JPH06264684A - Slurry pipe extending device - Google Patents

Slurry pipe extending device

Info

Publication number
JPH06264684A
JPH06264684A JP7775693A JP7775693A JPH06264684A JP H06264684 A JPH06264684 A JP H06264684A JP 7775693 A JP7775693 A JP 7775693A JP 7775693 A JP7775693 A JP 7775693A JP H06264684 A JPH06264684 A JP H06264684A
Authority
JP
Japan
Prior art keywords
pipe
mud
sheath
muddy water
plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7775693A
Other languages
Japanese (ja)
Other versions
JP3199513B2 (en
Inventor
Kunimoto Kawamura
邦基 河村
Kazuhiko Matsuzaki
和彦 松崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP7775693A priority Critical patent/JP3199513B2/en
Publication of JPH06264684A publication Critical patent/JPH06264684A/en
Application granted granted Critical
Publication of JP3199513B2 publication Critical patent/JP3199513B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To extend a slurry pipe for use in a slurry shield construction method without requiring manpower, in a manner permitting continuous adjustment of slurry pressure. CONSTITUTION:Between stator flanges 15, 16 wherein a connection cylinder 35 able to receive a slurry feed pipe 7A is provided on one side and a movable pipe 12 being a discharge part is provided on the other side, there is provided a rotary body 14 having a plurality of sheath pipes 17 each of which can accommodate a single pipe 9 being a slurry pipe, so that by rotating the body 14, a single pipe 9 is connected to the slurry feed pipe 7A. While the interior 17s of a specified sheath pipe 17 is being isolated by a plug 29 and open/close cylinder 32, slurry 20 of the interior 17s of the pipe 17 is once withdrawn by means of a slurry recovery mechanism 28 and a cap plug 31 is removed and a new single pipe 9' is inserted into the interior 17s and thereafter the slurry 20 is returned into the pipe 9'.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、泥水シールド工法によ
りトンネルを掘削構築する際に、シールド装置に接続し
て用いるに好適な泥水管延長装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a muddy water pipe extension device suitable for use by connecting to a shield device when excavating and constructing a tunnel by a muddy water shield method.

【0002】[0002]

【従来の技術】従来、泥水シールド工法によるシールド
工事においては、シールド掘進に伴い、切羽保持や掘削
土砂の搬出の為に泥水を送泥、排泥する泥水管を遅滞な
く順次延長しなければならない。そこで、こうした送泥
管、排泥管等の泥水管を延長する作業を送排泥を停止す
ることなく行う為に、例えば特開昭 63-293298に示すよ
うに、敷設済の管の先端を延長装置に接続しておき、切
羽が1管長さ分だけ進行したところで、該敷設済の管が
接続された延長装置内に延長用の管を装填してこれを継
ぎ足すようにした、管延長装置が既に提案されている。
こういった管延長装置においては、該管延長装置内部に
おいて敷設済の泥水管の開口端が配置する泥水流通領域
と、新たに継ぎ足される泥水管が装填収容される形の装
填領域を圧力的に離隔した状態にしておき、まず、新規
の泥水管を前記装填領域に装填してから、該装填された
泥水管を前記泥水流通領域に移動させる形で管延長作業
が行われている。
2. Description of the Related Art Conventionally, in the shield construction by the mud shield method, along with the shield excavation, the mud pipe for discharging the mud and for discharging the mud must be sequentially extended without delay in order to hold the face and carry out the excavated soil. . Therefore, in order to perform the work of extending the mud pipe such as the mud pipe and the mud pipe without stopping the mud pipe, for example, as shown in JP-A-63-293298, the tip of the installed pipe is The extension pipe is connected to the extension device, and when the face has advanced by one pipe length, the extension pipe is loaded into the extension device to which the installed pipe is connected, and the extension pipe is added. The device has already been proposed.
In such a pipe extension device, a mud flow region in which the open end of the installed mud pipe is placed inside the pipe extension device and a loading region in which a newly added mud pipe is loaded and accommodated are pressure-controlled. A pipe extension operation is performed in such a manner that a new muddy water pipe is first loaded in the loading region and then the loaded muddy water pipe is moved to the muddy water flow region.

【0003】[0003]

【発明が解決しようとする課題】ところが、こういった
管延長装置では、泥水管延長作業を行っている間、即ち
泥水流通領域に移動した形の新たに継ぎ足される泥水管
に圧力泥水が満たされる迄の間には、泥水圧の調整は全
く出来ないが、この間、シールド装置におけるカッタビ
ット側では、当該泥水管延長作業中においても切羽掘削
作業を続けているために、突然切羽の変動により逸泥等
が生じることも起こり得る。すると、このような切羽の
変動に応じて送排泥水の供給加圧が早急に必要とされる
場合に、従来の管延長装置では新規な泥水管に圧力泥水
が満たされるのを待つ分だけ対応が遅れて、これによっ
て、逸泥等の切羽崩壊を若干なりとも促進させる結果に
なることを否めない。しかし、新たに継ぎ足される泥水
管が収容される前記装填領域を、前記泥水流通領域に連
通させる形にしてここに圧力泥水を満たしてしまうと、
該装填領域には管延長装置の外部から新規な泥水管を順
次補給装填しなければならない為に、当該新規な泥水管
の補給装填度に泥水がここから坑道中に溢れ出て、その
分だけ泥水が無駄になり、また当該溢れ出た泥水の処理
に手間を要する、という不都合が生じてくる。そこで本
発明は、上記事情に鑑み、泥水シールド工法に用いる為
の送泥管、排泥管等の泥水管を延長する際に、泥水管補
給装填時における圧力泥水の処理が簡単であると共に、
敷設済み泥水管に継ぎ足される新規な泥水管に圧力泥水
が満たされるのを待つことなく継続して泥水圧を任意の
値に調整することが出来るようにした、泥水管延長装置
を提供することを目的とする。
However, in such a pipe extension device, the pressure muddy water is filled in the newly added muddy water pipe that has been moved to the muddy water distribution region during the muddy water pipe extension work. During this period, the mud pressure cannot be adjusted at all, but during this time, the cutter bit side of the shield device continues to excavate the face even during the mud pipe extension work, so it suddenly loses due to a change in the face. It is possible that mud or the like will be generated. Then, when the supply and pressurization of the sent and discharged mud water is urgently required in response to such a change in the face, the conventional pipe extension device can handle the new mud pipe by waiting until the pressure mud is filled. It is undeniable that this will result in a slight delay in facilitating the collapse of the face such as lost mud. However, if the charging area in which the mud pipe to be newly added is accommodated is made to communicate with the mud circulation area and the pressure mud is filled therein,
Since a new mud pipe must be sequentially replenished and loaded into the loading area from the outside of the pipe extension device, the mud overflows from here to the level of the replenishment loading of the new mud pipe, and only that much. There is an inconvenience that the muddy water is wasted and that it takes time to process the overflowing muddy water. Therefore, in view of the above circumstances, the present invention, in extending the mud pipe such as the mud pipe for use in the mud shield construction method, the mud pipe, the treatment of the pressure mud at the time of loading the mud pipe is simple,
To provide a mud pipe extension device capable of continuously adjusting the mud pressure to an arbitrary value without waiting for the pressure mud to fill a new mud pipe that is added to the laid mud pipe. To aim.

【0004】[0004]

【課題を解決するための手段】即ち本発明は、第1の回
転体支持手段(16)と第2の回転体支持手段(15)
を、トンネル構築方向前後方向に所定の間隔をなす形で
設け、前記第1の回転体支持手段(16)に泥水管受入
機構(35)を、既設の泥水管(7A)の先端(9a)
を受入自在で且つ該泥水管(7A)をその軸心に沿って
摺動自在に支持し得るように設け、前記第2の回転体支
持手段(15)の前記泥水管受入機構(35)と対向し
た位置に、シールド機(2)に接続自在な接続管路機構
(15a、12)を設け、前記第1の回転体支持手段
(16)と第2の回転体支持手段(15)の間に、その
各々の内部(17s)に泥水管(9、9’)が収容され
得る鞘管(17)を複数有する回転体(14)を、回転
自在に且つ該鞘管(17)を前記泥水管受入機構(3
5)と前記接続管路機構(15a、12)の間に選択的
に位置決め自在な形で設け、前記第1の回転体支持手段
(16)と第2の回転体支持手段(15)に、前記鞘管
(17)に泥水管(9、9’)を選択的に装填し得る装
填手段(26、27)を設け、前記装填手段(26、2
7)は前記鞘管(17)の前端と後端をそれぞれ開放閉
塞自在な第1及び第2の弁体(29)、(32)を有
し、前記第1及び/又は第2の弁体(29/32)に、
前記鞘管(17)の内部(17s)の泥水(20)を排
出注入し得る排出注入手段(28)を設け、前記第1及
び/又は第2の弁体(29/32)にプラグ(31)
を、該プラグ(31)が設けられた弁体(29/32)
を介して前記鞘管の内部を外部と連通し得る形で着脱自
在に設けて、構成される。なお、( )内の番号等は、
図面における対応する要素を示す、便宜的なものであ
り、従って、本記述は図面上の記載に限定拘束されるも
のではない。以下の作用の欄についても同様である。
That is, the present invention provides a first rotating body supporting means (16) and a second rotating body supporting means (15).
Are provided at a predetermined interval in the front-rear direction of the tunnel building direction, and the first rotating body supporting means (16) is provided with a muddy water pipe receiving mechanism (35) and the tip (9a) of the existing muddy water pipe (7A).
Is provided so that the muddy water pipe (7A) can be slidably supported along the axis thereof, and the muddy water pipe receiving mechanism (35) of the second rotating body supporting means (15) Connection pipe line mechanisms (15a, 12) that are connectable to the shield machine (2) are provided at opposing positions, and the connection is made between the first rotating body supporting means (16) and the second rotating body supporting means (15). In addition, a rotary body (14) having a plurality of sheath pipes (17) capable of accommodating the mud pipes (9, 9 ') in each of the insides (17s) thereof is rotatably provided and the sheath pipes (17) are provided in the mud pipe. Water pipe receiving mechanism (3
5) and the connection conduit mechanism (15a, 12) are provided in a selectively positionable manner, and the first rotating body supporting means (16) and the second rotating body supporting means (15) are provided with: The sheath pipe (17) is provided with loading means (26, 27) capable of selectively loading the mud pipes (9, 9 '), and the loading means (26, 2)
7) has first and second valve bodies (29) and (32) that can open and close the front end and the rear end of the sheath tube (17), respectively, and the first and / or second valve body (29/32),
A discharge / injection means (28) capable of discharging and injecting muddy water (20) in the inside (17s) of the sheath pipe (17) is provided, and the plug (31) is attached to the first and / or second valve body (29/32). )
A valve body (29/32) provided with the plug (31)
The sheath tube is detachably provided so that the inside of the sheath tube can communicate with the outside via the. The numbers in () are
It is to be understood that the corresponding elements in the drawings are shown for convenience and the present description is not limited to the description of the drawings. The same applies to the following action columns.

【0005】[0005]

【作用】上記した構成により本発明は、第1及び第2の
弁体(29)、(32)が所定の鞘管(17)の前端と
後端を閉塞することによって該鞘管(17)の内部(1
7s)を外部に対して隔離し、この状態で、排出注入手
段(28)が、該外部に対して隔離された鞘管(17)
の内部(17s)の泥水(20)を排出或いは注入する
ように作用する。
According to the present invention having the above-described structure, the first and second valve bodies (29) and (32) close the front end and the rear end of the predetermined sheath pipe (17) to thereby form the sheath pipe (17). Inside (1
7s) is isolated from the outside, and in this state, the discharge injection means (28) has the sheath tube (17) isolated from the outside.
It works to drain or inject the muddy water (20) inside (17s).

【0006】[0006]

【実施例】図1は泥水シールド工法により構築中のトン
ネルの一例を示す図、図2は本発明による泥水管延長装
置の一実施例を示す断側面図、図3は図2に示す泥水管
延長装置におけるIII、III矢視断面図、図4は図2に示
す泥水管延長装置におけるロータフランジとステータフ
ランジの分解斜視図、図5は図2に示す泥水管延長装置
におけるプラグ閉栓状態を示す部分拡大図、図6は図2
に示す泥水管延長装置におけるプラグ開栓状態を示す部
分拡大図、図7は図2に示す泥水管延長装置における敷
設済み泥水管とこれに継ぎ足される新たな泥水管の接続
部を示す拡大図、図8は図7に示す敷設済み泥水管とこ
れに継ぎ足される新たな泥水管の接続状態を示す断側面
図、図9乃至図11は図2に示す泥水管延長装置内にお
ける泥水管の延長方法を示す断側面図である。
1 is a view showing an example of a tunnel being constructed by a mud shield method, FIG. 2 is a sectional side view showing an embodiment of a mud pipe extension device according to the present invention, and FIG. 3 is a mud pipe shown in FIG. III, III sectional view in the extension device, FIG. 4 is an exploded perspective view of a rotor flange and a stator flange in the muddy water pipe extending device shown in FIG. 2, and FIG. 5 shows a plug closed state in the muddy water pipe extending device shown in FIG. Partly enlarged view, FIG. 6 is FIG.
FIG. 7 is a partially enlarged view showing a plug opening state in the muddy water pipe extending device shown in FIG. 7, FIG. 7 is an enlarged view showing a connection part of a laid muddy water pipe and a new muddy water pipe connected to the muddy water pipe extending device shown in FIG. FIG. 8 is a cross-sectional side view showing a connection state of the installed mud pipe shown in FIG. 7 and a new mud pipe connected to the mud pipe, and FIGS. 9 to 11 are extension methods of the mud pipe in the mud pipe extension device shown in FIG. FIG.

【0007】泥水シールド工法により構築中のトンネル
1は、図1に示すように、その切削刃が円盤状に形成さ
れたシールド機であるシールド装置2により軟弱地盤で
ある地盤3中に掘削形成された坑道5を有しており、坑
道5は図1中矢印B方向側から矢印A方向側に向かって
未だ掘進中であることから、図1の左端部に示す切羽5
aが掘進先端として矢印A方向に前進し得る形の横転円
柱状に形成されて、セグメント等により覆工支持されて
いる。坑道5の図1下部に示すインバート5bには、シ
ールド装置2に動力を供給するための油圧モータや、裏
込注入設備、変電設備等が搭載された後続台車(図示せ
ず)が、該シールド装置2に接続された形で、適当なる
仮軌条6上に走行自在に支持されており、仮軌条6は前
記切羽5aの前進と共に図1矢印A方向に向かって延長
され得る形で、図1矢印A、B方向に伸延している。
As shown in FIG. 1, the tunnel 1 being constructed by the muddy water shield method is excavated and formed in the soft ground 3 by a shield device 2 which is a shield machine whose cutting blade is formed in a disk shape. 1 has a tunnel 5 which is still under excavation from the arrow B direction side in FIG. 1 toward the arrow A direction side.
“A” is formed as a tumbling columnar shape having a shape capable of advancing in the direction of arrow A as an excavation tip, and is lined and supported by segments or the like. In the invert 5b shown in the lower part of the mineway 5 in FIG. 1, a hydraulic motor for supplying power to the shield device 2, a trailing vehicle (not shown) equipped with backfill injection equipment, substation equipment, etc. In the form of being connected to the device 2, it is movably supported on a suitable temporary rail 6, and the temporary rail 6 can be extended in the direction of arrow A in FIG. 1 as the cutting face 5a advances. It extends in the directions of arrows A and B.

【0008】坑道5中には、図1に示すように、泥水設
備7が、切羽5aの掘進と共にその矢印A、B方向長さ
が延長され得る形で設けられており、泥水設備7には、
泥水20を図1矢印A方向に圧送してシールド装置2内
の図1上部から切羽5aに泥水20を送給する形で送泥
管7A中に形成される送泥管路70と、該切羽5aに送
給された泥水20を掘削ズリと混合したものをシールド
装置2の図1下部から吐出してこれを除礫後、図1矢印
B方向に圧送し図1右部の坑口5c側に排出する形の図
示しない排泥管路との、泥水20の流通方向が相反する
2本の管路が設けられている。なお、泥水設備7におけ
る送泥管7Aと図示しない排泥管は、単に泥水20の流
通方向が相反する形で、両者は略同様に構成されている
ところから、以下に述べる実施例においては送泥管7A
とこれが形成している送泥管路70及びこれを延長する
ための泥水管延長装置として管延長装置10について述
べ、排泥管とこれが形成している排泥管路についてはそ
の詳細な説明及び図示を省略する。なお、排泥管を延長
するための泥水管延長装置の構成及びその坑道5中への
配設方向は以下に述べる管延長装置10と略同じであ
り、唯一泥水20の流通方向が相反する形になってい
る。
As shown in FIG. 1, a muddy water facility 7 is provided in the mineway 5 in such a manner that its length in the directions of arrows A and B can be extended as the face 5a is dug. ,
A muddy water conduit 70 formed in a muddy water pipe 7A in the form of feeding muddy water 20 in the direction of arrow A in FIG. 1 from the upper part of FIG. 1 is discharged from the lower part of the shield device 2 shown in FIG. 1 by mixing the muddy water 20 sent to the 5a with the excavation slag, and it is pumped in the direction of arrow B in FIG. Two pipes are provided in which the flow direction of the mud water 20 is opposite to the flow direction of the mud discharge pipe (not shown) that is discharged. The mud sending pipe 7A and the drain mud pipe (not shown) in the mud water facility 7 are simply configured such that the flowing directions of the mud water 20 are opposite to each other, and the two are configured in substantially the same manner. Mud pipe 7A
And the mud pipe 70 formed by the mud pipe and the pipe extension device 10 as a mud pipe extension device for extending the mud pipe, and a detailed description of the mud pipe and the mud pipe formed by the mud pipe. Illustration is omitted. The construction of the mud pipe extension device for extending the mud pipe and the installation direction in the gallery 5 are substantially the same as those of the pipe extension device 10 described below, and the flow direction of the mud water 20 is the only opposite direction. It has become.

【0009】即ち泥水設備7には、図1に示すように、
前記送泥管路70を形成している送泥管7Aを延長させ
る為の泥水管延長装置である管延長装置10が、その内
部に既に敷設された、即ち既設の泥水管である送泥管7
Aの最先頭部分を収容して、該管延長装置10及びこれ
に接続されたフレキシブルパイプ11を介して前記シー
ルド装置2の切削刃側即ち切羽5a側に泥水20を加圧
送給自在な形で、坑道5中をトンネル軸方向である矢印
A、B方向に移動自在に設けられており、管延長装置1
0の矢印B方向側に示すその後側である図1右側には送
泥管7Aがそれぞれ、該管延長装置10と坑口5c側を
接続する形で既設されている。送泥管7Aは、鋼管等か
らなる単管9を一本の泥水管として、該単管9をトンネ
ル構築方向前後方向である図1矢印A、B方向に複数直
列に接続して構成されており、一本一本の泥水管である
各単管9は実施例においては、図2に示す所定の管外径
D1をなし且つ矢印A、B方向に図1に示す所定の長さ
L1(例えば実施例においてはL1=5.0〜6.0m)をな
す形に形成されている。送泥管7Aを構成している複数
の単管9は、インバート5b等に移動し得ない形で仮固
定されることにより既に敷設済状態にされており、これ
ら複数の単管9のうち最先頭位置の単管9には図2に示
すように、送泥管7Aの先端である開口端9aが、該開
口端9aを介して延長用の単管9’が継ぎ足されて、こ
れにより送泥管7Aが矢印A、B方向に延長され得る形
で、前記管延長装置10内に開口している。(なお、送
泥管7Aを構成している単管9と、これに新たに継ぎ足
される延長用の単管9’は全く同一の部材であるが、実
施例においては説明の都合上、これ等単管9、9’に異
なる附号を附して、これを区別するものとする。)一
方、管延長装置10の図1矢印A方向側に示すその前側
には可撓性を有する樹脂管等からなるフレキシブルパイ
プ11が、該管延長装置10と前記シールド装置2とを
接続する形で、該装置10の吐出口である可動パイプ1
2の矢印A方向側に示す吐出口12aに装着されてい
る。
That is, in the muddy water facility 7, as shown in FIG.
A mud pipe extension device 10 which is a mud pipe extension device for extending the mud pipe 7A forming the mud pipe line 70 is already installed therein, that is, an existing mud pipe. 7
The top portion of A is accommodated, and the muddy water 20 can be pressure-fed and fed to the cutting blade side of the shield device 2, that is, the cutting face 5a side through the pipe extension device 10 and the flexible pipe 11 connected thereto. The pipe extension device 1 is movably provided in the tunnel 5 in the directions of arrows A and B, which are the axial directions of the tunnel.
On the right side of FIG. 1, which is the rear side shown in the arrow B direction of 0, mud pipes 7A are already installed in such a manner that the pipe extension device 10 and the wellhead 5c side are connected. The mud transport pipe 7A is configured by connecting a single pipe 9 made of a steel pipe or the like as one mud pipe and connecting a plurality of the single pipes 9 in series in the directions A and B shown in FIG. In the embodiment, each single pipe 9 which is a muddy water pipe has a predetermined pipe outer diameter D1 shown in FIG. 2 and has a predetermined length L1 (shown in FIG. 1 in the directions of arrows A and B). For example, in the embodiment, L1 = 5.0 to 6.0 m) is formed. The plurality of single pipes 9 constituting the mud transport pipe 7A are already installed by being temporarily fixed to the invert 5b or the like so that they cannot move. As shown in FIG. 2, the opening end 9a, which is the tip of the mud sending pipe 7A, is extended to the single pipe 9 at the leading position by the extension single pipe 9'through the opening end 9a. The mud pipe 7A is opened in the pipe extension device 10 so that it can be extended in the directions of arrows A and B. (It should be noted that the single pipe 9 constituting the mud transport pipe 7A and the single pipe 9'for extension newly added to this are exactly the same members, but in the embodiment, for convenience of explanation, these Different symbols are attached to the single pipes 9 and 9'to distinguish them.) On the other hand, a flexible resin pipe is provided on the front side of the pipe extension device 10 shown in the arrow A direction in FIG. A flexible pipe 11 made up of, for example, a movable pipe 1 which is a discharge port of the device 10 in a form of connecting the pipe extension device 10 and the shield device 2.
2 is attached to the discharge port 12a shown on the arrow A direction side.

【0010】管延長装置10は、図1に示すように、車
輪131等を介して前記仮軌条6上にここを走行自在な
形で支持された台座状のフレーム13を有しており、フ
レーム13上には、その各々が全体形状略円盤状に形成
された第1及び第2の回転体支持手段であるステータフ
ランジ16、15が、トンネル構築方向前後方向である
矢印A、B方向に所定の間隔をなす形で設けられてい
る。第1の回転体支持手段であるステータフランジ16
には、図2右下部に示すように、既設の泥水管である送
泥管7Aの先端である開口端9aを受入自在な泥水管受
入機構として、その詳細を後述する接続シリンダ35
が、その内側に該送泥管7Aを挿通させた状態で所定の
ストロークL2分だけ矢印A、B方向に移動自在な形、
即ち該送泥管7Aをその軸心に沿って摺動自在に支持し
得るように設けられており、一方、第2の回転体支持手
段であるステータフランジ15には、図2左下部に示す
ように、ステータフランジ16側に設けられた接続シリ
ンダ35と対向した位置に、ジョイントシリンダ15a
に矢印A、B方向に摺動自在に嵌合された形で前記可動
パイプ12が、前記シールド装置2に接続自在な接続管
路機構として設けられている。
As shown in FIG. 1, the pipe extension device 10 has a pedestal-shaped frame 13 rotatably supported on the temporary rail 6 via wheels 131 and the like. Stator flanges 16 and 15 which are first and second rotating body supporting means, each of which is formed into a generally disk-like overall shape, are disposed on the predetermined direction 13 in the directions A and B, which are the tunnel building direction and the front-back direction. It is provided in the form of intervals. Stator flange 16 which is a first rotating body supporting means
As shown in the lower right part of FIG. 2, a connection cylinder 35, the details of which will be described later, as a muddy water pipe receiving mechanism that can receive the opening end 9a that is the tip of the existing muddy water pipe 7A.
However, a shape that is movable in the directions of arrows A and B by a predetermined stroke L2 with the mud pipe 7A inserted therethrough.
That is, the sludge pipe 7A is provided so as to be slidably supported along its axis, while the stator flange 15 as the second rotating body supporting means is shown in the lower left portion of FIG. As described above, the joint cylinder 15a is provided at a position facing the connection cylinder 35 provided on the stator flange 16 side.
The movable pipe 12 is provided as a connection conduit mechanism connectable to the shield device 2 in such a manner that it is slidably fitted in the directions A and B.

【0011】また、ステータフランジ16、15間に
は、回転体14が、トンネル軸心と平行な軸(即ち後述
する主軸21の軸心CT0)を回転中心として、図1矢
印M、N方向に回転自在に設けられており、回転体14
は、その各々の材軸方向をトンネル軸方向である矢印
A、B方向に向けて、その各々の内部に図3に示すよう
に各1本の単管9、即ち敷設済みの送泥管7Aに継ぎ足
されるべき継ぎ足し用の新たな単管9’が収容され得る
鞘管17を複数、実施例においては4本有している。回
転体14には、4箇所の鞘管待機位置ST1、ST2、
ST3、ST4が、図3に示すように、その各々の軸心
を同一円周上に並べた形で設定されており、4本の鞘管
17は、回転体14の回転によって、各鞘管待機位置S
T1、ST2、ST3、ST4のそれぞれに移動位置決
めされ得るようになっている。4本の鞘管待機位置ST
1、ST2、ST3、ST4のうち、図2下側又は図3
最下部に示す鞘管待機位置ST1は、図2に示すよう
に、前記接続シリンダ35が形成している泥水管受入機
構と、前記可動パイプ12及びジョイントシリンダ15
aが形成している接続管路機構の間に配置する形になっ
ており、従って回転体14の各鞘管17は、該泥水管受
入機構と接続管路機構との間に選択的に位置決めされ得
る形になっている。
In addition, between the stator flanges 16 and 15, the rotating body 14 is rotated in the directions of arrows M and N in FIG. 1 about an axis parallel to the tunnel axis (that is, the axis CT0 of the main shaft 21 described later) as the center of rotation. It is rotatably installed and rotates 14
As shown in FIG. 3, each of the single pipes 9, that is, the laid mud pipe 7A, is oriented in the direction of the arrows A and B which are the axial directions of the tunnels. It has a plurality of, for example, four sheath tubes 17 capable of accommodating a new single tube 9'for addition which is to be added to. The rotator 14 has four sheath tube standby positions ST1, ST2,
As shown in FIG. 3, ST3 and ST4 are set in such a manner that their respective axial centers are arranged on the same circumference, and the four sheath pipes 17 are rotated by the rotating body 14 so that each sheath pipe Standby position S
Each of T1, ST2, ST3, and ST4 can be moved and positioned. Standby position ST for four sheaths
1, ST2, ST3, ST4 in FIG. 2 lower side or FIG.
As shown in FIG. 2, the sheath pipe standby position ST1 shown in the lowermost portion includes the muddy water pipe receiving mechanism formed by the connection cylinder 35, the movable pipe 12, and the joint cylinder 15.
It is arranged to be arranged between the connection conduit mechanisms formed by a. Therefore, each sheath pipe 17 of the rotating body 14 is selectively positioned between the muddy water pipe receiving mechanism and the connection conduit mechanism. It can be done.

【0012】回転体14の各鞘管17は、図2に示すよ
うに、送泥管7Aを構成している1本1本の泥水管であ
る前記単管9の長さL1より若干小なる長さをなし、該
単管9の外径D1より若干大なる内径をなす形で形成さ
れた鋼管等により構成されており、各鞘管17は、その
矢印A、B方向両端に突出形成されたフランジ17a、
17aの各前後面が、その各々が全体形状略円盤状に形
成されて矢印A、B方向に所定の間隔で配設された一対
のロータフランジ18、19にそれぞれ固定装着された
形になっている。ロータフランジ18、19にはそれぞ
れ、鞘管装着用の孔18s、19sが、回転体14に設
けられた鞘管17の本数分だけ、即ち実施例においては
4ヶづつ矢印A、B方向にそれぞれ貫通形成されてお
り、ロータフランジ18、19は、その孔18s、19
sと各鞘管17の内部17sを連通させた形で、4本の
鞘管17を支持し、この状態で前記ステータフランジ1
5、16に回転自在に嵌合されている。また、回転体1
4には、該回転体14の駆動軸である主軸21が、前記
4本の鞘管待機位置ST1、ST2、ST3、ST4の
中心に位置する形でロータフランジ18、19間に懸架
支持されており、主軸21は、前記4本の鞘管17を実
施例においては90度ピッチづつ回転位置決めし得るよ
うに設けられている。即ち主軸21にはその本体部分が
前記フレーム13に固定支持された油圧モータ23が、
駆動ギヤ22を介して該主軸21を90度づつ回転駆動
自在な形で接続されており、そして、回転体14は、4
本の鞘管17を嵌合連結する形で円盤状に形成されてそ
の図1下部に示す支持部251がフレーム13に固定支
持されたサポートリング25に嵌合支持された形で、主
軸21が油圧モータ23を介して軸心CT0を中心とし
て矢印M、N方向に90度づつ回転する動作によって、
該4本の鞘管17を各鞘管待機位置ST1、ST2、S
T3、ST4相互間において移動位置決めし得る形、即
ち該鞘管17を、接続シリンダ35が形成している泥水
管受入機構とジョイントシリンダ15aに嵌合された可
動パイプ12が形成している接続管路機構の間に選択的
に位置決め自在な形になっている。また、回転体14の
4本の鞘管17の図2上方には、サポートパイプ132
が、ボルト締め等の手段を介して前記ステータフランジ
15、16間に懸架固定されており、従って、上述した
ように主軸21が回転体14のロータフランジ18、1
9を90度ピッチで回転駆動することによって、各鞘管
待機位置ST1、ST2、ST3、ST4相互間に移動
位置決めされる4本の鞘管17は、フレーム13とサポ
ートパイプ132間において、各鞘管17の材軸心が主
軸21の軸心CT0を回転中心として円を描く形で90
度づつ回転するようになっている。
As shown in FIG. 2, each sheath pipe 17 of the rotating body 14 is slightly smaller than the length L1 of the single pipe 9 which is one mud pipe forming the mud pipe 7A. The sheath tube 17 has a length and an inner diameter slightly larger than the outer diameter D1 of the single tube 9. Each sheath tube 17 is formed so as to project at both ends in the directions of arrows A and B. Flange 17a,
Each of the front and rear surfaces of 17a is fixedly mounted on a pair of rotor flanges 18 and 19 which are each formed in a generally disk shape as a whole and are arranged at predetermined intervals in the directions of arrows A and B. There is. The rotor flanges 18 and 19 are provided with holes 18s and 19s for attaching the sheath pipes, respectively, by the number of the sheath pipes 17 provided on the rotating body 14, that is, four in the embodiment, respectively, in the directions of arrows A and B. The rotor flanges 18 and 19 are formed so as to penetrate therethrough.
s and the inside 17s of each sheath pipe 17 are communicated with each other, and four sheath pipes 17 are supported. In this state, the stator flange 1
5 and 16 are rotatably fitted. Also, the rotating body 1
4, a main shaft 21 which is a drive shaft of the rotating body 14 is suspended and supported between the rotor flanges 18 and 19 so as to be located at the center of the four sheath tube standby positions ST1, ST2, ST3 and ST4. The main shaft 21 is provided so that the four sheath tubes 17 can be rotationally positioned at 90 ° pitches in the embodiment. That is, the main shaft 21 has a hydraulic motor 23 whose main body is fixedly supported by the frame 13,
The main shaft 21 is rotatably connected to the main shaft 21 by 90 degrees via a drive gear 22.
The support shaft 251 shown in the lower part of FIG. 1 is fitted and supported by the support ring 25 fixedly supported by the frame 13, and the main shaft 21 is By the operation of rotating the shaft center CT0 through the hydraulic motor 23 in the directions of arrows M and N by 90 degrees,
The four sheath tubes 17 are connected to the respective standby positions ST1, ST2, S
T3 and ST4 can be moved and positioned with respect to each other, that is, the sheath pipe 17 is a connection pipe formed by the muddy water pipe receiving mechanism formed by the connection cylinder 35 and the movable pipe 12 fitted in the joint cylinder 15a. It is designed to be selectively positioned between the road mechanisms. Further, the support pipes 132 are provided above the four sheath tubes 17 of the rotating body 14 in FIG.
Is suspended and fixed between the stator flanges 15 and 16 by means of bolting or the like. Therefore, as described above, the main shaft 21 has the rotor flanges 18 and 1 of the rotor 14.
The four sheath tubes 17 which are movably positioned between the respective sheath tube standby positions ST1, ST2, ST3, ST4 by rotating 9 at a pitch of 90 degrees are provided between the frame 13 and the support pipe 132. The tube 17 has a material axis centered in a circle around the axis CT0 of the main shaft 21 as the center of rotation.
It is designed to rotate every time.

【0013】ところで、前記4本の鞘管待機位置ST
1、ST2、ST3、ST4のうち、管延長装置10に
おける最下部に位置し、図2下側に示す鞘管待機位置S
T1は、該鞘管待機位置ST1に位置する鞘管17の内
部17sに前記接続シリンダ35を介して送泥管7Aの
先端である開口端9aが配置され得る形で送泥管路70
の一部になっており、一方、残りの鞘管待機位置ST
2、ST3、ST4は、該鞘管待機位置ST2、ST
3、ST4に配置してその内部に単管9’がそれぞれ収
容された各鞘管17が、主軸21の回転を介して後に順
次鞘管待機位置ST1に移動するための待機準備位置に
なっている。そして、先に述べたように前後方向に一対
をなす前記ステータフランジ15、16には、鞘管待機
位置ST2、ST3、ST4の前後両端位置に対応した
形で、前側のステータフランジ15には3ヶのプラグ退
避孔15sが、後側のステータフランジ16には3ヶの
シリンダ装着孔16sが、それぞれのステータフランジ
15、16を矢印A、B方向に貫通する形で穿設形成さ
れている。管延長装置10においては、鞘管待機位置S
T2、ST3、ST4のそれぞれに位置する各鞘管17
の内部17sをその矢印A、B方向両端においてそれぞ
れ開放閉塞し得る形の一対のプラグ機構26、27が、
プラグ退避孔15s、シリンダ装着孔16sをそれぞれ
開放閉塞自在な形で、実施例においては各3ヶづつ設け
られており、プラグ機構26、27は、送泥管7Aに継
ぎ足されるべき新たな単管9’を、回転体14の各鞘管
17に選択的に装填し得る装填手段を構成する形になっ
ている。一方鞘管待機位置ST1に配置している鞘管1
7は、その矢印A、B方向両端が可動パイプ12及び接
続シリンダ35に向けて常時開口する形になっており、
該鞘管待機位置ST1に位置した鞘管17の内部17s
には、接続シリンダ35と、ジョイントシリンダ15a
に嵌合された可動パイプ12を直結する形の泥水本流が
流通し得る形で、該鞘管17の内部17sに前記送泥管
路70の一部が常時配置する形になっている。
By the way, the four sheath tube standby positions ST
Out of 1, ST2, ST3, and ST4, the sheath pipe standby position S is located at the bottom of the pipe extension device 10 and is shown in the lower side of FIG.
T1 is a mud feeding line 70 in which the open end 9a, which is the tip of the mud feeding pipe 7A, can be disposed in the inside 17s of the sheath pipe 17 located at the sheath pipe standby position ST1 via the connecting cylinder 35.
, While the rest of the sheath tube standby position ST
2, ST3, ST4 are the sheath tube standby positions ST2, ST
3 and ST4, and the respective sheath pipes 17 in which the single pipes 9'are respectively housed therein are in the standby preparation position for moving sequentially to the sheath pipe standby position ST1 via the rotation of the main shaft 21. There is. As described above, the stator flanges 15 and 16 forming a pair in the front-rear direction correspond to the front and rear end positions of the sheath tube standby positions ST2, ST3, and ST4, and the front stator flange 15 has three ends. 15 s of plug withdrawal holes, and 3 cylinder mounting holes 16 s are formed in the rear stator flange 16 so as to penetrate the respective stator flanges 15 and 16 in the directions of arrows A and B. In the pipe extension device 10, the sheath pipe standby position S
Each sheath tube 17 located in each of T2, ST3, ST4
A pair of plug mechanisms 26, 27 which can open and close the interior 17s of the plug at both ends in the directions of arrows A and B,
In the embodiment, three plug retraction holes 15s and three cylinder mounting holes 16s can be opened and closed. In the embodiment, three plug mechanisms 26 and 27 are new single pipes to be added to the mud pipe 7A. 9'is configured to form a loading means capable of selectively loading each sheath tube 17 of the rotating body 14. On the other hand, the sheath tube 1 arranged at the sheath tube standby position ST1
7 has a shape in which both ends in the arrow A and B directions are always open toward the movable pipe 12 and the connection cylinder 35.
The inside 17s of the sheath pipe 17 positioned at the sheath pipe standby position ST1
Includes a connection cylinder 35 and a joint cylinder 15a.
A part of the mud-sending conduit 70 is always arranged in the inside 17s of the sheath pipe 17 so that the main flow of the mud water directly connecting the movable pipe 12 fitted to the inside can flow.

【0014】また、管延長装置10において鞘管待機位
置ST1に配置している鞘管17内部に配置している送
泥管路70には、該管延長装置10における鞘管待機位
置ST2、ST3、ST4に配置している各鞘管17の
内部17s即ちこれに収容されている各単管9の内部と
連通し得る形のバイパス流路70s、70pが、図4乃
至図6に示すように、フレーム13の前側に設けられた
ステータフランジ15と回転体14におけるロータフラ
ンジ18の間と、後側のステータフランジ16と回転体
14におけるロータフランジ19の間にそれぞれ形成さ
れており、このうち第1のバイパス流路として後側に配
置するバイパス流路70sは前記接続シリンダ35と鞘
管待機位置ST2、ST3、ST4のそれぞれに位置す
る各鞘管17を連通する形で、一方第2のバイパス流路
として前側に配置するバイパス流路70sは前記可動パ
イプ12と該鞘管待機位置ST2、ST3、ST4のそ
れぞれに位置する各鞘管17を連通する形でそれぞれ形
成されている。従って、鞘管待機位置ST2、ST3、
ST4のそれぞれに位置する各鞘管17の前後をそれぞ
れ開放閉塞する形の装填手段としてステータフランジ1
5、16に設けられた前記プラグ機構26、27は、鞘
管待機位置ST2、ST3、ST4のそれぞれに位置す
る各鞘管17の内部17sをバイパス流路70p、70
sに対して連通或いは隔離自在な形になっている。
Further, in the sludge pipe line 70 arranged inside the sheath pipe 17 arranged at the sheath pipe standby position ST1 in the pipe extension device 10, the sheath pipe standby positions ST2, ST3 in the pipe extension device 10 are provided. , The bypass passages 70s and 70p of the shape which can communicate with the inside 17s of each sheath tube 17 arranged in ST4, that is, the inside of each single tube 9 accommodated therein are as shown in FIGS. , Between the stator flange 15 provided on the front side of the frame 13 and the rotor flange 18 of the rotating body 14, and between the rear stator flange 16 and the rotor flange 19 of the rotating body 14, respectively. The bypass flow passage 70s arranged on the rear side as one bypass flow passage connects the connecting cylinder 35 and each sheath pipe 17 located at each of the sheath pipe standby positions ST2, ST3, ST4. On the other hand, the bypass flow passage 70s arranged on the front side as the second bypass flow passage connects the movable pipe 12 and each sheath pipe 17 located at each of the sheath pipe standby positions ST2, ST3, ST4. Each is formed. Therefore, the sheath tube standby positions ST2, ST3,
The stator flange 1 is used as a loading means for opening and closing the front and rear of each sheath tube 17 located in each ST4.
The plug mechanisms 26 and 27 provided in Nos. 5 and 16 bypass the inside 17s of each sheath pipe 17 located at each of the sheath pipe standby positions ST2, ST3, and ST4 bypass passages 70p and 70.
It can communicate with or separate from s.

【0015】即ち、4本の鞘管17の前側が接続された
前記ロータフランジ18には、図4に示すように、該ロ
ータフランジ18とステータフランジ15との間におい
てバイパス流路70sを形成する為の溝18aが、該ロ
ータフランジ18の矢印A端面に示す前端面18b側
に、鞘管待機位置ST1、ST2、ST3、ST4の配
設方向に沿って周方向に連続する形で円環状に形成され
ており、ロータフランジ18の溝18sには、該ロータ
フランジ18の前記孔18sが、これに接続装着された
各鞘管17の内部17sとバイパス流路70sを連通さ
せ得る形で、先に述べたように矢印A、B方向に貫通す
るよう配設されている。そして、鞘管待機位置ST2、
ST3、ST4のそれぞれの前側に設けられた前記プラ
グ機構26のそれぞれには、図2又は図4に示すよう
に、ロータフランジ18の各孔18sを開放閉塞し得る
形の弁体であるプラグ29が、該プラグ機構26の矢印
A方向側に設けられたプラグ開閉シリンダ30を介し
て、トンネル軸方向である矢印A、B方向に該開閉シリ
ンダ30のストローク長L2分だけ突出後退駆動自在な
形で設けられている。従って、各プラグ機構26は、そ
のプラグ29がプラグ開閉シリンダ30を介して矢印
A、B方向に突出後退する動作によって、各鞘管待機位
置ST2、ST3、ST4のそれぞれに位置する各鞘管
17の内部17sを、送泥管路70のバイパス流路70
sから隔離或いはこれと連通し得るように、それぞれ構
成されている。
That is, in the rotor flange 18 to which the front sides of the four sheath pipes 17 are connected, as shown in FIG. 4, a bypass passage 70s is formed between the rotor flange 18 and the stator flange 15. A groove 18a for the purpose of forming an annular shape on the side of the front end surface 18b indicated by the end surface of the rotor flange 18 indicated by the arrow A in the circumferential direction along the arranging direction of the sheath tube standby positions ST1, ST2, ST3, ST4. The hole 18s of the rotor flange 18 is formed in the groove 18s of the rotor flange 18 in such a manner that the inside 17s of each sheath pipe 17 connected to the rotor flange 18 can communicate with the bypass passage 70s. As described above, it is arranged so as to penetrate in the directions of arrows A and B. And the sheath tube standby position ST2,
As shown in FIG. 2 or 4, each of the plug mechanisms 26 provided on the front side of ST3 and ST4 has a plug 29, which is a valve body that can open and close each hole 18s of the rotor flange 18. Through the plug opening / closing cylinder 30 provided on the side of the plug mechanism 26 in the direction of the arrow A, it can be driven backward and forward by the stroke length L2 of the opening / closing cylinder 30 in the directions of the arrows A and B, which are the tunnel axis directions. It is provided in. Therefore, in each plug mechanism 26, the sheath tube 17 positioned at each sheath tube standby position ST2, ST3, ST4 is moved by the operation of the plug 29 projecting and retracting in the directions of arrows A and B through the plug opening / closing cylinder 30. 17s of the inside of the bypass mud line 70
It is configured so that it can be isolated from or communicate with the s.

【0016】なお、各プラグ機構26のプラグ29に
は、図2に示すように、該プラグ機構26が設けられた
鞘管待機位置に位置決めされた鞘管17の内部17sの
泥水20を排出注入し得る形の泥水回収機構28が設け
られており、泥水回収機構28には、オーバーフローポ
ート291と、給排水口292が、各プラグ29におい
て図2上下に並ぶ形でそれぞれ開閉自在に設けられてい
る。各オーバーフローポート291と給排水口292に
は、図2に左端近傍に示すように、その容体部分に所定
容量の泥水20が貯留され得るタンク281が、耐圧ホ
ース等を介して接続されており、泥水回収機構28は、
プラグ機構26のプラグ29が図2又は図4に示すよう
に鞘管待機位置ST2、ST3、ST4に配置している
鞘管17の内部17sを外部に対して閉塞している状態
においても、該オーバーフローポート291と給排水口
292を介して、鞘管17内部17sの泥水20を自在
にタンク281中に排出或いは再びここから該鞘管17
の内部17sに注入し得るように構成されている。ま
た、プラグ機構26のプラグ29には、その突出先端側
である図2矢印B方向側端近傍に、該プラグ29の外周
に沿った円環状に形成された焼付のシールゴム293が
それぞれ嵌合されており、プラグ29はこれが矢印A、
B方向に突出後退することによって、シールゴム293
がロータフランジ18の各孔18sの外周部分と接続す
るか、或いはステータフランジ15の図4に示すプラグ
退避孔15sの外周部分と接続する形で、該プラグ29
が回転体14に接続分離自在になっている。
As shown in FIG. 2, the muddy water 20 in the inside 17s of the sheath pipe 17 positioned at the sheath pipe standby position where the plug mechanism 26 is provided is discharged and injected into the plug 29 of each plug mechanism 26. A muddy water collecting mechanism 28 having a shape capable of being formed is provided, and the muddy water collecting mechanism 28 is provided with an overflow port 291 and a water supply / drainage port 292 that can be opened / closed in the plugs 29 in the form of being arranged vertically in FIG. . As shown in the vicinity of the left end in FIG. 2, a tank 281 capable of storing a predetermined volume of muddy water 20 is connected to each overflow port 291 and the water supply / drainage port 292 via a pressure hose or the like. The recovery mechanism 28 is
Even when the plug 29 of the plug mechanism 26 closes the inside 17s of the sheath tube 17 arranged at the sheath tube standby positions ST2, ST3, ST4 to the outside as shown in FIG. 2 or FIG. Through the overflow port 291 and the water supply / drainage port 292, the muddy water 20 inside the sheath tube 17 can be freely discharged into the tank 281 or again from here.
Is configured to be injected into the interior 17s of the. Further, in the plug 29 of the plug mechanism 26, a sealing rubber 293 formed in an annular shape along the outer periphery of the plug 29 is fitted in the vicinity of the protruding end side in the direction of the arrow B in FIG. The plug 29 has an arrow A,
By protruding and retracting in the B direction, the seal rubber 293
Is connected to the outer peripheral portion of each hole 18s of the rotor flange 18 or the outer peripheral portion of the plug retraction hole 15s of the stator flange 15 shown in FIG.
Can be connected to and separated from the rotating body 14.

【0017】一方、回転体14と後側のステータフラン
ジ16の間には前記バイパス流路70pが、該回転体1
4の4本の鞘管17の後側を支持するロータフランジ1
9とステータフランジ16の間に形成される空間40部
分に対応する形でここに配置形成されており、バイパス
流路70pは、後述するように接続シリンダ35がロー
タフランジ19即ち回転体14に対して矢印B方向側に
後退することによって、該空間40部分を介して接続シ
リンダ35と鞘管17の内部17sを連通する形で、送
泥管路70と連通自在な形になっている。そして、鞘管
待機位置ST2、ST3、ST4に配置している各鞘管
17の後側を開放閉塞するように設けられた前記プラグ
機構27は、該鞘管17に後述するように装填口33を
坑道5に向けて開口形成してここから鞘管17の内部1
7sに新たな単管9’を選択的に装填するための装填手
段を構成していると同時に、該鞘管待機位置ST2、S
T3、ST4に配置している鞘管17の内部17sをバ
イパス流路70pに対して開放閉塞するためのプラグ手
段になっている。
On the other hand, the bypass passage 70p is provided between the rotating body 14 and the stator flange 16 on the rear side.
Rotor flange 1 for supporting the rear side of four sheath tubes 17 of 4
9 and the stator flange 16 are arranged and formed here corresponding to a space 40 portion. The bypass flow passage 70p has a connection cylinder 35 with respect to the rotor flange 19 or the rotor 14, as will be described later. By retreating in the direction of the arrow B, the connecting cylinder 35 and the inside 17s of the sheath pipe 17 are communicated with each other via the space 40, and are communicable with the mud-sending conduit 70. The plug mechanism 27 provided to open and close the rear side of each of the sheath pipes 17 arranged at the sheath pipe standby positions ST2, ST3, ST4 has a loading port 33 as described later. Is formed toward the gallery 5 and the inside 1 of the sheath pipe 17 is opened from here.
At the same time as configuring a loading means for selectively loading a new single tube 9'in 7s, the sheath tube standby positions ST2, S
It serves as plug means for opening and closing the inside 17s of the sheath pipe 17 arranged at T3 and ST4 with respect to the bypass flow passage 70p.

【0018】即ちプラグ機構27は、図2に示すよう
に、鞘管17の後側を開放閉塞自在な弁体として円筒状
に形成された開閉シリンダ32を有しており、開閉シリ
ンダ32は、前記プラグ開閉シリンダ30のストローク
長L2と略同じストローク長L2分だけステータフラン
ジ16に対して矢印A、B方向に突出後退移動自在な形
で、該ステータフランジ16の前記シリンダ装着孔16
sに嵌合装着されている。開閉シリンダ32の内側に
は、横転内空円柱状に形成されたプラグ体であるキャッ
ププラグ31が、その図2右端側に形成された把持部3
11を矢印B方向側に引張ることによって、開閉シリン
ダ32内から抜取ることが出来、該キャッププラグ31
が抜き取られた開閉シリンダ32を介して、鞘管待機位
置ST2、ST3、ST4に位置する鞘管17の内部1
7sを外部である坑道5と連通し得る形で着脱自在に設
けられている。従ってプラグ機構27は、弁体である開
閉シリンダ32とこれに着脱自在に嵌合装着されたプラ
グ体であるキャッププラグ31によって、各鞘管待機位
置ST2、ST3、ST4に対応したロータフランジ1
9の孔19sとステータフランジ16のシリンダ装着孔
16sを閉塞開放し得るように構成されていて、該開閉
シリンダ32の突出後退移動動作とキャッププラグ31
の着脱状態によって、該プラグ機構27が設けられた鞘
管17の内部17sを前記バイパス流路70pと連通さ
せるか、或いは外部である坑道5と連通させるか、或い
は遮蔽するかを自在に選択し得るように構成されてい
る。
That is, as shown in FIG. 2, the plug mechanism 27 has an open / close cylinder 32 formed in a cylindrical shape as a valve body that can open and close the rear side of the sheath tube 17, and the open / close cylinder 32 is The cylinder mounting hole 16 of the stator flange 16 is formed so as to project and retreat in the directions of arrows A and B relative to the stator flange 16 by a stroke length L2 that is substantially the same as the stroke length L2 of the plug opening / closing cylinder 30.
It is fitted and attached to s. Inside the opening / closing cylinder 32, a cap plug 31 that is a plug body formed in a rollover inner hollow column shape is provided on the right end side in FIG.
By pulling 11 in the direction of the arrow B, it can be pulled out from the inside of the opening / closing cylinder 32.
The inside 1 of the sheath pipe 17 located at the sheath pipe standby positions ST2, ST3, ST4 via the open / close cylinder 32 from which
It is detachably provided so that 7s can communicate with the gallery 5 which is the outside. Therefore, the plug mechanism 27 includes the open / close cylinder 32, which is a valve body, and the cap plug 31, which is a plug body that is detachably fitted and attached to the open / close cylinder 32, and the rotor flange 1 corresponding to each of the sheath tube standby positions ST2, ST3, and ST4.
9 and the cylinder mounting hole 16s of the stator flange 16 can be closed and opened. The opening / closing cylinder 32 has a protruding / retracting movement operation and a cap plug 31.
Depending on the attached / detached state, it is possible to freely select whether the inside 17s of the sheath pipe 17 provided with the plug mechanism 27 is communicated with the bypass flow passage 70p or the outside tunnel 5 or is shielded. Is configured to get.

【0019】また、ステータフランジ16のシリンダ装
着孔16sに嵌合された開閉シリンダ32内側のキャッ
ププラグ31装着領域は、鞘管待機位置ST2、ST
3、ST4に配置している各鞘管17に新規な単管9’
を装填するための装填口33になっており、従って、キ
ャッププラグ31は装填口33の開閉栓として、即ち鞘
管17内部17sを外部に連通させるための空間部分で
ある装填口33を塞ぐプラグを構成する形になってい
る。さらに、開閉シリンダ32の先端側である矢印A方
向側端部には、前記プラグ29の突出先端側に装着され
たシールゴム293と同等のシールゴム321が、該開
閉シリンダ32の外周に円環状に嵌合装着されており、
開閉シリンダ32は、これが矢印A、B方向に移動する
動作によって、シールゴム321がロータフランジ19
の孔19sの外周部分と接続するか、或いはステータフ
ランジ16における開閉シリンダ32装着領域の外周部
分と接続する形で、該開閉シリンダ32がロータフラン
ジ19に接続分離自在になっている。
Further, the cap plug 31 mounting region inside the opening / closing cylinder 32 fitted in the cylinder mounting hole 16s of the stator flange 16 has the sheath tube standby positions ST2, ST.
3, new single tube 9'on each sheath tube 17 arranged in ST4
Therefore, the cap plug 31 serves as an opening / closing plug of the loading port 33, that is, a plug for closing the loading port 33 which is a space portion for communicating the inside 17s of the sheath tube 17 with the outside. It is in the form of. Further, a seal rubber 321 equivalent to the seal rubber 293 attached to the projecting tip side of the plug 29 is annularly fitted to the outer periphery of the opening / closing cylinder 32 at the end of the opening / closing cylinder 32 on the arrow A direction side. It is fitted together,
In the opening / closing cylinder 32, the seal rubber 321 causes the rotor flange 19 to move when the opening / closing cylinder 32 moves in the directions of arrows A and B.
The opening / closing cylinder 32 is connectable / separable to / from the rotor flange 19 by being connected to the outer peripheral portion of the hole 19s of the stator flange 16 or the outer peripheral portion of the mounting area of the opening / closing cylinder 32 of the stator flange 16.

【0020】ところで、管延長装置10において前記鞘
管待機位置ST1の前側に配置する形で、先に述べたよ
うにフレキシブルパイプ11に接続されて該管延長装置
10の接続管路機構を構成している前記可動パイプ12
は、前記プラグ29及び開閉シリンダ32のストローク
長L2に対応したストローク長L2分だけ、前側のステ
ータフランジ15に対して矢印A、B方向に突出後退移
動自在な形で、該ステータフランジ15におけるその図
2左下に設けられたジョイントシリンダ15aに嵌合装
着されて管状に設けられており、可動管12は、その矢
印A、B方向への移動動作を介して前記ロータフランジ
18の溝18aに向けて進入後退する形で、前記バイパ
ス管路70s中に進入或いはここから退避自在に構成さ
れている。そして、可動パイプ12は、これが矢印B方
向側に向けて最突出状態を呈するとき、鞘管待機位置S
T1に配置している鞘管17中に収容配置された継ぎ足
し用の新たな単管9’を、管延長装置10の後側である
矢印B方向側に向けて押す形で移動させ得るように構成
されている。
By the way, as described above, the pipe extension device 10 is connected to the flexible pipe 11 so as to form the connection line mechanism of the pipe extension device 10 in the form of being arranged on the front side of the sheath pipe standby position ST1. The movable pipe 12
Is a portion of the stator flange 15 that is movable in a projecting / retracting manner in the directions of arrows A and B with respect to the front stator flange 15 by a stroke length L2 corresponding to the stroke length L2 of the plug 29 and the opening / closing cylinder 32. It is fitted in a joint cylinder 15a provided at the lower left of FIG. 2 and is provided in a tubular shape, and the movable tube 12 is directed to the groove 18a of the rotor flange 18 through its movement operation in the directions of arrows A and B. The bypass pipe line 70s is configured to be able to enter or retract from the bypass pipe line 70s in such a manner as to enter and retract. When the movable pipe 12 exhibits the most protruding state toward the arrow B direction side, the sheath pipe standby position S
A new single tube 9'for replenishment accommodated in the sheath tube 17 arranged at T1 can be moved by pushing toward the arrow B direction side which is the rear side of the tube extension device 10. It is configured.

【0021】また、管延長装置10において、鞘管待機
位置ST1の後側である矢印B方向側に配置する形で、
敷設済み泥水管7Aの最先頭位置の単管9を該管延長装
置10に受け入れるための前記接続シリンダ35は、プ
ラグ29及び開閉シリンダ32及び可動管12のストロ
ーク長L2に対応したストローク長L2分だけ、ステー
タフランジ15に対して矢印A、B方向に突出後退移動
自在な形で段付き円筒状に設けられており、接続シリン
ダ35の後端部近傍には、該接続シリンダ35内を挿通
される形で管延長装置10内に受け入れられる単管9の
外周との間をシールする為の、その各々が環状をなす可
撓性材料により形成されたパイプシール36が、矢印
A、B方向に複数並んで設けられている。また、接続シ
リンダ35の突出先端である矢印A方向側端には、前記
プラグ29の突出先端側に装着されたシールゴム293
及び開閉シリンダ32の突出先端側に装着されたシール
ゴム321と同等のシールゴム351が、該接続シリン
ダ35の前端縁部に沿って円環状に装着されており、接
続シリンダ35は、これが矢印A、B方向に移動する動
作によって、シールゴム351がロータフランジ19に
形成された前記孔19sの外周部分と接続するか、或い
はステータフランジ16における接続シリンダ35貫通
部の内周面に接続する形で、該接続シリンダ35がロー
タフランジ19に接続分離自在になっている。
Further, in the pipe extension device 10, in the form of being arranged on the arrow B direction side which is the rear side of the sheath pipe standby position ST1,
The connecting cylinder 35 for receiving the single pipe 9 at the foremost position of the installed muddy water pipe 7A into the pipe extension device 10 has a stroke length L2 corresponding to the stroke length L2 of the plug 29, the opening / closing cylinder 32 and the movable pipe 12. Is provided in a stepped cylindrical shape so that it can be projected and retracted in the directions of arrows A and B with respect to the stator flange 15, and is inserted into the connection cylinder 35 in the vicinity of the rear end of the connection cylinder 35. A pipe seal 36 formed of a flexible material, each of which has an annular shape, for sealing between the outer circumference of the single pipe 9 received in the pipe extension device 10 in the direction of arrows A and B. It is provided side by side. A seal rubber 293 is attached to the protruding tip side of the plug 29 at the arrow A side end which is the protruding tip of the connection cylinder 35.
Also, a seal rubber 351 equivalent to the seal rubber 321 attached to the protruding tip side of the opening / closing cylinder 32 is attached in an annular shape along the front end edge portion of the connection cylinder 35, and the connection cylinder 35 has arrows A, B. The seal rubber 351 is connected to the outer peripheral portion of the hole 19s formed in the rotor flange 19 or to the inner peripheral surface of the penetrating portion of the connecting cylinder 35 in the stator flange 16 by the movement in the direction. The cylinder 35 is connectable to and separable from the rotor flange 19.

【0022】さらに、接続シリンダ35の矢印B方向側
に示す後方側には、図2に示すように、その本体部分が
前記フレーム13上に固定支持された形の油圧クランプ
37が、該油圧クランプ37の把持部37aを介して、
前記接続シリンダ35内に挿通された単管9の外周部を
把持し得る形で設けられており、また、管延長装置10
には、前記4本の鞘管17の後側のロータフランジ19
とステータフランジ16の間に形成されてバイパス流路
70pとして用いられる空間40部分を洗浄し得るクリ
ーニング機構39が、その図2右上部に設けられた吸水
ポート391から該空間40中に給水して、これを図2
右下部に設けられた排水ポート392から排出自在な形
で設けられている。空間40は、接続シリンダ35の矢
印A、B方向への移動動作を介して、該接続シリンダ3
5の内部空間と連通し得る形になっているが、管延長装
置10において図2に示す送泥動作時には、シールゴム
351等を介して、該接続シリンダ35に挿通される単
管9内部に形成される送泥管路70と空間40に形成さ
れるバイパス流路70pが遮断された状態になってい
る。
Further, as shown in FIG. 2, on the rear side of the connecting cylinder 35 in the direction of the arrow B, a hydraulic clamp 37 whose main body is fixedly supported on the frame 13 is provided. Via the grip 37a of 37,
The single pipe 9 inserted into the connection cylinder 35 is provided so as to be able to grip the outer peripheral portion thereof, and the pipe extension device 10 is also provided.
The rotor flange 19 on the rear side of the four sheath tubes 17.
A cleaning mechanism 39, which is formed between the stator flange 16 and the stator flange 16 and can clean the space 40 portion used as the bypass flow passage 70p, supplies water into the space 40 from the water absorption port 391 provided in the upper right part of FIG. , This is shown in FIG.
It is provided so that it can be discharged freely from the drainage port 392 provided in the lower right part. The space 40 is connected to the connection cylinder 3 through the movement of the connection cylinder 35 in the directions of arrows A and B.
5 is formed so as to be able to communicate with the internal space of 5, but is formed inside the single pipe 9 that is inserted into the connecting cylinder 35 via the seal rubber 351 during the mud feeding operation shown in FIG. 2 in the pipe extension device 10. The mud-sending conduit 70 and the bypass passage 70p formed in the space 40 are blocked.

【0023】さらに管延長装置10を構成している各部
材間には適宜なシールパッキンが、ロータフランジ1
8、19及びこれに固定された4本の鞘管17の回転動
作と、各プラグ機構26、27及び可動管12と接続シ
リンダ35の突出後退移動動作と、さらに該管延長装置
10のフレーム13の走行移動動作を妨げない形で随所
に設けられており、これによって、泥水設備7の送泥管
路70は、既に敷設済みの送泥管7Aを構成している複
数接続された単管9の内部空間から、図2に示すように
油圧クランプ37の把持部37aに把持された形で接続
シリンダ35に挿通された単管9と、これに接続された
形で鞘管待機位置ST1に位置している鞘管17の内部
17sに配置している最先頭位置の単管9か或いは、こ
こにおいてこれから接続される新規な単管9’か、或い
は該鞘管待機位置ST1に位置している鞘管17自体の
内部17sを経て管延長装置10内部に吐出されて、前
記バイパス流路70p、70sと選択的に連通した形
で、ジョイントシリンダ15aに嵌合された可動パイプ
12内を通って、該可動パイプ12の図2左側開口端で
ある吐出口12aからフレキシブルパイプ11に送られ
る形で、シールド装置2に、即ち坑口5c側から切羽5
a側に泥水20を供給し得るように構成されている。
Further, appropriate seal packing is provided between the respective members constituting the pipe extension device 10, and the rotor flange 1
8, 19 and four sheath tubes 17 fixed thereto, the rotation operation, the plug mechanisms 26, 27, the movable tube 12 and the connecting cylinder 35 projecting and retracting, and the frame 13 of the tube extension device 10. Is provided everywhere in a manner that does not hinder the traveling movement operation of the mud water. Therefore, the mud sending pipe 70 of the mud equipment 7 constitutes the mud sending pipe 7A which has already been installed. As shown in FIG. 2, the single pipe 9 inserted into the connection cylinder 35 while being held by the holding portion 37a of the hydraulic clamp 37 and the sheath pipe standby position ST1 connected to the single pipe 9 Is located in the innermost 17 s of the sheath tube 17 that is located at the foremost position, or is a new single tube 9'to be connected here, or is located at the sheath tube standby position ST1. Pipe 17s inside the sheath tube 17 itself The discharge pipe is discharged into the extension device 10 and selectively communicates with the bypass flow passages 70p and 70s, and passes through the inside of the movable pipe 12 fitted in the joint cylinder 15a to open the movable pipe 12 on the left side in FIG. The face 5 is fed to the shield device 2, that is, from the side of the well hole 5c, in the form of being sent to the flexible pipe 11 from the discharge port 12a which is the end.
It is configured so that the muddy water 20 can be supplied to the a side.

【0024】ところで、管延長装置10における送泥時
には、該鞘管待機位置ST1に位置している鞘管17に
1本の単管9が配置して、該単管9を介して泥水20の
供給が行われる場合があり、また、該鞘管17自体が送
泥管路70を形成している場合もあるが、管延長装置1
0内部において非接続状態にあってこれから接続される
形で直列する一対の単管9、9の接合部は、図7に示す
ように、前記接続シリンダ35と鞘管待機位置ST1に
位置する鞘管17の間に位置する形になっている。各単
管9において隣接する他の単管9との接合部分には、該
単管9の矢印B方向端部に全内周に亙って雌ジョイント
部91が形成されており、雌ジョイント部91には係合
溝91aが形成されている。一方各単管9の矢印A方向
端部には全外周に亙って雄ジョイント部92が形成され
ており、雄ジョイント部92には係合突起92aが、前
記雌ジョイント部91の係合溝91aと係合し得る形で
円環状に形成されている。係合突起92aは、泥水管7
Aの断面放射方向内外である図7矢印G、H方向に拡大
収縮自在な形になっており、即ち係合突起92aは例え
ば、2つ割環状に形成されて雌ジョイント部91の内径
に対応した径まで縮径自在なリング状部材を適宜なバネ
手段を介して放射方向外側である矢印G方向側に付勢し
た状態で雄ジョイント92に締着したものにより構成さ
れている。そして、矢印A、B方向に隣接する単管9、
9は、雌ジョイント部91に雄ジョイント部92を押し
込む形で、図8に示すように、一方に対して他方を接合
させることがワンタッチで出来るように構成されてお
り、また雄ジョイント部92と雌ジョイント部91との
間には適宜なOリング、シール等が配設されて、該接合
される単管9、9の接合箇所間がシールされた状態にな
っている。なお、前記雌ジョイント91には雄ジョイン
ト92に設けられた係合突起92を放射方向内側である
矢印H方向側に縮径させるためのピンを挿し込む為のピ
ン挿し孔(図示せず)が穿設形成されており、上述した
ように接合される単管9、9は該ピン挿し孔に係合解除
ピンを挿し込むことによってその係合が解除され得るよ
うに構成されている。
By the way, when the mud is sent by the pipe extension device 10, one single pipe 9 is arranged in the sheath pipe 17 located at the sheath pipe standby position ST1, and the muddy water 20 is passed through the single pipe 9. There is a case where the supply is performed, and there is a case where the sheath pipe 17 itself forms the mud-sending line 70.
As shown in FIG. 7, the joint portion of the pair of single pipes 9 that are in a disconnected state and are connected to each other in the inside of 0 is a sheath located at the sheath pipe standby position ST1 with the connection cylinder 35. It is shaped to be located between the tubes 17. A female joint portion 91 is formed at the end of the single pipe 9 in the direction of arrow B over the entire inner circumference at the joint portion with the adjacent single pipe 9 in each single pipe 9. An engaging groove 91a is formed in 91. On the other hand, a male joint portion 92 is formed at the end portion of each single pipe 9 in the direction of arrow A over the entire outer circumference. The male joint portion 92 has an engaging projection 92a and the female joint portion 91 has an engaging groove. It is formed in an annular shape so that it can engage with 91a. The engaging projection 92a is provided with the muddy water pipe 7.
7 has a shape that can be expanded and contracted in the directions of arrows G and H, which are inside and outside in the radial direction of the cross section, that is, the engagement projection 92a is formed in, for example, a split annular shape and corresponds to the inner diameter of the female joint portion 91. A ring-shaped member whose diameter can be freely reduced to the above diameter is fastened to the male joint 92 in a state of being urged toward the arrow G direction side which is the outer side in the radial direction via an appropriate spring means. Then, the single pipes 9 adjacent in the directions of the arrows A and B,
9 is a form in which the male joint portion 92 is pushed into the female joint portion 91, and as shown in FIG. 8, it is configured so that one can be joined to the other, and the male joint portion 92 and Appropriate O-rings, seals, and the like are provided between the female joint portion 91 and the joint portions of the single pipes 9 to be joined so that the joint portions are sealed. It should be noted that the female joint 91 has a pin insertion hole (not shown) for inserting a pin for reducing the diameter of the engagement projection 92 provided on the male joint 92 toward the arrow H direction side which is the radial inner side. The single pipes 9, 9 that are formed by boring and are joined as described above are configured so that the engagement can be released by inserting an engagement release pin into the pin insertion hole.

【0025】トンネル1とこれを構築するシールド装置
2等は以上のような構成を有しているので、該トンネル
1を構築するには、シールド装置2の切削刃部分を回転
駆動させて地盤3を断面形状円形をなす形で切り拓き、
該シールド装置2内からその後方に直続する形でセグメ
ントを順次建込み覆工することにより、坑道5を矢印B
方向側からA方向側に向かって前進させる形で形成して
いく。こうして、地盤3を切り拓くことにより坑道5を
形成しようとするとき、切羽5a部分は、シールド切削
刃により掻き乱されて未だセグメント覆工されていない
ことから不安定状態を呈し、逸泥し、そして崩壊せんと
する。そこで、地盤3を掘削する際には、泥水設備7の
送泥管路70を介して、シールド装置2の隔壁内からそ
の切削刃に泥水20を加圧送給して、切羽5aの安定を
確保しつつ掘削作業を行う。また、シールド切削刃が地
盤3を掘削することにより形成されるズリは、前述した
ように送泥管路70により加圧送給された泥水20と混
合して、これをシールド装置2の除礫装置を介して除礫
後、送泥管路70と同様に構成される排泥管路(図示せ
ず)を介して矢印B方向側へ排泥する形で坑道5外へ搬
出するようにして、切羽5aから速やかに除去し、該切
羽5aにおいてシールド切削刃を常時円滑に回転させる
ようにする。
Since the tunnel 1 and the shield device 2 and the like for constructing the tunnel 1 have the above-described structure, in order to construct the tunnel 1, the cutting blade portion of the shield device 2 is driven to rotate and the ground 3 is formed. Opening up the cross section in the form of a circle,
By sequentially erection and lining the segments in the shield device 2 so as to directly connect to the rear of the shield device 2,
It is formed by advancing from the direction side toward the direction A side. Thus, when the tunnel 5 is to be formed by carving the ground 3, the face 5a is disturbed by the shield cutting blade and has not yet been lined with a segment, resulting in an unstable state and slipping. And try to collapse. Therefore, when excavating the ground 3, the mud water 20 is pressure-fed from the inside of the partition wall of the shield device 2 to the cutting blade via the mud-feeding conduit 70 of the mud equipment 7 to secure the stability of the face 5a. While excavating. Further, the scraps formed by the shield cutting blade excavating the ground 3 are mixed with the mud water 20 pressure-fed by the mud-feeding conduit 70 as described above, and this is removed by the debris removal device of the shield device 2. After removing the debris through the pipe, the sludge is discharged to the outside of the gallery 5 in the form of sludge in the direction of the arrow B through a sludge discharge line (not shown) configured similarly to the mud transport line 70, The face 5a is quickly removed, and the shield cutting blade is always smoothly rotated on the face 5a.

【0026】そこで、シールド切削刃を回転させての切
羽5aの掘削作業時には、接続シリンダ35を介して受
け入れられた形で管延長装置10内にその後側から入り
込み、送泥管7Aの最先頭位置に配置している単管9の
開口端9aを、図9に示すように、図9下側に示す鞘管
待機位置ST1に位置している鞘管17の前端部分の図
9左端部POS1に配置させる形で位置決めしておく。
この状態で、送泥管路70を介してシールド装置2に泥
水20を送給する為に、坑口5cから送泥管7Aを構成
している複数の単管9の最後端(矢印B側端部)に泥水
20を供給し、当該泥水20を圧送ポンプ設備(図示せ
ず)等を介して所定の圧力で矢印A方向に圧送する。す
ると、坑口5cから送泥管7Aに供給された泥水20は
送泥管路70を通過する形で、図9に示すように該送泥
管7Aの最先頭位置にある単管9の開口端9aから管延
長装置10内に吐出されて、その圧送勢をもって可動管
12内に流入する形で該可動管12の図2左端に図示す
る吐出口12aからフレキシブルパイプ11に吐出され
る。そして、フレキシブルパイプ11内に吐出された泥
水20は、シールド装置2の隔壁内上部等に圧送供給さ
れて、切羽5aの安定を保持する。なお切羽5aで掘削
形成されたズリは上述したように切羽5aに供給された
泥水20と混合して排泥管路を介して坑口5cに排出す
る為に、送泥管7Aと泥水20の流通方向が逆である排
泥管を介して該排泥管内を矢印B方向に圧送し、坑口5
c等から坑道5外へ排出する。
Therefore, at the time of excavating the face 5a by rotating the shield cutting blade, it enters into the pipe extension device 10 from the rear side in a form received through the connecting cylinder 35, and reaches the most front position of the mud pipe 7A. As shown in FIG. 9, the open end 9a of the single pipe 9 arranged at the position shown in FIG. 9 is connected to the left end portion POS1 of FIG. 9 of the front end portion of the sheath pipe 17 positioned at the sheath pipe standby position ST1 shown in the lower side of FIG. Position them so that they are arranged.
In this state, in order to feed the muddy water 20 to the shield device 2 via the mud feeding line 70, the rear end of the plurality of single pipes 9 (the end on the arrow B side) forming the mud feeding pipe 7A from the wellhead 5c. Part), and the muddy water 20 is pressure-fed in the direction of arrow A at a predetermined pressure through a pressure-fed pump facility (not shown) or the like. Then, the muddy water 20 supplied from the wellhead 5c to the mud transport pipe 7A passes through the mud transport pipe 70, and as shown in FIG. 9, the open end of the single pipe 9 at the most front position of the mud transport pipe 7A. 9a is discharged into the pipe extension device 10 and is discharged into the flexible pipe 11 from the discharge port 12a shown at the left end of FIG. Then, the muddy water 20 discharged into the flexible pipe 11 is pressure-fed and supplied to the upper part of the partition wall of the shield device 2 or the like to maintain the stability of the face 5a. In addition, since the scraps excavated and formed by the cutting face 5a are mixed with the mud water 20 supplied to the cutting face 5a and discharged to the wellhead 5c through the mud discharge pipe line as described above, the mud pipe 7A and the mud water 20 are circulated. The inside of the sludge pipe is pressure-fed in the direction of arrow B through the sludge pipe in the opposite direction, and the wellhead 5
Discharge from the c etc. to the outside of the gallery 5.

【0027】なお、こうして送泥管7Aによって泥水2
0を切羽5aに送泥する際に、管延長装置10におい
て、図9上側に示す鞘管待機位置ST2、ST3、ST
4に配置している鞘管17には、送泥管7Aの最先頭位
置を構成している単管9に継ぎ足されるべき新たな単管
9’がここにそれぞれ収納された状態になっているか、
或いは当該鞘管17に収納するための装填作業が行われ
ている最中である。このため、鞘管待機位置ST2、S
T3、ST4に配置している各鞘管17の前後の開閉機
構であるプラグ機構26、27は、その開閉状態が、例
えばプラグ機構26側では、図5に示す閉合状態か、或
いは図6に示す開放状態の、いずれか任意の状態を呈し
ている。この際、管延長装置10は、各プラグ機構2
6、27を介して各鞘管17を個別にその前後において
任意に閉塞するように構成されているところから、上述
した単管9’の装填作業をおこなっている鞘管17のみ
を、既に単管9’が収納されている鞘管17と送泥管路
70になっている鞘管待機位置ST1に位置する鞘管1
7に対して圧力的に隔離する形(即ち図5上側に示す状
態)にしておいて、ここで装填作業を行い、その他の鞘
管17ではこれに収容された単管9’が鞘管待機位置S
T1に配置している鞘管17中の単管9と内通した状態
(即ちバイパス70s、70pの連通状態)で、泥水2
0を管延長装置10外に漏出させることなく送泥作業を
行うことが出来る。従って、この状態で、プラグ機構2
6、27が後退開放状態にある鞘管待機位置ST2、S
T3、ST4に位置する各鞘管17に収容された単管
9’の内部には、管延長装置10内に形成されたバイパ
ス管路70p、70sを介して送泥管7A中の泥水20
が該各々の単管9’内に流れ込む形で、装填作業を行っ
ていない鞘管17に既に収容された各単管9’内は所定
の圧力の泥水20で満たされている。
In this way, the mud water 2 is supplied by the mud pipe 7A.
When 0 is sent to the face 5a, in the pipe extension device 10, the sheath pipe standby positions ST2, ST3, ST shown in the upper side of FIG.
In the sheath pipe 17 arranged in No. 4, is there a state in which new single pipes 9'to be added to the single pipe 9 forming the most leading position of the mud pipe 7A are stored here respectively? ,
Alternatively, a loading operation for storing the sheath tube 17 is being performed. Therefore, the sheath tube standby positions ST2, S
The open / closed states of the plug mechanisms 26 and 27, which are the open / close mechanisms for the front and rear of the respective sheath pipes 17 arranged at T3 and ST4, are, for example, on the plug mechanism 26 side, the closed state shown in FIG. Any one of the open states shown is exhibited. At this time, the pipe extension device 10 includes the plug mechanisms 2
Since each of the sheath tubes 17 is configured to be individually closed via front and rear via 6 and 27, only the sheath tubes 17 for which the above-mentioned single tube 9'is loaded are already separated. The sheath pipe 17 in which the pipe 9 ′ is housed and the sheath pipe 1 located at the sheath pipe standby position ST1 which is the mud transport line 70
7 is pressure-isolated (that is, the state shown in the upper side of FIG. 5), and the loading operation is performed here. In the other sheath pipes 17, the single pipe 9 ′ accommodated therein is in the standby state. Position S
In the state of communicating with the single pipe 9 in the sheath pipe 17 disposed at T1 (that is, the communication state of the bypasses 70s and 70p), the muddy water 2
It is possible to perform the mud sending work without leaking 0 to the outside of the pipe extension device 10. Therefore, in this state, the plug mechanism 2
Sheath tube standby positions ST2 and S where 6 and 27 are in the retracted open state
Inside the single pipe 9 ′ housed in each sheath pipe 17 located at T3 and ST4, the muddy water 20 in the mud pipe 7A is passed through the bypass pipes 70p and 70s formed in the pipe extension device 10.
Each of the single pipes 9 ′ already stored in the unfilled sheath pipe 17 is filled with muddy water 20 of a predetermined pressure in a form of flowing into each of the single pipes 9 ′.

【0028】ところで、シールド装置2が切羽5aを掘
進することにより、当該シールド装置2が矢印A方向へ
前進したなら、これに遅滞なく追従させる形で、仮軌条
6を矢印A方向に延長して前記シールド装置2の後続台
車を前進させると共に、泥水設備7の送泥管路70を排
泥管路と共に矢印A方向に延長させなければならない。
送泥管路70を矢印A方向に延長するには、管延長装置
10を用いて最先頭位置の単管9に延長用の単管9’を
継ぎ足すことにより送泥管7Aを延長させる形で、管延
長作業を行う。なお、送泥管7Aを延長しなくてもフレ
キシブルパイプ11が変形することによりシールド装置
2のある程度の前進は可能なので、該装置2が単管9の
一本分の長さL1に相当するだけ矢印A方向に前進した
ところで、送泥管7Aの延長作業を行う。
If the shield device 2 advances in the direction of arrow A as the shield device 2 excavates the face 5a, the provisional rail 6 is extended in the direction of arrow A so as to follow this without delay. The trailing carriage of the shield device 2 must be moved forward, and the mud sending pipe 70 of the mud equipment 7 must be extended in the direction of arrow A together with the mud discharging pipe.
In order to extend the mud pipe 70 in the direction of arrow A, the mud pipe 7A is extended by adding a single pipe 9'for extension to the single pipe 9 at the foremost position using the pipe extension device 10. Then, the pipe extension work is performed. Since the flexible device 11 can be deformed to extend the shield device 2 to some extent without extending the mud pipe 7A, the device 2 corresponds to the length L1 of one single pipe 9. When it advances in the direction of arrow A, the mud pipe 7A is extended.

【0029】そこで以下に、図9乃至図11に基づいて
送泥管7Aの延長方法について述べるが、図9乃至図1
0においては説明の便宜上、これ等の図における下部側
に鞘管待機位置ST1が設定されている一方で、該鞘管
待機位置ST1の上部側に図示されている部分に鞘管待
機位置ST2が設定されて、該鞘管待機位置ST1、S
T2は主軸軸心に対して互いに90度をなす位置に配置
しているものとする。いま、切羽5aの掘削作業時(即
ち送泥時)には先に述べたように、送泥管7Aの最先頭
部分を構成している単管9の開口端9aが、図9に示す
ように、鞘管待機位置ST1に位置している鞘管17の
図9左端部矢印POS1位置に配置されており、この状
態からまず、仮軌条6を介してフレーム13を、単管9
の長さL1に対応した長さ分だけ矢印A方向に前進移動
させる。なお、フレーム13の移動動作時には、油圧ク
ランプ37を図10に示すように解放すれば、接続シリ
ンダ35に挿通されていた単管9が把持部37aの内側
を通過する形で、フレーム13は敷設済みの送泥管7A
に対して容易に前進移動する。すると、フレーム13の
前進移動動作によって鞘管待機位置ST1に位置する鞘
管17内の単管9は、図10に示すように、該鞘管17
に対して矢印B方向に相対移動する形になり、これによ
って該単管9の開口端9aは、鞘管待機位置ST1に配
置している鞘管17の後側であるPOS2位置まで退避
する。なお、送泥管7Aの最先頭部分を構成している単
管9が鞘管17に対して矢印B方向に移動するのは、フ
レーム13の前進移動に起因する相対的なものであっ
て、既に敷設済みの該送泥管7Aにおける管延長装置1
0の後方側に配置する部分は、先に述べたようにインバ
ート5b等に仮固定される形で、何等移動することはな
い。こうして、送泥管7Aの開口端9aが図10POS
2位置まで退避すると、これによって図10下側の鞘管
待機位置ST1には、開口端9aと可動管12との間に
配置する形で、延長用の単管9’が一本分継ぎ足され得
る空隙SPが生じる。そこで、鞘管待機位置ST1に形
成された空隙SPに、新たな単管9’を装填してこれ
を、その開口端9aがPOS2位置に退避した単管9に
接続する形で管延長作業を行うが、実際に単管9、9’
が接続されるまでの間、即ち図10に示すように鞘管待
機位置ST1に配置している鞘管17中に空隙SPが形
成されていてここに単管9がない間も、泥水20は、該
鞘管待機位置ST1に配置している鞘管17自体の内部
17sを挿通される形で、その送泥がとぎれることはな
い。即ち、フレーム13の前進移動によって、管延長装
置10の後側に送り出される単管9は、接続シリンダ3
5の後部に設けられたパイプシール36によって、該接
続シリンダ35の内周面と該単管9の外周部との間を前
後方向に何重にもシールされた形で、ここから泥水20
が管延長装置10外に漏出することが防止されているの
で、該フレーム13前進中も泥水20の漏出なく送泥を
継続出来る。
Therefore, a method for extending the mud pipe 7A will be described below with reference to FIGS. 9 to 11.
In Fig. 0, for convenience of explanation, the sheath tube standby position ST1 is set on the lower side in these figures, while the sheath tube standby position ST2 is set on the upper side of the sheath tube standby position ST1. Once set, the sheath tube standby positions ST1, S
It is assumed that T2 is arranged at a position forming 90 degrees with respect to the main shaft axis. At the time of excavating the face 5a (that is, during mud feeding), as described above, the open end 9a of the single pipe 9 that constitutes the most leading portion of the mud feeding pipe 7A is as shown in FIG. 9 is located at the left end arrow POS1 in FIG. 9 of the sheath pipe 17 located at the sheath pipe standby position ST1. From this state, first, the frame 13 is connected to the single pipe 9 via the temporary rail 6.
Is moved forward in the direction of arrow A by a length corresponding to the length L1. During the movement operation of the frame 13, if the hydraulic clamp 37 is released as shown in FIG. 10, the frame 13 is laid so that the single pipe 9 inserted into the connection cylinder 35 passes through the inside of the grip portion 37a. Already sent mud pipe 7A
Move forward easily against. Then, as shown in FIG. 10, the single pipe 9 in the sheath pipe 17 positioned at the sheath pipe standby position ST1 by the forward movement operation of the frame 13 is
In contrast, the opening end 9a of the single pipe 9 is retracted to the POS2 position which is the rear side of the sheath pipe 17 arranged at the sheath pipe standby position ST1. The movement of the single pipe 9 forming the foremost part of the mud pipe 7A in the direction of arrow B with respect to the sheath pipe 17 is relative to the forward movement of the frame 13, Pipe extension device 1 for the already installed mud pipe 7A
The portion arranged on the rear side of 0 is temporarily fixed to the invert 5b or the like as described above, and does not move at all. In this way, the opening end 9a of the mud pipe 7A is shown in FIG.
When retracted to the 2 position, a single pipe 9'for extension is added to the sheath pipe standby position ST1 shown in the lower side of Fig. 10 by arranging it between the open end 9a and the movable pipe 12. A void SP is obtained. Therefore, the pipe extension work is performed by loading a new single pipe 9'into the space SP formed at the sheath pipe standby position ST1 and connecting the new single pipe 9'to the single pipe 9 whose open end 9a is retracted to the POS2 position. Do, but actually single tube 9, 9 '
Until the gap is connected, that is, while the void SP is formed in the sheath pipe 17 arranged at the sheath pipe standby position ST1 as shown in FIG. Since the inside 17s of the sheath pipe 17 itself arranged at the sheath pipe standby position ST1 is inserted, the mud feed is not interrupted. That is, the forward movement of the frame 13 causes the single pipe 9 sent to the rear side of the pipe extension device 10 to move to the connecting cylinder 3
The pipe seal 36 provided at the rear portion of the pipe 5 seals the inner peripheral surface of the connecting cylinder 35 and the outer peripheral portion of the single pipe 9 in multiple layers in the front-rear direction.
Is prevented from leaking to the outside of the pipe extension device 10, so that the mud can be continued without leaking the mud water 20 while the frame 13 is moving forward.

【0030】そこで、フレーム13の前進移動によって
鞘管待機位置ST1の鞘管17内に配置していた単管9
の開口端9aを図10に示すようにPOS2位置まで退
避させたところで、次に各プラグ機構26のプラグ2
9、各プラグ機構27の開閉シリンダ32、可動パイプ
12及び接続シリンダ35をそれぞれ図10に示すよう
に後退駆動させることによって、各々の鞘管17前後を
閉栓する形のプラグ29、開閉シリンダ32を、可動パ
イプ12及び接続シリンダ35と共に、それぞれ前後の
ロータフランジ18、19から縁切りして、これ等2
9、32、12、35をステータフランジ15、16側
に接続退避させる。なお、プラグ29、開閉シリンダ3
2、可動パイプ12及び接続シリンダ35は、その各々
の突出先端側に設けられたシールゴム293、321、
351等を介して、図10に示すその後退退避状態にお
いて、ステータフランジ15のプラグ退避孔15s或い
はジョイントシリンダ15a、又はステータフランジ1
6のシリンダ装着孔16s或いは接続シリンダ35前端
縁部の、各々の内周部分と水密に接続された状態になっ
ているところから、この状態においてもなお、送泥管路
70を介して泥水20の圧送供給を継続して、管延長装
置10から泥水20が坑道5中に漏出することはない。
Therefore, the forward movement of the frame 13 causes the single pipe 9 placed in the sheath pipe 17 at the sheath pipe standby position ST1.
When the open end 9a of the plug mechanism 26 is retracted to the POS2 position as shown in FIG.
9, the open / close cylinder 32 of each plug mechanism 27, the movable pipe 12 and the connecting cylinder 35 are driven backward as shown in FIG. , The movable pipe 12 and the connecting cylinder 35 are cut from the front and rear rotor flanges 18 and 19, respectively.
9, 32, 12, 35 are connected and retracted to the stator flanges 15, 16 side. The plug 29 and the opening / closing cylinder 3
2, the movable pipe 12 and the connection cylinder 35 are provided with seal rubbers 293, 321 provided on the respective projecting tip sides thereof.
In the retracted retracted state shown in FIG. 10 via the 351 or the like, the plug retracting hole 15s of the stator flange 15 or the joint cylinder 15a, or the stator flange 1
6 is in a state of being watertightly connected to the inner peripheral portion of each of the cylinder mounting hole 16s of 6 or the connecting cylinder 35 and the front end edge portion thereof. The muddy water 20 does not leak into the gallery 5 from the pipe extension device 10 by continuing the pressure-feeding of the pipe extension device 10.

【0031】こうしてプラグ29、開閉シリンダ32
を、可動パイプ12及び接続シリンダ35と共に、図1
0に示すように、それぞれ前後のロータフランジ18、
19から縁切りすると、該ロータフランジ18、19と
これ等の間に懸架された4本の鞘管17により構成され
る回転体14は、ステータフランジ15、16に対して
回転自在な形に解放される。これと共に、回転体14と
前後のステータフランジ15、16の間にはそれぞれ、
バイパス流路70s、70pが、バイパス流路70pは
接続シリンダ35の内部にある送泥管路70が該接続シ
リンダ35の開口端から空間40部分を介して鞘管待機
位置ST2、ST3、ST4に配置している鞘管17の
内部17sに連通する形で、バイパス流路70sは該鞘
管待機位置ST2、ST3、ST4に配置している鞘管
17の内部17sが、ジョイントシリンダ15aに嵌合
された可動パイプ12の内部にある送泥管路70と連通
した形で、送泥水の本流である送泥管路70と別途に形
成される。この状態で、油圧モータ23、駆動ギヤ22
を介して主軸21を所定の回転駆動量だけ回転させるこ
とによって、回転体14を、該主軸21の軸心CT0を
回転中心として、例えば矢印M方向(或いはN方向)に
90度回転させる。なお、先に述べたように図9乃至図
10においては、これ等の図上部に図示した鞘管待機位
置ST2に対して90度をなす位置に鞘管待機位置ST
1が配置している。従って、こうして主軸21を介して
回転体14を矢印M方向に90度回転させると、4本の
鞘管17は、その配置位置が90度づつ移動してここに
位置決めされる形になり、これによって、先に(図9に
示す状態では)鞘管待機位置ST1に配置していて、フ
レーム13の前進移動によって開口端9aがその後側の
POS2位置に配置するようその内部から単管9が退避
した鞘管17は、図3に示すように鞘管待機位置ST1
から90度矢印M方向側に位置する鞘管待機位置ST4
部分に移動して、図10図示されない部分に移動する。
これと同時に、単管9の退避によって空隙SPが形成さ
れていた鞘管待機域ST1には、先に(図9に示す状態
では)鞘管待機位置ST2に配置していてその内部17
sに1本の単管9’が収納された鞘管17が配置して、
これによって該空隙STには新規な単管9’が、その材
軸心を泥水管7Aの先頭部分を構成している単管9の材
軸心と整合させた形で、直列に配置される。当該新規な
単管9’は未だ泥水管7Aの最先頭部分を構成している
単管9と接続されていないが、先に述べた回転体14の
回転駆動動作に先立ち、プラグ29、開閉シリンダ3
2、接続シリンダ35を後退させた際に、これ等のプラ
グ29、開閉シリンダ32が閉栓していた各鞘管17の
内部17sに収容された単管9’内には、送泥管路70
と連通したバイパス流路70s、70pを介して各単管
9’内部に該送泥管路70中の泥水20が、該送泥管路
70と略同等の圧力をもって流通した状態になっている
ところから、いま新たに鞘管待機位置ST1に配置した
鞘管17内の新たな単管9’の内部には、該鞘管待機位
置ST1に回転移動してくる以前から、また、回転動作
中も継続して、送泥管路70と略同等の所定の圧力の泥
水20が流通した状態になる。即ち、回転体14の回転
動作中には、該回転体14における鞘管17が互いの位
置を入れ替える形で、90度隣接する鞘管待機位置に移
動することになる。このため、回転体14の回転動作中
には、接続シリンダ35と可動パイプ12の間において
当該回転動作時以外のときには送泥管路70として用い
られている鞘管待機位置ST1に、鞘管17が配置して
いない状態が現れるが、この際に、敷設済み送泥管7A
の開口端9aが図10POS2位置において管延長装置
10内に吐出した泥水20は、図10に示すようにバイ
パス流路70pを介して各鞘管17の内部17sを通
り、バイパス流路70sを介して可動パイプ12側に圧
送される形で、所定の圧力で流通した状態が継続され
る。従って、主軸21を介しての鞘管17の回転動作時
及び、該鞘管17内の新規の単管9’が敷設済み泥水管
7Aの単管9と未だ非接続状態にあるときも、可動管1
2の吐出口12aからフレキシブルパイプ11に吐出さ
れる泥水20の吐出圧が降下することはなく、常に所定
の状態で送泥を継続させることが出来る。
Thus, the plug 29 and the opening / closing cylinder 32
1 together with the movable pipe 12 and the connecting cylinder 35.
0, front and rear rotor flanges 18,
When edging from 19, the rotor 14 constituted by the rotor flanges 18, 19 and the four sheath tubes 17 suspended between them is released in a rotatable manner with respect to the stator flanges 15, 16. It Along with this, between the rotor 14 and the front and rear stator flanges 15 and 16, respectively,
The bypass flow passages 70s and 70p and the bypass flow passage 70p are located inside the connecting cylinder 35. The mud-sending pipe passage 70 extends from the open end of the connecting cylinder 35 to the sheath pipe standby positions ST2, ST3 and ST4 via the space 40 portion. In the bypass passage 70s, the inside 17s of the sheath pipe 17 arranged at the sheath pipe standby positions ST2, ST3, ST4 is fitted to the joint cylinder 15a so as to communicate with the inside 17s of the sheath pipe 17 arranged. It is formed separately from the mud sending pipe 70, which is the main stream of the mud sending water, in the form of communicating with the mud sending pipe 70 inside the movable pipe 12 thus formed. In this state, the hydraulic motor 23 and the drive gear 22
By rotating the main shaft 21 by a predetermined rotational drive amount via the rotary shaft 14, the rotating body 14 is rotated by 90 degrees in the arrow M direction (or N direction) with the axial center CT0 of the main shaft 21 as the rotation center. In addition, as described above, in FIGS. 9 to 10, the sheath tube standby position ST is located at a position 90 degrees with respect to the sheath tube standby position ST2 shown in the upper part of these figures.
1 is arranged. Therefore, when the rotary body 14 is rotated through 90 degrees in the direction of the arrow M through the main shaft 21 in this way, the four sheath tubes 17 are moved to the position where they are arranged by 90 degrees, and the four sheath tubes 17 are positioned there. Thus, the single pipe 9 is retracted from the inside so that the sheath pipe standby position ST1 is arranged first (in the state shown in FIG. 9) and the opening end 9a is arranged at the rear side POS2 position by the forward movement of the frame 13. As shown in FIG. 3, the sheath tube 17 is moved to the sheath tube standby position ST1.
90 degrees from the sheath tube standby position ST4 located on the arrow M direction side
Move to a part and move to a part not shown in FIG.
At the same time, in the sheath tube standby area ST1 where the void SP was formed by the withdrawal of the single tube 9, the sheath tube standby position ST2 was previously arranged (in the state shown in FIG. 9) and the inside 17
The sheath tube 17 in which one single tube 9'is stored is arranged in s,
As a result, a new single tube 9'is arranged in series in the space ST with its material axis aligned with the material axis of the single tube 9 forming the head portion of the mud pipe 7A. . Although the new single pipe 9'is not yet connected to the single pipe 9 forming the foremost portion of the muddy water pipe 7A, the plug 29 and the opening / closing cylinder are provided prior to the rotational driving operation of the rotating body 14 described above. Three
2. When the connecting cylinder 35 is retracted, the plug 29 and the opening / closing cylinder 32 are closed.
The mud water 20 in the mud sending conduit 70 is in a state of flowing with a pressure substantially equal to that of the mud sending conduit 70 inside each single pipe 9'through the bypass flow paths 70s and 70p communicating with the mud sending conduit 70 '. Therefore, in the inside of the new single pipe 9'in the sheath pipe 17 which is now newly arranged at the sheath pipe standby position ST1, before it is rotationally moved to the sheath pipe standby position ST1, and during the rotating operation. The muddy water 20 having a predetermined pressure substantially equal to that of the mud-sending conduit 70 continues to flow. That is, during the rotating operation of the rotating body 14, the sheath tubes 17 of the rotating body 14 move to the sheath tube standby positions adjacent to each other by 90 degrees in such a manner that their positions are interchanged. Therefore, during the rotating operation of the rotating body 14, the sheath tube 17 is placed between the connecting cylinder 35 and the movable pipe 12 at the sheath tube standby position ST1 used as the mud conveying line 70 except during the rotating operation. Appears, but at this time the installed mud pipe 7A
The muddy water 20 discharged into the pipe extension device 10 at the POS2 position of the open end 9a of FIG. 10 passes through the inside 17s of each sheath pipe 17 through the bypass flow passage 70p and the bypass flow passage 70s as shown in FIG. In the form of being pumped to the movable pipe 12 side, the state of circulation at a predetermined pressure is continued. Therefore, even when the sheath pipe 17 is rotated through the main shaft 21 and when the new single pipe 9'in the sheath pipe 17 is still not connected to the single pipe 9 of the installed muddy water pipe 7A, it is movable. Tube 1
The discharge pressure of the muddy water 20 discharged from the second discharge port 12a to the flexible pipe 11 does not decrease, and the mud feeding can be always continued in a predetermined state.

【0032】こうして鞘管待機位置ST1に新たな単管
9’が配置されると、その開口端9aが先に述べたよう
にPOS2位置に退避した単管9と、これに接合される
べき新規な単管9’は、その接合部分が図7に示すよう
に、単管9の開口端9aの退避位置であるPOS2位置
において、単管9の雄ジョイント部92が新規な単管
9’の雌ジョイント部91と対向した形になる。そこ
で、この状態で、図11に示すように、まず、油圧クラ
ンプ37を駆動させて、その把持部37aで既に敷設済
みの単管9の外周部を把持する。こうしておいて、可動
パイプ12を矢印B方向に突出駆動させると、該可動パ
イプ12はその最突出状態において、鞘管待機位置ST
1に配置している新たな単管9’を矢印B方向に向けて
押す形で、該新たな単管9’の雌ジョイント部91を単
管9の雄ジョイント部92に嵌合させる。即ち新たな単
管9’は、図7及び図8に示すように、その雌ジョイン
ト部91の内周面を介して、単管9側の係合突起92a
を一旦放射方向内側である矢印H方向側に縮径させ、該
単管9’が矢印B方向に向けて移動する動作によって、
係合突起92aと係合溝91aが配置整合したところ
で、該一旦縮径された係合突起92aが該係合突起92
自体に付与されたバネ力を介して単管9’側の係合溝9
1aにおいて放射方向外側である矢印G方向に拡径する
形で、雄ジョイント部92と雌ジョイント部91が係合
する。これによって、単管9、9’が、ボルト締め等の
手間なくワンタッチで接合されて、即ち送泥管7Aの最
先頭部分を構成していた単管9に新たな単管9’が一本
継ぎ足されて、該送泥管7Aは、単管9の1本の長さL
1に対応した長さ分だけ(即ちフレーム13の前進移動
量に対応した長さ文だけ)延長される。なお、こうして
ジョイント部91、92を介して一旦接合された単管
9、9’は前記係合解除ピン等を前記ピン挿し孔に挿し
込まない限り係合解除され得ないように、堅固に係合さ
れる。これに加えて、矢印A、B方向に隣接する単管
9、9間には、雄ジョイント部92と雌ジョイント部9
1との間にOリング等が設けられていることによって、
該単管9、9’間から泥水20が漏洩し得ない形で、送
泥管路70が矢印A、B方向に連続的に形成される。こ
うして行われる単管9、9’の接合作業中もまた、泥水
20の送泥作業は継続される。こうして、いま新たに接
合された単管9’の非接合側開口端である矢印A方向側
端部が、泥水管7Aにおける新たな開口端9aとなっ
て、該開口端9aが、再び図9に示す鞘管待機位置ST
1のPOS1位置に配置する形で、送泥が継続される。
When the new single tube 9'is thus arranged at the sheath tube standby position ST1, the open end 9a of the single tube 9 retracted to the POS2 position as described above and the new single tube to be joined thereto. 7, the male joint portion 92 of the single pipe 9 is connected to the new single pipe 9 ′ at the POS2 position, which is the retracted position of the open end 9a of the single pipe 9, as shown in FIG. The shape faces the female joint portion 91. Therefore, in this state, as shown in FIG. 11, first, the hydraulic clamp 37 is driven to grip the outer peripheral portion of the single pipe 9 already laid by the grip portion 37a. In this way, when the movable pipe 12 is driven to project in the direction of arrow B, the movable pipe 12 is in the most projecting state, and is in the sheath pipe standby position ST.
The new single pipe 9'disposed in No. 1 is pushed in the direction of the arrow B to fit the female joint portion 91 of the new single pipe 9'to the male joint portion 92 of the single pipe 9. That is, as shown in FIGS. 7 and 8, the new single tube 9 ′ has the engagement projection 92 a on the single tube 9 side via the inner peripheral surface of the female joint portion 91.
By once reducing the diameter toward the direction of the arrow H, which is the inner side of the radial direction, and moving the single tube 9 ′ in the direction of the arrow B,
When the engagement protrusion 92a and the engagement groove 91a are aligned and aligned, the once reduced diameter engagement protrusion 92a is replaced with the engagement protrusion 92a.
The engagement groove 9 on the side of the single pipe 9'via the spring force applied to itself.
1a, the male joint portion 92 and the female joint portion 91 are engaged with each other so as to expand in the arrow G direction which is the outer side in the radial direction. As a result, the single pipes 9 and 9'are joined by one-touch without trouble such as bolt tightening, that is, a new single pipe 9'is formed on the single pipe 9 which was the most leading part of the mud transport pipe 7A. The mud pipe 7A is replenished to form a single pipe 9 having a length L.
It is extended by the length corresponding to 1 (that is, only the length sentence corresponding to the amount of forward movement of the frame 13). It should be noted that the single pipes 9 and 9'which are once joined via the joint portions 91 and 92 in this manner are firmly engaged so that they cannot be disengaged unless the engagement release pins or the like are inserted into the pin insertion holes. Are combined. In addition to this, between the single pipes 9 and 9 adjacent in the directions of arrows A and B, the male joint portion 92 and the female joint portion 9 are provided.
By providing an O-ring, etc. with 1,
The mud-sending conduit 70 is continuously formed in the directions of arrows A and B so that the mud water 20 cannot leak from between the single pipes 9 and 9 '. The mud sending operation of the mud water 20 is continued during the joining operation of the single pipes 9 and 9 ′ thus performed. In this way, the end of the newly joined single pipe 9'on the side of arrow A, which is the non-joined side open end, becomes a new open end 9a in the mud pipe 7A, and the open end 9a is again shown in FIG. Sheath tube standby position ST shown in
The mud feeding is continued by arranging it at position 1 of POS 1.

【0033】一方、先に述べたように図9に示す状態に
おいて鞘管待機位置ST1に配置していて、回転体14
の90度回転動作によって図3に示す鞘管待機位置ST
4に移動した鞘管17は、該鞘管17の内部に未だ単管
9が収容されていない状態を呈している。そこで、管延
長装置10においては、その鞘管待機位置ST2、ST
3、ST4の何れかにおいて、プラグ体であるキャップ
プラグ31を弁体である開閉シリンダ32から引き抜く
ことにより、装填口33を形成して、該装填口33を介
して、空の鞘管17に新たな単管9’を順次装填する。
このため、管延長装置10には、該管延長装置10の後
方側である矢印B方向側に配置させる形で、該管延長装
置10のフレーム13に後続して坑道5中を前進移動し
得る単管供給手段を、鞘管待機位置ST2、ST3、S
T4の何れかのキャッププラグ31位置と整合させた形
で、その後方側に準備しておき、該単管供給手段を介し
て順次空の鞘管17に新たな単管9’を装填していく形
で、極力速やかに全ての鞘管17に単管9’を収納した
状態にしておく。これによって、管延長装置10は、送
泥管7Aを延長するための新規な単管9の供給が、例え
ば施工工程中に生じ得る何等かの事情によって途絶えて
も、該管延長装置10の4本の鞘管17に収容された形
の少なくとも4本の単管9分は、送泥管7Aを遅滞なく
延長させて、即ちその間に送泥が停止して、切羽5aの
掘進作業に支障を来すことは回避される。
On the other hand, as described above, in the state shown in FIG.
90 ° rotation operation of the sheath tube standby position ST shown in FIG.
The sheath tube 17 moved to No. 4 is in a state in which the single tube 9 is not yet housed inside the sheath tube 17. Therefore, in the pipe extension device 10, the sheath pipe standby positions ST2, ST
In any of 3 and ST4, the cap plug 31 which is the plug body is pulled out from the opening and closing cylinder 32 which is the valve body to form the loading port 33, and the empty sheath tube 17 is formed through the loading port 33. A new single tube 9'is sequentially loaded.
Therefore, the pipe extension device 10 can be moved forward in the gallery 5 following the frame 13 of the pipe extension device 10 in a form of being arranged on the arrow B direction side which is the rear side of the pipe extension device 10. The single pipe supply means is connected to the sheath pipe standby positions ST2, ST3, S
In a form aligned with any one of the positions of the cap plugs 31 of T4, it is prepared on the rear side thereof, and the empty sheath pipe 17 is sequentially loaded with new single pipes 9'through the single pipe supply means. As soon as possible, all the sheath tubes 17 are put in the state in which the single tube 9'is stored as quickly as possible. As a result, the pipe extension device 10 is able to supply the new single pipe 9 for extending the mud transport pipe 7A even if the supply of the new single pipe 9 is interrupted due to some circumstances that may occur during the construction process. The at least four single pipes 9 minutes accommodated in the sheath pipe 17 extend the mud feeding pipe 7A without delay, that is, the mud feeding stops during that time, which hinders the excavation work of the cutting face 5a. Coming is avoided.

【0034】空の鞘管17に新たな単管9’を装填する
には、まず、図11に示すように、該空になった鞘管1
7が配置している、例えば図11においては鞘管待機位
置ST4の前側である矢印A方向側のプラグ機構26を
駆動させて、プラグ29を矢印B方向側に向けて、その
突出先端に設けられたシールゴム293が前側のロータ
フランジ18の孔18s底部分において鞘管17の前端
(矢印A側端)部に当接するまで突出させ、該突出状態
のプラグ29を介して孔18sを塞ぐ形で、鞘管待機位
置ST4に配置している鞘管17の図11左端部を閉栓
する。この際、プラグ29はその突出状態によって、該
プラグ29の外周面がロータフランジ18の孔18sの
内周面と接続する形で、該ロータフランジ18の溝18
a中に配置し、これによって、プラグ29は該鞘管待機
位置ST4に配置している鞘管17の内部17sを、該
ロータフランジ18とステータフランジ15間に形成さ
れているバイパス流路70sから遮断する。また、これ
と同時に開閉シリンダ32を矢印A方向側に突出駆動さ
せ、その突出先端に嵌着されたシールゴム321を後側
のロータフランジ19の孔19sの外周面に接続させ
る。これによって、ロータフランジ19の孔19sとス
テータフランジ16のシリンダ装着孔16sは、開閉シ
リンダ32とその内側に嵌合されたキャッププラグ31
によって塞がれた形になり、いま鞘管待機値ST4に配
置している鞘管17の内部17sが、該ロータフランジ
19と該ステータフランジ16の間に形成されるバイパ
ス流路70pと、或いは管延長装置10の外部である坑
道5と遮断される。即ち、鞘管待機位置ST4に配置し
ている鞘管17の内部17sは、プラグ29及びその内
側にキャッププラグ31が嵌合された状態の開閉シリン
ダ32の突出配置によって、該内部17s以外の外部に
対して遮蔽隔離された形になる。
In order to load a new single tube 9'into the empty sheath tube 17, first, as shown in FIG.
7 is arranged, for example, in FIG. 11, the plug mechanism 26 on the arrow A direction side, which is the front side of the sheath tube standby position ST4 in FIG. 11, is driven, and the plug 29 is provided on the protruding tip thereof toward the arrow B direction side. The seal rubber 293 is protruded until it abuts on the front end (the end on the arrow A side) of the sheath pipe 17 at the bottom portion of the hole 18s of the front rotor flange 18, and the hole 18s is closed via the plug 29 in the protruding state. The left end of FIG. 11 of the sheath pipe 17 arranged at the sheath pipe standby position ST4 is closed. At this time, depending on the protruding state of the plug 29, the groove 18 of the rotor flange 18 is formed such that the outer peripheral surface of the plug 29 is connected to the inner peripheral surface of the hole 18 s of the rotor flange 18.
a, so that the plug 29 can move the inside 17s of the sheath pipe 17 located at the sheath pipe standby position ST4 from the bypass flow passage 70s formed between the rotor flange 18 and the stator flange 15. Cut off. At the same time, the opening / closing cylinder 32 is driven to project in the arrow A direction, and the seal rubber 321 fitted to the projecting tip is connected to the outer peripheral surface of the hole 19s of the rear rotor flange 19. As a result, the hole 19s of the rotor flange 19 and the cylinder mounting hole 16s of the stator flange 16 have the opening / closing cylinder 32 and the cap plug 31 fitted therein.
The inside 17s of the sheath pipe 17 which is closed by the sheath pipe standby value ST4 and is formed by the bypass passage 70p formed between the rotor flange 19 and the stator flange 16, or It is cut off from the tunnel 5 that is outside the pipe extension device 10. That is, the inside 17s of the sheath pipe 17 arranged at the sheath pipe standby position ST4 is not attached to the outside except the inside 17s by the protruding arrangement of the plug 29 and the opening / closing cylinder 32 in which the cap plug 31 is fitted therein. It becomes a shielded and isolated form against.

【0035】この状態で、鞘管待機位置ST4に配置し
ている鞘管17内には、先にこれが鞘管待機位置ST1
に配置していたときこれが送泥管路70の一部として用
いられていたことによって、該鞘管17の内部17sに
未だ泥水20が、該泥水管路70の泥水圧と略同等の圧
力で充填された状態を呈している。そこで、プラグ29
を介して閉栓されてなお圧力泥水がその内部17sに充
填されている鞘管17においては、これを閉栓状態のプ
ラグ機構26に設けられた泥水回収機構28のオーバー
フローポート291等を介して排出減圧する形で、該鞘
管17の内部17sの圧力を解放し、ここに充填されて
いた泥水20をタンク281に一旦抜き取り回収する。
こうしておいて、把持部311を管延長装置10の後方
側である矢印B方向に向けて引っ張る形で、キャッププ
ラグ31を開閉シリンダ32から抜取ると、鞘管待機位
置ST4に配置している鞘管17の後側には、該キャッ
ププラグ31の抜取りによって開閉シリンダ32の内側
に形成された空間である装填口33が、該鞘管17の内
部17sが管延長装置10の外部である坑道5と連通し
た形で、ここに形成される。そこで、こうして形成され
た装填口33から、先に述べた単管供給手段等を介し
て、鞘管待機位置ST4に配置していてその内部17s
が空の鞘管17に新たな単管9’をその後側から装填す
る。そして、その後キャッププラグ31を開閉シリンダ
32の内側に装填嵌合する。この状態で、いま新たに鞘
管17に装填補充された単管9’中のエアを、プラグ2
9のオーバーフローポート291、給排水口292等を
利用して、先に該鞘管17中から回収されてタンク28
1に貯留していた泥水20を該単管9’内に戻す形で、
所定圧力の泥水20と置換する。
In this state, in the sheath tube 17 arranged at the sheath tube standby position ST4, the sheath tube standby position ST1
Since it was used as a part of the mud transmission line 70 when it was placed in the above position, the muddy water 20 still remains in the inside 17s of the sheath pipe 17 at a pressure substantially equal to the muddy water pressure of the muddy water line 70. It is in a filled state. Therefore, the plug 29
In the sheath pipe 17 which is closed through the plug and still has the pressure muddy water filled in the inside 17s thereof, the pressure is discharged through the overflow port 291 of the muddy water recovery mechanism 28 provided in the plug mechanism 26 in the closed state. In this way, the pressure in the inside 17s of the sheath pipe 17 is released, and the mud water 20 filled therein is once drawn out and collected in the tank 281.
In this way, when the cap plug 31 is pulled out from the open / close cylinder 32 in the form of pulling the gripping portion 311 toward the direction of the arrow B, which is the rear side of the pipe extension device 10, the sheath arranged at the sheath pipe standby position ST4. On the rear side of the pipe 17, a loading port 33 which is a space formed inside the opening / closing cylinder 32 by removing the cap plug 31 is provided, and an inside 17s of the sheath pipe 17 is outside the pipe extension device 10. It is formed here in a form that communicates with. Therefore, from the loading port 33 formed in this way, through the above-mentioned single pipe supply means or the like, the sheath pipe standby position ST4 is provided and the inside 17s thereof is placed.
The empty sheath tube 17 is loaded with a new single tube 9'from the rear side. Then, after that, the cap plug 31 is loaded and fitted inside the opening / closing cylinder 32. In this state, the air in the single tube 9'which is newly loaded and replenished in the sheath tube 17 is replaced by the plug 2
The overflow port 291 and the water supply / drainage port 292 of the tank 9 are used to recover the tank 28 from the inside of the sheath pipe 17 first.
In the form of returning the muddy water 20 stored in 1 into the single pipe 9 ′,
The muddy water 20 having a predetermined pressure is replaced.

【0036】こうして、鞘管待機位置ST4に配置して
いた鞘管17、即ち先に(図9に示す状態では)鞘管待
機位置ST1に配置していて、フレーム13の前進移動
によって開口端9aがその後側のPOS2位置に配置す
るようその内部から単管9が退避して、これによってそ
の内部17sが空になっていた鞘管17には、新たな単
管9’が補充装填されて、該単管9’の内部には所定の
圧力の泥水20が充填準備される。従って、こうして、
例えば鞘管待機位置ST4において、空の鞘管17に新
たな単管9’を補充充填するには、プラグ29及び開閉
シリンダ32の突出配置によって、該鞘管待機位置ST
4のみに配置する鞘管17の内部17sを送泥管路70
及びバイパス流路70s、70pと隔離した状態で、該
新たな単管9’の補充装填作業の一切を行うことが出来
るので、送泥管路70側においては、該補充装填作業中
も、フレキシブルパイプ11中に吐出される泥水20の
圧力を降下させることなく送泥を継続していることが出
来る。こうしてその内部17sに新たな単管9’が補充
装填された鞘管待機位置ST4の鞘管17に対応したプ
ラグ29を再び、矢印A方向に向けて後退駆動させる形
でプラグ機構26を開栓すると、該プラグ29はステー
タフランジ15のプラグ退避孔15sに退避する形で、
ロータフランジ18の孔18s側から抜けて、該プラグ
29が抜けた孔18sを介して、再び鞘管待機位置ST
4の鞘管17の内部17sがバイパス流路70sと連通
する。また、ここで同様に、開閉シリンダ32、接続シ
リンダ35をそれぞれ後退させると、鞘管17の内部1
7sはバイパス流路70pとも連通する。これによっ
て、いま新たに鞘管17に補充装填された単管9’の内
部は、バイパス流路70p、70sと連通した状態にな
るが、この際いまプラグ29が開栓された単管9’内に
は、既に泥水回収機構28を介してタンク281から泥
水20が所定の圧力で充填された状態になっているとこ
ろから、該プラグ29の開栓時にも管延長装置10の接
続管路機構である可動パイプ12が吐出する送泥水が圧
力降下する危険性なく、泥水20は常に安定した状態で
泥水管路70を介して送泥される。なお、管延長装置1
0においてバイパス流路70s、70pとして用いられ
る回転体14とステータフランジ15又は16の間の空
間は、空間40に設けられたクリーニング機構39を介
して洗い流す形で清掃することが出来るので、管延長装
置10を、常にその水密性が良好に保持されて且つこれ
に泥水20の目詰まり等が生じていない良好な状態で、
長期に亙って使用することが出来る。
Thus, the sheath tube 17 which has been disposed at the sheath tube standby position ST4, ie, the sheath tube standby position ST1 previously (in the state shown in FIG. 9), is moved forward by the frame 13 to move the open end 9a. The single tube 9 is retracted from the inside so that the tube is placed at the POS2 position on the rear side thereof, whereby the sheath tube 17 whose inside 17s is empty is refilled with a new single tube 9 ', The inside of the single pipe 9'is filled with muddy water 20 having a predetermined pressure. Therefore, in this way,
For example, at the sheath tube standby position ST4, in order to replenish and fill the empty sheath tube 17 with a new single tube 9 ', the plug tube 29 and the opening / closing cylinder 32 are arranged so as to project therefrom.
The inner 17s of the sheath pipe 17 to be arranged only in No.
In addition, since the replenishment and loading work of the new single pipe 9'can be performed in a state of being isolated from the bypass flow passages 70s and 70p, the mud feeding line 70 side is flexible even during the replenishment and loading work. Mud can be continued without lowering the pressure of the muddy water 20 discharged into the pipe 11. In this way, the plug mechanism 26 is opened by driving the plug 29 corresponding to the sheath tube 17 at the sheath tube standby position ST4, in which the new single tube 9'is replenished and loaded into the inside 17s thereof, again in the direction of arrow A to drive the plug 29 backward. Then, the plug 29 is retracted into the plug retracting hole 15s of the stator flange 15,
Through the hole 18s through which the plug 29 has come out, the sheath flange standby position ST is re-established.
The inside 17s of the sheath tube 17 of No. 4 communicates with the bypass flow passage 70s. Similarly, when the open / close cylinder 32 and the connecting cylinder 35 are respectively retracted, the inside 1 of the sheath pipe 17 is
7s also communicates with the bypass flow passage 70p. As a result, the inside of the single pipe 9'which has been newly refilled in the sheath pipe 17 is in a state of communicating with the bypass flow passages 70p and 70s, but at this time, the single pipe 9'where the plug 29 has been opened. Since the inside thereof is already filled with the muddy water 20 at a predetermined pressure from the tank 281 through the muddy water collecting mechanism 28, the connection conduit mechanism of the pipe extension device 10 is opened even when the plug 29 is opened. The mud water discharged from the movable pipe 12 is a risk of pressure drop, and the mud water 20 is always sent in a stable state through the mud water conduit 70. In addition, pipe extension device 1
The space between the rotating body 14 and the stator flange 15 or 16 used as the bypass flow passages 70s and 70p in 0 can be cleaned in a flushing manner via the cleaning mechanism 39 provided in the space 40. The device 10 is kept in a good state in which its watertightness is always kept good and the muddy water 20 is not clogged therein.
It can be used for a long time.

【0037】こうして、鞘管待機位置ST2、ST3、
ST4に配置している各鞘管17の内部17sに単管
9’をそれぞれ収容し、該それぞれの単管9’の内部
に、バイパス流路70p、70sを介して送泥管路70
と略同等の圧力で泥水20を流通させることによって、
先に述べたように泥水20の加圧供給を休むことなく切
羽5aの掘進作業を連続して継続していく。そして、シ
ールド装置2が、送泥管7Aを構成している単管9の1
本の長さL1分だけ前進したなら、再び先に述べたよう
に、管延長装置10のフレーム13を該シールド装置2
の前進分だけ前進させて、回転体14の回転動作と可動
管12の突出動作を介して単管9に新たな単管9’を継
ぎ足す形で送泥管7Aの延長作業を行い、一方当該送泥
管7Aに単管9’を継ぎ足すことによってその内部17
sが空になった鞘管17にさらに新たな単管9’を補充
装填する動作を繰返すことによって、泥水20の加圧供
給を一時も休むことなく連続的に行いながら、即ち切羽
5aを安定した状態で連続掘進しつつ、送泥管7Aを手
間なく延長していくことが出来る。従って、送泥管7A
の延長の為に、送泥管路70を一旦切断して送泥を一時
中断する必要は全くなく、全ての管延長作業は管延長装
置10内部で処理される為に、効率的であると共に、送
泥管路70を切断しないことによって、管延長作業にか
かる労力を省力化し、また、管延長装置10においては
坑道5に泥水20が溢出することがないので、その分の
清掃手間を省略することが出来る。さらに、敷設済みの
泥水管7Aに継ぎ足される新たな単管9’内の圧力は、
該管延長作業に先立ち、また、当該管延長作業中には、
回転体14の回転動作時にも継続して、バイパス流路7
0s、70pを介して該送泥管7Aが形成している送泥
管路70と同等に泥水20が所定の圧力で圧送流通させ
た状態に保持されているところから、常時即ち管延長作
業中においてもシールド装置2側への泥水20の供給圧
力を任意に調整することが出来る。また、トンネル1を
構築する際にシールド装置2によって切羽5aから形成
される掘削ズリは、管延長装置10と全く同様の泥水管
延長装置によって、上述した送泥管7Aと全く同様に、
その排泥動作を一時も休むことなく継続したまま速やか
に延長され得る排泥管を介して坑口側に搬出されるの
で、当該排泥管延長作業が円滑に行われるのはもちろ
ん、トンネル掘削時における排泥量を常に任意に調整す
ることが出来る。従って、管延長装置10を用いれば、
切羽5aの突然の変動に対してもすばやくこれに対応し
て常に所定の泥水圧で切羽5aを保持することが出来る
ので、如何なるときも安定した掘進作業を継続して、安
全に且つ施工性良くトンネル1を構築していくことが出
来る。
Thus, the sheath tube standby positions ST2, ST3,
The single pipe 9'is housed in the inside 17s of each sheath pipe 17 arranged in ST4, and the mud-sending conduit 70 is inserted into each of the single pipes 9'through the bypass flow passages 70p and 70s.
By circulating the muddy water 20 at a pressure substantially equal to
As described above, the excavation work of the face 5a is continuously continued without stopping the pressurized supply of the muddy water 20. And, the shield device 2 is one of the single pipes 9 constituting the mud pipe 7A.
After advancing by the length L1 of the book, as described above, the frame 13 of the pipe extension device 10 is moved to the shield device 2 again.
Of the mud pipe 7A by extending a new single pipe 9'to the single pipe 9 through the rotating operation of the rotating body 14 and the projecting operation of the movable tube 12, and By adding the single pipe 9'to the mud pipe 7A, the inside 17
By repeating the operation of replenishing and loading a new single pipe 9 ′ into the sheath pipe 17 in which s is empty, the mud water 20 is continuously supplied under pressure without interruption, that is, the face 5a is stabilized. The mud pipe 7A can be extended without trouble while continuously excavating in this state. Therefore, the mud pipe 7A
It is not necessary to cut the mud-sending conduit 70 once to suspend the mud-sending for the purpose of extending the length of the pipe, and all the pipe-extending work is performed inside the pipe-extending device 10. By not cutting the mud-sending conduit 70, the labor required for the pipe extension work is saved, and since the mud water 20 does not overflow into the tunnel 5 in the pipe extension device 10, the labor required for cleaning is reduced. You can do it. Furthermore, the pressure in the new single pipe 9'added to the laid mud pipe 7A is
Prior to the pipe extension work, and during the pipe extension work,
Even when the rotating body 14 is rotating, the bypass flow path 7 continues.
Since the mud water 20 is maintained in a state of being pumped and flowed at a predetermined pressure in the same manner as the mud sending pipe 70 formed by the mud sending pipe 7A via 0s and 70p, at all times, that is, during pipe extension work. Also in this case, the supply pressure of the muddy water 20 to the shield device 2 side can be adjusted arbitrarily. Further, the excavation gap formed from the face 5a by the shield device 2 when constructing the tunnel 1 is the same as the mud pipe 7A described above by the mud pipe extension device that is exactly the same as the pipe extension device 10.
The sludge removal operation is carried out without delay to the mine mouth side through a sludge discharge pipe that can be extended promptly, so that the sludge discharge pipe extension work can be performed smoothly and at the time of tunnel excavation. The amount of sludge discharged can be adjusted at will. Therefore, using the tube extension device 10,
In response to sudden changes in the cutting face 5a, the cutting face 5a can always be held at a predetermined mud pressure in response to this suddenly, so that stable excavation work can be continued at any time to ensure safe and easy construction. You can build tunnel 1.

【0038】なお、上述した実施例においては、回転体
14は、ロータフランジ18、19に支持された4本の
鞘管17を有していて、該鞘管17の各々の軸心が同一
円周上を90度ピッチで回転自在であるように構成され
ている例を述べたが、鞘管17の配設本数及びその回転
様態は任意である。例えば、回転体14は2本の鞘管
が、接続シリンダ35等の泥水管受入機構と可動パイプ
12及びジョイントシリンダ15a等の接続管路機構の
間に選択的に、即ち交替でここに位置決め自在であるよ
うになっていても良く、或いは、回転体14は、これが
4本より多い複数の鞘管17を有していて、該複数の鞘
管17が、任意の軌道上を回転する形で前記泥水管受入
機構と前記接続管路機構との間に選択的に位置決め自在
であるように構成されていても差し支えない。また、実
施例においては、鞘管待機位置ST2、ST3、ST4
に位置決めされた鞘管17の前端と後端をそれぞれ開放
閉塞するための第1及び第2の弁体として、前端側にプ
ラグ29を、後端側に開閉シリンダ32を設け、該開閉
シリンダ32の内側に、該鞘管17の内部17sを外部
と連通し得る形のプラグとしてキャッププラグ31を該
開閉シリンダ32から抜取ることによって着脱自在な形
でここに嵌合した例を述べたが、プラグ29及び開閉シ
リンダ32等の第1及び第2の弁体は、鞘管17の前端
と後端を選択的に開放閉塞して、これによって該鞘管1
7の内部17sを外部に対して隔離し得るように構成さ
れていれば、必ずしも実施例で述べられたように構成さ
れていなくとも構わず、また、該第1及び第2の弁体の
支持装着様態は任意である。また、プラグとして開閉シ
リンダ32に嵌合されたキャッププラグ31は、プラグ
29及び開閉シリンダ32等の第1及び第2の弁体のい
ずれか一方のみに設けられているか、或いはその両方に
設けられていても良く、該キャッププラグ31等のプラ
グの形態及びその弁体への着脱様態は任意である。さら
に、実施例において鞘管17の内部17sの泥水20を
選択的に排出注入するための排出注入手段として用いた
泥水回収機構28は、これがプラグ29、開閉シリンダ
32等の弁体のいずれかに或いはその両方に配設されて
いることによって、該鞘管17の内部17sの泥水20
が排出注入自在であるならば、実施例で述べられた以外
の構成であっても差し支えない。
In the embodiment described above, the rotating body 14 has four sheath pipes 17 supported by the rotor flanges 18 and 19, and the respective axial centers of the sheath pipes 17 are the same circle. The example in which the sheath tube is configured to be rotatable at a pitch of 90 degrees has been described, but the number of the sheath tubes 17 and the rotation mode thereof are arbitrary. For example, the rotating body 14 has two sheath pipes selectively or alternately positioned between the muddy water pipe receiving mechanism such as the connecting cylinder 35 and the connecting pipe line mechanism such as the movable pipe 12 and the joint cylinder 15a. Alternatively, the rotating body 14 has a plurality of sheath tubes 17 which are more than four, and the sheath tubes 17 rotate in arbitrary orbits. It may be configured such that it can be selectively positioned between the muddy water pipe receiving mechanism and the connection pipe line mechanism. Further, in the embodiment, the sheath tube standby positions ST2, ST3, ST4
As the first and second valve bodies for opening and closing the front end and the rear end of the sheath pipe 17 positioned at the position, a plug 29 is provided at the front end side and an opening / closing cylinder 32 is provided at the rear end side. An example in which the cap plug 31 is detachably fitted by pulling out the cap plug 31 from the opening / closing cylinder 32 as a plug capable of communicating the inside 17s of the sheath tube 17 with the outside has been described. The first and second valve bodies such as the plug 29 and the opening / closing cylinder 32 selectively open and close the front end and the rear end of the sheath pipe 17, thereby allowing the sheath pipe 1 to be closed.
7 is not necessarily configured as described in the embodiment as long as it is configured to be able to isolate the inside 17s of 7 from the outside, and supports the first and second valve bodies. The mounting mode is arbitrary. Further, the cap plug 31 fitted as a plug into the opening / closing cylinder 32 is provided on only one of the plug 29 and the first and second valve bodies such as the opening / closing cylinder 32, or on both of them. However, the shape of the plug such as the cap plug 31 and the manner of attaching and detaching it to the valve body are arbitrary. Further, in the embodiment, the muddy water recovery mechanism 28 used as the discharge and injection means for selectively discharging and injecting the muddy water 20 in the inside 17s of the sheath pipe 17 has a plug 29, a valve cylinder such as the opening / closing cylinder 32, or the like. Alternatively, the muddy water 20 in the inside 17 s of the sheath pipe 17 is provided by being arranged in both of them.
If it can be discharged and injected, a configuration other than that described in the embodiment may be used.

【0039】[0039]

【発明の効果】以上説明したように本発明によれば、ス
テータフランジ16等の第1の回転体支持手段とステー
タフランジ15等の第2の回転体支持手段を、トンネル
構築方向前後方向に所定の間隔をなす形で設け、前記第
1の回転体支持手段に接続シリンダ35等の泥水管受入
機構を、送泥管7A等の既設の泥水管の開口端9a等の
先端を受入自在で且つ該泥水管をその軸心に沿って摺動
自在に支持し得るように設け、前記第2の回転体支持手
段の前記泥水管受入機構と対向した位置に、シールド装
置2等のシールド機に接続自在な、ジョイントシリンダ
15a、可動パイプ12等の接続管路機構を設け、前記
第1の回転体支持手段と第2の回転体支持手段の間に、
その各々の内部17sに単管9、9’等の泥水管が収容
され得る鞘管17を複数有する回転体14を、回転自在
に且つ該鞘管17を前記泥水管受入機構と前記接続管路
機構の間に選択的に位置決め自在な形で設け、前記第1
の回転体支持手段と第2の回転体支持手段に、前記鞘管
17に泥水管を選択的に装填し得るプラグ機構26、2
7等の装填手段を設け、前記装填手段は前記鞘管17の
前端と後端をそれぞれ開放閉塞自在なプラグ29、開閉
シリンダ32等の第1及び第2の弁体を有し、前記第1
及び/又は第2の弁体に、前記鞘管17の内部17sの
泥水20を排出注入し得る泥水回収機構28等の排出注
入手段を設け、前記第1及び/又は第2の弁体にキャッ
ププラグ31等のプラグを、該プラグが設けられた弁体
を介して前記鞘管の内部を外部と連通し得る形で着脱自
在に設けて構成したので、第1及び第2の弁体が所定の
鞘管17の前端と後端を選択的に閉塞することによって
該鞘管17の内部17sを外部に対して隔離し、この状
態で、排出注入手段が、該外部に対して隔離された鞘管
17の内部17sの泥水20を排出或いは注入すること
が出来る。従って、泥水シールド工法に用いる為の送泥
管、排泥管等の泥水管を延長する際に、泥水管受入機構
を介して既設の泥水管の先端を受入させる形で、管延長
装置10等の本発明による泥水管延長装置を設置してお
けば、泥水20は、泥水管受入機構と接続管路機構の間
に位置決め配置した鞘管を介して、該泥水管受入機構と
接続管路機構の間を流通する形で送排泥される。そし
て、既設の泥水管を延長させる際には、泥水管延長装置
を該既設の泥水管に対して前進させれば、該既設の泥水
管は泥水管受入機構に支持された状態でその軸心に沿っ
て摺動する形になるために、これによって、泥水管受入
機構と接続管路機構の間には、該既設の泥水管の先端の
前側に配置する形で、新たな泥水管が継ぎ足されるべき
空隙SP等の空間部分が形成される。そこで、この状態
のときに、回転体14を回転させることによって、その
内部17sに泥水管を収容した状態の鞘管17を、泥水
管受入機構と前記接続管路機構の間に位置決めすれば、
該位置決めされた鞘管17が収容した新たな泥水管を、
上述した新たな泥水管が継ぎ足されるべき空間部分に配
置させて、該新たな泥水管を既設の泥水管の先端に継ぎ
足すことが容易に出来る。この際、既設の泥水管の先端
位置に継ぎ足すべき新たな泥水管中には、これが回転体
の回転によって泥水管受入機構と前記接続管路機構の間
に位置決めされる以前に、該泥水管が収容された鞘管1
7の前端と後端を第1及び第2の弁体を介して閉塞する
ことによって、該鞘管17の内部17sを外部に対して
隔離し、この状態で、排出注入手段を介してその内部1
7sに泥水20を任意の圧力で注入しておくことが出来
る。故に、既設の泥水管の先端に継ぎ足される新規な泥
水管は、その内部に既設の泥水管中の泥水圧と同等の圧
力泥水を予め注入充填した状態で該既設の泥水管に継ぎ
足すことが出来るので、従来のように既設の泥水管に継
ぎ足された新たな泥水管に圧力泥水が満たされるのまで
の間に泥水圧が降下してしまう懸念がなく、即ち本発明
によれば、敷設済み泥水管に継ぎ足される新規な泥水管
に圧力泥水が満たされるのを待つことなく、この間も継
続して泥水圧を任意の値に調整することが出来る。な
お、こうして新規な泥水管中に圧力泥水を注入充填する
作業は、第1及び第2の弁体を介して該新規な泥水管が
収容された鞘管17の内部17sを外部に対して隔離し
た状態で行うことが出来るために、当該圧力泥水の充填
作業は、泥水管受入機構と前記接続管路機構の間に位置
決めされた鞘管17を介して泥水の流通が連続して行わ
れている間に、該泥水の流通と平行して行うことが出来
る。従って、例えば送泥管において切羽の変動によって
送泥水の加圧が早急に必要とされる場合や、排泥管にお
いて排泥量の調整を直ちに行いたいときには、いつでも
任意のときに即ち泥水管に新たな泥水管を継ぎ足した直
後でも泥水圧力の調整を行うことが出来るので、切羽の
変動に対して対応が早く、故に泥水管延長作業中に逸泥
等を招いて切羽崩壊を生じさせる危険性がない。また、
こうして既設の泥水管に新規な泥水管を継ぎ足すことに
よってその内部17sが空になった鞘管17には、泥水
管延長装置の外部から新規な泥水管を順次補給装填しな
ければならないが、この際、該鞘管17には、これが泥
水管受入機構と前記接続管路機構の間に位置決めされて
いたときにその内部17sに流通していた圧力泥水が満
たされた状態になっている。そこでその内部17sに圧
力泥水が満たされた鞘管17に新規な泥水管を補充装填
する際には、第1及び第2の弁体を介してその内部17
sを外部に対して隔離した状態で、排出注入手段を介し
てその内部17sに充填されていた圧力泥水を抜去すれ
ば、当該鞘管17の内部17sから泥水が坑道中に溢れ
出て、その分だけ泥水が無駄になったり、また当該溢れ
出た泥水の処理に手間がかかることなく、該泥水を処理
することが簡単に出来る。この状態で、プラグを第1及
び/又は第2の弁体から離脱させれば、該空の鞘管17
の内部17sに簡単に新規の泥水管を補充装填すること
が容易に出来る。こうして行われる鞘管17への泥水管
の補充装填作業は、該鞘管17の内部17sを、第1及
び第2の弁体を介して、外部に対して隔離した状態で行
うことが出来るために、当該新規な泥水管の補充装填作
業中もまた、泥水管受入機構と前記接続管路機構の間に
おいては上述したと同じく、泥水の流通が連続的に行わ
れる。なお、排出注入手段が鞘管17の内部17sから
抜去した圧力泥水は、これを一旦貯留しておいて、該鞘
管17に上述したように新規な泥水管を補充装填して
後、再び該排出注入手段を介して該貯留された泥水を該
鞘管17の内部17s即ちここに装填収容された泥水管
中に戻すようにすれば、先に述べたように該泥水管中に
既設の泥水管中の泥水圧と同等の圧力泥水を満たしてお
くのに新規な泥水を必要とすることがないために、泥水
の漏出無駄を省くことが出来、経済的である。従って本
発明によれば、泥水管の延長を手間なく行いながら、常
に切羽の安定を確保した状態で円滑な掘進作業を行って
いくことが施工性良く出来る。
As described above, according to the present invention, the first rotating body supporting means such as the stator flange 16 and the second rotating body supporting means such as the stator flange 15 are provided in the predetermined direction in the tunnel building direction. The first rotary member support means is provided with a muddy water pipe receiving mechanism such as a connection cylinder 35 and an open end 9a of an existing muddy water pipe such as a mud transport pipe 7A can be received. The muddy water pipe is provided so as to be slidably supported along its axis, and is connected to a shield machine such as a shield device 2 at a position of the second rotating body supporting means facing the muddy water pipe receiving mechanism. A flexible connecting pipe line mechanism such as the joint cylinder 15a and the movable pipe 12 is provided, and between the first rotating body supporting means and the second rotating body supporting means,
A rotating body 14 having a plurality of sheath pipes 17 capable of accommodating the muddy water pipes such as single pipes 9 and 9'in their respective inner portions 17s is rotatably provided, and the sheath pipes 17 are connected to the muddy water pipe receiving mechanism and the connection pipeline The mechanism is provided between the mechanisms in a selectively positionable manner,
The plug mechanism 26, 2 capable of selectively loading the sheath pipe 17 with the muddy water pipe in the rotating body supporting means and the second rotating body supporting means.
7 and other loading means are provided, and the loading means has first and second valve elements such as a plug 29 and an opening / closing cylinder 32 that can open and close the front end and the rear end of the sheath tube 17, respectively.
And / or the second valve body is provided with a discharge / injection means such as a muddy water recovery mechanism 28 capable of discharging and injecting the muddy water 20 in the inside 17s of the sheath pipe 17, and the first and / or second valve body is capped. Since the plug such as the plug 31 is detachably provided so that the inside of the sheath pipe can be communicated with the outside through the valve body provided with the plug, the first and second valve bodies have a predetermined configuration. The inside 17s of the sheath tube 17 is isolated from the outside by selectively closing the front end and the rear end of the sheath tube 17 of the sheath pipe 17, and in this state, the discharge injection means is the sheath isolated from the outside. The muddy water 20 in the inside 17s of the pipe 17 can be discharged or injected. Therefore, when extending a mud pipe such as a mud pipe and a mud pipe for use in the mud shield method, the tip of an existing mud pipe is received through a mud pipe receiving mechanism so that the pipe extension device 10 or the like can be received. If the muddy water pipe extension device according to the present invention is installed, the muddy water 20 receives the muddy water pipe receiving mechanism and the connecting pipe line mechanism through the sheath pipe positioned between the muddy water pipe receiving mechanism and the connecting pipe line mechanism. It is sent and discharged in the form of distribution between the two. Then, when extending the existing mud pipe, if the mud pipe extension device is moved forward with respect to the existing mud pipe, the axial center of the existing mud pipe is supported by the mud pipe receiving mechanism. Since it slides along the pipe, a new mud pipe is added between the mud pipe receiving mechanism and the connecting pipe mechanism in the form of being arranged in front of the tip of the existing mud pipe. A space portion such as a void SP to be formed is formed. Therefore, in this state, by rotating the rotating body 14, by positioning the sheath pipe 17 in a state where the mud pipe is housed in the inside 17s, between the mud pipe receiving mechanism and the connection conduit mechanism,
A new mud pipe containing the positioned sheath pipe 17
It is possible to easily arrange the new mud pipe described above in the space portion to be replenished and add the new mud pipe to the tip of the existing mud pipe. At this time, in the new mud pipe to be added to the tip position of the existing mud pipe, before the mud pipe is positioned between the mud pipe receiving mechanism and the connecting pipe mechanism by the rotation of the rotating body, Sheath tube 1 containing
By closing the front end and the rear end of 7 via the first and second valve bodies, the inside 17s of the sheath tube 17 is isolated from the outside, and in this state, the inside thereof is discharged through the discharge injection means. 1
The muddy water 20 can be injected into 7s at an arbitrary pressure. Therefore, the new mud pipe that is added to the tip of the existing mud pipe may be added to the existing mud pipe in a state where the pressure of the mud pressure equal to the mud pressure in the existing mud pipe is pre-injected and filled inside. Since it is possible, there is no concern that the mud pressure will drop until the pressure mud is filled in the new mud pipe that has been added to the existing mud pipe as in the past, that is, according to the present invention, it has already been installed. It is possible to continuously adjust the mud pressure to an arbitrary value during this period without waiting for the new mud pipe connected to the mud pipe to be filled with the pressure mud. The operation of injecting and filling the pressurized mud into the new mud pipe in this way isolates the inside 17s of the sheath pipe 17 accommodating the new mud pipe from the outside through the first and second valve bodies. Since it can be performed in a state where the muddy water is filled, the muddy water is continuously circulated through the sheath pipe 17 positioned between the muddy water pipe receiving mechanism and the connection conduit mechanism. It can be carried out in parallel with the circulation of the muddy water during the operation. Therefore, for example, when it is necessary to pressurize the mud water promptly due to fluctuations in the face of the mud pipe, or when it is desired to immediately adjust the amount of mud in the mud pipe, the mud pipe can be used at any time at any time. Since the mud pressure can be adjusted immediately after adding a new mud pipe, it is possible to respond quickly to changes in the cutting face, and therefore the risk of collapsing the cutting face by causing sludge during the mud pipe extension work. There is no. Also,
In this way, by adding a new mud pipe to the existing mud pipe, the inside 17s of which is emptied, the sheath pipe 17 must be sequentially replenished with new mud pipes from the outside of the mud pipe extension device. At this time, the sheath pipe 17 is in a state of being filled with the pressure muddy water circulating in the inside 17s thereof when it is positioned between the muddy water pipe receiving mechanism and the connection conduit mechanism. Therefore, when a new muddy water pipe is replenished and loaded into the sheath pipe 17 whose inside 17s is filled with pressure muddy water, the inner 17
When s is isolated from the outside, if the pressure muddy water filled in the inside 17s thereof is removed via the discharge / injection means, the muddy water overflows from the inside 17s of the sheath pipe 17 into the tunnel, and It is possible to easily treat the muddy water without wasting the muddy water as much as the amount of the muddy water and the trouble of treating the overflowing muddy water. In this state, if the plug is detached from the first and / or second valve body, the empty sheath tube 17
It is possible to easily replenish and load a new mud pipe into the interior 17s of the. The refilling work of the muddy water pipe into the sheath pipe 17 thus performed can be performed in a state where the inside 17s of the sheath pipe 17 is isolated from the outside through the first and second valve bodies. During the replenishment and loading operation of the new muddy water pipe, the muddy water is continuously circulated between the muddy water pipe receiving mechanism and the connection conduit mechanism as described above. The pressure muddy water discharged from the inside 17s of the sheath pipe 17 by the discharge injection means is temporarily stored, and the sheath pipe 17 is replenished with a new muddy water pipe as described above, and then again. If the stored mud water is returned to the inside 17s of the sheath pipe 17, that is, the mud pipe loaded and accommodated therein through the discharge injection means, as described above, the existing mud pipe is put into the mud pipe. Since no new mud is required to fill the mud with a pressure equal to the mud pressure in the water pipe, it is economical because the leakage waste of the mud can be omitted. Therefore, according to the present invention, it is possible to perform a smooth excavation work while maintaining the stability of the cutting face at all times with good workability while extending the mud pipe without trouble.

【図面の簡単な説明】[Brief description of drawings]

【図1】泥水シールド工法により構築中のトンネルの一
例を示す図である。
FIG. 1 is a diagram showing an example of a tunnel being constructed by a muddy water shield method.

【図2】本発明による泥水管延長装置の一実施例を示す
断側面図である。
FIG. 2 is a sectional side view showing an embodiment of a mud pipe extension device according to the present invention.

【図3】図2に示す泥水管延長装置におけるIII、III矢
視断面図である。
FIG. 3 is a sectional view taken along line III and III of the muddy water pipe extension device shown in FIG.

【図4】図2に示す泥水管延長装置におけるロータフラ
ンジとステータフランジの分解斜視図である。
FIG. 4 is an exploded perspective view of a rotor flange and a stator flange in the muddy water pipe extension device shown in FIG.

【図5】図2に示す泥水管延長装置におけるプラグ閉栓
状態を示す部分拡大図である。
5 is a partially enlarged view showing a plug closed state in the muddy water pipe extension device shown in FIG. 2. FIG.

【図6】図2に示す泥水管延長装置におけるプラグ開栓
状態を示す部分拡大図である。
6 is a partially enlarged view showing a plug opening state in the muddy water pipe extension device shown in FIG.

【図7】図2に示す泥水管延長装置における敷設済み泥
水管とこれに継ぎ足される新たな泥水管の接続部を示す
拡大図である。
FIG. 7 is an enlarged view showing a connection portion between a laid mud pipe and a new mud pipe connected to the laid mud pipe in the mud pipe extension device shown in FIG.

【図8】図7に示す敷設済み泥水管とこれに継ぎ足され
る新たな泥水管の接続状態を示す断側面図である。
FIG. 8 is a cross-sectional side view showing a connection state of the laid mud pipe shown in FIG. 7 and a new mud pipe connected to the laid mud pipe.

【図9】図2に示す泥水管延長装置内における泥水管の
延長方法を示す断側面図である。
9 is a cross-sectional side view showing a method for extending a muddy water pipe in the muddy water pipe extending device shown in FIG.

【図10】図2に示す泥水管延長装置内における泥水管
の延長方法を示す断側面図である。
10 is a cross-sectional side view showing a method for extending a muddy water pipe in the muddy water pipe extending device shown in FIG.

【図11】図2に示す泥水管延長装置内における泥水管
の延長方法を示す断側面図である。
11 is a cross-sectional side view showing a method for extending a mud pipe in the mud pipe extension device shown in FIG.

【符号の説明】[Explanation of symbols]

2……シールド機(シールド装置) 7A……既設の泥水管(送泥管) 9、9’……泥水管(単管) 9a……先端(開口端) 10……泥水管延長装置(管延長装置) 12……接続管路機構(可動パイプ) 15a……接続管路機構(ジョイントシリンダ) 15……第2の回転体支持手段(ステータフランジ) 16……第1の回転体支持手段(ステータフランジ) 17……鞘管 17s……内部 26、27……装填手段(プラグ機構) 28……排出注入手段(泥水回収機構) 29……弁体(プラグ) 31……プラグ(キャッププラグ) 32……弁体(開閉シリンダ) 35……泥水管受入機構(接続シリンダ) 2 ... Shielding machine (shielding device) 7A ... Existing muddy water pipe (muddy water pipe) 9, 9 '... Muddy water pipe (single pipe) 9a ... Tip (open end) 10 ... Muddy water pipe extension device (pipe) Extension device) 12 ... Connection conduit mechanism (movable pipe) 15a ... Connection conduit mechanism (joint cylinder) 15 ... Second rotor support means (stator flange) 16 ... First rotor support means ( Stator flange) 17 ... Sheath pipe 17s ... Inside 26, 27 ... Loading means (plug mechanism) 28 ... Discharge injection means (muddy water recovery mechanism) 29 ... Valve element (plug) 31 ... Plug (cap plug) 32 ... Valve body (open / close cylinder) 35 ... Muddy water pipe receiving mechanism (connection cylinder)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】第1の回転体支持手段と第2の回転体支持
手段を、トンネル構築方向前後方向に所定の間隔をなす
形で設け、 前記第1の回転体支持手段に泥水管受入機構を、既設の
泥水管の先端を受入自在で且つ該泥水管をその軸心に沿
って摺動自在に支持し得るように設け、 前記第2の回転体支持手段の前記泥水管受入機構と対向
した位置に、シールド機に接続自在な接続管路機構を設
け、 前記第1の回転体支持手段と第2の回転体支持手段の間
に、その各々の内部に泥水管が収容され得る鞘管を複数
有する回転体を、回転自在に且つ該鞘管を前記泥水管受
入機構と前記接続管路機構の間に選択的に位置決め自在
な形で設け、 前記第1の回転体支持手段と第2の回転体支持手段に、
前記鞘管に泥水管を選択的に装填し得る装填手段を設
け、 前記装填手段は前記鞘管の前端と後端をそれぞれ開放閉
塞自在な第1及び第2の弁体を有し、 前記第1及び/又は第2の弁体に、前記鞘管の内部の泥
水を排出注入し得る排出注入手段を設け、 前記第1及び/又は第2の弁体にプラグを、該プラグが
設けられた弁体を介して前記鞘管の内部を外部と連通し
得る形で着脱自在に設けて構成した、泥水管延長装置。
1. A first rotating body supporting means and a second rotating body supporting means are provided at a predetermined interval in a front and rear direction of a tunnel building direction, and the first rotating body supporting means has a muddy water pipe receiving mechanism. Is provided so that the tip of the existing muddy water pipe can be received and the slidable water pipe can be slidably supported along its axis, and faces the muddy water pipe receiving mechanism of the second rotating body supporting means. A connecting pipe line mechanism connectable to the shield machine is provided at a predetermined position, and a muddy water pipe can be housed inside each of the first rotating body supporting means and the second rotating body supporting means. A plurality of rotating bodies are rotatably provided, and the sheath pipe is selectively positioned between the muddy water pipe receiving mechanism and the connecting pipeline mechanism, and the first rotating body supporting means and the second rotating body supporting means are provided. In the rotating body support means of
The sheath pipe is provided with a loading device capable of selectively loading a muddy water pipe, and the loading device has first and second valve bodies capable of opening and closing a front end and a rear end of the sheath pipe, respectively. The first and / or second valve body is provided with a discharge and injection means capable of discharging and injecting muddy water inside the sheath pipe, and the first and / or second valve body is provided with a plug and the plug is provided. A muddy water pipe extension device, which is detachably provided so that the inside of the sheath pipe can communicate with the outside through a valve body.
JP7775693A 1993-03-11 1993-03-11 Mud pipe extension device Expired - Fee Related JP3199513B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7775693A JP3199513B2 (en) 1993-03-11 1993-03-11 Mud pipe extension device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7775693A JP3199513B2 (en) 1993-03-11 1993-03-11 Mud pipe extension device

Publications (2)

Publication Number Publication Date
JPH06264684A true JPH06264684A (en) 1994-09-20
JP3199513B2 JP3199513B2 (en) 2001-08-20

Family

ID=13642782

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7775693A Expired - Fee Related JP3199513B2 (en) 1993-03-11 1993-03-11 Mud pipe extension device

Country Status (1)

Country Link
JP (1) JP3199513B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150512A (en) * 2016-08-22 2016-11-23 上海交通大学 A kind of shield receives with steel bushing counter-force car device
CN113202498A (en) * 2021-06-07 2021-08-03 中国铁建重工集团股份有限公司 Pipeline extension equipment and slurry circulation system for slurry shield

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150512A (en) * 2016-08-22 2016-11-23 上海交通大学 A kind of shield receives with steel bushing counter-force car device
CN113202498A (en) * 2021-06-07 2021-08-03 中国铁建重工集团股份有限公司 Pipeline extension equipment and slurry circulation system for slurry shield
CN113202498B (en) * 2021-06-07 2022-11-11 中国铁建重工集团股份有限公司 Pipeline extension equipment and slurry circulation system for slurry shield

Also Published As

Publication number Publication date
JP3199513B2 (en) 2001-08-20

Similar Documents

Publication Publication Date Title
RU2600120C2 (en) Device for injection of resin for drilling device for installation of anchor bolts in soil
US4886396A (en) Existing pipeline renewing method and apparatus therefor
JP3199513B2 (en) Mud pipe extension device
JP3199512B2 (en) Mud pipe extension device
JPH06272475A (en) Mud pipe extending device
JP3874095B2 (en) Wellhead formation method and shield machine when reaching shield machine
JPH06272474A (en) Mud pipe extending device
JPH06272476A (en) Mud pipe
JPH06272478A (en) Pipe
JP5968171B2 (en) Receiving side shield machine for underground joint excavation equipment
JP5400083B2 (en) Ground improvement chemical injection pipe and ground improvement chemical injection method
JP3207817B2 (en) Branch shield excavation method and shield excavator capable of branch excavation
JP7289195B2 (en) Supporting method and supporting device for lining
JP3698431B2 (en) Underground joint type shield machine and its underground joining method
JP3579373B2 (en) Branch excavating shield excavator and branch shield excavating method
JP4148953B2 (en) Widening type shield machine and its excavation method
JPH09119279A (en) Method of propulsive construction of screw auger for excavating gallery
JP6162292B2 (en) Backing material injection device
JP3681371B2 (en) Shield digging machine capable of branch start and branch shield digging method
JP2003278490A (en) Tunnel excavator
JP3783951B2 (en) Shield machine capable of branch start and branch shield machine method
JP2001227283A (en) Boring machine for boring construction method, and starting method therefor
JPH11217991A (en) Drift excavation device
JP3811482B2 (en) Shield tunnel joining method
JPH0835390A (en) Drilling device