JPH06264539A - Partitioning unit and partition executing method using the same - Google Patents

Partitioning unit and partition executing method using the same

Info

Publication number
JPH06264539A
JPH06264539A JP8032493A JP8032493A JPH06264539A JP H06264539 A JPH06264539 A JP H06264539A JP 8032493 A JP8032493 A JP 8032493A JP 8032493 A JP8032493 A JP 8032493A JP H06264539 A JPH06264539 A JP H06264539A
Authority
JP
Japan
Prior art keywords
partition
panel
floor
end surface
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8032493A
Other languages
Japanese (ja)
Inventor
Hiroaki Hirakuri
弘明 平栗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAISEI DENKI KOGYO YUGEN
Original Assignee
TAISEI DENKI KOGYO YUGEN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAISEI DENKI KOGYO YUGEN filed Critical TAISEI DENKI KOGYO YUGEN
Priority to JP8032493A priority Critical patent/JPH06264539A/en
Publication of JPH06264539A publication Critical patent/JPH06264539A/en
Pending legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)

Abstract

PURPOSE:To precedingly construct a double floor, simplify the construction, improve the workability, shorten the constructing time and reduce the execution cost. CONSTITUTION:A partitioning unit 11 is formed of a plurality of partitioning panels 12 each of which has a projection 14 in the longitudinal direction on the panel lower end surface and at least one bolt insert hole 16 formed on the panel upper end surface; and a support bolt 17 the lower end part of which is inserted to each belt insert hole of the partitioning panel 12; and a regulating nut 22 screwed to the support bolt 17 and arranged on the bolt insert hole edge part of the partitioning panel 12. In the construction the projection 14 of the partitioning panel lower end surface is fitted to a clearance S between laid floor panels 10 to build the partitioning panel 12, and the regulating nut 22 is then rotated to further extend the support bolt 17 upward. The support bolt 17 top part and the regulating nut 22 are pressed onto a ceiling 23 and the partitioning panel 12 upper end surface, respectively, and the partitioning panel 12 is built and fixed onto the floor panel 10 upper surfaces.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、集合住宅等の各種建物
において間仕切りを簡単に施工できる間仕切りユニット
及びそれを用いた間仕切り施工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a partition unit which can easily construct a partition in various buildings such as an apartment house and a partition construction method using the partition unit.

【0002】[0002]

【従来の技術】従来、間仕切りの施工方法には多種多様
の方法が考えられているが、比較的に施工が簡単である
ということから一般に図6に示すような間仕切りユニッ
トが用いられている。図6に示す従来の間仕切りユニッ
ト101は、下端面にボルト挿入孔が形成された中空の
間仕切りパネル102と、該間仕切りパネル102のボ
ルト挿入孔(図示せず)に上端部が挿入された支持ボル
ト103とからなり、間仕切りパネル102の下端面は
支持ボルト103に螺合された調整ナット105により
支持される。この間仕切りユニット101の施工は、間
仕切りパネル102下端面のボルト挿入孔に支持ボルト
103の上端部を挿入した状態で、コンクリートスラブ
等の基礎床面106上に支持ボルト103の頭部104
を接床し、間仕切りパネル102を垂直に立て、次いで
調整ナット105を回して間仕切りパネル102を上方
に押し上げ、間仕切りパネル102の上端面を天井10
7に押し付け、この押圧力によって固定することにより
行われている。
2. Description of the Related Art Conventionally, various methods for partitioning have been considered, but a partitioning unit as shown in FIG. 6 is generally used because of its relatively simple construction. A conventional partition unit 101 shown in FIG. 6 is a hollow partition panel 102 having a bolt insertion hole formed at a lower end surface thereof, and a support bolt having an upper end portion inserted into a bolt insertion hole (not shown) of the partition panel 102. 103, and the lower end surface of the partition panel 102 is supported by an adjusting nut 105 screwed to the support bolt 103. The partition unit 101 is constructed by placing the head 104 of the support bolt 103 on the foundation floor 106 such as a concrete slab with the upper end of the support bolt 103 inserted in the bolt insertion hole in the lower end of the partition panel 102.
, The partition panel 102 is erected vertically, and then the adjusting nut 105 is turned to push the partition panel 102 upward to raise the upper end surface of the partition panel 102 to the ceiling 10.
It is carried out by pressing it against 7 and fixing it by this pressing force.

【0003】その後、このようにして設置された間仕切
りの所定高さに沿って際根太又は根太ユニット108を
設け、これを間仕切りパネル102に釘等により固定し
た後、床パネル109の一辺を支持させるか、又は棒状
脚部111と該棒状脚部の上端部に上下調節可能に装着
された受け板112とからなるユニット支持脚110を
所定間隔で配置し、このユニット支持脚110の受け板
112により床パネル109の縁部を支持させる。際根
太108又はユニット支持脚110により支持されてい
ない床パネル109の他の縁部は、約450mmのピッ
チで基礎床面106上に配置したユニット支持脚110
に片持たせの状態で載せて取り付ける。ユニット支持脚
110と床パネル109の取付は、ユニット支持脚11
0の受け板112上面に接着した粘着シート(図示せ
ず)等を介して行う。ユニット支持脚110の受け板1
12に形成された棒状脚部上端部がネジ込まれるネジ孔
(図示せず)は床パネル109の縁部から露出した状態
とする。隣合う床パネルも同様に、既に設置したユニッ
ト支持脚110上へ床パネル109のレベル調整ができ
る所定の間隙(上記ネジ孔が露出する間隙)を開けて載
せ、同様に他のユニット支持脚を配置して取り付ける。
床パネル109のレベル(又は受け板112の上面位)
は、前記ネジ孔を通して棒状脚部上端面に形成された溝
にドライバー等の回転工具の先端を嵌め込んで回転さ
せ、棒状脚部111を回すことにより調節する。このよ
うな作業を床パネルごと繰り返し、部屋の隅など定尺の
床パネルが入らない狭い箇所では、際根太を取付後、定
尺板を加工し、寸法を合わせて、適宜にユニット支持脚
を配置して床パネルを敷き詰める。その後、敷設された
床パネル上に必要に応じて捨て張り合板を敷設した後、
CFシート、絨毯、畳、木質フロアー材等の床仕上げ材
を敷設し、二重床の敷設作業を完了する。
After that, an extra joist or joist unit 108 is provided along the predetermined height of the partition thus installed, fixed to the partition panel 102 with a nail or the like, and then one side of the floor panel 109 is supported. Alternatively, the unit support legs 110 each including the rod-shaped leg portion 111 and the receiving plate 112 that is vertically adjustably attached to the upper end portion of the rod-shaped leg portion are arranged at a predetermined interval, and the unit support leg 110 allows the receiving plate 112 to move. The edge of the floor panel 109 is supported. The other edge of the floor panel 109 not supported by the edge joists 108 or the unit support legs 110 is the unit support legs 110 arranged on the foundation floor surface 106 at a pitch of about 450 mm.
Put it in a state that it is held by one side and attach it. The unit support leg 110 and the floor panel 109 are attached by the unit support leg 11
0 through a pressure-sensitive adhesive sheet (not shown) adhered to the upper surface of the receiving plate 112. Support plate 1 for the unit support leg 110
A screw hole (not shown) into which the upper end of the rod-shaped leg formed in 12 is screwed is exposed from the edge of the floor panel 109. Similarly, the adjacent floor panels are also placed on the already installed unit support legs 110 with a predetermined gap (a gap where the screw holes are exposed) allowing the level of the floor panel 109 to be adjusted, and the other unit support legs are similarly placed. Place and attach.
Level of floor panel 109 (or upper surface of backing plate 112)
Is adjusted by inserting the tip of a rotary tool such as a screwdriver into a groove formed on the upper end surface of the rod-shaped leg through the screw hole and rotating the rod-shaped leg 111. Repeat this work for each floor panel, and in a narrow space such as a corner of a room where a standard floor panel does not fit, after installing a thick joist, process the standard plate, adjust the dimensions, and install the unit support legs appropriately. Place and spread floor panels. Then, after laying a throwing plywood if necessary on the laid floor panel,
Laying floor finishing materials such as CF sheets, carpets, tatami mats, and wooden flooring materials, and completing the double floor laying work.

【0004】[0004]

【発明が解決しようとする課題】前記したように、従来
の間仕切りユニット101の施工は、支持ボルト103
の頭部104を基礎床面106に接床し、該支持ボルト
103に螺合された調整ナット105により支持された
状態に間仕切りパネル102を垂直に仮立設し、その後
調整ナット105を回して間仕切りパネル102を上方
に押し上げることにより行われる。従って、間仕切りユ
ニット101の仮立設の段階では、支持ボルト103の
頭部104のみが基礎床面106に接床しているため、
自立はできない。そのため、間仕切りユニット101を
垂直に保持する人と、調整ナットを操作する人の少なく
とも二人の作業員が必要であり、人手を要すると共に、
精度良く施工するためには施工時間も長くなり、施工費
が嵩む要因となっている。また、仮立設の段階では間仕
切りパネル102の全荷重が調整ナット105にかかっ
ており、調整ナット105を回すのにかなりの力を要す
るという難点がある。さらに、一旦間仕切りを施工した
後に二重床を構築しなければならず、二重床を先行施工
することができず、そのために先に施工された間仕切り
により区画された比較的狭い空間で二重床を施工しなけ
ればならず、施工性に劣るという問題があった。
As described above, the conventional partition unit 101 is constructed by the support bolt 103.
The head 104 of the floor is brought into contact with the base floor surface 106, the partition panel 102 is vertically erected vertically in a state of being supported by the adjusting nut 105 screwed to the support bolt 103, and then the adjusting nut 105 is turned. This is performed by pushing the partition panel 102 upward. Therefore, at the stage of temporarily arranging the partition unit 101, only the head 104 of the support bolt 103 is in contact with the foundation floor 106,
I cannot be independent. Therefore, at least two workers, that is, a person who holds the partition unit 101 vertically and a person who operates the adjustment nut are required.
In order to carry out the construction with high accuracy, the construction time becomes long, which is a factor of increasing the construction cost. Further, at the stage of temporary standing, the entire load of the partition panel 102 is applied to the adjusting nut 105, and there is a drawback that a considerable force is required to rotate the adjusting nut 105. Furthermore, a double floor must be constructed after the partition has been constructed, and it is not possible to construct the double floor in advance, and therefore the double floor is constructed in a relatively narrow space partitioned by the partition constructed earlier. There was a problem that the floor had to be constructed and the workability was poor.

【0005】従って、本発明の目的は、前記したような
従来の間仕切りユニット及びその施工上の問題を解消
し、一人の作業員により簡単に施工でき、しかも施工時
間が短く、低施工費で施工できる間仕切りユニット及び
その施工法を提供することにある。さらに本発明の目的
は、二重床を先行施工することができ、そのため、この
二重床先行施工との組合せによりさらに施工を簡略化で
き、施工性を向上できると共に、施工時間の短縮、施工
費の低減を図ることができる間仕切りユニット及びその
施工法を提供することにある。本発明のさらに他の目的
は、間仕切りユニットの高さ寸法を短くでき、従って材
料費の低減が図れる間仕切りユニット及びその施工法を
提供することにある。
Therefore, an object of the present invention is to solve the above-mentioned conventional partitioning unit and its construction problems, and can be easily constructed by one worker, and the construction time is short and the construction cost is low. It is to provide a partition unit and a construction method therefor. Furthermore, the object of the present invention is to perform a double floor prior construction, therefore, the combination with this double floor prior construction can further simplify the construction, improve the construction efficiency, and reduce the construction time and construction. It is to provide a partitioning unit that can reduce costs and a construction method thereof. Still another object of the present invention is to provide a partition unit and a construction method thereof, which can shorten the height dimension of the partition unit and therefore can reduce the material cost.

【0006】[0006]

【課題を解決するための手段】前記目的を達成するため
に、本発明によれば、パネル下端面に長手方向に突条又
は溝が形成され、かつパネル上端面に少なくとも1つの
ボルト挿入孔が形成された複数の間仕切りパネルと、下
端部が上記間仕切りパネルの各ボルト挿入孔に挿入され
る支持ボルトと、該支持ボルトに螺合され上記間仕切り
パネルのボルト挿入孔縁部に配座される調整ナットとか
ら成る間仕切りユニットが提供される。さらに本発明に
よれば、このような間仕切りユニットを用いた簡便な間
仕切り施工法も提供される。
In order to achieve the above object, according to the present invention, a ridge or groove is formed in the lower end surface of the panel in the longitudinal direction, and at least one bolt insertion hole is formed in the upper end surface of the panel. A plurality of partition panels formed, a support bolt whose lower end is inserted into each bolt insertion hole of the partition panel, and an adjustment which is screwed into the support bolt and seated at the edge of the bolt insertion hole of the partition panel A partition unit consisting of a nut is provided. Further, according to the present invention, a simple partition construction method using such a partition unit is also provided.

【0007】本発明の間仕切り施工法の第一の態様によ
れば、支持脚により基礎床面上所定の高さにかつ隣接す
る各床パネル間に所定の間隙を開けて敷設された床パネ
ル上に間仕切りを施工するに際して、パネル下端面に長
手方向に上記床パネル間の間隙に対応する幅の突条が形
成され、かつパネル上端面に少なくとも1つのボルト挿
入孔が形成された複数の間仕切りパネルと、下端部が上
記間仕切りパネルの各ボルト挿入孔に挿入され、かつ螺
合された調整ナットにより上記ボルト挿入孔縁部に配座
して組み込まれた状態の支持ボルトとから成る間仕切り
ユニットを用い、上記間仕切りパネル下端面の突条を敷
設された各床パネル間の間隙に嵌挿して間仕切りパネル
を立設し、その後、調整ナットを回して支持ボルトの間
仕切りパネル上端面から上方に突出している部分をさら
に延長し、支持ボルト頂部と調整ナットをそれぞれ天井
及び間仕切りパネル上端面に押圧せしめ、間仕切りパネ
ルを床パネル上面に立設、固定することを特徴とする間
仕切り施工法が提供される。
According to the first aspect of the partitioning construction method of the present invention, on the floor panel laid at a predetermined height on the foundation floor surface by the supporting legs and with a predetermined gap between adjacent floor panels. When a partition is installed on the panel, a plurality of partition panels in which a ridge having a width corresponding to the gap between the floor panels is formed in the lower end surface of the panel in the longitudinal direction and at least one bolt insertion hole is formed in the upper end surface of the panel. And a support bolt whose lower end is inserted into each bolt insertion hole of the partition panel, and is supported by being seated and assembled at the edge of the bolt insertion hole by an adjusting nut screwed together. , The partition panel is installed by inserting the ribs on the lower end surface of the partition panel into the gaps between the floor panels, and then turning the adjusting nut to rotate the adjusting nut to the upper end of the partition panel. The partitioning construction method characterized by further extending the part projecting upward from the above, pressing the top of the support bolt and the adjusting nut against the ceiling and the upper end surface of the partitioning panel, respectively, and erected and fixing the partitioning panel on the floor panel upper surface. Will be provided.

【0008】本発明の間仕切り施工法の第二の態様によ
れば、床部材上に間仕切りを施工するに際して、間仕切
り下端面に形成された溝に対応する幅を有する細長いガ
イド部材を床部材上に間仕切り設置ラインに沿って固着
し、次いで、パネル下端面に長手方向に溝が形成され、
かつパネル上端面に少なくとも1つのボルト挿入孔が形
成された複数の間仕切りパネルと、下端部が上記間仕切
りパネルの各ボルト挿入孔に挿入され、かつ螺合された
調整ナットにより上記ボルト挿入孔縁部に配座して組み
込まれた状態の支持ボルトとから成る間仕切りユニット
を用い、上記間仕切りパネル下端面の溝を床部材上に固
着されたガイド部材に嵌め込んで間仕切りパネルを立設
し、その後、調整ナットを回して支持ボルトの間仕切り
パネル上端面から上方に突出している部分をさらに延長
し、支持ボルト頂部と調整ナットをそれぞれ天井及び間
仕切りパネル上端面に押圧せしめ、間仕切りパネルを床
部材上面に立設、固定することを特徴とする間仕切り施
工法が提供される。
According to the second aspect of the partition construction method of the present invention, when the partition is constructed on the floor member, an elongated guide member having a width corresponding to the groove formed on the lower end surface of the partition is provided on the floor member. It is fixed along the partition installation line, and then a groove is formed in the longitudinal direction on the lower end surface of the panel,
A plurality of partition panels each having at least one bolt insertion hole formed in the upper end surface of the panel, and a lower end portion of each partition panel inserted into each bolt insertion hole of the partition panel and screwed together with the adjustment nut to form an edge portion of the bolt insertion hole. Using a partition unit consisting of a support bolt in a state of being installed and installed in the partition panel, the partition panel is erected by fitting the groove of the lower end surface of the partition panel into a guide member fixed on the floor member, and thereafter, Rotate the adjustment nut to further extend the part that protrudes upward from the upper end surface of the partition panel of the support bolt, press the top of the support bolt and the adjustment nut against the ceiling and the upper surface of the partition panel, respectively, and stand the partition panel on the top surface of the floor member. A partition construction method is provided which is characterized in that it is installed and fixed.

【0009】[0009]

【発明の作用】本発明の間仕切りユニットは、パネル下
端面に長手方向に突条又は溝が形成され、かつパネル上
端面に少なくとも1つのボルト挿入孔が形成された複数
の間仕切りパネルと、下端部が上記間仕切りパネルの各
ボルト挿入孔に挿入される支持ボルトと、該支持ボルト
に螺合され上記間仕切りパネルのボルト挿入孔縁部に配
座される調整ナットとから成る。従って、棒状脚部と該
棒状脚部の上端部に上下調節可能に装着された受け板と
からなるユニット支持脚群と正方形及び/又は長方形の
床パネル群とを組み合せて用いて床パネルの敷設を行う
従来の乾式二重床の施工方法において間仕切りを構築す
る場合、基礎床の床面上に複数のユニット支持脚を床パ
ネルの形状に対応する所定のピッチで配置し、複数の床
パネルをその縁部で上記ユニット支持脚により支持され
るように所定の間隙を開けて配置、敷設した後、パネル
下端面に長手方向に突条が形成された間仕切りパネルを
用い、該間仕切りパネル下端面の突条を敷設された各床
パネル間の間隙に嵌挿して間仕切りパネルを立設し、そ
の後調整ナットを回して支持ボルトの間仕切りパネル上
端面から上方に突出している部分をさらに延長し、支持
ボルト頂部と調整ナットをそれぞれ天井及び間仕切りパ
ネル上端面に押圧せしめ、間仕切りパネルを床パネル上
面に立設、固定することによって構築することができ
る。
The partition unit according to the present invention comprises a plurality of partition panels each having a ridge or groove formed in the lower end surface of the panel in the longitudinal direction and at least one bolt insertion hole formed in the upper end surface of the panel, and a lower end portion. Comprises a support bolt inserted into each bolt insertion hole of the partition panel, and an adjusting nut screwed into the support bolt and seated at the edge of the bolt insertion hole of the partition panel. Therefore, a floor panel is laid by using a combination of a unit support leg group including a rod-shaped leg portion and a receiving plate mounted on the upper end portion of the rod-shaped leg portion so as to be vertically adjustable, and a square and / or rectangular floor panel group. When constructing a partition in the conventional dry double-floor construction method, place multiple unit support legs on the floor surface of the foundation floor at a predetermined pitch that corresponds to the shape of the floor panel, and install multiple floor panels. After arranging and laying a predetermined gap so that the edge is supported by the unit supporting legs, a partition panel having a ridge in the longitudinal direction on the panel lower end surface is used, and the partition panel lower end surface is Insert the protrusions into the gaps between the floor panels installed to set up the partition panel, and then turn the adjustment nut to further extend the part projecting upward from the partition panel upper end surface, Each lifting bolt top and the adjusting nut allowed pressed against the ceiling and partition panel upper surface, the partition panel may be constructed in the floor panel top surface erected by fixing.

【0010】また、敷設された各床パネル間の間隙部以
外の箇所に間仕切りを構築する場合、パネル下端面に長
手方向に溝が形成された間仕切りパネルを用い、該溝に
対応する幅を有する細長いガイド部材を床部材上の間仕
切り設置ラインに沿って接着剤、ビス等の適当な手段に
よって固着し、次いで、上記間仕切りパネル下端面の溝
を該ガイド部材に嵌め込んで間仕切りパネルを立設し、
前記方法と同様にして間仕切りパネルを床部材上面に立
設、固定することによって構築することができる。前記
したいずれの施工法においても、二重床を敷設した後に
間仕切りを構築できるので、二重床の敷設を作業性よく
行うことができる。また、各床パネル間の間隙又は床面
上に固着された細長いガイド部材を案内部として、これ
に間仕切りパネル下端面の突条又は溝を嵌め込んで間仕
切りパネルを立設するので正確に間仕切りを施工できる
と共に、仮立設の段階では間仕切りパネル下端面の突条
又は溝の両側の側辺下端面部により床面上に支承される
ので自立でき、一人の作業員により間仕切り施工を行う
ことができる。しかも、支持ボルトはパネル上端面のボ
ルト挿入孔に挿入されているので、調整ナットの操作に
多大の力を必要とせず、僅かに支持ボルト頂部を天井に
押圧せしめる時にのみ力を要するだけである。従って、
従来の方法に比べて間仕切り施工の施工性が格段に向上
し、施工時間の短縮、施工人員の削減、施工費の低減を
達成できる。さらに、本発明においては、既に敷設され
た二重床の床面上に間仕切りを構築するものであるた
め、床の高さ分だけ間仕切りユニットの高さ寸法が短く
でき、材料費を低減することができる。
Further, when a partition is constructed at a place other than the gap between the laid floor panels, a partition panel having a groove formed in the lower end surface of the panel in the longitudinal direction is used and has a width corresponding to the groove. The elongated guide member is fixed along the partition installation line on the floor member by an appropriate means such as an adhesive or a screw, and then the groove of the lower end surface of the partition panel is fitted into the guide member to vertically install the partition panel. ,
It can be constructed by standing and fixing the partition panel on the upper surface of the floor member in the same manner as the above method. In any of the above-mentioned construction methods, since the partition can be constructed after the double floor is laid, the double floor can be laid with good workability. In addition, since the elongated guide member fixed to the gap between the floor panels or on the floor surface is used as the guide portion, and the ridges or grooves on the lower end surface of the partition panel are fitted into this to form the partition panel, the partition panel is set up accurately. At the stage of temporary installation, it can be self-supported because it is supported on the floor surface by the side edges and the lower end surfaces on both sides of the lower end surface of the partition panel at the stage of temporary installation, so that one worker can perform the partition operation. . Moreover, since the support bolt is inserted into the bolt insertion hole on the upper end surface of the panel, a large amount of force is not required to operate the adjustment nut, and a force is required only when the top of the support bolt is slightly pressed against the ceiling. . Therefore,
Compared with the conventional method, the workability of partition construction is significantly improved, and it is possible to reduce the construction time, the number of construction personnel, and the construction cost. Furthermore, in the present invention, since the partition is constructed on the floor surface of the already laid double floor, the height dimension of the partition unit can be shortened by the height of the floor, and the material cost can be reduced. You can

【0011】[0011]

【実施例】以下、添付図面に示す実施例を説明しつつ、
本発明についてさらに詳細に説明する。図1乃至図3
は、乾式置床工法により敷設された二重床の床面上に、
各床パネル間の間隙を案内部として間仕切りユニットを
施工する一実施例を示している。すなわち、基礎床面1
上に所定のピッチで配置されたユニット支持脚2の受け
板8上面に、隣接する各床パネル10の縁部を片持たせ
の状態で所定の間隙Sを開けて取り付け、二重床が敷設
されている。ユニット支持脚2は、例えば弾性ゴム製の
基台3に回動自在に植設された棒状脚部4と、外周下端
部に突設された環状の支持部7を有するレベル調整用ナ
ット6と、中央部に挿入孔9を有し、かつ上面に粘着シ
ート(図示せず)が貼着された受け板8とから構成され
る。レベル調整用ナット6は、受け板8に穿設された挿
入孔9に嵌合して取り付けられ、あるいはまた支持部7
上面にリング状の粘着シート(図示せず)を貼着し、こ
れを受け板8の挿入孔9周囲下面に接着して取り付ける
こともできる。このようにして受け板8の挿入孔9に嵌
合されたレベル調整用ナット6に棒状脚部4のネジ部が
ねじ込まれ、ユニット支持脚2が組み立てられる。な
お、棒状脚部4の上端面にはマイナス溝5(プラス溝や
多角形凹陥部でもよい)が設けられており、該溝5にド
ライバー等の回転用工具の先端を嵌め込んで棒状脚部4
を回転させることにより、レベル調整用ナット6及びそ
れが嵌合された受け板8が上下動し、受け板8により支
持されている床パネル10の床面レベルを調整すること
ができる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS While explaining the embodiments shown in the accompanying drawings,
The present invention will be described in more detail. 1 to 3
On the floor surface of the double floor laid by the dry floor construction method,
An example is shown in which a partition unit is constructed using the gap between floor panels as a guide. That is, the base floor surface 1
The unit support legs 2 arranged at a predetermined pitch above the receiving plate 8 are attached to the upper surface of the receiving plate 8 with one edge of each adjacent floor panel 10 with a predetermined gap S therebetween, and a double floor is laid. Has been done. The unit support leg 2 includes, for example, a rod-shaped leg portion 4 rotatably planted on a base 3 made of elastic rubber, and a level adjusting nut 6 having an annular support portion 7 protruding from the lower end of the outer periphery. , A receiving plate 8 having an insertion hole 9 in the center and an adhesive sheet (not shown) attached to the upper surface. The level adjusting nut 6 is fitted and attached to the insertion hole 9 formed in the receiving plate 8, or the supporting portion 7 is also provided.
It is also possible to attach a ring-shaped adhesive sheet (not shown) on the upper surface and attach it to the lower surface around the insertion hole 9 of the receiving plate 8 by adhesion. In this way, the threaded portion of the rod-shaped leg portion 4 is screwed into the level adjusting nut 6 fitted in the insertion hole 9 of the receiving plate 8 to assemble the unit support leg 2. In addition, a minus groove 5 (a plus groove or a polygonal concave portion may be provided) is provided on the upper end surface of the rod-shaped leg portion 4, and the tip of a rotating tool such as a screwdriver is fitted into the groove 5 to form the rod-shaped leg portion. Four
By rotating the, the level adjusting nut 6 and the receiving plate 8 into which the level adjusting nut 6 is fitted are moved up and down, and the floor level of the floor panel 10 supported by the receiving plate 8 can be adjusted.

【0012】一方、間仕切りユニット11は、枠体の両
側面に平板材が固着された構造の中空の間仕切りパネル
12と、支持ボルト17と、該支持ボルト17に螺合さ
れる調整ナット22とから構成される。間仕切りパネル
12の下部枠部材13下端面には、その長手方向に沿っ
て、前記敷設された各床パネル10間の間隙Sに対応す
る幅及び床パネル10の厚みよりも低い高さの突条14
が突設されており、一方、上部枠部材15には上記支持
ボルト17の下端部を挿入するためのボルト挿入孔16
が穿設されている。なお、このボルト挿入孔16は間仕
切りパネル12の長さに応じて1個又は複数個設ける
(図示の実施例では2個)。支持ボルト17の上端部に
はフランジ状の天井押圧部材19が装着されている。支
持ボルト17上端部への天井押圧部材19の取付けは、
支持ボルト17の上端部を天井押圧部材19の中央孔2
0に挿入し、支持ボルト17上端近傍に側方に突設され
たフランジ部18により天井押圧部材19を支承した状
態で支持ボルト先端を押しつぶし、これによって側方に
拡がった支持ボルト先端部分21とフランジ部18との
間に天井押圧部材19を挾持せしめることにより行う。
あるいは、支持ボルト17と天井押圧部材19とを一体
成形することもできる。なお、天井押圧部材19の形状
は図示のものに限られず、支持ボルトの径より拡大され
て天井にピッタリとフィットして押圧できるような押圧
部材であれば全て使用できる。
On the other hand, the partition unit 11 comprises a hollow partition panel 12 having a structure in which flat plates are fixed to both side surfaces of a frame, a support bolt 17, and an adjusting nut 22 screwed to the support bolt 17. Composed. On the lower end surface of the lower frame member 13 of the partition panel 12, a ridge having a width corresponding to the gap S between the laid floor panels 10 and a height lower than the thickness of the floor panel 10 along the longitudinal direction thereof. 14
On the other hand, a bolt insertion hole 16 for inserting the lower end portion of the support bolt 17 is provided in the upper frame member 15.
Has been drilled. It should be noted that one or a plurality of bolt insertion holes 16 are provided depending on the length of the partition panel 12 (two in the illustrated embodiment). A flange-shaped ceiling pressing member 19 is attached to the upper end of the support bolt 17. To attach the ceiling pressing member 19 to the upper end of the support bolt 17,
The upper end portion of the support bolt 17 is connected to the central hole 2 of the ceiling pressing member 19.
0, and the support bolt tip is crushed in a state where the ceiling pressing member 19 is supported by the flange portion 18 projecting laterally in the vicinity of the upper end of the support bolt 17, and thereby the support bolt tip portion 21 that is laterally expanded. This is performed by holding the ceiling pressing member 19 between the flange portion 18 and the flange portion 18.
Alternatively, the support bolt 17 and the ceiling pressing member 19 can be integrally formed. The shape of the ceiling pressing member 19 is not limited to the shape shown in the figure, and any pressing member that is larger than the diameter of the support bolt and can fit and press the ceiling can be used.

【0013】上記間仕切りユニット11の施工に際して
は、調整ナット22が螺合された支持ボルト17の下端
部を間仕切りパネル12の上部枠部材15に形成された
ボルト挿入孔16に挿入し、調整ナット22により上部
枠部材15上端面に配座された状態で、間仕切りパネル
12の下部枠部材13の下端面に突設された突条14を
各床パネル間の間隙Sに嵌挿し、仮立設する。この段階
では、間仕切りパネル12はその両側縁下端面において
隣接する各床パネルの端縁部上面により支承されてお
り、作業員が保持しなくても自立した状態となる。その
後、調整ナット22を回して支持ボルト17の間仕切り
パネル12上端面から上方に突出している部分をさらに
延長し、支持ボルト17頂部の天井押圧部材19と調整
ナット22をそれぞれ天井23及び間仕切りパネル12
の上部枠部材15上端面に押圧せしめることにより、間
仕切りパネル12の下端面を床パネル10の側縁部上面
に押し付け、間仕切りパネル12を床パネル10上面に
立設、固定する。なお、その後必要に応じて間仕切りパ
ネル12の側端面下端部から釘等を床パネル10まで貫
通するように打ち付けたり、あるいは予め間仕切りパネ
ルの下端面に接着剤を塗布しておくことにより、より強
固に固定することもできる。このように、乾式置床工法
により二重床を先行して施工するシステムにおいては、
隣接して敷設された各床パネル間の間隙部の下部には必
ず支持脚が配置されているので、該間隙部を間仕切り設
置ラインとすることにより、作業性よく間仕切り施工を
行えると共に、間仕切りユニットも上記支持脚により支
持され、強度の高い間仕切りが完成する。また、床は木
製の場合が殆んどで、間仕切りユニットとの接合が簡単
に行える。
When constructing the partition unit 11, the lower end portion of the support bolt 17 to which the adjustment nut 22 is screwed is inserted into the bolt insertion hole 16 formed in the upper frame member 15 of the partition panel 12, and the adjustment nut 22 is inserted. The ridges 14 projecting from the lower end surface of the lower frame member 13 of the partition panel 12 while being seated on the upper end surface of the upper frame member 15 are fitted into the gaps S between the floor panels and temporarily erected. . At this stage, the partition panel 12 is supported by the upper end edges of the floor panels adjacent to each other at the lower end surfaces on both side edges thereof, and becomes independent without being held by an operator. After that, the adjusting nut 22 is turned to further extend the portion protruding upward from the upper end surface of the partition panel 12 of the support bolt 17, and the ceiling pressing member 19 and the adjusting nut 22 on the top of the support bolt 17 are respectively attached to the ceiling 23 and the partition panel 12.
By pressing the upper frame member 15 at the upper end surface thereof, the lower end surface of the partition panel 12 is pressed against the upper surface of the side edge portion of the floor panel 10, and the partition panel 12 is erected and fixed on the upper surface of the floor panel 10. After that, if necessary, a nail or the like may be struck from the lower end of the side end surface of the partition panel 12 so as to penetrate to the floor panel 10, or an adhesive may be applied to the lower end surface of the partition panel in advance to make the partition panel stronger. It can also be fixed to. In this way, in the system that precedes the double floor by the dry floor construction method,
Since the support leg is always arranged at the lower part of the gap between the floor panels that are laid adjacent to each other, the partition can be installed with good workability by using the gap as a partition installation line. Is also supported by the above-mentioned supporting legs, and a partition with high strength is completed. Also, most of the floors are made of wood, which makes it easy to join the partition unit.

【0014】図4は、各間仕切りパネル間の接合をさね
継ぎ構造とした実施例を示す。すなわち、間仕切りパネ
ル12の一方の側端面に長手方向にさね溝24を形成
し、他方の側端面に上記さね溝24に嵌合するさね25
を形成する。このような構造の間仕切りパネル12を用
いることにより、先に立設、固定された間仕切りパネル
12の側端面のさね溝24(又はさね25)に次の間仕
切りパネルの側端面のさね25(又はさね溝24)を嵌
め込み、それによって、間仕切りパネルの仮立設の段階
で間仕切りパネルをより安定にかつ確実に立設できると
いう利点が得られる。
FIG. 4 shows an embodiment in which the partition panels are joined together in a tongue and groove structure. That is, the tongue groove 24 is formed in the longitudinal direction on one side end surface of the partition panel 12, and the tongue 25 is fitted to the tongue groove 24 on the other side end surface.
To form. By using the partition panel 12 having such a structure, the tongue groove 24 (or tongue 25) of the side end surface of the partition panel 12 which has been erected and fixed in advance is inserted into the tongue 25 of the side end surface of the next partition panel. (Or the tongue groove 24) is fitted, which has the advantage that the partition panel can be erected more stably and surely at the stage of temporary erection of the partition panel.

【0015】図5は本発明の他の実施例を示し、平坦な
床面上に間仕切りを施工する例を示す。この実施例の場
合、間仕切りパネル12aの下部枠部材13aが下端か
ら若干内側に引っ込んだ位置に取り付けられ、間仕切り
パネル12a下端面に溝26が形成された間仕切りユニ
ット11aに構成されている点において、前記図1乃至
図3に示す実施例で用いた間仕切りユニット11と異な
る。この間仕切りユニット11aを用いて間仕切りを施
工する場合、上記溝26に対応する幅を有する細長い板
状のガイド部材27を床パネル10上に所定の間仕切り
設置ラインに沿って接着剤、釘等適当な手段により固着
し、次いで上記間仕切りパネル12a下端面の溝26を
床パネル10上のガイド部材27に嵌め込んで間仕切り
パネルを立設し、その後は前記した実施例と同様にして
調整ナット22を回して支持ボルト17頂部の天井押圧
部材19を天井23に押圧せしめ、床パネル10と天井
23との間に立設、固定する。床は木製の場合が殆んど
で、間仕切りユニットとの接合が簡単に行える。なお、
間仕切りを安定かつ強固に構築するために、間仕切り設
置部の床パネル10下部にはユニット支持脚2(又は他
の適当な支持脚)を配設して補強する。
FIG. 5 shows another embodiment of the present invention, in which a partition is constructed on a flat floor surface. In the case of this embodiment, the lower frame member 13a of the partition panel 12a is attached to a position retracted slightly inward from the lower end, and is configured as a partition unit 11a in which a groove 26 is formed on the lower end surface of the partition panel 12a. This is different from the partition unit 11 used in the embodiment shown in FIGS. 1 to 3. When a partition is constructed by using this partition unit 11a, an elongated plate-shaped guide member 27 having a width corresponding to the groove 26 is provided on the floor panel 10 along a predetermined partition installation line by using an adhesive, a nail or the like. The partition panel 12a is fixed by a means, then the groove 26 on the lower end surface of the partition panel 12a is fitted into the guide member 27 on the floor panel 10 to stand the partition panel, and thereafter the adjusting nut 22 is turned in the same manner as in the above-described embodiment. The ceiling pressing member 19 at the top of the support bolt 17 is pressed against the ceiling 23, and is erected and fixed between the floor panel 10 and the ceiling 23. Most of the floors are made of wood and can be easily joined to the partition unit. In addition,
In order to construct the partition stably and firmly, a unit support leg 2 (or another appropriate support leg) is arranged and reinforced under the floor panel 10 of the partition installation portion.

【0016】以上、本発明に係る間仕切りユニット及び
その施工法を実施例に基づき具体的に説明したが、本発
明は上記実施例に限定されるものではなく、その要旨を
逸脱しない範囲で種々変更可能である。また、前記した
実施例は二重床の床面上に間仕切りを施工した例を示し
たが、本発明は他の床部材上にも適用可能である。例え
ば、襖やドアを配設する枠体上の空間部に間仕切り施工
する場合にも応用できる。この場合、枠体の上部枠部材
上面に溝又は突条を形成し、これに間仕切りパネル下端
面に形成された突条又は溝を嵌め込むようにすればよ
い。
The partitioning unit and its construction method according to the present invention have been specifically described based on the embodiments, but the present invention is not limited to the above embodiments, and various modifications can be made without departing from the scope of the invention. It is possible. Further, although the above-mentioned embodiment shows the example in which the partition is constructed on the floor surface of the double floor, the present invention can be applied to other floor members. For example, it can be applied to a case where a partition is installed in a space portion on a frame body in which a sliding door or a door is arranged. In this case, a groove or a protrusion may be formed on the upper surface of the upper frame member of the frame body, and the protrusion or the groove formed on the lower end surface of the partition panel may be fitted therein.

【0017】[0017]

【発明の効果】以上のように、本発明の間仕切りユニッ
ト及びそれを用いた間仕切り施工法によれば、二重床を
敷設した後に間仕切りを構築でき、また、各床パネル間
の間隙又は床面上に固着された細長いガイド部材を案内
部として、これに間仕切りパネル下端面の突条又は溝を
嵌め込んで間仕切りパネルを立設するので正確に間仕切
りを施工できると共に、仮立設の段階では間仕切りパネ
ル下端面の突条又は溝の両側の側辺下端面部により床面
上に支承されるので自立でき、一人の作業員により間仕
切り施工を行うことができ、しかも、支持ボルトはパネ
ル上端面のボルト挿入孔に挿入されているので、調整ナ
ットの操作に多大の力を必要とせず、僅かに支持ボルト
頂部を天井に押圧せしめる時にのみ力を要するだけであ
る。従って、従来の方法に比べて間仕切り施工の施工性
が格段に向上し、施工時間の短縮、施工人員の削減、施
工費の低減を達成できる。さらに、本発明においては、
既に敷設された二重床の床面上に間仕切りを構築するも
のであるため、床の高さ分だけ間仕切りユニットの高さ
寸法が短くでき、材料費を低減することができる。
As described above, according to the partitioning unit of the present invention and the partitioning construction method using the partitioning unit, the partitioning can be constructed after the double floor is laid, and the space between the floor panels or the floor surface can be constructed. The elongated guide member fixed on the top is used as a guide part, and the ridges or grooves on the lower end surface of the partition panel are fitted into this to install the partition panel, so that the partition can be constructed accurately, and at the stage of temporary installation, the partition is installed. Since it is supported on the floor by the ridges on the bottom edge of the panel or the side edges on both sides of the groove, it can be self-supporting and can be partitioned by one worker. Since it is inserted into the insertion hole, a great amount of force is not required to operate the adjusting nut, and a force is required only when the top of the support bolt is slightly pressed against the ceiling. Therefore, the workability of the partition construction can be remarkably improved as compared with the conventional method, and the construction time can be shortened, the construction personnel can be reduced, and the construction cost can be reduced. Furthermore, in the present invention,
Since the partition is constructed on the floor surface of the already installed double floor, the height dimension of the partition unit can be shortened by the height of the floor, and the material cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の間仕切りユニットを施工した実施例を
示す縦断面図である。
FIG. 1 is a vertical sectional view showing an embodiment in which a partition unit of the present invention is installed.

【図2】図1に示す間仕切りユニット施工例の部分断面
側面図である。
FIG. 2 is a partial cross-sectional side view of the partition unit construction example shown in FIG.

【図3】図1に示す間仕切りユニット施工例の部分横断
面図である。
FIG. 3 is a partial cross-sectional view of a partition unit construction example shown in FIG.

【図4】間仕切りパネルの他の実施例を示す部分横断面
図である。
FIG. 4 is a partial cross-sectional view showing another embodiment of the partition panel.

【図5】本発明の間仕切りユニットを施工した他の実施
例を示す縦断面図である。
FIG. 5 is a vertical sectional view showing another embodiment in which the partition unit of the present invention is installed.

【図6】従来の間仕切りユニットの施工例を示す縦断面
図である。
FIG. 6 is a vertical cross-sectional view showing an example of construction of a conventional partition unit.

【符号の説明】[Explanation of symbols]

1 基礎床面、 2 ユニット支持脚、 3 基台、
4 棒状脚部、 6レベル調整用ナット、 8 受け
板、 10 床パネル、 11,11a 間仕切りユニ
ット、 12,12a 間仕切りパネル、 13,13
a 下部枠部材、 14 突条、 15 上部枠部材、
16 ボルト挿入孔、 17 支持ボルト、 19
天井押圧部材、 22 調整ナット、 23 天井、
24 さね溝、 25 さね、 26 溝、 27 ガ
イド部材、 S 間隙
1 foundation floor, 2 unit support legs, 3 bases,
4 bar-shaped legs, 6 level adjusting nuts, 8 receiving plates, 10 floor panels, 11 and 11a partition units, 12 and 12a partition panels, 13 and 13
a lower frame member, 14 ridges, 15 upper frame member,
16 bolt insertion hole, 17 support bolt, 19
Ceiling pressing member, 22 adjustment nuts, 23 ceiling,
24 tongue groove, 25 tongue, 26 groove, 27 guide member, S gap

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 パネル下端面に長手方向に突条又は溝が
形成され、かつパネル上端面に少なくとも1つのボルト
挿入孔が形成された複数の間仕切りパネルと、下端部が
上記間仕切りパネルの各ボルト挿入孔に挿入される支持
ボルトと、該支持ボルトに螺合され上記間仕切りパネル
のボルト挿入孔縁部に配座される調整ナットとから成る
間仕切りユニット。
1. A plurality of partition panels each having a ridge or groove formed in the lower end surface of the panel in the longitudinal direction and at least one bolt insertion hole formed in the upper end surface of the panel, and each bolt of which the lower end portion is the partition panel. A partition unit comprising a support bolt inserted into the insertion hole and an adjusting nut screwed into the support bolt and seated at the edge of the bolt insertion hole of the partition panel.
【請求項2】 支持脚により基礎床面上所定の高さにか
つ隣接する各床パネル間に所定の間隙を開けて敷設され
た床パネル上に間仕切りを施工するに際して、パネル下
端面に長手方向に上記床パネル間の間隙に対応する幅の
突条が形成され、かつパネル上端面に少なくとも1つの
ボルト挿入孔が形成された複数の間仕切りパネルと、下
端部が上記間仕切りパネルの各ボルト挿入孔に挿入さ
れ、かつ螺合された調整ナットにより上記ボルト挿入孔
縁部に配座して組み込まれた状態の支持ボルトとから成
る間仕切りユニットを用い、上記間仕切りパネル下端面
の突条を敷設された各床パネル間の間隙に嵌挿して間仕
切りパネルを立設し、その後、調整ナットを回して支持
ボルトの間仕切りパネル上端面から上方に突出している
部分をさらに延長し、支持ボルト頂部と調整ナットをそ
れぞれ天井及び間仕切りパネル上端面に押圧せしめ、間
仕切りパネルを床パネル上面に立設、固定することを特
徴とする間仕切り施工法。
2. When a partition is installed on a floor panel laid by a support leg at a predetermined height above the foundation floor and with a predetermined gap between adjacent floor panels, a longitudinal direction is applied to the lower end surface of the panel. A plurality of partition panels each having a ridge having a width corresponding to the gap between the floor panels, and at least one bolt insertion hole formed in the upper end surface of the panel; and a lower end portion of each of the bolt insertion holes of the partition panel. A partition unit consisting of a support bolt that is inserted into a screw and is screwed into the bolt insertion hole edge part is installed on the edge portion of the bolt insertion hole, and a ridge is laid on the lower end surface of the partition panel. Insert the partition panel by inserting it into the space between the floor panels, and then turn the adjustment nut to further extend the part protruding upward from the upper end surface of the partition panel of the support bolt, A partitioning construction method characterized in that the top of the support bolt and the adjusting nut are pressed against the ceiling and the upper end surface of the partitioning panel, respectively, and the partitioning panel is erected and fixed on the floor panel upper surface.
【請求項3】 床部材上に間仕切りを施工するに際し
て、間仕切り下端面に形成された溝に対応する幅を有す
る細長いガイド部材を床部材上に間仕切り設置ラインに
沿って固着し、次いで、パネル下端面に長手方向に溝が
形成され、かつパネル上端面に少なくとも1つのボルト
挿入孔が形成された複数の間仕切りパネルと、下端部が
上記間仕切りパネルの各ボルト挿入孔に挿入され、かつ
螺合された調整ナットにより上記ボルト挿入孔縁部に配
座して組み込まれた状態の支持ボルトとから成る間仕切
りユニットを用い、上記間仕切りパネル下端面の溝を床
部材上に固着されたガイド部材に嵌め込んで間仕切りパ
ネルを立設し、その後、調整ナットを回して支持ボルト
の間仕切りパネル上端面から上方に突出している部分を
さらに延長し、支持ボルト頂部と調整ナットをそれぞれ
天井及び間仕切りパネル上端面に押圧せしめ、間仕切り
パネルを床部材上面に立設、固定することを特徴とする
間仕切り施工法。
3. When constructing a partition on a floor member, an elongated guide member having a width corresponding to the groove formed on the lower end surface of the partition is fixed on the floor member along the partition installation line, and then the panel bottom. A plurality of partition panels each having a groove formed in the end face in the longitudinal direction and at least one bolt insertion hole formed in the upper end face of the panel, and a lower end portion thereof inserted into each bolt insertion hole of the partition panel and screwed together. Using a partition unit consisting of support bolts installed and installed at the edge of the bolt insertion hole by the adjusting nut, the groove of the lower end face of the partition panel is fitted into the guide member fixed on the floor member. Install the partition panel upright, then turn the adjusting nut to further extend the part of the support bolt that protrudes upward from the partition panel upper end surface, and A partition construction method characterized in that the roof top and the adjusting nut are pressed against the ceiling and the upper end surface of the partition panel, respectively, and the partition panel is erected and fixed on the upper surface of the floor member.
JP8032493A 1993-03-16 1993-03-16 Partitioning unit and partition executing method using the same Pending JPH06264539A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8032493A JPH06264539A (en) 1993-03-16 1993-03-16 Partitioning unit and partition executing method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8032493A JPH06264539A (en) 1993-03-16 1993-03-16 Partitioning unit and partition executing method using the same

Publications (1)

Publication Number Publication Date
JPH06264539A true JPH06264539A (en) 1994-09-20

Family

ID=13715086

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8032493A Pending JPH06264539A (en) 1993-03-16 1993-03-16 Partitioning unit and partition executing method using the same

Country Status (1)

Country Link
JP (1) JPH06264539A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002285666A (en) * 2001-03-23 2002-10-03 Daiken Trade & Ind Co Ltd Supporting leg for partition wall, mounting structure thereof and construction method therefor
JP2008115569A (en) * 2006-11-01 2008-05-22 Inax Corp House construction method, and bearing fitting for waterproof pan

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002285666A (en) * 2001-03-23 2002-10-03 Daiken Trade & Ind Co Ltd Supporting leg for partition wall, mounting structure thereof and construction method therefor
JP2008115569A (en) * 2006-11-01 2008-05-22 Inax Corp House construction method, and bearing fitting for waterproof pan

Similar Documents

Publication Publication Date Title
JP2842632B2 (en) Dry flooring method and joist unit
JPH06264539A (en) Partitioning unit and partition executing method using the same
JPH10115079A (en) Unit support leg
JP3517272B2 (en) Floor construction method of detached house using unit supporting leg
JP3001383B2 (en) Dry flooring method and unit support leg used for it
RU204707U1 (en) FLOOR COVERING
GB2191225A (en) Levelling means in a component building
JP3866356B2 (en) Wall base and floor finish storage structure
US11585100B2 (en) Tiled floor assembly and components
JPH0724484Y2 (en) Wall structure
JP3359151B2 (en) Floor construction method of detached house using unit supporting leg
JP2001065168A (en) Heat insulation panel and construction of heat insulation double floor using the same
JPH11107495A (en) Unit supporting leg for constructing heat insulated double floor, heat insulated double floor unit, and method for constructing heat insulated double floor using these leg and unit
JP2580722Y2 (en) Floor panel
JP2557266Y2 (en) Joist support structure
JPH0332671B2 (en)
JPH0334980Y2 (en)
JP2724290B2 (en) Ceiling structure
JPH0622764Y2 (en) Floor base material level adjustment mounting structure for concrete slabs
JPH09268744A (en) Unit support-leg, double floor unit and execution method of double floor using the unit support leg
JPH01178644A (en) Construction panel for continuous installation
JP3051058U (en) Floor panel and floor structure formed using the floor panel
JPH0882073A (en) Method for constructing movable floor
JPH05106323A (en) Mounting structure for interior fittings
JP2003027712A (en) Repairing method of floor

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20001212