JPH06108476A - Construction of stud in steel frame structure - Google Patents

Construction of stud in steel frame structure

Info

Publication number
JPH06108476A
JPH06108476A JP4255996A JP25599692A JPH06108476A JP H06108476 A JPH06108476 A JP H06108476A JP 4255996 A JP4255996 A JP 4255996A JP 25599692 A JP25599692 A JP 25599692A JP H06108476 A JPH06108476 A JP H06108476A
Authority
JP
Japan
Prior art keywords
pile
concrete
stud
foundation
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4255996A
Other languages
Japanese (ja)
Inventor
Yuji Izumi
祐司 泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Steel Corp filed Critical Kawasaki Steel Corp
Priority to JP4255996A priority Critical patent/JPH06108476A/en
Publication of JPH06108476A publication Critical patent/JPH06108476A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE:To simplify the foundation structure without footing or horizontal beams, by excavating a hole in the foundation ground to insert a steel rod cage and directly burying the stud of a building on the ground at the head of concrete piles. CONSTITUTION:A hole is excavated in the foundation ground 1 to insert a steel rod cage with the enlarged head and concrete is placed to make a cast-in- place concrete pile 2. Next, the stud 61 of an upper structure 6 is buried on the enlarged head of the pile 2. And then finally concrete is placed to fix the stud. In this case, studs 61a are connected on the studs 61. The bending moment from the studs 61 is transmitted to the inside reinforcements of the enlarged head 21 through the concrete at the joint with the stud of the upper structure 6 on the pile 2 and hence, it is regarded as a fixed stud. In this way, the structure of foundation is simplified and the construction period is remarkably hastened and also the construction cost is reduced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、基礎地盤上に簡易な鉄
骨構造の構造物を構築する構築方法に関し、さらに詳し
くは、場所打ち鉄筋コンクリート杭の杭頭部を直接柱脚
部の基礎として利用する柱脚部分の構築方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for constructing a simple structural steel structure on a foundation ground. More specifically, the pile head of a cast-in-place reinforced concrete pile is directly used as a foundation for a column base. A method of constructing a column base portion to be used.

【0002】[0002]

【従来の技術】従来、たとえば立体駐車場等の簡易な鉄
骨構造の建造物を構築する場合であっても、本格的な建
造物と基本的には同様の手順により、図7に示すように
基礎地盤1に杭2を打設し、杭頭部にフーチング53を造
成し、必要に応じこれらを連結する基礎梁55を設けて基
礎部を形成したのち、基礎内にアンカーボルト54を植え
込み、このアンカーボルト上に地上の建造物6(上物)
を構築して固定することが行われている。
2. Description of the Related Art Conventionally, even in the case of constructing a building having a simple steel frame structure such as a multistory parking lot, as shown in FIG. 7, the procedure is basically the same as that of a full-scale building. After mounting the pile 2 on the foundation ground 1, forming the footing 53 on the pile head, and forming the foundation part by providing the foundation beam 55 connecting these as necessary, anchor bolts 54 are implanted in the foundation, Building 6 on the ground (above) on this anchor bolt
Is being built and fixed.

【0003】しかし、簡易な構造物であっても複雑な構
造物と同様の手順で基礎を施工するのは不経済であり、
簡略化することが望まれていた。なお、一般に基礎杭と
しては、既製杭と総称されるPC杭や鋼管杭の工場等で
製作した杭を現地に運搬して杭打ち機により打設するも
のと、現地に穴を掘削し、鉄筋かごを挿入してコンクリ
ートを打設し、杭体を形成する場所打ち鉄筋コンクリー
ト杭とがある。
However, it is uneconomical to construct a foundation in the same procedure as a complicated structure, even if the structure is simple.
It was desired to simplify it. Generally, as foundation piles, those piles manufactured in factories such as PC piles and steel pipe piles that are generically referred to as ready-made piles are transported to the site and placed by a pile driver, and holes are excavated locally and There is a cast-in-place reinforced concrete pile that inserts a basket and pours concrete to form a pile.

【0004】[0004]

【発明が解決しようとする課題】本発明は、荷重も小さ
く、構造も簡易な上物(地上建造物)の場合について、
基礎部分の構造を簡略化し、施工のスピードアップなら
びにコストダウンを図る新規な施工方法を提供すること
を目的とする。
DISCLOSURE OF THE INVENTION The present invention relates to the case of an overhead object (ground building) having a small load and a simple structure,
It is an object of the present invention to provide a new construction method that simplifies the structure of the foundation part to speed up construction and reduce costs.

【0005】[0005]

【課題を解決するための手段】第1の本発明は、基礎地
盤中に孔を掘削して鉄筋かごを挿入し、コンクリートを
打設してなる場所打ち鉄筋コンクリート杭の杭頭部に、
地上の構造物の柱脚部を直接埋め込んで固定したことを
特徴とする鉄骨構造物柱脚部分の構築方法であり、第2
の本発明は、場所打ち鉄筋コンクリート杭の杭頭部分
を、鉄骨構造物柱脚部分を埋め込めるように拡大して形
成する前記の鉄骨構造物柱脚部分の構築方法である。
[Means for Solving the Problems] The first aspect of the present invention relates to a pile head portion of a cast-in-place reinforced concrete pile, which is obtained by excavating a hole in a foundation ground, inserting a reinforcing cage, and placing concrete.
A method of constructing a column base portion of a steel structure, characterized in that the column base portion of a structure on the ground is directly embedded and fixed.
The present invention is the method for constructing a steel structure column base portion, wherein the pile head portion of a cast-in-place reinforced concrete pile is enlarged and formed so as to embed the steel structure column base portion.

【0006】[0006]

【作 用】一般に基礎杭としては、既製杭と総称される
PC杭や鋼管杭の工場等で製作した杭を現地に運搬して
杭打ち機により打設するものと、現地に穴を掘削し、鉄
筋かごを挿入してコンクリートを打設し、杭体を形成す
る場所打ち鉄筋コンクリート杭とがある。
[Operation] Generally, as foundation piles, PC piles, which are generically called ready-made piles, and piles manufactured at steel pipe pile factories are transported to the site and placed by a pile driver, and holes are excavated at the site. , There is a cast-in-place reinforced concrete pile that forms a pile by inserting concrete by inserting a reinforced cage.

【0007】本発明においては、場所打ちコンクリート
杭の杭頭部を直接上物の基礎として利用し、上物の柱脚
をこの杭頭部に埋め込む構造とした。この構造をとるこ
とにより、フーチングや水平梁の構築が不要となり、施
工がいちじるしく簡略化される。杭と上物の柱脚との接
続部においては、柱脚からの曲げモーメントは、コンク
リートを介して径を拡大した杭頭部の内部配筋に伝達さ
れるため、ピンではなく、固定脚として扱えるから設計
上有利である。また、地震時の水平力に対しては杭の土
中部分の剛性および地盤の反力で負担することができ
る。
In the present invention, the pile head of the cast-in-place concrete pile is directly used as the foundation for the upper article, and the column base of the upper article is embedded in the pile head. By adopting this structure, footing and construction of horizontal beams are not required, and the construction is greatly simplified. At the connection between the pile and the column base of the upper structure, the bending moment from the column base is transmitted to the internal reinforcement of the pile head with an enlarged diameter through concrete, so it is used as a fixed leg instead of a pin. Since it can be handled, it is advantageous in design. In addition, the horizontal force during an earthquake can be borne by the rigidity of the soil part of the pile and the reaction force of the ground.

【0008】[0008]

【実施例】【Example】

実施例1 図1ないし図3は、本発明の一実施例による施工方法を
順を追って説明した断面図である。まず図1において、 (1)基礎地盤1の表面にコンクリート層がある場合、
まずこの必要部分をはつり、コンクリート層を除去す
る。
Embodiment 1 FIGS. 1 to 3 are sectional views sequentially illustrating a construction method according to an embodiment of the present invention. First, in FIG. 1, (1) When there is a concrete layer on the surface of the foundation ground 1,
First of all, the required portion is removed and the concrete layer is removed.

【0009】(2)ドリリングバケットにより孔の掘削
を開始する。 (3)ケーシングパイプを建てこみ、地質に応じてベン
トナイト液を注入する。 (4)所定深さまで掘削する。 (5)バケットを引き上げ、先端深さを測定する。 (6)スライム(土中のへどろや有機性浮遊物)の沈殿
を待って、スライムの量を測定する。
(2) Drilling of a hole is started by a drilling bucket. (3) Build a casing pipe and inject bentonite liquid according to the geology. (4) Excavate to a predetermined depth. (5) Pull up the bucket and measure the tip depth. (6) Wait for sedimentation of slime (held metal in the soil or organic suspended matter) and measure the amount of slime.

【0010】つぎに図2にうつり、 (7)底ざらいバケットによりスライムを排出する。 (8)底ざらい後の孔底深さを測定する。 (9)孔の中へ鉄筋かご22を挿入する。 (10)トレミ管を挿入し、トレミ管に生コンクリートを
投入し、1〜2分の間、高圧水を噴射する。
Next, as shown in FIG. 2, (7) The slime is discharged by a bucket with a rough bottom. (8) Measure the bottom depth of the hole after roughening the bottom. (9) Insert the rebar cage 22 into the hole. (10) Insert the Tremi tube, pour fresh concrete into the Tremi tube, and inject high-pressure water for 1-2 minutes.

【0011】(11)高圧水噴射停止の後、トレミ間を上
昇させながらトレミ管より生コンクリートの打設を開始
する。 (12)生コンクリートの打設終了により、ケーシングパ
イプを引き上げる。以上で場所打ちコンクリート杭2が
形成される。 つづいて図3において、 (13)基礎地盤表面を約 500mm掘削し、打設した杭頭部
をはつる。
(11) After the injection of high-pressure water is stopped, pouring of fresh concrete from the tremie pipe is started while raising the distance between the tremies. (12) Pull up the casing pipe after finishing pouring the concrete. As described above, the cast-in-place concrete pile 2 is formed. Next, in Fig. 3, (13) Excavate the ground surface by about 500 mm and mount the pile head.

【0012】(14)杭頭部をモルタルにより高さ調整
し、柱芯を墨出しし、モルタル部内にアンカーボルトを
セットする。 (15)鉄骨部材6を建てこみ、アンカーボルトを本締め
する。 (16)杭頭部21に鉄筋を建てこみ、型枠をセットする。 (17)杭頭部21にコンクリートを打設し、上部構造物を
組み立てる。
(14) The height of the pile head is adjusted by mortar, the pillar core is marked out, and the anchor bolt is set in the mortar portion. (15) Build the steel member 6 and fully tighten the anchor bolts. (16) Build a reinforcing bar on the pile head 21 and set the formwork. (17) Pour concrete into the pile head 21 and assemble the superstructure.

【0013】(18)地盤表面を埋め戻して、全体が完成
する。 以上により、場所打ちコンクリート杭2と上物6の柱脚
61とが一体として連結され、荷重ならびにモーメントを
伝達する接続構造が実現する。さきに図3により説明し
た従来の工法に比較して、フーチングの形成を行わない
分、施工が簡略化されたばかりでなく、杭と上物の柱脚
との接続部が設計上ピンではなく、固定脚として扱える
という利点も生じている。
(18) The whole surface is completed by backfilling the ground surface. Due to the above, cast-in-place concrete pile 2 and column base of top 6
61 and 61 are integrally connected, and a connection structure for transmitting load and moment is realized. Compared with the conventional construction method described above with reference to FIG. 3, not only the footing is not formed, but the construction is simplified, and the connection between the pile and the column base of the upper article is not a pin by design, Another advantage is that it can be handled as a fixed leg.

【0014】実施例2 本発明の第2の実施例を図4〜6により説明する。図4
は、この実施例に使用する上物を示す正面図で、6は上
物である鉄骨構造物、61はその柱脚部で 300×300 の角
鋼管より成り、61a は柱脚部に建植されたスタッドで、
先端部長さ1000mmの範囲にわたり、径16mm、高さ80mmの
ものが各面に 6×2 列に設けられている。図5は杭を示
す正面図で、2は杭で径600mm 、21は杭頭部で径800mm
、長さ1000mm、22は鉄筋かごで、縦方向の主筋22a は
径19mmのもの16本、フープ筋22b は径13mmで、杭頭部に
おいてはピッチ100mm である。
Second Embodiment A second embodiment of the present invention will be described with reference to FIGS. Figure 4
Is a front view showing an upper object used in this embodiment, 6 is a steel structure which is an upper object, 61 is a column base portion of which is a 300 × 300 square steel pipe, and 61a is a planted portion in the column base portion. With the studs
The length of the tip is 1000 mm and the diameter is 16 mm and the height is 80 mm. Fig. 5 is a front view of the pile. 2 is a pile with a diameter of 600 mm, 21 is a pile head with a diameter of 800 mm.
, Length 1000mm, 22 are reinforced cages, 16 longitudinal main bars 22a have a diameter of 19mm, hoops 22b have a diameter of 13mm, and pitch is 100mm at the pile head.

【0015】本実施例では、さきの第1の実施例とは異
なり、上記のように鉄筋かごの上端部分を拡大して形成
し、上物の脚部61をこの拡大部分に挿入した状態で杭の
コンクリート打ちの最後の部分を施工すると、脚部61は
杭頭部21にコンクリートを介して固定され、実施例1と
同様の接続構造が実現する。完成状態の正面図を図6
(a)に、そのAA視による断面図を同じく図6(b)
に示す。杭頭部21の径拡大部分が、基礎地盤1の表面付
近に形成されている。
In this embodiment, unlike the first embodiment, the upper end portion of the reinforcing steel cage is enlarged and formed as described above, and the leg portion 61 of the upper object is inserted in this enlarged portion. When the last part of the concrete piling of the pile is constructed, the leg portion 61 is fixed to the pile head portion 21 through the concrete, and a connection structure similar to that of the first embodiment is realized. Figure 6 shows the front view of the completed state
A sectional view taken along the line AA is also shown in FIG.
Shown in. An enlarged diameter portion of the pile head 21 is formed near the surface of the foundation ground 1.

【0016】[0016]

【発明の効果】本発明によれば、荷重も小さく、構造も
簡易な鉄骨構造の上物(地上構造物)について、基礎部
分の構造を簡略化し、大幅な施工のスピードアップなら
びにコストダウンを図ることができる。
According to the present invention, for an upper structure (ground structure) of a steel frame structure having a small load and a simple structure, the structure of the foundation portion is simplified, and the construction speed and cost are significantly reduced. be able to.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の施工手順の一例の第1段階を示す断面
図である。
FIG. 1 is a sectional view showing a first stage of an example of a construction procedure of the present invention.

【図2】本発明の施工手順の一例の第2段階を示す断面
図である。
FIG. 2 is a sectional view showing a second stage of an example of the construction procedure of the present invention.

【図3】本発明の施工手順の一例の第3段階を示す断面
図である。
FIG. 3 is a sectional view showing a third step of an example of the construction procedure of the present invention.

【図4】本発明の第2の実施例に係わる鉄骨構造物を示
す正面図である。
FIG. 4 is a front view showing a steel frame structure according to a second embodiment of the present invention.

【図5】本発明の第2の実施例に係わる杭ならびに鉄筋
かごを示す正面図である。
FIG. 5 is a front view showing a pile and a reinforcing bar car according to a second embodiment of the present invention.

【図6】本発明の第2の実施例における接続構造を示す
正面図ならびにAA視による断面図である。
FIG. 6 is a front view showing a connection structure in a second embodiment of the present invention and a sectional view taken along the line AA.

【図7】従来の技術を示す断面図である。FIG. 7 is a cross-sectional view showing a conventional technique.

【符号の説明】[Explanation of symbols]

1 基礎地盤 2 場所打ち杭 21 杭頭部 22 鉄筋かご 6 上物 61 柱脚部 61a スタッド 53 フーチング 54 アンカーボルト 55 水平梁 1 Foundation ground 2 Cast-in-place pile 21 Pile head 22 Reinforcing cage 6 Upper object 61 Column base 61a Stud 53 Footing 54 Anchor bolt 55 Horizontal beam

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 基礎地盤中に孔を掘削して鉄筋かごを挿
入し、コンクリートを打設してなる場所打ち鉄筋コンク
リート杭の杭頭部に、地上の構造物の柱脚部を直接埋め
込んで固定したことを特徴とする鉄骨構造物柱脚部分の
構築方法。
1. A column base of a ground structure is directly embedded and fixed to a pile head of a cast-in-place reinforced concrete pile in which a hole is excavated in the foundation ground, a reinforced cage is inserted, and concrete is placed. A method of constructing a column base portion of a steel structure characterized by the above.
【請求項2】 場所打ち鉄筋コンクリート杭の杭頭部分
を、鉄骨構造物柱脚部分を埋め込めるように拡大して形
成する請求項1記載の鉄骨構造物柱脚部分の構築方法。
2. The method for constructing a column base portion of a steel structure structure according to claim 1, wherein the pile head portion of the cast-in-place reinforced concrete pile is enlarged and formed so as to embed the column base portion of the steel structure structure.
JP4255996A 1992-09-25 1992-09-25 Construction of stud in steel frame structure Pending JPH06108476A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4255996A JPH06108476A (en) 1992-09-25 1992-09-25 Construction of stud in steel frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4255996A JPH06108476A (en) 1992-09-25 1992-09-25 Construction of stud in steel frame structure

Publications (1)

Publication Number Publication Date
JPH06108476A true JPH06108476A (en) 1994-04-19

Family

ID=17286457

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4255996A Pending JPH06108476A (en) 1992-09-25 1992-09-25 Construction of stud in steel frame structure

Country Status (1)

Country Link
JP (1) JPH06108476A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268567A (en) * 1996-03-28 1997-10-14 Nkk Corp Joint structure of column and pile
JPH11172692A (en) * 1997-12-16 1999-06-29 Sato Benec Co Ltd Execution of column constitution member
JP2006233512A (en) * 2005-02-23 2006-09-07 Muto Hideo Foundation structure of column base, its construction method, its design method and its recording medium
CN109083137A (en) * 2018-09-20 2018-12-25 连云港东浦建筑工业化发展有限公司 A kind of gyro stake and its manufacturing process
JP2020056252A (en) * 2018-10-03 2020-04-09 株式会社竹中工務店 Connection part structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268567A (en) * 1996-03-28 1997-10-14 Nkk Corp Joint structure of column and pile
JPH11172692A (en) * 1997-12-16 1999-06-29 Sato Benec Co Ltd Execution of column constitution member
JP2006233512A (en) * 2005-02-23 2006-09-07 Muto Hideo Foundation structure of column base, its construction method, its design method and its recording medium
CN109083137A (en) * 2018-09-20 2018-12-25 连云港东浦建筑工业化发展有限公司 A kind of gyro stake and its manufacturing process
JP2020056252A (en) * 2018-10-03 2020-04-09 株式会社竹中工務店 Connection part structure

Similar Documents

Publication Publication Date Title
JP3625892B2 (en) Construction method of underground structure using precast concrete column
KR100673475B1 (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof
JPH06108476A (en) Construction of stud in steel frame structure
CN113668554B (en) Construction method of foundation pit supporting structure adjacent to building
JP2004027727A (en) Foundation pile and construction method for foundation pile
JP7275844B2 (en) WALL-LIKE STRUCTURE AND METHOD OF CONSTRUCTING WALL-LIKE STRUCTURE
JP6860895B2 (en) Retaining wall and its construction method
JPS5829922A (en) Constructing method for underground outer wall
JP3172694B2 (en) Embedding method of straight pillar in reverse hitting method
JP4675101B2 (en) Semi-rigid joint structure between concrete pile and foundation slab or foundation beam and its construction method
JP4502442B2 (en) Seismic foundation, seismic building, and pile reinforcement method
JPH0721196B2 (en) Reverse construction method of underground structure
JPH01315520A (en) Underground outer wall constructing method for superstructure
JP3637945B2 (en) Construction method of base-isolated building by reverse driving method
JPH04366229A (en) Temporary corresponding standard used for method of reverse driving construction
JP2004285613A (en) Construction method for building foundation
JPH108482A (en) Joined structure between construction center column and pile and posteriorly constructing method for construction center column
US20030084630A1 (en) Perimeter walls
JP2000291146A (en) Joint structure of pile head and column, and construction method therefor
JP2001011874A (en) Construction method for structural stud using precast pile
JP2555796B2 (en) Underground construction method using hollow PC columns
JPH073781A (en) Method for constructing foundation footing on cast-in-place concrete pile head
JPH0337603B2 (en)
KR200405652Y1 (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it
JP3061934B2 (en) Retaining wall construction method

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Effective date: 20040127

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Effective date: 20040130

Free format text: JAPANESE INTERMEDIATE CODE: A61

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080206

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20090206

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100206

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 7

Free format text: PAYMENT UNTIL: 20110206

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 8

Free format text: PAYMENT UNTIL: 20120206

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130206

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees