JPH0633612A - Temporary setting of all-weather shelter for multi-storied building - Google Patents

Temporary setting of all-weather shelter for multi-storied building

Info

Publication number
JPH0633612A
JPH0633612A JP21203092A JP21203092A JPH0633612A JP H0633612 A JPH0633612 A JP H0633612A JP 21203092 A JP21203092 A JP 21203092A JP 21203092 A JP21203092 A JP 21203092A JP H0633612 A JPH0633612 A JP H0633612A
Authority
JP
Japan
Prior art keywords
shelter
building
scaffold
construction
outer scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP21203092A
Other languages
Japanese (ja)
Other versions
JPH0730631B2 (en
Inventor
Mitsuo Futaki
満男 二木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUKUDAGUMI KK
Original Assignee
FUKUDAGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUKUDAGUMI KK filed Critical FUKUDAGUMI KK
Priority to JP21203092A priority Critical patent/JPH0730631B2/en
Publication of JPH0633612A publication Critical patent/JPH0633612A/en
Publication of JPH0730631B2 publication Critical patent/JPH0730631B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To permit a shelter to be vertically moved and supported. CONSTITUTION:An outside scaffold 2 higher than the first floor of a building 1 is assembled, a roof-type shelter 3 is supported on the scaffold 2, and the first floor is constructed under the condition that the upper part is covered with the shelter 3. Connecting struts 9 are vertically attached to the scaffold 2 and the lower end of the lift-up frame 10 is connected to the upper end to rise it up. The shelter 3 is lifted up by a chain block set on the upper part of the frame 10, and the outside scaffold 2 for the second floor is additionally connected to support the shelter 3 for constructing the second floor. The frame 10 is separated and pulled up on the scaffold 2, and new connecting struts 9 are attached to the connecting strut 9 below the scaffold 2. The shelter 3 is lifted up by the frame 10, and the scaffold 2 for upstairs is additionally connected to the outside scaffold 2 to support the shelter 3. These processes and the constructing process for upstairs are repeated.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、多層階建築物の建築
中において建築物上を覆って天候の良否に拘らず施工を
可能とした多層階建築物用全天候シェルターの仮設方法
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary installation method for an all-weather shelter for a multi-storey building, which can be constructed during the construction of a multi-storey building regardless of weather conditions. .

【0002】[0002]

【従来の技術】一般に、多層階建築物の建築施工途中に
おいては雨や雪などに対して現場の上方に遮幣物がない
ため、雨天等、天候不順な日には施工を中断せざるを得
ない場合が少なくなかった。
2. Description of the Related Art Generally, in the middle of construction of a multi-storey building, there is no barrier above the site against rain and snow, so the construction must be interrupted on rainy days or in bad weather. There were many cases where I could not get it.

【0003】そのため最近、多層階建築物の建築中にそ
の途中の建築物上にテント型の伸縮式シェルターを仮設
し、順次下層階から上層階に施工を移行する度にこの伸
縮式シェルターもその上方に移動仮設して、天候に拘ら
ず施工を継続することを可能とした工法が開発されつつ
ある。
Therefore, recently, a tent type telescopic shelter is temporarily installed on a building in the middle of a multi-story building, and this telescopic shelter is also installed every time the construction is sequentially transferred from the lower floor to the upper floor. A construction method is being developed that enables temporary construction by moving upward and continuing construction regardless of the weather.

【0004】[0004]

【発明が解決しようとする課題】現在開発中のシェルタ
ーは、建設途中の建物上に各階層毎に複数本の柱を建て
て、各柱にチャック移動式ジャッキを取付け、このジャ
ッキに支持したシェルターを尺とり虫状に上昇移動させ
る方式を採用するため、高価な特殊ジャッキを必要とす
る上に、シェルターの上昇工程中に各ジャッキの1スト
ローク毎にチャッキング位置を上下に交互に切り換える
操作を要し、その作業管理が容易でなく、しかもシェル
ターはその下方の建築施工中にジャッキで柱に継続的に
支持させるため、安全性や安定性に不安があるなどの課
題がある。
A shelter currently under development is a shelter in which a plurality of pillars are built for each floor on a building under construction, a chuck movable jack is attached to each pillar, and the pillar is supported by the jack. Since it uses a system that moves up and down like a bug, it requires an expensive special jack, and the chucking position is switched up and down alternately for each stroke of each jack during the raising process of the shelter. In addition, the work management is not easy, and there is a problem in that the shelter is continuously supported on the pillar by a jack during the construction work therebelow, so that there is concern about safety and stability.

【0005】また、ジャッキを取付ける柱は建設途中の
建物内に設置するため、この柱が建物施工の障害になり
かねず、しかもこの柱は下層階からその天井スラブを貫
通して連続して設置されているため、柱を撤去した後に
これが貫通したスラブ部分の後処理施工を要し、施工が
煩雑となるなどの課題もある。
Further, since the pillar to which the jack is attached is installed in the building under construction, this pillar may be an obstacle to the construction of the building. Moreover, the pillar is continuously installed from the lower floor through the ceiling slab. Therefore, after the pillar is removed, post-processing work for the slab portion that penetrates the post is required, and there is a problem that the work becomes complicated.

【0006】[0006]

【課題を解決するための手段】この発明は前記従来の課
題を解決するために、多層階建築物の建設用地の周囲に
沿って建物1の一階層分の高さよりも上端高さが多少高
い外足場2を組立て、この外足場2上に建設用地の上方
を覆う屋根型のシェルター3を組立てて支持し、このシ
ェルター3により上方を覆われた状態で建物1の一階層
を施工し、外足場2に横方向に所要間隔をおいて連結支
柱9,9を鉛直に取付けてその上端に吊上げ枠10の下
端を連結して立ち上げ、この吊上げ枠10の上部に設置
したチェーンブロック12によりシェルター3を吊上げ
保持した状態で、外足場2にさらに二階層分の外足場2
を継ぎ足してこの上にシェルター3を支持させ、この状
態で建物1の二階層分の施工を行い、その後は吊上げ枠
10を切り離して外足場2上に引き上げる工程と、この
外足場2に下方の連結支柱9に連続して新たな連結支柱
9を取付け、その上端に吊上げ枠10の下端を連結して
上方に立ち上げる工程と、この吊上げ枠10にチェーン
ブロック12によりシェルター3を吊上げ保持させた状
態で、外足場2にさらに上階層分の外足場2を継ぎ足し
てこの上にシェルター3を支持させる工程と、建物1の
上階層分の建築を行う工程とを繰り返すようにした多層
階建築物用全天候シェルターの仮設方法を提案するもの
である。
According to the present invention, in order to solve the above-mentioned conventional problems, the height of the upper end is slightly higher than the height of one floor of the building 1 along the periphery of the construction site of the multi-storey building. The outer scaffold 2 is assembled, the roof-type shelter 3 covering the upper part of the construction site is assembled and supported on the outer scaffold 2, and one layer of the building 1 is constructed in a state where the shelter 3 covers the upper part, Connection columns 9, 9 are vertically installed on the scaffold 2 at required intervals in the horizontal direction, the lower end of the hoisting frame 10 is connected to the upper end of the scaffolding 9 and is started up, and a shelter is provided by a chain block 12 installed on the upper part of the hoisting frame 10. The outer scaffold 2 for two layers is further added to the outer scaffold 2 in a state where 3 is hoisted and held.
To support the shelter 3 on top of this, and in this state the construction for two layers of the building 1 is performed, after that the process of separating the lifting frame 10 and pulling it up on the outer scaffold 2 and the lower part of this outer scaffold 2 A new connecting column 9 is continuously attached to the connecting column 9, a process of connecting the lower end of the hoisting frame 10 to the upper end of the connecting column 9 and raising it upwards, and the shelter 3 is hoisted and held by the chain block 12 on the hoisting frame 10. In this state, the multi-story building is configured such that the step of adding the outer scaffold 2 for the upper floor to the outer scaffold 2 to support the shelter 3 thereon and the step of constructing the upper floor of the building 1 are repeated. It proposes a temporary construction method for an all-weather shelter.

【0007】[0007]

【作用】吊上げ枠10の上部に設置したチェーンブロッ
ク12により屋根型のシェルター3を上方に吊上げるた
め、容易に入手できる市販のチェーンブロック12を用
いて簡単な操作でシェルター3を吊上げることができる
と共に、吊上げたシェルター3はその下方に組み上げた
外足場2上に支持するので、安定して安全に支持するこ
とができる。
The roof-type shelter 3 is lifted up by the chain block 12 installed on the upper part of the hoisting frame 10. Therefore, the shelter 3 can be hoisted by a simple operation using the commercially available chain block 12. At the same time, since the suspended shelter 3 is supported on the outer scaffolding 2 assembled below it, it can be stably and safely supported.

【0008】吊上げ枠10は外足場2に連結支柱9を介
して支持するため、建物1の建設作業に障害とならず、
円滑に建築施工を進行することができると共に、連結支
柱9の外足場2に対する専有部分も少なく、この外足場
2において行う作業を阻害しない。
Since the hoisting frame 10 is supported on the outer scaffold 2 via the connecting columns 9, it does not hinder the construction work of the building 1.
The construction can be smoothly progressed, and the portion of the connecting pillar 9 that is occupied by the outer scaffold 2 is small, so that the work performed on the outer scaffold 2 is not hindered.

【0009】[0009]

【実施例】RC又はSRC等の多層階建築物の建設用地
の周囲に沿って、建設すべき建物1の一階層分の高さ
(例えば、4m)よりも上端(足場の上端又はその上に
設置した支持部材を含む)の高さが多少高い(例えば、
6m)外足場2を組立て、この外足場2の上端部上に屋
根型のシェルター3を組立てて支持する。
[Example] Along the circumference of a construction site of a multi-storey building such as RC or SRC, the upper end (the upper end of the scaffold or above it) higher than the height (for example, 4 m) of one level of the building 1 to be constructed The height of the installed support members is a little high (for example,
6m) The outer scaffold 2 is assembled, and the roof-type shelter 3 is assembled and supported on the upper end of the outer scaffold 2.

【0010】シェルター3は、型鋼からなる方形枠状の
ベースフレーム4の上に函型の屋根トラス5を所要間隔
で所要数配列し、それらの上面にテントシートなどの可
撓性シート6を一連に張付けたもので、ベースフレーム
4の周囲にはその両側間に渡した型鋼からなる支持ビー
ム7の端部が突設されている。
The shelter 3 comprises a box-shaped roof truss 5 arranged on a square frame-shaped base frame 4 made of shaped steel at a required interval and a flexible sheet 6 such as a tent sheet arranged on the upper surface thereof. An end portion of a supporting beam 7 made of shaped steel, which is provided between both sides of the base frame 4, is projectingly provided around the base frame 4.

【0011】外足場2上にシェルター3を組上げる際に
は、先ず左右の外足場2上に型鋼等の支持ビーム7を架
渡し、その上にベースフレーム4を組立て、さらにこの
上に地上で組立てた屋根トラス5を順次吊り上げて配置
する。
When assembling the shelter 3 on the outer scaffold 2, first, the supporting beams 7 such as shaped steel are bridged on the left and right outer scaffolds 2, the base frame 4 is assembled thereon, and further on the ground. The assembled roof truss 5 is sequentially lifted and placed.

【0012】屋根トラス5は、その全てをベースフレー
ム4に固定した常時閉鎖型に構成してもよいが、図2に
示すように望ましくは端部あるいは中間の一部の屋根ト
ラス5を固定し、かつこの固定屋根トラス5に順次隣接
して一連に配した複数の屋根トラス5の下面にモノレー
ル式車輪8を取付けてベースフレーム4上を安定して走
行移動するように構成し、これらの移動屋根トラス5郡
と固定屋根トラス5と間に一連に可撓性シート6を張設
し、これらの移動屋根トラス5を一端の固定屋根トラス
5方向に可撓性シート6を折り畳みながら移動させるこ
とにより、シェルター3の一部を開放し、またこの状態
から逆に移動屋根トラス5を移動させることにより可撓
性シート6で全面閉鎖するように伸縮開閉式構造とす
る。
The roof truss 5 may be of a normally closed type in which all of the roof truss 5 is fixed to the base frame 4. However, as shown in FIG. Further, the monorail type wheels 8 are attached to the lower surfaces of a plurality of roof trusses 5 arranged in series adjacent to the fixed roof truss 5 in order to stably move and move on the base frame 4, and these movements are performed. Flexible sheets 6 are stretched in series between the roof trusses 5 and the fixed roof trusses 5, and the movable roof trusses 5 are moved while folding the flexible sheet 6 toward the fixed roof truss 5 at one end. Thus, a part of the shelter 3 is opened, and the movable roof truss 5 is moved from this state in reverse, so that the flexible sheet 6 closes the entire surface to provide an expandable and retractable structure.

【0013】また、屋根トラス5は図10に示すよう
に、各接点間を結ぶ斜めの上弦材5a、水平な下弦材5
b及び鉛直な腹弦材5cを着脱自在にボルト接合して一
体化したもので(図12〜16参照)、各上弦材5aと
各下弦材5bはそれぞれ同長の鋼材が、また各腹弦材5
cは左右端から中央の部材にかけて順次整数倍の長さを
もった鋼材が用いられており、これによって各上弦材5
a、下弦材5b及び腹弦材5cを共用しながら、左右の
幅が下弦材5bの長さの偶数倍だけ異なる相似形の屋根
トラスを組立られるように構成され、建設する建物の大
小に対応できるようになっている。
Further, as shown in FIG. 10, the roof truss 5 has an oblique upper chord member 5a connecting the respective contact points and a horizontal lower chord member 5a.
b and the vertical abdominal chord member 5c are detachably bolted and integrated (see FIGS. 12 to 16). Each upper chord member 5a and each lower chord member 5b is made of a steel material of the same length, and each abdominal chord member. Material 5
c is made of steel having a length that is an integral multiple from the right and left ends to the central member in order.
a, a lower chord member 5b and an abdominal chord member 5c are shared, and a roof truss of a similar shape whose left and right widths differ by an even multiple of the length of the lower chord member 5b can be assembled so that it corresponds to the size of a building to be constructed. You can do it.

【0014】さらにこの屋根トラス5の大小に対応し
て、この上に張設する可撓性シート6も最小寸法の本体
シートの周囲に継ぎ足しシートを順次連結紐等で連結し
て縮小拡大が自由にできるように構成されている。
Further, in accordance with the size of the roof truss 5, the flexible sheet 6 stretched on the roof truss 5 is added to the periphery of the main body sheet having the minimum size, and the sheets are sequentially connected by a connecting cord or the like to be freely reduced or enlarged. It is configured to be able to.

【0015】このようにして施工現場(建設用地以外
に、道路等に面して建築資材の吊上げ運搬スペースがあ
る場合には、そのスペースを含む)の上方をシェルター
3で覆った状態で建物1の一階層を施工する。
In this manner, the building 1 is covered with the shelter 3 above the construction site (including a space for hoisting and transporting building materials facing a road or the like other than the construction site). Construct one layer.

【0016】一階層の建物1の施工後、あるいはその施
工と併行して外足場2に横方向に所要間隔を置いて2本
の平行な連結支柱9,9を鉛直に取付け、この各支柱の
上端に吊上げ枠10の下端を連結して外足場2上に鉛直
に樹立する。
After the construction of the one-story building 1 or in parallel with the construction, two parallel connecting struts 9, 9 are vertically attached to the outer scaffold 2 with a required space in the lateral direction. The lower end of the hoisting frame 10 is connected to the upper end and is vertically established on the outer scaffold 2.

【0017】連結支柱9は図6〜図8に示すように、外
足場2における左右に隣接する支柱2’,2’にそれぞ
れ連結した振れ止め用横架材11にボルト等で固定して
安定させる。
As shown in FIGS. 6 to 8, the connecting column 9 is secured by bolts or the like to the steady rest horizontal members 11 connected to the columns 2'and 2'adjacent to the left and right of the outer scaffold 2, respectively. Let

【0018】吊上げ枠10は図4、図5に示すように、
H型鋼等の鋼材からなる平行な二本の支柱10a,10
aの上端及び下端間にそれぞれ上横架材10b及び下横
架材10cを取付け、上横架材10bにはチェーンブロ
ック12が吊り下げられている。
As shown in FIGS. 4 and 5, the lifting frame 10 is
Two parallel columns 10a, 10 made of steel material such as H-shaped steel
An upper horizontal member 10b and a lower horizontal member 10c are attached between the upper and lower ends of a, respectively, and a chain block 12 is suspended on the upper horizontal member 10b.

【0019】そして、シェルター3の支持ビーム7を吊
上げ枠10のチェーンブロック12のチェーンに連結し
て、吊上げ枠10の上端まで吊上げて一時的に保持した
状態で、先の一階層相当分の外足場2上にさらに二階層
相当分の外足場2を継ぎ足して組立て(建物1に足場2
の一部を固定する)、この外足場2上にシェルター3を
吊り降ろして支持させ、上方をシェルター3で覆った状
態で建物1の一階層上に二階層分の建築施工を行う。
Then, the support beam 7 of the shelter 3 is connected to the chain of the chain block 12 of the hoisting frame 10 and hoisted up to the upper end of the hoisting frame 10 and temporarily held, and the outer portion corresponding to the preceding one layer is removed. An outer scaffold 2 for two layers is added to the scaffold 2 to assemble (scaffold 2 on building 1
A part of is fixed), and the shelter 3 is hung and supported on the outer scaffold 2, and the building construction for two layers is performed on one layer of the building 1 with the upper part covered with the shelter 3.

【0020】その後は、吊上げ枠10を切り離して二階
層相当分の外足場2上に引き上げ、上記同様に外足場2
にさらに連結支柱9,9を下部の連結支柱9,9に継ぎ
足して鉛直に取付けた後、この連結支柱9,9の上端に
吊上げ枠10の下端を連結して外足場2上に鉛直に樹立
固定し、再びシェルター3を吊上げ枠10のチェーンブ
ロック12により吊上げて一時的に保持し、この状態で
さらに三階層相当分の外足場2を継ぎ足して組立て、こ
の外足場2上にシェルター3を吊り降ろして支持させ、
上方をシェルター3で覆った状態で建物1の二階層上に
三階層分の建築施工を行う。
After that, the hoisting frame 10 is separated and pulled up onto the outer scaffolding 2 corresponding to two layers, and the outer scaffolding 2 is used in the same manner as above.
Further, after connecting the connecting columns 9 and 9 to the lower connecting columns 9 and 9 and vertically mounting them, the lower ends of the hoisting frames 10 are connected to the upper ends of the connecting columns 9 and 9 to establish vertically on the outer scaffold 2. After fixing, the shelter 3 is hoisted again by the chain block 12 of the hoisting frame 10 and temporarily held, and in this state, the outer scaffolds 2 corresponding to three layers are added and assembled, and the shelter 3 is hoisted on the outer scaffold 2. Let it down and support it,
With the shelter 3 covering the upper part, three layers of construction work are performed on the second layer of the building 1.

【0021】以後上記同様に、吊上げ枠10を切り離し
て外足場2上に引き上げる工程と、この外足場2に下方
の連結支柱9に連続して新たな連結支柱9を取付け、そ
の上端に吊上げ枠10の下端を連結して上方に立ち上げ
る工程と、この吊上げ枠10にチェーンブロック12に
よりシェルター3を吊上げ保持させた状態で、外足場2
にさらに上階層分の外足場2を継ぎ足してこの上にシェ
ルター3を支持させる工程と、建物1の上階層分の建築
を行う工程とを繰り返して、順次外足場2を組み上げな
がらシェルター3を上方に移動させて上階層を連続的に
施工して行き、最上階の施工を完了した後にシェルター
3を解体撤去する。
Thereafter, in the same manner as above, a step of separating the lifting frame 10 and pulling it up onto the outer scaffold 2, and a new connecting column 9 is continuously attached to the lower connecting column 9 on this outer scaffold 2, and the lifting frame is attached to the upper end thereof. In the process of connecting the lower ends of 10 to the upper side and raising the shelter 3 by the chain block 12 to the hoisting frame 10, the outer scaffold 2
Then, the process of adding the outer scaffold 2 for the upper floor and supporting the shelter 3 on this is repeated, and the process for constructing the upper floor of the building 1 is repeated, and the shelter 3 is moved upward while sequentially constructing the outer scaffold 2. The upper shelves are continuously constructed by moving to the upper floor, and the shelter 3 is dismantled and removed after the construction of the uppermost floor is completed.

【0022】[0022]

【発明の効果】以上の通りこの発明によれば、吊上げ枠
の上部に設置したチェーンブロックにより屋根型のシェ
ルターを上方に吊上げるので、容易に入手できる市販の
チェーンブロックを用いて簡単な操作でシェルターを吊
上げることができ、施工管理も容易であると共に、吊上
げたシェルターはその下方に組み上げた外足場上に支持
するので、安定して安全に支持することができる。
As described above, according to the present invention, since the roof type shelter is hung up by the chain block installed on the upper part of the hoisting frame, the commercially available chain block which is easily available can be used for a simple operation. The shelter can be hoisted up, construction management is easy, and the hoisted shelter is supported on the outer scaffold assembled below it, so that it can be stably and safely supported.

【0023】また、吊上げ枠は外足場に連結支柱を介し
て支持するので、安定して設置できると共に、建物の建
設作業に障害とならずに円滑に建築施工を進行すること
ができ、また連結支柱の外足場に対する専有部分も少な
く、外足場における作業を阻害することもない。
Further, since the hoisting frame is supported on the outer scaffold via the connecting columns, the hoisting frame can be stably installed and the construction work can be smoothly proceeded without hindering the construction work of the building. There is also little occupation of the columns for the outer scaffolding, and it does not hinder the work on the outer scaffolding.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の工法による多層階建物の施工状態を
示す正面図。
FIG. 1 is a front view showing a construction state of a multi-storey building by the construction method of the present invention.

【図2】この発明の工法による多層階建物の施工状態を
示す側面図。
FIG. 2 is a side view showing a construction state of a multi-storey building by the construction method of the present invention.

【図3】この発明の工法による多層階建物の施工状態を
示す平面図。
FIG. 3 is a plan view showing a construction state of a multi-storey building by the construction method of the present invention.

【図4】この発明に用いる吊上げ枠の正面図。FIG. 4 is a front view of a lifting frame used in the present invention.

【図5】この発明に用いる吊上げ枠の縦断側面図。FIG. 5 is a vertical sectional side view of a lifting frame used in the present invention.

【図6】この発明に用いる連結支柱の取付状態を示す正
面図。
FIG. 6 is a front view showing a mounting state of a connecting column used in the present invention.

【図7】この発明に用いる連結支柱の取付状態を示す平
面図。
FIG. 7 is a plan view showing a mounting state of a connecting column used in the present invention.

【図8】この発明に用いる連結支柱の取付状態を示す側
面図。
FIG. 8 is a side view showing a mounting state of the connecting column used in the present invention.

【図9】この発明の施工工程の進行状態を示す概要図。FIG. 9 is a schematic view showing the progress of the construction process of the present invention.

【図10】この発明に用いる屋根トラスの正面図。FIG. 10 is a front view of a roof truss used in the present invention.

【図11】この発明に用いる屋根トラスの平面図。FIG. 11 is a plan view of a roof truss used in the present invention.

【図12】この発明に用いる屋根トラスの一接点部の縦
断正面図。
FIG. 12 is a vertical sectional front view of one contact portion of the roof truss used in the present invention.

【図13】この発明に用いる屋根トラスの他の接点部の
平面図。
FIG. 13 is a plan view of another contact portion of the roof truss used in the present invention.

【図14】この発明に用いる屋根トラスの他の接点部の
正面図。
FIG. 14 is a front view of another contact portion of the roof truss used in the present invention.

【図15】この発明に用いる屋根トラスの他の接点部の
正面図。
FIG. 15 is a front view of another contact portion of the roof truss used in the present invention.

【図16】この発明に用いる屋根トラスの他の接点部の
平面図。
FIG. 16 is a plan view of another contact portion of the roof truss used in the present invention.

【符号の説明】[Explanation of symbols]

1 建物 2 外足場 2’ 支柱 3 シェルター 4 ベースフレーム 5 屋根トラス 5a 上弦材 5b 下弦材 5c 腹弦材 6 可撓性シート 7 支持ビーム 8 モノレール式車輪 9 連結支柱 10 吊上げ枠 10a 支柱 10b 上横架材 10c 下横架材 11 振れ止め用横架材 12 チェーンブロック 1 Building 2 Outer Scaffolding 2'Post 3 Shelter 4 Base Frame 5 Roof Truss 5a Upper Chord 5b Lower Chord 5c Ventral 6 Flexible Sheet 7 Support Beam 8 Monorail Wheel 9 Connecting Strut 10 Lifting Frame 10a Strut 10b Over Horizontal Material 10c Lower horizontal material 11 Horizontal material for steady 12 Chain block

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成5年1月14日[Submission date] January 14, 1993

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図17[Name of item to be corrected] Fig. 17

【補正方法】追加[Correction method] Added

【補正内容】[Correction content]

【図17】 FIG. 17

【手続補正2】[Procedure Amendment 2]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図18[Name of item to be corrected] Fig. 18

【補正方法】追加[Correction method] Added

【補正内容】[Correction content]

【図18】 FIG. 18

【手続補正3】[Procedure 3]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図19[Name of item to be corrected] Fig. 19

【補正方法】追加[Correction method] Added

【補正内容】[Correction content]

【図19】 FIG. 19

【手続補正4】[Procedure amendment 4]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】全文[Correction target item name] Full text

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【書類名】 明細書[Document name] Statement

【発明の名称】 多層階建築物用全天候シェルターの
仮設方法
[Title of Invention] Temporary construction method of all-weather shelter for multi-storey building

【特許請求の範囲】[Claims]

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、多層階建築物の建築
中において建築物上を覆って天候の良否に拘らず施工を
可能とした多層階建築物用全天候シェルターの仮設方法
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary installation method for an all-weather shelter for a multi-storey building, which can be constructed during the construction of a multi-storey building regardless of weather conditions. .

【0002】[0002]

【従来の技術】一般に、多層階建築物の建築施工途中に
おいては雨や雪などに対して現場の上方に遮幣物がない
ため、雨天等、天候不順な日には施工を中断せざるを得
ない場合が少なくなかった。
2. Description of the Related Art Generally, in the middle of construction of a multi-storey building, there is no barrier above the site against rain and snow, so the construction must be interrupted on rainy days or in bad weather. There were many cases where I could not get it.

【0003】そのため最近、多層階建築物の建築中にそ
の途中の建築物上にテント型の伸縮式シェルターを仮設
し、順次下層階から上層階に施工を移行する度にこの伸
縮式シェルターもその上方に移動仮設して、天候に拘ら
ず施工を継続することを可能とした工法が開発されつつ
ある。
Therefore, recently, a tent type telescopic shelter is temporarily installed on a building in the middle of a multi-story building, and this telescopic shelter is also installed every time the construction is sequentially transferred from the lower floor to the upper floor. A construction method is being developed that enables temporary construction by moving upward and continuing construction regardless of the weather.

【0004】[0004]

【発明が解決しようとする課題】現在開発中のシェルタ
ーは、建設途中の建物上に各階層毎に複数本の柱を建て
て、各柱にチャック移動式ジャッキを取付け、このジャ
ッキに支持したシェルターを尺とり虫状に上昇移動させ
る方式を採用するため、高価な特殊ジャッキを必要とす
る上に、シェルターの上昇工程中に各ジャッキの1スト
ローク毎にチャッキング位置を上下に交互に切り換える
操作を要し、その作業管理が容易でなく、しかもシェル
ターはその下方の建築施工中にジャッキで柱に継続的に
支持させるため、安全性や安定性に不安があるなどの課
題がある。
A shelter currently under development is a shelter in which a plurality of pillars are built for each floor on a building under construction, a chuck movable jack is attached to each pillar, and the pillar is supported by the jack. Since it uses a system that moves up and down like a bug, it requires an expensive special jack, and the chucking position is switched up and down alternately for each stroke of each jack during the raising process of the shelter. In addition, the work management is not easy, and there is a problem in that the shelter is continuously supported on the pillar by a jack during the construction work therebelow, so that there is concern about safety and stability.

【0005】また、ジャッキを取付ける柱は建設途中の
建物内に設置するため、この柱が建物施工の障害になり
かねず、しかもこの柱は下層階からその天井スラブを貫
通して連続して設置されているため、柱を撤去した後に
これが貫通したスラブ部分の後処理施工を要し、施工が
煩雑となるなどの課題もある。
Further, since the pillar to which the jack is attached is installed in the building under construction, this pillar may be an obstacle to the construction of the building. Moreover, the pillar is continuously installed from the lower floor through the ceiling slab. Therefore, after the pillar is removed, post-processing work for the slab portion that penetrates the post is required, and there is a problem that the work becomes complicated.

【0006】[0006]

【課題を解決するための手段】この発明は前記従来の課
題を解決するために、多層階建築物の建設用地の周囲に
沿って建物1の一階層分の高さよりも上端高さが多少高
い外足場2を組立て、この外足場2上に建設用地の上方
を覆う屋根型のシェルター3を組立てて支持し、このシ
ェルター3により上方を覆われた状態で建物1の一階層
を施工し、外足場2に横方向に所要間隔をおいて連結支
柱9,9を鉛直に取付けてその上端に吊上げ枠10の下
端を連結して立ち上げ、この吊上げ枠10の上部に設置
したチェーンブロック12によりシェルター3を吊上げ
保持した状態で、外足場2にさらに二階層分の外足場2
を継ぎ足してこの上にシェルター3を支持させ、この状
態で建物1の二階層分の施工を行い、その後は吊上げ枠
10を切り離して外足場2上に引き上げる工程と、この
外足場2に下方の連結支柱9に連続して新たな連結支柱
9を取付け、その上端に吊上げ枠10の下端を連結して
上方に立ち上げる工程と、この吊上げ枠10にチェーン
ブロック12によりシェルター3を吊上げ保持させた状
態で、外足場2にさらに上階層分の外足場2を継ぎ足し
てこの上にシェルター3を支持させる工程と、建物1の
上階層分の建築を行う工程とを繰り返すようにした多層
階建築物用全天候シェルターの仮設方法を提案するもの
である。
According to the present invention, in order to solve the above-mentioned conventional problems, the height of the upper end is slightly higher than the height of one floor of the building 1 along the periphery of the construction site of the multi-storey building. The outer scaffold 2 is assembled, the roof-type shelter 3 covering the upper part of the construction site is assembled and supported on the outer scaffold 2, and one layer of the building 1 is constructed in a state where the shelter 3 covers the upper part, Connection columns 9, 9 are vertically installed on the scaffold 2 at required intervals in the horizontal direction, the lower end of the hoisting frame 10 is connected to the upper end of the scaffolding 9 and is started up, and a shelter is provided by a chain block 12 installed on the upper part of the hoisting frame 10. The outer scaffold 2 for two layers is further added to the outer scaffold 2 in a state where 3 is hoisted and held.
To support the shelter 3 on top of this, and in this state the construction of the two layers of the building 1 is performed, after that the process of separating the lifting frame 10 and pulling it up onto the outer scaffold 2 and the lower part of this outer scaffold 2 A new connecting column 9 is continuously attached to the connecting column 9, a process of connecting the lower end of the hoisting frame 10 to the upper end of the connecting column 9 and raising it upwards, and the shelter 3 is hoisted and held by the chain block 12 on the hoisting frame 10. In this state, the multi-story building is configured such that the step of adding the outer scaffold 2 for the upper floor to the outer scaffold 2 to support the shelter 3 thereon and the step of constructing the upper floor of the building 1 are repeated. It proposes a temporary construction method for an all-weather shelter.

【0007】[0007]

【作用】吊上げ枠10の上部に設置したチェーンブロッ
ク12により屋根型のシェルター3を上方に吊上げるた
め、容易に入手できる市販のチェーンブロック12を用
いて簡単な操作でシェルター3を吊上げることができる
と共に、吊上げたシェルター3はその下方に組み上げた
外足場2上に支持するので、安定して安全に支持するこ
とができる。
The roof-type shelter 3 is lifted up by the chain block 12 installed on the upper part of the hoisting frame 10. Therefore, the shelter 3 can be hoisted by a simple operation using the commercially available chain block 12. At the same time, since the suspended shelter 3 is supported on the outer scaffolding 2 assembled below it, it can be stably and safely supported.

【0008】吊上げ枠10は外足場2に連結支柱9を介
して支持するため、建物1の建設作業に障害とならず、
円滑に建築施工を進行することができると共に、連結支
柱9の外足場2に対する専有部分も少なく、この外足場
2において行う作業を阻害しない。
Since the hoisting frame 10 is supported on the outer scaffold 2 via the connecting columns 9, it does not hinder the construction work of the building 1.
The construction can be smoothly progressed, and the portion of the connecting pillar 9 that is occupied by the outer scaffold 2 is small, so that the work performed on the outer scaffold 2 is not hindered.

【0009】[0009]

【実施例】RC又はSRC等の多層階建築物の建設用地
の周囲に沿って、建設すべき建物1の一階層分の高さ
(例えば、4m)よりも上端(足場の上端又はその上に
設置した支持部材を含む)の高さが多少高い(例えば、
6m)外足場2を組立て、この外足場2の上端部上に屋
根型のシェルター3を組立てて支持する。
[Example] Along the circumference of a construction site of a multi-storey building such as RC or SRC, the upper end (the upper end of the scaffold or above it) of a height of one floor of the building 1 to be constructed (for example, 4 m) The height of the installed support members is a little high (for example,
6m) The outer scaffold 2 is assembled, and the roof-type shelter 3 is assembled and supported on the upper end of the outer scaffold 2.

【0010】シェルター3は、型鋼からなる方形枠状の
ベースフレーム4の上に函型の屋根トラス5を所要間隔
で所要数配列し、それらの上面にテントシートなどの可
撓性シート6を一連に張付けたもので、ベースフレーム
4の周囲にはその両側間に渡した型鋼からなる支持ビー
ム7の端部が突設されている。
The shelter 3 comprises a box-shaped roof truss 5 arranged on a square frame-shaped base frame 4 made of shaped steel at a required interval and a flexible sheet 6 such as a tent sheet arranged on the upper surface thereof. An end portion of a supporting beam 7 made of shaped steel, which is provided between both sides of the base frame 4, is projectingly provided around the base frame 4.

【0011】外足場2上にシェルター3を組上げる際に
は、先ず左右の外足場2上に型鋼等の支持ビーム7を架
渡し、その上にベースフレーム4を組立て、さらにこの
上に地上で組立てた屋根トラス5を順次吊り上げて配置
する。
When assembling the shelter 3 on the outer scaffold 2, first, the supporting beams 7 such as shaped steel are bridged on the left and right outer scaffolds 2, the base frame 4 is assembled thereon, and further on the ground. The assembled roof truss 5 is sequentially lifted and placed.

【0012】屋根トラス5は、その全てをベースフレー
ム4に固定した常時閉鎖型に構成してもよいが、図2に
示すように望ましくは端部あるいは中間の一部の屋根ト
ラス5を固定し、かつこの固定屋根トラス5に順次隣接
して一連に配した複数の屋根トラス5の下面にモノレー
ル式車輪8を取付けてベースフレーム4上を安定して走
行移動するように構成し、これらの移動屋根トラス5郡
と固定屋根トラス5と間に一連に可撓性シート6を張設
し、これらの移動屋根トラス5を一端の固定屋根トラス
5方向に可撓性シート6を折り畳みながら移動させるこ
とにより、シェルター3の一部を開放し、またこの状態
から逆に移動屋根トラス5を移動させることにより可撓
性シート6で全面閉鎖するように伸縮開閉式構造とす
る。
The roof truss 5 may be of a normally closed type in which all of the roof truss 5 is fixed to the base frame 4. However, as shown in FIG. Further, the monorail type wheels 8 are attached to the lower surfaces of a plurality of roof trusses 5 arranged in series adjacent to the fixed roof truss 5 in order to stably move and move on the base frame 4, and these movements are performed. Flexible sheets 6 are stretched in series between the roof trusses 5 and the fixed roof trusses 5, and the movable roof trusses 5 are moved while folding the flexible sheet 6 toward the fixed roof truss 5 at one end. Thus, a part of the shelter 3 is opened, and the movable roof truss 5 is moved from this state in reverse, so that the flexible sheet 6 closes the entire surface to provide an expandable and retractable structure.

【0013】また、屋根トラス5は図10に示すよう
に、各接点間を結ぶ斜めの上弦材5a、水平な下弦材5
b及び鉛直な腹弦材5cを着脱自在にボルト接合して一
体化したもので(図12〜16参照)、各上弦材5aと
各下弦材5bはそれぞれ同長の鋼材が、また各腹弦材5
cは左右端から中央の部材にかけて順次整数倍の長さを
もった鋼材が用いられており、これによって各上弦材5
a、下弦材5b及び腹弦材5cを共用しながら、左右の
幅が下弦材5bの長さの偶数倍だけ異なる相似形の屋根
トラスを組立られるように構成され、建設する建物の大
小に対応できるようになっている。
Further, as shown in FIG. 10, the roof truss 5 has an oblique upper chord member 5a connecting the respective contact points and a horizontal lower chord member 5a.
b and the vertical abdominal chord member 5c are detachably bolted and integrated (see FIGS. 12 to 16). Each upper chord member 5a and each lower chord member 5b is made of a steel material of the same length, and each abdominal chord member. Material 5
c is made of steel having a length that is an integral multiple from the right and left ends to the central member in order.
a, a lower chord member 5b and an abdominal chord member 5c are shared, and a roof truss of a similar shape whose left and right widths differ by an even multiple of the length of the lower chord member 5b can be assembled so that it corresponds to the size of a building to be constructed. You can do it.

【0014】さらにこの屋根トラス5の大小に対応し
て、この上に張設する可撓性シート6も最小寸法の本体
シートの周囲に継ぎ足しシートを順次連結紐等で連結し
て縮小拡大が自由にできるように構成されている。
Further, in accordance with the size of the roof truss 5, the flexible sheet 6 stretched on the roof truss 5 is added to the periphery of the main body sheet having the minimum size, and the sheets are sequentially connected by a connecting cord or the like to be freely reduced or enlarged. It is configured to be able to.

【0015】このようにして施工現場(建設用地以外
に、道路等に面して建築資材の吊上げ運搬スペースがあ
る場合には、そのスペースを含む)の上方をシェルター
3で覆った状態で建物1の一階層を施工する。
In this manner, the building 1 is covered with the shelter 3 above the construction site (including a space for hoisting and transporting building materials facing a road or the like other than the construction site). Construct one layer.

【0016】一階層の建物1の施工後、あるいはその施
工と併行して外足場2に横方向に所要間隔を置いて2本
の平行な連結支柱9,9を鉛直に取付け、この各支柱の
上端に吊上げ枠10の下端を連結して外足場2上に鉛直
に樹立する。
After the construction of the one-story building 1 or in parallel with the construction, two parallel connecting struts 9, 9 are vertically attached to the outer scaffold 2 with a required space in the lateral direction. The lower end of the hoisting frame 10 is connected to the upper end and is vertically established on the outer scaffold 2.

【0017】連結支柱9は図6〜図8に示すように、外
足場2における左右に隣接する支柱2’,2’にそれぞ
れ連結した振れ止め用横架材11にボルト等で固定して
安定させる。
As shown in FIGS. 6 to 8, the connecting column 9 is secured by bolts or the like to the steady rest horizontal members 11 connected to the columns 2'and 2'adjacent to the left and right of the outer scaffold 2, respectively. Let

【0018】吊上げ枠10は図4、図5に示すように、
H型鋼等の鋼材からなる平行な二本の支柱10a,10
aの上端及び下端間にそれぞれ上横架材10b及び下横
架材10cを取付け、上横架材10bにはチェーンブロ
ック12が吊り下げられている。
As shown in FIGS. 4 and 5, the lifting frame 10 is
Two parallel columns 10a, 10 made of steel material such as H-shaped steel
An upper horizontal member 10b and a lower horizontal member 10c are attached between the upper and lower ends of a, respectively, and a chain block 12 is suspended on the upper horizontal member 10b.

【0019】そして、シェルター3の支持ビーム7を吊
上げ枠10のチェーンブロック12のチェーンに連結し
て、吊上げ枠10の上端まで吊上げて一時的に保持した
状態で、先の一階層相当分の外足場2上にさらに二階層
相当分の外足場2を継ぎ足して組立て(建物1に足場2
の一部を固定する)、この外足場2上にシェルター3を
吊り降ろして支持させ、上方をシェルター3で覆った状
態で建物1の一階層上に二階層分の建築施工を行う。
Then, the support beam 7 of the shelter 3 is connected to the chain of the chain block 12 of the hoisting frame 10 and hoisted up to the upper end of the hoisting frame 10 and temporarily held, and the outer portion corresponding to the preceding one layer is removed. An outer scaffold 2 for two layers is added to the scaffold 2 to assemble (scaffold 2 on building 1
A part of is fixed), and the shelter 3 is hung and supported on the outer scaffold 2, and the building construction for two layers is performed on one layer of the building 1 with the upper part covered with the shelter 3.

【0020】その後は、吊上げ枠10を切り離して二階
層相当分の外足場2上に引き上げ、上記同様に外足場2
にさらに連結支柱9,9を下部の連結支柱9,9に継ぎ
足して鉛直に取付けた後、この連結支柱9,9の上端に
吊上げ枠10の下端を連結して外足場2上に鉛直に樹立
固定し、再びシェルター3を吊上げ枠10のチェーンブ
ロック12により吊上げて一時的に保持し、この状態で
さらに三階層相当分の外足場2を継ぎ足して組立て、こ
の外足場2上にシェルター3を吊り降ろして支持させ、
上方をシェルター3で覆った状態で建物1の二階層上に
三階層分の建築施工を行う。
After that, the hoisting frame 10 is separated and pulled up onto the outer scaffolding 2 corresponding to two layers, and the outer scaffolding 2 is used in the same manner as above.
Further, after connecting the connecting columns 9 and 9 to the lower connecting columns 9 and 9 and vertically mounting them, the lower ends of the hoisting frames 10 are connected to the upper ends of the connecting columns 9 and 9 to establish vertically on the outer scaffold 2. After fixing, the shelter 3 is hoisted again by the chain block 12 of the hoisting frame 10 and temporarily held, and in this state, the outer scaffolds 2 corresponding to three layers are added and assembled, and the shelter 3 is hoisted on the outer scaffold 2. Let it down and support it,
With the shelter 3 covering the upper part, three layers of construction work are performed on the second layer of the building 1.

【0021】以後上記同様に、吊上げ枠10を切り離し
て外足場2上に引き上げる工程と、この外足場2に下方
の連結支柱9に連続して新たな連結支柱9を取付け、そ
の上端に吊上げ枠10の下端を連結して上方に立ち上げ
る工程と、この吊上げ枠10にチェーンブロック12に
よりシェルター3を吊上げ保持させた状態で、外足場2
にさらに上階層分の外足場2を継ぎ足してこの上にシェ
ルター3を支持させる工程と、建物1の上階層分の建築
を行う工程とを繰り返して、順次外足場2を組み上げな
がらシェルター3を上方に移動させて上階層を連続的に
施工して行き、最上階の施工を完了した後にシェルター
3を解体撤去する。
Thereafter, in the same manner as above, a step of separating the lifting frame 10 and pulling it up onto the outer scaffold 2, and a new connecting column 9 is continuously attached to the lower connecting column 9 on this outer scaffold 2, and the lifting frame is attached to the upper end thereof. In the process of connecting the lower ends of 10 to the upper side and raising the shelter 3 by the chain block 12 to the hoisting frame 10, the outer scaffold 2
Then, the process of adding the outer scaffold 2 for the upper floor and supporting the shelter 3 on this is repeated, and the process for constructing the upper floor of the building 1 is repeated, and the shelter 3 is moved upward while sequentially constructing the outer scaffold 2. The upper shelves are continuously constructed by moving to the upper floor, and the shelter 3 is dismantled and removed after the construction of the uppermost floor is completed.

【0022】なお、上記実施例における吊上げ枠10
は、支柱10a,10aの上端及び下端間にそれぞれ上
横架材10b及び下横架材10cを取付けた状態のまま
上方に引き上げて、連結支柱9に連結するという使い方
をしたが、このような使い方以外に支柱10aとして連
結支柱9を利用し、外足場2の上方に吊上げ枠10を立
ち上げる際には図18及び図19に示すように、支柱1
0aに代わる新たな連結支柱9を上横架材10b及び下
横架材10cと共に上方に吊り上げ、この連結支柱9の
上下端に上横架材10b及び下横架材10cをボルト・
ナットで着脱自在に取付けた上で、下方の連結支柱9に
連結一体化するようにしてもよい。
The hoisting frame 10 in the above embodiment is used.
Has been used to pull up the upper horizontal member 10b and the lower horizontal member 10c between the upper and lower ends of the columns 10a and 10a, respectively, and connect them to the connecting column 9. In addition to the usage, the connecting column 9 is used as the column 10a, and when the hoisting frame 10 is raised above the outer scaffold 2, as shown in FIGS.
The new connecting column 9 in place of 0a is lifted upward together with the upper horizontal member 10b and the lower horizontal member 10c, and the upper horizontal member 10b and the lower horizontal member 10c are bolted to the upper and lower ends of the connecting column 9.
You may make it attachable and detachable with a nut, and may be connected and integrated with the lower connection support pillar 9.

【0023】このように支柱10aとして連結支柱9を
利用する場合には図17に示すように、建物1の最初の
1階層の施工の際に用いる最下端の連結支柱9だけは建
物1の1階層の高さよりも長い(例えば、1階層の高さ
が4mであれば6m)鋼材を用い、その後は短い(例え
ば、4m)鋼材を用いて順次上階層に新たに吊上げ枠1
0を立ち上げようとする度に上方に吊り上げると共に、
下層階で使った上横架材10b及び下横架材10cを解
体して上方に吊り上げて繰り返し使用する。
When the connecting pillars 9 are used as the pillars 10a in this way, as shown in FIG. 17, only the lowermost connecting pillar 9 used in the construction of the first layer of the building 1 is the building 1 A steel material that is longer than the height of the floor (for example, 6 m if the height of one floor is 4 m) is used, and then a steel material that is shorter (for example, 4 m) is used, and the lifting frame 1 is newly added to the upper floor.
Every time I try to launch 0, I will lift it up,
The upper horizontal member 10b and the lower horizontal member 10c used on the lower floor are disassembled and lifted upward to be used repeatedly.

【0024】[0024]

【発明の効果】以上の通りこの発明によれば、吊上げ枠
の上部に設置したチェーンブロックにより屋根型のシェ
ルターを上方に吊上げるので、容易に入手できる市販の
チェーンブロックを用いて簡単な操作でシェルターを吊
上げることができ、施工管理も容易であると共に、吊上
げたシェルターはその下方に組み上げた外足場上に支持
するので、安定して安全に支持することができる。
As described above, according to the present invention, since the roof type shelter is hung up by the chain block installed on the upper part of the hoisting frame, the commercially available chain block which is easily available can be used for a simple operation. The shelter can be hoisted up, construction management is easy, and the hoisted shelter is supported on the outer scaffold assembled below it, so that it can be stably and safely supported.

【0025】また、吊上げ枠は外足場に連結支柱を介し
て支持するので、安定して設置できると共に、建物の建
設作業に障害とならずに円滑に建築施工を進行すること
ができ、また連結支柱の外足場に対する専有部分も少な
く、外足場における作業を阻害することもない。
Further, since the hoisting frame is supported on the outer scaffold via the connecting columns, the hoisting frame can be stably installed and the construction work can be smoothly proceeded without hindering the construction work of the building. There is also little occupation of the columns for the outer scaffolding, and it does not hinder the work on the outer scaffolding.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の工法による多層階建物の施工状態を
示す正面図。
FIG. 1 is a front view showing a construction state of a multi-storey building by the construction method of the present invention.

【図2】この発明の工法による多層階建物の施工状態を
示す側面図。
FIG. 2 is a side view showing a construction state of a multi-storey building by the construction method of the present invention.

【図3】この発明の工法による多層階建物の施工状態を
示す平面図。
FIG. 3 is a plan view showing a construction state of a multi-storey building by the construction method of the present invention.

【図4】この発明に用いる吊上げ枠の正面図。FIG. 4 is a front view of a lifting frame used in the present invention.

【図5】この発明に用いる吊上げ枠の縦断側面図。FIG. 5 is a vertical sectional side view of a lifting frame used in the present invention.

【図6】この発明に用いる連結支柱の取付状態を示す正
面図。
FIG. 6 is a front view showing a mounting state of a connecting column used in the present invention.

【図7】この発明に用いる連結支柱の取付状態を示す平
面図。
FIG. 7 is a plan view showing a mounting state of a connecting column used in the present invention.

【図8】この発明に用いる連結支柱の取付状態を示す側
面図。
FIG. 8 is a side view showing a mounting state of the connecting column used in the present invention.

【図9】この発明の施工工程の進行状態を示す概要図。FIG. 9 is a schematic view showing the progress of the construction process of the present invention.

【図10】この発明に用いる屋根トラスの正面図。FIG. 10 is a front view of a roof truss used in the present invention.

【図11】この発明に用いる屋根トラスの平面図。FIG. 11 is a plan view of a roof truss used in the present invention.

【図12】この発明に用いる屋根トラスの一接点部の縦
断正面図。
FIG. 12 is a vertical sectional front view of one contact portion of the roof truss used in the present invention.

【図13】この発明に用いる屋根トラスの他の接点部の
平面図。
FIG. 13 is a plan view of another contact portion of the roof truss used in the present invention.

【図14】この発明に用いる屋根トラスの他の接点部の
正面図。
FIG. 14 is a front view of another contact portion of the roof truss used in the present invention.

【図15】この発明に用いる屋根トラスの他の接点部の
正面図。
FIG. 15 is a front view of another contact portion of the roof truss used in the present invention.

【図16】この発明に用いる屋根トラスの他の接点部の
平面図。
FIG. 16 is a plan view of another contact portion of the roof truss used in the present invention.

【図17】この発明の他の態様の施工工程の進行状態を
示す概要図。
FIG. 17 is a schematic view showing a progress state of a construction process of another aspect of the present invention.

【図18】この発明に用いる他の態様の吊上げ枠の正面
図。
FIG. 18 is a front view of a lifting frame of another embodiment used in the present invention.

【図19】この発明に用いる他の態様の吊上げ枠の縦断
側面図。
FIG. 19 is a vertical cross-sectional side view of a lifting frame of another aspect used in the present invention.

【符号の説明】 1 建物 2 外足場 2’ 支柱 3 シェルター 4 ベースフレーム 5 屋根トラス 5a 上弦材 5b 下弦材 5c 腹弦材 6 可撓性シート 7 支持ビーム 8 モノレール式車輪 9 連結支柱 10 吊上げ枠 10a 支柱 10b 上横架材 10c 下横架材 11 振れ止め用横架材 12 チェーンブロック[Explanation of Codes] 1 Building 2 Outer Scaffold 2'Post 3 Shelter 4 Base Frame 5 Roof Truss 5a Upper Chord 5b Lower Chord 5c Ventral Chord 6 Flexible Sheet 7 Support Beam 8 Monorail Wheel 9 Connecting Strut 10 Lifting Frame 10a Column 10b Upper horizontal member 10c Lower horizontal member 11 Horizontal steadying material 12 Chain block

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 多層階建築物の建設用地の周囲に沿って
建物の一階層分の高さよりも上端高さが多少高い外足場
を組立て、この外足場上に建設用地の上方を覆う屋根型
のシェルターを組立てて支持し、このシェルターにより
上方を覆われた状態で建物の一階層を施工し、前記外足
場に横方向に所要間隔をおいて連結支柱を鉛直に取付け
てその上端に吊上げ枠の下端を連結して立ち上げ、この
吊上げ枠の上部に設置したチェーンブロックにより前記
シェルターを吊上げ保持した状態で、前記外足場にさら
に二階層分の外足場を継ぎ足してこの上に前記シェルタ
ーを支持させ、この状態で建物の二階層分の施工を行
い、その後は前記吊上げ枠を切り離して外足場上に引き
上げる工程と、この外足場に前記下方の連結支柱に連続
して新たな連結支柱を取付け、その上端に前記吊上げ枠
の支柱の下端を連結して上方に立ち上げる工程と、この
吊上げ枠に前記チェーンブロックにより前記シェルター
を吊上げ保持させた状態で、前記外足場にさらに上階層
分の外足場を継ぎ足してこの上にシェルターを支持させ
る工程と、建物の上階層分の建築を行う工程とを繰り返
すことを特徴とする多層階建築物用全天候シェルターの
仮設方法。
1. A roof type that assembles an outer scaffold along the circumference of a construction site of a multi-storey building, the height of which is slightly higher than the height of one floor of the building, and covers the construction site above the outer scaffold. Assemble and support the shelter, and construct one level of the building with the upper part covered by this shelter, vertically attach the connecting columns to the outer scaffold at a required interval in the lateral direction, and lift the frame at the upper end. With the chain block installed on the upper part of the hoisting frame, the shelter is hoisted and held, and the outer scaffolding is further extended by two layers of outer scaffolding to support the shelter on it. Then, in this state, the construction for two layers of the building is performed, after that the process of separating the lifting frame and pulling it up on the outer scaffold, and a new connecting strut continuous to the lower connecting strut on this outer scaffold Attaching, connecting the lower end of the pillar of the hoisting frame to the upper end of the hoisting frame, and raising it up, and in a state where the shelter is hoisted and held by the chain block on the hoisting frame, the upper scaffolding for the upper layer A temporary installation method for an all-weather shelter for a multi-storey building, characterized by repeating a process of adding an outer scaffold to support a shelter on the outer scaffold and a process of constructing an upper floor of a building.
JP21203092A 1992-07-15 1992-07-15 Temporary construction of all-weather shelter for multi-storey buildings Expired - Lifetime JPH0730631B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21203092A JPH0730631B2 (en) 1992-07-15 1992-07-15 Temporary construction of all-weather shelter for multi-storey buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21203092A JPH0730631B2 (en) 1992-07-15 1992-07-15 Temporary construction of all-weather shelter for multi-storey buildings

Publications (2)

Publication Number Publication Date
JPH0633612A true JPH0633612A (en) 1994-02-08
JPH0730631B2 JPH0730631B2 (en) 1995-04-10

Family

ID=16615710

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21203092A Expired - Lifetime JPH0730631B2 (en) 1992-07-15 1992-07-15 Temporary construction of all-weather shelter for multi-storey buildings

Country Status (1)

Country Link
JP (1) JPH0730631B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7597290B2 (en) 2005-03-30 2009-10-06 Fujitsu Ten Limited Tilting apparatus and electronic apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7597290B2 (en) 2005-03-30 2009-10-06 Fujitsu Ten Limited Tilting apparatus and electronic apparatus

Also Published As

Publication number Publication date
JPH0730631B2 (en) 1995-04-10

Similar Documents

Publication Publication Date Title
EP0480683B1 (en) Erection workbench and construction process
JPH0571225A (en) Temporarily set roof of complete weather type
JPH0633612A (en) Temporary setting of all-weather shelter for multi-storied building
JP3061560B2 (en) Tent warehouse and its construction method
JP2618171B2 (en) Telescopic strut
JPH05133016A (en) Peripheral supporting self-rising type building engineering method
JP3069835B2 (en) Uchigumi scaffold structure
JP2836369B2 (en) Roof structure of temporary beam assembly device for building construction
JP2903859B2 (en) Reinforcement structure of column in temporary beam system for building construction
JP3200788B2 (en) Installation structure of the frame of the external curing coating
JP3328790B2 (en) High-rise building assembly method
JP2945326B2 (en) Gas tank dismantling method
JPH1162244A (en) Skeleton construction frame, and method using the same
JP2671967B2 (en) High-rise building construction method and construction beam assembly equipment
JP2876991B2 (en) Steel frame method for high-rise buildings
JPH0540492U (en) Automatic lifting work platform
JPH0539637A (en) Construction method for domed roof and heavy hoist therefor
JPH08312143A (en) Temporary frame device for construction
JPH09302936A (en) Construction method of building
JP2835880B2 (en) High-rise building frame construction method
JP2802568B2 (en) Construction method
JPH0781323B2 (en) Building construction method
JPH04231530A (en) Method for constructing main frames of high-rise building
JPH04146372A (en) Constructing method for frame
JPH08312149A (en) Temporary frame device for construction