JPH06235271A - Concrete guard fence installing method and device thereof - Google Patents

Concrete guard fence installing method and device thereof

Info

Publication number
JPH06235271A
JPH06235271A JP2282193A JP2282193A JPH06235271A JP H06235271 A JPH06235271 A JP H06235271A JP 2282193 A JP2282193 A JP 2282193A JP 2282193 A JP2282193 A JP 2282193A JP H06235271 A JPH06235271 A JP H06235271A
Authority
JP
Japan
Prior art keywords
guard fence
beams
road
installation
installation position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2282193A
Other languages
Japanese (ja)
Other versions
JPH0772413B2 (en
Inventor
Akira Sato
彰 佐藤
Yoshiharu Matsuba
美晴 松葉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON SAMIKON KK
Original Assignee
NIPPON SAMIKON KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON SAMIKON KK filed Critical NIPPON SAMIKON KK
Priority to JP2282193A priority Critical patent/JPH0772413B2/en
Publication of JPH06235271A publication Critical patent/JPH06235271A/en
Publication of JPH0772413B2 publication Critical patent/JPH0772413B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Fencing (AREA)

Abstract

PURPOSE:To carry out construction in space reduction. CONSTITUTION:Tracks 11 and 11A are arranged on both sides sandwiching a median divider strip C being an installing position between them. Beams 12 and 12A are constructed between these tracks. Hoists 13 are installed on these beams 12 and 12A. After a guard fence 1 is hung up by these hoists 13, this guard fence 1 is moved in the road width direction, and is installed in the median divide strip C. In a fixed condition of being supported at their opposite ends, the beams 12 and 12A are hung up and are moved. Thereby, the comparatively heavy guard fence 1 can be installed while reducing space.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は道路の長さ方向にプレキ
ャストコンクリートガードフェンスを据付けるコンクリ
ートガードフェンスの据付方法とその装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete guard fence installation method and apparatus for installing a precast concrete guard fence along the length of a road.

【0002】[0002]

【従来の技術】ガードフェンスは、走行車線を逸脱した
車両が道路外あるいは対向車線に逸脱すことを防止する
ため設けられるものであり、十分な逸脱防止効果を備え
ていなければならない。この点コンクリートガードフェ
ンスでは、一般に鋼製では得られない強度と耐久性が得
られるため、高速道路など車両が高速で走行する道路な
どに広く用いられている。その中でも工場製作によるプ
レキャストコンクリートガードフェンスでは、所定長さ
の工場製品を現場に搬入し、この搬入した製品をクレー
ン車などにより据付けて道路の長さ方向に連続したガー
ドフェンスを構築することができる。
2. Description of the Related Art A guard fence is provided to prevent a vehicle deviating from a traveling lane from deviating to the outside of the road or to an oncoming lane, and must have a sufficient deviation preventing effect. In this respect, concrete guard fences are widely used for roads where vehicles run at high speed, such as highways, because strength and durability that are not generally obtained with steel can be obtained. Among them, in the precast concrete guard fence manufactured by the factory, it is possible to carry a factory product of a predetermined length to the site and install the carried product with a crane car etc. to construct a continuous guard fence in the length direction of the road. .

【0003】[0003]

【発明が解決しようとする課題】上記従来技術のプレキ
ャストコンクリートガードフェンスでは、コンクリート
の工場製作によって優れた強度と耐久性が得られるもの
の、そのコンクリート一体構造によって鋼製のガードフ
ェンスに比べると製品重量が大になる面があった。この
点を考慮して長さ寸法を短くし1個あたりの製品重量を
軽くすることもできるが、この場合、施工に必要な製品
数量が増加し、施工速度の低下と工費の増大を招いてし
まという問題がある。そこで一般には施工性と工費の両
面を考慮した長さ寸法で製品を製作し現場に据付けるよ
うにしており、例えば長さ寸法が3メートル程度のもの
では製品重量が7トン程度となって比較的製品重量も軽
く作業性も良好となり、従来の現場打ちコンクリートに
よる施工に比べて施工速度の向上,工費の削減,品質及
び管理の向上等が図られ、特に新設の道路において広く
用いられている。ところでこのような施工性等に優れた
プレキャストコンクリートガードフェンスを、既設の道
路に据付ける場合、その据付作業に種々の制約が生じ、
例えば工事の為に全面交通止めをすることが難しい高速
道路等においては、実際上施工が困難になる場合があ
る。図10は片側2車線A,a,B,bの高速道路にお
いて、片側1車線aを車両交通可能に確保し、中央分離
帯Cにガードフェンス1を据付ける例であり、この場
合、中央分離帯C寄りの車線Aにクレーン車2を配置
し、この車線Aを車両通行止めとし、前記クレーン車2
のアーム3でガードフェンス1を吊上げて据付けを行わ
なければならない。そしてこのように片側1車線を車両
通行可能に確保してクレーン車2を用いる場合では、据
付作業中にクレーン車2のアーム3を中央分離帯C方向
に水平旋回すると、図示右下側に示すように、該クレー
ン車2の旋回ボディー4後方が、通行車線a側にはみ出
して車両と接触事故を引き起こす危険があり、その水平
旋回角度θが制限されてしまう。そこで小さい水平旋回
角度θで中央分離帯Cにガードフェンス1を据付けるた
めには、アーム3の仰角を水平に近付け、旋回半径Rを
大にしなければならない。しかし、アーム3の仰角を小
さくして旋回半径Rを大きく取ると、吊上重量が低下
し、例えば35トンクレーン車で旋回半径Rを16メー
トルとすると吊上げ可能な重量は1.65トンと大幅に
小さくなり、この種の比較的部材重量が大きなガードフ
ェンス1を吊り上げることができなくなるという問題が
あった。さらにこの種の工事では、全面通行時の安全を
図るため、工事時間以外は重機及び工事資材などを、中
央分離帯Cも含めて道路上からすべて撤去しなければな
らない場合があり、上記クレーン車2のような自走式の
吊上げ方法を用いることができないと施工を行うことが
困難になってしまう。さらにまた、一般道路等において
アーム3を有するクレーン車2を使用する場合、道路の
上部空間に電線等の障害物があると、吊り下ろし作業中
にアーム3が障害物に接触する等の危険性が生じ、アー
ム3の仰角を大きくして吊り下ろし作業を行うことがで
きないという問題もあった。
In the above-mentioned prior art precast concrete guard fence, although excellent strength and durability can be obtained by factory production of concrete, the weight of the product is smaller than that of steel guard fence due to the concrete integral structure. There was a big side. In consideration of this point, it is possible to shorten the length dimension and reduce the weight of each product, but in this case, the number of products required for construction increases, resulting in a decrease in construction speed and an increase in construction cost. There is a problem of stripes. Therefore, in general, products are manufactured with a length dimension that considers both workability and construction cost and installed on site. For example, if the length dimension is about 3 meters, the product weight will be about 7 tons. The product weight is light and the workability is good. Compared with the conventional construction using cast-in-place concrete, the construction speed is improved, the construction cost is reduced, the quality and management are improved, and it is widely used especially on new roads. . By the way, when installing a precast concrete guard fence with excellent workability, etc., on the existing road, there are various restrictions on the installation work,
For example, on an expressway where it is difficult to stop all traffic due to construction, construction may be difficult in practice. FIG. 10 shows an example in which one lane a on one side is secured for vehicle traffic and the guard fence 1 is installed on the central separation zone C on a highway with two lanes A, a, B, b on one side. The crane vehicle 2 is arranged in the lane A near the belt C, and the lane A is closed to the vehicle.
The guard fence 1 must be hoisted and installed by the arm 3 of. When the crane vehicle 2 is used with one lane on one side secured so that the vehicle can pass through, the arm 3 of the crane vehicle 2 is horizontally swung in the direction of the median strip C during the installation work, as shown in the lower right side of the figure. As described above, there is a risk that the rear part of the turning body 4 of the crane vehicle 2 may protrude to the side of the traffic lane a to cause a contact accident with the vehicle, and the horizontal turning angle θ is limited. Therefore, in order to install the guard fence 1 on the median strip C at a small horizontal turning angle θ, the elevation angle of the arm 3 must be close to horizontal and the turning radius R must be large. However, if the elevation angle of the arm 3 is made small and the turning radius R is made large, the hoisting weight is reduced. For example, if the turning radius R is 16 meters with a 35-ton mobile crane, the hoistable weight is 1.65 tons. However, there is a problem that the guard fence 1 of this kind, which has a relatively large member weight, cannot be lifted. In addition, in this type of construction, in order to ensure safety during full-scale traffic, it may be necessary to remove all heavy equipment and construction materials from the road, including the median strip C, except during construction hours. If a self-propelled hoisting method such as 2 cannot be used, it will be difficult to perform construction. Furthermore, when using a mobile crane 2 having an arm 3 on an ordinary road, if there is an obstacle such as an electric wire in the upper space of the road, there is a risk that the arm 3 will come into contact with the obstacle during the hanging work. There is also a problem in that the elevation angle of the arm 3 cannot be increased to perform the hanging work.

【0004】そこで本発明は上記旋回式のクレーン車の
欠点を考慮し、場所を取らず施工性に優れたコンクリー
トガードフェンスの据付方法とその装置を提供すること
を目的とする。
In view of the above-mentioned drawbacks of the swing type crane truck, the present invention has an object to provide a method and an apparatus for installing a concrete guard fence which is space-saving and has excellent workability.

【0005】[0005]

【課題を解決するための手段】請求項1の据付方法は、
道路の長さ方向にプレキャストコンクリートガードフェ
ンスを据付けるコンクリートガードフェンスの据付方法
において、前記ガードフェンスの据付位置を挟んだ両側
に、移動可能な支持体を配置すると共に、これら支持体
間に梁を架設し、この梁に沿って移動可能な吊上装置に
よりガードフェンスを吊上げた後、このガードフェンス
を道路幅方向に移動して前記据付位置に据付けるもので
ある。
The installation method according to claim 1 is
In the installation method of the concrete guard fence to install the precast concrete guard fence in the length direction of the road, on both sides sandwiching the installation position of the guard fence, with a movable support, and a beam between these supports. After being erected, the guard fence is hoisted by a hoisting device movable along the beam, and then the guard fence is moved in the road width direction and installed at the installation position.

【0006】請求項2の据付装置は、道路の長さ方向に
プレキャストコンクリートガードフェンスを据付けるコ
ンクリートガードフェンスの据付装置において、前記ガ
ードフェンスの据付位置を挟んだ両側に配置される移動
可能な支持体と、これら支持体間に架設する梁と、この
梁に沿って移動可能でかつ前記ガードフェンスを吊上可
能な吊上装置とを具備するものである。
The installation apparatus of claim 2 is a concrete guard fence installation apparatus for installing a precast concrete guard fence in a length direction of a road, and a movable support arranged on both sides of the installation position of the guard fence. It comprises a body, a beam installed between these supports, and a hoisting device movable along the beam and capable of hoisting the guard fence.

【0007】また請求項3の据付方法は、道路の長さ方
向にプレキャストコンクリートガードフェンスを据付け
るコンクリートガードフェンスの据付方法において、前
記ガードフェンスの据付位置の一側に移動可能な支持体
を配置し、この支持体から前記据付位置側に梁をほぼ水
平に張出し、この梁の途中を支持部材により支持し、前
記梁に沿って移動可能な吊上装置によりガードフェンス
を吊上げた後、このガードフェンスを道路幅方向に移動
して前記据付位置に据付けるものである。
The installation method according to claim 3 is the installation method of a concrete guard fence in which a precast concrete guard fence is installed in the longitudinal direction of a road, wherein a movable support is arranged on one side of the installation position of the guard fence. Then, a beam is extended substantially horizontally from the support body to the installation position side, the midway of the beam is supported by a support member, and a guard fence is lifted by a lifting device movable along the beam, and then the guard fence is lifted. The fence is moved in the width direction of the road and installed at the installation position.

【0008】また請求項4の据付装置は、道路の長さ方
向にプレキャストコンクリートガードフェンスを据付け
るコンクリートガードフェンスの据付装置において、前
記ガードフェンスの据付位置の一側に配置される移動可
能な支持体と、この支持体から前記据付位置側にほぼ水
平に張出す梁と、この梁の途中を支持する支持部材と、
前記梁に沿って移動可能でかつ前記ガードフェンスを吊
上可能な吊上装置とを具備するものである。
The installation apparatus of claim 4 is a concrete guard fence installation apparatus for installing a precast concrete guard fence in the length direction of a road, wherein the movable support is arranged at one side of the installation position of the guard fence. A body, a beam extending substantially horizontally from the support to the installation position side, and a support member supporting the middle of the beam,
A lifting device that is movable along the beam and that can lift the guard fence.

【0009】[0009]

【作用】上記構成によって、据付場所を挟んで支持体を
配置し、これら支持体間に梁を架設し、吊上装置によっ
てガードフェンスを吊上げ、据付位置まで移動して据付
けを行い、その梁の両端側を支持してかつこの梁を位置
固定した状態でガードフェンスを道路の幅方向に移動さ
せるため、比較的重たいガードフェンスを場所を取らず
に吊上げ移動することができる。
With the above structure, the supports are arranged across the installation place, the beams are erected between the supports, the guard fence is hung by the hoisting device, the guard fence is moved to the installation position and the installation is performed. Since the guard fence is moved in the width direction of the road while both ends are supported and the beam is fixed in position, the relatively heavy guard fence can be lifted and moved without taking a space.

【0010】また上記構成によって、据付場所の一側に
支持体を配置し、これら支持体から据付位置側に梁を張
出し、この梁の途中を支持部材により支持し、吊上装置
によってガードフェンスを吊上げ、据付位置まで移動し
て据付けを行い、その梁を支持体と支持部材より支持し
てかつこの梁をほぼ水平に位置固定した状態でガードフ
ェンスを道路の幅方向に移動させるため、道路の上方に
障害物がある場合でもガードフェンスを吊上げ移動する
ことができる。
Further, according to the above-mentioned structure, the supports are arranged on one side of the installation place, the beams are extended from the supports to the installation position side, the midway of the beams is supported by the support member, and the guard fence is supported by the lifting device. In order to move the guard fence in the width direction of the road while hoisting and moving to the installation position and installing it, the beam is supported by the support and the supporting member and the beam is fixed in a substantially horizontal position. Even if there is an obstacle above, the guard fence can be lifted and moved.

【0011】[0011]

【実施例】以下、本発明の実施例を添付図面を参照して
説明する。図1ないし図3は本発明の第1実施例を示
し、上記図10と同一部分に同一符号を付しその説明を
省略して詳述すると、図1は片側2車線A,a,B,b
づつの高速道路の平面図を示したものであり、本発明
は、据付位置である中央分離帯Cを挟んで左右内側の車
線A,Bに、支持体であるクレーン付きトラック11,11
Aをほぼ並列に配置し、これらトラック11,11Aの間に
一対の梁12,12Aを架設し、この梁12,12Aにそれぞれ
移動可能な吊上装置たるホイスト13を設け、あらかじめ
一方の車線Aに仮置きしたプレキャストコンクリートガ
ードフェンス1(以下ガードフェンスという)を前記ホ
イスト13により吊上げて据付位置たる中央分離帯Cのほ
ぼ中央に据付ける方法であり、さらに、この方法に用い
る装置の一例を詳細に説明すると、前記クレーン付きト
ラック11,11Aには、その前部に最大吊上げ重量3トン
程度のクレーンのアーム14が設けられると共に、側部に
は張出し及び収納可能でガードフェンス1の吊上げ時ト
ラック11,11Aの安定を図る接地脚15を備え、図1中下
方のトラック11の荷台16には、一対の前記梁12,12Aが
旋回可能に設けられ、これら梁12,12Aは、図2に示す
ように、前記荷台16上に台座17を固定し、この台座17
に、それぞれ前後及び幅方向に間隔を置いて回転支柱1
8,18を立設し、各回転支柱18,18は前記台座17内に配
設した回転駆動装置19によりそれぞれ回転し、それら回
転支柱18,18の上端に、枢着軸20を介して前記梁12,12
Aをそれぞれ垂直旋回可能に枢着し、図示しない上下旋
回装置により前記梁12,12Aが片持ち状に上下に旋回す
る。また、図1中上方のクレーン付きトラック11Aに
は、前記両梁12,12Aの先端側を載置して支持可能な昇
降台21が設けられ、この昇降台21は、前記荷台16に油圧
ジャッキなどの昇降装置22を立設し、この昇降装置22の
上部に載置台部23を設けてなる。また、前記梁12,12A
は例えばI型鋼からなり、その梁12,12Aの下部にはレ
ール24が設けられると共に、そのレール24の下面には長
さ方向ほぼ全長に渡って下向きのラック25が設けられて
いる。そして前記レール24に吊上装置たる電動式のホイ
スト13,13が着脱自在に設けられ、このホイスト13は所
謂ギヤドトロリであって、前記ラック24に噛合するピニ
オンギヤ26を備え、このピニオンギヤ26をモータなどの
図示しない回転駆動装置により回転駆動して前記梁12,
12Aに沿って移動する。
Embodiments of the present invention will be described below with reference to the accompanying drawings. 1 to 3 show a first embodiment of the present invention, in which the same parts as those in FIG. 10 are designated by the same reference numerals and the description thereof will be omitted to explain in detail. FIG. 1 shows two lanes A, a, B on one side. b
FIG. 1 is a plan view of each of the highways, and the present invention shows that trucks 11 and 11 with cranes, which are support bodies, are provided in the left and right lanes A and B on both sides of the median strip C, which is the installation position.
A is arranged substantially in parallel, a pair of beams 12 and 12A are erected between the tracks 11 and 11A, and a hoist 13 which is a movable lifting device is provided on each of the beams 12 and 12A. It is a method of hoisting the precast concrete guard fence 1 (hereinafter referred to as a guard fence) temporarily placed in the center of the median strip C, which is the installation position, and an example of an apparatus used for this method. To explain, the crane-mounted trucks 11 and 11A are provided with a crane arm 14 having a maximum hoisting weight of about 3 tons at the front part thereof, and can be extended and stored on the side part thereof when the guard fence 1 is hoisted. 1, 11A is provided with a grounding leg 15 for stabilizing the load, and a pair of the beams 12, 12A is rotatably provided on the loading platform 16 of the truck 11 in the lower part of FIG. As shown in FIG. 2, 2 and 12A fix a pedestal 17 on the loading platform 16, and the pedestal 17
In the front and rear and the width direction, respectively, the rotation support 1
8 and 18 are erected, and each of the rotary columns 18 and 18 is rotated by a rotary drive device 19 disposed in the pedestal 17, and the rotary columns 18 and 18 are connected to the upper ends of the rotary columns 18 and 18 via a pivot shaft 20. Beams 12, 12
Each of the beams A and 12A is pivotally mounted so as to be vertically rotatable, and the beams 12 and 12A are vertically cantilevered by an unillustrated vertically rotating device. In addition, the truck 11A with a crane in the upper part of FIG. 1 is provided with an elevating table 21 on which the tip ends of the both beams 12, 12A can be placed and supported. An elevating device 22 such as the above is erected, and a mounting table portion 23 is provided on the upper part of the elevating device 22. In addition, the beams 12, 12A
Is made of, for example, an I-shaped steel, and rails 24 are provided below the beams 12 and 12A, and a lower surface of the rails 24 is provided with a downward rack 25 over substantially the entire length. An electric hoist 13, 13, which is a hoisting device, is detachably provided on the rail 24. The hoist 13 is a so-called geared trolley and is provided with a pinion gear 26 that meshes with the rack 24. The pinion gear 26 is used as a motor or the like. The beam 12, which is rotationally driven by a rotary drive device (not shown),
Move along 12A.

【0012】次ぎに前記装置を用いたガードフェンス1
の据付け方法に付き説明すると、先ず中央分離帯Cに沿
って車線A上に複数のガードフェンス1を仮置きする。
この場合、ガードフェンス1は、車線Aに配置した図示
しない運搬車両の荷台から下ろされ、クレーン2のアー
ム3の仰角は大で旋回半径Rは小さくなり、余裕をもっ
てガードフェンス1を吊上げることができると共に、水
平旋回角度θも僅かで済み、旋回ボディー4が隣り合う
車線aにはみ出すことなく吊り下ろしすることができ
る。この仮置きが済んだガードフェンス1箇所の中央分
離帯Cを挟むようにして図1及び図2に示すように、該
中央分離帯Cの両内側車線A,Bにトラック11,11Aを
配置する。なお、車線Aのトラック11は、両梁12,12A
を荷台16の長さ方向に旋回した状態で固定し、所定位置
まで走行してくる。両トラック11,11Aを配置した後、
回転駆動装置19により両梁12,12Aを平面略90度旋回
し、他方のトラック11Aの昇降台21を昇降して梁12,12
Aの先端を支持する。この後、トラック11,11Aの荷台
16に搭載していたホイスト13を、両梁12,12Aのレール
24にそれぞれ2機づつセットし、各ホイスト13のワイヤ
ー13Aをガードフェンス1に掛装して吊上げる。そして
吊上げた状態でホイスト13を走行してガードフェンス1
を据付位置Cの上部まで移動し据付けを行う。1つのガ
ードフェンス1の据付けを終えたら、両梁12,12Aを架
設したまま両トラック11,11Aを次ぎのガードフェンス
1の位置まで移動し、同様にホイルト13で吊上げて据付
けを行う。そして所定時間内に仮置きした全てのガード
フェンス1の据付けを終了し、この後ホイスト13を梁1
2,12Aから外して荷台16に搭載し、また全ての工具も
トラック11,11Aなどに搭載し、一方、回転駆動装置19
により両梁12,12Aを今度は平面逆方向に旋回して荷台
16の幅内に収め、作業場所から撤去する。このようにし
て交通開放時には、中央分離帯Cを含む道路A,a,
B,bから、全ての工事関係資材及び装置を撤去する。
Next, a guard fence 1 using the above device
First, a plurality of guard fences 1 are temporarily placed on the lane A along the median strip C.
In this case, the guard fence 1 is unloaded from the bed of a not-illustrated transport vehicle arranged in the lane A, the arm 3 of the crane 2 has a large elevation angle and the turning radius R is small, and the guard fence 1 can be lifted with a margin. In addition, the horizontal turning angle θ is small, and the turning body 4 can be hung down without protruding to the adjacent lane a. As shown in FIGS. 1 and 2, the trucks 11 and 11A are arranged on both inner lanes A and B of the central separator C so as to sandwich the central separator C at one position of the guard fence which has been temporarily placed. In addition, the truck 11 in the lane A has both beams 12 and 12A.
Is fixed in a state of being swung in the longitudinal direction of the loading platform 16 and travels to a predetermined position. After placing both tracks 11 and 11A,
The beams 12, 12A are rotated by the rotary drive device 19 to rotate the beams 12, 12A approximately 90 degrees in a plane and the elevator 21 of the other truck 11A is moved up and down.
Support the tip of A. After this, the loading platform for trucks 11 and 11A
The hoist 13 mounted on the 16 is replaced by the rails of both beams 12 and 12A.
Set 2 units each on 24 and hang wire 13A of each hoist 13 on guard fence 1. Then, while hoisting, run the hoist 13 and guard fence 1
Move to the upper part of the installation position C and install. After the installation of one guard fence 1 is completed, both trucks 11 and 11A are moved to the position of the next guard fence 1 while both beams 12 and 12A are installed, and the hoist 13 is similarly used to perform installation. Then, the installation of all the guard fences 1 temporarily placed within the predetermined time is completed, and then the hoist 13 is attached to the beam 1.
Removed from 2, 12A and mounted on the loading platform 16, and all tools are also mounted on the truck 11, 11A, etc., while the rotary drive device 19
By turning both beams 12 and 12A in the opposite direction to the plane,
It fits within the width of 16 and is removed from the work place. Thus, when the traffic is open, the roads A, a, including the median strip C,
Remove all construction-related materials and equipment from B and b.

【0013】このように本実施例では、道路の長さ方向
にプレキャストコンクリートガードフェンス1を据付け
るコンクリートガードフェンスの据付方法において、ガ
ードフェンス1の据付位置たる中央分離帯Cを挟んだ両
側に、移動可能な支持体たるトラック11,11Aを配置す
ると共に、これら支持体11,11A間に梁12,12Aを架設
し、この梁12,12Aに沿って移動可能な吊上装置13によ
りガードフェンス1を吊上げた後、このガードフェンス
1を道路幅方向に移動して中央分離帯Cに据付ける施工
方法であるから、従来のアーム3を旋回してガードフェ
ンス1を据付けるものと異なり、梁12,12Aの両端側を
トラック11,11Aによって支持し、かつその梁12,12A
を位置固定した状態でガードフェンス1を吊上げて道路
の幅方向に移動させ、これにより比較的重たいガードフ
ェンス1を場所を取らずに吊上げて据付場所まで移動
し、簡便に据付を行うことができる。
As described above, in this embodiment, in the concrete guard fence installation method of installing the precast concrete guard fence 1 in the length direction of the road, on both sides of the central separating strip C, which is the installation position of the guard fence 1, Tracks 11 and 11A as movable supports are arranged, beams 12 and 12A are erected between these supports 11 and 11A, and a guard fence 1 is provided by a lifting device 13 movable along the beams 12 and 12A. Since this is a construction method in which the guard fence 1 is moved in the road width direction and installed on the median strip C after the hoisting of the guard fence 1, unlike the conventional method of turning the arm 3 to install the guard fence 1, the beam 12 , 12A both ends of which are supported by tracks 11 and 11A, and their beams 12 and 12A
With the position fixed, the guard fence 1 is hoisted and moved in the width direction of the road, whereby the relatively heavy guard fence 1 is hoisted up without taking a space and moved to the installation place, and the installation can be performed easily. .

【0014】またこのように本実施例においては、道路
の長さ方向にプレキャストコンクリートガードフェンス
1を据付けるコンクリートガードフェンスの据付装置に
おいて、ガードフェンス1の据付位置たる中央分離帯C
を挟んだ両側に配置される移動可能な支持体たるトラッ
ク11,11Aと、これらトラック11,11A間に架設する梁
12,12Aと、梁12,12Aに沿って移動可能でかつガード
フェンス1を吊上可能な吊上装置たるホイスト13とを具
備するものであるから、比較的重たいガードフェンス1
を場所を取らずに吊上げて移動し、簡便に据付を行うこ
とができ、さらに1箇所の据付けが終わったら、梁12,
12Aを架設した状態で両トラック11,11Aを車線に沿っ
て移動し、次ぎのガードフェンス1の据付けを行い、道
路の長さ方向に順次連続的にガードフェンス1を据付け
て行くことができ、据付作業速度の向上を図ることがで
きる。
As described above, in this embodiment, in the concrete guard fence installation device for installing the precast concrete guard fence 1 in the lengthwise direction of the road, the central separating strip C which is the installation position of the guard fence 1 is used.
Tracks 11 and 11A, which are movable supports arranged on both sides of the track, and beams installed between these tracks 11 and 11A.
Since it is provided with 12, 12A and a hoist 13 which is a hoisting device capable of moving along the beams 12, 12A and capable of hoisting the guard fence 1, a relatively heavy guard fence 1 is provided.
Can be easily lifted and moved without taking up space, and after installation at one place, the beam 12,
It is possible to move both trucks 11 and 11A along the lane with 12A erected, install the next guard fence 1, and successively install the guard fence 1 in the length direction of the road. The installation work speed can be improved.

【0015】また、実施例上の効果として、片側2車線
の道路において、トラック11,11Aを中央分離帯C寄り
の片側1車線A,B内に配置して施工をするようにした
から、残りの1車線a,bの交通を確保して施工を行う
ことができる。さらに、梁12,12Aを一方のトラック11
に水平旋回、かつ該トラック11の荷台16幅内に収納可能
に構成したことにより、作業終了後は梁12,12Aをトラ
ック11の荷台16幅内に収納してトラック11ごと移動し、
据付場所に、機材を残すことなく速やかに退去すること
ができ、かつ施工開始時にも、梁12,12Aを旋回してそ
の先端側を他方のトラック11Aの昇降台21に載置すれば
セットが終了し、準備時間も大幅に削減することができ
る。さらに、梁12,12Aを回転支柱18に枢着し、かつ梁
12,12Aの先端を支持する昇降台22の載置台部23を昇降
可能に構成したことにより、中央分離帯Cを挟む両側の
道路A,Bの高さが異なる場合でも、載置台部23の高さ
を調整して梁12,12Aを水平に配置することができ、ホ
イスト13によりガードブロック1を安定して移動するこ
とができる。さらに、レール24にラック25を設けると共
に、吊上装置たるホイスト13を、該ラック25に噛合する
ピニオンギヤ26の駆動により移動するように構成したた
め、作業条件により梁12,12Aを水平に設置できない場
合でも、ラック25とレール24との噛合によりホイスト13
を安定して走行することができる。
Further, as an effect of the embodiment, on a road with two lanes on each side, the trucks 11 and 11A are arranged in the one lane A and B on one side near the median strip C, so that the construction works. The construction can be performed while securing the traffic in the first lane a and b. In addition, the beams 12 and 12A are connected to one track 11
After the work is completed, the beams 12 and 12A are housed within the width of the cargo bed 16 of the truck 11 and moved together with the truck 11 by horizontally swinging and being able to be housed within the width of the cargo bed 16 of the truck 11.
It is possible to quickly leave the installation site without leaving any equipment, and even at the start of construction, if the beams 12 and 12A are turned and the tip side is placed on the lifting platform 21 of the other truck 11A, the set is completed. It can be completed and the preparation time can be greatly reduced. Further, the beams 12 and 12A are pivotally attached to the rotating column 18, and
Even when the heights of the roads A and B on both sides of the median strip C are different, the mounting table portion 23 of the elevating table 22 that supports the tips of the 12 and 12A can be moved up and down. The beams 12 and 12A can be horizontally arranged by adjusting the height, and the hoist 13 can move the guard block 1 stably. Further, since the rack 25 is provided on the rail 24 and the hoist 13, which is a hoisting device, is moved by the drive of the pinion gear 26 that meshes with the rack 25, the beams 12, 12A cannot be installed horizontally depending on the working conditions. However, due to the meshing of rack 25 and rail 24, hoist 13
You can drive stably.

【0016】図4は本発明の第2実施例を示し、上記第
1実施例と同一部分に同一符号を付しその詳細な説明を
省略して詳述すると、この例では、支持体として自走式
のトラックを用いる代わりに、専用の台車31,31Aを用
いた例を示し、これら台車31,31Aは、前後及び左右に
車輪32を有し、トラックなどの自走車両に搭載あるいは
牽引して移動可能に構成されている。また梁12B,12C
は上部が鋼材を組んだトラス鋼材33と下部のI型鋼34と
を一体として構成されている。
FIG. 4 shows a second embodiment of the present invention. The same parts as those in the first embodiment are designated by the same reference numerals and detailed description thereof will be omitted. An example is shown in which dedicated trucks 31 and 31A are used instead of using a traveling truck. These trucks 31 and 31A have wheels 32 on the front and rear and on the left and right, and are mounted or towed on a self-propelled vehicle such as a truck. It is configured to be movable. Also beams 12B, 12C
Is composed of a truss steel member 33 having an upper part made of steel and an I type steel member 34 at the lower part.

【0017】このように本実施例では、道路の長さ方向
にプレキャストコンクリートガードフェンス1を据付け
るコンクリートガードフェンスの据付装置において、ガ
ードフェンス1の据付位置たる中央分離帯Cを挟んだ両
側に配置される移動可能な支持体たる台車31,31Aと、
これら台車31,31A間に架設する梁12B,12Cと、梁12
B,12Cに沿って移動可能でかつガードフェンス1を吊
上可能な吊上装置たるホイスト13とを具備するものであ
るから、回転駆動装置19により両梁12,12Aを他方の台
車31A側に平面略90度旋回し、他方のトラック11Aの
昇降台21を昇降して梁12B,12Cの先端を支持し、ホイ
スト13によりガードフェンス1を吊上げ、中央分離帯C
に移動して据付けを行うことができ、比較的重たいガー
ドフェンス1を場所を取らずに吊上げて移動し、中央分
離帯Cに据付けることが可能となり、さらに1箇所の据
付けが終わったら、梁12,12Aを架設した状態で両台車
31,31Aを車線に沿って移動し、次ぎのガードフェンス
1の据付けを行い、道路の長さ方向に順次ガードフェン
ス1を据付けて行くことができ、据付作業速度の向上を
図ることができ、第1実施例と同様な作用,効果を有
し、また、この例ではトラス鋼材33とI型鋼34とを一体
にして梁12B,12Cを構成したため、中央分離帯Cの幅
が比較的長い場合に有効である。
As described above, in this embodiment, in the concrete guard fence installation device for installing the precast concrete guard fence 1 in the length direction of the road, the guard fence 1 is arranged on both sides of the central separating strip C, which is the installation position. And a movable support truck 31 and 31A,
Beams 12B and 12C installed between these carriages 31 and 31A, and beams 12
Since it is provided with a hoist 13 that is a hoisting device that can move along B and 12C and can hoist the guard fence 1, both beams 12 and 12A are moved to the other bogie 31A side by the rotary drive device 19. Around 90 degrees on the plane, the elevator 21 of the other truck 11A is raised and lowered to support the tips of the beams 12B and 12C, and the guard fence 1 is hoisted by the hoist 13 and the central divider C
It is possible to move to and install the guard fence 1 that is relatively heavy, move it by lifting it up without taking up space, and install it on the median strip C. Both dolly with 12 and 12A installed
It is possible to move 31 and 31A along the lane, install the next guard fence 1, and install the guard fence 1 sequentially in the length direction of the road, which can improve the installation work speed. In the case where the width of the median strip C is relatively long, it has the same actions and effects as those of the first embodiment, and in this example, the truss steel material 33 and the I-shaped steel 34 are integrated to form the beams 12B and 12C. Is effective for.

【0018】図5は本発明の第3実施例を示し、上記第
1実施例と同一部分に同一符号を付しその詳細な説明を
省略して詳述すると、この例では、梁12D,12Eの変形
例を示し、これら梁12D,12Eは先端に支持体となる支
持脚体41を枢軸42を介して回動自在に枢着し、かつその
枢軸42には図示しない角度固定機構が設けられ、梁12
D,12Eと支持脚部41とを角度固定可能に設け、さらに
その支持脚部41の下端には車輪43が設けており、この車
輪43によって前記支持脚部41を移動可能としている。
FIG. 5 shows a third embodiment of the present invention, in which the same parts as those in the first embodiment are designated by the same reference numerals and detailed description thereof will be omitted. In this embodiment, the beams 12D and 12E will be described. The beam 12D, 12E has a support leg body 41 serving as a support body rotatably pivotally attached to the tip end thereof via a pivot shaft 42, and the pivot shaft 42 is provided with an angle fixing mechanism (not shown). , Beams 12
The D and 12E and the support leg portion 41 are provided so as to be able to fix the angle, and a wheel 43 is provided at the lower end of the support leg portion 41, and the support leg portion 41 can be moved by the wheel 43.

【0019】そしてガードフェンス1の据付けに当たっ
ては、トラック11を接地脚15により固定し、荷台11の幅
内に収納した梁12D,12Eを旋回し、かつ梁12D,12E
の先端の支持脚体41を下向きに回動して車輪43を接地す
ると共に、梁12D,12Eに対しほぼ90度に固定した
後、上記各実施例と同様にホイスト13によりガードフェ
ンス1を吊上げ移動して据付けを行う。また、据付けが
完了したら、梁12D,12Eを平面逆方向に旋回して荷台
16の幅内に収納し、トラック11ごと現場から退去する。
When installing the guard fence 1, the truck 11 is fixed by the grounding legs 15, the beams 12D and 12E accommodated within the width of the cargo bed 11 are swung, and the beams 12D and 12E are also rotated.
After the support leg 41 at the tip of the is rotated downward to ground the wheel 43 and fixed to the beams 12D and 12E at approximately 90 degrees, the guard fence 1 is hoisted by the hoist 13 as in the above embodiments. Move and install. When the installation is completed, turn the beams 12D and 12E in the opposite direction to the plane and load the platform.
Stored within the width of 16 and leave truck 11 with the site.

【0020】このように本実施例では、道路の長さ方向
にプレキャストコンクリートガードフェンス1を据付け
るコンクリートガードフェンスの据付装置において、ガ
ードフェンス1の据付位置たる中央分離帯Cを挟んだ両
側に配置される移動可能な支持体たるトラック11及び支
持脚体41と、これらトラック11及び支持脚体41間に架設
する梁12D,12Eと、梁12D,12Eに沿って移動可能で
かつガードフェンス1を吊上可能な吊上装置たるホイス
ト13とを具備するものであるから、比較的重たいガード
フェンス1を場所を取らずに吊上げて移動し、中央分離
帯Cに据付けることが可能となり、さらに1箇所の据付
けが終わったら、梁12D,12Eを架設した状態でトラッ
ク11を車線に沿って移動し、次ぎのガードフェンス1の
据付けを行い、道路の長さ方向に順次連続的にガードフ
ェンス1を据付けて行くことができ、据付作業速度の向
上を図ることができ、第1実施例と同様な作用,効果を
有し、さらに他方の支持体として梁12D,12Eの先端に
支持脚体41をそれぞれ枢着したことによって、1台のト
ラック11によって梁12D,12Eの架設を容易に行うこと
ができ、また、荷台16に収納する際は支持脚体41を折畳
んでコンパクトに収納することができる。
As described above, in this embodiment, in the concrete guard fence installation device for installing the precast concrete guard fence 1 in the length direction of the road, the guard fence 1 is installed on both sides of the central separating strip C, which is the installation position. The movable support track 11 and the support leg 41, the beams 12D and 12E installed between the track 11 and the support leg 41, and the guard fence 1 movable along the beams 12D and 12E. Since the hoist 13, which is a hoisting device that can be hoisted, is provided, the relatively heavy guard fence 1 can be hoisted and moved without taking up space, and can be installed in the median strip C. After the installation of the location is completed, the truck 11 is moved along the lane with the beams 12D and 12E installed, and the next guard fence 1 is installed. The guard fence 1 can be sequentially installed continuously in the same direction, the installation work speed can be improved, the same operation and effect as those of the first embodiment can be achieved, and the beam 12D can be used as the other support. , 12E are pivotally attached to the tips of the support legs 41, 12E, respectively, so that the beams 12D, 12E can be easily erected by the single truck 11, and the support legs 41 are stored when the beams 12D, 12E are stored in the loading platform 16. Can be folded and stored compactly.

【0021】図6及び図7は本発明の第4実施例を示
し、上記第1実施例及び第3実施例と同一部分に同一符
号を付しその詳細な説明を省略して詳述すると、この例
では、ガードフェンス1を片側1車線A,Bの道路の法
面D寄りの道路端部Eに施工する例を示し、クレーン付
きトラック11に旋回可能に設けられる梁12D,12Eに
は、第4実施例で示した支持脚体の代わりに支持体たる
伸縮支持脚体41Aを設けたものを示し、この伸縮支持体
41Aは、途中に高さ調整用のジャッキ51を設けて伸縮自
在に構成している。
FIGS. 6 and 7 show a fourth embodiment of the present invention, in which the same parts as those in the first and third embodiments are designated by the same reference numerals, and detailed description thereof will be omitted. In this example, an example in which the guard fence 1 is installed on the road end E near the slope D of the road with one lane A and B on one side is shown, and the beams 12D and 12E rotatably provided on the crane-equipped truck 11 include: An elastic support leg 41A serving as a support is provided instead of the support leg shown in the fourth embodiment.
41A is provided with a height adjusting jack 51 in the middle so that it can be expanded and contracted.

【0022】そしてガードフェンス1の据付けに当たっ
ては、道路Aにガードフェンス1を仮置きし、また、ト
ラック11を車線A内に配置して他方の車線Bの交通を確
保する。そして、荷台16の幅内に収納した梁12D,12E
を旋回し、かつ梁12D,12Eの先端の支持脚体41Aを下
向きに回動して梁12D,12Eに対してほぼ90度に固定
し、さらにジャッキ51を伸縮して車輪43を道路外の接地
面dに接地した後、上記各実施例と同様にホイスト13に
よりガードフェンス1を吊上げ、設置位置たる道路端部
Eに移動して据付けを行う。また、据付けが完了した
ら、延ばした支持脚体41Aを収縮すると共に折畳み、梁
12D,12Eを平面逆方向に旋回して荷台16の幅内に収納
し、トラック11ごと現場から退去する。
In installing the guard fence 1, the guard fence 1 is temporarily placed on the road A, and the truck 11 is arranged in the lane A to secure the traffic in the other lane B. Then, the beams 12D and 12E housed within the width of the loading platform 16
And the supporting legs 41A at the tips of the beams 12D and 12E are rotated downward to fix the beams at about 90 degrees with respect to the beams 12D and 12E. After grounding on the ground surface d, the guard fence 1 is hoisted by the hoist 13 and moved to the road end E which is the installation position for installation as in the above-described embodiments. Further, when the installation is completed, the extended support leg 41A is contracted and folded,
12D and 12E are swiveled in the opposite direction of the plane and stored within the width of the loading platform 16, and the truck 11 and the truck are withdrawn from the site.

【0023】このように本実施例では、道路の長さ方向
にプレキャストコンクリートガードフェンス1を据付け
るコンクリートガードフェンスの据付装置において、ガ
ードフェンス1の据付位置たる道路端部Eを挟んだ両側
に配置される移動可能な支持体たるトラック11及び支持
脚体41Aと、これらトラック11及び支持脚体41A間に架
設する梁12D,12Eと、梁12D,12Eに沿って移動可能
でかつガードフェンス1を吊上可能な吊上装置たるホイ
スト13とを具備するものであるから、比較的重たいガー
ドフェンス1を場所を取らずに吊上げて移動し、道路の
道路端部Dに据付けることが可能となり、さらに1箇所
の据付けが終わったら、梁12D,12Eを架設した状態で
支持脚体41Aごとトラック11を車線に沿って移動し、次
ぎのガードフェンス1の据付けを行い、道路の長さ方向
に順次連続的にガードフェンス1を据付けて行くことが
でき、据付作業速度の向上を図ることができ、第1実施
例と同様な作用,効果を有し、この例では他方の支持体
となる伸縮支持脚体41Aを伸縮自在に構成したことによ
って、法面D下方の接地面dに凹凸があっても該支持脚
体41Aを伸縮して梁梁12D,12Eを水平に保つことがで
きる。
As described above, in this embodiment, in the concrete guard fence installation device for installing the precast concrete guard fence 1 in the length direction of the road, the guard fence 1 is arranged on both sides of the road end E which is the installation position. The movable support track 11 and the support leg 41A, the beams 12D and 12E installed between the track 11 and the support leg 41A, and the guard fence 1 movable along the beams 12D and 12E. Since the hoist 13, which is a hoisting device that can be hoisted, is provided, the relatively heavy guard fence 1 can be hoisted and moved without taking a place, and can be installed at the road end D of the road. When the installation of one more place is completed, the truck 11 is moved along the lane together with the support legs 41A while the beams 12D and 12E are installed, and the next guard fence 1 is installed. It is possible to install the guard fence 1 continuously in the longitudinal direction of the road, to improve the installation work speed, and to obtain the same operation and effect as the first embodiment. In this example, the elastic support leg 41A serving as the other support is configured to be expandable and contractable, so that even if the ground contact surface d below the slope D has irregularities, the support leg 41A expands and contracts to the beam 12D, 12E can be kept horizontal.

【0024】図8及び図9は本発明の第5実施例を示
し、上記第1実施例と同一部分に同一符号を付しその詳
細な説明を省略して詳述すると、この例では、ガードフ
ェンス1を片側1車線A,Bの道路の法面D寄りの道路
端部Eに施工する例を示し、支持体たるクレーン付きト
ラック11を道路端部Eの一側である道路Aに配置し、そ
のトラック11に旋回可能に設けらた梁12,12Aを、道路
端部E側に水平旋回して張出し、これら梁12,12Aの途
中を、支持部材たる門型枠61により支持し、この門型枠
61は、両脚部62,62の上部を横梁部63により連結し、そ
の脚部62の下部には車輪64が設けられ、この車輪64によ
り該門型枠61が道路Aの長さ方向に移動可能であって、
その車輪64が道路A上に接地される。また、前記門型枠
61の横梁部63の下部が、前記梁12,12Aの上部に、ボル
トナットなどの取付部材65を介して着脱自在に取付けら
れ、その取付状態で前記ホイスト13は前記門型枠61内を
走行可能になっている。
FIGS. 8 and 9 show a fifth embodiment of the present invention. The same parts as those of the first embodiment are designated by the same reference numerals and detailed description thereof will be omitted. An example of constructing the fence 1 at the road end E near the slope D of the road with one lane A and B on one side is shown. The crane truck 11 serving as a support is arranged on the road A which is one side of the road end E. , The beams 12 and 12A provided on the track 11 so as to be able to turn are horizontally turned to the side of the road end E and overhang, and the middle of these beams 12 and 12A is supported by a gate form frame 61 as a support member. Gate formwork
In the 61, both leg parts 62, 62 are connected at their upper parts by a lateral beam part 63, and a wheel 64 is provided at the lower part of the leg part 62, and the gate form 61 is moved by the wheel 64 in the length direction of the road A. Is possible,
The wheel 64 is grounded on the road A. Also, the gate formwork
The lower portion of the horizontal beam portion 63 of 61 is detachably attached to the upper portions of the beams 12 and 12A via an attachment member 65 such as a bolt and nut, and in the attached state, the hoist 13 travels in the gate form 61. It is possible.

【0025】そしてガードフェンス1の据付けに当たっ
ては、道路Aにガードフェンス1を仮置きし、また、ト
ラック11を車線A内に配置して他方の車線Bの交通を確
保する。そして、荷台16の幅内に収納した梁12,12Aを
道路端部E方向に水平旋回し、旋回後梁12,12Aに門型
枠61を取付けて支持し、上記各実施例と同様にホイスト
13によりガードフェンス1を吊上げ、設置位置たる道路
端部Eに移動して据付けを行う。この場合、梁12,12A
は水平方向に旋回してセットし、かつガードフェンス1
の移動時もほぼ水平にして据付作業を行い、また、道路
A側のトラック11と門型枠61とにより梁12,12Aを支持
するため、図示右側の道路外に建物あるいは障害物があ
る場合でも施工を行うことができる。
When installing the guard fence 1, the guard fence 1 is temporarily placed on the road A, and the truck 11 is arranged in the lane A to secure traffic in the other lane B. Then, the beams 12 and 12A accommodated within the width of the cargo bed 16 are horizontally swiveled in the direction of the road end E, and after the swiveling, the gate form 61 is attached to and supported by the beams 12 and 12A, and the hoist is carried out in the same manner as in the above embodiments.
The guard fence 1 is lifted by 13 and moved to the road end E, which is the installation position, for installation. In this case, beams 12, 12A
Swivel horizontally to set, and guard fence 1
The installation work is performed with the truck 11 on the road A side and the gate form 61 to support the beams 12 and 12A even when the vehicle is moving, so that there is a building or obstacle outside the road on the right side of the figure. But construction can be done.

【0026】このように本実施例では、道路の長さ方向
にプレキャストコンクリートガードフェンス1を据付け
るコンクリートガードフェンスの据付方法において、ガ
ードフェンス1の据付位置たる道路端部Eの一側たる道
路A側に移動可能な支持体たるトラック11を配置し、こ
のトラック11から道路端部E側に梁12,12Aをほぼ水平
に張出し、この梁12,12Aの途中を支持部材たる門型枠
61により支持し、梁12,12Aに沿って移動可能な吊上装
置たるホイスト13によりガードフェンス1を吊上げた
後、このガードフェンス1を道路幅方向に移動して道路
端部Eに据付ける据付方法であるから、従来のアーム3
を旋回してガードフェンス1を据付けるものと異なり、
梁12,12Aをトラック11と門型枠61によって支持し、か
つその梁12,12Aを位置固定した状態でガードフェンス
1を吊上げて道路の幅方向に移動させ、これにより比較
的重たいガードフェンス1を場所を取らずに吊上げて据
付場所まで移動し、簡便に据付を行うことができ第1実
施例と同様な作用,効果を有すると共に、梁12,12Aは
水平方向に旋回してセットし、かつガードフェンス1の
移動時もほぼ水平にして据付作業を行うことができるた
め、道路Aの上方に電線等の障害物がある場合でも、施
工を行うことができる。
As described above, in this embodiment, in the concrete guard fence installation method in which the precast concrete guard fence 1 is installed in the length direction of the road, the road A which is one side of the road end E where the guard fence 1 is installed is located. A truck 11, which is a movable support, is disposed on the side, beams 12 and 12A are extended substantially horizontally from the truck 11 to the road end E side, and a midway between the beams 12 and 12A is a gate formwork that is a support member.
Installation to install the guard fence 1 on the road end E by hoisting the guard fence 1 by the hoist 13, which is a hoisting device supported by 61 and movable along the beams 12 and 12A. Because it is a method, the conventional arm 3
Unlike installing the guard fence 1 by turning the
The beams 12 and 12A are supported by the truck 11 and the gate form 61, and the guard fence 1 is lifted and moved in the width direction of the road with the beams 12 and 12A fixed in position. Can be easily moved up to the installation place without taking up space, and can be installed easily, with the same actions and effects as in the first embodiment, and the beams 12 and 12A can be set by turning horizontally. Moreover, since the installation work can be performed substantially horizontally even when the guard fence 1 is moved, the construction can be performed even when there is an obstacle such as an electric wire above the road A.

【0027】またこのように本実施例では、道路の長さ
方向にプレキャストコンクリートガードフェンス1を据
付けるコンクリートガードフェンスの据付装置におい
て、ガードフェンス1の据付位置たる道路端部Eの一側
たる道路A側に配置される移動可能な支持体たるトラッ
ク11と、このトラック11から道路端部E側にほぼ水平に
張出す梁12,12Aと、この梁12,12Aの途中を支持する
支持部材たる門型枠61と、梁12,12Aに沿って移動可能
でかつガードフェンス1を吊上可能な吊上装置たるホイ
スト13とを具備するものであるから、比較的重たいガー
ドフェンス1を場所を取らずに吊上げて移動し、簡便に
据付を行うことができ、さらに1箇所の据付けが終わっ
たら、門型枠61により途中を支持されて張出した状態の
梁12,12Aを、トラック11とともに車線に沿って移動
し、次ぎのガードフェンス1の据付けを行い、道路の長
さ方向に順次連続的にガードフェンス1を据付けて行く
ことができ、据付作業速度の向上を図ることができる。
As described above, in this embodiment, in the concrete guard fence installation device for installing the precast concrete guard fence 1 in the length direction of the road, the road which is one side of the road end E where the installation position of the guard fence 1 is located. A truck 11 that is a movable support disposed on the A side, beams 12 and 12A extending substantially horizontally from the truck 11 to the road end E side, and a support member that supports the middle of the beams 12 and 12A. Since the gate form 61 and the hoist 13 that is a hoisting device that can move along the beams 12 and 12A and that can hoist the guard fence 1 are provided, the relatively heavy guard fence 1 can be installed in a small space. It can be easily lifted and moved without installing, and after installation at one location is completed, the beams 12 and 12A, which are partly supported and extended by the gate formwork 61, are used as the track 11. It is possible to move along the lane, install the next guard fence 1, and install the guard fence 1 sequentially and continuously in the length direction of the road, which can improve the installation work speed. .

【0028】なお、本発明は上記実施例に限定されるも
のではなく、本発明の要旨の範囲内において種々の変形
実施が可能である。例えば吊上装置はホイスト以外にウ
インチ等を用いてもよく、このウインチを滑車等によっ
て梁に沿って手動あるいは電動により移動するように構
成してもよい。また本発明の方法及び装置は、高速道路
あるいは一般道など各種道路に用いることができ、ま
た、既設の道路に限らず新設道路のガードフェンスの施
工においても用いることができる。さらに、支持部材の
形状は門型枠に限らず梁を支持するものであれば適宜選
定することができる。
The present invention is not limited to the above embodiment, but various modifications can be made within the scope of the present invention. For example, a winch or the like may be used as the hoisting device other than the hoist, and the winch may be manually or electrically moved along the beam by a pulley or the like. Further, the method and apparatus of the present invention can be used for various roads such as highways and general roads, and also for construction of guard fences for new roads as well as existing roads. Further, the shape of the support member is not limited to the gate form, and can be appropriately selected as long as it supports the beam.

【0029】[0029]

【発明の効果】請求項1の据付方法は、道路の長さ方向
にプレキャストコンクリートガードフェンスを据付ける
コンクリートガードフェンスの据付方法において、前記
ガードフェンスの据付位置を挟んだ両側に、移動可能な
支持体を配置すると共に、これら支持体間に梁を架設
し、この梁に沿って移動可能な吊上装置によりガードフ
ェンスを吊上げた後、このガードフェンスを道路幅方向
に移動して前記据付位置に据付けるものであるから、場
所を取らず施工性に優れたコンクリートガードフェンス
の据付方法を提供することができる。
According to the installation method of claim 1, in the installation method of the concrete guard fence in which the precast concrete guard fence is installed in the length direction of the road, a movable support is provided on both sides of the installation position of the guard fence. A body is placed, a beam is installed between these supports, and a guard fence is hoisted by a hoisting device movable along this beam, and then this guard fence is moved in the road width direction to the installation position. Since it is to be installed, it is possible to provide a method for installing a concrete guard fence that saves space and is excellent in workability.

【0030】請求項2の据付方法は、道路の長さ方向に
プレキャストコンクリートガードフェンスを据付けるコ
ンクリートガードフェンスの据付装置において、前記ガ
ードフェンスの据付位置を挟んだ両側に配置される移動
可能な支持体と、これら支持体間に架設する梁と、この
梁に沿って移動可能でかつ前記ガードフェンスを吊上可
能な吊上装置とを具備するものであるから、場所を取ら
ず施工性に優れたコンクリートガードフェンスの据付装
置を提供することができる。
According to a second aspect of the present invention, in a concrete guard fence installation device for installing a precast concrete guard fence in a length direction of a road, a movable support arranged on both sides of the installation position of the guard fence. Since it is provided with a body, a beam installed between these supports, and a hoisting device movable along the beam and capable of hoisting the guard fence, it is space-saving and excellent in workability. A concrete guard fence installation device can be provided.

【0031】また請求項3の据付方法は、道路の長さ方
向にプレキャストコンクリートガードフェンスを据付け
るコンクリートガードフェンスの据付方法において、前
記ガードフェンスの据付位置の一側に移動可能な支持体
を配置し、この支持体から前記据付位置側に梁をほぼ水
平に張出し、この梁の途中を支持部材により支持し、前
記梁に沿って移動可能な吊上装置によりガードフェンス
を吊上げた後、このガードフェンスを道路幅方向に移動
して前記据付位置に据付けるものであるから、場所を取
らず施工性に優れたコンクリートガードフェンスの据付
方法を提供することができる。
According to the third aspect of the present invention, in the method for installing a concrete guard fence in which a precast concrete guard fence is installed in the lengthwise direction of a road, a movable support is arranged at one side of the guard fence installation position. Then, a beam is extended substantially horizontally from the support body to the installation position side, the midway of the beam is supported by a support member, and a guard fence is lifted by a lifting device movable along the beam, and then the guard fence is lifted. Since the fence is moved in the width direction of the road and installed at the installation position, it is possible to provide a method for installing a concrete guard fence that is space-saving and has excellent workability.

【0032】また請求項4の据付装置は、道路の長さ方
向にプレキャストコンクリートガードフェンスを据付け
るコンクリートガードフェンスの据付装置において、前
記ガードフェンスの据付位置の一側に配置される移動可
能な支持体と、この支持体から前記据付位置側にほぼ水
平に張出す梁と、この梁の途中を支持する支持部材と、
前記梁に沿って移動可能でかつ前記ガードフェンスを吊
上可能な吊上装置とを具備するものであるから、場所を
取らず施工性に優れたコンクリートガードフェンスの据
付装置を提供することができる。
The installation device of claim 4 is a concrete guard fence installation device for installing a precast concrete guard fence in the length direction of a road, wherein the movable support is arranged on one side of the installation position of the guard fence. A body, a beam extending substantially horizontally from the support to the installation position side, and a support member supporting the middle of the beam,
Since it is provided with a hoisting device that can move along the beam and can hoist the guard fence, it is possible to provide a concrete guard fence installation device that is excellent in workability and does not take up space. .

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1実施例を示す平面図である。FIG. 1 is a plan view showing a first embodiment of the present invention.

【図2】本発明の第1実施例を示す側面図である。FIG. 2 is a side view showing the first embodiment of the present invention.

【図3】本発明の第1実施例を示す要部の側面図であ
る。
FIG. 3 is a side view of an essential part showing the first embodiment of the present invention.

【図4】本発明の第2実施例を示す側面図である。FIG. 4 is a side view showing a second embodiment of the present invention.

【図5】本発明の第3実施例を示す側面図である。FIG. 5 is a side view showing a third embodiment of the present invention.

【図6】本発明の第4実施例を示す側面図である。FIG. 6 is a side view showing a fourth embodiment of the present invention.

【図7】本発明の第4実施例を示す伸縮支持脚体の動作
を説明する側面図である。
FIG. 7 is a side view for explaining the operation of the telescopic support leg body according to the fourth embodiment of the present invention.

【図8】本発明の第5実施例を示す側面図である。FIG. 8 is a side view showing a fifth embodiment of the present invention.

【図9】本発明の第5実施例を示す平面図である。FIG. 9 is a plan view showing a fifth embodiment of the present invention.

【図10】従来の施工を説明する平面図である。FIG. 10 is a plan view illustrating conventional construction.

【符号の説明】[Explanation of symbols]

1 プレキャストコンクリートガードフェンス 11,11A トラック(支持体) 12,12A,12B,12C,12D,12E 梁 13 ホイスト(吊上装置) 31,31A 台車(支持体) 41 支持脚体(支持体) 41A 伸縮支持脚体(支持体) 61 門型枠(支持部材) C 中央分離帯(据付位置) E 道路端部(据付位置) 1 Precast concrete guard fence 11, 11A Truck (support) 12, 12A, 12B, 12C, 12D, 12E Beam 13 Hoist (lifting device) 31, 31A Truck (support) 41 Support leg (support) 41A Telescopic Support leg (support) 61 Gate formwork (support member) C Median strip (installation position) E Road edge (installation position)

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 道路の長さ方向にプレキャストコンクリ
ートガードフェンスを据付けるコンクリートガードフェ
ンスの据付方法において、前記ガードフェンスの据付位
置を挟んだ両側に、移動可能な支持体を配置すると共
に、これら支持体間に梁を架設し、この梁に沿って移動
可能な吊上装置によりガードフェンスを吊上げた後、こ
のガードフェンスを道路幅方向に移動して前記据付位置
に据付けることを特徴とするコンクリートガードフェン
スの据付方法。
1. A method for installing a concrete guard fence in which a precast concrete guard fence is installed in the lengthwise direction of a road, wherein movable supports are arranged on both sides of the installation position of the guard fence, and these supports are provided. A concrete that is characterized in that a beam is installed between the bodies, the guard fence is lifted by a hoisting device movable along the beam, and then the guard fence is moved in the road width direction to be installed at the installation position. How to install a guard fence.
【請求項2】 道路の長さ方向にプレキャストコンクリ
ートガードフェンスを据付けるコンクリートガードフェ
ンスの据付装置において、前記ガードフェンスの据付位
置を挟んだ両側に配置される移動可能な支持体と、これ
ら支持体間に架設する梁と、この梁に沿って移動可能で
かつ前記ガードフェンスを吊上可能な吊上装置とを具備
することを特徴とするコンクリートガードフェンスの据
付装置。
2. A concrete guard fence installation device for installing a precast concrete guard fence in a length direction of a road, and movable supports arranged on both sides of the guard fence installation position, and these supports. An installation device for a concrete guard fence, comprising: a beam installed between them; and a hoisting device that can move along the beam and that can hoist the guard fence.
【請求項3】 道路の長さ方向にプレキャストコンクリ
ートガードフェンスを据付けるコンクリートガードフェ
ンスの据付方法において、前記ガードフェンスの据付位
置の一側に移動可能な支持体を配置し、この支持体から
前記据付位置側に梁をほぼ水平に張出し、この梁の途中
を支持部材により支持し、前記梁に沿って移動可能な吊
上装置によりガードフェンスを吊上げた後、このガード
フェンスを道路幅方向に移動して前記据付位置に据付け
ることを特徴とするコンクリートガードフェンスの据付
方法。
3. A method of installing a concrete guard fence for installing a precast concrete guard fence in a length direction of a road, wherein a movable support is arranged on one side of the installation position of the guard fence, and the support is moved from the support to the side. A beam is extended almost horizontally to the installation position side, the middle of this beam is supported by a support member, and a guard fence is lifted by a lifting device that can move along the beam, and then this guard fence is moved in the road width direction. And then installing the concrete guard fence at the installation position.
【請求項4】 道路の長さ方向にプレキャストコンクリ
ートガードフェンスを据付けるコンクリートガードフェ
ンスの据付装置において、前記ガードフェンスの据付位
置の一側に配置される移動可能な支持体と、この支持体
から前記据付位置側にほぼ水平に張出す梁と、この梁の
途中を支持する支持部材と、前記梁に沿って移動可能で
かつ前記ガードフェンスを吊上可能な吊上装置とを具備
することを特徴とするコンクリートガードフェンスの据
付装置。
4. In a concrete guard fence installation device for installing a precast concrete guard fence in a length direction of a road, a movable support arranged on one side of an installation position of the guard fence, and A beam extending substantially horizontally to the installation position side, a support member for supporting the beam midway, and a hoisting device movable along the beam and capable of hoisting the guard fence. Installation equipment for the featured concrete guard fence.
JP2282193A 1993-02-10 1993-02-10 Concrete guard fence installation method and equipment Expired - Lifetime JPH0772413B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2282193A JPH0772413B2 (en) 1993-02-10 1993-02-10 Concrete guard fence installation method and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2282193A JPH0772413B2 (en) 1993-02-10 1993-02-10 Concrete guard fence installation method and equipment

Publications (2)

Publication Number Publication Date
JPH06235271A true JPH06235271A (en) 1994-08-23
JPH0772413B2 JPH0772413B2 (en) 1995-08-02

Family

ID=12093362

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2282193A Expired - Lifetime JPH0772413B2 (en) 1993-02-10 1993-02-10 Concrete guard fence installation method and equipment

Country Status (1)

Country Link
JP (1) JPH0772413B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095521A (en) * 2020-10-09 2020-12-18 河北工业大学 Drawing type movable guardrail for central separation belt of highway
JP2023003878A (en) * 2021-06-24 2023-01-17 大林道路株式会社 Concrete product installation apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095521A (en) * 2020-10-09 2020-12-18 河北工业大学 Drawing type movable guardrail for central separation belt of highway
JP2023003878A (en) * 2021-06-24 2023-01-17 大林道路株式会社 Concrete product installation apparatus

Also Published As

Publication number Publication date
JPH0772413B2 (en) 1995-08-02

Similar Documents

Publication Publication Date Title
JP3968579B2 (en) Self-propelled precast slab erection machine
JP2023164952A (en) Heavy object movement device and heavy object movement method using the heavy object movement device
US5435410A (en) Bridge sidewalk vehicle
JP5852520B2 (en) Material conveying device and material conveying method
US5940916A (en) Bridge span-by-span construction apparatus and method
JPH01223204A (en) Bridge girder replacement method and device thereof
JP2971042B2 (en) Girder transporter and girder transport method
JPH06235271A (en) Concrete guard fence installing method and device thereof
JP2004175545A (en) Bridge crane
JPH08326002A (en) Rail conveyor
JP7321200B2 (en) A loading and unloading device, a loading and unloading system using the device, a loading and unloading method thereof, a structure construction system using the device and a construction method thereof
JP4169717B2 (en) Track slab conveyor
JPH09256323A (en) Bridge girder installing apparatus
CN111926706A (en) Prefabricated pier erecting device, erecting method and obstacle passing method
JP2002003166A (en) Locomotive crane capable of passing along road
JP3124498B2 (en) Bridge loading and unloading device
JPH07292964A (en) Device for construction work of building wall surface
JP3094357B2 (en) Crane type conveyor for slope
JPH0445440B2 (en)
JP3191075B2 (en) Suspended conveyor for slopes
JP3346720B2 (en) Vehicle access system and vehicle access method in shaft site
JPH09169495A (en) Weight lifting device
JPH09235898A (en) Removing method of bridge pier
JPS5820632Y2 (en) Mobile portal crane
JPH05163701A (en) Girder setter for monorail track