JPH06153745A - Japanese danish seine - Google Patents

Japanese danish seine

Info

Publication number
JPH06153745A
JPH06153745A JP31703892A JP31703892A JPH06153745A JP H06153745 A JPH06153745 A JP H06153745A JP 31703892 A JP31703892 A JP 31703892A JP 31703892 A JP31703892 A JP 31703892A JP H06153745 A JPH06153745 A JP H06153745A
Authority
JP
Japan
Prior art keywords
net
winch
reel
towline
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP31703892A
Other languages
Japanese (ja)
Other versions
JP3382271B2 (en
Inventor
Hiromi Kinoshita
弘実 木下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nichimo Co Ltd
Original Assignee
Nichimo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nichimo Co Ltd filed Critical Nichimo Co Ltd
Priority to JP31703892A priority Critical patent/JP3382271B2/en
Publication of JPH06153745A publication Critical patent/JPH06153745A/en
Application granted granted Critical
Publication of JP3382271B2 publication Critical patent/JP3382271B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Mechanical Means For Catching Fish (AREA)

Abstract

PURPOSE:To obtain Japanese Danish seine capable of rapidly and surely throwing, netting and raising a laying and drawing fishing net with a few hands, improving operation efficiency and fishing efficiency. CONSTITUTION:A laying and drawing fishing net 4 having a right and a left wing nets 4a and 4b, a main net 4c and a cod net 4d is thrown, netted and raised by a net winch 22 having at least two reels 22R and 22L wherein at least one is separately driven.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、かけまわし漁具を用い
て漁獲操業を行なうかけまわし漁法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a squirrel-fishing method in which a fishing operation is carried out by using a sword-fishing gear.

【0002】[0002]

【従来の技術】一般に、かけまわし漁業は、前方から後
方に向かって袖網、身網およびコッド網を有するかけま
わし網を、これとほぼ同一構成のトロール網と異なり、
オッターボード等の強制拡網装置を一切用いないで拡網
状態とさせて水中に投網して、漁獲操業するものであ
る。
2. Description of the Related Art In general, in a squid kneading fishery, a shaving net having a sleeve net, a net and a cod net from the front to the back is different from a trawl net having almost the same structure as that of the trawl net.
It does not use any forced netting equipment such as an otter board and puts it into the net and casts it into the water for fishing operation.

【0003】図7はかけまわし漁業の概略を示してお
り、まず船1が投網水域において、A、B、C、D、A
の各ポイントを通るようにほぼ矩形に航行する間に、最
初にポイントAにおいて樽2を投下し、続いてポイント
Bにおいて90度転舵してポイントCに達するまで引き
綱3Rを繰出し、ポイントCにおいて転舵する間にかけ
まわし網4を一方の袖網4a、身網4c、コッド網4d
および他方の袖網4bの順に水中に投網し、続いてポイ
ントDにおいて90度転舵して最初のポイントAに戻る
までに他方の引き綱3Lを繰出し、ポイントAにおいて
樽2を船上に揚げる。続いてポイントEまでかけまわし
網2を曳網する流し行程において魚類を漁獲し、続いて
ポイントFまでの寄せこぎ行程の間に船1から引出され
た引き綱3R、3Lを船上に巻上げ、その後かけまわし
網2を船上に揚網し、コッド網2bから魚類を魚槽内に
収容する。
FIG. 7 shows an outline of the squid-fishing fishery. First, in the case where the ship 1 is in the casting net area, A, B, C, D, A
While traveling in a substantially rectangular shape passing through each point, first, drop barrel 2 at point A, then steer 90 degrees at point B, and pull out towline 3R until point C is reached. While turning the steering wheel, the net 4 is spun on one sleeve net 4a, net 4c, and net 4d.
And the other sleeve net 4b in that order, and then steered 90 degrees at the point D to extend the other towline 3L until returning to the first point A, and at the point A, the barrel 2 is lifted on board. Then, fish up to point E in the sinking process to haul the net 2 and then wind up the tow ropes 3R and 3L drawn from the ship 1 during the hopping process up to point F, and then The whirling net 2 is lifted on the ship, and the fish are stored in the fish tank from the cod net 2b.

【0004】更に、図8から図12に示す行程図によ
り、具体的な作業とそれに要する人員数を説明する。
Further, the concrete work and the number of personnel required for it will be described with reference to the process charts shown in FIGS.

【0005】行程1:投網前 右船尾の樽台5に樽2を載せておき、投樽の準備を行な
う。左袖手木ロープ6Lはコイルされている。 操業人数:0人。
Step 1: In front of the casting net, the barrel 2 is placed on the barrel stand 5 on the right stern to prepare for the barrel casting. The left sleeve hand tree rope 6L is coiled. Number of operators: 0 people.

【0006】行程2:投樽 樽台5から樽2を落とす(油圧でブリッジから操作)。
右舷リール7Rはフリーの状態で、右舷スナッチ式トッ
プローラ8Rを通って引き綱3Rが繰出されて行く。 操業人数:0人。
Step 2: Casting barrel The barrel 2 is dropped from the barrel stand 5 (hydraulic operation from the bridge).
The starboard reel 7R is in a free state, and the towline 3R is fed out through the starboard snatch type top roller 8R. Number of operators: 0 people.

【0007】行程3:転舵 右舷の引き綱3Rが半分出たところで(600m)左へ
90°転舵する。引き綱3Rのつなぎ目のスイベル9が
出る時に、リール7Rにブレーキをかける。 操業人数:1人。
Stroke 3: Steering When the starboard towline 3R half goes out (600 m), the vehicle steers 90 ° to the left. When the swivel 9 at the joint of the towline 3R comes out, the brake is applied to the reel 7R. Number of operators: 1 person.

【0008】行程4:左手木ロープをスナッチ式トップ
ローラへ入れる 転舵後、船尾にコイルされていた左袖手木ロープ6Lを
右舷の引き綱3Rが走っている右舷スナッチ式トップロ
ーラ8Rへ入れる。 操業人数:2人。
Step 4: Insert the left hand tree rope into the snatch type top roller After steering, put the left sleeve hand tree rope 6L, which was coiled at the stern, into the starboard snatch type top roller 8R on which the starboard towline 3R is running . Number of operators: 2 people.

【0009】行程5:リールストップ、右のワイヤと左
袖手木ロープの連結 右の引き綱3Rが出終わると、リール7Rをストップし
て、ストッパワイヤ10Raをきかせた後、リール7R
を少し繰り出して張力をストッパ側にかける。フリーに
なった右の引き綱3Rをリール7Rに残っているワイヤ
から外して、左袖手木ロープ6Lと知恵の輪フック11
で連結する。 操業人数:5人。
Stroke 5: Reel stop, connection of right wire and left-handed rope Rope When the right tow rope 3R has come out, the reel 7R is stopped and the stopper wire 10Ra is pulled out, and then the reel 7R
And apply tension to the stopper side. Remove the free right towline 3R from the wire remaining on the reel 7R, left sleeve hand tree rope 6L and wisdom wheel hook 11
Connect with. Number of operators: 5 people.

【0010】行程6:ストッパ切断 ストッパ10Rを切断すると、再び張力が引き綱3Rに
かかり、左袖手木ロープ6Lと連結された右の引き綱3
Rはスナッチ式トップローラ8Rから外れる。右のリー
ル7Rに残っているワイヤの端部は、その場でコイルさ
れる。 操業人数:5人。
Step 6: Stopper cutting When the stopper 10R is cut, tension is again applied to the towline 3R, and the right towline 3 connected to the left sleeve hand tree rope 6L.
R is disengaged from the snatch type top roller 8R. The end of the wire remaining on the right reel 7R is coiled in place. Number of operators: 5 people.

【0011】行程7:投網 右の引き綱3Rに続いてかけまわし網4がスリップウェ
イ13から繰り出される。網4の右袖手木ロープ6Rは
左の引き綱3Lに知恵の輪フック11で連結されてお
り、スナッチ式トップローラ8Lを通ってリール7Lに
巻かれている。 操業人数:0人。
Step 7: Throwing net 3R on the right side is followed by a hauling net 4 from the slipway 13. The right sleeved hand rope 6R of the net 4 is connected to the left tow rope 3L by a wheel hook 11 of wisdom, and is wound around a reel 7L through a snatch type top roller 8L. Number of operators: 0 people.

【0012】行程8:左の引き綱繰り出し 網4に続いて左の引き綱3Lが繰出されて行く。(リー
ル7Lはフリー) この時、揚網時に使う両手木引寄せワイヤ14R、14
Lを用意しておく。(両舷のワーピングドラム15R、
15Lに巻かれたワイヤ14R、14Lを中央の滑車1
6を通して船尾まで持ってくる。) 操業人数:4人。
Stroke 8: Left towline unwinding The left towline 3L is unrolled following the net 4. (The reel 7L is free.) At this time, the two-handed wood pulling wires 14R, 14 used for the net fishing
Prepare L. (Both side warping drums 15R,
Wires 14R and 14L wound around 15L are attached to the pulley 1 at the center.
Bring to the stern through 6. ) Number of operators: 4 people.

【0013】行程9:転舵 左舷の引き綱3Lが半分出たところで(600m)左へ
90°転舵する。前回と同様にスイベル9が出る時に、
リール7Lにブレーキをかける。 操業人数:1人。
Cycle 9: Steering When the port 3R on the port side is half-out (600m), the vehicle steers 90 ° to the left. As with the last time, when swivel 9 comes out,
Apply the brake to reel 7L. Number of operators: 1 person.

【0014】行程10:右リール残りワイヤを左スナッ
チ式トップローラへ入れる コイルされていた右舷のリール7Lの残りワイヤを左の
引き綱3Lが走っている左舷スナッチ式トップローラ8
Lへ大まわしで入れる。 操業人数:4人。
Step 10: Inserting the remaining wire on the right reel into the left snatch type top roller The remaining wire on the starboard reel 7L that was coiled is on the port side snatch type top roller 8 on which the left towline 3L is running.
Put it in L with a large swirl. Number of operators: 4 people.

【0015】行程11:左舷リールストップ 左の引き綱3Lが出終わると、リール7Lをストップし
てストッパワイヤ10Laを取付け、ストッパをきかせ
た後、リール7Lを少し繰り出して張力ストッパ側にか
ける。フリーになった引き綱3Lを左リールの残りワイ
ヤから外し、行程10において大まわしで持ってきた右
リールの残りワイヤと連結する。 操業人数:5人。
Step 11: Port side reel stop When the left towline 3L finishes to come out, the reel 7L is stopped and the stopper wire 10La is attached, and after the stopper is pushed, the reel 7L is slightly extended and applied to the tension stopper side. The free towline 3L is removed from the remaining wire of the left reel, and is connected to the remaining wire of the right reel which is brought around in the stroke 10 by a large turn. Number of operators: 5 people.

【0016】行程12:ストッパ切断、引き綱の移動 ストッパ10Lを切断すると、再び張力が引き綱3Lに
かかり、左スナッチ式トップローラ8Lから外れて右ス
ナッチ式トップローラ8Rへと移動する。この時、行程
11で外された左リール残り引き綱はコイルルされてい
る。左の引き綱3Lの繰出しが終了するころ、船1は投
樽位置近くにすでに到着している。 操業人数:5人。
Step 12: Cutting of stopper, movement of tow rope When the stopper 10L is cut, tension is again applied to the tow rope 3L, which is released from the left snatch type top roller 8L and moves to the right snatch type top roller 8R. At this time, the left reel remaining towline removed in step 11 is coiled. By the time the feeding of the left towline 3L is completed, the ship 1 has already arrived near the barreling position. Number of operators: 5 people.

【0017】行程13:樽とり準備 ストッパ切断と同時に右船首では樽とりの準備のため、
カギ17を持った甲板員が1人待機している。 操業人数:1人。
Step 13: Preparation for barrel removal At the same time as the stopper is cut off, the right bow is prepared for barrel removal.
One deck member with the key 17 is waiting. Number of operators: 1 person.

【0018】行程14:揚樽 右船首からカギ17を樽2にひっかけて引き綱3Rを取
り、船尾まで持って行き、デリック18にて樽2を引き
上げて樽台5に載せる。この時、左リールの残り引き綱
は左スナッチ式トップローラ8Lを通して、大まわしで
右船尾の樽台5のところまで持ってくる。 操業人数:4人。
Step 14: Lifting barrel From the right bow, hook the key 17 on the barrel 2 and take the towline 3R, bring it to the stern, pull the barrel 2 up on the derrick 18 and place it on the barrel stand 5. At this time, the remaining towline of the left reel is brought around to the barrel stand 5 on the right stern through the left snatch type top roller 8L. Number of operators: 4 people.

【0019】行程15:樽の引き綱と左リールの残り引
き綱を連結 ストッパワイヤ10Raを樽2についている引き綱3R
にかけて張力をストッパにかけ、フリーになった引き綱
3Rを樽2から外し、行程14で用意した左リールの残
り引き綱に知恵の輪フック11で連結する。 操業人数:4人。
Step 15: Connect the towline of the barrel to the remaining towline of the left reel. 3R of the towline with the stopper wire 10Ra attached to the barrel 2.
Then, tension is applied to the stopper to remove the free towline 3R from the barrel 2, and it is connected to the remaining towline of the left reel prepared in step 14 with the wheel hook 11 of wisdom. Number of operators: 4 people.

【0020】行程16:ストッパ切断、引き綱の移動 ストッパ10Rを切断すると、再び張力が引き綱3Rに
かかり、樽2についていた引き綱3Rは左スナッチ式ト
ップローラ8Lへと移動する。 操業人数:2人。
Step 16: Cutting of stopper, movement of towline When the stopper 10R is cut, tension is again applied to the towline 3R, and the towline 3R attached to the barrel 2 moves to the left snatch type top roller 8L. Number of operators: 2 people.

【0021】行程17:流し開始 両舷リール7R、7Lを若干巻いて曳網状態に入る。船
速は3〜5ノット(kt)程度で30分間流す。この間
に揚網用デリック付ヤイヤを用意し、第2甲板では前操
業の漁獲物の仕分けが行われる。 操業人数:2人。
Step 17: Start of sinking The reels 7R and 7L are slightly wound to enter the hauling state. The ship speed is about 3 to 5 knots (kt) and flows for 30 minutes. During this period, yairs with derricks for lifting nets are prepared, and the catches from the previous operation are sorted on the second deck. Number of operators: 2 people.

【0022】行程18:寄せこぎ開始 流し開始30分後、次に寄せこぎ(45分)が開始され
る。この間に揚網された両袖網4a、4bをひっくり返
すためのモッコ網(図示せず)が用意される。 操業人数:2人。
Step 18: Start of crowding After 30 minutes from the start of the sinking, next, the crowding (45 minutes) is started. During this time, a mocco net (not shown) for turning over the sleeve nets 4a and 4b lifted up is prepared. Number of operators: 2 people.

【0023】行程19:リールストップと手木引寄せワ
イヤ連結 寄せこぎ(巻揚げ)後、両手木19R、19Lが上がる
と、ウインチによりリール7R、7Lをストップさせ
て、行程8で用意しておいた両手木引寄せワイヤ14
R、14Lを両手木19R、19Lにフックで連結させ
る。 操業人数:4人。
Step 19: Reel Stop and Hand Wood Pulling Wire Connection After pulling (winding), when both hand trees 19R, 19L are raised, the reels 7R, 7L are stopped by the winch and prepared in step 8. Iwata Hand Pulling Wire 14
R and 14L are connected to both hand trees 19R and 19L by hooks. Number of operators: 4 people.

【0024】行程20:強制曳網(魚の追込み) 両舷のリール7R、7Lを繰り出して張力を中央の手木
引寄せワイヤ14R、14Lにかける。右の引き綱3R
は樽2を連結するために、左の引き綱3Lより多く出し
ておく。この時、両舷の引き綱3R、3Lはフリーの状
態になっている。その後、海面に網4が上がってくるま
で強制曳網を行う。 操業人数:8人。
Step 20: Forced hauling (fish driving) The reels 7R and 7L on both sides are unrolled and tension is applied to the central hand-pulling wires 14R and 14L. Right towline 3R
In order to connect the barrel 2, put out more than the left towline 3L. At this time, the ropes 3R and 3L on both sides are free. After that, forced towing nets are carried out until the nets 4 rise to the surface of the sea. Number of operators: 8 people.

【0025】行程21:両手木引き上げ 手木引寄せワイヤ14R、14Lで両手木19R、19
Lを甲板まで上げた後、両引き綱3R、3Lを手木19
R、19Lから外して船尾にコイルする。デリック付ウ
インチ(図示せず)にてストロップがけをして両手木1
9R、19Lをつり上げ、ペンネントは手ぐりでコイル
される。 操業人数:13人。
Step 21: Pulling both hands trees Pulling the two hands trees 14R, 14L with both hands trees 19R, 19
After pulling L up to the deck, pull both ropes 3R, 3L into a hand tree 19
Remove from R and 19L and coil to the stern. Use a winch with a derrick (not shown) to remove the strops and use both hands 1
Lift up 9R and 19L, and the pen is coiled with a handrail. Number of operators: 13 people.

【0026】行程22:揚網 ストロップがけで左右のデリック付ワイヤ18を交互に
使いながら揚網していく。ストロップ回数は左右各7〜
8回で合計15回程度。両袖網4a、4bはデリック付
ワイヤ18から降ろされる時に、それぞれ人力で捌か
れ、用意されたモッコの上に置かれていく。 操業人数:13人。
Step 22: Lifting net Stretching is performed while alternately using the left and right derricked wires 18. 7 times for each left and right
A total of about 15 times in 8 times. When the two sleeve nets 4a and 4b are unloaded from the derrick wire 18, they are manually handled and placed on the prepared mocco. Number of operators: 13 people.

【0027】行程23:コッド網揚げ ストロップがけでコッド網4dが上がると船尾のハッチ
21を開けて、漁獲物を第2甲板に落としてハッチ21
を閉じる。 操業人数:13人。
Step 23: Cod net fried When the cod net 4d is lifted by stroup, the hatch 21 on the stern is opened, and the catch is dropped on the second deck and hatched 21.
Close. Number of operators: 13 people.

【0028】行程24:網整反後各引き綱連結 漁獲物収納後、デリック付ワイヤ18を用いて網4を整
反する。左袖網4bはモッコに乗せて船尾に移動してひ
っくり返す。ペンネントはコイルされる。右手木19R
および右袖網4Aは甲板前方の位置において、大まわし
で左スナッチ式トップローラ8Lを通った左の引き綱3
Lと連結される。右に引き綱3Rは右スナッチ式トップ
ローラ8Rを通って樽2と連結される。投網準備に入
る。 操業人数:13人。
Step 24: After connecting the nets, each net is connected. After the catch is stored, the wire 4 with derrick is used to arrange the nets 4. The left sleeve net 4b is placed on the mocco, moved to the stern and turned over. The pennant is coiled. Right hand tree 19R
And the right sleeve net 4A at the position in front of the deck, the left towline 3 which passed through the left snatch type top roller 8L with a large rotation.
It is connected to L. The towline 3R to the right is connected to the barrel 2 through the right snatch type top roller 8R. Prepare for casting nets. Number of operators: 13 people.

【0029】このようにして、従来のかけまわし漁業が
行なわれている。
In this way, the conventional sprinkling fishery is carried out.

【0030】[0030]

【発明が解決しようとする課題】しかしながら、今日の
漁業をとりまく環境は年々厳しくなるのが実情であり、
特に漁業に従事する人の人員不足、高齢化等が深刻な問
題を提起している。
[Problems to be Solved by the Invention] However, it is a reality that the environment surrounding today's fisheries is becoming severer year by year.
In particular, the shortage of personnel engaged in fisheries and the aging of society pose serious problems.

【0031】このような状況において、前記した従来の
かけまわし漁法においては、作業に要する人員数が非常
に多く、しかもその作業は重労働なものであった。特
に、船上において、かけまわし網4を次の投網のために
所定位置に再配置するように捌く作業の大部分が、人手
により行わなければならず、非常に大変なものであっ
た。また、人手による作業が多いために作業効率が悪
く、かけまわし網の投揚網に長時間を要し、漁獲効率も
悪いという不都合もあった。
In such a situation, in the above-mentioned conventional sprinkling fishing method, the number of workers required for the work was very large, and the work was a heavy labor. In particular, most of the work on the ship, which involves relocating the sprinkling net 4 to a predetermined position for the next casting, must be performed manually, which is very difficult. In addition, since there are many manual operations, the work efficiency is poor, and it takes a long time for the nets to be thrown around and the fishing efficiency is poor.

【0032】本発明はこれらの点に鑑みてなされたもの
であり、少ない人手により迅速にかつ確実にかけまわし
網を投揚網することができ、作業効率および漁獲効率を
向上させることのできるかけまわし漁法を提供すること
を目的とする。
The present invention has been made in view of these points, and it is possible to swiftly and reliably hang a twisting net with a small amount of manpower and improve the working efficiency and the fishing efficiency. The purpose is to provide fishing methods.

【0033】[0033]

【課題を解決するための手段】前記目的を達成するため
に、特許請求の範囲の請求項1に記載されている本発明
のかけまわし漁法は、左右の袖網、身網およびコッド網
とを有するかけまわし網を、少なくとも2個ののリール
を有するとともに、少なくとも一方のリールが別駆動さ
れるように形成されているネットウインチにより投揚網
することを特徴とする。
In order to achieve the above-mentioned object, the sprinkling fishing method of the present invention described in claim 1 of the present invention comprises a left-side sleeve net, a net net and a cod net. It is characterized in that the hanging net has a net winch having at least two reels and at least one reel is separately driven.

【0034】また、特許請求の範囲の請求項2に記載さ
れているかけまわし漁法は、ネットウインチの2個のリ
ールにかけまわし網の左右の袖網をそれぞれ巻回させな
がら身網まで揚網し、その後コッド網より魚類を取出
し、その後前記2個のリールを逆転させて甲板上の所定
位置に前記コッド網および身網を降ろし、その後先に投
網する袖網を前記リールを回転させながら甲板上の所定
位置に降ろして投網待機状態とさせ、投網時には前記甲
板上に配置されている袖網、身網、コッド網、およびリ
ールに巻回されている他方の袖網の順に前記リールを逆
回転させながら投網させることを特徴とする。
[0034] According to the method for shunting and fishing described in claim 2 of the present invention, two reels of a net winch are wound around the nets while winding the left and right sleeve nets respectively. After that, take out the fish from the cod net, then reverse the two reels to lower the cod net and net to a predetermined position on the deck, and then throw the sleeve net to be thrown ahead on the deck while rotating the reel. And put it in the casting net standby state, and reversely rotate the reel in the order of the sleeve net, the net, the cod net and the other sleeve net wound on the reel when the net is cast. It is characterized by letting it cast a net.

【0035】[0035]

【作用】請求項1および2に記載の本発明によれば、ネ
ットウインチを用いてかけまわし網の揚網を行なうこと
ができ、前記ネットウインチのリールを回転させること
により先に投網される側の袖網を甲板上に引出し、他方
の袖網を他方のリールに巻回させたままにしてかけまわ
し網を次の投網のために用意させることができる。これ
により少ない人手により迅速にかつ確実にかけまわし網
を投揚網することができ、作業効率および漁獲効率を向
上させることができる。
According to the present invention as set forth in claims 1 and 2, it is possible to perform a net-pulling net using a net winch, and the net is first cast by rotating the reel of the net winch. Can be pulled out onto the deck, the other sleeve net can be left wound on the other reel, and the spinning net can be prepared for the next casting net. As a result, it is possible to swiftly and reliably cast the net with a small amount of manpower, and it is possible to improve work efficiency and fishing efficiency.

【0036】[0036]

【実施例】以下、本発明の実施例を図1から図6につい
て説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT An embodiment of the present invention will be described below with reference to FIGS.

【0037】図1は本発明の実施に用いる船の概略を示
している。
FIG. 1 shows an outline of a ship used for carrying out the present invention.

【0038】この船1aは、甲板上のワープウインチの
リール7R、7Lより船尾側にネットウインチ22を設
けたものであり、その他は前記従来の船1とほぼ同様に
形成されている。
This ship 1a is provided with a net winch 22 on the stern side of the warp winch reels 7R and 7L on the deck, and is otherwise formed in substantially the same manner as the conventional ship 1.

【0039】このネットウインチ22はかけまわし網4
の投揚網に使用されるものであり、2個のリール22
R、22Lを同軸状にして配設し、いずれか一方のリー
ル(本実施例においては左方のリール22L)にクラッ
チ(図示せず)を設けて自由回転可能に形成している。
This net winch 22 is a spinning net 4
It is used for the lifting net of two reels 22
R and 22L are arranged coaxially, and a clutch (not shown) is provided on either one of the reels (the left reel 22L in the present embodiment) so as to be freely rotatable.

【0040】次に、本発明方法に基づくかけまわし漁法
を、図2から図6に示す行程図により、具体的な作業を
それに要する人員数とを行程順に説明する。
Next, the sprinkling fishing method based on the method of the present invention will be described in the order of the number of personnel required for a specific work by the process diagrams shown in FIGS. 2 to 6.

【0041】行程1:投樽準備 右舷の引き綱3Rは右舷の樽2のストッパーフック2a
に連結しておく。(右舷スナッチ式トップローラーを介
しギャロスを大回しする) 右袖の手木押さえロープ23Rと引き綱3Lは、右袖の
手木19Rに連結しておく。(左舷スナッチ式トップロ
ーラーを介し) 船尾甲板には身網4c、コッド網4d、左袖網4b、ペ
ンネント24、手木19Lが準備されている。右袖網4
aはネットウィンチ22の右舷部のリール22Rに巻回
されたままである。 操業人数:0人。
Step 1: Preparation for barrel casting Starboard towline 3R is a stopper hook 2a for starboard barrel 2
Connect to. (Garros is turned a lot through the starboard snatch type top roller.) The right-handed hand tree holding rope 23R and the tow rope 3L are connected to the right-handed hand tree 19R. (Through port-side snatch type top roller) On the stern deck, a net 4c, a net 4d, a left sleeve net 4b, a pen 24, and a hand tree 19L are prepared. Right sleeve net 4
a is still wound around the starboard side reel 22R of the net winch 22. Number of operators: 0 people.

【0042】行程2:投樽 右舷より樽2をレッコする。(油圧操作) 右舷の引き綱3Rは右舷スナッチ式トップローラ8Rを
介しワープウィンチ12のリール7Rがフリー状態で繰
り出される。 操業人数:0人。
Step 2: Throwing barrel Lecce barrel 2 from the starboard side. (Hydraulic operation) In the starboard towline 3R, the reel 7R of the warp winch 12 is delivered in a free state via the starboard snatch type top roller 8R. Number of operators: 0 people.

【0043】行程3:転舵 引き綱3Rが半分程度繰出された後、左へ約90゜転舵
する。左袖網4bの手木押さえロープ23Lは右舷船尾
でコイルされる。 操業人数:3人。
Stroke 3: Steering After the towline 3R has been fed out for about half, turn the steering rope about 90 ° to the left. The hand pressing rope 23L of the left sleeve net 4b is coiled at the starboard stern. Number of operators: 3 people.

【0044】行程4:手木押さえロープ連結 右舷の引き綱3Rの末端がトップローラ手前まで繰り出
された所でワープウィンチ12をストップさせ、スリッ
プウェイローラー部のストッパーフックに引き綱末端を
掛ける。(以下ストッパ10R) ワープウィンチ12の引寄せワイヤを引き綱3Rから外
す。左袖手木押さえロープ23Lと引き綱3Rの末端を
知恵の輪フック11を用いて連結する。 操業人数:3人。
Step 4: Hand-pushing rope connection When the end of the starboard towline 3R has been extended to the front roller front side, the warp winch 12 is stopped, and the towline end is hooked on the stopper hook of the slipway roller section. (Hereinafter, stopper 10R) The pulling wire of the warp winch 12 is removed from the pulling rope 3R. The left sleeve hand tree holding rope 23L and the end of the towline 3R are connected using the wisdom wheel hook 11. Number of operators: 3 people.

【0045】行程5:ストッパ切断投網開始 ストッパ10Rを切り、左袖網4bを投網する。続いて
コッド網4d、身網4cが投網される。この間に右舷の
ワープウィンチの引寄せワイヤは船尾にコイルしてお
く。 操業人数:1人。
Step 5: Start of Stopper Cutting and Netting Stopper 10R is cut, and left sleeve net 4b is netted. Subsequently, the cod net 4d and the net 4c are cast. During this time, the pulling wire of the starboard warp winch is coiled in the stern. Number of operators: 1 person.

【0046】行程6:右袖投網と綱連結 右袖側が張ってくると右舷ネットウィンチ22の右舷側
のブレーキをゆるめ右袖網4aを順次投網する。右手木
19Rがスリップウェイローラ付近まで繰出した所で、
ネットウィンチ22をストップさせ、左舷手木押さえロ
ープ23Lを手木19Rに連結する。 操業人数:4人。
Step 6: Right-sleeve netting and rope connection When the right-sleeve side stretches, the brake on the starboard side of the starboard net winch 22 is released and the right-sleeve nets 4a are sequentially cast. At the place where the right hand tree 19R has been extended to near the slipway roller,
The net winch 22 is stopped, and the port side tree holding rope 23L is connected to the hand tree 19R. Number of operators: 4 people.

【0047】行程7:ストッパ切断、右袖網繰出し ネットウィンチ引寄せワイヤ25Rのストッパーフック
を切断して、右袖網4aを投網する。続いて手木押さえ
ロープ23Lと左舷ウィンチのリール7Lに巻かれた引
き綱3Lとがワープウィンチフリー状態(ブレーキ投
網)で繰出される。 操業人数:2人。
Step 7: Cutting the stopper and feeding out the right-sleeve netting The stopper hook of the net winch pulling wire 25R is cut, and the right-sleeve net 4a is cast. Then, the hand tree holding rope 23L and the tow rope 3L wound around the reel 7L of the port side winch are delivered in a warp winch free state (brake net). Number of operators: 2 people.

【0048】行程8:転舵 左舷の引き綱3Lが半分程度繰出された後、左へ約90
゜転舵する。揚網準備の為、ネットウィンチ引寄せワイ
ヤ25R、25Lを繰出しておく。 操業人数:3人。
Cycle 8: Steering After about half of the port towline 3L has been paid out, about 90 to the left
° Steer. In order to prepare the net, the net winch pulling wires 25R and 25L are fed out. Number of operators: 3 people.

【0049】行程9:左舷の引き綱を右舷ウィンチへ移
動 左舷の引き綱3Lの末端がトップローラ手前まで繰出さ
れた所で、左舷のワープウィンチ12をストップさせ、
スリップウェイローラ部のストッパ10Lに引き綱3L
の末端を掛ける。ワープウィンチ引寄せワイヤを引き綱
3Lから外す。右舷ワープウィンチ引寄せワイヤを右舷
トップローラおよび左舷トップローラを介して大回し
て、左舷の引き綱3Lの末端と連結する。ストッパ10
Lを切り、左舷の引き綱3Lを右舷ウィンチ側に移動さ
せる。 操業人数:5人。
Step 9: Move the port towline to the starboard winch. When the end of the port towline 3L is extended to the front roller front side, the port side warp winch 12 is stopped.
3L of towline to stopper 10L of slipway roller
Hang the end of. Remove the warp winch pulling wire from the pull rope 3L. The starboard warp winch pulling wire is turned around via the starboard top roller and the portside top roller, and is connected to the end of the port towline 3L. Stopper 10
Cut L and move the port towline 3L to the starboard winch side. Number of operators: 5 people.

【0050】行程10:樽揚げ、右舷の引き綱を左舷ウ
ィンチへ移動 左舷ワープウィンチ引寄せワイヤを左舷トップローラー
を介して右舷ギャロスを大回しし、右舷船尾に準備す
る。右舷船首からカギで樽ロープを引掛け、船尾でカギ
に連結したロープを巻き、樽2を揚げる。左舷ワープ引
寄せワイヤと樽2に連結されていた右舷の引き綱3Rの
末端とを連結し、樽2のストッパを切り、右舷の引き綱
3Rを左舷リール7L側に移動させる。 操業人数:5人。
Step 10: Lifting the barrel, moving the starboard tow rope to the port winch. The starboard warp winch pulling wire is turned around the starboard Garros via the port top roller to prepare for the starboard stern. From the starboard bow, hook the barrel rope with the key, wind the rope connected to the key at the stern, and raise the barrel 2. The port warp pulling wire is connected to the end of the starboard towline 3R connected to the barrel 2, the stopper of the barrel 2 is cut, and the starboard towline 3R is moved to the port reel 7L side. Number of operators: 5 people.

【0051】行程11:流し、寄せこぎ、揚網開始 左右の引き綱3R、3Lの入れ換えが終了し、流し(曳
網=15〜20分程度)、寄せこぎ(45分程度)に入
る。 操業人数:0人。
Step 11: Sinking, pulling, and start of lifting net After the replacement of the right and left ropes 3R, 3L is completed, the sink (pulling net = about 15 to 20 minutes) and the pulling net (about 45 minutes) are entered. Number of operators: 0 people.

【0052】行程12:ウィンチストップ手木引寄せワ
イヤ連結 寄せこぎ後、両手木19R、19Lがスナップ式トップ
ローラまで揚がると、ワープウィンチ12をストップす
る。ネットウィンチ引寄せワイヤ25R、25Lを両舷
の手木19R、19Lにそれぞれ連結する。 操業人数:3人。
Stroke 12: Winch Stop Hand Tree Pulling Wire Connection After pulling, when the hand trees 19R, 19L are lifted to the snap type top roller, the warp winch 12 is stopped. The net winch pulling wires 25R and 25L are respectively connected to the starboard trees 19R and 19L. Number of operators: 3 people.

【0053】行程13:強制曳網網繰出し ネットウィンチ22を巻きながら、両舷ワープウィンチ
12は繰り出す。網4の張力はネットウィンチ引寄せワ
イヤ25R、25Lに掛ける。(引き綱3R、3Lは無
テンションとなる) 同時にロープ移動装置で両舷手木押さえロープを繰出
し、船尾部にコイルする。ネットウィンチ22をストッ
プさせて網4が海面に揚がってくるまで強制曳網を行な
う。 操業人数:5人。
Step 13: Forced towing net feeding The both side warp winches 12 are fed while winding the net winch 22. The tension of the net 4 is applied to the net winch pulling wires 25R and 25L. (Tension lines 3R and 3L are tensionless.) At the same time, the rope moving device pulls out the ropes holding the two handboard trees and coils them in the stern. The net winch 22 is stopped and the forced towing net is carried out until the net 4 reaches the surface of the sea. Number of operators: 5 people.

【0054】行程14:手木引揚げ、網取り外し 網4が海面まで浮上したら、ネットウィンチ22を巻き
あげ、手木19R、19Lを甲板まで揚げる。両手木1
9R、19Lから手木押さえロープを外す。右舷の引き
綱3Rはギャロスを大回しし、樽2のストッパーフック
2aに連結する。右舷手木押さえロープ23Rは右舷船
尾にコイルされ、左舷の引き綱3Lと連結され、左舷手
木押さえロープ23Lは左舷船尾にコイルされる。 操業人数:4人。
Step 14: Lifting the hand tree and removing the net When the net 4 has floated to the surface of the sea, the net winch 22 is rolled up, and the hand trees 19R and 19L are lifted to the deck. Both hands 1
Remove the handwood rope from 9R and 19L. The starboard towline 3R makes a large rotation of Garros and connects it to the stopper hook 2a of the barrel 2. The starboard hand holding rope 23R is coiled on the starboard stern and connected to the port tow rope 3L, and the port holding tree hold rope 23L is coiled on the port stern. Number of operators: 4 people.

【0055】行程15:揚網 手木ペンネントに続いて袖網4a、4bと身網4cをネ
ットウィンチ22に巻き揚げる。両袖網4a、4bを巻
く時は、左右それぞれ浮子側と沈子側に1人ずつ就いて
網4を捌きながら巻き揚げる。身網4c以降も続いて巻
き揚げる。 操業人数:6人。
Step 15: Lifting nets The sleeve nets 4a and 4b and the net net 4c are wound up on the net winch 22 following the hand tree penent. When winding the two-sleeve nets 4a and 4b, one person is placed on each of the float side and the sink side on each of the left and right sides, and the net 4 is lifted while being separated. The nets 4c and after are also rolled up. Number of operators: 6 people.

【0056】行程16:コッド網揚げ スリップウェイ13にコッド頭が揚がったら、ネットウ
ィンチ22をストップし、カーゴウィンチ26R、26
Lおよびセンターウィンチを使ってコッド網4dを揚げ
る。カーゴウィンチ26R、26Lおよびセンターウィ
ンチのワイヤは、ネットウィンチ22の下を通してコッ
ド網4dに掛ける。コッド網4dはそのままネットウィ
ンチ22の下をくぐらせ、ハッチ21から魚を処理場へ
おろす。 操業人数:6人。
Step 16: Cod net lifting When the cod head is lifted on the slipway 13, the net winch 22 is stopped and the cargo winches 26R, 26 are carried out.
Use the L and center winches to fry the cod net 4d. The wires of the cargo winches 26R, 26L and the center winch pass through under the net winch 22 and are hung on the cod net 4d. The cod net 4d passes under the net winch 22 as it is, and the fish is dropped from the hatch 21 to the processing plant. Number of operators: 6 people.

【0057】行程17:投網準備(コッド網移動) 魚を出した後ギャロス上のベビーウィンチ27等を使用
し、再びコッド網4dをネットウィンチ22の下をくぐ
らせ船尾に引出す。 操業人数:5人。
Step 17: Preparation of throwing net (moving of the cod net) After the fish is taken out, the baby winch 27 or the like on the Garros is used and the cod net 4d is passed under the net winch 22 again and pulled out to the stern. Number of operators: 5 people.

【0058】行程18:投網準備(身網繰出し) ネットウィンチ22を逆転させてコッド網4dの上に身
網4cをある程度整反しながら前天井付近まで右舷側に
山積みする。なお、ネットウィンチ22から網4が繰出
される時は、左右舷それぞれ3人(計6人)で適宜捌
く。ベビーウィンチ27およびカーゴウィンチ26R、
26Lを使用して(モッコ網を併用しながら)網4を船
尾に移動させる。 操業人数:6人。
Step 18: Preparation for throwing nets (feeding out nets) The net winch 22 is reversed and the nets 4c are piled up on the starboard side up to the vicinity of the front ceiling while aligning the nets 4c on the cod nets 4d to some extent. When the net 4 is delivered from the net winch 22, the left and right sides of the net 4 are appropriately handled by three persons (six persons in total). Baby winch 27 and cargo winch 26R,
26L is used to move the net 4 to the stern (while also using the mocco net). Number of operators: 6 people.

【0059】行程19:投網準備(左袖網繰出し) 身網4cの前天井部が出し終えたら、次に左舷ネットウ
ィンチリール22Lのみ逆転させ、左袖網4bのみ繰出
しながら捌き整反する。この時浮子、網地、沈子と分担
し4名でモッコを下に敷いて左奥袖を下にして順次網を
載せて行く。ペンネント、手木19Lまで繰出した後、
左舷ネットウィンチ引寄せワイヤ25Lを手木19Lと
切断する。 操業人数:6人。
Step 19: Preparation for throwing net (feeding out left-sleeve net) After the front ceiling portion of the net 4c has been taken out, only the port net winch reel 22L is reversed, and only the left-sleeve net 4b is taken out and arranged. At this time, four people are assigned to the float, net, and shelter, and the mocco is laid down with the left back sleeve down and the nets are sequentially placed. After feeding the pennent, Tegi 19L,
The port net winch pulling wire 25L is cut with the hand tree 19L. Number of operators: 6 people.

【0060】行程20:投網準備(左袖網移動) 船尾ギャロスベビーウィンチ27を使用し,左袖モッコ
網を船尾に移動させ右舷にコイルされていた左側の手木
押さえロープ23Lの片端と左袖手木19Lを連結す
る。(モッコ網は除去) 操業人数:4人。
Step 20: Preparation for net throwing (moving left sleeve net) Using the stern Garros baby winch 27, the left sleeve mocco net is moved to the stern and one end of the left hand tree holding rope 23L coiled on the starboard side and the left sleeve. 19L of hand tree is connected. (Mocco net removed) Number of operators: 4 people.

【0061】行程21:投網準備終了 投網準備終了となり、行程1に戻る。(右袖網4aはネ
ットウィンチ22に巻いたまま投樽する。) 以上の本発明方法によれば、甲板上での作業者の人数は
最大で6名である。これは前記従来例の13名と比較す
ると、作業者数が半分以下に削減されたこととなり、大
きく省人化されたことになる。また、作業も新設したネ
ットウインチ22を用いて迅速、かつ、円滑に行なうこ
とができ、網4の捌きも小さな力により簡単に行なうこ
とができる。
Step 21: Preparation for casting nets Preparation for casting nets is completed, and the process returns to step 1. (The right sleeve net 4a is barreled while being wound on the net winch 22.) According to the method of the present invention described above, the maximum number of workers on the deck is six. This means that the number of workers has been reduced to less than half as compared with the conventional example of 13 persons, which means a great labor saving. Further, the work can be performed quickly and smoothly by using the newly installed net winch 22, and the net 4 can be easily separated with a small force.

【0062】このように、本発明方法によれば、少ない
人手により迅速にかつ確実にかけまわし網を投揚網する
ことができ、作業効率および漁獲効率を向上させること
ができる。更に、投揚網作業を短時間内に行なうことが
できるので、朝夕の漁獲最適時間中における網4の投揚
網回数を従来方法より多くすることができ、漁獲量も大
きく向上されることとなる。
As described above, according to the method of the present invention, it is possible to swiftly and reliably throw the net over a small number of workers and improve the working efficiency and the fishing efficiency. Furthermore, since the fishing net work can be carried out within a short time, the number of fishing nets of the net 4 during the optimum fishing time in the morning and evening can be increased more than the conventional method, and the catch amount can be greatly improved. Become.

【0063】なお、本発明は前記実施例に限定されるも
のではなく、必要に応じて変更することができる。
The present invention is not limited to the above embodiment, but can be modified as necessary.

【0064】[0064]

【発明の効果】このように本発明のかけまわし漁法は構
成され作用するものであるから、少ない人手により迅速
にかつ確実にかけまわし網を投揚網することができ、作
業効率および漁獲効率を向上させることができる等の効
果を奏する。
As described above, since the sprinkling fishing method of the present invention is constructed and operates, it is possible to quickly and reliably cast a sprinkling net with a small amount of manpower, thereby improving working efficiency and fishing efficiency. There is an effect that it can be made.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のかけまわし漁法に使用される船の1例
を示す斜視図
FIG. 1 is a perspective view showing an example of a ship used in the sprinkling fishing method of the present invention.

【図2】本発明のかけまわし漁法の1実施例の行程1か
ら行程5を示す平面図
FIG. 2 is a plan view showing strokes 1 to 5 of one embodiment of the sham-fishing method of the present invention.

【図3】本発明のかけまわし漁法の1実施例の行程6か
ら行程10を示す平面図
FIG. 3 is a plan view showing strokes 6 to 10 of one embodiment of the sprinkling fishing method of the present invention.

【図4】本発明のかけまわし漁法の1実施例の行程11
から行程15を示す平面図
FIG. 4 is a step 11 of one embodiment of the Kakemawari fishing method of the present invention.
Plan view showing process 15

【図5】本発明のかけまわし漁法の1実施例の行程16
から行程20を示す平面図
FIG. 5 is a stroke 16 of one embodiment of the Kakewamashi fishing method of the present invention.
Plan view showing process 20

【図6】本発明のかけまわし漁法の1実施例の行程21
を示す平面図
FIG. 6 is a stroke 21 of one embodiment of the Kakemawari fishing method of the present invention.
A plan view showing

【図7】かけまわし漁法の概要を示す説明図[Figure 7] Explanatory diagram showing the outline of the Kakemawari fishing method

【図8】従来のかけまわし漁法を示す行程1から行程5
を示す平面図
FIG. 8: Stroke 1 to Stroke 5 showing the conventional Kakemawari fishing method
A plan view showing

【図9】従来のかけまわし漁法を示す行程6から行程1
0を示す平面図
FIG. 9: Stroke 6 to Stroke 1 showing the conventional Kakemawari fishing method
Plan view showing 0

【図10】従来のかけまわし漁法を示す行程11から行
程15を示す平面図
FIG. 10 is a plan view showing strokes 11 to 15 showing a conventional sprinkling fishing method.

【図11】従来のかけまわし漁法を示す行程16から行
程20を示す平面図
FIG. 11 is a plan view showing strokes 16 to 20 showing a conventional sprinkling fishing method.

【図12】従来のかけまわし漁法を示す行程21から行
程24を示す平面図
FIG. 12 is a plan view showing strokes 21 to 24 showing a conventional sprinkling fishing method.

【符号の説明】[Explanation of symbols]

4 かけまわし網 4a、4b 袖網 4c 身網 4d コッド網 22 ネットウインチ 22R、22L リール 4 Swivel net 4a, 4b Sleeve net 4c Body net 4d Cod net 22 Net winch 22R, 22L Reel

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 左右の袖網、身網およびコッド網とを有
するかけまわし網を、少なくとも2個ののリールを有す
るとともに、少なくとも一方のリールが別駆動されるよ
うに形成されているネットウインチにより投揚網するこ
とを特徴とするかけまわし漁法。
1. A net winch having a left and right sleeve net, a net and a cod net, and a net having at least two reels and at least one reel being driven separately. Kakemawari fishing method characterized by catching nets.
【請求項2】 請求項1に記載のかけまわし漁法におい
て、ネットウインチの2個のリールにかけまわし網の左
右の袖網をそれぞれ巻回させながら身網まで揚網し、そ
の後コッド網より魚類を取出し、その後前記2個のリー
ルを逆転させて甲板上の所定位置に前記コッド網および
身網を降ろし、その後先に投網する袖網を前記リールを
回転させながら甲板上の所定位置に降ろして投網待機状
態とさせ、投網時には前記甲板上に配置されている袖
網、身網、コッド網、およびリールに巻回されている他
方の袖網の順に前記リールを逆回転させながら投網させ
ることを特徴とするかけまわし漁法。
2. The fishing method according to claim 1, wherein two reels of a net winch are wound around the nets while winding the left and right sleeve nets of the net, respectively, and then fishes are taken from the cod net. Then, the two reels are reversed to lower the cod net and the net to a predetermined position on the deck, and then the sleeve net to be thrown first is lowered to a predetermined position on the deck while rotating the reel to throw the net. It is set in a standby state, and at the time of casting, the sleeve net, the net, the cod net arranged on the deck, and the other sleeve net wound around the reel are sequentially rotated in the order of the reel to cast the net. Kakemawari fishing method.
JP31703892A 1992-11-26 1992-11-26 Sprinkle fishing method Expired - Lifetime JP3382271B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31703892A JP3382271B2 (en) 1992-11-26 1992-11-26 Sprinkle fishing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31703892A JP3382271B2 (en) 1992-11-26 1992-11-26 Sprinkle fishing method

Publications (2)

Publication Number Publication Date
JPH06153745A true JPH06153745A (en) 1994-06-03
JP3382271B2 JP3382271B2 (en) 2003-03-04

Family

ID=18083728

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31703892A Expired - Lifetime JP3382271B2 (en) 1992-11-26 1992-11-26 Sprinkle fishing method

Country Status (1)

Country Link
JP (1) JP3382271B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103371131A (en) * 2013-07-08 2013-10-30 唐德财 Buoyant cover net for lamplight cover net fishing boat

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103371131A (en) * 2013-07-08 2013-10-30 唐德财 Buoyant cover net for lamplight cover net fishing boat

Also Published As

Publication number Publication date
JP3382271B2 (en) 2003-03-04

Similar Documents

Publication Publication Date Title
JP3861258B2 (en) Automatic fish net lifting method
US3662484A (en) Method and apparatus for fishing
JP3480613B2 (en) Fishing boat for fishing
JP3803572B2 (en) How to set up a mesh
JPH02291222A (en) Landing apparatus for fish and its method
CN103704182A (en) Novel offshore fishing device
JPH06153745A (en) Japanese danish seine
CN210761200U (en) Operation winch and double-deck trawler
JP5115940B2 (en) Turning network and operating method using the same
US2875546A (en) Purse boats with improved seine handling means and method of using the same
KR100277293B1 (en) Operation automation device of super fishery
JPH071975Y2 (en) Fishing net equipment used for bottom-draft fishing boats
JPH0755117B2 (en) Purse seine fishing
JP2515815Y2 (en) Yose rope feeding device in a fishing boat
JP3838433B2 (en) Ring hook and method of operating a lathe using the same
US3307284A (en) Method and apparatus for drum trawling
JPS5934828A (en) Net throwing and winding method of trawl vessel
SU379448A1 (en) DEVICE FOR DOWNLOAD AND LIFTING TOOLS
JPS6041432A (en) Net wind-up apparatus of drawing net fishing vessel
JPH0823827A (en) Net hauler for trawling fishing boat and net hauling and casting method using the net hauler
Fry Jr Operation of a California shrimp trawl
JPH05176660A (en) Device for pulling sinker of applied fishing net
JPH03290137A (en) Fish-dragging and hauling apparatus for long-line fishery
JPH0739274A (en) Method for hauling in and casting net and apparatus therefor
JPS6224454Y2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20111220

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121220

Year of fee payment: 10

EXPY Cancellation because of completion of term