JPH06262300A - Method and device for producing metal object - Google Patents
Method and device for producing metal objectInfo
- Publication number
- JPH06262300A JPH06262300A JP25099193A JP25099193A JPH06262300A JP H06262300 A JPH06262300 A JP H06262300A JP 25099193 A JP25099193 A JP 25099193A JP 25099193 A JP25099193 A JP 25099193A JP H06262300 A JPH06262300 A JP H06262300A
- Authority
- JP
- Japan
- Prior art keywords
- metal
- alloy
- connecting channel
- molten
- main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D1/00—Treatment of fused masses in the ladle or the supply runners before casting
- B22D1/007—Treatment of the fused masses in the supply runners
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D5/00—Machines or plants for pig or like casting
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Continuous Casting (AREA)
- Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、合金物体、有利には標
準重量の合金物体を鋳造により、主金属の溶融後に合金
素材を主金属流に添加するようにして生産する方法およ
び装置に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and apparatus for producing alloy bodies, preferably standard weight alloy bodies, by casting, so that the alloy material is added to the main metal stream after the main metal has been melted. Is.
【0002】[0002]
【従来の技術】合金物体の鋳造の際、通常は合金素材が
主金属の溶融に関連して固形の状態で同じ溶鉱炉に添加
される。鋳造に先立ち、正しい合成状態を確認するため
に、分析用の標本が溶鉱炉から取り出されるが、この作
業によって実質的に鋳造サイクルの長さが増大する。さ
らに、異なる合金素材を含むいくつかの合金を同じ溶鉱
炉内で鋳造したい場合、個々の合金が少しでも混ざり合
わないようにするため、その炉を実質的に完全に空にし
なければならない。2. Description of the Prior Art During the casting of alloy bodies, the alloy stock is usually added to the same blast furnace in the solid state in connection with the melting of the main metal. Prior to casting, analytical specimens are removed from the blast furnace to confirm correct synthesis, but this operation substantially increases the length of the casting cycle. Furthermore, if several alloys, including different alloy stocks, are to be cast in the same blast furnace, the furnaces must be substantially completely emptied in order to prevent any mixing of the individual alloys.
【0003】[0003]
【発明が解決しようとする課題】本発明はこのような従
来技術の欠点を解消し、合金物体、本質的には標準重量
の合金物体を鋳造により、主金属の溶融に用いた溶鉱炉
へその合金素材を供給する必要なく、その合金素材を溶
鉱炉と鋳型の間の溶融主金属流へ後に供給するようにし
て生産し、改良された比較的安全な方法および装置を達
成することを目的とする。主要な新しい特質は添付の特
許請求の範囲に明らかである。SUMMARY OF THE INVENTION The present invention solves the above-mentioned drawbacks of the prior art by casting an alloy body, essentially an alloy body of standard weight, into a blast furnace used to melt the main metal. It is an object of the present invention to produce the alloy material as it is subsequently supplied to the molten main metal stream between the blast furnace and the mold, without the need to supply the material, to achieve an improved and relatively safe method and apparatus. The main new features are apparent in the appended claims.
【0004】[0004]
【課題を解決するための手段】本発明によれば、主金属
の溶鉱炉からは、溶鉱炉と溶融金属回分装置との間に設
けられた少なくとも1つの接続チャンネルへ溶融金属
が、有利にはその溶鉱炉の溶融容量から許容される速度
で導入されるが、この接続チャンネルは、実質的に横方
向と垂直方向に動かすことができる。この接続チャンネ
ルへ導入する溶融金属の量を制御装置により調節して、
溶融金属の溶鉱炉から接続チャンネルへの実質的に連続
的供給を達成するようにする。合金される金属は、1つ
またはいくつかになることがあるが、目標の量が溶鉱炉
と鋳型との間の溶融流へ導入され、主金属流を調節する
制御装置も使用して、目標の合金比率と被鋳造金属物体
の重量に従って合金金属(単数または複数)の供給量を
調節するのが有利である。合金金属は、溶鉱炉と溶融金
属回分装置との間の接続チャンネルに、または溶融金属
回分装置に直接、主金属流に溶融あるいは固体のいずれ
かの状態で導入される。SUMMARY OF THE INVENTION According to the invention, molten metal, from the main metal blast furnace, to at least one connecting channel provided between the blast furnace and the molten metal batch device, preferably the blast furnace. This connection channel can be moved substantially laterally and vertically, although it is introduced at an acceptable rate from the melting volume of the. The amount of molten metal introduced into this connection channel is adjusted by the controller,
To achieve a substantially continuous supply of molten metal from the blast furnace to the connecting channels. The metal to be alloyed may be one or several, but a target amount is introduced into the melt flow between the blast furnace and the mold, and a controller that regulates the main metal flow is also used to target the metal. It is advantageous to adjust the supply of alloy metal (s) according to the alloy ratio and the weight of the metal body to be cast. The alloy metal is introduced either in the molten or solid state into the main metal stream into the connecting channel between the blast furnace and the molten metal batch device or directly into the molten metal batch device.
【0005】溶鉱炉と回分装置との間の接続チャンネル
からは、溶融金属を回分装置に導入して、有利には、接
続チャンネルを転移用部材により垂直方向に下方へ移動
し、その溶解物が接続チャンネルから鋳型の回分装置へ
流れ始めるようにする。実質的には、この溶解物が接続
チャンネルから回分装置へ流れている間は、溶解物の溶
鉱炉から接続チャンネルへの供給速度、および個々の合
金金属の接続チャンネルへの供給速度、または必要に応
じて回分装置へ直接、供給する速度を増加することがで
きる。溶解物の接続チャンネルから回分装置への供給
と、その結果生じる金属合金の乱流とによって、金属合
金の混合が有利な方法で都合よく強化される。From the connection channel between the blast furnace and the batch device, the molten metal is introduced into the batch device and is advantageously moved vertically downwards by the transfer member so that the melt is connected. Start the flow from the channel to the mold batcher. In essence, the rate at which the melt is fed from the blast furnace to the connection channel, and the rate at which the individual alloy metal is fed to the connection channel, or if necessary, while the melt is flowing from the connection channel to the batch device. The feed rate can be increased directly to the batching device. The supply of the melt from the connecting channels to the batch device and the resulting turbulence of the metal alloy advantageously enhance the mixing of the metal alloy in an advantageous manner.
【0006】この回分装置は、接続チャンネルから供給
される溶融金属流と、回分装置に直接供給されることが
ある、少なくとも1つの合金金属流を受け入れる。前回
の鋳造サイクルにおけると同じ溶融金属合金を回分装置
へ供給する場合、少量の前記金属合金が都合よく前回の
鋳造で回分装置の中に残るため、例えば溶融金属の飛散
による金属のロスのみならず、回分装置の底部への貼り
付きに起因する金属のロスを、都合よく考慮に入れるこ
とができる。ここで、被鋳造金属物体の重量に相当する
量の溶融金属を新たに回分装置へ供給する。その被鋳造
金属合金を入れ替えなければならない場合、回分装置へ
は、その回分装置に収容される溶解物の量を被鋳造金属
物体の重量に対応させるために必要な量の合金溶融金属
だけしか、供給されない。The batch device receives a stream of molten metal supplied from the connecting channel and at least one alloy metal stream which may be supplied directly to the batch device. When supplying the same molten metal alloy to the batch device as in the previous casting cycle, a small amount of the metal alloy conveniently remains in the batch device in the previous casting, so that not only loss of metal due to splashing of molten metal The metal loss due to sticking to the bottom of the batch device can be conveniently taken into account. Here, an amount of molten metal corresponding to the weight of the cast metal object is newly supplied to the batch device. If the metal alloy to be cast must be replaced, the batch device only has the amount of molten alloy metal required to correspond the amount of melt contained in the batch device to the weight of the metal object to be cast, Not supplied.
【0007】目標量の溶解物が回分装置へ供給される
と、溶解物の回分装置への流入は、例えば、接続チャン
ネルと合金金属供給部材をそれぞれの最上部の位置に移
動させることによって、停止するのがよい。回分装置か
らは、被鋳造物体の量に相当する合金溶解物が回分装置
を傾けることによって鋳型の中へ導入される。被鋳造金
属合金を入れ替えなければならない場合だけ、回分装置
を全く空にし、それ以外は、少量の被鋳造合金溶融金属
を基礎量として回分装置の中に残すのが有利である。When the target amount of melt is fed to the batch device, the inflow of melt to the batch device is stopped, for example, by moving the connecting channel and the alloy metal feed member to their respective uppermost positions. Good to do. From the batch device, an alloy melt corresponding to the quantity of the object to be cast is introduced into the mold by tilting the batch device. Only if the metal alloy to be cast has to be replaced, it is advantageous to empty the batching device altogether, otherwise leaving a small amount of molten metal to be cast as a basic amount in the batch device.
【0008】被鋳造金属物体における主金属を溶鉱炉か
らその溶鉱炉と回分装置との間の少なくとも1つの接続
チャンネルへ供給することは、2つの連続する段階で行
なって、接続チャンネルがその最上位置にあり、溶解物
が回分装置へ流入していない場合は、溶融した主金属だ
けがその接続チャンネルへ供給されるようにするのが有
利である。ここで、この接続チャンネルは溶融主金属の
中間タンクとして都合よく機能するが、この場合、別の
中間タンクを必要としないので、一方のタンクから他方
のタンクへ、スラグを生成させるような1回の溶解物移
送は、回避される。他方、接続チャンネルが低い位置に
あり、溶解物がその接続チャンネルから回分装置へ流れ
ている場合、その溶融主金属の溶鉱炉から接続チャンネ
ルへの供給速度は増加する。主金属の供給速度の増加と
実質的に同時に合金素材(単数または複数)の供給が開
始され、合金素材が固体または溶融状態で接続チャンネ
ルにおける主金属流へ、または回分装置へ直接、供給さ
れる。したがって、溶鉱炉における主金属流は、この合
金素材とは関係なくなり、被鋳造金属合金は、単にその
合金素材の量、合金比率または合金素材を変更すること
により、かつ合金素材(単数または複数)を溶鉱炉か
ら、すでにその溶鉱炉から移動して溶鉱炉と鋳型との間
にある主金属流へ供給することにより、変更することが
できる。さらに、合金素材(単数または複数)を接続チ
ャンネルへ供給すると、都合のよいことには主金属流の
合金形成が回分装置より前ですでに始まる。The feeding of the main metal in the cast metal body from the blast furnace to at least one connecting channel between the blast furnace and the batching device is carried out in two successive steps, the connecting channel being in its uppermost position. If the melt is not flowing into the batch device, it is advantageous to ensure that only the molten main metal is supplied to the connecting channel. Here, this connecting channel conveniently serves as an intermediate tank for the molten main metal, but in this case it does not require another intermediate tank, so that it is not necessary to use a single slag from one tank to the other tank. Lysate transfer is avoided. On the other hand, if the connecting channel is in a low position and the melt is flowing from the connecting channel to the batch device, the feed rate of the molten main metal from the blast furnace to the connecting channel is increased. Feeding of the alloy material (s) is started at substantially the same time as the increase of the feed rate of the main metal, and the alloy material is fed in solid or molten state into the main metal stream in the connecting channel or directly to the batch device. . Therefore, the main metal flow in the blast furnace is independent of this alloy material, and the cast metal alloy can be made by simply changing the amount, alloy ratio or alloy material of the alloy material and the alloy material (s). Modifications can be made from the blast furnace by moving from the blast furnace and feeding the main metal stream between the blast furnace and the mold. In addition, feeding the alloying material (s) into the connecting channel conveniently causes the alloying of the main metal stream to already begin before the batch device.
【0009】[0009]
【作用】本発明によれば、少なくとも1つの合金素材と
合金し、鋳造により標準重量の金属物体を生産する方法
と装置において、主金属流と合金素材流を導入して、そ
の合金素材を、主金属の溶解に用いられる溶鉱炉と鋳型
との間にある溶融主金属流へ供給する。According to the present invention, in a method and apparatus for alloying with at least one alloy material and producing a standard weight metal object by casting, a main metal stream and an alloy material stream are introduced to produce the alloy material. It feeds the molten main metal stream between the blast furnace and the mold used to melt the main metal.
【0010】[0010]
【実施例】次に添付図面を参照して発明を詳細に説明す
る。DESCRIPTION OF THE PREFERRED EMBODIMENTS The invention will be described in detail with reference to the accompanying drawings.
【0011】図1によれば、合金される金属物体におけ
る主金属は、溶鉱炉1で溶解される。この溶鉱炉1から
は、溶解された主金属が接続チャンネル2へ、有利には
ポンプ3によって導入され、それを通り抜ける溶解物の
流れは、有利には溶鉱炉1の容量に適するよう調節する
ことができる。この溶解物をポンプ3により接続チャン
ネル2へ供給する量は、制御装置4により調節される。
この溶解物供給速度を調節して、接続チャンネル2がそ
の最上位置にある時、すなわち回分装置5が無負荷段階
にある間は、その溶解物供給速度を都合よく維持して、
少量の溶解物しかシュート状の接続チャンネル2へ流入
しないようにする。他方、接続チャンネル2がその低い
位置にある時、すなわち回分装置5が充填段階にある間
は、溶解物供給速度を増加し、かつその供給速度の増加
と実質的に同時に合金素材の接続チャンネル2への供給
を始める。合金素材の1つが先ず合金素材溶鉱炉6で溶
解され、1個の金属物体当りの目標量の合金素材が合金
素材回分装置7を通って接続チャンネルへ導入される。
一方、固体状態で供給される2番目の合金素材は、所望
の量が合金素材供給装置8から接続チャンネル2を流れ
る溶融金属へ供給される。合金素材のこの接続チャンネ
ル2への供給もまた、同じ制御装置4によって行なうの
がよい。According to FIG. 1, the main metal in the metal body to be alloyed is melted in a blast furnace 1. From this blast furnace 1, the molten main metal is introduced into the connecting channel 2, preferably by means of a pump 3, the flow of the melt therethrough being preferably adjustable to suit the capacity of the blast furnace 1. . The amount of this melt to be supplied to the connection channel 2 by the pump 3 is adjusted by the controller 4.
This lysate feed rate is adjusted to conveniently maintain the lysate feed rate when the connecting channel 2 is in its uppermost position, ie while the batching device 5 is in the unload stage.
Only a small amount of melt is allowed to flow into the chute-shaped connecting channel 2. On the other hand, when the connecting channel 2 is in its lower position, i.e. while the batching device 5 is in the filling phase, the melt feed rate is increased, and substantially simultaneously with the increase of the feed rate, the alloy material connecting channel 2 To supply to. One of the alloy materials is first melted in the alloy material blast furnace 6, and a target amount of alloy material per one metal object is introduced into the connection channel through the alloy material batching device 7.
On the other hand, the second alloy material supplied in the solid state is supplied from the alloy material supply device 8 to the molten metal flowing through the connection channel 2 in a desired amount. The supply of alloy material to this connecting channel 2 can also be effected by the same control device 4.
【0012】接続チャンネル2からは、合金溶融金属が
1回分ごとに標準量で回分装置5へ導入される。この標
準量は、実質的には被鋳造金属物体の重量に等しい。し
かし、本発明の方法では、金属物体の合金方法を変更し
た後に最初に回分する際に、回分装置5の中へは、被鋳
造金属物体と、同金属物体を排出した後にその回分装置
5に残った基礎量との和の重量に等しい分量が供給され
る。この基礎量は、回分装置5の最後の排出に関連して
取り出されるが、それは、金属物体の合金方法を変更す
る前に行なわれる。From the connection channel 2, the molten alloy metal is introduced into the batch device 5 in a standard amount for each batch. This standard amount is substantially equal to the weight of the cast metal object. However, in the method of the present invention, when the first batching is performed after changing the alloying method of the metal object, the casting metal object and the same metal object are discharged into the batching apparatus 5 after being discharged. A quantity equal to the weight of the remaining basal quantity is supplied. This basal quantity is taken in connection with the last discharge of the batching device 5, which is done before changing the alloying method of the metal objects.
【0013】回分装置5からは、被鋳造金属物体の重量
に相当する量の合金溶融金属が鋳型9の中へ放出され
る。いくつかの鋳型9を設けて、回転する同じ鋳造ライ
ン10上に配列することができる。この鋳型9はまた、有
利には曲線配列に固定して配置し、回分装置5が前記曲
線に関する円の中心で回転するように配置することもで
きる。From the batching device 5, a quantity of molten alloy metal corresponding to the weight of the metal object to be cast is discharged into the mold 9. Several molds 9 can be provided and arranged on the same rotating casting line 10. This mold 9 can also be arranged, preferably fixedly in a curvilinear arrangement, so that the batching device 5 rotates about the center of the circle with respect to said curving.
【0014】上述の記載は、本発明の1つの好ましい実
施例のみについての説明であるが、本発明は添付の特許
請求の範囲内で大きく改変することができる。例えば、
回分装置5は、有利には2つまたは数個の接続チャンネ
ル2で共用することができる。したがって、大きな金属
物体でさえ、実質的に高精度で高速に合金することがで
きる。While the above description is only a description of one preferred embodiment of the invention, the invention can be greatly modified within the scope of the appended claims. For example,
The batch device 5 can advantageously be shared by two or several connection channels 2. Therefore, even large metal objects can be alloyed with high accuracy and at high speed.
【0015】[0015]
【発明の効果】金属物体を生産するための本発明による
方法および装置を用いれば、実質的に生産を中断するこ
となく金属物体の合金素材量、合金比率または合金素材
を変更することができる。同様に、各金属物体は目標量
の合金金属を正確に含有し、金属物体は実質的に正確に
目標重量となる。さらに、合金素材の量、合金比率また
は合金素材を変更しても、合金金属物体が不正確に作り
出されることがなく、したがって、分析用の標本は実質
的に不必要となる。さらに、本発明による方法と装置を
使用すると、場所と労力の必要性が本質的に減少され
る。装置は、単純なため、生産施設において組立と据付
に実質的には少量の作業しか必要なく、したがって装置
は、実質的に迅速に据え付けることが可能であり、これ
によって、本発明による方法と装置の適用性が増す。With the method and the device according to the invention for producing metal objects, it is possible to change the amount of alloy material, the alloy ratio or the alloy material of the metal object without substantially interrupting the production. Similarly, each metal object will contain exactly the target amount of alloy metal, and the metal object will be substantially exactly the target weight. Furthermore, changing the amount of alloy stock, alloy ratio or alloy stock does not produce alloy metal objects inaccurately, thus making the specimen for analysis substantially unnecessary. Moreover, the use of the method and the device according to the invention substantially reduces the space and labor requirements. Due to the simplicity of the device, it requires substantially less work to assemble and install in a production facility, so that the device can be installed substantially faster, which allows the method and device according to the invention to be installed. The applicability of.
【図1】本発明による好ましい実施例の上から見た概略
図である。1 is a schematic view from above of a preferred embodiment according to the invention.
1 溶鉱炉 2 接続チャンネル 3 ポンプ 4 制御装置 5,7 回分装置 6 合金素材溶鉱炉 8 合金素材供給装置 9 鋳型 10 回転鋳型ライン 1 Blast furnace 2 Connection channel 3 Pump 4 Control device 5,7 batching device 6 Alloy material blast furnace 8 Alloy material supply device 9 Mold 10 Rotating mold line
Claims (10)
造によって標準重量の金属物体を生産する金属物体の生
産方法において、主金属流および合金素材流を制御し
て、前記主金属の溶融に使われる溶鉱炉と鋳型との間の
溶融主金属流に前記合金素材を供給することを特徴とす
る金属物体の生産方法。1. A method for producing a metal object which is alloyed with at least one alloy material and produces a standard weight metal object by casting, wherein a main metal flow and an alloy material flow are controlled to be used for melting the main metal. A method for producing a metal object, comprising supplying the alloy raw material to a molten main metal flow between a blast furnace and a mold.
金素材は、前記溶鉱炉と回分装置との間の接続チャンネ
ルにおける溶融主金属流に供給されることを特徴とする
金属物体の生産方法。2. The method according to claim 1, wherein the alloy material is supplied to a molten main metal flow in a connection channel between the blast furnace and a batch device.
金素材は、回分装置における溶融主金属流に供給される
ことを特徴とする金属物体の生産方法。3. The method for producing a metal object according to claim 1, wherein the alloy raw material is supplied to a molten main metal flow in a batch device.
いて、主金属の接続チャンネルへの供給は、基本的には
連続的操作で行われることを特徴とする金属物体の生産
方法。4. A method according to claim 1, 2 or 3, characterized in that the supply of the main metal to the connecting channels is carried out essentially in a continuous operation.
法において、前記合金素材は、1回分ごとに主金属流へ
供給されることを特徴とする金属物体の生産方法。5. The method for producing a metal object according to claim 1, wherein the alloy raw material is supplied to the main metal stream in batches.
法において、前記合金素材は、溶融状態で主金属流へ供
給されることを特徴とする金属物体の生産方法。6. The method for producing a metal object according to claim 1, wherein the alloy material is supplied to the main metal stream in a molten state.
法において、前記合金素材は、固体状態で主金属流へ供
給されることを特徴とする金属物体の生産方法。7. The method for producing a metal object according to claim 1, wherein the alloy material is supplied to the main metal stream in a solid state.
装置において、該装置は、前記主金属を溶融するための
溶鉱炉と、前記合金素材の回分装置と、鋳造すべき溶融
金属を移送する接続チャンネルと、該溶融金属の制御装
置および回分装置と、鋳型とを含み、前記接続チャンネ
ルは、前記溶融金属の回分装置に対して少なくとも垂直
に実質的に移動可能に設置されていることを特徴とする
金属物体の生産装置。8. An apparatus for realizing the method according to claim 1, wherein the apparatus transfers a blast furnace for melting the main metal, a batching apparatus for the alloy material, and a molten metal to be cast. A connecting channel, a molten metal control device and a batching device, and a mold, the connecting channel being installed so as to be substantially movable at least perpendicularly to the molten metal batching device. Characteristic metal object production equipment.
続チャンネルは、実質的に連続する主金属流の中間タン
クとして機能することを特徴とする金属物体の生産装
置。9. The apparatus for producing a metal object according to claim 8, wherein the connection channel functions as an intermediate tank for a substantially continuous main metal flow.
て、前記接続チャンネルの数は、各被鋳造金属物体毎に
少なくとも1つであることを特徴とする金属物体の生産
装置。10. Apparatus according to claim 8 or 9, characterized in that the number of connection channels is at least one for each cast metal object.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI924112 | 1992-09-14 | ||
FI924112A FI95671C (en) | 1992-09-14 | 1992-09-14 | Method and apparatus for making a metal body |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH06262300A true JPH06262300A (en) | 1994-09-20 |
JP3513190B2 JP3513190B2 (en) | 2004-03-31 |
Family
ID=8535862
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP25099193A Expired - Fee Related JP3513190B2 (en) | 1992-09-14 | 1993-09-14 | Method and apparatus for producing metal objects |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP0588266B1 (en) |
JP (1) | JP3513190B2 (en) |
AU (1) | AU676486B2 (en) |
CA (1) | CA2105850A1 (en) |
DE (1) | DE69325219T2 (en) |
FI (1) | FI95671C (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017509800A (en) * | 2014-03-31 | 2017-04-06 | ティッセンクルップ スチール ヨーロッパ アクチェンゲゼルシャフトThyssenKrupp Steel Europe AG | Apparatus and method for purifying melt and hot dipping system |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI20075949L (en) * | 2007-12-21 | 2009-06-22 | Outotec Oyj | An arrangement in an anode casting plant for casting copper anodes |
ITUA20162690A1 (en) * | 2016-04-18 | 2017-10-18 | Fonderia Ghirlandina Spa | FOUNDRY PLANT FOR CASTING CAST IRONS |
CN111534707A (en) * | 2020-04-07 | 2020-08-14 | 浙江顺虎铝业有限公司 | Integrated production equipment for high-precision wear-resistant aluminum alloy material |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE122573C (en) * | ||||
JPS5120293B2 (en) * | 1972-04-01 | 1976-06-24 | ||
WO1980002659A1 (en) * | 1979-06-07 | 1980-12-11 | Mezger Ag Maschf Giesserei | Automatic adjusting servo-controlled device for injecting molten metal during a casting operation |
JPS57134241A (en) * | 1981-02-13 | 1982-08-19 | Jidosha Imono Kk | Method for addition of inoculant |
US4436142A (en) * | 1981-11-09 | 1984-03-13 | Harvey Hubbell Incorporated | Method and apparatus for making ductile iron castings |
-
1992
- 1992-09-14 FI FI924112A patent/FI95671C/en active
-
1993
- 1993-09-09 CA CA 2105850 patent/CA2105850A1/en not_active Abandoned
- 1993-09-10 EP EP19930114609 patent/EP0588266B1/en not_active Expired - Lifetime
- 1993-09-10 DE DE1993625219 patent/DE69325219T2/en not_active Expired - Fee Related
- 1993-09-13 AU AU46285/93A patent/AU676486B2/en not_active Ceased
- 1993-09-14 JP JP25099193A patent/JP3513190B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017509800A (en) * | 2014-03-31 | 2017-04-06 | ティッセンクルップ スチール ヨーロッパ アクチェンゲゼルシャフトThyssenKrupp Steel Europe AG | Apparatus and method for purifying melt and hot dipping system |
Also Published As
Publication number | Publication date |
---|---|
JP3513190B2 (en) | 2004-03-31 |
DE69325219T2 (en) | 1999-09-30 |
FI95671B (en) | 1995-11-30 |
AU4628593A (en) | 1994-03-24 |
FI924112A0 (en) | 1992-09-14 |
FI95671C (en) | 1996-03-11 |
EP0588266A1 (en) | 1994-03-23 |
AU676486B2 (en) | 1997-03-13 |
FI924112A (en) | 1994-03-15 |
CA2105850A1 (en) | 1994-03-15 |
DE69325219D1 (en) | 1999-07-15 |
EP0588266B1 (en) | 1999-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5411240A (en) | Furnace for delivering a melt to a casting machine | |
US3728108A (en) | Process for the production of reinforced composite alloys | |
AU2003212338B2 (en) | Method and device for the weight-controlled filling of ingot molds in non-iron casting machines | |
US3650311A (en) | Method for homogeneous refining and continuously casting metals and alloys | |
US3911993A (en) | Method and apparatus for adding treating agents to molten metal | |
US3648758A (en) | Apparatus for the production of copper anode plates | |
CN1061275C (en) | Casting metal strip | |
CN1041329C (en) | Process control of compacted graphite cast iron production in pouring furnaces | |
JP3949208B2 (en) | Metal remelting method and apparatus used for manufacturing continuous casting | |
JP3513190B2 (en) | Method and apparatus for producing metal objects | |
US5119977A (en) | Continuous semi-liquid casting process and a furnace for performing the process | |
EP0244255A1 (en) | Continuous production of alloys | |
JPH06320235A (en) | Split casting method | |
JPH01272714A (en) | Method and apparatus for regulating composition with continuous casting tundish | |
SU831297A1 (en) | Method of treating metals and alloys at continuous casting | |
US1235872A (en) | Process of alloying metals. | |
RU2080206C1 (en) | Method of production of ingots | |
JPH03151144A (en) | Method for refining molten steel in tundish for continuous casting | |
JPH0857587A (en) | Method for directly forming half-solidified metal slurry | |
JPH02303659A (en) | Continuous casting method including different component metals casting and tundish for continuous casting thereof | |
JPS61150770A (en) | Method and device for continuous supply of molten metal at constant rate | |
CA1037263A (en) | Method and apparatus for adding treating agents to molten metal | |
JPH0760432A (en) | Device for pouring molten ductile metal and method therefor | |
JPH08294755A (en) | Four ladle mounting type ladle changing device | |
JPH03128151A (en) | Apparatus for casting different kinds of cast slab and method for using this |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20021001 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040109 |
|
LAPS | Cancellation because of no payment of annual fees |