Frame receiving structure for lids for underground structures

Info

Publication number
JPH0617872Y2
JPH0617872Y2 JP1987016552U JP1655287U JPH0617872Y2 JP H0617872 Y2 JPH0617872 Y2 JP H0617872Y2 JP 1987016552 U JP1987016552 U JP 1987016552U JP 1655287 U JP1655287 U JP 1655287U JP H0617872 Y2 JPH0617872 Y2 JP H0617872Y2
Authority
JP
Japan
Prior art keywords
receiving frame
bulk
connecting bolt
nut
adjusting ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1987016552U
Other languages
Japanese (ja)
Other versions
JPS63126453U (en
Inventor
豊 斎藤
定司 浦上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hinode Ltd
Original Assignee
Hinode Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hinode Ltd filed Critical Hinode Ltd
Priority to JP1987016552U priority Critical patent/JPH0617872Y2/en
Publication of JPS63126453U publication Critical patent/JPS63126453U/ja
Application granted granted Critical
Publication of JPH0617872Y2 publication Critical patent/JPH0617872Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【考案の詳細な説明】 <産業上の利用分野> 本考案はマンホール、その他の地下構造物用の蓋を支持
する受枠の構造に関するものである。
DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a structure of a receiving frame that supports a lid for a manhole or other underground structure.

<従来の技術> 路面に設置するマンホール、その他の地下構造物用の蓋
は、上面に車輛が通過すると重量とともに激しい衝撃と
か振動による外力が作用する。しかも、このような外力
は瞬間的に生じる極めて大きい動荷重であって頻繁に発
生し、蓋から蓋を支持する受枠にまで作用する。したが
って受枠と、この受枠を支持する下桝との間にがたつき
を生じ、受枠の周囲の舗装面を破壊するし、長期間経過
すると下桝をも破壊することになる。
<Prior Art> Manholes installed on the road surface and lids for other underground structures, when a vehicle passes over the top surface, are subjected to heavy impact and external force due to vibrations. Moreover, such an external force is an extremely large dynamic load that is instantaneously generated and frequently generated, and acts from the lid to the receiving frame that supports the lid. Therefore, rattling occurs between the receiving frame and the lower stile supporting the receiving frame, and the pavement surface around the receiving frame is destroyed, and the lower stile is also destroyed after a long period of time.

上記した舗装面や下桝等の破壊を防止する地下構造物用
受枠の固定構造としては、例えば実開昭54-89158号公報
に記載のものが知られている。
As a fixing structure of the receiving frame for an underground structure which prevents the above-mentioned pavement surface, lower pit, etc. from being destroyed, for example, the one described in Japanese Utility Model Publication No. 54-89158 is known.

この受枠固定構造は地中の下桝上面に植設されたアンカ
ーボルトを挿通する孔を穿設したフランジを受枠の下端
に設け、孔から突き出たアンカーボルトに上方からナッ
トを螺合することにより受枠を固定している。
This receiving frame fixing structure is provided with a flange at the lower end of the receiving frame that has a hole for inserting the anchor bolt planted on the upper surface of the lower pit in the ground, and the nut is screwed from above to the anchor bolt protruding from the hole. The receiving frame is fixed.

<考案が解決しようとする問題点> 一方、車輛が頻繁に通過することによる路面の損傷や路
盤の沈下等に応じ、路面を再舗装する必要が生じる。路
面を再舗装すると、路面と地下構造物の蓋との間には段
差が生じるので、蓋の位置を新たに形成された路面に一
致させるため嵩上げ、嵩下げの嵩調整をしなければなら
ない。
<Problems to be solved by the invention> On the other hand, the road surface needs to be repaved depending on the damage to the road surface or the subsidence of the roadbed caused by the frequent passage of vehicles. When the road surface is repaved, a step is generated between the road surface and the lid of the underground structure. Therefore, in order to match the position of the lid with the newly formed road surface, it is necessary to raise and lower the volume.

この嵩調整は地中に埋設した下桝と受枠との間に、スペ
ーサとして嵩調整リングを着脱することにより行なうの
で、受枠を下桝から一旦取り外さなければならない。し
かし、前記した従来の受枠固定構造ではアンカーボルト
が地中に埋設状であるから、受枠と下桝とを分離作業す
るために、路面をアンカーボルトの部分まで掘削する必
要がある。したがって、蓋の嵩調整前後の路面の掘削及
び補修作業の工程を伴なうことになるので、作業が極め
て煩雑になる欠点が有る。
Since this bulk adjustment is performed by attaching and detaching a bulk adjusting ring as a spacer between the lower sill buried in the ground and the receiving frame, the receiving frame must be temporarily removed from the lower stile. However, since the anchor bolt is buried in the ground in the conventional receiving frame fixing structure described above, it is necessary to excavate the road surface up to the anchor bolt portion in order to separate the receiving frame and the lower stile. Therefore, the work of excavating and repairing the road surface before and after adjusting the bulk of the lid is involved, which is a drawback that the work becomes extremely complicated.

また、路面はアスファルト及びコンクリートで舗装され
ているので、埋設状のアンカーボルトの螺子溝にセメン
トモルタル等が付着したままの状態である場合があり、
蓋の嵩調整作業時に螺子溝内のセメントモルタルを除去
したりオイルを塗布しなければナットを取り外すことが
むずかしく、作業時間が著しく長期となる。
In addition, since the road surface is paved with asphalt and concrete, cement mortar etc. may remain attached to the screw groove of the embedded anchor bolt,
It is difficult to remove the nut unless the cement mortar in the screw groove is removed or oil is applied during the bulk adjustment work of the lid, and the working time becomes extremely long.

更に、蓋の嵩調整はアンカーボルトの長さにより規制さ
れるので、アンカーボルトの長さ以上に嵩上げすること
ができない。
Furthermore, since the bulk adjustment of the lid is restricted by the length of the anchor bolt, it is impossible to raise the lid more than the length of the anchor bolt.

一方、実開昭57-197540号公報に記載されているよう
に、受枠の内側部分を空洞状にして底部にナットを設
け、このナットをアンカーボルトに連結するようにした
構造も知られている。
On the other hand, as described in Japanese Utility Model Laid-Open No. 57-197540, there is also known a structure in which the inner portion of the receiving frame is hollow and a nut is provided at the bottom, and the nut is connected to an anchor bolt. .

しかし、上記した構造もナットは空洞部内に位置するの
で狭いスペースでスパナ等の工具を操作する必要が有
り、極めて作業性が悪い。
However, also in the above-mentioned structure, the nut is located in the hollow portion, so that it is necessary to operate a tool such as a spanner in a narrow space, and workability is extremely poor.

実開昭59−51849号公報や実開昭60−1265
39号公報に記載されている受枠固定構造は、受枠の外
面にボルトやナットを設けて地中やセメントモルタル等
に埋設状となっているので、前記の実開昭54-89158号公
報に記載のものとほぼ同様に、受枠と下桝とを分離作業
するために、路面をボルトの部分まで掘削する必要があ
るので、蓋の嵩調整前後の路面の掘削及び補修作業の工
程を伴なうことになって作業が極めて煩雑になる欠点が
あるばかりでなく、ボルトの螺子溝にセメントモルタル
等が付着したままの状態である場合があり、蓋の嵩調整
作業時に螺子溝内のセメントモルタルを除去したりオイ
ルを塗布しなければナットを取り外すことがむずかし
く、作業時間が著しく長期となる欠点がある。
Japanese Utility Model Publication No. 59-51849 and Japanese Utility Model Publication No. 60-1265.
The receiving frame fixing structure described in Japanese Patent No. 39 has a bolt and a nut provided on the outer surface of the receiving frame so as to be embedded in the ground, cement mortar, or the like, and therefore is described in Japanese Utility Model Publication No. 54-89158. Almost the same as the above, the road surface needs to be excavated up to the bolt part in order to separate the receiving frame and the lower basin, so the process of excavating and repairing the road surface before and after the lid bulk adjustment is involved. Not only is there a drawback that the work becomes extremely complicated, but there are cases where cement mortar etc. is still attached to the screw groove of the bolt, so the cement mortar in the screw groove can be removed during bulk adjustment work of the lid. It is difficult to remove the nut unless it is removed or oil is applied, and the working time is extremely long.

<問題点を解決するための手段> 本考案は上記した従来の欠点に鑑み提案されたもので、
下桝の上面に設置される蓋支持用の受枠の外周部に半径
方向への突出部のない略円筒状の周壁部を設けるととも
に、該周壁部より内側に連結ボルト挿通用の孔部を開設
し、上記孔部に挿通する連結ボルトを螺着する雌ネジ具
を前記下桝に取付けたことを特徴とするものである。
<Means for Solving Problems> The present invention has been proposed in view of the above-mentioned conventional drawbacks.
An outer peripheral portion of a receiving frame for supporting the lid installed on the upper surface of the lower basin is provided with a substantially cylindrical peripheral wall portion having no protruding portion in the radial direction, and a hole for inserting a connecting bolt is formed inside the peripheral wall portion. Then, a female screw tool for screwing a connecting bolt inserted into the hole is attached to the lower rod.

<実施例> 以下に本考案を図面に示す実施例に基づいて説明する。<Embodiment> The present invention will be described below based on an embodiment shown in the drawings.

第1図は本考案の第1実施例を示す要部を拡大した縦断
面図である。
FIG. 1 is an enlarged vertical sectional view of a main part showing a first embodiment of the present invention.

第1図において、蓋1は、路面Rに等しいレベルとなる
ように設置された受枠2にその周囲をテーパ嵌合によっ
て支持されている。
In FIG. 1, a lid 1 is supported by a receiving frame 2 installed at a level equal to the road surface R by taper fitting around the receiving frame 2.

受枠2の下方には、地下構造物に通じる下桝3が位置す
ると共に、この下桝3の上端面と受枠2の下端面との間
には、嵩調整のために嵩調整リング4を配置している。
これらの受枠2、嵩調整リング4及び下桝3は、受枠2
の外周面14の内側において、連結ボルト5で接続する
ことによって一体化されている。このために、下桝3に
は連結ボルト5に螺合する雌ネジ具としてのナット又は
雌螺子6(以下「ナット6」という)を埋設状に設け、
嵩調整リング4には連結ボルト5が挿通するスリーブ7
を備えている。
A lower basin 3 communicating with an underground structure is located below the receiving frame 2, and a bulk adjusting ring 4 is arranged between the upper end surface of the lower basin 3 and the lower end surface of the receiving frame 2 for bulk adjustment. is doing.
These receiving frame 2, bulk adjusting ring 4 and lower basin 3 are
It is integrated by connecting with the connecting bolt 5 inside the outer peripheral surface 14. For this purpose, a nut or a female screw 6 (hereinafter referred to as "nut 6") as a female screw tool that is screwed into the connecting bolt 5 is provided in the lower basin 3 in an embedded form.
A sleeve 7 through which a connecting bolt 5 is inserted into the bulk adjusting ring 4.
Is equipped with.

第1図に示す本考案の第1実施例は受枠2の内部側を数
か所突出して連結ボルト5の取り付け部分としたもの
で、受枠2の内周面の下端に前記取り付け部分に対応す
る内向きのフランジ状部分を設けて連結ボルト5が挿通
するボルト挿通孔11を開設している。
In the first embodiment of the present invention shown in FIG. 1, the inner side of the receiving frame 2 is projected at several places to form the connecting portion of the connecting bolt 5, and the lower end of the inner peripheral surface of the receiving frame 2 corresponds to the attaching portion. An inward flange-shaped portion is provided to form a bolt insertion hole 11 through which the connecting bolt 5 is inserted.

なお、通行車両から受ける振動や衝撃による連結ボルト
5の緩衝みを防止するために、連結ボルト5の受枠2着
座面には、平ワッシャ12に加えてスプリングワッシャ
を備えることが好ましい。
In addition to the flat washer 12, the spring washer is preferably provided on the receiving surface of the receiving frame 2 of the connecting bolt 5 in order to prevent buffering of the connecting bolt 5 due to vibrations and impacts received from a passing vehicle.

また、この受枠2の外周面14は、突出部のない形状、
好ましくは下方に向けて縮径する形状のテーパ面とする
が、受枠2の軸線に平行な直壁状としたり、斜め上に向
けて凸となるような曲面状とすることもできる。このよ
うな外周面14の形状がいずれであっても、突出部が全
くないものとし、受枠2の取り除き作業に支障を伴うこ
とがないようにしておく。また、外周面14には、舗装
用のアスファルトと受枠2との接着を防止するために、
油紙等の剥離用シートを巻回しておくことが好ましい。
Further, the outer peripheral surface 14 of the receiving frame 2 has a shape without a protrusion,
Preferably, the taper surface is shaped so as to reduce its diameter downward, but it may also be a straight wall shape parallel to the axis of the receiving frame 2, or a curved surface shape that is convex upward. Regardless of the shape of the outer peripheral surface 14 as described above, it is assumed that there is no protruding portion at all so that the removal work of the receiving frame 2 will not be hindered. In addition, in order to prevent the asphalt for paving and the receiving frame 2 from adhering to the outer peripheral surface 14,
It is preferable to wind a peeling sheet such as oil paper.

下桝3は、一般に使用されているレジンコンクリートを
素材として作られている。この下桝3の成形時に、連結
ボルト5に螺合するナット6を、インサート成形法によ
って、下桝3の内部に埋設状に設ける。
The lower basin 3 is made of generally used resin concrete. At the time of molding the lower basin 3, a nut 6 that is screwed into the connecting bolt 5 is embedded in the lower basin 3 by an insert molding method.

嵩調整リング4は、再生プラスチックスや硬質合成樹脂
を素材とするが、負荷される重量や衝撃に耐え得る強度
を備えると共に、弾性効果をも果たすものが好ましい。
また、この嵩調整リング4に受枠2および下桝3の内面
形状に対応させた突出部分に配置するスリーブ7は、連
結ボルト5の挿通用としてのみでなく、負荷される重量
に対しての補強の機能をも果たす。したがって、スリー
ブ7の素材を軸線強度の高い鋼管やステンレスパイプ等
とすることが好ましい。そして、嵩調整リング4の弾性
変形を考慮して、成形時の段階ではスリーブ7の上端は
嵩調整リング4の上面より下方に位置するように製作す
る。このスリーブ7の配置により、据え付けた後には嵩
調整リング4は圧縮荷重によって僅かに弾性変形してス
リーブ7の上端と同じレベルになっても、スリーブ7が
嵩調整リング4全体と共に受枠2を支持することにな
り、嵩調整のレベルを維持するように機能する。
The bulk adjusting ring 4 is made of a recycled plastic or a hard synthetic resin, but it is preferable that the bulk adjusting ring 4 has a strength capable of withstanding a weight to be applied and an impact and also has an elastic effect.
Further, the sleeve 7 arranged on the protruding portion corresponding to the inner surface shapes of the receiving frame 2 and the lower frame 3 in the bulk adjusting ring 4 is not only for inserting the connecting bolt 5, but also for reinforcing against the weight to be loaded. Also fulfills the function of. Therefore, the material of the sleeve 7 is preferably a steel pipe or a stainless pipe having a high axial strength. In consideration of the elastic deformation of the bulk adjusting ring 4, the upper end of the sleeve 7 is manufactured so as to be located below the upper surface of the bulk adjusting ring 4 at the stage of molding. Due to this arrangement of the sleeve 7, even if the bulk adjusting ring 4 is slightly elastically deformed by a compressive load after installation and reaches the same level as the upper end of the sleeve 7, the sleeve 7 supports the receiving frame 2 together with the bulk adjusting ring 4 as a whole. And functions to maintain the level of bulk adjustment.

なお、以上の嵩調整リング4の外径は、受枠2の下端外
径に略等しいか又は少し小さいものとしておく。これ
は、既に設置している嵩調整リング4を交換するような
場合に、受枠2を除去した後に、土中の掘削作業を必要
とすることなく取り出し及び据え付けできることを目的
としたものである。
The outer diameter of the bulk adjusting ring 4 is set to be substantially equal to or slightly smaller than the outer diameter of the lower end of the receiving frame 2. This is for the purpose of removing and installing the receiving frame 2 after exchanging the receiving frame 2 when exchanging the bulk adjusting ring 4 which has already been installed, without requiring excavation work in the soil.

次いで、嵩上げ調整時に、嵩調整リング4を装着する手
順を説明する。
Next, a procedure for mounting the bulk adjusting ring 4 at the time of raising adjustment will be described.

まず、受枠2の内周面の下端に設けたフランジ状部分の
ボルト挿通孔11に挿通させた連結ボルト5を工具によ
って緩め、下桝3のナット6との螺合を解く。次いで、
受枠2を地上に引き上げた後、必要とする高さ寸法の嵩
調整リング4を下桝3上面若しくは既設の嵩調整リング
4上面に載置する。
First, the connecting bolt 5 inserted into the bolt insertion hole 11 of the flange-shaped portion provided at the lower end of the inner peripheral surface of the receiving frame 2 is loosened with a tool, and the screw engagement with the nut 6 of the lower rod 3 is released. Then
After pulling up the receiving frame 2 to the ground, the bulk adjusting ring 4 having a required height is placed on the upper surface of the lower basin 3 or the existing upper surface of the bulk adjusting ring 4.

更に、嵩調整リング4のスリーブ7の位置を下桝3のナ
ット6に整合した状態とし、受枠2を再びこの嵩調整リ
ング4上に置き、ボルト挿通孔11をスリーブ7に整合
させて連結ボルト5をこれに挿入する。
Further, the position of the sleeve 7 of the bulk adjusting ring 4 is aligned with the nut 6 of the lower rod 3, the receiving frame 2 is placed on the bulk adjusting ring 4 again, and the bolt insertion hole 11 is aligned with the sleeve 7 to connect the connecting bolt. Insert 5 into this.

そして、連結ボルト5をナット6にねじ込むことによっ
て、受枠2に対して嵩調整リング4の高さ寸法分の嵩上
げを行うことができる。
Then, by screwing the connecting bolt 5 into the nut 6, it is possible to raise the receiving frame 2 by the height of the bulk adjusting ring 4.

また、路面Rのレベル低下に伴う嵩下げ作業の要領は、
前記と同様に、まず受枠2を取り除き、既設の嵩調整リ
ング4を取り出して、必要とする寸法の嵩調整リング4
に交換する。この交換作業の後、嵩上げの場合と同様
に、受枠2を設置し、連結ボルト5を下桝3のナット6
にねじ込んで固定することによって、作業を完了する。
In addition, the procedure of the bulking down work accompanying the decrease in the level of the road surface R is
Similar to the above, first, the receiving frame 2 is removed, the existing bulk adjusting ring 4 is taken out, and the bulk adjusting ring 4 having a required size is obtained.
Replace with. After this replacement work, as in the case of raising, the receiving frame 2 is installed and the connecting bolt 5 is attached to the nut 6 of the lower rod 3.
Work is completed by screwing in and fixing.

以上のように、工事の開始時点における受枠2の取り外
しには、受枠2全周の路面Rを掘削する必要はなく、作
業工程を簡略化でき、作業員数を削減しても支障なく施
工できる。
As described above, in order to remove the receiving frame 2 at the start of construction, it is not necessary to excavate the road surface R around the entire periphery of the receiving frame 2, the work process can be simplified, and the work can be performed without any trouble even if the number of workers is reduced.

また、連結ボルト5は、作業前の時点では下桝3のナッ
ト6に螺合しているので、その螺子部にはセメントモル
タル等が全く付着しない状態を維持している。したがっ
て、嵩調整リング4を介装した後にナット6にねじ込む
作業も円滑に行え、作業性の向上が図れる。
Further, since the connecting bolt 5 is screwed into the nut 6 of the lower basin 3 before the operation, cement mortar and the like are not attached to the screw portion at all. Therefore, the work of screwing the nut 6 after inserting the bulk adjustment ring 4 can be smoothly performed, and the workability can be improved.

更に、連結ボルト5を長尺のものに交換することによっ
て、大幅な嵩上げ調整も現場合わせで容易に行うことが
できる。
Further, by replacing the connecting bolt 5 with a long one, it is possible to easily make a large adjustment of the height in the field.

本考案の上記第1実施例に示す様に、連結ボルト5の取
付け位置を受枠2の内周側とすることによって、常に蓋
1によって保護されているので、螺子部にモルタル等が
付着することはなく、連結作業に支障をきたす恐れはな
い。
As shown in the first embodiment of the present invention, the mounting position of the connecting bolt 5 is on the inner peripheral side of the receiving frame 2 so that it is always protected by the lid 1. There is no danger of interfering with the connection work.

なお、下桝3には連結ボルト5に螺合する雌螺子を加工
してナット6の代用とすることもできる。このように下
桝3に雌螺子を加工する場合には、螺子切り加工と強度
の点から、下桝を鋳鉄等の金属素材とすることも可能で
ある。
It should be noted that the lower rod 3 may be formed with a female screw that is screwed into the connecting bolt 5 to substitute for the nut 6. In the case of processing the female screw on the lower basin 3 in this manner, the lower basin may be made of a metal material such as cast iron in view of the thread cutting and strength.

第2図は本考案の第2実施例の要部断面図で、これは樹
脂製の嵩調整リング4を保護するために、受枠2の外周
面14の下部に外周が連続した袴状のカバー部2aを形成
したものである。このカバー部2aは、嵩調整リング4
の周囲を囲むような環状体として下桝3のレベルより下
側まで伸延し、路面Rに施工するアスファルトと嵩調整
リング4周面とを遮断している。その他の構成は、前記
したものと全く同様で、連結ボルト5を下桝3に一体化
したナット6にねじ込むことによって、受枠2を下桝3
に連結固定できる。なお、6aはナット6を下桝3に固
定保持するために配筋した鉄筋である。
FIG. 2 is a cross-sectional view of a main part of a second embodiment of the present invention. This is a hakama-shaped cover whose outer periphery is continuous with the lower part of the outer peripheral surface 14 of the receiving frame 2 in order to protect the bulk adjusting ring 4 made of resin. The part 2a is formed. The cover portion 2a is provided with a bulk adjustment ring 4
As an annular body that surrounds the circumference of the road, it extends below the level of the lower basin 3 and blocks the asphalt to be built on the road surface R and the peripheral surface of the bulk adjustment ring 4. The other structure is exactly the same as that described above, and the receiving frame 2 is moved to the lower frame 3 by screwing the connecting bolt 5 into the nut 6 integrated with the lower frame 3.
Can be connected and fixed to. In addition, 6a is a reinforcing bar for fixing the nut 6 to the lower rod 3 in a fixed manner.

このようにカバー2aを設けたものでは、アスファルト
の施工時における樹脂製の嵩調整リング4を保護でき
る。すなわち、嵩調整リング4は、路面Rの補修の際の
アスファルトに接触しないため、高温のアスファルトか
ら熱影響を受けることがない。したがって、嵩調整リン
グの損傷を防ぐことができると共に、嵩調整レベルの狂
い等を伴うことなく嵩調整作業を行うことができる。
With the cover 2a thus provided, the resin bulk adjustment ring 4 can be protected during asphalt construction. That is, the bulk adjusting ring 4 does not come into contact with the asphalt at the time of repairing the road surface R, so that the bulk adjusting ring 4 is not thermally affected by the high temperature asphalt. Therefore, the bulk adjustment ring can be prevented from being damaged, and the bulk adjustment work can be performed without causing a deviation in the bulk adjustment level.

第3図は本考案の第3実施例を示す要部の断面図で、こ
れは連結ボルト5の頭部を収納する受枠2の凹部10内
に合成樹脂製のキャップ20を嵌合配置したものであ
る。なお、第3図中、21は受枠2下面と下桝3上面間
に介装したダクタイル鋳鉄製の敷板で、第3図中、説明
していない符号の構成は前記実施例の同一符号と同一の
構成であるから、説明を省略する。
FIG. 3 is a sectional view of an essential part showing a third embodiment of the present invention, in which a synthetic resin cap 20 is fitted and arranged in a recess 10 of a receiving frame 2 for accommodating the head of a connecting bolt 5. Is. In FIG. 3, reference numeral 21 is a floor plate made of ductile cast iron interposed between the lower surface of the receiving frame 2 and the upper surface of the lower basin 3, and the unexplained reference numerals in FIG. Since it has the above configuration, the description is omitted.

上記敷板21は、受枠2の下端外径よりも小さいものと
し、受枠2の除去後に、土中の掘削作業を必要とするこ
となく取り除けるようにしておく。
The floor plate 21 is smaller than the outer diameter of the lower end of the receiving frame 2 so that it can be removed after the receiving frame 2 is removed without excavating the soil.

上記実施例において、キャップ20を備えることによっ
て、路面R下に埋没する凹部10内から連結ボルト5の
螺子部方向へのコンクリートモルタルやアスファルト等
の侵入を防止できる。したがって、連結ボルト5の螺子
部を保護でき、嵩調整作業でのナット6との接続の容易
化を図ることができる。
In the above embodiment, by providing the cap 20, it is possible to prevent concrete mortar, asphalt, or the like from entering from the recess 10 buried under the road surface R toward the screw portion of the connecting bolt 5. Therefore, the screw portion of the connecting bolt 5 can be protected, and the connection with the nut 6 in the bulk adjustment work can be facilitated.

なお、上記した本考案の図面による各実施例において示
した下桝3は、ナット6を一体的に取付けたレジンコン
クリートの他に、鋳鉄等の金属素材を利用してナット6
に代わる筒状の雌螺子を埋設したものとすることもでき
る。
In addition to the resin concrete in which the nut 6 is integrally attached, the lower basin 3 shown in each of the embodiments according to the drawings of the present invention uses a nut 6 made of a metal material such as cast iron.
It is also possible to embed a cylindrical female screw instead of the above.

<考案の効果> 以上に説明したように、本考案に係る地下構造物用蓋構
造の受枠においては、受枠の外周部に半径方向への突出
部のない略円筒状の周壁部を設けるとともに、該周壁部
より内側に連結ボルト挿通用の孔部を開設し、後部に挿
通する連結ボルトを螺着する雌ネジ具を下桝に取り付け
たので、受枠の上方から、若しくは受枠の内部における
操作で連結ボルトの取付け、取り外しを行うことによ
り、嵩調整作業に際して受枠周りの路面を掘削する作業
を必要としないので、施工が極めて簡単になる。しか
も、施工後の路面補修の工程も不要なので、作業時間の
短縮が図れる。更に、連結ボルトの頭部、螺子部及び下
桝のナットに、路面からのセメントモルタルやアスファ
ルトが付着しないので、下桝に対する受枠の着脱作業も
著しく軽い労力で行うことができる。また、連結ボルト
の長さを適宜選択することによって、大幅な嵩調整にも
対応できる。
<Effect of the Invention> As described above, in the receiving frame of the lid structure for an underground structure according to the present invention, the outer peripheral portion of the receiving frame is provided with a substantially cylindrical peripheral wall portion having no protruding portion in the radial direction, and Since a hole for inserting the connecting bolt is opened inside the peripheral wall and a female screw tool for screwing the connecting bolt to be inserted in the rear portion is attached to the lower rod, it can be operated from above the receiving frame or inside the receiving frame. By attaching and removing the connecting bolts, it is not necessary to excavate the road surface around the receiving frame in bulk adjustment work, so that the construction is extremely simple. Moreover, since the road surface repair process after construction is unnecessary, the working time can be shortened. Further, since cement mortar and asphalt from the road surface do not adhere to the head portion, the screw portion and the nut of the lower rod of the connecting bolt, the work of attaching / detaching the receiving frame to / from the lower rod can be performed with remarkably light labor. Further, by appropriately selecting the length of the connecting bolt, it is possible to cope with a large volume adjustment.

【図面の簡単な説明】[Brief description of drawings]

第1図は本考案の第1実施例の要部を拡大して示す縦断
面図、第2図は本考案の第2実施例の要部を拡大して示
す断面図、第3図は本考案の第3実施例の要部を拡大し
て示す断面図である。 1は蓋、2は受枠、3は下桝、4は嵩調整リング、5は
連結ボルト、6はナット、7はスリーブ、11はボルト
挿通用の孔部、14は外周面。
FIG. 1 is an enlarged longitudinal sectional view showing an essential part of a first embodiment of the present invention, FIG. 2 is an enlarged sectional view showing an essential part of a second embodiment of the present invention, and FIG. 3 is a book. It is sectional drawing which expands and shows the principal part of 3rd Example of a device. 1 is a lid, 2 is a receiving frame, 3 is a lower rod, 4 is a bulk adjusting ring, 5 is a connecting bolt, 6 is a nut, 7 is a sleeve, 11 is a hole for inserting a bolt, and 14 is an outer peripheral surface.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】下桝の上面に設置される蓋支持用の受枠の
外周部に半径方向への突出部のない略円筒状の周壁部を
設けるとともに、該周壁部より内側に連結ボルト挿通用
の孔部を開設し、上記孔部に挿通する連結ボルトを螺着
する雌ネジ具を前記下桝に取付けたことを特徴とする地
下構造物用蓋の受枠構造。
1. A peripheral wall of a receiving frame for supporting a lid, which is installed on the upper surface of a lower basin, is provided with a substantially cylindrical peripheral wall portion having no protruding portion in the radial direction, and a connecting bolt is inserted inside the peripheral wall portion. The hole is opened, and a female screw tool for screwing a connecting bolt inserted into the hole is attached to the lower rod.
JP1987016552U 1987-02-09 1987-02-09 Frame receiving structure for lids for underground structures Expired - Lifetime JPH0617872Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1987016552U JPH0617872Y2 (en) 1987-02-09 1987-02-09 Frame receiving structure for lids for underground structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1987016552U JPH0617872Y2 (en) 1987-02-09 1987-02-09 Frame receiving structure for lids for underground structures

Publications (2)

Publication Number Publication Date
JPS63126453U JPS63126453U (en) 1988-08-18
JPH0617872Y2 true JPH0617872Y2 (en) 1994-05-11

Family

ID=30808514

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1987016552U Expired - Lifetime JPH0617872Y2 (en) 1987-02-09 1987-02-09 Frame receiving structure for lids for underground structures

Country Status (1)

Country Link
JP (1) JPH0617872Y2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5567204B1 (en) * 2013-12-18 2014-08-06 タカマツ株式会社 Manhole cover mounting structure and mounting and removal methods
JP5514362B1 (en) * 2013-12-18 2014-06-04 タカマツ株式会社 Manhole cover mounting structure and mounting and removal methods

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5951849U (en) * 1982-09-30 1984-04-05 京阪コンクリ−ト工業株式会社 manhole
JPS60126539U (en) * 1984-01-28 1985-08-26 長島鋳物株式会社 Raised structure for underground objects
JPS6299518A (en) * 1985-10-25 1987-05-09 Asahi Concrete Kogyo Kk Fitting structure of receiving frame for manhole

Also Published As

Publication number Publication date
JPS63126453U (en) 1988-08-18

Similar Documents

Publication Publication Date Title
JPH0617872Y2 (en) Frame receiving structure for lids for underground structures
KR101125089B1 (en) Construction of manholes method
KR100578554B1 (en) Manhole maintenance method and suppoting device for the method
JP2006291616A (en) Lid body device and lid body installation device
JP4976952B2 (en) Road surface repair method, rolling plate and guide member used therefor
JP5139377B2 (en) Manhole floating prevention structure
US5403116A (en) Booted road plate
JP4113095B2 (en) Gutter lid
JP6574280B2 (en) Opening structure of underground structure
KR101217488B1 (en) Extension structure of pile foundation
KR101181844B1 (en) Manhole repair apparatus and manhole repair method using the same
KR102177466B1 (en) Valve cover mount type water control valve protecting case
JP3926613B2 (en) Repair method for underground structures
KR200272128Y1 (en) A manhole for height adjustment
KR102532488B1 (en) Manhole structure having improved construction height adjustment structure
JP2004332522A (en) Overlay construction method, cutting overlay construction method, and paving construction method
JP3136514B2 (en) Level adjustment device
KR200175290Y1 (en) Lock device of pulling up ring a manhole
JP2926003B2 (en) Height adjustment method for repair of underground structures and height adjustment tools used in the method
JP7002081B2 (en) Manhole reinforcement structure
CN220538708U (en) Anti-floating well lid for municipal road
JP2979389B2 (en) Lid for underground structures
KR200462762Y1 (en) Assist cover frame for manhole cover assembly
KR100461492B1 (en) Maintenace and Reinforce Engineering Method of Structure Under Ground
JP3007146U (en) Manhole cover level adjustment member