JPH0360963B2 - - Google Patents

Info

Publication number
JPH0360963B2
JPH0360963B2 JP7910988A JP7910988A JPH0360963B2 JP H0360963 B2 JPH0360963 B2 JP H0360963B2 JP 7910988 A JP7910988 A JP 7910988A JP 7910988 A JP7910988 A JP 7910988A JP H0360963 B2 JPH0360963 B2 JP H0360963B2
Authority
JP
Japan
Prior art keywords
snow removal
built
removal nozzle
screw
end mill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP7910988A
Other languages
Japanese (ja)
Other versions
JPH01250509A (en
Inventor
Mineo Takeuchi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP7910988A priority Critical patent/JPH01250509A/en
Publication of JPH01250509A publication Critical patent/JPH01250509A/en
Publication of JPH0360963B2 publication Critical patent/JPH0360963B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Road Repair (AREA)
  • Nozzles (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は舗装道路等の舗装面に埋設されている
消雪ノズルの補修工法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a repair method for snow removal nozzles buried in paved surfaces such as paved roads.

〔従来の技術〕[Conventional technology]

従来、この種消雪ノズルの補修工法として、消
雪ノズルに埋設用コンクリートを削つて旧消雪ノ
ズル全体を取り除き、代りに新しい消雪ノズルを
取付け、周囲をコンクリートで固定する全体入れ
替え方式は知られている。
Previously, as a repair method for this type of snow removal nozzle, there was no known method of completely replacing the old snow removal nozzle by scraping the buried concrete on the snow removal nozzle, removing the entire old snow removal nozzle, installing a new snow removal nozzle in its place, and fixing the surrounding area with concrete. It is being

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

上記従来の技術に於て述べた全体入れ替え方式
は、コンクリートを毀す時の騒音および振動が大
きく、またコンクリートが固まる迄に長い養生時
間を必要とし、更に養生中は交通規制を必要とす
る。特に冬期に行なわれる補修はコンクリートが
冷温下では固化し難いので、養生の時間も交通の
規制時間も長くなる不都合があるのみならず路側
には雪があるために工事中は道路巾が長時間に亘
り狭くなることもあつて危険度が極めて高い等の
欠陥があつた。
The total replacement method described in the above-mentioned conventional technology causes large noise and vibration when breaking the concrete, requires a long curing time for the concrete to harden, and also requires traffic control during curing. In particular, repairs carried out in winter are not only inconvenient because concrete is difficult to solidify in cold temperatures, but also the curing time and traffic control time are extended, and due to snow on the roadside, the road width will be stretched for a long time during construction. There were deficiencies such as the fact that it was extremely narrow and extremely dangerous.

本発明は上記欠陥を充分に解消する消雪ノズル
の補修工法を提供することを目的とするものであ
る。
An object of the present invention is to provide a method for repairing a snow removal nozzle that fully eliminates the above-mentioned defects.

〔課題を解決するための手段〕[Means to solve the problem]

上記目的を達成するために本発明消雪ノズルの
補修工法は、既設の消雪ノズルに於けるノズル本
体の天壁の中央個所をエンドミルにより円形に切
断する工程と、円形切断により囲繞された部分お
よび旧バルブ等内蔵物を取去する工程と、当該取
去により形成された空洞内に施す新バルブ等内蔵
物に適合するタツプ穴切り工程と、上記空洞内に
新バルブ等内蔵物を上記タツプ穴利用で適合状態
に装填する工程を備えたものである。
In order to achieve the above object, the repair method for the snow removal nozzle of the present invention includes the steps of cutting the center part of the top wall of the nozzle body of the existing snow removal nozzle into a circle using an end mill, and cutting the area surrounded by the circular cutting. and a process of removing built-in items such as old valves, a step of cutting a hole in the cavity formed by the removal to fit the new built-in items such as a valve, and a process of tapping the new built-in items such as a new valve into the cavity. It is equipped with a process of loading in a suitable state using holes.

〔実施例〕および〔作用〕 次いで、本発明の実施例を図面に依拠して説明
するに、 先ず、磁性金属板製台盤1の前側の両隅個所お
よび後側の中央個所に上下に貫通するネジ孔(図
示せず)を設け、これ等前側両ネジ孔、後側ネジ
孔に着地脚用ネジ棒2,2′,3を其の上下両端
が台盤1の上下両方に貫出した状態として螺入
し、これ等着地脚用ネジ棒2,2′,3の上端に
ハンドル4を着脱自在とすると共に台盤1の後縁
の両側に搬送用浮輪5,5′が取付けることによ
り架台6を構成し、 またこれとは別個に取手7付きオモリ体8の一
対を構成し、 更に、これ等とは別個の電磁石(図示せず)入
り座台9の上に回転止めネジ10付き回転台11
を、この回転台11の上に機台12を、この機台
12の前面にハンドル13およびラツク機構(図
示せず)により上下に摺動するスライドヘツド1
4を、このスライドヘツド14に取付金具15お
よび取付ネジ16,16′を介して下向きに電気
ドリド本体17を、この電気ドリド本体16の主
軸18の下端にシヤンクホルダ19を夫々設け、
当該シヤンクホルダ18には円筒の外周および底
面に刃20,20′をもつエンドミル21、下穴
明け用ドリド22およびタツプ23を任意に交換
して取付けるようにすると共に上記機台12に於
てスライドヘツド14の横に同スライドヘツド1
4の上下動量計測用スライドゲージ24を上下移
動可能として設けることにより本体25を構成
し、 仍つて、架台6を所定の場所にセツトしこの架
台6に於ける台盤1の上に本体25およびオモリ
体8を載置し且つ座台9に於ける電磁石により本
体25を台盤1に起立状態に固定し使用する工事
用機械26を構成する。
[Embodiments] and [Operations] Next, embodiments of the present invention will be described with reference to the drawings. First, vertically penetrating holes are formed at both corners of the front side and at the center of the rear side of the base plate 1 made of magnetic metal plate. Screw holes (not shown) were provided for the landing leg, and the landing leg screw rods 2, 2', and 3 were inserted into both the front screw holes and the rear screw hole so that their upper and lower ends penetrated both the top and bottom of the base plate 1. A handle 4 is removably attached to the upper end of the threaded rods 2, 2', 3 for the landing legs, and conveyance floats 5, 5' are attached to both sides of the rear edge of the platform 1. It constitutes a pedestal 6, and separately constitutes a pair of weight bodies 8 with handles 7, and also has a rotation stopper screw 10 on a pedestal 9 containing a separate electromagnet (not shown). Turntable 11
A machine base 12 is mounted on the rotary base 11, and a slide head 1 that slides up and down by a handle 13 and a rack mechanism (not shown) is mounted on the front surface of the machine base 12.
4, an electric drib main body 17 is mounted downwardly on this slide head 14 via a mounting bracket 15 and mounting screws 16, 16', and a shank holder 19 is provided at the lower end of the main shaft 18 of this electric drib main body 16, respectively.
An end mill 21 having blades 20 and 20' on the outer periphery and bottom of the cylinder, a drill bit 22 for drilling a pilot hole, and a tap 23 are installed on the shank holder 18 by replacing them as desired. Same slide head 1 next to 14
The main body 25 is constructed by providing the slide gauge 24 for measuring the vertical movement of No. 4 so as to be movable up and down, and the pedestal 6 is set at a predetermined place, and the main body 25 and A construction machine 26 is constructed in which the weight body 8 is placed and the main body 25 is fixed to the base plate 1 in an upright state by an electromagnet in the seat base 9.

また、これとは別個に上端の開口縁のまわりに
鍔状の蓋部28を一体に連設され且つ当該蓋部2
8の外周面にOリング27を嵌着された上側管体
29の下方部の内周面に第2雌ネジ30を刻設し
て当該第2雌ネジ30に、上下両端部の外周に第
1雄ネジ31および第2雄ネジ32をまた上端部
の内周に第3雌ネジ33を夫々有する下側管体3
4を第2雌ネジ30と第1雄ネジ31との螺着に
よつて連結すると共に下側管体34の中間高さ個
所に内外に連通する導水用固定孔35を開設し、
またこれとは別個に上面が閉塞され下面が開放さ
れた円筒状を呈し且つ上半分の外周面に第3雄ネ
ジ37が刻設され上面にドライバー溝38を有す
る制水コマ39を構成し、この制水コマ39を上
記下側管体34の中に上方より挿入して第3雌ネ
ジ33と第3雄ネジ37を螺合させ、当該制水コ
マ39の周壁部に両端が内外に開口する導水用可
動孔40を開設することによつて新バルブ等内蔵
物41を構成する。
Separately from this, a flange-shaped lid part 28 is integrally provided around the opening edge at the upper end, and the lid part 2
A second female thread 30 is carved into the inner circumferential surface of the lower part of the upper tube body 29, which has an O-ring 27 fitted to the outer circumferential surface of the upper tube 29, A lower tube body 3 having a first male screw 31 and a second male screw 32 and a third female screw 33 on the inner periphery of the upper end.
4 are connected by screwing the second female screw 30 and the first male screw 31, and a fixing hole 35 for water conduction that communicates with the inside and outside is opened at an intermediate height of the lower tube body 34,
Separately from this, a water control piece 39 is configured, which has a cylindrical shape with a closed upper surface and an open lower surface, has a third male screw 37 carved on the outer peripheral surface of the upper half, and has a driver groove 38 on the upper surface, This water control piece 39 is inserted into the lower pipe body 34 from above, and the third female screw 33 and third male screw 37 are screwed together, and both ends of the water control piece 39 are opened inwardly and outwardly on the peripheral wall portion. By opening a movable hole 40 for introducing water, a built-in component 41 such as a new valve is constructed.

斯くして、工事用機械26および新バルブ等内
蔵物41を現場に持つて行き、工事用機械26を
既設の消雪ノズル43の埋設された路面上に置い
てオモリ体8を載せ、次いでハンドル4を着替え
乍ら用いて着地脚用ネジ棒2,2′,3を廻し、
仍つて、台盤1の水平向きを調節したのち台盤1
上に於ける座台9の位置を決める操作、回転止め
ネジ10を弛めて回転台11を廻す操作、回転止
めネジ10を締め戻す操作、ハンドル13により
電気ドリル本体17の高さを調節する操作等をな
してシヤンクホルダ19の中心と既設消雪ノズル
43の中心を合せ、このシヤンクホルダ19にエ
ンドミル21を取付け、当該エンドミル21の底
面刃20′が既設消雪ノズル43の所定の個所に
当たるかどうかをハンドル13にて電気ドリド本
体17を下降させることにより確かめ、もしこの
時にエンドミル21の底面刃20′が既設消雪ノ
ズル43に正確に当つていない場合には座台9の
位置、回転台11の向き、ひいては台盤1の位置
を補正し、斯くしてエンドミル21が正確に位置
づけされたのちに電磁石に通電して座台9を架台
6に吸着し且つ回転止めネジ10の締付を確認す
る。
In this way, the construction machine 26 and built-in items 41 such as new valves are brought to the site, and the construction machine 26 is placed on the road surface where the existing snow removal nozzle 43 is buried, the weight body 8 is placed on it, and the handle is attached. 4 while changing clothes, turn the landing leg threaded rods 2, 2', and 3.
After adjusting the horizontal orientation of base plate 1,
The operation of determining the position of the base 9 on the top, the operation of loosening the rotation stop screw 10 and rotating the rotation table 11, the operation of tightening the rotation stop screw 10, and the adjustment of the height of the electric drill body 17 using the handle 13. Align the center of the shank holder 19 with the center of the existing snow removal nozzle 43 by performing an operation, attach the end mill 21 to this shank holder 19, and check whether the bottom blade 20' of the end mill 21 hits a predetermined location on the existing snow removal nozzle 43. Check this by lowering the electric drido main body 17 using the handle 13. If the bottom blade 20' of the end mill 21 does not hit the existing snow removal nozzle 43 accurately at this time, change the position of the seat 9 and the rotary stand. After the end mill 21 is accurately positioned, the electromagnet is energized to attract the seat 9 to the pedestal 6, and the rotation stop screw 10 is tightened. confirm.

次いで、ハンドル13を操作してエンドミル2
1の底面刃20′を既設消雪ノズル43の天壁4
4の上面に軽く当て、この当つている状態に於て
スライドゲージ24に上下動操作を加えてそのゼ
ロ点を基準点(図示せず)に合せ、然るのちハン
ドル13を戻してエンドミル21の底面刃20′
を既設消雪ノズル43の天壁44より難し、この
難れ状態に於て電気ドリド本体17を回転状態と
すると共にハンドル13を操作してエンドミル2
1を下降させ、仍つて既設消雪ノズル44の天壁
44の中央個所を噴水口45を残した状態で円形
に切断する。この切断が充分になされたかどうか
は上記ゼロ合せをなしたスライドゲージ24の目
盛でスライドヘツド14の下降量を見乍ら切断の
深さが所定寸法に達したことを知る手段により確
認する。
Next, operate the handle 13 to turn the end mill 2.
1's bottom blade 20' to the top wall 4 of the existing snow removal nozzle 43.
4, and while it is in contact, move the slide gauge 24 up and down to align its zero point with the reference point (not shown), then return the handle 13 and move the end mill 21. Bottom blade 20'
This is more difficult than the top wall 44 of the existing snow removal nozzle 43, and in this difficult state, the electric drido main body 17 is rotated and the handle 13 is operated to remove the end mill 2.
1 is lowered, and the central part of the top wall 44 of the existing snow removal nozzle 44 is cut into a circular shape with the water fountain 45 remaining. Whether or not this cutting has been done sufficiently is confirmed by checking the amount of descent of the slide head 14 on the scale of the slide gauge 24, which has been set to zero, by means of determining whether the depth of the cut has reached a predetermined depth.

然るのち、電気ドリド本体17を停止させて上
方位置に戻し、エンドミル21をシヤンクホルダ
19より外し、上記円形切断により囲繞された部
分46および旧バルブ等内蔵物47を特殊プライ
ヤーにより取去する。
Thereafter, the electric drill main body 17 is stopped and returned to the upper position, the end mill 21 is removed from the shank holder 19, and the portion 46 surrounded by the circular cut and the built-in items 47 such as old valves are removed using special pliers.

更に、シヤンクホルダ19に下孔明け用ドリル
22を取付け、この下孔明け用ドリル22を回転
および下降させて既設消雪ノズル44のケース4
8に於ける底面に下孔49を穿設する。
Furthermore, the pilot hole drilling drill 22 is attached to the shank holder 19, and the pilot hole drilling drill 22 is rotated and lowered to open the case 4 of the existing snow removal nozzle 44.
A pilot hole 49 is bored in the bottom surface at point 8.

次いで、下孔49にタツプ23を用いて第1雌
ネジ50を刻設する。この該設作業はタツプ23
を片手回しの逆転止メ用爪車(図示せず)内蔵型
レンチ51を利用して回し且つレンチ51に予め
設けられた短い丸棒ピン52をシヤンクホルダ1
9に回転自在に嵌着して頭ブレを防止してなす。
Next, a first female thread 50 is cut into the pilot hole 49 using the tap 23. Tap 23 for this installation work.
is turned using a wrench 51 with a built-in ratchet wheel (not shown) that can be turned with one hand, and the short round bar pin 52 pre-installed on the wrench 51 is attached to the shank holder 1.
9 so that it can rotate freely and prevent the head from wobbling.

このようにして既設消雪ノズル43の方への加
工を完了する。
In this way, the processing for the existing snow removal nozzle 43 is completed.

次いで、旧バルブ等内蔵物47の取去によつて
形成された空間53内に上記新バルブ等内蔵物4
1を挿入して第2雄ネジ32を第1雌ネジ50に
螺合させ、当該螺合により蓋部28の外周面と上
記円形切断にて形成された孔の切縁面54とを対
向させ且つこれ等対向両面間をOリング27によ
り気密密にし、然るのち必要に応じて、既設消雪
ノズル43のケース48の上面と新バルブ等内蔵
物41の上面とをサンダーにより同じ高さにけず
り仕上げ、仍つて工事を完了するものである。
Next, the new valve, etc. built-in object 4 is inserted into the space 53 formed by removing the old valve, etc. built-in object 47.
1 and screw the second male screw 32 into the first female screw 50, and the screwing causes the outer peripheral surface of the lid part 28 and the incisal surface 54 of the hole formed by the circular cutting to face each other. The space between these opposing surfaces is made airtight using an O-ring 27, and then, if necessary, the top surface of the case 48 of the existing snow removal nozzle 43 and the top surface of the built-in component 41 such as a new valve are made to the same height using a sander. The construction will be completed with the finishing touches.

〔発明の効果〕〔Effect of the invention〕

本発明消雪ノズルの補修工法は旧消雪ノズルの
周囲の埋設用コンクリートを削る必要がないもの
であつて、上記騒音、振動、時間および危険性等
の問題点を多大に解決するものである。
The snow removal nozzle repair method of the present invention does not require scraping the buried concrete around the old snow removal nozzle, and greatly solves the above-mentioned problems such as noise, vibration, time, and danger. .

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の実施例のフローチヤート、第
2図は本発明の実施に使用する工事用機械を示す
平面図、第3図は同じく側面図である。 1……台盤、2,2′,3……着地脚用ネジ棒、
4……ハンドル、5,5′……浮輪、6……架台、
7……取手、8……オモリ体、9……座台、10
……回転止めネジ、11……回転台、12……機
台、13……ハンドル、14……スライドヘツ
ド、15……取付金具、16,16′……取付ネ
ジ、17……電気ドリル本体、18……主軸、1
9……シヤンクホルダ、20,20′……刃、2
1……エンドミル、22……ドリル、23……タ
ツプ、24……スライドゲージ、25……本体、
26……工事用機械、27……Oリング、28…
…蓋部、29……上側管体、30……第2雌ネ
ジ、31……第1雄ネジ、32……第2雄ネジ、
33……第3雌ネジ、34……下側管体、35…
…固定孔、37……第3雄ネジ、38……ドライ
バー溝、39……制水コマ、40……可動孔、4
1……新バルブ内蔵物、43……既設消雪ノズ
ル、44……天壁、45……噴水口、46……部
分、47……旧バルブ内蔵物、48……ケース、
49……下孔、50……第1雌ネジ、51……レ
ンチ、53……空間。
FIG. 1 is a flowchart of an embodiment of the present invention, FIG. 2 is a plan view showing a construction machine used for carrying out the present invention, and FIG. 3 is a side view of the same. 1... Base plate, 2, 2', 3... Threaded rod for landing leg,
4... Handle, 5,5'... Floating ring, 6... Frame,
7... Handle, 8... Weight body, 9... Base, 10
... Rotation stop screw, 11 ... Turntable, 12 ... Machine base, 13 ... Handle, 14 ... Slide head, 15 ... Mounting bracket, 16, 16' ... Mounting screw, 17 ... Electric drill body , 18...main axis, 1
9...Shank holder, 20, 20'...Blade, 2
1...End mill, 22...Drill, 23...Tap, 24...Slide gauge, 25...Main body,
26... Construction machine, 27... O-ring, 28...
... Lid part, 29 ... Upper tube body, 30 ... Second female thread, 31 ... First male thread, 32 ... Second male thread,
33...Third female screw, 34...Lower tube body, 35...
... Fixed hole, 37 ... Third male screw, 38 ... Driver groove, 39 ... Water control piece, 40 ... Movable hole, 4
1...Built-in new valve, 43...Existing snow removal nozzle, 44...Ceiling wall, 45...Fountain, 46...Part, 47...Built-in old valve, 48...Case,
49... pilot hole, 50... first female screw, 51... wrench, 53... space.

Claims (1)

【特許請求の範囲】[Claims] 1 既設の消雪ノズルに於けるノズル本体の天壁
の中央個所をエンドミルにより円形に切断する工
程と、円形切断により囲繞された部分および旧バ
ルブ等内蔵物を取去する工程と、当該取去により
形成された空洞内に施すバルブ等内蔵物に適合す
るタツプ穴切り工程と、上記空洞内に新バルブ等
内蔵物を上記タツプ穴利用で適合状態に装填する
工程を備えたことを特徴とする消雪ノズルの補修
工法。
1 The process of cutting the central part of the top wall of the nozzle body of an existing snow removal nozzle into a circle using an end mill, the process of removing the part surrounded by the circular cut and the built-in parts such as old valves, and the removal. The present invention is characterized by comprising the steps of cutting a tap hole to fit a built-in item such as a valve into the cavity formed by the process, and loading a new built-in item such as a valve into the cavity in a compatible state by using the tapped hole. Repair method for snow removal nozzles.
JP7910988A 1988-03-31 1988-03-31 Repairing construction for snow removing nozzle Granted JPH01250509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7910988A JPH01250509A (en) 1988-03-31 1988-03-31 Repairing construction for snow removing nozzle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7910988A JPH01250509A (en) 1988-03-31 1988-03-31 Repairing construction for snow removing nozzle

Publications (2)

Publication Number Publication Date
JPH01250509A JPH01250509A (en) 1989-10-05
JPH0360963B2 true JPH0360963B2 (en) 1991-09-18

Family

ID=13680735

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7910988A Granted JPH01250509A (en) 1988-03-31 1988-03-31 Repairing construction for snow removing nozzle

Country Status (1)

Country Link
JP (1) JPH01250509A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6193804B2 (en) * 2014-05-19 2017-09-06 北越消雪機械工業株式会社 Repair method of snow-melting nozzle

Also Published As

Publication number Publication date
JPH01250509A (en) 1989-10-05

Similar Documents

Publication Publication Date Title
CN208303982U (en) Vertical milling and drilling machine
CN111074892A (en) Circular cutting device and circular cutting method for pile head
US5478271A (en) Milling, surfacing and polishing machine with automatic tool change and corresponding device
JPH0360964B2 (en)
US2413084A (en) Glass drilling apparatus
JPH0360963B2 (en)
US2844053A (en) Engine parts boring machine
JPH0230410A (en) Construction machine used for repair of snow-melting nozzle
US2814219A (en) Woodworking boring jig
JPH01252329A (en) Machine for work used for repair of snow melting nozzle
CN219796606U (en) Adjustable measuring instrument
JP3091901B2 (en) Sprinkling nozzle device for snow removal on roads
JPH072049Y2 (en) Lid in new part used for construction of repair method of snow-melting nozzle
US5439329A (en) Valve machining unit
CN212715968U (en) Cast-in-place concrete floor thickness control device
JPH0622710B2 (en) Repair method for snow-melting nozzle
JP4819563B2 (en) Pipe cutting device and manhole cover and receiving frame replacement method using the device
JPH0749107B2 (en) Nozzle device
CN208557935U (en) A kind of novel and multifunctional hydraulic engineering drilling machine
CN110355652A (en) A kind of dedicated die repair machine of high-precision laser positioning mold mandril
JPH0636887B2 (en) Nozzle device and repair method for snow-melting nozzle using the same
CN219667837U (en) Old building woodcarving component repair mould
CN210588443U (en) A high accuracy drilling equipment for aluminum alloy door and window production
CN219015691U (en) Sampling device for road engineering detection
CN213121474U (en) Raw and other materials hardness detection device is used in diamond production