- JPH06240665A JPH06240665A JP3003093A JP3003093A JPH06240665A JP H06240665 A JPH06240665 A JP H06240665A JP 3003093 A JP3003093 A JP 3003093A JP 3003093 A JP3003093 A JP 3003093A JP H06240665 A JPH06240665 A JP H06240665A
- Authority
- JP
- Japan
- Prior art keywords
- partition member
- concrete
- inner partition
- peripheral edge
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、場所打ちコンクリー
ト杭などのコンクリート構造体の頭端処理方法に関す
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for treating a head end of a concrete structure such as a cast-in-place concrete pile.
【0002】[0002]
【従来の技術】場所打ちコンクリート杭の頭端に基礎フ
ーチングを形成する場合、コンクリート杭の頭端不要部
分を除去する処理が必要になる。2. Description of the Related Art When a foundation footing is formed on the head end of a cast-in-place concrete pile, it is necessary to remove the unnecessary portion of the concrete pile head end.
【0003】従来の処理方法としては、特開昭59−4
8520号公報に示すように、コンクリート構造体の鉄
筋を露出しようとする端部において、露出しようとする
鉄筋にそれをコンクリートから隔離しようとする隔離部
材を装着して環状壁体を形成し、これをコンクリートに
埋設して、このコンクリートを上記環状壁体の内側と外
側の二層に区画し、打設コンクリートの硬化後に杭の頭
端のコンクリートを破砕すると共に、環状壁体を撤去し
て鉄筋を露出する。A conventional treatment method is disclosed in Japanese Patent Laid-Open No. 59-4.
As shown in Japanese Patent No. 8520, at the end of the concrete structure where the reinforcing bar is to be exposed, a separating member for separating the reinforcing bar to be exposed from the concrete is attached to form an annular wall body. Is embedded in concrete, and this concrete is divided into two layers, the inner and outer sides of the annular wall body, and after the setting concrete is hardened, the concrete at the head end of the pile is crushed, and the annular wall body is removed to reinforce the concrete. To expose.
【0004】[0004]
【発明が解決しようとする課題】上記のような構造体の
端部処理方法によると、環状壁体を形成する隔離部材に
よってそれぞれの鉄筋を被い、打設したコンクリートの
硬化後環状壁体部分のコンクリートをコンクリートブレ
ーカーなどを使用して破砕するので、騒音問題が発生す
ると共に、飛散したコンクリート片の回収作業に著しく
手数のかかる問題があった。According to the above-mentioned method for treating the end portion of the structure, the annular wall body portion after hardening of the concrete which is cast by covering the respective reinforcing bars with the separating member forming the annular wall body is placed. Since the above concrete is crushed by using a concrete breaker or the like, there is a problem that a noise problem occurs, and that it takes a lot of time and effort to collect scattered concrete pieces.
【0005】また、衝撃動工具による破砕時に鉄筋に傷
を付けるので、露出した鉄筋を基礎フーチングの配筋に
用いると、強下が低下する。Further, since the reinforcing bar is damaged when it is crushed by the impact tool, if the exposed reinforcing bar is used for the reinforcing bar of the basic footing, the strength is lowered.
【0006】さらに、コンクリート杭の衝撃動工具を用
いた破砕面は、大きな凹凸面になっているので、できる
だけフラットになるようなハッリ作業が必要になる問題
もあった。Further, since the crushing surface of the concrete pile using the impact tool is a large uneven surface, there is a problem that it is necessary to carry out a burring work so as to be as flat as possible.
【0007】そこで、この発明の課題は、カットライン
の設定が容易となると共に、鉄筋コンクリート構造物の
頭端不要部分を容易に分離することができるようにした
頭端処理方法を提供することである。SUMMARY OF THE INVENTION An object of the present invention is to provide a head end processing method which facilitates setting of a cut line and can easily separate a head end unnecessary portion of a reinforced concrete structure. .
【0008】[0008]
【課題を解決するための手段】上記の課題を解決するた
めに、この発明は、場所打ちなどの鉄筋コンクリート構
造体の構築に際し、鉄筋かごの上部所定位置の周囲外側
にピアノ線により外周縁が孔壁に当接して鍔状に広がる
可撓シート製外側仕切り部材を配置すると共に、上記鉄
筋かごの周囲に上記外側仕切り部材の内周縁を適宜の方
法で支持し、また外周縁の各透孔に上記鉄筋かごの縦筋
を貫通させて支持すると共に、複数の分割縁がピアノ線
によりオーバーラップ状に塞がる可撓シート製内側仕切
り部材を上記外側仕切り部材と略同レベルに配置し、さ
らに、上記鉄筋かご周囲所定位置の縦筋に適宜の手段に
より着脱自在に取付けてある放射状外向きの係止装置に
手操った上記外側仕切り部材の外周縁を係止し、また放
射状内向きの係止装置に手操った上記内側仕切り部材の
分割縁を係止し、さらに、全ての上記縦筋の上端から上
記内側仕切り部材迄の範囲を被い材により被い、次い
で、コンクリートを打設したのち、外部からの操作によ
り上記係止装置による上記外側及び内側仕切り部材の手
操り状態を解除して上記ピアノ線により前記外側及び内
側仕切り部材を展開し、打設コンクリートの硬化後に上
記外側及び内側仕切り部材の上方コンクリート塊状物を
上方に引き抜き撤去して縦筋を露出する方法を採用した
ものである。In order to solve the above-mentioned problems, the present invention, when constructing a reinforced concrete structure such as cast-in-place, has an outer peripheral edge formed by a piano wire on the outer periphery of a predetermined upper position of a rebar cage. An outer partition member made of a flexible sheet that abuts against the wall and spreads like a brim is arranged, and the inner peripheral edge of the outer partition member is supported around the rebar cage by an appropriate method, and each through hole of the outer peripheral edge is provided. While supporting the vertical bars of the rebar cage through and supporting, a plurality of dividing edges are arranged at substantially the same level as the outer partition member, the flexible sheet-made inner partition member being closed in an overlap shape by a piano wire, and further, The outer peripheral edge of the manually operated outer partition member is locked by a radially outward locking device that is removably attached to a vertical bar at a predetermined position around the reinforcing steel car by an appropriate means, and is radially inwardly locked. After locking the divided edges of the inner partitioning member that was manually manipulated, cover the range from the upper ends of all the vertical bars to the inner partitioning member with covering material, and then after placing concrete. , Releasing the hand-operated state of the outer and inner partition members by the locking device by an operation from the outside, deploying the outer and inner partition members with the piano wire, and then curing the outer and inner partitions after setting concrete. The method employs a method of exposing the vertical streaks by pulling out and removing the upper concrete block of the member.
【0009】[0009]
【作用】コンクリートの打設後に外部からの操作により
係止装置による外側及び内側仕切り部材の手操り状態を
解除すると、ピアノ線により外側仕切り部材が外方に向
け展開しながら鍔状になり、またピアノ線により内側仕
切り部材がそれぞれ内方に向け展開すると共に、分割縁
がオーバーラップして最終的に円板状になる。[Function] When the outer and inner partition members are released from the hand-operated state by the locking device by an operation from the outside after the concrete is poured, the outer partition member is outwardly expanded by the piano wire to form a brim, and The inner partition members are deployed inward by the piano wire, and the dividing edges overlap each other to finally form a disk shape.
【0010】打設したコンクリートが硬化すると、内側
及び外側仕切り部材の上方コンクリート塊状物にワイヤ
を係止し、係止後のワイヤを上方に引っ張りながら内側
及び外側仕切り部材の上方コンクリート塊状物と共に被
い部材を撤去して鉄筋かごの縦筋を露出する。When the cast concrete is hardened, the wire is locked to the upper concrete lumps of the inner and outer partitioning members, and the wire after the locking is pulled upward while the upper concrete lumps of the inner and outer partitioning members are covered. Remove the member to expose the longitudinal bars of the cage.
【0011】[0011]
【実施例】以下、この発明の実施例を添付図面に基づい
て説明する。Embodiments of the present invention will be described below with reference to the accompanying drawings.
【0012】図1から図6に示すように、まず、掘削機
(例えばアースオーガのみ或はケーシングとアースオー
ガとを組み合わせたもの)を用いて地面から地中の所定
の深さ迄掘削すると共に、排土して設けた削孔1内に鉄
筋かご2を挿入する。As shown in FIGS. 1 to 6, first, an excavator (for example, only an earth auger or a combination of a casing and an earth auger) is used to excavate from the ground to a predetermined depth in the ground. , The rebar cage 2 is inserted into the drilled hole 1 that has been excavated.
【0013】上記の鉄筋かご2は、多数本の縦筋3と、
この縦筋3の上部から下端迄に上下に所定の間隔を存し
て配置すると共に、縦筋3に固着した環状筋4とで構成
されている。The rebar cage 2 has a large number of vertical bars 3,
The vertical stripes 3 are arranged from the upper part to the lower end of the vertical stripes 3 with a predetermined gap therebetween, and are constituted by annular stripes 4 fixed to the vertical stripes 3.
【0014】また、鉄筋かご2の上部外側には、ピアノ
線5により外周縁が削孔1の孔壁に当接するように鍔状
に広がる可撓シート製外側仕切り部材6が配置してあ
る。An outer partition member 6 made of a flexible sheet is arranged on the outer side of the upper portion of the rebar cage 2 so that the outer peripheral edge of the reed cage 2 spreads in a brim shape so as to contact the hole wall of the drilled hole 1.
【0015】上記の外側仕切り部材6は、図2、図4、
図6に示すように、軟質合成樹脂シート(表面にコンク
リートに対する離形膜を設けておくとよい)製扁平な平
面弧状の複数のチューブ7を端面突き合わせによってリ
ング状に並べると共に、チューブ7の外周縁内側にピア
ノ線5を挿通して形成したが、リング状チューブの1箇
所を切断すると共に、切断端を広げ、そして鉄筋かご2
の外側に嵌装するもの、或は鉄筋かご2の上端からリン
グ状のチューブを嵌装する方式であってもよい。この場
合、ピアノ線5は、切り離したリング状のものを使用す
る。The outer partition member 6 has the structure shown in FIGS.
As shown in FIG. 6, a plurality of flat flat arc-shaped tubes 7 made of a soft synthetic resin sheet (a release film for concrete is preferably provided on the surface) are arranged in a ring shape by end face butting, and at the The piano wire 5 was inserted through the inside of the peripheral edge, but one part of the ring-shaped tube was cut and the cut end was expanded, and the reinforcing bar cage 2
May be fitted to the outside of the car, or a ring-shaped tube may be fitted from the upper end of the reinforcing bar car 2. In this case, the piano wire 5 is a ring-shaped one that has been separated.
【0016】さらに、外側仕切り部材6の内周縁は、鉄
筋かご2の外周に支持させてある。上記鉄筋2に対する
外側仕切り部材6の支持は、図示の場合、外側仕切り部
材6の内周縁内側に挿通してある一本の紐8の引き出し
た両端を結んで、鉄筋かご2の外周面に外側仕切り部材
6の内周縁を押し付けて支持したが、各縦筋にチューブ
を紐などを介し止めることもある。Further, the inner peripheral edge of the outer partition member 6 is supported on the outer periphery of the reinforcing bar car 2. In the case of the illustration, the outer partition member 6 is supported on the outer peripheral surface of the reinforcing bar cage 2 by connecting both ends of a single string 8 inserted through the inner peripheral edge of the outer partition member 6 to each other. Although the inner peripheral edge of the partition member 6 is pressed and supported, the tube may be stopped at each vertical line via a string or the like.
【0017】9は複数の分割縁がピアノ線10によりオ
ーバーラップ状に塞がる可撓シート製の内側仕切り部材
である。Reference numeral 9 denotes an inner partition member made of a flexible sheet in which a plurality of divided edges are closed by the piano wire 10 in an overlapping manner.
【0018】上記の内側仕切り部材9は、図4、図7、
図8に示すように、二つ折りにより上下に重ね合わせた
平面半円形の二組のシート11の屈曲直線縁の内側に辺
縁よりも長いピアノ線10を挿通して形成したが、一枚
の半円形シートの直線縁に筒状の袋部を設けて、この袋
部にピアノ線を挿通することもある。The above-mentioned inner partition member 9 is shown in FIGS.
As shown in FIG. 8, the piano wire 10 longer than the side edge is formed inside the bent straight edge of the two sets of flat semicircular sheets 11 that are vertically folded and folded in half. A cylindrical bag portion may be provided on the straight edge of the semicircular sheet, and a piano wire may be inserted into the bag portion.
【0019】また、上記シート11の半円状の縁は、弧
状縁の透孔12に縦筋3を貫通させて支持する。Further, the semicircular edge of the sheet 11 supports the vertical stripe 3 through the through hole 12 of the arcuate edge.
【0020】さらに、外側仕切り部材6は、鉄筋かご2
の外周に向け手操り、内側仕切り部材9は、鉄筋かご2
の内周に向け手操ると共に、所定位置の縦筋3に対し着
脱自在に設けてある係止装置13に外側仕切り部材6の
外周縁及び内側仕切り部材9の分割縁を係止して手操り
状態を維持し、外部からの操作により係止を解除するこ
とができるようになっている。Further, the outer partition member 6 is a reinforcing bar cage 2
The inner partitioning member 9 is manually operated toward the outer periphery of the rebar cage 2
While manipulating the inner periphery of the outer peripheral member of the outer partition member 6 and the dividing edge of the inner partition member 9 with a locking device 13 which is detachably attached to the vertical line 3 at a predetermined position. The state can be maintained and the lock can be released by an operation from the outside.
【0021】上記の係止装置13は、図2及び図5に示
すように、内側仕切り部材9の取付け以前に、縦筋3の
外側に嵌装する筒体14と、この筒体14にねじ込んで
縦筋3の外周面に先端を押し付けることにより縦筋3に
対し筒体14を停止するボルト15と、この筒体14の
外周面から放射線上外側と内側とに突出する水平のアー
ム16と、この両アーム16の端末面にピン17を介し
上向き上位端を回動自在に取付けたL形の揺動辺18
と、この揺動片18の下位端に接続して鉄筋かご2の上
端から外方に引き出した操作紐19とで構成し、自重に
より垂れ下がり方向に回動して停止した揺動片18に外
側仕切り部材6の外周縁を、内側仕切り部材9の分割縁
をそれぞれ係止して、内側仕切り部材9及び外側仕切り
部材6の手操り状態を維持し、操作紐19を引っ張って
起立方向に揺動片18を回動すると、外側仕切り部材6
の外周縁から、内側仕切り部材9の分割縁から揺動片1
8が外れるようになっている。As shown in FIGS. 2 and 5, the locking device 13 has a cylindrical body 14 fitted on the outer side of the vertical streak 3 and screwed into the cylindrical body 14 before the inner partition member 9 is attached. A bolt 15 for stopping the cylindrical body 14 against the vertical stripe 3 by pressing the tip against the outer peripheral surface of the vertical stripe 3 with a horizontal arm 16 projecting radially outward and inward from the outer peripheral surface of the cylindrical body 14. , An L-shaped swinging side 18 in which the upper upper end is rotatably attached to the end faces of both arms 16 via pins 17.
And the operation string 19 connected to the lower end of the swing piece 18 and pulled outward from the upper end of the reinforcing bar car 2, and is attached to the outside of the swing piece 18 which is rotated in the hanging direction by its own weight and stopped. The outer peripheral edge of the partition member 6 is locked to the divided edges of the inner partition member 9 to maintain the manual operation state of the inner partition member 9 and the outer partition member 6, and the operation string 19 is pulled to swing in the standing direction. When the piece 18 is rotated, the outer partition member 6
From the outer peripheral edge of the inner partition member 9 to the swinging piece 1
8 is coming off.
【0022】なお、図1、図3、図5に示すように、鉄
筋かご2の周囲所要等分位置の筒体14に水平のガイド
筒21を設けて、このガイド筒21に挿通したスライド
杆22の外端フック23に手操った外側仕切り部材6の
外周縁を引っかけておくと、外側仕切り部材6の垂れ下
がりを止め、削孔1の孔壁に向け外側仕切り部材6が展
開する際、スライド杆22がスライドする。As shown in FIGS. 1, 3 and 5, a horizontal guide cylinder 21 is provided on a cylinder body 14 at a required equal position around the reinforcing bar car 2, and a slide rod inserted into the guide cylinder 21. When the outer peripheral edge of the outer partition member 6 that has been manually manipulated is hooked on the outer end hook 23 of 22, the outer partition member 6 is prevented from hanging down, and when the outer partition member 6 is deployed toward the hole wall of the drilled hole 1, it slides. The rod 22 slides.
【0023】また、内側仕切り部材9を取付けたのち、
全ての縦筋3の上端から内側仕切り部材9迄の間は、上
方に抜き取ることができる被い部材24により被ってあ
る。After attaching the inner partition member 9,
A space between the upper ends of all the vertical stripes 3 and the inner partition member 9 is covered by a cover member 24 that can be pulled out upward.
【0024】上記の被い部材24には、上端閉鎖の発泡
スチロール製の筒体や合成樹脂製の袋などがある。The cover member 24 may be a styrofoam cylinder closed at the upper end or a bag made of synthetic resin.
【0025】上記のように、削孔1に挿入する前の鉄筋
かご2の外側及び内側に外側仕切り部材6、内側仕切り
部材9を配置すると共に、図1、図2、図3、図4に示
すように、係止装置13により手操った内側仕切り部材
6及び外側仕切り部9を係止しておく。As described above, the outer partition member 6 and the inner partition member 9 are arranged on the outer side and the inner side of the rebar cage 2 before being inserted into the drilled hole 1, and as shown in FIG. 1, FIG. 2, FIG. 3, and FIG. As shown, the manually operated inner partition member 6 and the outer partition portion 9 are locked by the locking device 13.
【0026】また、各縦筋3の内側仕切り部材9から上
端迄の範囲を被い部材24により被っておく。Further, the covering member 24 covers the range from the inner partition member 9 to the upper end of each vertical stripe 3.
【0027】しかして、削孔1内に鉄筋かご2を挿入し
たのち、トレミ管などを用いて削孔1内にコンクリート
を打設する。Then, after inserting the reinforcing steel cage 2 into the drilled hole 1, concrete is poured into the drilled hole 1 using a tremie pipe or the like.
【0028】コンクリートの打設(硬化する以前)後、
まず、操作紐19を引っ張って係止装置13による内側
仕切り部材9及び外側仕切り部材6の手操り維持を解除
すると、図8及び図9に示すように、ピアノ線5により
外側仕切り部材6が外方に展開しながら、削孔1の孔壁
に展開した外側仕切り部材6の外周縁が当接する。After placing concrete (before hardening),
First, when the operation string 19 is pulled to release the manual operation maintenance of the inner partition member 9 and the outer partition member 6 by the locking device 13, as shown in FIGS. 8 and 9, the outer partition member 6 is removed by the piano wire 5. The outer peripheral edge of the outer partition member 6 that has spread is brought into contact with the hole wall of the drilled hole 1 while expanding in one direction.
【0029】また、ピアノ線10により内側仕切り部材
9が内方に展開しながら、内側仕切り部材9の分割縁が
オーバーラップする。その結果、コンクリート構造体の
外側仕切り部材6及び内側仕切り部材9の上下が区劃さ
れる。Further, while the inner partition member 9 is expanded inward by the piano wire 10, the dividing edges of the inner partition member 9 overlap each other. As a result, the upper and lower parts of the outer partition member 6 and the inner partition member 9 of the concrete structure are separated.
【0030】打設コンクリートが硬化すると、コンクリ
ート構造体の頭端部周囲の土砂を排土したのち、コンク
リート構造体の頭端部にワイヤを巻き付け、巻き付けた
ワイヤをウインにより上方に引っ張りながら外側仕切り
部材6及び内側仕切り部材9の上側コンクリート塊状物
を撤去する。勿論、被い部材24も撤去され、縦筋3の
上端部が露出する。When the cast concrete is hardened, earth and sand around the head end of the concrete structure are discharged, and then a wire is wound around the head end of the concrete structure, and the wound wire is pulled upward by a winch to form an outer partition. The upper concrete lumps of the member 6 and the inner partition member 9 are removed. Of course, the covering member 24 is also removed, and the upper end portion of the vertical stripe 3 is exposed.
【0031】なお、内側仕切り部材9の手操りにともな
い外周縁の両端部に作用する引っ張り力に対する融通性
をもたせる場合には、図1及び図8に示すように、縦筋
3に対しゴム紐28を介し透孔12を止めておくとよ
い。In order to have flexibility with respect to the pulling force acting on both ends of the outer peripheral edge due to the manual operation of the inner partition member 9, as shown in FIG. 1 and FIG. It is preferable to stop the through hole 12 via 28.
【0032】[0032]
【効果】以上のように、この発明に係る方法を採用する
と、騒音を少なくして極めて容易に鉄筋コンクリート構
造体の頭端不要部分を撤去して傷の付かない縦筋を露出
することができる。As described above, when the method according to the present invention is adopted, noise can be reduced and the unnecessary portions of the head end of the reinforced concrete structure can be removed very easily to expose the vertical streaks which are not damaged.
【0033】また、外側仕切り部材及び内側仕切り部材
により構造体の残置上端面が美しく仕上げられ、補修す
る作業が不要になる。Further, the outer partition member and the inner partition member beautifully finish the remaining upper end surface of the structure, and the repair work becomes unnecessary.
【図1】この発明の実施例を示す平面図FIG. 1 is a plan view showing an embodiment of the present invention.
【図2】同上の要部を示す縦断拡大正面図FIG. 2 is an enlarged vertical sectional front view showing the main part of the above.
【図3】同上の平面図FIG. 3 is a plan view of the same as above.
【図4】スライド杆を示す縦断拡大正面図FIG. 4 is an enlarged vertical sectional front view showing a slide rod.
【図5】同上の分解斜視図FIG. 5 is an exploded perspective view of the above.
【図6】チューブの斜視図FIG. 6 is a perspective view of a tube.
【図7】シートの斜視図FIG. 7 is a perspective view of a seat
【図8】外側仕切り部材及び仕切り部材の展開した状態
を示す平面図FIG. 8 is a plan view showing a developed state of the outer partition member and the partition member.
【図9】同上の縦断拡大正面図FIG. 9 is an enlarged vertical front view of the above.
【図10】同縦断拡大側面図FIG. 10 is an enlarged side view of the same vertical section.
1 削孔 2 鉄筋かご 3 縦筋 4 環状筋 5 ピアノ線 6 外側仕切り部材 7 チューブ 8 紐 9 内側仕切り部材 10 ピアノ線 11 シート 12 透孔 13 係止装置 14 筒体 15 ボルト 16 アーム 17 ピン 18 揺動片 19 操作紐 24 被い部材 1 Drilled Hole 2 Reinforcing Bar Cage 3 Vertical Bar 4 Ring Bar 5 Piano Wire 6 Outer Partition Member 7 Tube 8 String 9 Inner Partition Member 10 Piano Wire 11 Sheet 12 Through Hole 13 Locking Device 14 Cylindrical Body 15 Bolt 16 Arm 17 Pin 18 Swing Moving piece 19 Operation string 24 Covering member
Claims (1)
の構築に際し、鉄筋かごの上部所定位置の周囲外側にピ
アノ線により外周縁が孔壁に当接して鍔状に広がる可撓
シート製外側仕切り部材を配置すると共に、上記鉄筋か
ごの周囲に上記外側仕切り部材の内周縁を適宜の方法で
支持し、また外周縁の各透孔に上記鉄筋かごの縦筋を貫
通させて支持すると共に、複数の分割縁がピアノ線によ
りオーバーラップ状に塞がる可撓シート製内側仕切り部
材を上記外側仕切り部材と略同レベルに配置し、さら
に、上記鉄筋かご周囲所定位置の縦筋に適宜の手段によ
り着脱自在に取付けてある放射状外向きの係止装置に手
操った上記外側仕切り部材の外周縁を係止し、また放射
状内向きの係止装置に手操った上記内側仕切り部材の分
割縁を係止し、さらに、全ての上記縦筋の上端から上記
内側仕切り部材迄の範囲を被い材により被い、次いで、
コンクリートを打設したのち、外部からの操作により上
記係止装置による上記外側及び内側仕切り部材の手操り
状態を解除して上記ピアノ線により前記外側及び内側仕
切り部材を展開し、打設コンクリートの硬化後に上記外
側及び内側仕切り部材の上方コンクリート塊状物を上方
に引き抜き撤去して縦筋を露出することを特徴とする鉄
筋コンクリート構造体の頭端処理方法。1. When constructing a reinforced concrete structure such as cast-in-place, an outer partition member made of a flexible sheet is spread around the upper predetermined position of the reinforced cage outside the predetermined position by a piano wire so that the outer peripheral edge abuts the hole wall and spreads in a brim. While arranging, the inner peripheral edge of the outer partition member is supported around the reinforcing bar cage by an appropriate method, and the longitudinal bars of the reinforcing bar cage are supported through the through holes of the outer peripheral edge, and a plurality of divisions are made. An inner partition member made of a flexible sheet whose edge is closed by a piano wire in an overlapped manner is arranged at substantially the same level as the outer partition member, and is further detachably attached to the vertical bar at a predetermined position around the reinforcing bar car by an appropriate means. The outer peripheral edge of the manually operated outer partition member is locked to the radially outward locking device, and the manually operated split edge of the inner partition member is locked to the radially inward locking device. , Covering the range from the upper end of all the vertical bars to the inner partition member with covering material, and then
After pouring concrete, the outer and inner partition members are released from the manual operation of the outer and inner partition members by the locking device by an operation from the outside, and the outer and inner partition members are expanded by the piano wire to harden the concrete. A method for treating the head end of a reinforced concrete structure, characterized in that the upper concrete lumps of the outer and inner partitioning members are subsequently pulled out and removed to expose the vertical streaks.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3003093A JPH0772417B2 (en) | 1993-02-19 | 1993-02-19 | Head end treatment method for reinforced concrete structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3003093A JPH0772417B2 (en) | 1993-02-19 | 1993-02-19 | Head end treatment method for reinforced concrete structures |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH06240665A true JPH06240665A (en) | 1994-08-30 |
JPH0772417B2 JPH0772417B2 (en) | 1995-08-02 |
Family
ID=12292427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3003093A Expired - Lifetime JPH0772417B2 (en) | 1993-02-19 | 1993-02-19 | Head end treatment method for reinforced concrete structures |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0772417B2 (en) |
-
1993
- 1993-02-19 JP JP3003093A patent/JPH0772417B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0772417B2 (en) | 1995-08-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5961253A (en) | Pile head dresser, pile head dressing method, and, placement of cast-in-place concrete piles | |
KR101363878B1 (en) | Temporary construction and originally construction the outer layer of a 2-layer wall type underground road building method | |
GB1591477A (en) | Filler plug for coil insert in concrete product | |
JP3625892B2 (en) | Construction method of underground structure using precast concrete column | |
JPH06240665A (en) | Treatment of head end of reinforced concrete structure | |
KR101230986B1 (en) | Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow | |
JP2552196B2 (en) | How to build a reinforced embankment | |
CN109680722A (en) | The construction method for setting external building access port is directly stayed on outer wall of basement body | |
JPH08209686A (en) | Pile head processing tool and pile head processing construction method for cast-in-place pile | |
JP6825149B1 (en) | How to build landslide prevention piles and landslide prevention piles. | |
JP2007218077A (en) | Sheet member for restraining and reinforcing material | |
KR101674865B1 (en) | Shotcrete retaining wall and construction method thereof | |
JPH0649841A (en) | Top end processing method for reinforce concrete structure | |
JPH0784764B2 (en) | A cage formwork for removing the box of the steel column base fixing part in the SRC building | |
JPS58143020A (en) | Slope protection work | |
JP3974760B2 (en) | Cast-in-place pile head end treatment sheet | |
JPH08284194A (en) | Repairing material for concrete structure under ground and repairing method therefor | |
JP3920903B1 (en) | Method for producing restraint reinforcement | |
JP2001182054A (en) | Method and implement for removing pile head extra-fill of cast-in-place concrete pile | |
JPH05295726A (en) | Top processing method for reinforced concrete structure | |
JP3947459B2 (en) | Method for constructing concrete structure, formwork block used in the method, and method for manufacturing the formwork block | |
JP2004019096A (en) | Pile head separating device and pile head separating method | |
JPH06980B2 (en) | How to place steel sheet pile concrete | |
JPH09279610A (en) | Method for constructing retaining wall and equipment therefor | |
JP2003342951A (en) | Construction method for treatment of pile head of cast- in-place pile, and cushion material and concrete destroying device for use in the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20070802 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080802 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080802 Year of fee payment: 13 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 13 Free format text: PAYMENT UNTIL: 20080802 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 14 Free format text: PAYMENT UNTIL: 20090802 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090802 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100802 Year of fee payment: 15 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 15 Free format text: PAYMENT UNTIL: 20100802 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 15 Free format text: PAYMENT UNTIL: 20100802 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 15 Free format text: PAYMENT UNTIL: 20100802 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 16 Free format text: PAYMENT UNTIL: 20110802 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 17 Free format text: PAYMENT UNTIL: 20120802 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |