JPH0651393U JP8887592U JP8887592U JPH0651393U JP H0651393 U JPH0651393 U JP H0651393U JP 8887592 U JP8887592 U JP 8887592U JP 8887592 U JP8887592 U JP 8887592U JP H0651393 U JPH0651393 U JP H0651393U
Authority
JP
Japan
Prior art keywords
hook
rod
hole
pipe
long rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8887592U
Other languages
Japanese (ja)
Other versions
JP2561256Y2 (en
Inventor
弘太 上野
誠治 君岡
Original Assignee
光洋機械産業株式会社
誠治 君岡
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 光洋機械産業株式会社, 誠治 君岡 filed Critical 光洋機械産業株式会社
Priority to JP8887592U priority Critical patent/JP2561256Y2/en
Publication of JPH0651393U publication Critical patent/JPH0651393U/en
Application granted granted Critical
Publication of JP2561256Y2 publication Critical patent/JP2561256Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

(57)【要約】 (修正有) 【目的】 鉤杆の抜け出しのおそれがない足場枠結合金
具を提供する。 【構成】 中央に係止部22、上下両側に挿入部23、
24を有する連結パイプ21と、一端に短杆部26、他
端に長杆部27を有するL字形の鉤杆25とからなり、
係止部の対向する壁面に透孔を形成し、透孔に鉤杆の長
杆部をスライド自在に挿入し、連結パイプの一方の挿入
部に、鉤杆の短杆部を挿入する透孔34を形成し、鉤杆
の長杆部に、鉤杆を連結パイプ側に付勢させるバネ32
を装着した足場枠結合金具において、係止部の対向する
壁面の透孔の内側に、透孔をつなぐ抜け止めパイプ30
を固着し、パイプ内に長杆部を挿入し、パイプの内面と
長杆部の外面との間にバネを装着し、バネを長杆部の先
端にキャップ33を被せて係止し、バネによって鉤杆を
連結パイプ側に付勢させた状態において長杆部と先端の
キャップの長さを、キャップの先端が透孔から外方に突
出しない長さに形成した。
(57) [Summary] (Modified) [Purpose] To provide a scaffolding frame coupling fitting that does not have the possibility of the hook coming out. [Structure] The locking portion 22 is provided at the center, and the insertion portions 23 are provided at both upper and lower sides.
A connecting pipe 21 having 24, a short rod portion 26 at one end, and an L-shaped hook rod 25 having a long rod portion 27 at the other end,
A through hole is formed by forming a through hole on the opposing wall surface of the locking part, the long rod part of the hook bar is slidably inserted into the through hole, and the short rod part of the hook bar is inserted into one insertion part of the connecting pipe. A spring 32 that forms a member 34 and urges the hook rod toward the connecting pipe on the long rod portion of the hook rod.
In the scaffolding frame coupling fitting mounted with, the retaining pipe 30 for connecting the through hole to the inside of the through hole of the wall surface facing the locking portion.
, The long rod is inserted into the pipe, a spring is attached between the inner surface of the pipe and the outer surface of the long rod, and the spring is covered with the cap 33 and locked. With the hook rod biased toward the connecting pipe, the length of the long rod portion and the cap of the tip is formed such that the tip of the cap does not project outward from the through hole.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は、パイプによって構成された足場枠を組立てる場合に、下方足場パ イプと上方足場パイプとを連結する足場枠結合金具に関するものである。 The present invention relates to a scaffolding frame coupling fitting for connecting a lower scaffolding pipe and an upper scaffolding pipe when assembling a scaffolding frame composed of pipes.

【0002】[0002]

【従来の技術】[Prior art]

従来、この種の結合金具として、図4及び図5に示すものがある。 Conventionally, as this type of coupling fitting, there is one shown in FIGS. 4 and 5.

【0003】 このものは、中央に係止部2と、その両側に挿入部3、4を有する連結パイプ 1と、一端に短杆部6を有し、他端に連結パイプ1の軸心に対して直交する方向 に貫通する長さの長杆部7を有するL字形の鉤杆5とからなる。上記連結パイプ 1の中央の係止部2には、軸心に対して直交する位置の対向壁面にそれぞれ透孔 8、9が形成されている。この透孔8、9には、L字形の鉤杆5の長杆部7がス ライド自在に挿入されている。また、連結パイプ1の上方の挿入部3の壁面には 、L字形の鉤杆5の短杆部6が挿入される透孔10が形成されている。上記連結 パイプ1内に挿通された鉤杆5の長杆部7には、バネ11が装着され、このバネ 11によって鉤杆5が連結パイプ1側に付勢させられている。This one has a locking part 2 in the center, a connecting pipe 1 having insertion parts 3 and 4 on both sides thereof, a short rod part 6 at one end, and an axial center of the connecting pipe 1 at the other end. It is composed of an L-shaped hook rod 5 having a long rod portion 7 having a length penetrating in a direction orthogonal to it. Through holes 8 and 9 are formed in the engaging wall 2 at the center of the connecting pipe 1 on the opposing wall surfaces at positions orthogonal to the axis. The long rod portion 7 of the L-shaped hook rod 5 is slidably inserted into the through holes 8 and 9. Further, a through hole 10 into which the short rod portion 6 of the L-shaped hook rod 5 is inserted is formed on the wall surface of the insertion portion 3 above the connection pipe 1. A spring 11 is attached to the long rod portion 7 of the hook 5 inserted through the connecting pipe 1, and the hook 5 is biased toward the connecting pipe 1 by the spring 11.

【0004】 そして、足場枠を組立てる場合には、まず、下方足場パイプ15の上端に、連 結パイプ1の下方の挿入部4を挿入し、連結パイプ1の下方の挿入部4に形成し た透孔12に、下方足場パイプAの上端に形成した透孔を合わせて係止ピン(図 示省略)を挿入することによって、下方足場パイプ15の上端に連結パイプ1を 継ぎ足す。次に、L字形の鉤杆5を引張って短杆部6を連結パイプ1の挿入部3 の透孔10から出して、鉤杆5の短杆部6を下方に回転させた状態で、上方足場 パイプ16の下端に、連結パイプ1の上方の挿入部3を挿し入れ、上方足場パイ プ16の下端に形成した透孔17と連結パイプ1の挿入部3に形成した透孔10 の位置を合わせた後、鉤杆5の短杆部6を上方に回転させ、鉤杆5を引張って短 杆部6を、上方足場パイプ16の透孔17と連結パイプ1の挿入部3の透孔10 に挿し込む。When assembling the scaffolding frame, first, the lower insertion portion 4 of the connecting pipe 1 is inserted into the upper end of the lower scaffolding pipe 15 to form the lower insertion portion 4 of the connecting pipe 1. The connecting pipe 1 is added to the upper end of the lower scaffolding pipe 15 by inserting a locking pin (not shown) into the through hole 12 by aligning the through hole formed at the upper end of the lower scaffolding pipe A. Next, pulling the L-shaped hook rod 5 to bring the short rod portion 6 out of the through hole 10 of the insertion portion 3 of the connecting pipe 1, and while rotating the short rod portion 6 of the hook rod 5 downward, The insertion part 3 above the connecting pipe 1 is inserted into the lower end of the scaffolding pipe 16, and the positions of the through hole 17 formed in the lower end of the upper scaffold pipe 16 and the through hole 10 formed in the inserting part 3 of the connecting pipe 1 are set. After the adjustment, the short rod portion 6 of the hook rod 5 is rotated upward, and the hook rod 5 is pulled to connect the short rod portion 6 to the through hole 17 of the upper scaffold pipe 16 and the through hole 10 of the insertion portion 3 of the connecting pipe 1. Insert into.

【0005】 このようにして、下方足場パイプ15と上方足場パイプ16とが連結パイプ1 を介して連結される。In this way, the lower scaffolding pipe 15 and the upper scaffolding pipe 16 are connected via the connecting pipe 1.

【0006】[0006]

【考案が解決しようとする課題】[Problems to be solved by the device]

ところで、上記のようにして組立てられた下方足場パイプ15の横フレーム1 8には、足場板が掛け渡される。 By the way, a scaffolding board is laid over the horizontal frame 18 of the lower scaffolding pipe 15 assembled as described above.

【0007】 ところが、上記従来の足場枠結合金具では、図5に示すように、鉤杆5の長杆 部7の先端が、透孔8から外方に突出しているため、足場板を掛け渡したときに 、足場板が外方に突出する長杆部7の先端に当たり、鉤杆5がバネ11に抗して 移動し、鉤杆5の短杆部7が透孔10、17から抜け出し、鉤杆5が外れる危険 がある。However, in the above-mentioned conventional scaffolding frame coupling fitting, as shown in FIG. 5, since the tip of the long rod portion 7 of the hook 5 projects outward from the through hole 8, the scaffolding board is hung. At this time, the scaffold plate hits the tip of the long rod 7 protruding outward, the hook 5 moves against the spring 11, and the short rod 7 of the hook 5 comes out of the through holes 10 and 17, There is a risk that the hook 5 will come off.

【0008】 そこで、この考案は、上記のような鉤杆の抜け出しを防止しようとするもので ある。Therefore, the present invention is intended to prevent the hook rod from slipping out as described above.

【0009】[0009]

【課題を解決するための手段】[Means for Solving the Problems]

上記の課題を解決するために、この考案は、中央に係止部22、その上下両側 に挿入部23、24を有する連結パイプ21と、一端に短杆部26を有し、他端 に長杆部27を有するL字形の鉤杆25とからなり、上記中央の係止部22の対 向する壁面に透孔28、29を形成し、この透孔28、29にL字形の鉤杆25 の長杆部27をスライド自在に挿入し、連結パイプ21の一方の挿入部23に、 L字形の鉤杆25の短杆部26を挿入する透孔34を形成し、L字形の鉤杆25 の長杆部27に、鉤杆25を連結パイプ21側に付勢させるバネ32を装着した 足場枠結合金具において、上記中央の係止部22の対向する壁面に形成した透孔 28、29の内側に、透孔28、29をつなぐ抜け止めパイプ30を固着し、こ の抜け止めパイプ30内に長杆部27を挿入し、この抜け止めパイプ30の内面 と長杆部27の外面との間にバネ32を装着し、このバネ32を長杆部27の先 端にキャップ33を被せて係止し、このバネ32によって鉤杆25を連結パイプ 21側に付勢させた状態において長杆部27とその先端のキャップ33の長さを 、キャップ33の先端が透孔28から外方に突出しない長さに形成したのである 。 In order to solve the above-mentioned problems, the present invention has a connecting pipe 21 having a locking portion 22 in the center, insertion portions 23 and 24 on both upper and lower sides thereof, a short rod portion 26 at one end, and a long rod at the other end. It is composed of an L-shaped hook 25 having a rod 27, and through holes 28 and 29 are formed on the opposite wall surfaces of the central locking portion 22, and the L-shaped hook 25 is formed in the through holes 28 and 29. Of the L-shaped hook rod 25 is formed in the insertion portion 23 of the connecting pipe 21 through which the short rod portion 26 of the L-shaped hook rod 25 is inserted. In the scaffolding frame connecting fitting in which the spring 32 for urging the hook rod 25 toward the connecting pipe 21 side is attached to the long rod portion 27 of the above, the through holes 28, 29 formed in the facing wall surfaces of the central locking portion 22 are provided. A retaining pipe 30 that connects the through holes 28 and 29 is fixed to the inside of the retaining pipe 30. Insert the long rod 27 into the rod 30, install a spring 32 between the inner surface of the retaining pipe 30 and the outer surface of the long rod 27, and attach the spring 32 to the end of the long rod 27 with the cap 33. The length of the long rod 27 and the cap 33 at the tip thereof is set so that the tip of the cap 33 is removed from the through hole 28 when the hook 25 is biased toward the connecting pipe 21 by the spring 32. It was formed to a length that did not project toward one side.

【0010】[0010]

【作用】[Action]

上記の構成により、鉤杆25の長杆部27と、その先端のキャップ33が、抜 け止めパイプ30内に収容され、鉤杆25が外方に突出しないので、足場板を掛 け渡しても、足場板と鉤杆25との接触が防止され、鉤杆25が不意に外れたり しない。 With the above configuration, the long rod portion 27 of the hook rod 25 and the cap 33 at the tip thereof are housed in the retaining pipe 30, and since the hook rod 25 does not project outward, the scaffolding plate is hung over. However, contact between the scaffolding plate and the hook 25 is prevented, and the hook 25 does not come off unexpectedly.

【0011】[0011]

【実施例】【Example】

以下、この考案に係る足場枠結合金具の一実施例について説明する。 Hereinafter, an embodiment of the scaffold frame connecting fitting according to the present invention will be described.

【0012】 この考案に係る足場枠結合金具は、中央に係止部22と、その両側に挿入部2 3、24を有する連結パイプ21と、一端に短杆部26を有し、他端に連結パイ プ21の軸心に対して直交する方向に貫通する長さの長杆部27を有するL字形 の鉤杆25との組合せからなる。A scaffolding frame coupling fitting according to the present invention has a locking portion 22 in the center, a connecting pipe 21 having insertion portions 23 and 24 on both sides thereof, a short rod portion 26 at one end, and a other end at the other end. It is combined with an L-shaped hook rod 25 having a long rod portion 27 having a length penetrating in a direction orthogonal to the axis of the connecting pipe 21.

【0013】 上記連結パイプ21の中央の係止部22は、別体のパイプを連結パイプ21に 被せ、両者をかしめて固着することによって形成されている。この係止部22に は、連結パイプ21の軸心に対して直交する位置の対向壁面に、鉤杆25の長杆 部27がスライド自在に挿入される透孔28、29が形成されている。この透孔 28、29は、長杆部27の径よりも大径に形成され、長杆部27の周囲に抜け 止めパイプ30が被せられるようになっている。この抜け止めパイプ30の両端 は、透孔28、29に固着され、透孔28側の端部は係止部22の壁面から外方 に突出しないように固着され、透孔29側の端部は係止部22の壁面から外方に 突出して固着されている。透孔29から突出する抜け止めパイプ30の端部には 、鉤杆25の両側面をガイドするガイド壁31が一体に形成されている。The engaging portion 22 at the center of the connecting pipe 21 is formed by covering the connecting pipe 21 with a separate pipe, and caulking and fixing them. The engaging portion 22 is formed with through holes 28 and 29 into which the long rod portion 27 of the hook rod 25 is slidably inserted, on the opposing wall surface at a position orthogonal to the axis of the connecting pipe 21. . The through holes 28 and 29 are formed to have a diameter larger than that of the long rod portion 27, and a retaining pipe 30 is put around the long rod portion 27. Both ends of the retaining pipe 30 are fixed to the through holes 28 and 29, and the end portion on the side of the through hole 28 is fixed so as not to project outward from the wall surface of the locking portion 22, and the end portion on the side of the through hole 29. Is fixed by protruding outward from the wall surface of the locking portion 22. A guide wall 31 for guiding both side surfaces of the hook rod 25 is integrally formed at an end portion of the retaining pipe 30 protruding from the through hole 29.

【0014】 上記抜け止めパイプ30の内面は、透孔29の近くが、鉤杆25の長杆部27 の周囲にぴったりと沿う小径に形成され、この小径の部分から透孔28の端部ま では大径に形成されている。この大径の部分と鉤杆25の長杆部27との間に形 成される空間には、鉤杆25を連結パイプ21側に付勢させるバネ32が収容さ れている。上記鉤杆25の長杆部27の先端には、上記バネ32を抜け止めパイ プ30内に保持するキャップ33が、透孔28側から被せられて固着されている 。このキャップ33と長杆部27の長さは、鉤杆25をバネ32によって連結パ イプ21側に付勢された状態において、キャップ33の先端が、係止部22の透 孔28から外方に突出しない長さに形成されている。The inner surface of the retaining pipe 30 is formed with a small diameter near the through hole 29 so as to fit snugly around the long rod portion 27 of the hook 25, and from this small diameter portion to the end of the through hole 28. Has a large diameter. A spring 32 that biases the hook 25 toward the connecting pipe 21 is housed in a space formed between the large diameter portion and the long rod 27 of the hook 25. At the tip of the long rod portion 27 of the hook rod 25, a cap 33 for preventing the spring 32 from coming off and holding the pipe 30 is covered and fixed from the through hole 28 side. The length of the cap 33 and the long rod 27 is such that the tip of the cap 33 is outward from the through hole 28 of the engaging portion 22 when the hook 25 is urged toward the connecting pipe 21 by the spring 32. It is formed to have a length that does not protrude into.

【0015】 上記連結パイプ21の上方の挿入部23には、鉤杆25の短杆部26が挿入さ れる透孔34が形成されている。また、上記連結パイプ21の下方の挿入部24 にも、鉤杆25を外方に引出して、下方に短杆部26が位置するように鉤杆25 を回転させた状態において、短杆部26が挿入される透孔35が形成されている 。A through hole 34 into which the short rod portion 26 of the hook rod 25 is inserted is formed in the insertion portion 23 above the connection pipe 21. In addition, the hook rod 25 is pulled out to the insertion portion 24 below the connecting pipe 21, and the hook rod 25 is rotated so that the rod rod 26 is located below the hook rod 26. A through hole 35 into which is inserted is formed.

【0016】 上記連結パイプ21の下方の挿入部24の端部には、下方足場パイプ15の上 端に形成された係止孔36に対応する透孔37が、軸心に直交するように対向位 置に形成されている。下方足場パイプ15の上端に形成される係止孔36の位置 は、下方足場パイプ15の種類によって異なる場合がある。即ち、係止孔36の 位置が、例えば、上端から70mmの位置にあったり、80mmの位置にあった りする。このため、下方の挿入部24に形成する透孔37の位置を、例えば、係 止部22の下端面から70mmにした場合、上方の挿入部23に、係止部22の 上端面から80mmの位置に透孔38を形成しておけば、足場枠結合金具を逆さ に使用することによって、係止孔36の位置が異なる二種類の下方足場パイプ1 5に使用することができる。足場枠結合金具を逆さにして使用する場合には、鉤 杆25を引出し、鉤杆25を回転させて逆向けにする。A through hole 37 corresponding to a locking hole 36 formed at an upper end of the lower scaffold pipe 15 is opposed to an end portion of the lower insertion portion 24 of the connecting pipe 21 so as to be orthogonal to an axis. It is formed in position. The position of the locking hole 36 formed at the upper end of the lower scaffold pipe 15 may differ depending on the type of the lower scaffold pipe 15. That is, the position of the locking hole 36 may be, for example, 70 mm or 80 mm from the upper end. Therefore, when the position of the through hole 37 formed in the lower insertion portion 24 is, for example, 70 mm from the lower end surface of the locking portion 22, the upper insertion portion 23 is located 80 mm from the upper end surface of the locking portion 22. If the through hole 38 is formed at the position, the scaffolding frame coupling fitting can be used upside down to be used for two types of lower scaffolding pipes 15 having different positions of the locking holes 36. When using the scaffolding frame coupling fittings upside down, pull out the hook rod 25 and rotate the hook rod 25 so that it faces in the opposite direction.

【0017】 次に、上記鉤杆25の短杆部26の先端面は、短杆部26が嵌まる透孔34を 形成した挿入部23の端部側に向く傾斜面になっている。この傾斜面の外側の端 部は、透孔34の外方に位置し、図2(a)に示すように、挿入部23に上方足 場パイプ16の下端を挿し入れた際に、上方足場パイプ16の下端面が上記傾斜 面に当たるようになっている。このように、上方足場パイプ16の下端面が、鉤 杆25の短杆部26の先端の傾斜面に当たり、上方足場パイプ16の重量が短杆 部26の傾斜面にかかると、その力によって鉤杆25がバネ32に抗してガイド 壁31にガイドされながら外方に移動し、短杆部26が透孔34から抜け出して 上方足場パイプ16が短杆部26の下方の係止部22の上端面に当たる位置まで 挿し込まれる。そして、上方足場パイプ16の下端面が係止部22の上端面に当 たると、短杆部26の先端に、上方足場パイプ16の係止孔17が位置し、バネ 32によって、係止孔17に短杆部26の先端が引っ掛かるように鉤杆25が引 き戻される。Next, the tip surface of the short rod portion 26 of the hook rod 25 is an inclined surface facing the end portion side of the insertion portion 23 in which the through hole 34 into which the short rod portion 26 is fitted is formed. The outer end of this inclined surface is located outside the through hole 34, and when the lower end of the upper scaffold pipe 16 is inserted into the insertion portion 23 as shown in FIG. The lower end surface of the pipe 16 contacts the inclined surface. Thus, the lower end surface of the upper scaffold pipe 16 hits the inclined surface of the tip of the short rod portion 26 of the hook rod 25, and when the weight of the upper scaffold pipe 16 is applied to the inclined surface of the short rod portion 26, the force causes the hook portion to hook. The rod 25 moves outward while being guided by the guide wall 31 against the spring 32, the short rod portion 26 slips out of the through hole 34, and the upper scaffold pipe 16 moves the locking portion 22 below the short rod portion 26. It is inserted until it hits the top surface. When the lower end surface of the upper scaffolding pipe 16 hits the upper end surface of the locking portion 22, the locking hole 17 of the upper scaffolding pipe 16 is located at the tip of the short rod 26, and the locking hole 17 is locked by the spring 32. The hook rod 25 is pulled back so that the tip of the short rod portion 26 is caught.

【0018】 上記のように、短杆部26の先端面を傾斜面に形成しておくと、上方足場パイ プ16を挿入する際に、鉤杆25を手でいちいち引き出す必要がないので、足場 枠の組立て作業を迅速に行うことができる。As described above, if the tip end surface of the short rod portion 26 is formed as an inclined surface, it is not necessary to pull out the hook rod 25 by hand when inserting the upper scaffold pipe 16, so that the scaffolding is not required. The frame assembly work can be performed quickly.

【0019】[0019]

【考案の効果】[Effect of device]

以上のように、この考案によれば、鉤杆25の抜け出しのおそれがない安全な 足場枠結合金具を提供することができる。 As described above, according to the present invention, it is possible to provide a safe scaffolding frame coupling fitting that does not cause the hook rod 25 to slip out.

【0020】 また、鉤杆25の先端面を傾斜面にすることによって、足場枠の組立て作業を 迅速に行うことができるという効果もある。Further, by making the tip end surface of the hook rod 25 into an inclined surface, there is also an effect that the work of assembling the scaffolding frame can be performed quickly.

【0021】 さらに、上下の挿入部23、24の端部に、それぞれ係止部22の端面からの 距離が異なる透孔37、38を形成することにより、二種類の異なる足場パイプ の組立てに使用できるという効果もある。Furthermore, by forming through holes 37 and 38 at different distances from the end faces of the locking portions 22 at the ends of the upper and lower insertion portions 23 and 24, it is used for assembling two different types of scaffold pipes. There is also an effect that you can.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案に係る足場枠結合金具の一実施例を示
す分解斜視図
FIG. 1 is an exploded perspective view showing an embodiment of a scaffolding frame fitting according to the present invention.

【図2】(a)は同上の縦断面図、(b)は同上の側面
2A is a vertical cross-sectional view of the above, FIG. 2B is a side view of the same.

【図3】同上の使用状態を示す図FIG. 3 is a diagram showing a usage state of the same as above.

【図4】従来例の分解斜視図FIG. 4 is an exploded perspective view of a conventional example.

【図5】従来例の要部を示す縦断面図FIG. 5 is a vertical sectional view showing a main part of a conventional example.

【符号の説明】[Explanation of symbols]

21 連結パイプ 22 係止部 23、24 挿入部 25 鉤杆 26 短杆部 27 長杆部 28、29、34、35、37、38 透孔 30 抜け止めパイプ 31 ガイド壁 32 バネ 33 キャップ 21 connecting pipe 22 locking part 23, 24 insertion part 25 hook rod 26 short rod part 27 long rod part 28, 29, 34, 35, 37, 38 through hole 30 retaining pipe 31 guide wall 32 spring 33 cap

Claims (3)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 中央に係止部22、その上下両側に挿入
部23、24を有する連結パイプ21と、一端に短杆部
26を有し、他端に長杆部27を有するL字形の鉤杆2
5とからなり、上記中央の係止部22の対向する壁面に
透孔28、29を形成し、この透孔28、29にL字形
の鉤杆25の長杆部27をスライド自在に挿入し、連結
パイプ21の一方の挿入部23に、L字形の鉤杆25の
短杆部26を挿入する透孔34を形成し、L字形の鉤杆
25の長杆部27に、鉤杆25を連結パイプ21側に付
勢させるバネ32を装着した足場枠結合金具において、
上記中央の係止部22の対向する壁面に形成した透孔2
8、29の内側に、透孔28、29をつなぐ抜け止めパ
イプ30を固着し、この抜け止めパイプ30内に長杆部
27を挿入し、この抜け止めパイプ30の内面と長杆部
27の外面との間にバネ32を装着し、このバネ32を
長杆部27の先端にキャップ33を被せて係止し、この
バネ32によって鉤杆25を連結パイプ21側に付勢さ
せた状態において長杆部27とその先端のキャップ33
の長さを、キャップ33の先端が透孔28から外方に突
出しない長さに形成したことを特徴とする足場枠結合金
具。
1. An L-shaped structure having a locking portion 22 in the center, a connecting pipe 21 having insertion portions 23 and 24 on both upper and lower sides thereof, a short rod portion 26 at one end, and a long rod portion 27 at the other end. Hook 2
5, through holes 28 and 29 are formed in the opposing wall surfaces of the central locking portion 22, and the long rod portion 27 of the L-shaped hook rod 25 is slidably inserted into the through holes 28 and 29. A through hole 34 for inserting the short rod portion 26 of the L-shaped hook rod 25 is formed in one insertion portion 23 of the connecting pipe 21, and the hook rod 25 is attached to the long rod portion 27 of the L-shaped hook rod 25. In a scaffolding frame coupling fitting equipped with a spring 32 for urging the connecting pipe 21 side,
Through hole 2 formed in the wall surfaces of the central locking portion 22 facing each other
A retaining pipe 30 that connects the through holes 28 and 29 is fixed to the inside of the retaining pipes 8 and 29, and the long rod portion 27 is inserted into the retaining pipe 30. The inner surface of the retaining pipe 30 and the long rod portion 27 are A spring 32 is attached between the outer surface and the outer surface, and the spring 32 is locked by covering the tip of the long rod 27 with a cap 33, and the spring 25 urges the hook 25 toward the connecting pipe 21. Long rod 27 and cap 33 at its tip
The scaffolding frame coupling fitting is characterized in that the length of the cap 33 is formed so that the tip of the cap 33 does not project outward from the through hole 28.
【請求項2】 上記鉤杆25の短杆部26の先端面を、
透孔34を形成した挿入部23の端部側に向く傾斜面と
し、この傾斜面の外側の端部が透孔34の外方に位置
し、鉤杆25の長杆部27を挿入した係止部22の透孔
29の両側に、鉤杆25の両側面をガイドするガイド壁
31を形成したことを特徴とする請求項1記載の足場枠
結合金具。
2. The tip surface of the short rod portion 26 of the hook rod 25 is
A slanted surface facing the end side of the insertion portion 23 in which the through hole 34 is formed is provided, the outer end of this slanted surface is located outside the through hole 34, and the long rod 27 of the hook 25 is inserted. The scaffolding frame coupling fitting according to claim 1, wherein guide walls 31 for guiding both side surfaces of the hook 25 are formed on both sides of the through hole 29 of the stopper portion 22.
【請求項3】 上記係止部22の上下両側の挿入部2
3、24にそれぞれ、鉤杆25の短杆部26が挿入され
る透孔34、35を形成し、上記両挿入部23、24の
端部にそれぞれ係止ピン挿入用の透孔37、38を形成
し、この両挿入部23、24の端部に形成された透孔3
7、38から係止部22までの距離を、一方を他方より
も長くしたことを特徴とする請求項1又は2記載の足場
枠結合金具。
3. The insertion portions 2 on both the upper and lower sides of the locking portion 22.
3 and 24 are formed with through holes 34 and 35, respectively, into which the short rod portions 26 of the hook 25 are inserted, and through holes 37 and 38 for inserting locking pins are formed at the ends of the both insertion portions 23 and 24, respectively. And a through hole 3 formed at the ends of both insertion portions 23 and 24.
The scaffolding frame coupling fitting according to claim 1 or 2, wherein one of the distances from the locking holes 22 to the locking portions 22 is longer than the other.
JP8887592U 1992-12-25 1992-12-25 Scaffolding frame fitting Expired - Lifetime JP2561256Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8887592U JP2561256Y2 (en) 1992-12-25 1992-12-25 Scaffolding frame fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8887592U JP2561256Y2 (en) 1992-12-25 1992-12-25 Scaffolding frame fitting

Publications (2)

Publication Number Publication Date
JPH0651393U true JPH0651393U (en) 1994-07-12
JP2561256Y2 JP2561256Y2 (en) 1998-01-28

Family

ID=13955187

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8887592U Expired - Lifetime JP2561256Y2 (en) 1992-12-25 1992-12-25 Scaffolding frame fitting

Country Status (1)

Country Link
JP (1) JP2561256Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180000282U (en) * 2016-07-19 2018-01-29 최환우 Scaffolding with semiautomatic connect pin

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180000282U (en) * 2016-07-19 2018-01-29 최환우 Scaffolding with semiautomatic connect pin

Also Published As

Publication number Publication date
JP2561256Y2 (en) 1998-01-28

Similar Documents

Publication Publication Date Title
JPH0713273U (en) Clothes hanger
US5400870A (en) Scaffolding frame system
US5285869A (en) Scaffolding frame to which a story can be added
JPH0651393U (en) Scaffolding frame fittings
JPH0724521Y2 (en) Pipe joint
CN212251622U (en) Automatic locking joint with checking function
JP3558992B2 (en) Connection of steel pipe scaffold
JP2538796Y2 (en) Scaffolding frame fitting
EP0427448B1 (en) Scaffolding
KR950006536Y1 (en) Coupling bar for scaffoldings
JPH0451284U (en)
JP2601495Y2 (en) Fixture
JP3825608B2 (en) Two piece clip
JPS6347278Y2 (en)
JPH0421470Y2 (en)
JPH0142385Y2 (en)
JP2548893B2 (en) Connecting pin for scaffolding frame
JPH01109610U (en)
JP2535587Y2 (en) Tunnel segment coupling device
JPS6123704Y2 (en)
JPS5826309Y2 (en) grating mounting device
JPH0610505U (en) Connection pipe for scaffolding frame
JPH079298Y2 (en) Lighting equipment suspension device
JPS5938075Y2 (en) Housing coupling device
JPS5856413Y2 (en) Fixing pin for vertical spring on cooker door