JPH0615764B2 - Underwater structure scouring prevention method - Google Patents

Underwater structure scouring prevention method

Info

Publication number
JPH0615764B2
JPH0615764B2 JP61156217A JP15621786A JPH0615764B2 JP H0615764 B2 JPH0615764 B2 JP H0615764B2 JP 61156217 A JP61156217 A JP 61156217A JP 15621786 A JP15621786 A JP 15621786A JP H0615764 B2 JPH0615764 B2 JP H0615764B2
Authority
JP
Japan
Prior art keywords
scaffold
scour
underwater structure
mat
scour prevention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61156217A
Other languages
Japanese (ja)
Other versions
JPS6314909A (en
Inventor
良和 黒瀬
佳伸 古川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP61156217A priority Critical patent/JPH0615764B2/en
Publication of JPS6314909A publication Critical patent/JPS6314909A/en
Publication of JPH0615764B2 publication Critical patent/JPH0615764B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】 《産業上の利用分野》 この発明は、強潮流下であって大深度海底に沈設された
水中構造物に好適な洗掘防止工法に関する。
Description: TECHNICAL FIELD The present invention relates to a scour prevention method suitable for an underwater structure that is submerged in a deep seabed under a strong tide.

《従来の技術》 ケーソンなどの水中構造物に対する洗掘現象は、特に強
潮流下で広範囲におよび、かつ顕著となる。この種の洗
掘を防止する工法としては、その原理により地盤を改良
して洗掘力を低減する方法と、地盤の洗掘抵抗力を増大
する方法のいずれかが採用される。
<< Prior Art >> The scouring phenomenon for underwater structures such as caisson is widespread and remarkable, especially under strong tide. As a construction method for preventing this type of scour, either a method of improving the ground by reducing the scour force or a method of increasing the scour resistance of the ground is adopted.

しかしながら、大水深であって強潮流下では、洗掘抵抗
力を増す方法は極めて難しく、従って、洗掘力を低減す
る方法が採用されているが、以下に説明する問題があっ
た。
However, it is extremely difficult to increase the scour resistance at a deep water and under strong tide. Therefore, although the method for reducing the scour force is adopted, there are problems described below.

《発明が解決しようとする問題点》 すなわち、洗掘力を低減させる洗掘防止工法は、従来水
中構造物の水平断面より大きな面の防護材を水底面に敷
設するものであったが、この作業は、ダイバーなどの水
中作業によって専ら行なわれていたために、作業能率が
低く、工期が長期化する問題があった。
<< Problems to be solved by the invention >> That is, the scouring prevention method for reducing the scouring force has conventionally laid a protective material having a surface larger than the horizontal cross section of the underwater structure on the bottom of the water. Since the work is carried out exclusively by underwater work such as a diver, there is a problem that the work efficiency is low and the construction period is prolonged.

この発明は、以上の欠点に鑑みされたものであって、洗
掘防止工の施工を極く短期間でしかも水中作業なしで精
度良く行えるようにすることを目的とする 《問題点を解決するための手段》 前記目的を達成するため、この発明の水中構造物の洗掘
防止工法は、水中構造物の周囲に配置された足場と、該
足場から各々下方に延長する複数の吊下用ワイヤーと、
該複数の吊下用ワイヤーによって略水平に展開状態で支
持される洗掘防止マットとを設け、該洗掘防止マット
を、前記各ワイヤーの繰り出し量を調整して前記展開状
態を保持しつつ水中構造物の周囲水底面に沈降敷設する
ようにしたことを特徴とするものである。
The present invention has been made in view of the above-mentioned drawbacks, and an object thereof is to make it possible to carry out the construction of scour prevention work accurately in an extremely short period of time and without underwater work. Means for Means >> To achieve the above object, a method for preventing scour of an underwater structure according to the present invention includes a scaffold arranged around the underwater structure and a plurality of hanging wires extending downward from the scaffold. When,
A scour prevention mat that is supported substantially horizontally by the plurality of hanging wires in an unfolded state is provided, and the scour preventive mat is adjusted in water while maintaining the unfolded state by adjusting the payout amount of each wire. It is characterized by being settled on the water bottom around the structure.

《作 用》 この発明の水中構造物の洗掘防止工法によれば、足場か
らの作業により水中作業によることなく洗掘防止マット
の所定位置への沈降敷設作業が行われるとともに、足場
に設けた各吊下用ワイヤーの繰り出し量を調整すること
により、洗掘防止マットは、敷設位置を覆う展開状態を
保持しつつバランス良く水中に沈降される。
<Operation> According to the scour prevention method for underwater structures of the present invention, the sinking laying work of the scour prevention mat to a predetermined position is performed by the work from the scaffold and the scaffold is provided on the scaffold. By adjusting the feeding amount of each hanging wire, the scour prevention mat is settled in water in a well-balanced manner while maintaining the expanded state of covering the laying position.

《実施例》 以下、この発明工法の実施例を図面を用いて詳細に説明
する。
<Example> Hereinafter, an example of the method of the present invention will be described in detail with reference to the drawings.

第1図ないし第3図はこの発明工法の第1実施例を示
し、第1図は同工法を適用したケーソンと洗掘防止マッ
トとの結合関係を示す平面図、第2図,第3図は同工法
における洗掘防止マットの敷設手順を示す工程説明図で
ある。
1 to 3 show a first embodiment of the construction method of the present invention, and FIG. 1 is a plan view showing the coupling relationship between a caisson and a scour prevention mat to which the construction method is applied, FIG. 2, FIG. FIG. 4 is a process explanatory view showing a procedure for laying a scour prevention mat in the same construction method.

各図において、1は円筒形の綱製ケーソン、2はケーソ
ン1の外周部に複数に分割され展開した状態で海底面に
敷設される底面被覆用洗掘防止マット(以下第1のマッ
トと称する)、3,4は第1の洗掘防止マット2の外周
面に二重同心円状に配される法面被覆用洗掘防止マット
(以下第2,3の洗掘防止マットと称する)である。
In each figure, 1 is a cylindrical steel caisson, 2 is a scorching prevention mat for covering the bottom (hereinafter referred to as the first mat) which is laid on the seabed in a state in which the caisson 1 is divided into a plurality of outer peripheral portions ), 3 and 4 are scouring prevention mats for slope covering which are arranged in a double concentric pattern on the outer peripheral surface of the first scouring prevention mat 2 (hereinafter referred to as second and third scouring prevention mats). .

前記第1の洗掘防止マット2は、ケーソン1の頂面周縁
部に組立てられた固定式作業足場5に複数の吊りワイヤ
ー6を介して敷設位置を覆う展開した状態でかつ吊下状
態に保持されている。また、前記第2,3の洗掘防止マ
ット3,4は浮体、すなわち台船8の下面に同じく複数
の吊りワイヤー6を介して敷設位置を覆う展開した状態
でかつ吊下状態に保持されている。
The first scour prevention mat 2 covers the fixed work scaffold 5 assembled on the peripheral portion of the top surface of the caisson 1 through a plurality of suspension wires 6 and covers the laying position and keeps it in an expanded state and in a suspended state. Has been done. Further, the second and third scour prevention mats 3 and 4 are held in a floating state, that is, in a deployed state that covers the laying position on the lower surface of the pontoon 8 through a plurality of suspension wires 6 as well and in a suspended state. There is.

洗掘防止マット2,3,4は、チェーンマット,コンク
リートマット,砂利(捨石)マット,アスファルマッ
ト,コンクリートマット,コンクリートブロックマット
などからなるものであり、それぞれ前記ワイヤー6の下
端に連結した吊り枠7の下部に保持されている。
The scour prevention mats 2, 3 and 4 are composed of a chain mat, a concrete mat, a gravel (rubbish) mat, an asphalt mat, a concrete mat, a concrete block mat, etc. It is held at the bottom of 7.

そして、前記第1の洗掘防止マット2は、建造ドック内
でのケーソン1の構築終了後、艤装工程において前記作
業足場5を組立てた後に、その下部に吊りワイヤー6を
介して吊下状態に保持され、この状態で曳船などにより
ケーソン1の沈設現場まで曳航される。
After the construction of the caisson 1 in the construction dock is completed, the first scour prevention mat 2 is assembled with the work scaffold 5 in the outfitting process, and then suspended under the suspending wire 6 under the work scaffold 5. It is held, and in this state, it is towed to the site where Caisson 1 is settled by a tugboat.

また、第2,3の洗掘防止マット3,4は、艤装現場と
は別な所で組立てられ、前記台船8に水中吊下された状
態でこの台船8を曵船により曳航し、沈設現場にてそれ
ぞれ第1の洗掘防止マット2の外周部に配置するように
なっている。前記作業足場5上および台船8上には、前
記各吊りワイヤー6に相当する台数の複数のウィンチ9
が設けられている。
Further, the second and third scour prevention mats 3 and 4 are assembled at a place different from the outfitting site, and are towed by the barge 8 underwater, and the barge 8 is towed by a tugboat. Each of them is arranged on the outer peripheral portion of the first scour-prevention mat 2 at the digging site. A plurality of winches 9 corresponding to the suspension wires 6 are provided on the work scaffold 5 and the berth 8.
Is provided.

従って、沈設現場で第2図に示すように、ケーソン1を
沈設した後に台船8をそれぞれ作業足場の外周部に接続
し、各台船8を係留索などによって固定した後に前記ウ
ィンチ9を巻き戻せば、各洗掘防止マット2は想像線で
示す如く下降し、第3図に示す如く第1の洗掘防止マッ
ト2はケーソン1の外周部の海底面Eに敷設される。
Therefore, as shown in FIG. 2 at the sunk site, after the caisson 1 is sunk, the pontoons 8 are connected to the outer periphery of the work scaffolds, respectively, and the pontoons 8 are wound after the pontoons 8 are fixed by mooring lines. When returned, each scour prevention mat 2 descends as shown by the imaginary line, and as shown in FIG. 3, the first scour prevention mat 2 is laid on the sea bottom E on the outer peripheral portion of the caisson 1.

また、第2,3の洗掘防止マット3,4が平坦面でな
く、法面Eの如く不陸状の部分に着地した場合には、
その形状に沿って各ワイヤー6が緊張したり緩んだりす
るので、そのテンションを見ながらウィンチ9の巻き戻
し作業を行なうことによって不陸形状に対応した状態に
敷設できる。
In addition, when the second and third scour prevention mats 3 and 4 land on an uneven surface such as slope E 1 instead of a flat surface,
Since the wires 6 are tensioned or loosened along the shape, the unwinding operation of the winch 9 can be performed while observing the tension, so that the wire can be laid in a state corresponding to the uneven shape.

なお、この作業は強潮流下で行なうために、それぞれの
ワイヤー6の緊張状態に応じてウィンチ9を作動させる
ことにより、精度よく所期の設置予定位置に敷設するこ
とができる。
Since this work is performed under strong tide, by operating the winch 9 according to the tension state of each wire 6, it can be laid accurately at the intended installation position.

また、敷設作業にあっては、各洗掘防止マット2,3,
4間あるいは隣り合うマット間をワイヤーなどで結合し
ておくことにより、各マット間での隙間が小さく大きな
洗掘防止効果を得ることになる。
In addition, during laying work, each scour prevention mat 2, 3,
By connecting the four mats or the adjacent mats with a wire or the like, the gap between the mats is small and a large scour prevention effect can be obtained.

尚、前記各洗掘防止マット2,3,4と吊り枠7との切
り離しは、適宜の遠隔操作によって行うことができる。
The scour prevention mats 2, 3, 4 and the suspension frame 7 can be separated from each other by an appropriate remote operation.

次に第4図はこの発明工法の第2実施例を示すものであ
る。
Next, FIG. 4 shows a second embodiment of the method of the present invention.

図において、第1の洗掘防止マット2は、前記と同じく
作業足場5の下部にあって、吊り枠7の下部に敷設位置
を覆う展開した状態でかつ吊下状態に固定されていると
ともに、この吊り枠7はガイド用のワイヤー6′によっ
て足場5の下部に保持されている。
In the figure, the first scour prevention mat 2 is fixed to the lower part of the work scaffold 5 in the same manner as described above, in a deployed state that covers the laying position at the lower part of the suspension frame 7, and in the suspended state, The suspension frame 7 is held under the scaffold 5 by a guide wire 6 '.

そして、この第1の洗掘防止マット2は、前記ウィンチ
9に代えてクレーン20に吊下用ワイヤー6を介して連
結されており、これの下降動作によって前記と同じく海
底面Eに沈降敷設される。
And this 1st scour prevention mat 2 is connected to the crane 20 via the wire 6 for suspension instead of the said winch 9, and it descends | decreases and it lays down on the seabed E like the above. It

また、その外周側の洗掘防止マット10は前記第1の実
施例とは異なり、一体化された状態で吊り枠7の下部に
支持されている。
Unlike the first embodiment, the scour prevention mat 10 on the outer peripheral side is supported by the lower portion of the suspension frame 7 in an integrated state.

そして、これはクレーン船30に設けたクレーン31
に、複数の吊り用ワイヤー6を介して吊下状態で沈設現
場まで運ばれ、前記第1の洗掘防止マット2の外周に接
合した状態でクレーン31の稼動により沈設されるよう
になっている。
And this is the crane 31 provided on the crane ship 30.
In addition, it is carried to the submerged site in a suspended state through a plurality of suspension wires 6, and is laid by the operation of the crane 31 while being joined to the outer periphery of the first scour prevention mat 2. .

本実施例によれば、前記第1の実施例に比べて一斉に洗
掘防止マットを沈設することはできず、クレーン20お
よびクレーン船30を順次稼動することによって、ケー
ソン1の外周の海底面に順次敷設されることになるが、
1台のクレーン20およびクレーン船30で作業が行な
われるため、工期は長期化するが、設備費は第1実施例
に比べて安価なものとなる。
According to the present embodiment, the scour prevention mats cannot be simultaneously sunk as compared with the first embodiment, and the crane 20 and the crane ship 30 are sequentially operated, so that the sea bottom on the outer periphery of the caisson 1 is Will be laid in sequence,
Since the work is performed by one crane 20 and one crane ship 30, the construction period is extended, but the equipment cost is lower than that of the first embodiment.

《発明の効果》 以上詳細に説明したように、この発明の水中構造物の洗
掘防止工法によれば、海上面からの作業によって洗掘防
止マットの敷設作業を容易かつ迅速に行うことができる
とともに、各吊下用ワイヤーの繰り出し量を調整して洗
掘防止マットの展開状態を保持しつつ沈降することによ
り、所定の敷設位置に精度良くかつ海底面の不陸部分に
追随して洗掘防止マットを沈降敷設することができる。
<< Effects of the Invention >> As described in detail above, according to the scour prevention method for an underwater structure of the present invention, the scour prevention mat can be easily and quickly laid by working from the sea surface. At the same time, the amount of each hanging wire is adjusted to settle while maintaining the developed state of the scour prevention mat, so that the scour can be performed accurately at the specified laying position and following the unsealed part of the sea floor. The prevention mat can be laid down by sedimentation.

【図面の簡単な説明】[Brief description of drawings]

第1図ないし第3図はこの発明の第1実施例を示し、第
1図はケーソンと洗掘防止マットとの配置関係を示す平
面図、第2図,第3図は同工法における洗掘防止マット
の洗掘手順を示す断面説明図、第4図はこの発明工法の
第2実施例を示す説明図である。 1……ケーソン(水中構造物) 2,3,4,10……洗掘防止マット 5……作業足場、6……吊りワイヤー 8……台 船(浮体) 9……ウィンチ、20,31……クレーン
1 to 3 show a first embodiment of the present invention, FIG. 1 is a plan view showing the positional relationship between a caisson and a scour prevention mat, and FIGS. 2 and 3 are scour in the same construction method. FIG. 4 is an explanatory sectional view showing a scour procedure for the prevention mat, and FIG. 4 is an explanatory diagram showing a second embodiment of the method of the present invention. 1 ... Caisson (underwater structure) 2, 3, 4, 10 ... Scour prevention mat 5 ... Work scaffolding, 6 ... Suspension wire 8 ... Barge (floating body) 9 ... Winch, 20, 31 ... …crane

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】水中構造物の周囲に配置された足場と、該
足場から各々下方に延長する複数の吊下用ワイヤーと、
該複数の吊下用ワイヤーによって略水平に展開状態で支
持される洗掘防止マットとを設け、該洗掘防止マット
を、前記各ワイヤーの繰り出し量を調整して前記展開状
態を保持しつつ水中構造物の周囲水底面に沈降敷設する
ようにしたことを特徴とする水中構造物の洗掘防止工
法。
1. A scaffold disposed around an underwater structure, and a plurality of suspension wires extending downward from the scaffold, respectively.
A scour prevention mat that is supported substantially horizontally by the plurality of hanging wires in an unfolded state is provided, and the scour preventive mat is adjusted in water while maintaining the unfolded state by adjusting the payout amount of each wire. A scour prevention method for underwater structures, characterized by being settled on the water bottom around the structure.
【請求項2】前記足場は水中構造物の周囲に張出し状態
に設けられた固定足場であることを特徴とする特許請求
の範囲第1項記載の水中構造物の洗掘防止工法。
2. The scour prevention method for an underwater structure according to claim 1, wherein the scaffold is a fixed scaffold that is provided around the underwater structure in an extended state.
【請求項3】前記足場は水中構造物の周囲に張出し状態
に設けられた固定足場と、該固定足場の外周部にあって
前記洗掘防止マットを水中に吊下状態に保持した浮体と
からなることを特徴とする特許請求の範囲第1項記載の
水中構造物の洗掘防止工法。
3. The scaffold is composed of a fixed scaffold provided in an extended state around an underwater structure, and a floating body which is in an outer peripheral portion of the fixed scaffold and holds the scour prevention mat in a suspended state in water. The method for preventing scouring of an underwater structure according to claim 1, wherein
【請求項4】前記沈降するための手段として前記吊下用
ワイヤーを繰り出すウィンチを用いたことを特徴とする
特許請求の範囲第1項ないし第3項のいずれかに記載の
水中構造物の洗掘防止工法。
4. The washing of an underwater structure according to any one of claims 1 to 3, wherein a winch for paying out the hanging wire is used as the means for sinking. Excavation prevention method.
【請求項5】前記沈降するための手段としてクレーンを
用いたことを特徴とする特許請求の範囲第1項ないし第
3項のいずれかに記載の水中構造物の洗掘防止工法。
5. A scour prevention method for an underwater structure according to any one of claims 1 to 3, wherein a crane is used as the means for sinking.
JP61156217A 1986-07-04 1986-07-04 Underwater structure scouring prevention method Expired - Lifetime JPH0615764B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61156217A JPH0615764B2 (en) 1986-07-04 1986-07-04 Underwater structure scouring prevention method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61156217A JPH0615764B2 (en) 1986-07-04 1986-07-04 Underwater structure scouring prevention method

Publications (2)

Publication Number Publication Date
JPS6314909A JPS6314909A (en) 1988-01-22
JPH0615764B2 true JPH0615764B2 (en) 1994-03-02

Family

ID=15622916

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61156217A Expired - Lifetime JPH0615764B2 (en) 1986-07-04 1986-07-04 Underwater structure scouring prevention method

Country Status (1)

Country Link
JP (1) JPH0615764B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0621459B2 (en) * 1988-01-27 1994-03-23 清水建設株式会社 Floating scaffolding device for Izutsu and method of constructing Izutsu
TW340078B (en) * 1995-07-06 1998-09-11 Showa Sentetsu Kk Process of manufacturing rion-copper substrate coating welding containing metal-mesh intermediate layers
JP4948308B2 (en) * 2007-07-31 2012-06-06 三菱電機株式会社 Built-in cooking device
CN110485365A (en) * 2019-08-01 2019-11-22 宁夏辰邦石油装备制造有限公司 A kind of seabed protection against erosion bionic system and its construction technology and application

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5555714A (en) * 1979-07-06 1980-04-23 Rsv Gusto Eng Bv Sealing apparatus of lower portion of pillar in water

Also Published As

Publication number Publication date
JPS6314909A (en) 1988-01-22

Similar Documents

Publication Publication Date Title
US4242010A (en) Method and means for protecting a sea bottom surface and an installation on same
CN112030978A (en) Underwater accurate stone throwing system for complex terrain and stone throwing construction method
CN109506044A (en) A kind of pipeline under the ocean construction technology
CN213952233U (en) Underwater accurate stone throwing system for complex terrain
JPH0615764B2 (en) Underwater structure scouring prevention method
CN106628024B (en) Overwater piling operation platform
WO1979000108A1 (en) A system for depositing sediment and/or protecting an installation on the floor of a body of water
JPS58143023A (en) Caisson for pile supporting type breakwater
CN104627326A (en) Special lifting and vibration-driving ship for integrated driving of cell type steel sheet pile large cylinders and vice cells
CN112061335A (en) Protection device capable of lifting and preventing scouring in semi-submersible barge bottom-setting construction and construction method
CN111942539A (en) Protection device with movable protection plate for semi-submersible barge bottom-setting construction and construction method
JP2541897B2 (en) Installation method of shallow water bowling turret and its turret device
JP2632875B2 (en) Rubber sheet laying method at marine waste disposal site
JP2827536B2 (en) Sinking method for submerged boxes
JP2001003332A (en) Immersion method for caisson and floater for immersing the caisson
JPH0739647B2 (en) Method of laying waterproof sheet
JPH0765303B2 (en) Scouring protection method for bottomed offshore structures
JP4067192B2 (en) How to prevent rocks such as sloping levee or rubble mound
JP3010274B2 (en) Mobile breakwater structure and installation method
JPS60119804A (en) Construction of off-shore structure
WO2023107676A1 (en) Submersible drag barge
JPS634105A (en) Scour-proof construction for underwater structure
JPH0227095A (en) Sinking and burying method
JPH0835221A (en) Construction of large scale floating structure
JPS5938369B2 (en) Floating and sinking oil fence flotation device