JPH06193073A - Fabrication method for vegetation box and structure thereof - Google Patents

Fabrication method for vegetation box and structure thereof

Info

Publication number
JPH06193073A
JPH06193073A JP35799892A JP35799892A JPH06193073A JP H06193073 A JPH06193073 A JP H06193073A JP 35799892 A JP35799892 A JP 35799892A JP 35799892 A JP35799892 A JP 35799892A JP H06193073 A JPH06193073 A JP H06193073A
Authority
JP
Japan
Prior art keywords
slope
planting
box
frame member
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP35799892A
Other languages
Japanese (ja)
Other versions
JP3000073B2 (en
Inventor
Yuji Nakano
裕司 中野
Masashi Miura
雅司 三浦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Raito Kogyo Co Ltd
Koiwa Kanaami Co Ltd
Original Assignee
Raito Kogyo Co Ltd
Koiwa Kanaami Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Raito Kogyo Co Ltd, Koiwa Kanaami Co Ltd filed Critical Raito Kogyo Co Ltd
Priority to JP35799892A priority Critical patent/JP3000073B2/en
Publication of JPH06193073A publication Critical patent/JPH06193073A/en
Application granted granted Critical
Publication of JP3000073B2 publication Critical patent/JP3000073B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PURPOSE:To enable a construction cost to be reduced by jointing a frame member to an engagement member fixed to a slope, and filling space around the frame member with a hardener to form vegetation space between a wall body and the slope. CONSTITUTION:The bent end of the hooking arm 34 of an inner reinforcement cage 3 is coupled to a steel rod 41 laid on a slope. Then, the bent end of the hooking reinforcement 21 of an outer gauze board 2 is coupled to the intermediate gauze board 31 of the cage 3, thereby coupling the outer gauze board 2 and cage 3 to each other. Thereafter, a prefabricated form of vegetation base material 5 is laid in space between the slope and the inner gauze board 32, and a hardener such as mortar and concrete is sprayed to space around a frame member 1. Concurrently, space around a chain 4 and a steel rod 4 is filled with the hardener. A vegetation box is completed via a process for curing and setting the hardener.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、斜面に花や樹木を植栽
するボックスを作製する工法及び植栽用ボッスクの構造
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method of a box for planting flowers and trees on a slope and a structure of a planting boss.

【0002】[0002]

【従来の技術】図4に示すように、植栽用ボックスa
は、法枠b等の斜面上に設けられたボックス型法枠であ
り、内部に土砂cを充填して植栽を行うものである。従
来、植栽用ボックスaを作製する場合は、法枠bの配筋
と植栽用ボックスaの配筋とを一体的に組み立て、それ
らの配筋に固化材を吹き付けて構築を行っていた。
2. Description of the Related Art As shown in FIG. 4, a planting box a
Is a box-shaped method frame provided on a slope such as a method frame b, and is filled with earth and sand c for planting. Conventionally, when the planting box a is produced, the reinforcement of the legal frame b and the reinforcement of the planting box a are integrally assembled, and a solidifying material is sprayed onto these reinforcements for construction. .

【0003】[0003]

【発明が解決しようとする課題】上記の従来技術には、
次のような問題点が存在する。即ち、法枠bの配筋と植
栽用ボックスaの配筋とを一体的に組み立てる作業は非
常に煩雑であり、熟練を要する。そのため、施工が長期
化し、それに伴いコストが高くなるという問題がある。
DISCLOSURE OF THE INVENTION Problems to be Solved by the Invention
There are the following problems. That is, the work of integrally assembling the bar arrangement of the legal frame b and the bar arrangement of the planting box a is very complicated and requires skill. Therefore, there is a problem that the construction becomes long and the cost becomes high accordingly.

【0004】[0004]

【課題を解決するための手段】本発明は、上記のような
問題点を解決するためになされたもので、施工の省力化
及びコストの低減を図ることができる植栽用ボックス工
法及び植栽用ボックスの構造を提供することを目的とす
る。即ち、本発明は、斜面に花や樹木を植栽するボック
スを作製する技術において、斜面上に掛止部材を固定
し、略水平方向に掛止ア−ムを突設した枠材を、あるい
は枠材と植栽基材とを、掛止ア−ムの先端を前記掛止部
材に掛止して斜面上に立設し、枠材周囲に固化材を充填
して、養生、固化させて壁体を構築し、この壁体と斜面
との間に植栽エリアを形成することを特徴とした、植栽
用ボックス技術である。
The present invention has been made to solve the above problems, and a planting box construction method and a planting method capable of reducing labor and cost of construction. It is intended to provide the structure of a box for use. That is, the present invention is a technique for producing a box for planting flowers or trees on a slope, in which a locking member is fixed on the slope, and a frame member having a locking arm protruding in a substantially horizontal direction, or The frame material and the planting base material are hooked to the hooking member at the tip of the hooking arm to stand upright on the slope, and the frame material is filled with a solidifying material to cure and solidify. It is a planting box technology characterized by constructing a wall body and forming a planting area between the wall body and the slope.

【0005】[0005]

【実施例1】以下、図面を参照しながら、本発明の一実
施例について説明する。 <イ>枠材の構造 枠材1は、図1に示すように、ボックス外面側に位置す
る外網板2と、その内側に位置する内鉄筋篭3とを合体
させて構成するものである。外網板2には、その一方の
面の左右上下方向の適所に、複数の掛止筋21を略水平
方向に突設し、これらを縦方向の補強筋22により連結
して補強を行う。また、各掛止筋21の先端部は下方に
折り曲げ、内鉄筋篭3と連結できるように構成する。内
鉄筋篭3は、中網板31と内網板32間を連結筋33に
より連結し、篭状に作製する。また、内鉄筋篭3の上部
からは、適宜数の掛止ア−ム34を水平方向に突設し、
その先端部を下方に折り曲げ、後述の掛止部材と連結で
きるよう構成する。図1は、内鉄筋篭3の上部の両側端
部からのみ掛止ア−ム34を突出させた場合であるが、
それらの中間部分に一本あるいは複数本突出させても構
わない。さらに、掛止ア−ム34は折り畳み可能に構成
するとよい。例えば、図3に示すように、掛止ア−ム3
4の下端部側を内鉄筋篭3の横鉄筋に巻き付けて巻き付
け部35を形成し、さらに巻き付け部35に連続してL
字状の係止部36を設ける。これによって、掛止ア−ム
34は回転可能となり、かつ係止部36が縦鉄筋に係止
するため、直立させることが可能となる。また、外網板
2、中網板31、内網板32は、金網やパンチングメタ
ル等の公知の網板を使用し、図2に示すように、上端は
同じレベルとし、下端は斜面の傾斜に合わせて外網板2
から内網板32に向かって徐々に短く形成する。以上の
ように枠材1を分割して構成するのは、急斜面での作業
においては、なるべく重量が軽い方が運搬及び設置が行
い易いためであるが、これらを一体に作製する場合もあ
り、この場合には一度に設置できるという利点が得られ
る。一体型か分割型かは、種々の施工条件に合わせて選
択するとよい。
Embodiment 1 An embodiment of the present invention will be described below with reference to the drawings. <A> Structure of Frame Material As shown in FIG. 1, the frame material 1 is configured by combining an outer net plate 2 located on the outer surface side of the box and an inner rebar cage 3 located inside thereof. . The outer net plate 2 is provided with a plurality of hooking bars 21 projecting in a substantially horizontal direction at appropriate positions on one side thereof in the left-right and up-down directions, and these are connected by vertical reinforcing bars 22 for reinforcement. Further, the front end of each retaining bar 21 is bent downward so that it can be connected to the inner reinforcing bar cage 3. The inner reinforcing bar cage 3 is manufactured in a cage shape by connecting the middle mesh plate 31 and the inner mesh plate 32 with the connecting bar 33. Further, from the upper part of the inner rebar cage 3, an appropriate number of hooking arms 34 are horizontally projected.
The tip portion is bent downward so that it can be connected to a hooking member described later. FIG. 1 shows a case where the hooking arm 34 is projected only from both end portions of the upper portion of the inner reinforcing bar cage 3,
One or a plurality of protrusions may be provided in the intermediate portion. Further, the latch arm 34 may be configured to be foldable. For example, as shown in FIG.
The lower end side of 4 is wound around the horizontal reinforcing bar of the inner reinforcing bar cage 3 to form a winding portion 35, and further to the winding portion 35, L
A character-shaped locking portion 36 is provided. As a result, the hooking arm 34 is rotatable and the locking portion 36 is locked to the vertical reinforcing bar, so that it can be erected upright. As the outer net plate 2, the middle net plate 31, and the inner net plate 32, known net plates such as wire netting and punching metal are used. As shown in FIG. 2, the upper end is at the same level and the lower end is the slope of the slope. Outer mesh plate 2 according to
From the inner mesh plate 32 toward the inner mesh plate 32. The reason why the frame member 1 is divided and configured as described above is that, when working on a steep slope, it is easier to carry and install if the weight is as light as possible. In this case, there is an advantage that they can be installed at once. The integrated type or the divided type may be selected according to various construction conditions.

【0006】<ロ>掛止部材の固定 掛止部材は、斜面上に固定して、枠材1を掛止するため
のものである。例えば、斜面上の上下方向に、アンカ−
により固定した複数本のチェ−ン4と、このチェ−ン4
のリング内に両端を通して、水平方向に掛け渡した鋼棒
41とより構成する。その他、掛止部材としては、リン
グあるいはフックを頭部に有するアンカ−ピンなど、掛
止構造を有するものであればよい。なお、掛止部材や上
記の枠材1には、アルミ被覆等の防錆処理を施してお
く。また、必要に応じてモルタル等で被覆する。
<B> Fixing of Locking Member The locking member is for fixing the frame member 1 on the slope. For example, in the vertical direction on the slope, the anchor
A plurality of chains 4 fixed by, and this chain 4
It consists of a steel rod 41 which is horizontally passed through both ends in the ring. In addition, the hooking member may be any member having a hooking structure such as an anchor pin having a ring or a hook on its head. In addition, the latching member and the frame member 1 are subjected to rustproof treatment such as aluminum coating. If necessary, it is covered with mortar or the like.

【0007】<ハ>枠材の設置 先ず、図2に示すように、内鉄筋篭3を斜面上に鉛直方
向に設置し、その掛止ア−ム34の先端曲折部を斜面上
に固定した鋼棒41に掛止する。次に、外網板2を、そ
の掛止筋21の先端曲折部を内鉄筋篭3の中網板31に
掛止して、斜面上に設置するとともに、内鉄筋篭3と合
体させる。
<C> Installation of frame material First, as shown in FIG. 2, the inner rebar cage 3 was installed vertically on the slope, and the bent end of the hooking arm 34 was fixed on the slope. Hook on the steel rod 41. Next, the outer mesh plate 2 is hooked to the middle mesh plate 31 of the inner reinforcing bar cage 3 with the bent end portion of the retaining bar 21 being set on the slope, and is joined to the inner reinforcing bar cage 3.

【0008】<ニ>植栽基材の設置 枠材1の設置と同時に、プレハブ化した植栽基材5を、
斜面と内網板32間の空間に設置する。植栽基材5は、
斜面と内網板32間の空間に合致する形状に構成したも
のであり、例えばダンボ−ル紙に種肥土を埋め込んだも
のや、袋体に土砂と種を充填したものなどを用いる。な
お、枠材1と植栽基材5を予め工場で一体製造したもの
を斜面に設置してもよく、この場合には、斜面上での設
置作業の省力化を図ることができる。
<D> Installation of planting base material At the same time when the frame material 1 is installed, the prefabricated planting base material 5 is
It is installed in the space between the slope and the inner net plate 32. The planting base material 5 is
It is configured to have a shape matching the space between the slope and the inner net plate 32. For example, a cardboard paper in which seed fertilizer soil is embedded or a bag body filled with earth and sand and seeds is used. It should be noted that the frame material 1 and the planting base material 5 that have been integrally manufactured in advance in a factory may be installed on the slope, and in this case, labor saving of the installation work on the slope can be achieved.

【0009】<ホ>固化材の充填 以上のように、斜面上に枠材1及び植栽基材5の設置が
完了した後、図2に示すように、モルタルやコンクリ−
ト等の固化材6を枠材1の周囲に吹き付ける。同時に、
チェ−ン4や鋼棒41にも固化材6を充填し、雨水に対
する防錆処理を施す。固化材6の、養生、固化により、
植栽用ボックスの施工を完了する。なお、上記の植栽基
材5を使用せずに、固化材6を充填し、固化させた後
に、斜面と内網板32間の空間に植栽用土砂を充填する
場合もある。
<E> Filling with solidifying material As described above, after the installation of the frame material 1 and the planting base material 5 on the slope is completed, as shown in FIG. 2, as shown in FIG.
A solidifying material 6 such as G is sprayed around the frame material 1. at the same time,
The chains 4 and the steel rods 41 are also filled with the solidifying material 6 and subjected to a rust preventive treatment against rainwater. By curing and solidifying the solidifying material 6,
Complete the construction of the planting box. In some cases, the space between the slope and the inner net plate 32 is filled with planting sand after the solidifying material 6 is filled and solidified without using the planting base material 5 described above.

【0010】[0010]

【実施例2】固化材6の充填を打設により行う場合は、
外網板2の前面に透水性シ−トを張設し、この下部を地
山に沿わせて植栽基材5側に巻き込んで設置する。これ
によって、固化材6の流出を防止できるため、植栽用ボ
ックスの現場打ちコンクリ−ト施工が可能となる。この
場合、プレハブ化された植栽基材5の外面が内型枠の機
能をするため、内型枠を設ける必要がない。
[Embodiment 2] When the solidified material 6 is filled by casting,
A water-permeable sheet is stretched on the front surface of the outer net plate 2, and the lower part of the sheet is wound around the planting base material 5 side along the natural ground. As a result, the solidified material 6 can be prevented from flowing out, so that the planting box can be concretely cast on site. In this case, since the outer surface of the prefabricated planting base material 5 functions as the inner mold, it is not necessary to provide the inner mold.

【0011】[0011]

【本発明の効果】本発明は以上説明したようになるた
め、次のような効果を得ることができる。 <イ>斜面に固定した掛止部材に枠材を掛止し、固化材
を充填するだけで植栽用ボックスを作製できる。そのた
め、作業がプレハブ化されて非常に容易になり、施工期
間の短縮及びコストの低減を図ることができる。
Since the present invention is as described above, the following effects can be obtained. <B> A planting box can be produced by simply hooking the frame member to the hooking member fixed to the slope and filling the solidifying material. Therefore, the work is prefabricated and becomes very easy, and the construction period and cost can be shortened.

【0012】<ロ>枠材は掛止部材に掛止するだけ設置
できるため、任意の位置に設置でき、しかも微調整が可
能である。そのため、施工が正確で柔軟性がある。
<B> Since the frame member can be installed only by hooking it on the hooking member, it can be installed at any position and can be finely adjusted. Therefore, the construction is accurate and flexible.

【0013】<ハ>枠材を分割型に構成した場合は、急
斜面での運搬及び設置が行い易くなる。
<C> When the frame material is of a split type, it is easy to carry and install it on a steep slope.

【0014】<ニ>植栽基材の設置もプレハブ化できる
ため、より一層施工が容易になる。
<D> Since the planting base material can be prefabricated, the construction can be further facilitated.

【0015】<ホ>枠材と植栽基材を予め工場で一体製
造したものを斜面に設置する場合には、斜面上での設置
作業をよりいっそう省力化することができる。
<E> When the frame material and the planting base material are integrally manufactured in advance in a factory and installed on a slope, the installation work on the slope can be further labor-saving.

【0016】<ヘ>従来のように法枠と一体に配筋する
必要がないため、地山斜面だけでなく、既設の法枠上で
あっても、掛止部材を法枠上に固定し、枠材を掛止すれ
ば施工が容易に行える。
<F> Since it is not necessary to reinforce with the law frame as in the conventional case, the hooking member is fixed on the law frame not only on the ground slope but also on the existing law frame. If the frame material is hooked, the construction can be done easily.

【0017】<ト>チェ−ン等の掛止部材を斜面に複数
配置し、これに枠材等を横方向に連続して掛止すること
によって、斜面上に横方向に連続する植栽用ボックスを
構築することができる。そのため、従来の単独型のボッ
クスと異なり、植栽基材の容量を横方向に増すことがで
きる。従って、植物の根が横方向に長く伸びることがで
き、良質な緑化を行うことができ、ボックス設計の多様
化を図ることがきる。
<To> A plurality of locking members such as chains are arranged on the slope, and a frame material or the like is continuously locked horizontally on the slope, so that the slope is continuously continuous in the horizontal direction. Boxes can be built. Therefore, unlike the conventional stand-alone box, the capacity of the planting base material can be increased in the lateral direction. Therefore, the roots of the plant can be elongated in the lateral direction, high quality greening can be performed, and the box design can be diversified.

【0018】<チ>既設コンクリ−ト面、岩盤、既設法
枠など、どのような種類の斜面でも施工が可能なため、
汎用性に優れている。
<Chi> Since it is possible to work on any kind of slope such as existing concrete surface, bedrock, existing method frame, etc.,
It has excellent versatility.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の植栽用ボックスの組み立て説明図FIG. 1 is an explanatory view of assembling a planting box of the present invention.

【図2】 斜面に植栽用ボックスを設置した状態の説明
[Fig. 2] Illustration of a planting box installed on the slope

【図3】 掛止ア−ムの折り畳み構造の説明図FIG. 3 is an explanatory view of a folding structure of a latch arm.

【図4】 従来技術の説明図FIG. 4 is an explanatory diagram of a conventional technique.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 斜面に花や樹木を植栽するボックスを作
製する工法において、 斜面上に掛止部材を固定し、 略水平方向に掛止ア−ムを突設した枠材を、掛止ア−ム
の先端を前記掛止部材に掛止して斜面上に立設し、 枠材の周囲に固化材を充填し、養生、固化させて壁体を
構築し、 この壁体と斜面との間に植栽用の空間を形成することを
特徴とした、 植栽用ボックス工法。
1. A method for producing a box for planting flowers or trees on a slope, wherein a locking member is fixed on the slope, and a frame member having a locking arm protruding substantially horizontally is used. The end of the arm is hooked on the hooking member and erected on the slope, the solidification material is filled around the frame material, and cured and solidified to construct a wall body. A boxing method for planting, characterized by forming a space for planting between.
【請求項2】 斜面に花や樹木を植栽するボックスを作
製する工法において、 斜面上に掛止部材を固定し、 略水平方向に掛止ア−ムを突設した枠材と、枠材と斜面
との間に配置する植栽基材とを、掛止ア−ムの先端を前
記掛止部材に掛止して斜面上に設置した後、 枠材の周囲に固化材を充填し、養生、固化させて壁体を
構築することを特徴とした、 植栽用ボックス工法。
2. A method of manufacturing a box for planting flowers or trees on a slope, comprising a frame member having a latching member fixed on the slope, and a latching arm protruding substantially horizontally. And a planting substrate to be arranged between the slope and the slope, after the end of the latch arm is hooked on the latch member and installed on the slope, the frame material is filled with a solidifying material, A boxing method for planting, which is characterized by curing and solidifying to build a wall.
【請求項3】 掛止部材は、斜面上の上下方向に複数本
固定したチェ−ンと、このチェ−ン間に水平方向に掛け
渡した鋼棒とより構成した請求項1又は2記載の植栽用
ボックス工法。
3. The hooking member according to claim 1 or 2, wherein the hooking member comprises a plurality of vertically fixed chains on a slope and steel bars horizontally hung between the chains. Box construction method for planting.
【請求項4】 請求項2に記載の植栽用ボックス工法に
用いるボックスであって、略水平方向に掛止ア−ムを突
設した枠材と、枠材と斜面との間に配置する植栽基材と
よりなる植栽用ボックスの構造。
4. The box used in the planting box construction method according to claim 2, wherein the box is arranged between a frame member and a frame member having a hook arm projecting in a substantially horizontal direction. Structure of planting box consisting of planting base material.
【請求項5】 枠材は、壁体の外面に位置する外網体
と、内側に位置する内鉄筋篭とを合体させることより構
成した請求項4に記載の植栽用ボックスの構造。
5. The structure of a planting box according to claim 4, wherein the frame member is configured by combining an outer net body located on the outer surface of the wall body and an inner rebar cage located inside.
JP35799892A 1992-12-25 1992-12-25 Planting box method and planting box structure Expired - Fee Related JP3000073B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35799892A JP3000073B2 (en) 1992-12-25 1992-12-25 Planting box method and planting box structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35799892A JP3000073B2 (en) 1992-12-25 1992-12-25 Planting box method and planting box structure

Publications (2)

Publication Number Publication Date
JPH06193073A true JPH06193073A (en) 1994-07-12
JP3000073B2 JP3000073B2 (en) 2000-01-17

Family

ID=18457021

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35799892A Expired - Fee Related JP3000073B2 (en) 1992-12-25 1992-12-25 Planting box method and planting box structure

Country Status (1)

Country Link
JP (1) JP3000073B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007222075A (en) * 2006-02-23 2007-09-06 Koiwa Kanaami Co Ltd Step structure
JP2013516158A (en) * 2010-01-01 2013-05-13 張 宇順 Eco green wall and its construction method
CN112854252A (en) * 2020-12-31 2021-05-28 中国水利水电第八工程局有限公司 Three-dimensional prefabrication and damaged mountain ecological restoration method for high-slope plant-growing groove floating plate

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007222075A (en) * 2006-02-23 2007-09-06 Koiwa Kanaami Co Ltd Step structure
JP2013516158A (en) * 2010-01-01 2013-05-13 張 宇順 Eco green wall and its construction method
CN112854252A (en) * 2020-12-31 2021-05-28 中国水利水电第八工程局有限公司 Three-dimensional prefabrication and damaged mountain ecological restoration method for high-slope plant-growing groove floating plate
CN112854252B (en) * 2020-12-31 2022-03-11 中国水利水电第八工程局有限公司 Three-dimensional prefabrication and damaged mountain ecological restoration method for high-slope plant-growing groove floating plate

Also Published As

Publication number Publication date
JP3000073B2 (en) 2000-01-17

Similar Documents

Publication Publication Date Title
JPH06193073A (en) Fabrication method for vegetation box and structure thereof
JP4167915B2 (en) Slope reinforcement method
JPH09144008A (en) Measuring coil for forming cast-in-place sloped form
JP3074421B2 (en) Construction method for the soil on the slope
JP3027106B2 (en) Landscape landscape formwork applied to concrete structures and landscape landscape formwork
JP2004244880A (en) Seeding and planting method for slope face and net form for slope protection frame used therefor
JP2694326B2 (en) Cast-in-place method
JP2004190432A (en) Triangular holding frame and structure of greening slope
JP2767233B2 (en) New formwork and construction structure of retaining wall etc. using new formwork and method of constructing retaining wall etc. using new formwork
JP3353207B2 (en) How to build a step-shaped step retaining wall
JPH08144288A (en) Constructing method of stepped retaining wall and tree-planting method
JP3516132B2 (en) Slope greening structure and slope greening method
JP2743002B2 (en) Formwork equipment for terrace pocket construction of legal formwork and method of constructing formwork between legal formwork and terrace pocket
JP3069836B2 (en) Greening law frame
JP2573157B2 (en) Leg frame method and gauge formwork used in the method
JPH0355638Y2 (en)
JP2003003478A (en) Concrete placing method on face of slope by spaced out arrangement of cylindrical forms without filling concrete
JP2709346B2 (en) Block for legal framework
JPH10252070A (en) Reinforcing earthen wall surface structure
WO1984000042A1 (en) A process for producing a number of plinths, and an arrangement for carrying out the process
JPH09144009A (en) Measuring frame for forming cast-in-place sloped form
JP2002309584A (en) Frame for forming slope protection frame and method for constructing slope protection frame using the same
JPS62182318A (en) Construction work of bearing plate
JPH07331664A (en) Slope frame coil, and constructing method for slope frame body in grating employing slope frame coil
JPH04209209A (en) Protecting method for slope

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081112

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20091112

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20101112

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20111112

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20111112

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121112

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees