JPH06146223A - Method of erecting suspended scaffold - Google Patents

Method of erecting suspended scaffold

Info

Publication number
JPH06146223A
JPH06146223A JP32629992A JP32629992A JPH06146223A JP H06146223 A JPH06146223 A JP H06146223A JP 32629992 A JP32629992 A JP 32629992A JP 32629992 A JP32629992 A JP 32629992A JP H06146223 A JPH06146223 A JP H06146223A
Authority
JP
Japan
Prior art keywords
scaffold
bridge
wire
guide
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP32629992A
Other languages
Japanese (ja)
Inventor
Satoshi Ouchi
聡 大内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP32629992A priority Critical patent/JPH06146223A/en
Publication of JPH06146223A publication Critical patent/JPH06146223A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)

Abstract

PURPOSE:To enhance the safety by laying main wires with the use of a temporarily installed wire provided between the upper parts of structures, as a guide, and by joining scaffolds which are slidable on the main wires as a guide, one by one so as to form a long scaffold. CONSTITUTION:A plurality of main wires 3 are stretched between anchors with the use of a temporarily installed wire 2 stretched between the upper parts of bridge bases 1, as a guide. Next, a clamp incorporating a roller is attached to the lower end of a scaffold 7 assembled in a ladder-like shape, and a safety net for preventing a fall is attached to the scaffold 7. Then, the scaffold assembled on the wires 3 on one bridge base side 1 through the intermediary of the roller and having two or three spans is towed by a tow cable 81. Further, a new scaffold 7 is laid as an extension between the bridge beds 1 by repeating the work for assembling the scaffold 7 in a space obtained in rear of the a scaffold 7. Further, a lift-up device 9 is attached to a bridge beam 11 so as to lift up the scaffold 7 through the intermediary of a lift-up wire 91. With this arrangement, it is possible to prevent occurrence of a fall and a drop, and further it is possible to travel between the bridge bases before the installation of the bridge.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、吊り足場の架設方法に
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing suspended scaffolds.

【0002】[0002]

【発明が解決しようとする問題点】従来は架設した桁等
より足場を吊り下げながら組み付け架設して行くため、
組み立て前端では墜落及び材料等の落下の危険がある。
ましてや、桁等の下部が車道、鉄道の場合、落下物も大
問題となる。
[Problems to be Solved by the Invention] Conventionally, since the scaffolding is suspended from a erected girder and the like, the scaffold is assembled and erected.
At the front end of assembly, there is a risk of falling and falling of materials.
Moreover, if the lower part of the girder is a roadway or a railway, falling objects will be a big problem.

【0003】[0003]

【本発明の目的】本発明は上記のような問題を改善する
ためになされたもので、建設物に先行して安全に足場を
架設することができる吊り足場の架設方法を提供するこ
とを目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and an object of the present invention is to provide a suspension scaffold construction method capable of safely constructing a scaffold prior to a construction. And

【0004】[0004]

【問題点を解決するための手段】すなわち本発明は、吊
り足場架設予定地の構造物間上部へ仮設ワイヤ−を設置
し、仮設ワイヤ−をガイドにしてその下方に主ワイヤ−
を架設し、この主ワイヤ−をガイドとして滑走可能に構
成した足場を、主ワイヤーに沿って継ぎ足して延設し、
連続する足場を構造物間に架設する、吊り足場の架設方
法である。
[Means for Solving the Problems] That is, according to the present invention, a temporary wire is installed in the upper part between structures at a site where a suspended scaffold is to be installed, and the temporary wire is used as a guide to guide the main wire below the temporary wire.
, A scaffolding configured to be slidable using this main wire as a guide, is extended by extending along the main wire,
It is a method of constructing suspended scaffolds in which continuous scaffolds are constructed between structures.

【0005】[0005]

【実施例】以下図面を参照しながら本発明の一実施例に
ついて説明する。尚、本実施例では橋桁を作成する場合
を例として説明する。 <イ>仮設ワイヤ− 図2に示すように、桁を架設する以前に、橋台1間の上
部に仮設ワイヤ−2を架設する。この仮設ワイヤ−2
は、公知のロ−プストランド又はパラレルワイヤストラ
ンド等を用いる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. In this embodiment, a case of creating a bridge girder will be described as an example. <A> Temporary Wire-As shown in FIG. 2, before the girder is erected, the temporary wire-2 is erected above the abutment 1. This temporary wire-2
A known rope strand or parallel wire strand is used as the material.

【0006】<ロ>主ワイヤ−の架設 主ワイヤ−3は、桁によって吊り上げられるまで足場を
支えるため、公知のロ−プストランド又はパラレルワイ
ヤストランド等の強度を有するワイヤ−を用いる。図3
に示すように、両側の橋台1へ一対の係留金具4を複数
組設置する。次に両側の橋台1の係留金具4間へ、複数
の主ワイヤ−3を水平方向に並行させて架設する。主ワ
イヤ−3の架設方法は、例えば、上方に架設した仮設ワ
イヤ−2に、牽引索5を連結した移動滑車6を装備し、
この移動滑車6に主ワイヤ−3の一端側を取り付け、主
ワイヤ−3の他端側を一方の係留金具4に連結する。そ
して、牽引索5の一方を引っ張って移動滑車6を移動さ
せ、主ワイヤ−3を橋台1間に架設する。主ワイヤ−3
の架設完了後は、仮設ワイヤ−2、牽引索5、移動滑車
6を撤去する。
<B> Construction of Main Wire-For the main wire-3, a wire having a strength such as known rope strands or parallel wire strands is used to support the scaffold until it is suspended by the girder. Figure 3
As shown in, a plurality of pairs of mooring fittings 4 are installed on the abutments 1 on both sides. Next, a plurality of main wires 3 are laid horizontally in parallel between the mooring fittings 4 of the abutments 1 on both sides. The main wire-3 is installed by, for example, equipping the temporary wire-2 installed above with the movable pulley 6 in which the tow line 5 is connected,
One end side of the main wire-3 is attached to the movable pulley 6, and the other end side of the main wire-3 is connected to one mooring fitting 4. Then, one of the tow lines 5 is pulled to move the movable pulley 6, and the main wire-3 is installed between the abutments 1. Main wire-3
After the completion of the erection, the temporary wire-2, the tow cable 5, and the movable pulley 6 are removed.

【0007】<ハ>足場 足場7は、図6に示すように、パイプ71等を梯子状態
に配置し、これをクランプ72等により接続して組み立
てる。また、パイプ71にはロ−ラ付きクランプ73を
装着し、主ワイヤ−3上にこのロ−ラ−を装着して、足
場7を滑走可能に構成する。さらに足場7には、墜落防
止用の安全ネット74を張設しておく。尚、足場7が主
ワイヤ−3から脱落しないように、脱落防止手段を設け
ておく。
<C> Scaffold As shown in FIG. 6, the scaffold 7 is assembled by arranging pipes 71 and the like in a ladder state and connecting them with clamps 72 and the like. Further, a clamp 73 with a roller is attached to the pipe 71, and this roller is attached on the main wire-3 so that the scaffold 7 can be slid. Furthermore, a safety net 74 for preventing a fall is stretched on the scaffold 7. It should be noted that a drop-out preventing means is provided so that the scaffold 7 does not drop off the main wire-3.

【0008】<ニ>延設 図4に示すように、足場7を橋台1の一方の側の主ワイ
ヤ−3上へ2〜3スパン組み立てる。橋台1の他方の側
には、滑車8を取り付け、組み立てた足場7に一端を連
結した牽引索81を、この滑車8に巻回し、Uタ−ンさ
せて他端を足場7側に位置させる。そして、牽引索81
を引っ張って、足場7を主ワイヤ−3に沿って2〜3ス
パン滑走させ、足場7の後方にできたスペ−スに新たに
2〜3スパン足場7を組み立てる。この作業を繰り返し
て行い、足場7を延設し、橋台1間に架設する。足場7
の架設後は、滑車8及び牽引索81を撤去する。
<D> Extension As shown in FIG. 4, the scaffold 7 is assembled on the main wire-3 on one side of the abutment 1 for a few spans. A pulley 8 is attached to the other side of the abutment 1, and a tow line 81 whose one end is connected to the assembled scaffold 7 is wound around the pulley 8 and U-turned so that the other end is located on the scaffold 7 side. . And the tow line 81
To slide the scaffold 7 along the main wire-3 for 2 to 3 spans, and to assemble the 2-3 span scaffold 7 to the space formed behind the scaffold 7 again. By repeating this operation, the scaffold 7 is extended and installed between the abutments 1. Scaffolding 7
After erection, the pulley 8 and the tow line 81 are removed.

【0009】<ホ>吊り足場の吊り上げ 図1に示すように、ウインチまたはチェ−ンブロック等
の吊り上げ装置9を複数橋台1に取り付け、さらに吊り
上げ索91を吊り下げる。そして、吊り上げ索91の下
端を足場7に接続し、吊り上げ装置9を作動させて、足
場7を吊り上げる。
<E> Suspension of Suspension Scaffold As shown in FIG. 1, a suspension device 9 such as a winch or a chain block is attached to a plurality of abutments 1 and the suspension ropes 91 are suspended. Then, the lower end of the hoisting rope 91 is connected to the scaffold 7, and the hoisting device 9 is operated to hoist the scaffold 7.

【0010】<ヘ>付帯設備の取付け 足場7の張設完了後、吊り上げ装置9、吊り上げ索91
を撤去する。そして、吊り足場7に足場板、手摺等の付
帯設備を取り付け、吊り足場7の施工を完成させる。
<F> Attachment of incidental equipment After the completion of the tensioning of the scaffold 7, the lifting device 9 and the lifting rope 91
To remove. Then, ancillary equipment such as scaffolding boards and handrails are attached to the suspended scaffolding 7 to complete the construction of the suspended scaffolding 7.

【0011】[0011]

【発明の効果】本発明は以上に説明したようになるから
次のような効果を期待することができる。 <イ> 架設予定物に先行して安全ネットの取付完了し
た足場を架設する。そのため、組立て途中での人の転落
及び材料等の落下を未然に防止できる。 <ロ> 架設予定物の設置以前に、主ワイヤ−によって
支えられた足場を設置する。そのため、架設予定物の設
置以前に橋台間の往来が可能となる。
Since the present invention is as described above, the following effects can be expected. <a> Install a scaffold with safety nets installed prior to the planned construction. Therefore, it is possible to prevent a person from falling and materials and the like from falling during assembly. <B> Before installing the planned construction material, install a scaffold supported by the main wire. Therefore, it is possible to move between abutments before the installation of the planned construction material.

【図面の簡単な説明】[Brief description of drawings]

【図1】吊り足場の完成状態の説明図[Figure 1] Explanatory drawing of the completed state of the suspended scaffold

【図2】仮設ワイヤ−の仮設工程の説明図FIG. 2 is an explanatory view of a temporary installation process of a temporary wire.

【図3】主ワイヤ−の仮設工程の説明図FIG. 3 is an explanatory view of a temporary wire attaching process.

【図4】足場の延設工程の説明図FIG. 4 is an explanatory view of a scaffold extending process.

【図5】足場の延設工程の説明図FIG. 5 is an explanatory view of a scaffold extending process.

【図6】足場の拡大説明図FIG. 6 is an enlarged explanatory view of the scaffold.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】吊り足場架設予定地の構造物間上部へ仮設
ワイヤ−を設置し、 仮設ワイヤ−をガイドにしてその下方に主ワイヤ−を架
設し、 この主ワイヤ−をガイドとして滑走可能に構成した足場
を、 主ワイヤーに沿って継ぎ足して延設し、 連続する足場を構造物間に架設する、 吊り足場の架設方法
1. A temporary wire is installed on the upper part of a structure between suspended scaffolding construction sites, a main wire is installed below the temporary wire as a guide, and the main wire is slidable by using the main wire as a guide. A method of constructing suspended scaffolds, in which the constructed scaffolds are extended by extending them along the main wire, and continuous scaffolds are constructed between structures.
【請求項2】請求項1の吊り足場の架設方法において、 足場へ安全ネットを設置した、 吊り足場の架設方法2. The method for constructing a suspended scaffold according to claim 1, wherein a safety net is installed on the scaffold.
JP32629992A 1992-11-12 1992-11-12 Method of erecting suspended scaffold Pending JPH06146223A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32629992A JPH06146223A (en) 1992-11-12 1992-11-12 Method of erecting suspended scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32629992A JPH06146223A (en) 1992-11-12 1992-11-12 Method of erecting suspended scaffold

Publications (1)

Publication Number Publication Date
JPH06146223A true JPH06146223A (en) 1994-05-27

Family

ID=18186222

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32629992A Pending JPH06146223A (en) 1992-11-12 1992-11-12 Method of erecting suspended scaffold

Country Status (1)

Country Link
JP (1) JPH06146223A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06185020A (en) * 1992-12-17 1994-07-05 Kensetsu Toso Kogyo Kk Stretching method of rope in hanging scaffolding method
JP6950108B1 (en) * 2021-03-25 2021-10-13 中日本ハイウェイ・エンジニアリング東京株式会社 How to check under the bridge deck
JP2023113321A (en) * 2022-02-03 2023-08-16 ▲蔦▼井株式会社 Moving connecting suspended scaffold, and method for using the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06185020A (en) * 1992-12-17 1994-07-05 Kensetsu Toso Kogyo Kk Stretching method of rope in hanging scaffolding method
JP6950108B1 (en) * 2021-03-25 2021-10-13 中日本ハイウェイ・エンジニアリング東京株式会社 How to check under the bridge deck
JP2022149049A (en) * 2021-03-25 2022-10-06 中日本ハイウェイ・エンジニアリング東京株式会社 Method for inspecting beneath bridge floor slab
JP2023113321A (en) * 2022-02-03 2023-08-16 ▲蔦▼井株式会社 Moving connecting suspended scaffold, and method for using the same

Similar Documents

Publication Publication Date Title
US3527319A (en) Safety net
JP5097313B2 (en) Suspended scaffold and its installation method
EP0211671A2 (en) Trussed girder and method of constructing the roof framing of a building using the trussed girder
CN108265628A (en) One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
JP3440422B2 (en) Bridge construction method and bridge construction device
CN216739582U (en) Multifunctional auxiliary device for binding reinforcing steel bars of slide-resistant piles
JP2006265899A (en) Scaffolding construction method
JP6783011B1 (en) Suspended scaffolding
JPH06146223A (en) Method of erecting suspended scaffold
US11788306B1 (en) Building debris containment method
CN105040592B (en) Horizontal pull rope bridge and erection method thereof
CN216196742U (en) A wallboard installation device for position is striden to height
CN214301281U (en) Construction platform for connecting steel truss girder and bridge deck slab
CN212773371U (en) Limited space steel construction daylighting top cable work platform
JPH04140363A (en) Assembly of suspended scaffolding
JP2021075967A (en) Suspended scaffolding
JP2664642B2 (en) Cover for covering the connecting space of hanging scaffold and connecting space covering structure using it
JP2860313B2 (en) Escalator / truss lifting method
JP2019027145A (en) Installation method for falling object protective device
JP4372674B2 (en) Dismantling method of ultra-high cylindrical structure
CN213059957U (en) Hoisting equipment suitable for installing large-span high-altitude steel structure
JP7112146B1 (en) Mobile connection suspension scaffold and its usage
CN114776035B (en) Construction method of oblique spoke type cable truss structure
JPH01322064A (en) Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe
KR101323384B1 (en) Remote Erecting Suspended Scaffolding and the methods