Info

Publication number
JPH0622710B2
JPH0622710B2 JP26291590A JP26291590A JPH0622710B2 JP H0622710 B2 JPH0622710 B2 JP H0622710B2 JP 26291590 A JP26291590 A JP 26291590A JP 26291590 A JP26291590 A JP 26291590A JP H0622710 B2 JPH0622710 B2 JP H0622710B2
Authority
JP
Japan
Prior art keywords
screw
male screw
ceiling wall
snow
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP26291590A
Other languages
Japanese (ja)
Other versions
JPH04141252A (en
Inventor
岑男 竹内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP26291590A priority Critical patent/JPH0622710B2/en
Publication of JPH04141252A publication Critical patent/JPH04141252A/en
Publication of JPH0622710B2 publication Critical patent/JPH0622710B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Nozzles (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は舗装道路等の舗装面に埋設されている既設の消
雪ノズルの補修工法に関する。
The present invention relates to a method for repairing an existing snow-melting nozzle buried in a paved surface such as a paved road.

〔従来の技術〕[Conventional technology]

従来、既設の消雪ノズル装置の補修は、消雪ノズル埋設
用コンクリート、アスフアルト等舗装材料を削つて旧消
雪ノズル全体を取り除き、代りに新しい消雪ノズルを取
付け、周囲を再びコンクリート、アスフアルト等舗装材
料で固定するという全体入れ替え方式で行つていた。
Conventionally, the existing snow-melting nozzle device has been repaired by removing the old snow-melting nozzle by scraping pavement materials such as concrete for snow-melting nozzle burying, asphalt, and installing a new snow-melting nozzle in its place, and then surrounding it again with concrete, asphalt, etc. It was carried out by the whole replacement method of fixing with paving material.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

前記従来の技術において述べた全体入れ変え方式で行な
う補修の場合には、コンクリートを毀す時の騒音および
振動が大きく、また給水パイプ側を誤つて破損させてし
まう等の欠陥があつた。
In the case of the repair performed by the total replacement method described in the above-mentioned conventional technique, there were defects such as large noise and vibration when the concrete was scrubbed, and the water supply pipe side was mistakenly damaged.

そこで、新しい補修工法、すなわち既設のノズル装置の
一部を残しこの残した部分に新設部分を取付けこの取付
けによつて高くなつた分だけ旧路面の上に新しくコンク
リート、アスフアルト等路面舗装材料を重ねて新路面を
形成する工法(以下、嵩上工法という。)の採用が望ま
しいことが判つた。
Therefore, a new repairing method is used, that is, a part of the existing nozzle device is left and a new part is attached to this remaining part, and by this installation, the road surface pavement material such as concrete and asphalt is newly piled on the old road surface. It has been found that it is desirable to adopt a construction method for forming a new road surface (hereinafter referred to as "bulkage construction method").

本発明は既設の消雪ノズルの補修に有効な嵩上工法を提
供することを目的とするものである。
It is an object of the present invention to provide a bulking method effective for repairing an existing snow-melting nozzle.

〔課題を解決するための手段〕[Means for Solving the Problems]

前記目的を達成するために本発明消雪ノズルの補修工法
は、 既設の消雪ノズルに於けるノズル本体の天壁の中央個所
をエンドミルにより円形に切断する工程と、円形切断に
より囲繞された部分および旧バルブ等内蔵物を取去する
工程と、当該取去により形成された空間内に施す下記の
新設部分に適合するボーリング工程およびタツプ穴切り
工程と、上記空間内に下記新設部分を上記タツプ穴利用
および溶接嵌着等固定手段で適合状態で装填する工程
と、既存路面の上に新しいコンクリート、アスフアルト
等路面舗装材を重ねて新路面を形成する工程とをもつも
のである。
In order to achieve the above object, the method for repairing a snow-melting nozzle of the present invention comprises a step of cutting a central portion of a ceiling wall of a nozzle body of an existing snow-melting nozzle into a circular shape by an end mill, and a portion surrounded by the circular cutting. And removing the internal components such as the old valve, boring process and tap hole cutting process suitable for the following new parts to be provided in the space formed by the removal, and the following new parts in the space. The method includes a step of loading in a conforming state by fixing means such as using holes and welding and a step of forming a new road surface by overlaying a pavement material such as new concrete or asphalt on the existing road surface.

嵩上寸法より長い短管状部材(1)の内周面の下端部に第
1雌ネジ(2)を刻設すると共に当該短管状部材(1)の底面
に深い環状凹溝(5)を穿設して内周壁部(6)、外周壁部
(7)及び天壁部(8)を形成し且つ天壁部(8)の適宜個所に
上下両端が同天壁部(8)の上下両面に開放する散水孔(9)
を開設することによつて構成した蓋体(イ)と、 短い細管(10)の上下両端部の外周に第1雄ネジ(11)及び
第2雄ネジ(12)を同じく上端部の内周に第2雌ネジ(13)
を刻設すると共に当該細管(10)の中間高さ個所に内外に
連通する導水用固定側孔(14)を開設することによつて構
成した弁体(ロ)と、 棒状部材(16)の下端面の中央に浅い凹孔(17)を穿設し且
つ同凹孔(17)の周壁に内外に開放する導水用可動側孔(1
8)を開設すると共に当該棒状部材(16)の中間高さ個所の
外周に上記第2雌ネジ(13)と螺合自在の第3雄ネジ(19)
を同じく上端面にドライバー溝(20)をそれぞれ刻設し且
つ同棒状部材(16)において第3雄ネジ(19)より上方の外
周個所に第2パツキン溝(21)を刻設して当該第2パツキ
ン溝(21)に第2オー・リング(22)を嵌着することによつ
て構成した制水弁(ハ)とをもつ新設部分。
A first female screw (2) is engraved on the lower end of the inner peripheral surface of the short tubular member (1) longer than the bulk dimension, and a deep annular groove (5) is bored in the bottom surface of the short tubular member (1). Installed on the inner peripheral wall (6), outer peripheral wall
(7) and the ceiling wall (8), and water spray holes (9) at both ends of the ceiling wall (8) are opened at the appropriate points on the ceiling wall (8).
By opening the lid (a), the short male tube (10) is provided with the first male screw (11) and the second male screw (12) on the outer periphery of the upper and lower ends, and the inner periphery of the upper end. On the second female screw (13)
Of the valve body (b) and the rod-shaped member (16), which are formed by engraving the valve and opening a fixed water-conducting side hole (14) communicating with the inside and outside at the middle height position of the thin tube (10). A shallow recess (17) is formed in the center of the lower end surface, and a movable water guiding hole (1) is formed in the peripheral wall of the recess (17) to open in and out.
8) is opened and the third male screw (19) is screwed to the second female screw (13) on the outer periphery of the intermediate height of the rod member (16).
Similarly, a driver groove (20) is also engraved on the upper end surface and a second packing groove (21) is engraved on the outer peripheral portion of the rod-shaped member (16) above the third male screw (19). 2 A new part having a water control valve (C) constructed by fitting a second O-ring (22) in the packing groove (21).

〔実施例〕及び〔作用〕 本発明の実施例を図面に依拠して説明する。[Embodiment] and [Operation] An embodiment of the present invention will be described with reference to the drawings.

先ず、嵩上寸法より長い短管状部材(1)の内周面の下端
部に第1雌ネジ(2)を同じく外周面の下端部に第1パツ
キング溝(3)をそれぞれ刻設し且つ第1パツキン溝(3)に
第1オー・リング(4)を嵌着すると共に当該短管状部材
(1)の底面に深い環状凹溝(5)を穿設して内周壁部(6)、
外周壁部(7)及び天壁部(8)を形成し且つ天壁部(8)の適
宜個所に上下両端が同天壁部(8)の上下両面に開放する
傾斜状の散水孔(9)を開設することによつて高さの異な
る多数種類の蓋体(イ)(図中、一種類のみ示す。)を構
成する。
First, a first female screw (2) is engraved at the lower end of the inner peripheral surface of a short tubular member (1) longer than the bulk dimension, and a first packing groove (3) is also engraved at the lower end of the outer peripheral surface thereof. (1) The first O-ring (4) is fitted into the packing groove (3) and the short tubular member
A deep annular groove (5) is bored on the bottom surface of (1) to form an inner peripheral wall (6),
An inclined water spouting hole (9) that forms the outer peripheral wall (7) and the ceiling wall (8) and is opened at both upper and lower ends of the ceiling wall (8) at appropriate points on the ceiling wall (8). ), A large number of types of lids (a) having different heights (only one type is shown in the figure) are formed.

また、短い細管(10)の上下両端部の外周に第1雄ネジ(1
1)及び第2雄ネジ(12)を同じく上端部の内周に第2雌ネ
ジ(13)を刻設すると共に当該細管(10)の中間高さ個所に
内外に連通する導水用固定側孔(14)を開設することによ
つて一種類の弁体(ロ)を構成する。
In addition, the first male screw (1
1) and a second male screw (12) are similarly engraved with a second female screw (13) on the inner circumference of the upper end, and a fixed water-conducting side hole that communicates with the inside and outside at the intermediate height position of the thin tube (10). One type of valve body (b) is constructed by opening (14).

また、棒状部材(16)の下端面の中央に浅い凹孔(17)を穿
設し且つ同凹孔(17)の周壁に内外に開放する導水用可動
側孔(18)を開設すると共に当該棒状部材(16)の中間高さ
個所の外周に上記第2雌ネジ(13)と螺合自在の第3雄ネ
ジ(19)を同じく上端面にドライバー溝(20)をそれぞれ刻
設し且つ同棒状部材(16)において第3雄ネジ(19)より上
方の外周個所に第2パツキン溝(21)を刻設して当該第2
パツキン溝(21)、第2カー・リング(22)を嵌着すること
によつて長さの異なる多数種類の制水弁(ハ)(図中一種
類のみ示す。)を構成する。
In addition, a shallow concave hole (17) is formed in the center of the lower end surface of the rod-shaped member (16), and a movable water guiding hole (18) that opens inward and outward is formed in the peripheral wall of the concave hole (17). A third male screw (19) screwable with the second female screw (13) is formed on the outer periphery of the intermediate height portion of the rod member (16), and a driver groove (20) is also formed on the upper end face of the third male screw (19). In the rod-shaped member (16), a second packing groove (21) is engraved at an outer peripheral portion above the third male screw (19) to make the second
By fitting the packing groove (21) and the second car ring (22), a large number of types of water control valves (c) having different lengths (only one type is shown in the figure) are constructed.

更に、これ等とは別に次のような工事用機械(ニ)を用意
する。すなわち、この工事用機械は、 手押ハンドル(31)付き磁性金属板製台盤(32)の前側の両
隅個所および後側の中央個所に上下に貫通するネジ孔
(図示せず)を設け、これ等前側両ネジ孔、後側ネジ孔
に着地脚用ネジ棒(33)(33)′(34)を其の上下両端が台盤
(32)の上下両方に貫出した状態として螺入し、これ等着
地用ネジ棒(33)(33)′(34)の上端にハンドル(35)を着脱
自在とすると共に台盤(32)の後縁の両側に搬送用浮輪(3
6)(36)′を取付けることにより架台(37)を構成し、台盤
(32)の上に横けた(38)を介して前後方向に移動自在とし
て移動止めネジ(39)付きサドル(40)を装備し、このサド
ル(40)の上に回転止めネジ(41)付き回転台(42)を、この
回転台(42)の上に機台(43)を、この機台(43)の前面にハ
ンドル(44)およびラツク機構(図示せず)により上下に
摺動するスライドヘツド(45)を、このスライドヘツド(4
5)に取付金具(46)および取付ネジ(47)(47)′を介して下
向きに電気ドリル本体(48)を、この電気ドリル本体(48)
の主軸(49)の下端にシヤンクホルダ(50)を夫々設け、当
該シヤンクホルダ(50)には円筒の外周および底面に刃(5
1)(51)′をもつ天壁切断用エンドミル(52)、下穴明け用
ドリル(53)、タツプ(54)およびボーリング用エンドミル
(55)を任意に交換して取付けるようにすると共に上記機
台(43)に於てスライドヘツド(45)の横に同スライドヘツ
ド(45)の上下動量計測用スライドゲージ(56)を上下移動
可能として設け、そして別途に用意した取手(57)付きオ
モリ体(58)を台盤(32)の上に載置して使用するようにし
たものである。
In addition to these, the following construction machine (d) is prepared. That is, this construction machine is provided with screw holes (not shown) that vertically pass through both front corners and rear center of the magnetic metal plate base (32) with a hand handle (31). , These screw holes (33) (33) ′ (34) for landing legs in both front screw holes and rear screw holes, and the upper and lower ends of them are bases.
It is screwed into both the upper and lower sides of (32), and the handle (35) can be attached to and detached from the upper ends of these landing screw rods (33) (33) ′ (34) and the base (32). On both sides of the trailing edge of the
6) (36) 'is attached to form the pedestal (37)
Equipped with a saddle (40) with detent screw (39) that can be moved in the front and rear direction via (38) laid on (32), and with rotation stop screw (41) on this saddle (40) The rotary base (42), the machine base (43) on the rotary base (42), and the handle (44) and the rack mechanism (not shown) slide up and down on the front surface of the machine base (43). Replace the slide head (45) with this slide head (4
5) Attach the electric drill body (48) downward to the electric drill body (48) via the mounting bracket (46) and the mounting screws (47) (47) '.
A shank holder (50) is provided at the lower end of the main shaft (49) of each, and the shank holder (50) has a blade (5
1) (51) 'ceiling wall cutting end mill (52), prepared hole drill (53), tap (54) and boring end mill
(55) can be arbitrarily replaced and installed, and the slide gauge (56) for measuring the vertical movement of the slide head (45) can be moved up and down next to the slide head (45) in the machine base (43). A weight body (58) with a handle (57) prepared separately is placed on the base (32) for use.

斯くして、前記の蓋体(イ)の多種類、弁体(ロ)の一種類、
制水弁(ハ)の多種類及び工事用機械(ニ)を現場に持つて行
き、工事用機械(ニ)を既設の消雪ノズル(ホ)の埋設された
路面上に置いてオモリ体(58)を載せ、次いでハンドル(3
5)を着け替え乍ら用いて着地脚用ネジ棒(33)(33)′(34)
を廻し、仍つて、台盤(32)の水平向きを調節したのち移
動止めネジ(39)を、弛めてサドル(40)を移動する操作、
回転止めネジ(41)を弛めて回転台(42)を廻す操作、回転
止めネジ(41)を締め戻す操作、移動止めネジ(39)を締め
戻す操作、ハンドル(44)により電気ドリル本体(48)の高
さを調節する操作等をなしてシヤンクホルダ(50)の中心
と既設消雪ノズル(ロ)の中心を合せ、このシヤンクホル
ダ(50)に天壁切断用エンドミル(52)を取付け、当該天壁
切断用エンドミル(52)の底面刃(51)′が既設消雪ノズル
(ホ)の所定の個所に当たるかどうかをハンドル(44)にて
電気ドリル本体(48)を下降させることにより確かめ、も
しこの時に天壁切断用エンドミル(52)の底面刃(51)が、
既設消雪ノズル(ホ)に正確に当つていない場合にはサド
ル(40)の位置、回転台(42)の向き、ひいては台盤(32)の
位置を補正し、斯くして天壁切断用エンドミル(52)が正
確に位置づけされたのち移動止めネジ(39)および回転止
めネジ(41)の締付を確認する。
Thus, various types of the lid (a), one type of valve body (b),
Take various types of water control valves (c) and construction machinery (d) to the site, place the construction machinery (d) on the road surface where the existing snow-melting nozzle (e) is buried, and 58) and then the handle (3
5) Replace the grounding leg screw rod (33) (33) '(34)
Turn the knob to adjust the horizontal direction of the base (32), loosen the detent screw (39), and move the saddle (40).
Loosen the rotation stop screw (41) to rotate the rotary base (42), re-tighten the rotation stop screw (41), re-tighten the movement stop screw (39), and use the handle (44) to turn the electric drill body ( Adjust the height of 48) and align the center of the shank holder (50) with the center of the existing snow removal nozzle (b), and attach the ceiling wall cutting end mill (52) to this shank holder (50). The bottom blade (51) ′ of the ceiling wall cutting end mill (52) is the existing snow-melting nozzle.
Confirm by hitting the electric drill main body (48) with the handle (44) whether it hits a predetermined part of (e), and at this time, the bottom blade (51) of the ceiling wall cutting end mill (52) is
If it does not hit the existing snow removal nozzle (e) accurately, correct the position of the saddle (40), the orientation of the rotating table (42), and the position of the platform (32), thus cutting the ceiling wall. Check the tightening of the detent screw (39) and detent screw (41) after the end mill (52) is correctly positioned.

次いで、ハンドル(44)を操作して天壁切断用エンドミル
(52)の底面刃(51)′を既設消雪ノズル(ホ)の天壁(61)の
上面に軽く当て、この当つている状態に於てスライドゲ
ージ(56)に上下動操作を加えてそのゼロ点を基準点(図
示せず)に合せ、然るのちハンドル(44)を戻してエンド
ミル(52)の底面刃(51)′を既設消雪ノズル(ホ)の天壁(6
1)より離し、この離れ状態に於て電気ドリル本体(48)を
回転状態とすると共にハンドル(44)を操作してエンドミ
ル(52)を下降させ、仍つて既設消雪ノズル(ホ)の天壁(6
1)の中央個所を旧散水孔(62)を残した状態で円形に切断
する。この切断が充分になされたかどうかは前記ゼロ合
せをなしたスライドゲージ(56)の目盛でスライドヘツド
(45)の下降量を見乍ら切断の深さが所定寸法に達したこ
とを知る手段により確認する。
Next, operate the handle (44) to cut the ceiling wall end mill.
The bottom blade (51) ′ of (52) is lightly applied to the upper surface of the top wall (61) of the existing snow-melting nozzle (e), and in this contacting state, the slide gauge (56) is moved up and down. The zero point is aligned with a reference point (not shown), and then the handle (44) is returned and the bottom blade (51) ′ of the end mill (52) is attached to the top wall (6) of the existing snow removal nozzle (e).
1) away from this, and in this separated state, the electric drill main body (48) is rotated and the handle (44) is operated to lower the end mill (52), and the ceiling of the existing snow removal nozzle (e) is lowered. Wall (6
Cut the center part of 1) into a circle with the old water spray holes (62) left. Whether or not this cutting has been sufficiently performed is determined by the scale of the slide gauge (56) with the zero adjustment described above.
Checking the descending amount of (45), it is confirmed by a means to know that the cutting depth has reached a predetermined dimension.

然るのち、電気ドリル本体(48)を停止させて上方位置に
戻し、天壁切断用エンドミル(52)をシヤンクホルダ(50)
より外し、前記円形切断により囲繞された部分(64)およ
び旧バルブ等内蔵物(65)を特殊プライヤー(図示せず)
により取去する。
After that, stop the electric drill body (48) and return it to the upper position, and attach the ceiling wall cutting end mill (52) to the shank holder (50).
The pliers (not shown) by removing the parts enclosed by the circular cutting (64) and the built-in components (65) such as old valves.
To remove.

更に、シヤンクホルダ(50)に下孔明け用ドリル(53)を取
付け、この下孔明け用ドリル(53)を回転および下降させ
て既設消雪ノズル(ホ)のケース(66)に於ける底面に下孔
(67)を穿設する。
Further, attach a pilot hole drill (53) to the shank holder (50), rotate and lower the pilot hole drill (53) to lower the bottom of the case (66) of the existing snow removal nozzle (e). Pilot hole
Drill (67).

次いで、下孔(67)にタツプ(54)を用いて連結用雌ネジ(6
8)を刻設する。この刻設作業はタツプ(54)を片手回しの
逆転止メ用爪車(図示せず)内蔵型レンチ(69)を利用し
て回し且つレンチ(69)に予め設けられた短い丸棒ピン(7
0)をシヤンクホルダ(50)に回転自在に嵌着して頭ブレを
防止してなす。
Then, using the tap (54) in the pilot hole (67), the connecting female screw (6
8) Engrave. In this engraving work, the tap (54) is rotated by using a built-in wrench (69) for reverse rotation stop mechanism (not shown) which is a one-handed rotation, and a short round bar pin (pre-installed on the wrench (69) ( 7
(0) is rotatably fitted to the shank holder (50) to prevent head movement.

然るのち、シヤンクホルダ(50)よりタツプ(54)およびレ
ンチ(69)を外し、当該シヤンクホルダ(50)にボーリング
用エンドミル(55)を取付けこのボーリング用エンドミル
(55)を利用して既設消雪ノズル(ホ)に於ける旧散水孔(6
2)を含む天壁等部分を切除する。
After that, remove the tap (54) and wrench (69) from the shank holder (50) and attach the boring end mill (55) to the shank holder (50).
Using the (55), the old water spray hole (6
Cut off the top wall including 2).

このようにして既設消雪ノズル(ホ)の方への加工を完了
する。
In this way, the processing for the existing snow-melting nozzle (e) is completed.

次いで、旧バルブ等内蔵物(65)の取去によつて形成され
た空間(71)内に弁体(ロ)と適宜の制水弁(ハ)を予め合体し
てから挿入して第2雄ネジ(12)を連結用雌ネジ(68)に螺
合させる。然るのち蓋体(イ)の下縁部を空間(71)内に捻
じ回し乍ら押入して、第1オー・リング(4)の外周面を
空間(71)の周壁面に、第2オー・リング(22)の外周面を
蓋体(イ)における内周壁部(6)の内面にそれぞれ気密に圧
接し且つ第1雌ネジ(2)に第1雄ネジ(11)を螺合すると
共に既設消雪ノズル(ホ)における空間(71)の開口全周縁
と蓋体(イ)の外周壁部(7)の外周面とを気密に溶接するこ
とによつて既設消雪ノズル(ホ)の上に新設部分(ヘ)を形成
したのち既存路面(旧路面)(73)の上に新しくコンクリ
ーテ、アスフアルト等路面舗装材料を重ねて新路面(74)
を形成して工事を完了する等の用法で供するものであ
る。
Then, the valve body (b) and an appropriate water control valve (c) are previously combined into the space (71) formed by removing the built-in object (65) such as the old valve, and then the second valve is inserted. The male screw (12) is screwed into the connecting female screw (68). After that, the lower edge of the lid (a) is twisted into the space (71) and pushed in, and the outer peripheral surface of the first O-ring (4) is attached to the peripheral wall surface of the space (71) to the second side. The outer peripheral surface of the O-ring (22) is hermetically pressed against the inner surface of the inner peripheral wall portion (6) of the lid (a), and the first male screw (11) is screwed onto the first female screw (2). Together with the existing snow-melting nozzle (e), the entire peripheral edge of the opening of the space (71) in the existing snow-melting nozzle (e) and the outer peripheral surface of the outer peripheral wall portion (7) of the lid (a) are hermetically welded together. After forming a new part (f) on the top of the existing road surface (old road surface) (73), a new road surface (74) with new pavement materials such as concrete and asphalt
Is used to complete construction.

本発明は、第1オー・リング(4)を設けないで、または
既設消雪ノズル(ホ)に対する蓋体(イ)の溶接を行わないで
実施することもある。
The present invention may be carried out without providing the first O-ring (4) or without welding the lid (a) to the existing snow removal nozzle (e).

〔発明の効果〕〔The invention's effect〕

本発明の消雪ノズルの補修工法は上記のような構成であ
るので、上記において述べたような工事手段を行うこと
で嵩上工法が可能となるものであり、しかも既存のコン
クリートを毀す時の騒音及び振動が出ないものであり、
また給水パイプ側を誤つて破損させてしまうこともない
ものであつて、所期の目的を充分に達成することができ
る優れた効果を奏するものである。
Since the snow-melting nozzle repairing method of the present invention has the above-described structure, it is possible to carry out the bulking-up method by performing the construction means described above. The noise and vibration of the
In addition, the water supply pipe side is prevented from being accidentally damaged and has an excellent effect that the intended purpose can be sufficiently achieved.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の実施例のフローチヤート、第2図は新
設部分の分解斜視図、第3図は工事完了状態を示す断面
図、第4図は工事手段に用いる工事用機械を示す正面
図、第5図は同じく平面図、第6図は同じく側面図であ
る。 (1)…短管状部材、(2)…第1雌ネジ、(3)…第1パツキ
ン溝、(4)…第1オー・リング、(5)…環状凹溝、(6)…
内周壁部、(7)…外周壁部、(8)…天壁部、(9)…散水
孔、(イ)…蓋体、(10)…細管、(11)…第1雄ネジ、(12)
…第2雄ネジ、(13)…第2雌ネジ、(14)…固定側孔、
(ロ)…弁体、(16)…棒状部材、(17)…凹孔、(18)…可動
側孔、(19)…第3雄ネジ、(20)…ドライバー溝、(21)…
第2パツキン、(22)…第2オー・リング、(ハ)…制水
弁、(ニ)…工事用機械、(31)…手押ハンドル、(32)…率
台盤、(33)(33)′(34)…着地脚用ネジ棒、(35)…ハンド
ル、(36)(36)′…浮輪、(37)…架台、(38)…横けた、(3
9)…移動止めネジ、(40)…サドル、(41)…回転止めネ
ジ、(42)…回転台、(43)…機台、(44)…ハンドル、(45)
…スライドヘツド、(46)…取付金具、(47)(47)′…取付
ネジ、(48)…電気ドリル本体、(49)…主軸、(50)…シヤ
ンクホルダ、(51)(51)′…刃、(52)…エンドミル、(53)
…ドリル、(54)…タツプ、(55)…エンドミル、(56)…ス
ライドゲージ、(57)…取手、(58)…オモリ体、(61)…天
壁、(62)…旧散水路、(64)…切断部分、(65)…旧バルブ
等内蔵物、(66)…ケース、(67)…下孔、(68)…連結用雌
ネジ、(69)…レンチ、(70)…丸棒ピン、(71)…空間、(7
3)…旧路面、(74)…新路面、(ホ)…既設消雪ノズル、(ヘ)
…新設部分。
FIG. 1 is a flow chart of an embodiment of the present invention, FIG. 2 is an exploded perspective view of a new portion, FIG. 3 is a sectional view showing a completed construction state, and FIG. 4 is a front view showing a construction machine used as construction means. 5 and FIG. 5 are also plan views and FIG. 6 is a side view. (1) ... Short tubular member, (2) ... First female screw, (3) ... First packing groove, (4) ... First O-ring, (5) ... Annular groove, (6) ...
Inner peripheral wall part, (7) ... Outer peripheral wall part, (8) ... Top wall part, (9) ... Sprinkler hole, (a) ... Lid, (10) ... Capillary tube, (11) ... First male screw, ( 12)
… Second male screw, (13)… Second female screw, (14)… Fixed side hole,
(B) ... Valve element, (16) ... bar-shaped member, (17) ... concave hole, (18) ... movable side hole, (19) ... third male screw, (20) ... driver groove, (21) ...
Second packing, (22) ... Second O-ring, (C) ... Water control valve, (D) ... Construction machine, (31) ... Handwheel, (32) ... Billing board, (33) ( 33) ′ (34)… Screw rod for landing leg, (35)… Handle, (36) (36) ′… Float, (37)… Stand, (38)… Landed, (3
9) ... Detent screw, (40) ... Saddle, (41) ... Rotation stop screw, (42) ... Rotary base, (43) ... Machine base, (44) ... Handle, (45)
… Slide head, (46)… Mounting bracket, (47) (47) ′… Mounting screw, (48)… Electric drill body, (49)… Spindle, (50)… Shank holder, (51) (51) ′… Blade, (52) ... End mill, (53)
… Drill, (54)… Tap, (55)… End mill, (56)… Slide gauge, (57)… Handle, (58)… Weight body, (61)… Top wall, (62)… Old sprinkler, (64)… Cut part, (65)… Built-in valve etc., (66)… Case, (67)… Pilot hole, (68)… Female thread for connection, (69)… Wrench, (70)… Round Stick pin, (71) ... space, (7
3)… Old road surface, (74)… New road surface, (e)… Existing snow-melting nozzle, (f)
... new part.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】既設の消雪ノズルに於けるノズル本体の天
壁の中央個所をエンドミルにより円形に切断する工程
と、円形切断により囲繞された部分および旧バルブ等内
蔵物を取去する工程と、当該取去により形成された空間
内に施す下記の新設部分に適合するボーリング工程およ
びタツプ穴切り工程と、上記空間内に下記新設部分を上
記タツプ穴利用および溶接、嵌着等固定手段で適合状態
に装填する工程と、既存路面の上に新しいコンクリー
ト、アスフアルト等路面舗装材を重ねて新路面を形成す
る工程とをもつことを特徴とする消雪ノズルの補修工
法。 嵩上寸法より長い短管状部材(1)の内周面の下端部に第
1雌ネジ(2)を刻設すると共に当該短管状部材(1)の底面
に深い環状凹溝(5)を穿設して内周壁部(6)、外周壁部
(7)及び天壁部(8)を形成し且つ天壁部(8)の適宜個所に
上下両端が同天壁部(8)の上下両面に開放する散水孔(9)
を開設することによつて構成した蓋体(イ)と、 短い細管(10)の上下両端部の外周に第1雄ネジ(11)及び
第2雄ネジ(12)を同じく上端部の内周に第2雌ネジ(13)
を刻設すると共に当該細管(10)の中間高さ個所に内外に
連通する導水用固定側孔(14)を開設することによつて構
成した弁体(ロ)と、 棒状部材(16)の下端面の中央に浅い凹孔(17)を穿設し且
つ同凹孔(17)の周壁に内外に開放する導水用可動側孔(1
8)を開設すると共に当該棒状部材(16)の中間高さ個所の
外周に上記第2雌ネジ(13)と螺合自在の第3雄ネジ(19)
を同じく上端面にドライバー溝(20)をそれぞれ刻設し且
つ同棒状部材(16)において第3雄ネジ(19)より上方の外
周個所に第2パツキン溝(21)を刻設して当該第2パツキ
ン溝(21)に第2オー・リング(22)を嵌着することによつ
て構成した制水弁(ハ)とをもつ新設部分。
1. A step of cutting a central portion of a ceiling wall of a nozzle body of an existing snow-melting nozzle into a circular shape by an end mill, and a step of removing a portion surrounded by the circular cutting and an internal component such as an old valve. , The boring process and tap hole cutting process that are applied to the following new parts that are applied in the space formed by the removal, and the following new parts that are used in the space are applicable using the tap holes and fixing means such as welding and fitting. A method for repairing snow-melting nozzles, which comprises a step of loading into a state and a step of forming a new road surface by overlaying a pavement material such as new concrete or asphalt on the existing road surface. A first female screw (2) is engraved on the lower end of the inner peripheral surface of the short tubular member (1) longer than the bulk dimension, and a deep annular groove (5) is bored in the bottom surface of the short tubular member (1). Installed on the inner peripheral wall (6), outer peripheral wall
(7) and the ceiling wall (8), and water spray holes (9) at both ends of the ceiling wall (8) are opened at the appropriate points on the ceiling wall (8).
By opening the lid (a), the short male tube (10) is provided with the first male screw (11) and the second male screw (12) on the outer periphery of the upper and lower ends, and the inner periphery of the upper end. On the second female screw (13)
Of the valve body (b) and the rod-shaped member (16), which are formed by engraving the valve and opening a fixed water-conducting side hole (14) communicating with the inside and outside at the middle height position of the thin tube (10). A shallow recess (17) is formed in the center of the lower end surface, and a movable water guiding hole (1) is formed in the peripheral wall of the recess (17) to open in and out.
8) is opened and the third male screw (19) is screwed to the second female screw (13) on the outer periphery of the intermediate height of the rod member (16).
Similarly, a driver groove (20) is also engraved on the upper end surface and a second packing groove (21) is engraved on the outer peripheral portion of the rod-shaped member (16) above the third male screw (19). 2 A new part having a water control valve (C) constructed by fitting a second O-ring (22) in the packing groove (21).
JP26291590A 1990-09-29 1990-09-29 Repair method for snow-melting nozzle Expired - Lifetime JPH0622710B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26291590A JPH0622710B2 (en) 1990-09-29 1990-09-29 Repair method for snow-melting nozzle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26291590A JPH0622710B2 (en) 1990-09-29 1990-09-29 Repair method for snow-melting nozzle

Publications (2)

Publication Number Publication Date
JPH04141252A JPH04141252A (en) 1992-05-14
JPH0622710B2 true JPH0622710B2 (en) 1994-03-30

Family

ID=17382377

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26291590A Expired - Lifetime JPH0622710B2 (en) 1990-09-29 1990-09-29 Repair method for snow-melting nozzle

Country Status (1)

Country Link
JP (1) JPH0622710B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6193804B2 (en) * 2014-05-19 2017-09-06 北越消雪機械工業株式会社 Repair method of snow-melting nozzle

Also Published As

Publication number Publication date
JPH04141252A (en) 1992-05-14

Similar Documents

Publication Publication Date Title
CA2278869A1 (en) Level-adjusting apparatus for a power tool
CN113638393B (en) Hole digging and repairing device for detecting roadbed solidity by sand filling method
JPH0622710B2 (en) Repair method for snow-melting nozzle
US4414869A (en) Counterbore boring and refacing tool
JPH0683926B2 (en) Construction machinery used to repair snow-melting nozzles
JPH0360964B2 (en)
CN210194590U (en) A instrument of digging pit for compactness detects
US5398577A (en) Method and apparatus for tree felling
JP4819563B2 (en) Pipe cutting device and manhole cover and receiving frame replacement method using the device
JPH0749107B2 (en) Nozzle device
JPH0636887B2 (en) Nozzle device and repair method for snow-melting nozzle using the same
JPH072049Y2 (en) Lid in new part used for construction of repair method of snow-melting nozzle
JP2872726B2 (en) Drilling claw welding positioning device
JP3091901B2 (en) Sprinkling nozzle device for snow removal on roads
JPH074713B2 (en) Construction machinery used to repair snow-melting nozzles
JPH0360963B2 (en)
JP3016130B2 (en) Support equipment for surveying equipment in a vertical pipe
US4965964A (en) Portable apparatus for processing marble tile
US20050244240A1 (en) Router attachment
CN208067530U (en) A kind of assistance platform of copying cutting machine
CN217632288U (en) Road bridge construction drilling support
JP2530013Y2 (en) Rod measuring device for inspection of concrete casting surface
CN218780320U (en) Reamer for geological exploration
JPH0713992U (en) Auxiliary device
JPS6123055Y2 (en)