JPH06248644A - Injecting method for filling material by use of anchor - Google Patents

Injecting method for filling material by use of anchor

Info

Publication number
JPH06248644A
JPH06248644A JP5943293A JP5943293A JPH06248644A JP H06248644 A JPH06248644 A JP H06248644A JP 5943293 A JP5943293 A JP 5943293A JP 5943293 A JP5943293 A JP 5943293A JP H06248644 A JPH06248644 A JP H06248644A
Authority
JP
Japan
Prior art keywords
anchor
packer
hole
filler
filling material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5943293A
Other languages
Japanese (ja)
Other versions
JPH0765311B2 (en
Inventor
Shigeo Kokubu
茂夫 国分
Hideo Senke
秀雄 千家
Keita Ito
敬太 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Nisshinbo Holdings Inc
Original Assignee
Taisei Corp
Nisshinbo Industries Inc
Nisshin Spinning Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, Nisshinbo Industries Inc, Nisshin Spinning Co Ltd filed Critical Taisei Corp
Priority to JP5943293A priority Critical patent/JPH0765311B2/en
Publication of JPH06248644A publication Critical patent/JPH06248644A/en
Publication of JPH0765311B2 publication Critical patent/JPH0765311B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To facilitate assembling work and filling work by locating a high leakage bag around the outer peripheral part of an anchor as a packer and forming a spare chamber with a low leakage sheet on the both ends of the packer in the outer peripheral part of the anchor. CONSTITUTION:Before an anchor 1 is inserted, a ground is excavated in a preceding way and then the anchor 1 mounted with a packer 2 is inserted into the excavated hole where a filling material is injected into the packer 2 by way of an expansion pipe 21. A cylindrical part of the packer 2 comes into contact with a hole wall so that the filling material is discharged outside to a satisfactory extent, thereby obtaining favorable adhesion and penetrating the surrounding rock cracks and shielding a space between the inner wall of the excavated hole and the anchor 1. Then, the filling material is injected into a spare chamber 3 on both ends of the packer 2, thereby checking the leakage of the filling material from the packer 2 in the longitudinal direction of the anchor 1. Then, the filling material is injected into the foremost depth of the hole from the rear end of a hollow passage of the anchor by way of its hollow passage.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、アンカーを地山に固定
するとともに、アンカー孔の周囲の地山の補強を行う、
アンカーによる充填材の注入工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention fixes an anchor to a natural ground and reinforces the natural ground around an anchor hole.
The present invention relates to a method for injecting a filler with an anchor.

【0002】[0002]

【従来の技術】地山に定着するアンカーそのものを利用
して充填材をアンカー孔に注入する注入工法が存在す
る。その場合にいったん穿孔した後、その孔内にアンカ
ーを挿入し、その先端から充填材を注入するのである
が、単に注入しただけであると孔壁とアンカーとの間隔
に充填された充填材は孔の口元から流れ出してしまう。
特に上向きのアンカーの場合にはその流出は明らかであ
る。そこでアンカーの周囲に複数の膨脹袋(パッカー)
を取り付け、このパッカーを膨脹させて孔壁とアンカー
周囲との空間を遮断した後、アンカー先端から注入する
工法が一般に採用されている。ただしアンカーの先端か
ら高圧で充填材を注入する場合には、このパッカーと孔
壁との付着が大きくなければ、パッカーと孔壁との間隔
をぬって充填材が漏れてしまう。こうした問題を解決す
るために、パッカーをアンカーの2か所に設け、この2
か所のパッカーを膨脹した、その後に2か所のパッカー
の間に充填材を注入して口元を強固に固める工法が存在
する。
2. Description of the Related Art There is an injection method for injecting a filler into an anchor hole by utilizing the anchor itself which is fixed in the ground. In that case, after perforating once, insert the anchor into the hole and inject the filler from the tip, but if only injected, the filler filled in the space between the hole wall and the anchor is It flows out from the mouth of the hole.
Especially in the case of an upward facing anchor, the outflow is obvious. There are several inflatable bags (packers) around the anchor.
Is generally used to expand the packer to block the space between the hole wall and the periphery of the anchor, and then to inject from the tip of the anchor. However, when the filler is injected from the tip of the anchor at a high pressure, if the adhesion between the packer and the hole wall is not large, the filler leaks through the gap between the packer and the hole wall. In order to solve these problems, packers are installed at two places on the anchor,
There is a method of inflating a packer at one place and then injecting a filler between the packers at two places to solidify the mouth.

【0003】[0003]

【発明が解決しようとする問題点】前記した従来の2か
所のパッカーを使用した注入工法にあっては、強固な口
元の保護ができるが、また次のような問題点がある。 <イ>パッカーを2か所に設置し、各々の内部に充填材
を注入してパッカを膨脹させる作業、2か所のパッカー
の間にさらに充填材を充填する作業、そしてアンカーの
先端から本来の目的とする充填材を注入する作業、とと
いった複数回の充填作用が必要となる。したがって注入
作業が煩わしいとともに、パッカーの配置など、アンカ
ー組み立てにも多数の工程をようし不経済である。 <ロ>パッカーには漏液性の高い材料を使用しているか
ら、膨脹させるための充填段階においてパッカーから充
填材が漏れる場合がある。すると上向きアンカーの場合
には口元から充填材が流れ落ち、作業環境を悪化させ
る。 <ハ>下向きアンカーの場合には、パッカーからの漏液
は最深部に流れてアンカーの先端から中空路内に侵入し
てしまう。するとアンカーの先端が閉塞してしまうた
め、目的とするアンカー先端からの地盤への注入が不可
能となる。
The conventional injection method using two packers described above can firmly protect the mouth, but has the following problems. <B> Install packers in two places, inject the filling material into each of them to expand the packer, work to fill the filling material between the packers in two places, and from the tip of the anchor It is necessary to perform the filling operation a plurality of times such as the work of injecting the intended filler. Therefore, the injection work is troublesome, and many steps are required for assembling the anchor such as the arrangement of the packer, which is uneconomical. <B> Since the packer is made of a highly leaky material, the packing material may leak from the packer during the filling step for expanding. Then, in the case of the upward anchor, the filling material flows down from the mouth, deteriorating the working environment. <C> In the case of the downward facing anchor, the leaked liquid from the packer flows into the deepest part and enters the hollow passage from the tip of the anchor. Then, the tip of the anchor is blocked, and it becomes impossible to inject it from the intended tip of the anchor into the ground.

【0004】[0004]

【本発明の目的】本発明は上記したような従来の問題を
解決するためになされたもので、経済的な組み立て、施
工ができ、かつアンカーからの漏液を防止することので
きるアンカーによる充填材の注入工法を提供することを
目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional problems, and is filled with an anchor that can be economically assembled and constructed and that can prevent liquid leakage from the anchor. The purpose is to provide a material injection method.

【0005】[0005]

【問題点を解決するための手段】上記のような目的を達
成するために、本発明のアンカーによる充填材の注入工
法は、地盤に穿孔した孔内に中空のアンカーを挿入し、
この孔内にアンカーの中空路を介して充填材を注入して
定着する工法であって、アンカーの外周に漏液性の大き
い袋をパッカーとして位置させ、さらにこのパッカーの
両端は漏液性の小さいシートによってアンカーの外周と
の間に予備室を形成し、前記パッカー内に充填材を注入
してパッカーを円周方向に拡大することによって孔内壁
とアンカーとの間の空間を遮蔽するとともに、充填材を
パッカー両端の予備室に注入することによってパッカー
からアンカー軸方向への充填材の漏液を阻止し、この状
態でアンカー内部の中空路を通して孔の最深部に充填材
を注入することを特徴としたものである。
[Means for Solving the Problems] In order to achieve the above object, the method of injecting a filler with an anchor of the present invention is such that a hollow anchor is inserted into a hole drilled in the ground,
This is a method of injecting the filler into the hole through the hollow path of the anchor to fix it, and a bag with large liquid leakage is positioned as a packer on the outer periphery of the anchor, and both ends of this packer are A preliminary chamber is formed between the anchor and the outer circumference by a small sheet, and a space between the hole inner wall and the anchor is shielded by injecting a filler into the packer to expand the packer in the circumferential direction, It is possible to prevent the filler from leaking from the packer in the axial direction of the anchor by injecting the filler into the preliminary chambers at both ends of the packer, and in this state, inject the filler to the deepest part of the hole through the hollow passage inside the anchor. It is a feature.

【0006】[0006]

【本発明の構成】以下図面を参照しながら本発明のアン
カーによる充填材の注入工法の実施例について説明す
る。 <イ>本工法の目的 本発明の工法は、先行して地盤に穿孔しておき、この孔
内に中空のアンカー1を挿入したのち、アンカー1内部
の中空路を介してその先端付近の吐出口から孔内に充填
材を注入する工法である。ただし注入する圧力は大きい
ものであって、単に孔内に充填するだけでなく、周囲の
岩盤の細かいクラック内にも浸透させ、周囲の岩盤の補
強を同時に行うもおである。すなわち、周囲の岩盤の補
強と、アンカー1の定着との両方の目的を1本の中空ア
ンカー1を介して行うものである。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of a method for injecting a filler with an anchor of the present invention will be described below with reference to the drawings. <a> Purpose of this construction method In the construction method of the present invention, the ground is first perforated, the hollow anchor 1 is inserted into this hole, and then the discharge near the tip end is performed through the hollow passage inside the anchor 1. This is a method of injecting a filler from the outlet into the hole. However, the pressure to be injected is large, and it is possible to reinforce not only the holes, but also the small rocks in the surrounding rocks to reinforce the surrounding rocks at the same time. That is, the purpose of both the reinforcement of the surrounding rock mass and the anchoring of the anchor 1 is performed through one hollow anchor 1.

【0007】<ロ>パッカーの構造 本発明の工法に使用するアンカー1はその外周に1か所
だけ、パッカー2を位置させる。パッカー2は、円筒状
の袋体であって、これをアンカー1の周囲に固定したも
のである。その袋体の内部に充填材を供給することによ
って、袋体はアンカー1の周囲に円周方向に膨脹し、ア
ンカー1と孔壁との間隔を遮断することになる。これが
パッカー2の作用である。そのためにパッカー2には孔
の外から充填材を供給するための膨脹用パイプ21を接
続しておく。さらに本発明の工法に使用するパッカー2
はとくに漏液性の大きい生地を使用して袋を形成する。
漏液性の大きい材料とは、袋の内部に充填する充填材の
粘性によって相違するが、たとえばナイロン、テトロ
ン、綿、など公知の素材によって構成できる。そのよう
な素材を空気透過率が0.001 〜 0.5m3 /m2 /sec の
範囲に調整して使用する。
<B> Structure of Packer The anchor 1 used in the construction method of the present invention has the packer 2 positioned at only one position on the outer periphery thereof. The packer 2 is a cylindrical bag body and is fixed around the anchor 1. By supplying the filling material to the inside of the bag body, the bag body expands circumferentially around the anchor 1 and interrupts the gap between the anchor 1 and the hole wall. This is the action of the packer 2. For that purpose, the packer 2 is connected with an expansion pipe 21 for supplying the filler from the outside of the hole. Further, the packer 2 used in the construction method of the present invention
Uses a particularly leaky fabric to form the bag.
The material having large liquid leakage differs depending on the viscosity of the filling material with which the inside of the bag is filled, but may be made of a known material such as nylon, tetron, or cotton. Use such a material adjusted to have an air permeability of 0.001 to 0.5 m 3 / m 2 / sec.

【0008】<ハ>予備室 このパッカー2はアンカー1の外周に円筒状に固定した
ものであるが、円筒の両端には予備室3を設ける。この
予備室3は、漏液性の小さいシートによってパッカー2
の端面とアンカー1の外周とを包囲したものである。そ
のためにやはり円筒形のホース状の材料を、その一端の
縁部はパッカー2の円筒部の縁部に縫い合わせなどによ
って固定し、他端の縁部は径を縮小してアンカー1の外
周に取り付ける。この取り付けはひもで縛るなどの簡単
な方法でおこなうことができる。漏液性の小さい材料と
は、やはり使用する充填材の粘性によって違ってくる
が、パッカー2を構成する素材と比較して漏液性が小さ
いという相対的なものである。 ただし止水性の完全な
材料を使用すると、充填材を供給した場合に内部の空気
の逃げ場がなくなって空気溜まりができてしまうので、
充填材の透過は阻止するが、空気の透過を許す程度の市
販の素材を使用する。予備室3は、パッカー2の両端だ
けに設けるものであるから、円筒状のパッカー2の円筒
側面には予備室3は存在せず、側面には漏液性の大きい
材料がそのまま露出していることになる。
<C> Spare chamber The packer 2 is fixed to the outer periphery of the anchor 1 in a cylindrical shape, and the spare chambers 3 are provided at both ends of the cylinder. The preparatory chamber 3 is provided with a packer 2 with a sheet having small liquid leakage.
The end surface of the anchor and the outer periphery of the anchor 1 are surrounded. Therefore, a cylindrical hose-shaped material is fixed to the outer periphery of the anchor 1 by fixing the edge of one end to the edge of the cylindrical portion of the packer 2 by sewing or the like and reducing the diameter of the other end. . This attachment can be done by a simple method such as strapping. A material having low liquid leakage is a relative material having low liquid leakage as compared with the material forming the packer 2, although it depends on the viscosity of the filler used. However, if you use a completely water-stopping material, there will be no air escape when you supply the filler, and air will accumulate, so
Use a commercially available material that blocks the permeation of the filler but allows the permeation of air. Since the preliminary chamber 3 is provided only on both ends of the packer 2, the preliminary chamber 3 does not exist on the cylindrical side surface of the cylindrical packer 2, and the material having large liquid leakage is exposed as it is on the side surface. It will be.

【0009】[0009]

【施工方法】[Construction method]

<イ>アンカー1の挿入 次に施工方法について説明する。まずアンカー1の挿入
以前に先行して地盤に穿孔しておく。そしてこの孔内に
内部に中空路を形成したアンカー1を挿入する。このア
ンカー1はその先端付近には充填材の吐出孔を開放して
あり、アンカー1尾端から供給した充填材が先端の吐出
孔からアンカー1孔内に吐出する構造になっている。
<A> Insertion of anchor 1 Next, a construction method will be described. First, before the insertion of the anchor 1, the ground is drilled in advance. Then, the anchor 1 having a hollow passage formed therein is inserted into the hole. The anchor 1 has a filler discharge hole opened near its tip, and the filler supplied from the tail end of the anchor 1 is discharged into the anchor 1 hole from the tip discharge hole.

【0010】<ロ>パッカー2への充填 パッカー2を取り付けたアンカー1を孔内に挿入した
ら、パッカー2の内部に膨脹用パイプ21を介して充填
材を注入する。するとパッカー2は円周方向に拡大して
円筒形を形成することになり、その円筒側面は孔の内壁
に衝突するまで膨脹する。こうしてアンカー1とその周
囲の間隙を遮蔽することができる。しかしパッカー2の
素材は比較的目の荒い、充填材の漏液性が大きい材料に
よって構成している。したがってパッカー2の円筒部分
は孔壁に接触しても十分に充填材が外部へ吐出して良好
な付着を得ることができるともに、周辺の岩盤のクラッ
クにも浸透し、シールゾーン4を形成する。
<B> Packing into Packer 2 After the anchor 1 with the packer 2 attached is inserted into the hole, the packing material is injected into the packer 2 through the expansion pipe 21. Then, the packer 2 expands in the circumferential direction to form a cylindrical shape, and the side surface of the cylinder expands until it collides with the inner wall of the hole. In this way, the anchor 1 and the space around it can be shielded. However, the material of the packer 2 is made of a material having a relatively rough mesh and a large leaking property of the filler. Therefore, even if the cylindrical portion of the packer 2 comes into contact with the hole wall, the filling material can be sufficiently discharged to obtain good adhesion, and at the same time, it can penetrate into the cracks of the surrounding rock and form the seal zone 4. .

【0011】<ハ>予備室3への充填 充填材は円筒部の側面からのみ外部へ吐出するだけでは
なく、その端面からも吐出する。しかしパッカー2両端
には予備室3が配置してあるから、充填材はその予備室
3の内部に吐出することになる。この予備室3を構成す
る材料は漏液性が良好ではないから、充填材は外部へ吐
出することがなく、その内部に十分に充填されるとそれ
以上の充填は困難となる。 この状態を検知して充填材
のパッカー2への充填材の供給を終了する。こうしてパ
ッカー2およびその両側が完全に孔壁と接触しているか
ら、アンカー1軸方向への充填材の漏液は完全に阻止さ
れる。
<C> Filling of the preliminary chamber 3 The filling material is discharged not only from the side surface of the cylindrical portion to the outside, but also from the end surface thereof. However, since the preparatory chamber 3 is arranged at both ends of the packer 2, the filling material is discharged into the preparatory chamber 3. Since the material forming the preliminary chamber 3 does not have a good liquid leakage property, the filling material is not discharged to the outside, and if it is sufficiently filled inside, further filling becomes difficult. When this state is detected, the supply of the filler to the packer 2 is completed. In this way, the packer 2 and both sides thereof are completely in contact with the hole wall, so that leakage of the filler in the axial direction of the anchor 1 is completely prevented.

【0012】<ニ>先端からの充填 この状態でアンカー1内部の中空路を通して中空路の尾
端から、孔の最深部に充填材を注入する、上記したよう
に、アンカー1と孔壁との間隔は完全にかつ強固に遮蔽
されているから、アンカー1先端からは大きな圧力で充
填材を孔内に供給できる。すると充填材は孔の最深部付
近の細かいクラックの内部にまで充填され、定着補強ゾ
ーン5が形成される。その結果アンカー1の良好な定
着、および最深部周辺の岩盤の良好な補強がなされる。
<D> Filling from the tip In this state, the filler is injected into the deepest part of the hole from the tail end of the hollow passage through the hollow passage inside the anchor 1, as described above, between the anchor 1 and the hole wall. Since the gap is completely and firmly shielded, the filler can be supplied into the hole from the tip of the anchor 1 with a large pressure. Then, the filler is filled even inside the fine cracks near the deepest part of the hole, and the fixing and reinforcing zone 5 is formed. As a result, the anchor 1 is well anchored and the rock around the deepest part is well reinforced.

【0013】[0013]

【発明の効果】本発明のアンカーによる充填材の注入工
法は以上説明したようになるから次のような効果を得る
ことができる。 <イ>アンカーによる充填に際して、低圧での注入の場
合には問題がないが、岩盤への高圧注入の場合には矛盾
した要求が存在する。すなわちパッカーの孔壁への付着
は高く、しかも漏液は少なくという要求である。しかし
パッカーの孔内壁への付着を良好にするためには、充填
材はパッカーから外部へ侵出した方が望ましいが、パッ
カーから外部への漏液が多いと大量に口元へ戻って周囲
を汚したり、あるいは孔の最深部からアンカーの先端に
侵入して目的とする注入を不可能にしてしまう。その点
で本発明は、パッカーの孔壁への接触面からは充填材侵
出を許し、一方、孔内への侵出は予備室によって阻止す
るものである。したがって孔の口元や最深部への漏液を
阻止し、かつ孔壁への良好な付着を期待できいるもので
ある。 <ロ>孔内への強力な固定のために、2か所にパッカー
を設け、この間にシール用の充填部分を設ける方法があ
るが、そうした方法に比較して構造が単純である。 し
たがって、アンカーの組み立て作業が簡単であるととも
に、繁雑な充填作業や充填管理が不要であり、熟練しな
い作業員によっても簡単に施工することができるもので
ある。
Since the method of injecting the filler with the anchor of the present invention is as described above, the following effects can be obtained. <B> When filling with anchors, there is no problem in the case of low-pressure injection, but there are contradictory requirements in the case of high-pressure injection into rock. That is, it is required that the packer adheres highly to the hole wall and that the liquid leakage is small. However, in order to improve the adhesion of the packer to the inner wall of the hole, it is desirable that the filler leaches from the packer to the outside, but if there is a large amount of leakage from the packer to the outside, it will return to the mouth in large quantities and stain the surrounding area. Or, it penetrates into the tip of the anchor from the deepest part of the hole and makes the target injection impossible. In that respect, the present invention permits the leaching of the filler from the contact surface of the packer to the hole wall, while the leaching into the hole is prevented by the preliminary chamber. Therefore, it can be expected that liquid leakage to the mouth and the deepest part of the hole can be prevented and good adhesion to the wall of the hole can be expected. <B> For strong fixing in the hole, there is a method of providing packers at two places and providing a filling portion for sealing between them, but the structure is simple as compared with such a method. Therefore, the assembly work of the anchor is simple, and complicated filling work and filling management are not required, so that even an unskilled worker can easily carry out the construction.

【図面の簡単な説明】[Brief description of drawings]

【図1】アンカーによる充填材の注入工法の説明図FIG. 1 is an explanatory view of a method of injecting a filler with an anchor.

【図2】アンカーによる充填材の注入工法の説明図FIG. 2 is an explanatory view of a method for injecting a filler with an anchor.

【図3】アンカーによる充填材の注入工法の説明図FIG. 3 is an explanatory view of a method of injecting a filler with an anchor.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 伊藤 敬太 東京都足立区西新井栄町1−18−1 日清 紡績株式会社西新井化成工場内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Keita Ito 1-1-18 Nishiaraieicho, Adachi-ku, Tokyo Nisshin Spinning Co., Ltd. Nishiarai Kasei Plant

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】地盤に穿孔した孔内に中空のアンカーを挿
入し、 この孔内にアンカーの中空路を介してその先端付近から
充填材を注入して定着する工法であって、 アンカーの外周に漏液性の大きい袋をパッカーとして位
置させ、 さらにこのパッカーの両端は漏液性の小さいシートによ
ってアンカーの外周との間に予備室を形成し、 前記パッカー内に充填材を注入してパッカーを円周方向
に拡大することによって孔内壁とアンカーとの間の空間
を遮蔽するとともに、 充填材をパッカー両端の予備室に注入することによって
パッカーからアンカー軸方向への充填材の漏液を阻止
し、 この状態でアンカー内部の中空路を通して孔の最深部に
充填材を注入する、 アンカーによる充填材の注入工法
1. A method of inserting a hollow anchor into a hole drilled in the ground, and injecting a filler from the vicinity of the tip of the anchor into the hole through a hollow path of the anchor to fix the anchor. A bag with a large liquid leak is positioned as a packer, and both ends of this packer form a preliminary chamber between the outer circumference of the anchor and a sheet with a small liquid leak, and a packing material is injected into the packer. The space between the inner wall of the hole and the anchor is shielded by enlarging the circumference of the hole, and the filler is injected into the preliminary chambers at both ends of the packer to prevent leakage of the filler from the packer in the axial direction of the anchor. Then, in this state, the filler is injected into the deepest part of the hole through the hollow passage inside the anchor.
JP5943293A 1993-02-25 1993-02-25 Filler injection method using anchors Expired - Lifetime JPH0765311B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5943293A JPH0765311B2 (en) 1993-02-25 1993-02-25 Filler injection method using anchors

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5943293A JPH0765311B2 (en) 1993-02-25 1993-02-25 Filler injection method using anchors

Publications (2)

Publication Number Publication Date
JPH06248644A true JPH06248644A (en) 1994-09-06
JPH0765311B2 JPH0765311B2 (en) 1995-07-19

Family

ID=13113113

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5943293A Expired - Lifetime JPH0765311B2 (en) 1993-02-25 1993-02-25 Filler injection method using anchors

Country Status (1)

Country Link
JP (1) JPH0765311B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007040065A (en) * 2005-08-05 2007-02-15 Tokai Rubber Ind Ltd Construction method for fixing anchor to pc hollow floor panel bridge
JP2010236351A (en) * 2010-05-31 2010-10-21 Ps Mitsubishi Construction Co Ltd Method for installation of anchor bolt in concrete hollow floor slab
US20140314503A1 (en) * 2013-04-11 2014-10-23 Henan Polytech Infrastructure Rehabilitation LTD. Grouting method for anchoring with polymer

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007040065A (en) * 2005-08-05 2007-02-15 Tokai Rubber Ind Ltd Construction method for fixing anchor to pc hollow floor panel bridge
JP4519029B2 (en) * 2005-08-05 2010-08-04 東海ゴム工業株式会社 Anchor fixing method to PC hollow floor slab bridge
JP2010236351A (en) * 2010-05-31 2010-10-21 Ps Mitsubishi Construction Co Ltd Method for installation of anchor bolt in concrete hollow floor slab
US20140314503A1 (en) * 2013-04-11 2014-10-23 Henan Polytech Infrastructure Rehabilitation LTD. Grouting method for anchoring with polymer
US9004820B2 (en) * 2013-04-11 2015-04-14 SAFEKEY Engineering Technology(Zhengzhou), Ltd. Grouting method for anchoring with polymer

Also Published As

Publication number Publication date
JPH0765311B2 (en) 1995-07-19

Similar Documents

Publication Publication Date Title
JP4902351B2 (en) Expansion injection bolt and injection method using the same
KR100697629B1 (en) Grout injector and nailing apparatus having the same
KR20190041370A (en) Caulking unit with quick attachment for tube assembly for tunnel grouting and tunnel supporting method of using thereof
JPH06248644A (en) Injecting method for filling material by use of anchor
JPH08226119A (en) Packer and natural ground consolidation method using the packer
KR102267049B1 (en) Watertight Band for Tube Type Rock Bolt
JPH0686800B2 (en) Filling material injection method
JP2022109072A (en) Shield method
JP2553332Y2 (en) Injection fixing type support member
JP2553336Y2 (en) Injection fixing type support member
JP3987234B2 (en) Ground mountain tip receiving reinforcement method
KR200229369Y1 (en) Grout cement leakage blocking device in deep well
JP2721950B2 (en) Ground improvement method for tunnel excavation and surrounding area
KR102102947B1 (en) Earth anchor of corrugated tube type and the anchor construction method
JP2636139B2 (en) Wellhead sealing device
JPH0433926B2 (en)
JPH06200524A (en) Lock anchor
JPH0522040B2 (en)
JP2022189654A (en) Packer movement mechanism and ground reinforcement method
JP2567093Y2 (en) Injection member
JP3413416B2 (en) Ground improvement method and tools used for it
JP2000345789A (en) Mouth caulking device used for filling type long-sized steel pipe tip receiving work, and filling type long-sized steel pipe tip receiving method using the device
JPH0913871A (en) Construction method for timbering, and device member used therefor
JP2005314940A (en) Chemical grouting device
JPS6042157Y2 (en) Segment for blocking backfill material used in shield construction method