JPH06146214A - Temporary detour overpass for construction work - Google Patents

Temporary detour overpass for construction work

Info

Publication number
JPH06146214A
JPH06146214A JP32363092A JP32363092A JPH06146214A JP H06146214 A JPH06146214 A JP H06146214A JP 32363092 A JP32363092 A JP 32363092A JP 32363092 A JP32363092 A JP 32363092A JP H06146214 A JPH06146214 A JP H06146214A
Authority
JP
Japan
Prior art keywords
staircase
bridge
column
bridge girder
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP32363092A
Other languages
Japanese (ja)
Inventor
Katsuji Tsuyama
濶次 津山
Masayuki Ogino
政之 荻野
Yoshiro Moriya
与四郎 守屋
Hikari Goto
光 後藤
Yoji Oku
要治 奥
Keijiro Sato
啓次郎 佐藤
Osamu Nakajima
修 中島
Tamotsu Osaka
有 大坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DENSHIN DENWA KOJI KYOKAI
IHI Corp
Nippon Telegraph and Telephone Corp
Original Assignee
DENSHIN DENWA KOJI KYOKAI
IHI Corp
Nippon Telegraph and Telephone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DENSHIN DENWA KOJI KYOKAI, IHI Corp, Nippon Telegraph and Telephone Corp filed Critical DENSHIN DENWA KOJI KYOKAI
Priority to JP32363092A priority Critical patent/JPH06146214A/en
Publication of JPH06146214A publication Critical patent/JPH06146214A/en
Withdrawn legal-status Critical Current

Links

Abstract

PURPOSE:To ensure safety of pedestrians by assembling a detour overpass by means of bridge beams which are conveyed by a carrier, columns which support them, and parts such as staircase sections on sidewalk which requires construction work. CONSTITUTION:A bridge beam section 6, a column section 14, and a staircase section 24 are transported to the site of construction on sidewalk 1 by a carrier with crane. The, divided bridge beam members 7, 8 are connected to assemble the bridge beam 6, and the column sections 14 are set up at both ends. Then, after an upper staircase 25 is mounted at both ends of the bridge beam 6, brake is applied on a caster 15, an outrigger 16 is adjusted to obtain horizontal and vertical alignment of the whole bridge, and attachments such as fence on handrail 39 in the bridge beam section are mounted. An upper column 18 is elongated upward for a lower column 17 by using an automatic jack provided on the column 14. Further, an upper end of a lower staircase 26 is connected with a lower end of the upper staircase 25 to form the staircase 24, and a work space 23 for a work vehicle 4 is formed in the inside. Consequently, it is possible to ensure safety of pedestrians and carry out construction work without obstacle in the daytime.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、工事用仮設迂回歩道橋
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary detour pedestrian bridge for construction.

【0002】[0002]

【従来の技術】従来、都市における交通の激しい車道に
沿った歩道では、歩行者の多い昼間を避け、歩行者の少
ない夜間に歩道を遮断して各種の工事を行っているのが
現状である。
2. Description of the Related Art Conventionally, on a sidewalk along a road with heavy traffic in a city, various construction work is performed by avoiding the daytime when there are many pedestrians and blocking the sidewalk at night when there are few pedestrians. .

【0003】この際、車道の一部に安全柵を張って臨時
の通行路を作り、ガードマンなどに歩行者の誘導を行わ
せるようにしている。
At this time, a safety fence is set up on a part of the roadway to make a temporary passage so that a guard man or the like can guide a pedestrian.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記し
たように歩行者が多い時間帯を避けて夜間に工事を行う
ようにした場合には、以下のような問題があった。
However, when the construction is carried out at night while avoiding the time zone where there are many pedestrians as mentioned above, there are the following problems.

【0005】即ち、夜間作業は全体として昼間作業に比
べて安全性や能率が低下することが避けられないという
問題や、夜間作業は労働条件が悪いため従業者の確保が
困難であるなどの問題があり、且つ、上記によって工事
費用が増大するということも深刻な問題となっていた。
That is, the nighttime work is inevitably inferior in safety and efficiency to the daytime work as a whole, and the nighttime work is difficult to secure an employee because of poor working conditions. In addition, there is a serious problem that the construction cost increases due to the above.

【0006】又、車道に臨時の通行路を確保する場合、
関係機関の承認を得るための届け出が必要など、手続上
手間が掛るという問題がある。
In addition, when securing a temporary traffic route on the road,
There is a problem in that it takes time and effort for the procedure, such as the need for notification to obtain approval from related organizations.

【0007】本発明は上述の実情に鑑み、歩行者が多い
場合でも歩行者を安全に通行させられるようにすること
により、昼間の工事を支障なく行わせ得るようにした工
事用仮設迂回歩道橋を提供することを目的とするもので
ある。
In view of the above-mentioned circumstances, the present invention provides a temporary detour pedestrian bridge for construction in which daytime construction can be performed without hindrance by allowing pedestrians to pass safely even when there are many pedestrians. It is intended to be provided.

【0008】[0008]

【課題を解決するための手段】本発明は、歩道上に作業
スペースを置いて歩道とほぼ平行に配設された橋桁部
と、橋桁部の両端を支持する支柱部と、橋桁部の両端に
取付けられた階段部とを備え、前記各部が運搬車の荷台
に積載可能な大きさとなるよう構成されたことを特徴と
する工事用仮設迂回歩道橋にかかるものである。
According to the present invention, a bridge girder portion having a working space placed on a sidewalk and arranged substantially parallel to the sidewalk, a pillar portion supporting both ends of the bridge girder portion, and both ends of the bridge girder portion are provided. A temporary detour pedestrian bridge for construction, comprising: a stairway part attached to the stairway part, and each part having a size capable of being loaded on a bed of a carrier.

【0009】[0009]

【作用】本発明の作用は以下の通りである。The operation of the present invention is as follows.

【0010】運搬車に積載して搬送してきた橋桁部や支
柱部や階段部などの部品を歩道上で組立てると、内部に
作業スペースを有する工事用仮設迂回歩道橋となる。
When parts such as bridge girders, columns, stairs, etc., which have been loaded and transported in a carrier, are assembled on a sidewalk, a temporary detour pedestrian bridge for construction having a working space inside is constructed.

【0011】そこで、歩行者に工事用仮設迂回歩道橋を
通すようにすれば、昼間でも工事用仮設迂回歩道橋の内
部で作業を行うなうことができる。
Therefore, by allowing a pedestrian to pass through the temporary work detour pedestrian bridge, it is possible to work inside the temporary work detour pedestrian bridge even during the daytime.

【0012】[0012]

【実施例】以下、本発明の実施例を図面を参照しつつ説
明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0013】図1〜図10は本発明の一実施例である。1 to 10 show an embodiment of the present invention.

【0014】図中、1は歩道、2は車道、3はクレーン
付き4トントラックなどの運搬車、4はバックホーなど
の作業車である。
In the figure, 1 is a sidewalk, 2 is a roadway, 3 is a carrier such as a 4-ton truck with a crane, and 4 is a working vehicle such as a backhoe.

【0015】又、5は工事用仮設迂回歩道橋、6は工事
用仮設迂回歩道橋5を構成する橋桁部であって、該橋桁
部6は前記運搬車3に積載可能なように二つの分割橋桁
部材7,8に分割され、ボルト9などで連結固定される
ようになっている。
Further, 5 is a temporary detour pedestrian bridge for construction, 6 is a bridge girder portion which constitutes the temporary detour pedestrian bridge 5 for construction, and the bridge girder portion 6 is composed of two divided bridge girder members so that they can be loaded on the carrier 3. It is divided into 7 and 8 and is connected and fixed by a bolt 9 or the like.

【0016】10は橋桁部6に沿って移動可能に設けら
れた掘削土砂運搬用のホイスト、11は橋桁部6の両側
部に取付けられた庇フレーム、12は庇フレーム11の
先端間に架設されたカーテンレール、13はカーテンレ
ール12に吊下げられたシートである。
Numeral 10 is a hoist for moving excavated earth and sand provided so as to be movable along the bridge girder portion 6, 11 is an eaves frame mounted on both sides of the bridge girder portion 6, and 12 is installed between the tips of the eaves frame 11. The curtain rail 13 is a sheet suspended from the curtain rail 12.

【0017】14は橋桁部6の両端を支持する支柱部で
あって、該支柱部14は、ほぼU字状をして下端にキャ
スター部15及びアウトリガー部16を備えた下部支柱
部17と、該下部支柱部17に対し上方へスライド自在
に外嵌されたほぼ逆U字状の上部支柱部18と、上下部
支柱部17,18間に介装されて支柱部14を上下方向
へ伸縮動させるための手動或いは自動式のジャッキ部1
9とで主に構成されており、前記橋桁部6の両端に設け
られたブラケット20と、上部支柱部18上端に設けら
れたブラケット21との間にピン22を嵌入することに
より両者が連結され、内部に前記作業車4などによる作
業スペース23が形成されるようになっている。
Reference numeral 14 denotes a support column which supports both ends of the bridge girder 6, and the support column 14 is a substantially U-shaped lower support column 17 having a caster section 15 and an outrigger section 16 at its lower end. A substantially inverted U-shaped upper strut portion 18 slidably fitted on the lower strut portion 17 and an upper and lower strut portions 17, 18 are interposed to extend and retract the strut portion 14 in the vertical direction. Manual or automatic jack part 1 for
9 is mainly configured, and a bracket 20 provided at both ends of the bridge girder portion 6 and a bracket 21 provided at an upper end of the upper strut portion 18 are fitted with a pin 22 so that they are connected to each other. A work space 23 for the work vehicle 4 is formed inside.

【0018】24は橋桁部6の両端に取付けられる階段
部であって、該階段部24は、運搬車3に積載可能なよ
うに上部階段部25と下部階段部26とに分割され、両
者に設けられたブラケット27,28間にピン29を嵌
入することにより、一体に連結されるようになってい
る。
Reference numeral 24 is a staircase portion attached to both ends of the bridge girder portion 6. The staircase portion 24 is divided into an upper staircase portion 25 and a lower staircase portion 26 so that it can be loaded on the transport vehicle 3, and the staircase portion 24 is divided into both. By inserting a pin 29 between the brackets 27 and 28 provided, they are integrally connected.

【0019】そして、30は前記上部支柱部18にブラ
ケット31,32及びピン33を介して取付けられた階
段支持部であって、上部階段部25の上端部に取付けら
れたブラケット34と、階段支持部30の上端部に取付
けられたブラケット35との間にピン36を嵌入するこ
とにより橋桁部6の両端部に階段部24が取付けられる
ようになっている。
Reference numeral 30 denotes a staircase support portion attached to the upper strut portion 18 via brackets 31 and 32 and a pin 33, and a bracket 34 attached to an upper end portion of the upper staircase portion 25 and a staircase support portion. By inserting the pin 36 between the bracket 36 and the bracket 35 attached to the upper end of the portion 30, the stair portions 24 are attached to both ends of the bridge girder portion 6.

【0020】37は橋桁部6と上部支柱部18との間に
ピン連結される橋桁部補強部材、38は上部階段部25
と上部支柱部18との間に連結される階段部補強部材で
ある。
Reference numeral 37 is a bridge girder reinforcing member which is pin-connected between the bridge girder portion 6 and the upper strut portion 18, and 38 is an upper step portion 25.
The staircase reinforcing member is connected between the upper support portion 18 and the upper support portion 18.

【0021】39は橋桁部手摺柵、40は階段部手摺
柵、41は上部階段部25及び下部階段部26に設けら
れたキャスター部、42は階段支持部30の下端部に設
けられたキャスター部、43は庇フレーム11の取付け
角度を調整するワイヤ部材である。
Reference numeral 39 is a bridge girder handrail fence, 40 is a staircase handrail fence, 41 is a caster portion provided on the upper staircase portion 25 and the lower staircase portion 26, and 42 is a caster portion provided on the lower end portion of the staircase support portion 30. , 43 are wire members for adjusting the mounting angle of the eaves frame 11.

【0022】次に、作動について説明する。Next, the operation will be described.

【0023】図3に示すように、橋桁部6、支柱部1
4、階段部24などを構成する各部材を、二台のクレー
ン付き4トントラックなどの運搬車3の荷台に積載し
て、歩道1の工事などを行う部分まで運搬する。
As shown in FIG. 3, the bridge girder portion 6 and the column portion 1
4. Each member constituting the staircase portion 24 and the like is loaded on the bed of the carrier 3 such as two 4-ton trucks with cranes, and transported to the sidewalk 1 where the construction or the like is performed.

【0024】そして、図4に示すように、二台の運搬車
3のクレーンを用いて歩道1上に前記各部材を卸し、図
5に示すように、各クレーンで分割橋桁部材7,8を吊
上げて、分割橋桁部材7,8をボルト9で連結して一体
化し橋桁部6とすると共に、クレーンで吊上げられた橋
桁部6の両端に支柱部14を位置させ、橋桁部6の両端
に設けられたブラケット20と、上部支柱部18上端に
設けられたブラケット21との間にピン22を嵌入する
ことにより両者を連結し、更に、橋桁部6と上部支柱部
18との間に橋桁部補強部材37をピン連結することに
より橋桁部6を自立させる。
Then, as shown in FIG. 4, the above-mentioned members are unloaded on the sidewalk 1 using the cranes of the two transport vehicles 3, and the divided bridge girder members 7 and 8 are provided by the respective cranes as shown in FIG. The bridge girder members 7 and 8 are lifted and integrated by connecting them with bolts 9 to form a bridge girder portion 6, and the column parts 14 are located at both ends of the bridge girder portion 6 hung by a crane, and are provided at both ends of the bridge girder portion 6. The bracket 20 provided on the upper end of the upper strut portion 18 and the bracket 21 provided at the upper end of the upper strut portion 18 so as to connect the two, thereby further reinforcing the bridge girder portion between the bridge girder portion 6 and the upper strut portion 18. By connecting the members 37 with pins, the bridge girder portion 6 is made independent.

【0025】尚、この際、ホイスト10は移動しないよ
うに固定しておくようにする。
At this time, the hoist 10 is fixed so as not to move.

【0026】次に、図6に示すように、前記クレーンを
用いて上部階段部25を吊上げ、上部支柱部18にピン
連結された階段支持部30上端部のブラケット35と、
上部階段部25上端部のブラケット34との間にピン3
6を嵌入し、更に、上部階段部25と上部支柱部18と
の間に階段部補強部材38を連結することにより橋桁部
6の両端部に上部階段部25を取付ける。
Next, as shown in FIG. 6, the upper staircase 25 is hoisted using the crane, and the bracket 35 at the upper end of the staircase support 30 is pin-connected to the upper support 18.
Pin 3 between the upper stair part 25 and the bracket 34 at the upper end part
6 is fitted, and the staircase reinforcing member 38 is connected between the upper staircase section 25 and the upper strut section 18 to attach the upper staircase section 25 to both ends of the bridge girder section 6.

【0027】次いで、図7に示すように、支柱部14に
設けられたキャスター部15にブレーキを掛け、アウト
リガー部16を調節して、支柱部14の垂直度や、橋桁
部6及び上部階段部25の水平度を出し、且つ、橋桁部
6に橋桁部手摺柵39を、上部階段部25及び下部階段
部26に階段部手摺柵40をボルトなどにより固定し、
更に、橋桁部6に庇フレーム11やカーテンレール12
を取付ける。
Next, as shown in FIG. 7, the caster portion 15 provided on the column portion 14 is braked and the outrigger portion 16 is adjusted to adjust the verticality of the column portion 14, the bridge girder portion 6 and the upper staircase portion. The horizontal level of 25 is provided, and the bridge girder handrail fence 39 is fixed to the bridge girder portion 6, and the staircase handrail fence 40 is fixed to the upper staircase portion 25 and the lower staircase portion 26 with bolts or the like.
Furthermore, the eaves frame 11 and the curtain rail 12 are attached to the bridge girder portion 6.
Install.

【0028】更に、図8に示すように、支柱部14に設
けられた手動或いは自動式のジャッキ部19により、下
部支柱部17に対して上部支柱部18を上方へスライド
させて支柱部14を伸長動させ、この時に持上げられた
上部階段部25下端部のブラケット27と下部階段部2
6上端部のブラケット28間にピン29を嵌入すること
により階段部24が一体に連結され、内部にバックホー
などの作業車4のための作業スペース23を有する工事
用仮設迂回歩道橋5が形成される。
Further, as shown in FIG. 8, the manual or automatic jack portion 19 provided on the supporting column portion 14 slides the upper supporting column portion 18 upward with respect to the lower supporting column portion 17 to move the supporting column portion 14 upward. The bracket 27 at the lower end of the upper staircase 25 and the lower staircase 2 which are extended and lifted at this time
6 By inserting the pin 29 between the brackets 28 at the upper end portion, the staircase portion 24 is integrally connected, and the construction temporary detour pedestrian bridge 5 having the working space 23 for the work vehicle 4 such as the backhoe is formed inside. .

【0029】本発明によれば、歩行者が多数いる場合で
も、不安感なく安全に工事用仮設迂回歩道橋5を渡って
通すことができ、同時に、工事用仮設迂回歩道橋5内部
に形成される作業スペース23で作業を行うことができ
るので、昼間にても支障なく工事を行うことができる。
According to the present invention, even if there are a large number of pedestrians, it is possible to safely pass the temporary detour pedestrian bridge 5 for construction without feeling anxiety, and at the same time, work formed inside the temporary detour pedestrian bridge 5 for construction. Since the work can be performed in the space 23, the work can be performed during the daytime without any trouble.

【0030】尚、該工事では、バックホーなどの作業車
4で歩道1を掘削し、掘削した土砂をホイスト10で吊
上げて、橋桁部6に沿ってホイスト10を移動させるこ
とにより、効率良く土砂を搬出することができる。
In the construction, the sidewalk 1 is excavated by the work vehicle 4 such as a backhoe, the excavated earth and sand is hoisted by the hoist 10, and the hoist 10 is moved along the bridge girder portion 6 to efficiently remove the earth and sand. It can be carried out.

【0031】又、必要に応じて、カーテンレール12に
シート13を吊下げることにより、工事の目隠しや防音
や粉塵の飛散防止、又、作業者の日除けなどを行わせる
ことができる。
Further, by hanging the sheet 13 on the curtain rail 12 as required, it is possible to blind the construction, prevent noise, prevent dust from scattering, and shade the operator.

【0032】更に、歩道1の特定の箇所に対する作業が
終了して他の箇所の作業に移行する場合には、図9に示
すように、上部階段部25から下部階段部26を切り離
し、ジャッキ部19を作動して支柱部14を収縮動し、
アウトリガー部16を解除しすると共にキャスター部1
5のブレーキを解除し、更に、図10に示すように、上
部支柱部18から階段支持部30を取外すことにより、
橋桁部6と上部階段部25を切り離した上で、バックホ
ーなどの作業車4を用いて橋桁部6や上部階段部25や
下部階段部26を目的の箇所まで運搬し、上記とは反対
の手順で組立てる。
Further, when the work on a specific part of the sidewalk 1 is completed and the work is transferred to another part, as shown in FIG. 9, the lower staircase part 26 is separated from the upper staircase part 25 and the jack part is formed. 19 is operated to contract and move the pillar portion 14,
Release the outrigger part 16 and caster part 1
The brake of No. 5 is released, and further, as shown in FIG.
After separating the bridge girder section 6 and the upper staircase section 25, the work girder 4 such as a backhoe is used to transport the bridge girder section 6, the upper staircase section 25, and the lower staircase section 26 to a desired location, and the procedure opposite to the above. Assemble with

【0033】工事が終了した場合には、図4に示すよう
に各部を分解し、図3に示すように、運搬車3に積載し
て搬出する。
When the construction is completed, the respective parts are disassembled as shown in FIG. 4, and the carrier 3 is loaded and unloaded as shown in FIG.

【0034】尚、本発明は、上述の実施例にのみ限定さ
れるものではなく、上部階段部25と下部階段部26と
の間に踊り場を構成する中間部材を設けても良く、又、
上部階段部25と下部階段部26を直線的に接続する代
りに設置場所に応じて角度を持たせて接続するようにし
ても良いこと、その他、本発明の要旨を逸脱しない範囲
内において種々変更を加え得ることは勿論である。
The present invention is not limited to the above embodiment, but an intermediate member forming a landing may be provided between the upper staircase portion 25 and the lower staircase portion 26, or
Instead of connecting the upper staircase portion 25 and the lower staircase portion 26 linearly, the upper staircase portion 25 and the lower staircase portion 26 may be connected at an angle depending on the installation location, and other various changes are made without departing from the scope of the present invention. Of course, it is possible to add.

【0035】[0035]

【発明の効果】以上説明したように、本発明の工事用仮
設迂回歩道橋によれば、歩行者が多い場合でも歩行者を
安全に通行させられるので、昼間の工事を支障なく行わ
せることができるという優れた効果を奏し得る。
As described above, according to the temporary detour pedestrian bridge for construction of the present invention, pedestrians can safely pass through even when there are many pedestrians, so that daytime construction can be carried out without trouble. That is, the excellent effect can be achieved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例の全体側面図である。FIG. 1 is an overall side view of an embodiment of the present invention.

【図2】図1のII−II矢視図である。FIG. 2 is a view taken along the line II-II of FIG.

【図3】本発明の工事用仮設迂回歩道橋を分解して運搬
車に積載した状態を示す図である。
FIG. 3 is a diagram showing a state in which the temporary detour pedestrian bridge for construction of the present invention is disassembled and loaded on a carrier.

【図4】図3を運搬車から卸した状態を示す図である。FIG. 4 is a diagram showing a state in which FIG. 3 is unloaded from a transport vehicle.

【図5】図1の組立て行程図である。5 is an assembly process diagram of FIG. 1. FIG.

【図6】図5に続く組立て行程図である。FIG. 6 is an assembly process diagram following FIG. 5;

【図7】図6に続く組立て行程図である。FIG. 7 is an assembly process diagram following FIG. 6;

【図8】図7に続く組立て行程図である。FIG. 8 is an assembly process diagram following FIG. 7;

【図9】図1の移動行程図である。9 is a travel process diagram of FIG. 1. FIG.

【図10】図9に続く移動行程図である。FIG. 10 is a movement process diagram continued from FIG. 9;

【符号の説明】[Explanation of symbols]

1 歩道 3 運搬車 6 橋桁部 14 支柱部 23 作業スペース 24 階段部 1 Sidewalk 3 Transport Car 6 Bridge Girder 14 Prop 23 Work Space 24 Stairs

───────────────────────────────────────────────────── フロントページの続き (72)発明者 津山 濶次 東京都江東区豊洲三丁目1番15号 石川島 播磨重工業株式会社東二テクニカルセンタ ー内 (72)発明者 荻野 政之 東京都江東区豊洲三丁目1番15号 石川島 播磨重工業株式会社東二テクニカルセンタ ー内 (72)発明者 守屋 与四郎 東京都千代田区大手町二丁目2番1号 石 川島播磨重工業株式会社本社内 (72)発明者 後藤 光 東京都千代田区内幸町1丁目1番6号 日 本電信電話株式会社内 (72)発明者 奥 要治 東京都千代田区内幸町1丁目1番6号 日 本電信電話株式会社内 (72)発明者 佐藤 啓次郎 東京都千代田区内幸町1丁目1番6号 日 本電信電話株式会社内 (72)発明者 中島 修 東京都千代田区内幸町1丁目1番6号 日 本電信電話株式会社内 (72)発明者 大坂 有 東京都渋谷区猿楽町3番3号 社団法人電 信電話工事協会内 ─────────────────────────────────────────────────── ─── Continued Front Page (72) Inventor Toji Tsuji, Toyama, Koto-ku, Tokyo 3-chome 1-15 Ishikawajima Harima Heavy Industries Ltd. Toji Technical Center (72) Inventor Masayuki Ogino Toyosu, Koto-ku, Tokyo 1-215 Ishikawajima Harima Heavy Industries Co., Ltd. Toji Technical Center (72) Inventor Moriya Yoshiro 2-2-1 Otemachi, Chiyoda-ku, Tokyo Ishi Kawashima Harima Heavy Industries Co., Ltd. Head Office (72) Inventor Mitsuru Goto Nihon Telegraph and Telephone Corporation 1-6, Uchisaiwaicho, Chiyoda-ku, Tokyo (72) Inventor Okaji Oku 1-1-6, Uchisaiwaicho, Chiyoda-ku, Tokyo Nihon Telegraph and Telephone Corporation (72) Inventor Sato Keijiro 1-1-6 Uchisaiwaicho, Chiyoda-ku, Tokyo Nihon Telegraph and Telephone Corporation (72) Inventor Osamu Nakajima Chiyo, Tokyo 1-6-1, Saichocho, Ta-ku, Japan Nippon Telegraph and Telephone Corp. (72) Inventor, Osaka, 3-3, Sarugaku-cho, Shibuya-ku, Tokyo, Japan Telegraph and Telephone Construction Association

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 歩道上に作業スペースを置いて歩道とほ
ぼ平行に配設された橋桁部と、橋桁部の両端を支持する
支柱部と、橋桁部の両端に取付けられた階段部とを備
え、前記各部が運搬車の荷台に積載可能な大きさとなる
よう構成されたことを特徴とする工事用仮設迂回歩道
橋。
1. A bridge girder portion provided with a work space on the sidewalk and arranged substantially parallel to the sidewalk, a pillar portion supporting both ends of the bridge girder portion, and a stair portion attached to both ends of the bridge girder portion. A temporary detour pedestrian bridge for construction, characterized in that each of the above-mentioned parts is configured to have a size capable of being loaded on a bed of a carrier.
JP32363092A 1992-11-09 1992-11-09 Temporary detour overpass for construction work Withdrawn JPH06146214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32363092A JPH06146214A (en) 1992-11-09 1992-11-09 Temporary detour overpass for construction work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32363092A JPH06146214A (en) 1992-11-09 1992-11-09 Temporary detour overpass for construction work

Publications (1)

Publication Number Publication Date
JPH06146214A true JPH06146214A (en) 1994-05-27

Family

ID=18156877

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32363092A Withdrawn JPH06146214A (en) 1992-11-09 1992-11-09 Temporary detour overpass for construction work

Country Status (1)

Country Link
JP (1) JPH06146214A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100465999B1 (en) * 2002-02-15 2005-01-13 배석동 Moving Bridge
KR100768724B1 (en) * 2007-01-31 2007-10-23 (주)대흥엔지니어링 Overhead bridge
JP2008223341A (en) * 2007-03-13 2008-09-25 Mitsubishi Electric Corp Mobile installation type pedestrian overpass
CN108316119A (en) * 2018-03-27 2018-07-24 遵义路鑫机械有限公司 The steel construction overline bridge being easily installed

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100465999B1 (en) * 2002-02-15 2005-01-13 배석동 Moving Bridge
KR100768724B1 (en) * 2007-01-31 2007-10-23 (주)대흥엔지니어링 Overhead bridge
JP2008223341A (en) * 2007-03-13 2008-09-25 Mitsubishi Electric Corp Mobile installation type pedestrian overpass
CN108316119A (en) * 2018-03-27 2018-07-24 遵义路鑫机械有限公司 The steel construction overline bridge being easily installed
CN108316119B (en) * 2018-03-27 2023-08-04 遵义路鑫机械有限公司 Steel construction overpass convenient to installation

Similar Documents

Publication Publication Date Title
CN106498842A (en) A kind of voluntarily axle beam and its method of construction under existing elevated bridge
KR101082429B1 (en) Widening and supporting structure for architecture and civil engineering structure and bridge widening method using the same
JP2018104972A (en) Floor slab erection method and floor slab erection device
JP2021031884A (en) Bridge upper structure removal method
JP2008223341A (en) Mobile installation type pedestrian overpass
JP2021080822A (en) Construction method based on mobile work platform for erection of steel box girder overbridge
US4098036A (en) Elevated train station
JPH06146214A (en) Temporary detour overpass for construction work
JP7017927B2 (en) Steel bridge widening erection equipment and steel bridge widening erection method
JP3225933U (en) Railing-mounted scaffolding and its scaffolding support
JP6368628B2 (en) Mobile scaffold and inspection / repair method using the mobile scaffold
JP6873435B2 (en) Suspended scaffolding and its erection method
JP3504812B2 (en) Pedestrian bridge
US5014381A (en) Rolling platform assembly
JP2759600B2 (en) Wall mounting method
JP2000178922A (en) Erection method and device for extension girder
JPH10292790A (en) Method for tunnel lining construction
JPH0633422A (en) Movable type three-dimensional footpath bridge
JPS60258311A (en) Construction of high structure
JP2991713B1 (en) Method and apparatus for coating suspended monorail track girder
US20070235258A1 (en) Fold-up scaffold for semi-trailer shop
JP3082851B2 (en) Construction method of sound absorbing scaffold under viaduct
CN102979528B (en) Well casing installing worktable
KR101932674B1 (en) Girder for temporary bridge and Method for installing the same
JP2019027145A (en) Installation method for falling object protective device

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20000201