに僅かに挿入された位置で、残糸ボビン
交換腕30の上昇を一時的に停止させる。
As shown in FIG. 2(C), raise the remaining thread bobbin exchange arm 30 and replace the remaining thread bobbin at the position where the tip 24a of the peg 24 is slightly inserted into the recess jla at the lower end of the remaining thread bobbin U. The raising of the arm 30 is temporarily stopped.

対をなしたローラ61a、61b、67a167b間に
粗糸Rを把持し、ローラ61a、61b、67a、67
bを回転させることにより、残糸ボビンUから粗糸Rを
2速に引出す(第2図(d)参照)。
The roving R is held between the pair of rollers 61a, 61b, 67a167b, and the rollers 61a, 61b, 67a, 67
By rotating b, the roving R is pulled out from the remaining yarn bobbin U at the second speed (see FIG. 2(d)).

この際各ローラ61a、61b、67a、67bには螺
旋溝が形成されているため、粗糸Rは円滑に対をなした
ローラ間に導かれる。
At this time, since spiral grooves are formed in each of the rollers 61a, 61b, 67a, and 67b, the roving R is smoothly guided between the pair of rollers.

この粗糸Rの引出し時に残糸ボビンUがボビンハンガー
4.5のまわりに揺れようとしても、残糸ボビンUの底
部の凹部Uaにペッグ24a、24bの先端が臨んでい
るので、残糸ボビンUが大きく揺れることがない。また
、後述するように残糸ボビン交換腕30,31を再上昇
させる際にも、ペッグ24.25の先端部24a、25
aがボビンUの底部の凹部Uaに臨んでいるので、ペッ
グ24.25は円滑にボビンUに挿入される。
Even if the remaining yarn bobbin U tries to swing around the bobbin hanger 4.5 when the roving yarn R is pulled out, the ends of the pegs 24a and 24b face the recess Ua at the bottom of the remaining yarn bobbin U, so the remaining yarn bobbin U does not shake much. Also, when raising the remaining yarn bobbin exchange arms 30, 31 again as described later, the tips 24a, 25 of the pegs 24, 25
The pegs 24 and 25 are smoothly inserted into the bobbin U because the portion a faces the recess Ua at the bottom of the bobbin U.

必要量の粗糸が引出されると、プランジャ52aが引込
まれて両把持部材51a151bがブラケット40の鍔
部40a側に回動され、粗糸Rが両把持部材50a、5
0bと鍔部40aとの間に把持される。この状態でロー
ラ61a、61b、67a、67bを回転して粗糸Rを
引出して把持部分とローラとの間で引張って粗糸Rを切
断する。
When the required amount of roving is pulled out, the plunger 52a is retracted and both gripping members 51a151b are rotated toward the flange 40a side of the bracket 40, and the roving R is pulled out from both gripping members 50a, 5.
0b and the collar portion 40a. In this state, the rollers 61a, 61b, 67a, and 67b are rotated to pull out the roving yarn R and cut the roving yarn R by pulling it between the gripping portion and the rollers.

切断後のドラフトパート7に連なる粗糸Rは第2図(e
)に示すように、ドラフトバート7のウェイティングア
ームの支947 a上に引掛かり図の右方向に垂れ下が
る。
The roving R connected to the draft part 7 after cutting is shown in Figure 2 (e
), it is caught on the support 947a of the weighting arm of the draft bart 7 and hangs down to the right in the figure.

粗糸3の切断後、シリンダ18が作動されて昇降基板1
9が上昇移動され、残糸ボビン交換腕30.31が最上
端まで再上昇され、ペッグ24.25が残糸ボビンUの
凹部Uaに完全に嵌挿され、残糸ボビンUの底部がペッ
グ24.25のフランジ部43aで押し上げられ、残糸
ボビンUがボビンハンガー2.3から外される。
After cutting the roving 3, the cylinder 18 is actuated to lift the lifting board 1.
9 is moved upward, the remaining thread bobbin exchange arm 30.31 is raised again to the uppermost end, the peg 24.25 is completely fitted into the recess Ua of the remaining thread bobbin U, and the bottom of the remaining thread bobbin U is inserted into the peg 24. The remaining yarn bobbin U is pushed up by the flange portion 43a of .25 and removed from the bobbin hanger 2.3.

ペッグ24.25が残糸ボビンUに嵌挿される付近でソ
レノイド52が作動され、プランジャ52aが突出し粗
糸Rの把持が解放される。
The solenoid 52 is activated near where the pegs 24 and 25 are inserted into the remaining yarn bobbin U, the plunger 52a projects, and the grip on the roving yarn R is released.

ペッグ24.25.81.82への残糸ボビンUおよび
予I!I篠巻Fの挿入が完了した後シリンダ18が作動
され、ピストンロッド18aが引込まれて昇降基板1つ
が下降移動され、ペッグ24.25に載ったまま、残糸
ボビンUが、残糸ボビン交換腕30,31とともに下降
する。
Remaining thread bobbin U and pre-I to peg 24.25.81.82! After the insertion of the I Shinomaki F is completed, the cylinder 18 is activated, the piston rod 18a is retracted, and one elevating board is moved downward, and the remaining thread bobbin U is replaced while remaining on the pegs 24 and 25. It descends together with the arms 30 and 31.

下降開始時点付近でモータ45が駆動され、プーリ47
.46およびベルト48を介してペッグ24.25が回
転され、残糸ボビンUから垂れ下がった粗糸Rが残糸ボ
ビンUに巻取られる。
The motor 45 is driven near the start of descent, and the pulley 47
.. The pegs 24 and 25 are rotated via the belt 46 and the belt 48, and the roving R hanging down from the remaining yarn bobbin U is wound onto the remaining yarn bobbin U.

昇降基板1つの下降完了後シリンダ38が作動され、リ
ンク橢構26.27が残糸ボビンUが予備篠巻列の端部
に余分に取付けられたハンガー10.11と対応する位
置に復帰する。次に予備篠巻移載装置15が作動され、
予@篠巻Fを支持したペッグ81.82は残糸ボビンU
が取外された位置まで移動する。この状態で再びシリン
ダ18が作動され、昇降基板19が上昇しかつ直ちに下
降し各ハンガー2.3.10.11に予備篠巻Fおよび
残糸ボビンUが吊下される。次いで、予備篠巻移載装置
15のリンク)1構が元の位置に復帰し篠替の1サイク
ルが完了する。以下同壕にして篠替IJ13が順次精紡
機し1台に沿って間欠的に移動し、篠替が行われる。
After the lowering of one lifting board is completed, the cylinder 38 is activated, and the link structure 26.27 returns to the position corresponding to the hanger 10.11 on which the remaining yarn bobbin U is extra attached to the end of the preliminary winding row. Next, the backup Shinomaki transfer device 15 is activated,
The pegs 81 and 82 that supported Pre@Shinomaki F are the remaining thread bobbin U
Move to the position where it was removed. In this state, the cylinder 18 is operated again, and the elevating base plate 19 is raised and immediately lowered, so that the preliminary shinumaki F and the remaining thread bobbin U are suspended from each hanger 2.3.10.11. Next, one link of the spare shinomaki transfer device 15 returns to its original position, completing one cycle of shinomaki change. Thereafter, Shinogae IJ13 machines are sequentially moved in the same trench, moving intermittently along one machine, and Shinogae is performed.

〔発明の効果〕〔Effect of the invention〕

本発明によれば、残糸ボビンから粗糸を引出す際に、残
糸ボビンの揺れを抑えることができ、揺れが収まるまで
待って、次の交換動作に入る必要もなく、時間短縮がは
かれる。また、揺れ抑え用の別の装置も不要である。加
えて、残糸ボビンに一気にペッグが嵌挿されずペッグと
残糸ボビンの中心がずれても一時停止させることにより
、ペッグに残糸ボビンが倣い、残糸ボビンに確実にペッ
グが入る。
According to the present invention, when the roving is pulled out from the remaining yarn bobbin, it is possible to suppress the shaking of the remaining yarn bobbin, and there is no need to wait until the shaking stops before starting the next exchange operation, thereby shortening the time. Further, a separate device for suppressing shaking is not required. In addition, even if the peg is not inserted into the remaining thread bobbin all at once and the centers of the peg and the remaining thread bobbin shift, the remaining thread bobbin follows the peg and the peg is surely inserted into the remaining thread bobbin.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の実施例の側面図、第2図(a)〜(f
)は本発明の詳細な説明する側面図、第3図は正面図、
第4図は第3図のA−A断面図、第5図は第4図のB−
8断面図、第6図は一部破断乎面図、第7図は斜視図で
ある。 2.3・・・ボビンハンガー、 6・・・ロービングガイド、 7・・・ドラフトローラ、 24.25・・・ペッグ、 24a、25a・・・ペッグ先端部、 43a・・・ペッグフランジ部、 30.31・・・残糸ボビン交換腕、 5ia、61b、67a、67 b−D −5,100
・・・トランペット、 R・・・粗糸、 U・・・残糸ボビン。
FIG. 1 is a side view of an embodiment of the present invention, and FIGS. 2(a) to (f)
) is a side view explaining the invention in detail, FIG. 3 is a front view,
Figure 4 is a sectional view taken along line A-A in Figure 3, and Figure 5 is a cross-sectional view taken along line B-- in Figure 4.
8 is a sectional view, FIG. 6 is a partially cutaway view, and FIG. 7 is a perspective view. 2.3... Bobbin hanger, 6... Roving guide, 7... Draft roller, 24.25... Peg, 24a, 25a... Peg tip, 43a... Peg flange, 30 .31... Remaining thread bobbin exchange arm, 5ia, 61b, 67a, 67 b-D -5,100
...Trumpet, R...Roving, U...Remaining thread bobbin.

Claims (1)

【特許請求の範囲】[Claims] 1、ボビン交換腕を昇降させて精紡機機台のクリールの
予備篠巻列に吊下された予備篠巻と粗糸が使用された後
の残糸ボビンとを交換する篠替機において、残糸ボビン
から粗糸を引出したときに残糸ボビンがボビンハンガー
を中心として回転できるようにボビンハンガーに吊下さ
れた残糸ボビン底部の凹部にボビン交換腕先端に形成さ
れたペッグの先端部を緩係合させた状態まで交換腕を上
昇させ、残糸ボビンからボビン交換時に必要量の粗糸を
引出し、次いでボビン交換腕を最終端まで上昇させて残
糸ボビンを取出すことを特徴とする篠替機の残糸ボビン
取出し方法。
1. In a bobbin changing machine that moves the bobbin exchange arm up and down to exchange the remaining thread bobbin after the roving has been used, the spare thread hanging from the spare thread winding row of the creel on the spinning frame frame is exchanged. Insert the tip of the peg formed at the tip of the bobbin exchange arm into the recess at the bottom of the remaining thread bobbin suspended from the bobbin hanger so that the remaining thread bobbin can rotate around the bobbin hanger when the roving is pulled out from the thread bobbin. Shino is characterized in that the exchange arm is raised to a loosely engaged state, the required amount of roving yarn is pulled out from the remaining thread bobbin at the time of bobbin exchange, and then the bobbin exchange arm is raised to the final end to take out the remaining thread bobbin. How to take out the remaining thread bobbin from a replacement machine.
JP14982187A 1987-06-16 1987-06-16 How to take out the residual thread bobbin of the Shinosaiki machine Expired - Lifetime JPH0768653B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14982187A JPH0768653B2 (en) 1987-06-16 1987-06-16 How to take out the residual thread bobbin of the Shinosaiki machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14982187A JPH0768653B2 (en) 1987-06-16 1987-06-16 How to take out the residual thread bobbin of the Shinosaiki machine

Publications (2)

Publication Number Publication Date
JPS63315624A true JPS63315624A (en) 1988-12-23
JPH0768653B2 JPH0768653B2 (en) 1995-07-26

Family

ID=15483433

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14982187A Expired - Lifetime JPH0768653B2 (en) 1987-06-16 1987-06-16 How to take out the residual thread bobbin of the Shinosaiki machine

Country Status (1)

Country Link
JP (1) JPH0768653B2 (en)

Also Published As

Publication number Publication date
JPH0768653B2 (en) 1995-07-26

Similar Documents

Publication Publication Date Title
US5099641A (en) Method and apparatus for exchanging roving bobbins
JPS63315624A (en) Method for taking out residual yarn bobbin from bobbin-exchanger
JP2503963B2 (en) Shining machine for spinning machines
JP2503962B2 (en) Remaining thread bobbin take-out device of Shino-changing machine
JPS6014848B2 (en) Shino change method in spinning machine
JPH07100890B2 (en) Remaining thread bobbin take-out device of Shino-changing machine
JPH03193936A (en) Roving-changing method in fine spinning machine and roving-changing device
JPH0585658B2 (en)
JPH0811667B2 (en) Bobbin carrier
JPH08113834A (en) Method for changing bobbin in roving frame and apparatus for changing bobbin
JP2684777B2 (en) Coarse yarn end position alignment device
JPH0377291B2 (en)
JPH0585659B2 (en)
JPS61119730A (en) Method for doffing in roving frame and apparatus therefor
JPH0657558A (en) Device for exchanging roving of fine spinning frame
JPS6366332A (en) Sliver exchanging method and device therefor in spinning machine
JPH0663151B2 (en) Rover replacement method
JPH0512311Y2 (en)
JPH0523586Y2 (en)
JPH0236692B2 (en)
JPH06128817A (en) Equipment for preventing roving of roving bobbin from hanging down
JP2002285435A (en) Cop-changing apparatus in roving frame
JPH08113835A (en) Bobbin-carrying platform of roving frame
JPH04358671A (en) Bobbin hanger
JPH0515809B2 (en)