JPH06104540B2 - Bobbin holding method and bobbin holder - Google Patents

Bobbin holding method and bobbin holder

Info

Publication number
JPH06104540B2
JPH06104540B2 JP1267419A JP26741989A JPH06104540B2 JP H06104540 B2 JPH06104540 B2 JP H06104540B2 JP 1267419 A JP1267419 A JP 1267419A JP 26741989 A JP26741989 A JP 26741989A JP H06104540 B2 JPH06104540 B2 JP H06104540B2
Authority
JP
Japan
Prior art keywords
bobbin
ring
pressing force
grip
holder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1267419A
Other languages
Japanese (ja)
Other versions
JPH03128868A (en
Inventor
清治 岩城
善朗 三垣
剛 鶴岡
尚文 山内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toray Engineering Co Ltd
Original Assignee
Toray Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toray Engineering Co Ltd filed Critical Toray Engineering Co Ltd
Priority to JP1267419A priority Critical patent/JPH06104540B2/en
Publication of JPH03128868A publication Critical patent/JPH03128868A/en
Publication of JPH06104540B2 publication Critical patent/JPH06104540B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は1本のボビンホルダーの複数本のボビンを挿着
し同時に把持する方法に関するものである。
The present invention relates to a method of inserting and holding a plurality of bobbins of a bobbin holder at the same time.

〔従来技術〕[Prior art]

一般に、複数本の糸条を同時に複数本のボビンに巻取る
場合は、例えば、実公昭47−37566号公報に記載されて
いるような構成のボビンホルダーが使用されている。該
ボビンホルダーは機枠に回転自在に装着された軸体を筒
体を嵌挿すると共に、筒体および軸体の間に把持リング
を介在せしめ、把持リングに軸心長手方向の押圧力を作
用させて直径方向に張り出たせてボビンの内周面を圧接
してボビンを把持するように構成されている。また、把
持リングによって各ボビンが均一に把持されるようにす
るため、把持リングの外径寸法、あるいは、把持リング
の硬度を変えるようにした構成のボビンホルダーが提案
されている。該構成のボビンホルダーは、例えば、実公
昭48−38907号公報、特公昭48−26102号公報に記載され
ている。
Generally, in the case of winding a plurality of yarns on a plurality of bobbins at the same time, a bobbin holder having a structure as described in JP-B-47-37566 is used. In this bobbin holder, a shaft body rotatably mounted on a machine frame is inserted into a cylinder body, and a grip ring is interposed between the cylinder body and the shaft body, and a pressing force is applied to the grip ring in the longitudinal direction of the shaft center. The bobbin is gripped by pressing the inner peripheral surface of the bobbin so as to project in the diameter direction. Further, in order to uniformly hold each bobbin by the holding ring, there has been proposed a bobbin holder configured to change the outer diameter dimension of the holding ring or the hardness of the holding ring. The bobbin holder having such a structure is described, for example, in Japanese Utility Model Publication No. 48-38907 and Japanese Patent Publication No. 48-26102.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

上述のように把持リングの外径寸法、あるいは、把持リ
ングの硬度を変えて複数本のボビンを同時に把持するよ
うにしていても、加工誤差、摩擦抵抗等があるため、複
数個の把持リングを略同時に変形させて複数のボビンを
把持することはほとんど不可能である。そのため、先端
部、あるいは、中間部の把持リングが先に張り出してボ
ビンを把持すると、ボビンホルダーの先端側から押圧力
を作用させてもボビンが移動しないため、該把持リング
以降の把持リングに押圧力が作用せずボビンの把持が行
われない。そのため、糸条の巻取操作時に振動等を発生
するという問題があった。
Even if a plurality of bobbins are gripped at the same time by changing the outer diameter of the grip ring or the hardness of the grip ring as described above, there are processing errors, frictional resistance, etc. It is almost impossible to deform a plurality of bobbins at substantially the same time. Therefore, if the grip ring at the tip or in the middle extends first and grips the bobbin, the bobbin does not move even if pressure is applied from the tip side of the bobbin holder, so the grip ring after the grip ring is pushed. No pressure is applied and the bobbin is not gripped. Therefore, there is a problem that vibration or the like occurs during the winding operation of the yarn.

〔目的」 本発明の目的はボビンホルダーに嵌挿したボビンの全て
を確実に把持できるようにすることである。
[Purpose] An object of the present invention is to ensure that all bobbins fitted into the bobbin holder can be gripped.

〔課題を解決するための手段〕[Means for Solving the Problems]

上述の課題を解決するために本発明のボビン把持方法は
請求項1のように、機枠に回転自在に装着された軸体に
筒体を嵌挿すると共に、筒体および軸体の間に把持リン
グを介在せしめ、前記把持リングに押圧力を作用させて
直径方向に張り出させてボビンの内周面を圧接してボビ
ンを把持するボビンホルダーに複数本のボビンを把持す
るに際し、複数本のボビンを前記ボビンホルダーに挿着
して前記把持リングに押圧力を作用させて各ボビンを仮
把持の状態にせしめ、少なくとも1回前記把持リングに
対する押圧力を除去してボビンの把持を一時的に解除
し、次いで、前記把持リングに押圧力を作用させて各ボ
ビンを把持せしめるようにしてある。
In order to solve the above-mentioned problems, the bobbin holding method of the present invention is such that, as in claim 1, the tubular body is inserted into the axial body rotatably mounted on the machine frame, and between the tubular body and the axial body. A gripping ring is interposed, and when a plurality of bobbins are gripped on the bobbin holder that grips the bobbin by pressing the inner diameter of the bobbin by pressing it against the gripping ring in a diametrical direction to grip the bobbin. Of the bobbin is inserted into the bobbin holder and a pressing force is applied to the grip ring to make each bobbin in a temporary grip state, and the pressing force on the grip ring is removed at least once to temporarily hold the bobbin. Then, the bobbin is gripped by applying a pressing force to the grip ring.

また、請求項2のように軸体に形成されたボビン位置決
め用鍔部に対して所定の間隔を有するように複数本のボ
ビンを前記ボビンホルダーに挿着して前記把持リングに
押圧力を作用させて各ボビンを仮把持の状態にせしめ、
少なくとも1回前記把持リングに対する押圧力を除去し
てボビンの把持を一時的に解除し、次いで、前記把持リ
ングに押圧力を作用させて各ボビンを前記ボビン位置決
め用鍔部に当接した状態で把持せしめるようにすること
もできる。
In addition, a plurality of bobbins are inserted into the bobbin holder so as to have a predetermined space with respect to the bobbin positioning flange formed on the shaft, and a pressing force is applied to the grip ring. So that each bobbin is in a state of temporary gripping,
In a state where the pressing force on the grip ring is removed at least once to temporarily release the grip of the bobbin, and then the pressing force is applied to the grip ring to bring each bobbin into contact with the bobbin positioning flange. It can also be gripped.

さらに、本発明のボビンホルダーは請求項3のように機
枠に回転自在に装着された軸体に筒体を嵌挿すると共
に、筒体および軸体の間に把持リングを介在せしめ、前
記把持リングに押圧力を作用させて直径方向に張り出さ
せてボビンの内周面を圧接してボビンを把持するボビン
ホルダーおいて、前記軸体に形成されたボビン位置決め
用鍔部に、ボビン挿着時にはボビン端部が当接して仮位
置決めが行なわれ、ボビン把持動作時にはボビンが軸心
長手方向に移動可能な間隙形成部材を装着せしめた構成
にしてある。
Further, according to the bobbin holder of the present invention, the cylindrical body is fitted and inserted into the shaft body rotatably mounted on the machine frame as described in claim 3, and the grip ring is interposed between the cylindrical body and the shaft body to hold the grip body. In the bobbin holder that presses the ring to project it in the diameter direction and presses the inner peripheral surface of the bobbin to grip the bobbin, insert the bobbin into the bobbin positioning collar formed on the shaft body. Occasionally, the bobbin ends contact with each other for temporary positioning, and a bobbin is mounted with a gap forming member that is movable in the longitudinal direction of the axis during the bobbin holding operation.

〔実施例〕〔Example〕

本発明のボビン把持方法を実施するためのボビンホルダ
ーの1実施例の構成を図面に基づいて説明する。
The structure of one embodiment of a bobbin holder for carrying out the bobbin holding method of the present invention will be described with reference to the drawings.

2はボビン位置決め用鍔部2aと把持リング位置決め用鍔
部2bと圧空供給用孔2cを有する軸体であり、ベアリング
3によって機枠1に回転自在に取付けてある。4は軸体
2の端部の嵌挿されたピストンであり、圧縮ばね5によ
り上記(イ)方向に押圧されている。6〜8は軸体2の
外周に嵌挿されたスライドリングであり、9はピストン
4、スライドリング6〜8、および、軸体2の鍔部2aの
間に嵌挿された把持リングである。
Reference numeral 2 denotes a shaft body having a bobbin positioning flange 2a, a grip ring positioning flange 2b, and a compressed air supply hole 2c, which is rotatably attached to the machine frame 1 by a bearing 3. Reference numeral 4 denotes a piston fitted into the end portion of the shaft body 2, and is pressed by the compression spring 5 in the direction (a). Reference numerals 6 to 8 are slide rings fitted around the outer circumference of the shaft body 2, and 9 is a grip ring fitted between the piston 4, the slide rings 6 to 8 and the flange portion 2a of the shaft body 2. .

上述の軸体2の圧空供給用孔2cには電磁切替弁を有する
圧空供給用管(図示せず)が連結してある。
A compressed air supply pipe (not shown) having an electromagnetic switching valve is connected to the compressed air supply hole 2c of the shaft body 2 described above.

上述のボビンホルダーによりボビンを把持する場合は、
まず、電磁切替弁(図示せず)を作動させ供給路を切替
えて圧空を軸体2に供給すると、ピストン4が(ロ)方
向に移動して各把持リング9a〜9dに作用していた圧縮ば
ね5による押圧力が除去され、各把持リング9a〜9dは弾
性力によって自然に状態に復帰し、その外径がボビンの
内径より小さくなる。該状態でボビン20A、20Bをボビン
位置決め用鍔部2aに当接するまで挿入する。次いで、電
磁切替弁(図示せず)を作動させて供給路を切替えて圧
空の供給を停止し、ピストン4に対する押圧力を無くす
と、圧縮ばね5の押圧力によってピストン4が(イ)方
向に移動する。この時、圧縮ばね5の押圧力がピストン
4、把持リング9a、スライドリング6、把持リング9b、
スライドリング7、把持リング9c、スライドリング8、
把持リング9dの順に伝達され、先端側に位置する把持リ
ング9aから順次押圧力によって圧縮されて直径方向に張
り出しボビン20Aの内周面を圧接する。そのため、把持
リング9aが押圧力によって軸心長手方向(イ)に移動す
ると順次把持リング9b〜9dが押圧されてボビン20A、20B
を把持する。しかし、ボビン20A、20Bは把持リング9d側
の方が把持力が弱くなっている。そこで、上述のボビン
20把持操作が済むと、電磁切替弁(図示せず)を作動さ
せ供給路を切替えて圧空を軸体2に供給する。すると、
第2図に示すように、ピストン4が(ロ)方向に移動し
て各把持リング9a〜9dに作用していた圧縮ばね5による
押圧力が除去され、各把持リング9a〜9dは弾性力によっ
て自然の状態に復帰し、把持リング9a〜9d、および、ス
ライドリング6、7、8が(ロ)方向に移動しながら、
各把持リング9a〜9dはボビンの内径より小さくなる。そ
のため、ボビンA、ボビンBも(ロ)方向に微少寸法移
動して間隙S−1、S−2(約1mm〜2mm)を生じる。該
操作により間隙を生じると、電磁切替弁(図示せず)を
作動させて供給路を切替えて再び圧空の供給を停止、ピ
ストン4に対する押圧力を無くし圧縮ばね5の押圧力に
よってピストン4を(イ)方向に移動させる。この時、
圧縮ばね5の押圧力がピストン4、把持リング9a、スラ
イドリング6、把持リング9b、スライドリング7、把持
リング9c、スライドリング8、把持リング9dの順に伝達
され、先端側に位置する把持リング9aから順次押圧力の
よって圧縮されて直径方向に張り出しボビン20Aの内周
面を圧接する。そのため、把持リング9aが押圧力によっ
て軸心長手方向(イ)に移動するとボビン20Aも同時に
同方向に移動し、順次把持リング9b〜9dが押圧されて把
持リングと共にボビン20Bも移動し、ボビン間に間隙の
ない状態でボビン20A、20Bが把持される。
When holding the bobbin with the bobbin holder described above,
First, when an electromagnetic switching valve (not shown) is operated to switch the supply path to supply compressed air to the shaft body 2, the piston 4 moves in the (b) direction and acts on the gripping rings 9a to 9d. The pressing force of the spring 5 is removed, and the holding rings 9a to 9d are naturally returned to the state by the elastic force, and the outer diameter thereof becomes smaller than the inner diameter of the bobbin. In this state, the bobbins 20A and 20B are inserted until they come into contact with the bobbin positioning flange 2a. Next, when an electromagnetic switching valve (not shown) is operated to switch the supply path to stop the supply of compressed air and the pressing force on the piston 4 is eliminated, the pressing force of the compression spring 5 causes the piston 4 to move in the (a) direction. Moving. At this time, the pressing force of the compression spring 5 causes the piston 4, the grip ring 9a, the slide ring 6, the grip ring 9b,
Slide ring 7, grip ring 9c, slide ring 8,
The grip ring 9d is transmitted in this order, and is sequentially compressed by the pressing force from the grip ring 9a located on the tip side to project in the diametrical direction and press-contact the inner peripheral surface of the bobbin 20A. Therefore, when the grip ring 9a is moved in the longitudinal direction (a) of the axial center by the pressing force, the grip rings 9b to 9d are sequentially pressed and the bobbins 20A and 20B.
To hold. However, the bobbin 20A, 20B has a weaker gripping force on the gripping ring 9d side. So, the bobbin mentioned above
20 When the gripping operation is completed, an electromagnetic switching valve (not shown) is operated to switch the supply path and supply compressed air to the shaft body 2. Then,
As shown in FIG. 2, the piston 4 moves in the (b) direction and the pressing force of the compression spring 5 acting on each of the grip rings 9a to 9d is removed, and each of the grip rings 9a to 9d is elastically moved. While returning to the natural state, the grip rings 9a to 9d and the slide rings 6, 7 and 8 move in the (b) direction,
Each grip ring 9a-9d is smaller than the inner diameter of the bobbin. Therefore, the bobbin A and the bobbin B are also slightly moved in the (B) direction to form the gaps S-1 and S-2 (about 1 mm to 2 mm). When a gap is created by the operation, an electromagnetic switching valve (not shown) is operated to switch the supply path to stop the supply of compressed air again, the pressing force on the piston 4 is eliminated, and the piston 4 is pressed by the pressing force of the compression spring 5. B) Move in the direction. At this time,
The pressing force of the compression spring 5 is transmitted in the order of the piston 4, the grip ring 9a, the slide ring 6, the grip ring 9b, the slide ring 7, the grip ring 9c, the slide ring 8 and the grip ring 9d, and the grip ring 9a located on the tip side. Then, the bobbin 20A is sequentially compressed by a pressing force and protrudes in the diametrical direction to press the inner peripheral surface of the bobbin 20A. Therefore, when the grip ring 9a moves in the axial center longitudinal direction (a) by the pressing force, the bobbin 20A also moves in the same direction at the same time, and the grip rings 9b to 9d are sequentially pressed to move the bobbin 20B together with the grip ring. The bobbins 20A and 20B are gripped in a state where there is no gap in the bobbin.

上述の軸体2のボビン位置決め用鍔部2aに第3図から第
6図に示すような間隙形成部材を装着して、ボビン位置
決め用鍔部2aとボビン20Bの端面との間に間隙を設け、
ボビン把持動作時に把持リングと共に各ボビンが移動さ
せると、上述のボビン把持操作において生じた間隙S−
1、S−2と相俟ってより確実にボビンを把持すること
ができる。
A gap forming member as shown in FIGS. 3 to 6 is attached to the bobbin positioning flange portion 2a of the shaft body 2 to provide a gap between the bobbin positioning flange portion 2a and the end surface of the bobbin 20B. ,
When each bobbin is moved together with the grip ring during the bobbin grip operation, the gap S− generated in the bobbin grip operation described above is generated.
The bobbin can be gripped more reliably in combination with the first and S-2.

第3図は間隙形成部材としてスプリング10を軸体2の鍔
部2aに装着したものである。
FIG. 3 shows a spring 10 mounted on the flange portion 2a of the shaft body 2 as a gap forming member.

第4図は軸体2の鍔部2aの近接位置の周面に溝を形成
し、合成樹脂、あるいは、合成ゴム等のOリング11を装
着したものである。
In FIG. 4, a groove is formed on the peripheral surface of the shaft body 2 in the vicinity of the flange portion 2a, and an O-ring 11 made of synthetic resin or synthetic rubber is attached.

第5図は軸体2の鍔部2aの近接位置に周面に螺子孔を穿
設し、ボールプランジャ12を螺着したものである。
In FIG. 5, a screw hole is formed in the peripheral surface in the vicinity of the flange portion 2a of the shaft body 2, and the ball plunger 12 is screwed.

第6図は軸体2の鍔部2bの近接位置の周面にスライドリ
ング13を移動自在に嵌着し、該スライドリング13と鍔部
2bの間にスプリング14を装着したものである。
FIG. 6 shows that a slide ring 13 is movably fitted on the peripheral surface of the shaft body 2 in the vicinity of the flange portion 2b.
A spring 14 is attached between 2b.

上述の間隙形成部材は、スプリングの押圧力によってス
ライドリングを軸心方向に移動させ、剛体の把持リング
を直径方向に張り出させてボビンを把持すると共に、ピ
ストン、および、各スライドリングを連結部材によっ順
次連結し、ピストンの動きを各スライドリングに伝達し
て把持リングを軸心方向に縮小させてボビンの把持を解
除するボビンホルダーに装着することもできる。
The above-mentioned gap forming member moves the slide ring in the axial direction by the pressing force of the spring, causes the rigid grip ring to diametrically project to grip the bobbin, and connects the piston and each slide ring to the connecting member. It is also possible to mount them on the bobbin holder that releases the grip of the bobbin by transmitting the movement of the piston to each slide ring to reduce the grip ring in the axial direction by sequentially connecting.

〔発明の効果〕 本発明のボビン把持方法は請求項1のように機枠に回転
自在に装着された軸体に筒体を嵌挿すると共に、筒体お
よび軸体の間に把持リングを介在せしめ、前記把持リン
グに押圧力を作用させて直径方向に張り出させてボビン
の内周面を圧接してボビンを把持するボビンホルダーに
複数本のボビンを把持するに際し、複数本のボビンを前
記ボビンホルダーに挿着して前記把持リングに押圧力を
作用させて各ボビンを仮把持の状態にせしめ、少なくと
も1回前記把持リングに対する押圧力を除去してボビン
の把持を一時的に解除し、次いで、前記把持リングに押
圧力を作用させて各ボビンを把持せしめるようにしてあ
るため、把持リングによってボビンを把持した状態で把
持リングと共にボビンが軸心長手方向に移動することが
でき、全ての把持リングによって全てのボビンを均一に
把持することができる。
[Effects of the Invention] According to the bobbin holding method of the present invention, the tubular body is inserted into the shaft body rotatably mounted on the machine frame as described in claim 1, and the holding ring is interposed between the tubular body and the shaft body. When holding a plurality of bobbins in a bobbin holder for holding the bobbin by pressing the inner peripheral surface of the bobbin by applying a pressing force to the grip ring to diametrically project the bobbin, a plurality of bobbins are The bobbin holder is inserted into the bobbin holder and a pressing force is applied to the grip ring to bring each bobbin into a temporary grip state, and the pressing force on the grip ring is removed at least once to temporarily release the grip of the bobbin, Next, since each bobbin is gripped by applying a pressing force to the grip ring, it is possible to move the bobbin together with the grip ring in the longitudinal direction of the axial center while gripping the bobbin with the grip ring. In this case, all the bobbins can be uniformly held by all the holding rings.

また、請求項2のように軸体に形成されたボビン位置決
め用鍔部に対して所定の間隔を有するように複数本のボ
ビンを前記ボビンホルダーに挿着して前記把持リングに
押圧力を作用させて各ボビンを仮把持の状態にせしめ、
少なくとも1回前記把持リングに対する押圧力を除去し
てボビンの把持を一時的に解除し、次いで、前記把持リ
ングに押圧力を作用させて各ボビンを前記ボビン位置決
め用鍔部に当接した状態で把持せしめるようにすると、
ボビン嵌挿時の間隙と、ボビン把持動作時に生じる間隙
によってボビンが把持リングの動きに同調するため、全
てのボビンをより均一な力で把持することができる。
In addition, a plurality of bobbins are inserted into the bobbin holder so as to have a predetermined space with respect to the bobbin positioning flange formed on the shaft, and a pressing force is applied to the grip ring. So that each bobbin is in a state of temporary gripping,
In a state where the pressing force on the grip ring is removed at least once to temporarily release the grip of the bobbin, and then the pressing force is applied to the grip ring to bring each bobbin into contact with the bobbin positioning flange. If you try to hold it,
Since the bobbin synchronizes with the movement of the holding ring due to the gap at the time of inserting the bobbin and the gap generated at the time of the bobbin holding operation, all the bobbins can be held with a more uniform force.

さらに、本発明のボビンホルダーを請求項3のように機
枠に回転自在に装着された軸体に筒体を嵌挿すると共
に、筒体および軸体の間に把持リングを介在せしめ、前
記把持リングに押圧力を作用させて直径方向に張り出さ
せてボビンの内周面を圧接してボビンを把持するボビン
ホルダーおいて、前記軸体に形成されたボビン位置決め
用鍔部に、ボビン挿着時にはボビン端部が当接して仮位
置決めが行なわれ、ボビン把持動作時にはボビンが軸心
長手方向に移動可能な間隙形成部材を装着せしめた構成
にすると、ボビン位置決め機構がボビンホルダーに近接
して設置された巻取機に比較して巻取機全体をコンパク
トにすることができると共に、ボビンの位置決めおよび
ボビンの把持を確実に行なうことができる。
Further, the bobbin holder of the present invention is inserted into a shaft body rotatably mounted on a machine frame as claimed in claim 3, and a grip ring is interposed between the cylinder body and the shaft body to hold the grip body. In the bobbin holder that presses the ring to project it in the diameter direction and presses the inner peripheral surface of the bobbin to grip the bobbin, insert the bobbin into the bobbin positioning collar formed on the shaft body. Occasionally, the bobbin end contacts the bobbin for temporary positioning, and when the bobbin is mounted with a gap forming member that can move in the longitudinal direction of the shaft during gripping operation, the bobbin positioning mechanism is installed close to the bobbin holder. The entire winder can be made compact as compared with the above-described winder, and the bobbin can be positioned and gripped reliably.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明のボビンホルダーの1実施例を示す概略
断面図である。 第2図はボビン把持操作途中におけるボビン把持を解除
した状態を示す概略図である。 第3図、乃至、第6図は間隙形成部材の実施例を示す概
略図である。 1:機枠、2:軸体、 4:ピストン、5:圧縮ばね、 6,7,8,13:スライドリング、 9:把持リング、10:間隙形成部材、 11:Oリング、12:ボールプランジャ、 14:スプリング、
FIG. 1 is a schematic sectional view showing one embodiment of the bobbin holder of the present invention. FIG. 2 is a schematic view showing a state in which the bobbin grip is released during the bobbin grip operation. 3 to 6 are schematic views showing an embodiment of the gap forming member. 1: Machine frame, 2: Shaft body, 4: Piston, 5: Compression spring, 6,7,8,13: Slide ring, 9: Holding ring, 10: Gap forming member, 11: O-ring, 12: Ball plunger , 14: Spring,

───────────────────────────────────────────────────── フロントページの続き 審査官 松縄 正登 (56)参考文献 特開 昭62−196270(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page Examiner Masato Matsunawa (56) References JP 62-196270 (JP, A)

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】機枠に回転自在に装着された軸体に筒体を
嵌挿すると共に、筒体および軸体の間に把持リングを介
在せしめ、前記把持リングに押圧力を作用させて直径方
向に張り出させてボビンの内周面を圧接してボビンを把
持するボビンホルダーに複数本のボビンを把持するに際
し、複数本のボビンを前記ボビンホルダーに挿着して前
記把持リングに押圧力を作用させて各ボビンを仮把持の
状態にせしめ、少なくとも1回前記把持リングに対する
押圧力を除去してボビンの把持を一時的に解除し、次い
で、前記把持リングに押圧力を作用させて各ボビンを把
持せしめるようにしたことを特徴とするボビン把持方
法。
1. A diameter is obtained by inserting a cylinder into a shaft rotatably mounted on a machine frame, interposing a grip ring between the cylinder and the shaft, and applying a pressing force to the grip ring. When holding multiple bobbins in the bobbin holder that holds the bobbin by pressing the inner peripheral surface of the bobbin against the bobbin holder, press the bobbin into the bobbin holder and press it against the grip ring. To make each bobbin in a temporary gripping state, to release the pressing force on the gripping ring at least once to temporarily release the gripping of the bobbin, and then to apply a pressing force to the gripping ring. A bobbin holding method characterized in that the bobbin is held.
【請求項2】軸体に形成されたボビン位置決め用鍔部に
対して所定の間隔を有するように複数本のボビンを前記
ボビンホルダーに挿着して前記把持リングに押圧力を作
用させて各ボビンを仮把持の状態にせしめ、少なくとも
1回前記把持リングに対する押圧力を除去してボビンの
把持を一時的に解除し、次いで、前記把持リングに押圧
力を作用させて各ボビンを前記ボビン位置決め用鍔部に
当接した状態で把持せしめるようにしたことを特徴とす
る請求項1のボビン把持方法。
2. A plurality of bobbins are inserted into the bobbin holder so as to have a predetermined space with respect to a bobbin positioning flange portion formed on the shaft body, and a pressing force is applied to the grip ring to apply the pressing force to each of the bobbins. The bobbin is temporarily held, the pressing force on the holding ring is removed at least once to temporarily release the holding of the bobbin, and then the pressing force is applied to the holding ring to position each bobbin. 2. The bobbin holding method according to claim 1, wherein the bobbin holding method is carried out in a state where the bobbin is held in contact with the work collar.
【請求項3】機枠に回転自在に装着された軸体に筒体を
嵌挿すると共に、筒体および軸体の間に把持リングを介
在せしめ、前記把持リングに押圧力を作用させて直径方
向に張り出させてボビンの内周面を圧接してボビンを把
持するボビンホルダーおいて、前記軸体に形成されたボ
ビン位置決め用鍔部に、ボビン挿着時にはボビン端部が
当接して仮位置決めが行なわれ、ボビン把持動作時には
ボビンが軸心長手方向に移動可能な間隙形成部材を装着
せしめたことを特徴とするボビンホルダー。
3. A diameter is obtained by inserting a cylinder into a shaft rotatably mounted on a machine frame, interposing a grip ring between the cylinder and the shaft, and applying a pressing force to the grip ring. In the bobbin holder that bulges in the direction and presses the inner peripheral surface of the bobbin to grip the bobbin, the bobbin positioning flange formed on the shaft body is temporarily contacted with the bobbin end when the bobbin is inserted. A bobbin holder characterized in that a positioning is performed and a gap forming member is mounted on the bobbin so that the bobbin can move in a longitudinal direction of an axis during a gripping operation.
JP1267419A 1989-10-13 1989-10-13 Bobbin holding method and bobbin holder Expired - Lifetime JPH06104540B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1267419A JPH06104540B2 (en) 1989-10-13 1989-10-13 Bobbin holding method and bobbin holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1267419A JPH06104540B2 (en) 1989-10-13 1989-10-13 Bobbin holding method and bobbin holder

Publications (2)

Publication Number Publication Date
JPH03128868A JPH03128868A (en) 1991-05-31
JPH06104540B2 true JPH06104540B2 (en) 1994-12-21

Family

ID=17444589

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1267419A Expired - Lifetime JPH06104540B2 (en) 1989-10-13 1989-10-13 Bobbin holding method and bobbin holder

Country Status (1)

Country Link
JP (1) JPH06104540B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4736569B2 (en) * 2005-07-01 2011-07-27 株式会社デンソー Inductive load abnormality detection device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0794309B2 (en) * 1986-02-20 1995-10-11 東レ株式会社 Bobbin holder

Also Published As

Publication number Publication date
JPH03128868A (en) 1991-05-31

Similar Documents

Publication Publication Date Title
JPS60118339A (en) Metal forming device
JPS6218601Y2 (en)
JPH06104540B2 (en) Bobbin holding method and bobbin holder
JPS58201696A (en) Propelling pencil automatically forwarding lead by writing pressure
JP2515159B2 (en) Reel device
US5084953A (en) Container assembly machine
JP2930012B2 (en) Holder such as spool
EP1476274B1 (en) Spindle with axially acting collet-opening device
SU1611688A1 (en) Arrangement for clamping parts
US3972422A (en) Material handling apparatus
JP3336324B2 (en) Work fitting stamping device
JPH056035Y2 (en)
SU1727952A1 (en) Chuck
SU1180166A1 (en) Device for clamping work
JPH0985546A (en) Method and device for push and moving parts
JPH0158010B2 (en)
SU1703262A1 (en) Apparatus for clamping blanks
CS242503B1 (en) Portable positioning device
JPH0511948Y2 (en)
JPH0411453B2 (en)
JPS5741166A (en) Clamping device for work
JPH07108471A (en) Part installing jig
JPS5914230Y2 (en) Crimping device for clasps of writing instruments, etc.
JPS62295211A (en) Adjusting mechanism
FI103649B (en) Method and apparatus for marking objects to be processed