JPH0610449A - Envelope - Google Patents

Envelope

Info

Publication number
JPH0610449A
JPH0610449A JP19276092A JP19276092A JPH0610449A JP H0610449 A JPH0610449 A JP H0610449A JP 19276092 A JP19276092 A JP 19276092A JP 19276092 A JP19276092 A JP 19276092A JP H0610449 A JPH0610449 A JP H0610449A
Authority
JP
Japan
Prior art keywords
plate
supporting
hole
tension
portions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP19276092A
Other languages
Japanese (ja)
Other versions
JP2819442B2 (en
Inventor
Akiteru Hashiguchi
韶輝 橋口
Yoshio Tsunoda
義雄 角田
Yasuhiro Suzuki
康博 鈴木
Koichi Yamamoto
浩一 山本
Katsuji Mukai
勝二 向井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanko Metal Industrial Co Ltd
Original Assignee
Sanko Metal Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanko Metal Industrial Co Ltd filed Critical Sanko Metal Industrial Co Ltd
Priority to JP19276092A priority Critical patent/JP2819442B2/en
Publication of JPH0610449A publication Critical patent/JPH0610449A/en
Application granted granted Critical
Publication of JP2819442B2 publication Critical patent/JP2819442B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To execute an envelope so easily and quickly by setting a building plate to a bracket metal without using any clamping devices such as a bolt, a nut or the like. CONSTITUTION:Each bracket B, provided with a support plate 6 having two supporting through holes 6a, upward is set up at a specified interval. A building plate A formed with two connecting flexures 3, 3 in each upper end at both sides in the cross direction of a main plate 1 is set up in space between two brackets B and B. The support plate 6 is pierced through a top face part 10 of a clamping hanger D flectionally formed with two holding parts 11, 11 from both side ends in the cross direction of the top face part 10. A clamping plate C is inserted into the supporting through hole 6a of the support plate 6 from the upside of the clamping hanger D, and an engaged part 9 is engaged with this supporting through hole 6a. In addition, a cap material 4 is fitted in both these connecting flexures 3 and 3 opposed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ボルト・ナット等の固
着具を一切使用しないで、簡易且つ迅速に施工すること
ができる外囲体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an enclosure which can be simply and quickly constructed without using any fasteners such as bolts and nuts.

【0002】[0002]

【従来の技術】従来より、多種の金属製の建築用板にて
施工された屋根,壁等の外囲体が存在しているが、その
多くのものでは、金属製の建築用板を受金具に固着する
場合にボルト・ナット等の固着具を使用している。
2. Description of the Related Art Conventionally, there have been enclosures such as roofs and walls constructed with various types of metal building boards, but most of them have received metal building boards. Fixing tools such as bolts and nuts are used when fixing to metal fittings.

【0003】[0003]

【発明が解決しようとする課題】しかし、建築用板を上
記ボルト・ナット,ドリルビス等の固着具にて受金具に
固着することは、大型建築物になるに従って、極めて面
倒な作業となり、多くの作業時間を要する施工作業とな
る。
However, fixing a building board to a receiving metal fitting with a fixing tool such as the above-mentioned bolts, nuts, and drill screws becomes an extremely troublesome work as a large-scale building is constructed. This is a construction work that requires working time.

【0004】さらに、建築用板にボルト・ナット、或い
はドリルビス等にて、建築用板に孔を開けると、その箇
所の塗装が剥がれて、錆を発生させたり、また雨水の浸
入するおそれもあり、その雨水の浸入に対する防御対策
等のために複雑且つ高価なものとなる等の種々の課題が
存在している。
Further, if a hole is made in the building board with bolts, nuts, or drill screws on the building board, the paint at that portion may peel off, which may cause rusting or the intrusion of rainwater. However, there are various problems such as complicated and expensive measures for protection against the infiltration of rainwater.

【0005】[0005]

【課題を解決するための手段】そこで、発明者は、上記
課題を解決すべく鋭意,研究を重ねた結果、本発明を支
持用貫通孔を有する支持板を上方に備えた受金具を所定
間隔に配置し、主板の幅方向両側上端に連結屈曲部を形
成した建築用板をそれぞれの受金具間に配置し、頂面部
の幅方向両側端より抱持部を屈曲形成した緊定吊子の頂
面部に前記支持板を貫通させ、抱持部を支持板の両側で
対向する連結屈曲部に巻着し、係止部を備えた緊定板を
前記緊定吊子上より支持板の支持用貫通孔に挿入し、係
止部を支持用貫通孔に係止し、対向する連結屈曲部にキ
ャップ材を嵌合してなる外囲体としたことにより、その
施工においてボルト.ナット等の固着具を不要にするこ
とができ、且つ簡易且つ迅速なる施工作業を行うことが
でき、前記課題を解決したものである。
Therefore, as a result of earnest studies to solve the above-mentioned problems, the inventor has found that the present invention provides support brackets having a supporting plate having through holes for supporting the invention at predetermined intervals. , And the construction board with connecting bent parts formed on both upper ends in the width direction of the main plate is placed between the respective metal fittings, and the hanger is bent and formed from both side ends of the top surface in the width direction. The support plate is penetrated through the top surface, the holding portions are wound around the connecting bent portions on both sides of the support plate, and the tension plate having the locking portions is supported on the tension hanger from the tension plate. It is inserted into the through hole for use, the locking portion is locked in the through hole for support, and the cap member is fitted to the connecting bent portion facing each other, so that the bolt. It is possible to eliminate the need for a fixing tool such as a nut and to perform a simple and quick construction work, thereby solving the above problem.

【0006】[0006]

【実施例】以下、本発明の実施例を図面に基づいて説明
すると、まず本発明の外囲体では、図1,図3等に示す
ように、主に建築用板A,受金具B,緊定板C及び緊定
吊子D等からなり、複数の建築用板A,A,…を受金具
B,B,…にて下部より支持するとともに、その建築用
板A,A,…を緊定吊子D及び緊定板Cにて受金具B,
B,…上に固定して外囲体を施工するものであって、そ
の建築用板Aは、図1,図3,図4等に示すように、主
板1の幅方向両端より立上り部2,2を介して連結屈曲
部3,3が形成されており、該連結屈曲部3は、上面部
3a及び被嵌合屈曲部3bから構成されており、上面部
3aは立上り部2の上端に形成され、その上面部3aの
外端より主板1側に向かって被嵌合屈曲部3bが形成さ
れている。
Embodiments of the present invention will be described below with reference to the drawings. First, in the enclosure of the present invention, as shown in FIGS. It is composed of a tension plate C, a tension suspender D, etc., and supports a plurality of construction boards A, A, ... From the bottom with receiving brackets B, B ,. Fitting bracket B, with tension strap D and tension plate C,
B, ..., which is fixed to the top to construct an outer enclosure, and the building board A has a rising portion 2 from both ends in the width direction of the main board 1 as shown in FIGS. , 2 are connected to each other to form connecting bent portions 3 and 3. The connected bent portion 3 is composed of an upper surface portion 3a and a fitted bent portion 3b, and the upper surface portion 3a is located at the upper end of the rising portion 2. The fitting bent portion 3b is formed from the outer end of the upper surface portion 3a toward the main plate 1 side.

【0007】また、立上り部2の上端は、図1,図3,
図4等に示すように、断面L字形状をなしており、具体
的には立上り部2の上端が建築用板Aの外方に突出する
よう屈曲形成されたものであり、複数の建築用板A,
A,…を平行して配置したときに、隣接する建築用板
A,Aの対向する立上り部2,2と連結屈曲部3,3と
により、略台形山形状が構成されるものであって、その
隣接する建築用板A,Aの対向する連結屈曲部3,3上
にはキャップ材4が嵌合される構成となっている。
Further, the upper end of the rising portion 2 has the upper end shown in FIGS.
As shown in FIG. 4 and the like, it has an L-shaped cross section, and specifically, is formed by bending the upper end of the rising portion 2 so as to project to the outside of the building board A. Board A,
When A, ... Are arranged in parallel, a substantially trapezoidal mountain shape is formed by the opposing rising portions 2 and 2 of the adjacent building boards A and A and the connecting bent portions 3 and 3. The cap member 4 is fitted onto the connecting bent portions 3 and 3 of the adjacent building boards A and A facing each other.

【0008】その受金具Bは、図3等に示すように、受
金具脚部5の上方に支持板6が設けられているものであ
って、その受金具脚部5の具体的な実施例としては、金
属帯板が適宜に屈曲されて略台形山形状に形成されたも
のであり、該受金具脚部5の頂部箇所より略垂直状に支
持板6が設けられており、該支持板6には、図2等に示
すように、支持用貫通孔6aが形成されている。
As shown in FIG. 3 etc., the receiving bracket B is provided with a support plate 6 above the receiving bracket leg 5, and a specific embodiment of the receiving bracket leg 5 is shown. Is a metal strip that is appropriately bent to form a trapezoidal mountain shape, and a support plate 6 is provided in a substantially vertical shape from the top of the receiving metal leg portion 5. As shown in FIG. 2 and the like, 6 has a through hole 6a for support formed therein.

【0009】さらに、図2乃至図7等に示すように、支
持板6の下方の首部分が、受金具脚部5の頂部に形成さ
れている固定用孔5aに貫通し、受金具脚部5の頂部裏
面側に設けられた軸状の固定体7にて受金具脚部5の前
後方向に揺動可能に構成される実施例も存在する。
Further, as shown in FIGS. 2 to 7, the lower neck portion of the support plate 6 penetrates through a fixing hole 5a formed at the top of the receiving metal leg portion 5 to receive the receiving metal leg portion. There is also an embodiment in which a shaft-shaped fixed body 7 provided on the back side of the top of the support member 5 is swingable in the front-back direction of the receiving metal leg 5.

【0010】その支持板6の支持用貫通孔6aには、図
1乃至図4等に示すように、後述の緊定板Cが挿入固定
される構成となっており、その支持用貫通孔6aは一乃
至複数が形成されるものであって、該支持用貫通孔6
a,6aの間が方形状等の適宜の形状の比較的大きな切
欠きが形成され、即ち支持用貫通孔6a箇所のみが上方
に突出した形状となっている。
As shown in FIGS. 1 to 4, a tension plate C described later is inserted and fixed in the supporting through hole 6a of the supporting plate 6, and the supporting through hole 6a is formed. 1 to a plurality of are formed, and the supporting through holes 6 are formed.
A relatively large notch having an appropriate shape such as a rectangular shape is formed between a and 6a, that is, only the supporting through-hole 6a has a shape protruding upward.

【0011】その緊定板Cは、押え部8及び係止部9を
備えており、具体的には、図2,図7乃至図9に示すよ
うに、押え部8は複数の挿入片8a,8a,…が櫛状を
なして形成されており、その挿入片8a,8a,…に応
じた数の支持用貫通孔6a,6a,…が支持板6に形成
され、各挿入片8aが対応する支持用貫通孔6aに挿入
する構成となっている。
The tension plate C is provided with a pressing portion 8 and a locking portion 9. Specifically, as shown in FIGS. 2, 7 to 9, the pressing portion 8 has a plurality of insertion pieces 8a. , 8a, ... Are formed in a comb shape, and supporting through-holes 6a, 6a, ... are formed in the support plate 6 in a number corresponding to the insertion pieces 8a, 8a ,. It is configured to be inserted into the corresponding supporting through hole 6a.

【0012】その押え部8は、前述したように、複数の
挿入片8a,8a,…が形成されたものが多く、図1,
図2に示す実施例では支持板6に二つの支持用貫通孔6
a,6aが形成され、緊定板Cにも二つの挿入片8a,
8a,…が形成されている。さらに、その押え部8に前
述したような櫛状の複数の挿入片8a,8a,…が形成
されるものではなく、その押え部8が単に方形状に形成
され、また受金具Bの支持板6には、図7に示すよう
に、前記方形状の押え部8が貫通可能な一つの支持用貫
通孔6aが形成される実施例も存在する。
As described above, most of the pressing portion 8 has a plurality of insertion pieces 8a, 8a, ...
In the embodiment shown in FIG. 2, the support plate 6 has two support through holes 6
a, 6a are formed, and the clamp plate C also has two insertion pieces 8a,
8a, ... Are formed. Further, the plurality of comb-shaped insertion pieces 8a, 8a, ... As described above are not formed in the holding portion 8, but the holding portion 8 is simply formed in a square shape, and the supporting plate of the receiving bracket B is formed. 6, there is also an embodiment in which, as shown in FIG. 7, one supporting through hole 6a through which the rectangular holding portion 8 can pass is formed.

【0013】その緊定板Cの係止部9は、押え部8に一
体的に形成されており、具体的には、挿入片8a箇所に
形成されるものであって、該挿入片8aが支持板6の支
持用貫通孔6aに挿入するときに、該支持用貫通孔6a
に適正に挿入した状態において、丁度その係止部9が支
持用貫通孔6aに係止する構成となっている。
The engaging portion 9 of the tension plate C is formed integrally with the pressing portion 8, and more specifically, is formed at the insertion piece 8a. When inserting into the supporting through hole 6a of the support plate 6, the supporting through hole 6a
When it is properly inserted, the engaging portion 9 is engaged with the supporting through hole 6a.

【0014】その係止部9の具体的な実施例としては、
図2,図4に示すように、押え部8(挿入片8a箇所を
含む)の表面側から膨出して一体形成されたものであっ
て、その膨出状の係止部9の頂部には係止凹部9aが形
成され、該係止凹部9aが支持板6の支持用貫通孔6a
に係止して、緊定板Cが固定されるものである。
A concrete example of the engaging portion 9 is as follows.
As shown in FIGS. 2 and 4, the pressing portion 8 (including the insertion piece 8a) is bulged from the surface side and integrally formed, and the bulging locking portion 9 has a top portion at the top. A locking recess 9a is formed, and the locking recess 9a is formed through the supporting through hole 6a of the support plate 6.
The tension plate C is fixed by being locked to.

【0015】その係止部9の別の実施例では、図7に示
すように、押え部8(挿入片8a箇所を含む)より一部
に線状の切除部を形成して、該切除部箇所を押え部8表
面側に折り曲げて起こし、この折り曲げて起こした箇所
を係止部9とするものであって、その頂部箇所に切欠き
状の係止凹部9aが形成されており、さらにまた、図8
に示すように、係止部9が押え部8の挿入片8aの幅方
向端縁箇所より上方に折り曲げられて形成されることも
ある。
In another embodiment of the locking portion 9, as shown in FIG. 7, a linear cutting portion is formed in a part of the holding portion 8 (including the insertion piece 8a), and the cutting portion is formed. A portion is bent and raised to the surface side of the pressing portion 8, and the bent and raised portion is used as a locking portion 9, and a notch-shaped locking concave portion 9a is formed at the top portion thereof. , Fig. 8
As shown in, the locking portion 9 may be formed by bending the insertion piece 8a of the pressing portion 8 upward from the widthwise end edge portion.

【0016】さらに、係止部9の別の実施例としては、
図9(a),(b)に示すように、押え部8(挿入片8
a箇所を含む)に線状の切除部を形成して、その箇所を
上方に弾性を有するように切り起こしたものであって、
その切り起こした係止部9には前述の係止凹部9aが屈
曲形成されており、該実施例の係止部9は支持板6の支
持用貫通孔6aに挿入したときに、図9(b)に示すよ
うに、支持用貫通孔6aに適宜の押圧力を有して当接す
ることができる。
Further, as another embodiment of the locking portion 9,
As shown in FIGS. 9A and 9B, the pressing portion 8 (insertion piece 8
a linear cutout portion is formed in (including a portion), and the portion is cut and raised upward so as to have elasticity,
The cut-and-raised locking portion 9 is formed with the above-described locking recess 9a in a bent shape, and the locking portion 9 of the embodiment is shown in FIG. 9 (when inserted into the supporting through hole 6a of the support plate 6). As shown in b), it is possible to abut against the supporting through hole 6a with an appropriate pressing force.

【0017】緊定吊子Dは、図1,図2等に示すよう
に、頂面部10の幅方向両側端より抱持部11,11が
形成されており、該抱持部11は前記建築用板Aの連結
屈曲部3に巻付け可能となるように、中間に折曲線が形
成され、該折曲線箇所より内方(頂面部10側)に容易
に折曲可能となっている。
As shown in FIGS. 1 and 2, etc., the restraint suspension D has holding portions 11, 11 formed from both widthwise ends of the top surface portion 10, and the holding portion 11 is constructed as described above. A folding curve is formed in the middle so that it can be wound around the connecting bent portion 3 of the work plate A, and it can be easily folded inward (toward the top surface portion 10) from the folding curve.

【0018】その緊定吊子Dの頂面部10には、図2,
図5,図10等に示すように、貫通部10aが形成され
ており、該貫通部10aは前記受金具Bの支持板6が貫
通可能となっており、且つ支持用貫通孔6aは、その一
部分が頂面部10から突出する構成となっており、特に
緊定板Cを支持板6の支持用貫通孔6aに挿入固定した
状態では、緊定板Cの押え部8が緊定吊子Dの頂面部1
0を押圧した状態となっている。
As shown in FIG.
As shown in FIGS. 5 and 10, etc., a penetrating portion 10a is formed, the supporting plate 6 of the receiving fitting B can penetrate through the penetrating portion 10a, and the supporting through hole 6a is A part thereof is configured to project from the top surface portion 10, and particularly when the tension plate C is inserted and fixed in the supporting through hole 6a of the support plate 6, the holding portion 8 of the tension plate C is clamped by the tension suspender D. Top part 1
0 is pressed.

【0019】次に、本発明の外囲体の施工について述べ
ると、まず母屋,胴縁等の構造材12上(図3参照のこ
と)に受金具Bが所定間隔をおいて固着され、該受金具
B,B,…間に複数の建築用板A,A,…が平行状に配
置され、隣接する建築用板A,Aの両立上り部2,2間
に受金具Bが存在する構成となる。
Next, the construction of the enclosure of the present invention will be described. First, the brackets B are fixed on the structural material 12 (see FIG. 3) such as the purlin and the furring strip at predetermined intervals. A configuration in which a plurality of building boards A, A, ... Are arranged in parallel between the receiving brackets B, B, ..., and the receiving bracket B is present between the compatible rising portions 2 of the adjacent building boards A, A. Becomes

【0020】その隣接する建築用板A,Aの立上り部
2,2及び連結屈曲部3,3が受金具Bを介して対向す
る状態となり、対向する連結屈曲部3,3が受金具Bの
受金具脚部5上端に支持されながら、対向する連結屈曲
部3,3の間より支持板6が突出した状態となる(図5
参照)。
The rising portions 2 and 2 and the connecting bent portions 3 and 3 of the adjacent building boards A and A are in a state of facing each other through the receiving metal fitting B, and the facing connecting bending portions 3 and 3 are of the receiving metal fitting B. While being supported by the upper ends of the receiving metal leg portions 5, the supporting plate 6 projects from the space between the connecting bent portions 3 and 3 facing each other (FIG. 5).
reference).

【0021】その対向する連結屈曲部3,3の間より突
出した支持板6の上方より、緊定吊子Dの貫通部10a
に支持板6を貫通させて緊定吊子Dを配置し、その頂面
部10を連結屈曲部3,3の上面部3a,3a上に当接
させ、次いで抱持部11,11を連結屈曲部3,3の被
嵌合屈曲部3b,3bに巻着させる(図6参照のこ
と)。
From above the supporting plate 6 projecting between the opposing connecting bent portions 3 and 3, the penetrating portion 10a of the tension suspension D is provided.
The support plate 6 is pierced through the elastic clamp D and the top portion 10 is brought into contact with the upper surface portions 3a, 3a of the connecting bent portions 3, 3, and then the holding portions 11, 11 are connected and bent. The parts 3 and 3 are wound around the fitted bent parts 3b and 3b (see FIG. 6).

【0022】次に、緊定吊子Dの頂面部10の貫通部1
0aより突出した支持板6の支持用貫通孔6aに緊定板
Cの押え部8を挿入するが、具体的には押え部8に形成
した挿入片8a,8a,…を挿入するものであって、そ
の押え部8を支持板6の支持用貫通孔6aに貫通させる
とともに、係止部9を支持用貫通孔6aに係止し、緊定
板Cを支持板6及び緊定吊子D上に固定し、建築用板
A,Aの対向する連結屈曲部3,3上にキャップ材4を
嵌合して外囲体を施工するものである。
Next, the penetrating portion 1 of the top surface portion 10 of the restraint suspension D
The pressing portion 8 of the tension plate C is inserted into the supporting through hole 6a of the supporting plate 6 protruding from 0a. Specifically, the insertion pieces 8a, 8a, ... Formed in the pressing portion 8 are inserted. The pressing portion 8 is passed through the supporting through hole 6a of the support plate 6, and the locking portion 9 is locked in the supporting through hole 6a, so that the tension plate C is fixed to the support plate 6 and the tension hanger D. The cap member 4 is fixed to the upper part, and the cap material 4 is fitted on the connecting bent portions 3 and 3 of the building boards A and A facing each other to construct the outer enclosure.

【0023】[0023]

【発明の効果】請求項1においては、支持用貫通孔6a
を有する支持板6を上方に備えた受金具Bを所定間隔に
配置し、主板1の幅方向両側上端に連結屈曲部3,3を
形成した建築用板Aをそれぞれの受金具B,B間に配置
し、頂面部10の幅方向両側端より抱持部11,11を
屈曲形成した緊定吊子Dの頂面部10に前記支持板6を
貫通させ、10部11,11を支持板6の両側で対向す
る連結屈曲部3,3に巻着し、係止部9を備えた緊定板
Cを前記緊定吊子D上より支持板6の支持用貫通孔6a
に挿入し、係止部9を支持用貫通孔6aに係止し、対向
する連結屈曲部3,3にキャップ材4を嵌合してなる外
囲体としたことにより、まず第1に屋根,壁等の外囲体
の施工が極めて簡易且つ迅速にできるし、第2に極めて
強固且つ耐久性のある外囲体にすることができる等の種
々の効果を奏する。
According to the present invention, the supporting through hole 6a is provided.
The receiving brackets B having the supporting plate 6 having the above are arranged at a predetermined interval, and the building board A in which the connecting bent portions 3, 3 are formed at the upper ends in the width direction of the main plate 1 is provided between the respective receiving brackets B, B. , The supporting plate 6 is penetrated through the top surface portion 10 of the tension suspension D in which the holding portions 11 and 11 are bent and formed from both side ends of the top surface portion 10 in the width direction. The tension plate C, which is wound around the connecting bent portions 3 and 3 facing each other on both sides of the tension plate, is provided with a locking portion 9 from above the tension hanger D.
First, the locking portion 9 is locked to the supporting through hole 6a, and the cap material 4 is fitted to the connecting bent portions 3 and 3 facing each other. The construction of the outer enclosure such as a wall can be performed very easily and quickly, and secondly, the outer enclosure can be made extremely strong and durable, and various effects can be obtained.

【0024】上記効果を詳述すると、まず支持用貫通孔
6aを形成した支持板6を上方に備えた受金具Bを所定
間隔に配置し、この受金具B,B,…間に建築用板A,
A,…を配置し、受金具Bの支持板6の両側にて隣接且
つ対向した連結屈曲部3,3上に、該連結屈曲部3,3
に巻着可能な抱持部11,11を有する緊定吊子Dの頂
面部10に支持板6を貫通させることにより、抱持部1
1,11にて連結屈曲部3,3を馳締工具等により一回
の工程により容易に巻着することができる。
The above effects will be described in detail. First, the receiving brackets B having the supporting plate 6 having the supporting through holes 6a formed above are arranged at predetermined intervals, and the building plate is provided between the receiving brackets B, B, .... A,
A, ... Are arranged, and the connection bent portions 3, 3 are provided on the connection bent portions 3, 3 that are adjacent and opposed to each other on both sides of the support plate 6 of the metal fitting B.
By holding the support plate 6 through the top surface portion 10 of the tension sling D having the holding portions 11 and 11 which can be wrapped around the holding portion 1,
It is possible to easily wind the connecting bent portions 3 and 3 at 1 and 11 in a single step by using a fastening tool or the like.

【0025】また、その対向する連結屈曲部3,3を巻
着した後は、係止部9を備えた緊定板Cを支持板6に形
成した支持用貫通孔6aに挿入し、該支持用貫通孔6a
に係止部9を係止するのみで、緊定吊子Dを受金具Bに
固定することができ、特に、緊定板Cに係止部9を設け
たので、前述したように、緊定板Cを支持板6の支持用
貫通孔6aに挿入するとともに係止部9を支持用貫通孔
6aに係止する構成としたので、ボルト・ナット等の固
着具を不要とし、これによって建築用板Aに固着具用の
貫通孔を設ける必要がなくなり、雨水の浸入,錆の発生
等を防止することができる。
After the opposite connecting bent portions 3 and 3 are wound, the tightening plate C having the engaging portion 9 is inserted into the supporting through hole 6a formed in the supporting plate 6, and the supporting member 6 is supported. Through hole 6a
It is possible to fix the tensioning hanger D to the receiving metal fitting B only by locking the locking portion 9 to the bracket. Particularly, since the locking portion 9 is provided on the tension plate C, as described above, Since the fixed plate C is inserted into the supporting through hole 6a of the supporting plate 6 and the locking portion 9 is locked into the supporting through hole 6a, fasteners such as bolts and nuts are not required, thereby constructing Since it is not necessary to provide through holes for the fixtures in the plate A, it is possible to prevent rainwater from entering and rusting.

【0026】しかも、緊定吊子Dは、頂面部10に支持
板6を貫通して、抱持部11,11にて連結屈曲部3,
3を巻着し、その緊定吊子D上に緊定板Cを支持板6の
支持用貫通孔6aに挿入して固定しているので、緊定吊
子Dを連結屈曲部3,3側に常時、押さえ付ける状態と
なり、極めて強固、且つ耐久性のある外囲体にすること
ができる。
In addition, the tensioning suspension D penetrates the support plate 6 through the top surface portion 10, and the holding bent portions 11 and 11 connect the bent portions 3 and 3.
3 is wound, and the tension plate C is inserted and fixed on the tension hanger D by inserting the tension plate C into the supporting through hole 6a of the support plate 6, so that the tension hanger D is connected to the connecting bent portions 3, 3 Since it is always pressed down to the side, an extremely strong and durable outer body can be obtained.

【0027】次に請求項2においては、支持用貫通孔6
aを有する支持板6を上方に備えた受金具Bを所定間隔
に配置し、主板1の幅方向両側上端に連結屈曲部3,3
を形成した建築用板Aをそれぞれの受金具B,B間に配
置し、頂面部10の幅方向両側端より抱持部11,11
を屈曲形成した緊定吊子Dの頂面部10に前記支持板6
を前後方向に移動可能に貫通させ、抱持部11,11を
支持板6の両側で対向する連結屈曲部3,3に巻着し、
係止部9を備えた緊定板Cを前記緊定吊子D上より支持
板6の支持用貫通孔6aに挿入し、係止部9を支持用貫
通孔6aに係止し、対向する連結屈曲部3,3にキャッ
プ材4を嵌合してなる外囲体としたことにより、緊定吊
子Dの頂面部10を受金具Bの支持板6に対して、前後
方向に移動可能に設けたことで、緊定吊子Dは、建築用
板A,Aの対向する連結屈曲部3,3に巻着した状態
で、受金具Bに対して移動することができるので、建築
用板Aの熱伸縮に対して充分に対応することができる
(図10,図11参照)。
Next, in claim 2, the supporting through hole 6
Receiving metal fittings B having a support plate 6 having a above are arranged at predetermined intervals, and connecting bent portions 3 and 3 are provided at both upper ends in the width direction of the main plate 1.
The building board A formed with the above is arranged between the receiving brackets B and B, and the holding portions 11 and 11 are provided from both side ends of the top surface portion 10 in the width direction.
The support plate 6 is provided on the top surface portion 10 of the elastic suspension D that is formed by bending.
Is movably penetrated in the front-back direction, and the holding portions 11 and 11 are wound around the connecting bent portions 3 and 3 facing each other on both sides of the support plate 6,
The tightening plate C having the locking portion 9 is inserted into the supporting through hole 6a of the supporting plate 6 from above the tightening suspension D, and the locking portion 9 is locked in the supporting through hole 6a to face each other. By using the outer body formed by fitting the cap member 4 to the connecting bent portions 3 and 3, the top surface portion 10 of the tension suspension D can be moved in the front-rear direction with respect to the support plate 6 of the bracket B. Since it is possible to move the tensioning hangers D with respect to the metal fittings B while being wound around the connecting bent portions 3 and 3 of the building boards A and A that are opposed to each other, It is possible to sufficiently cope with the thermal expansion and contraction of the plate A (see FIGS. 10 and 11).

【0028】[0028]

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の要部斜視図FIG. 1 is a perspective view of an essential part of the present invention.

【図2】受金具,緊定板及び緊定吊子の実施例を示す斜
視図
FIG. 2 is a perspective view showing an embodiment of a bracket, a tension plate and a tension hanger.

【図3】本発明を用いて施工した外囲体の断面図FIG. 3 is a cross-sectional view of an outer envelope constructed using the present invention.

【図4】本発明を用いて施工した外囲体の要部断面図FIG. 4 is a cross-sectional view of an essential part of an outer casing constructed using the present invention.

【図5,図6】本発明の構成を施工する工程を示す要部
断面図
5 and 6 are cross-sectional views of a main part showing a process of constructing the structure of the present invention.

【図7,図8】緊定板の実施例を示す斜視図7 and 8 are perspective views showing an embodiment of the tension plate.

【図9】(a)は緊定板の実施例の斜視図 (b)は外囲体の要部断面図FIG. 9A is a perspective view of an embodiment of a tension plate, and FIG. 9B is a cross-sectional view of a main part of an outer enclosure.

【図10】本発明の別の実施例の斜視図FIG. 10 is a perspective view of another embodiment of the present invention.

【図11】緊定吊子が摺動する状態を示す略示図FIG. 11 is a schematic view showing a state in which the tension hanger slides.

【符号の説明】[Explanation of symbols]

A…建築用板 1…主板 3…連結屈曲部 4…キャップ材 B…受金具 6…支持板 6a…支持用貫通孔 C…緊定板 9…係止部 D…緊定吊子 10…頂面部 11…抱持部 A ... Building plate 1 ... Main plate 3 ... Connection bending part 4 ... Cap material B ... Receiving metal fitting 6 ... Support plate 6a ... Support through hole C ... Tightening plate 9 ... Locking part D ... Tightening suspension 10 ... Top Face 11 ... Holding part

───────────────────────────────────────────────────── フロントページの続き (72)発明者 山本 浩一 東京都中央区京橋2丁目9番地2号 三晃 金属工業株式会社内 (72)発明者 向井 勝二 東京都中央区京橋2丁目9番地2号 三晃 金属工業株式会社内 ─────────────────────────────────────────────────── ─── Continuation of front page (72) Koichi Yamamoto 2-9-2 Kyobashi, Chuo-ku, Tokyo Within Sanko Metal Industry Co., Ltd. (72) Katsuji Mukai 2--9-2 Kyobashi, Chuo-ku, Tokyo Sanko Metal Industry Co., Ltd.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 支持用貫通孔を有する支持板を上方に備
えた受金具を所定間隔に配置し、主板の幅方向両側上端
に連結屈曲部を形成した建築用板をそれぞれの受金具間
に配置し、頂面部の幅方向両側端より抱持部を屈曲形成
した緊定吊子の頂面部に前記支持板を貫通させ、抱持部
を支持板の両側で対向する連結屈曲部に巻着し、係止部
を備えた緊定板を前記緊定吊子上より支持板の支持用貫
通孔に挿入し、係止部を支持用貫通孔に係止し、対向す
る連結屈曲部にキャップ材を嵌合してなることを特徴し
た外囲体。
1. A receiving plate having a supporting plate having a supporting through hole provided above is arranged at a predetermined interval, and a building plate having connecting bent portions formed on both upper ends in the width direction of the main plate is provided between the receiving plates. The holding plate is arranged on both sides of the width direction of the top surface portion, and the supporting plate is penetrated through the top surface portion of the tensioning hanger in which the holding portion is formed by bending, and the holding portion is wound around the connecting bending portions on both sides of the supporting plate. Then, insert the tensioning plate with the locking portion into the supporting through hole of the supporting plate from above the tensioning hanger, lock the locking portion in the supporting through hole, and cap the opposite connecting bent portion. An outer enclosure characterized by being formed by fitting materials.
【請求項2】 支持用貫通孔を有する支持板を上方に備
えた受金具を所定間隔に配置し、主板の幅方向両側上端
に連結屈曲部を形成した建築用板をそれぞれの受金具間
に配置し、頂面部の幅方向両側端より抱持部を屈曲形成
した緊定吊子の頂面部に前記支持板を前後方向に移動可
能に貫通させ、抱持部を支持板の両側で対向する連結屈
曲部に巻着し、係止部を備えた緊定板を前記緊定吊子上
より支持板の支持用貫通孔に挿入し、係止部を支持用貫
通孔に係止し、対向する連結屈曲部にキャップ材を嵌合
してなることを特徴した外囲体。
2. A receiving plate having support plates having supporting through holes provided above is arranged at predetermined intervals, and a building plate having connecting bent portions formed on both upper ends in the width direction of the main plate is provided between the receiving plates. The supporting plate is disposed so as to be movable in the front-rear direction through the top surface of the tensioning hanger in which the holding portions are formed by bending the holding portions from both ends in the width direction of the top surface, and the holding portions face each other on both sides of the support plate. Wrap around the connecting bent part, insert the tension plate with the locking part into the support through hole of the support plate from above the tension hanger, lock the locking part in the support through hole, and face each other. An outer enclosure characterized in that a cap material is fitted to the connecting bent portion.
JP19276092A 1992-06-29 1992-06-29 Outer enclosure Expired - Fee Related JP2819442B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19276092A JP2819442B2 (en) 1992-06-29 1992-06-29 Outer enclosure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19276092A JP2819442B2 (en) 1992-06-29 1992-06-29 Outer enclosure

Publications (2)

Publication Number Publication Date
JPH0610449A true JPH0610449A (en) 1994-01-18
JP2819442B2 JP2819442B2 (en) 1998-10-30

Family

ID=16296596

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19276092A Expired - Fee Related JP2819442B2 (en) 1992-06-29 1992-06-29 Outer enclosure

Country Status (1)

Country Link
JP (1) JP2819442B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4897744A (en) * 1987-05-29 1990-01-30 Matsushita Electric Industrial Co., Ltd. Apparatus for selectively loading small or large tape cassettes

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4897744A (en) * 1987-05-29 1990-01-30 Matsushita Electric Industrial Co., Ltd. Apparatus for selectively loading small or large tape cassettes

Also Published As

Publication number Publication date
JP2819442B2 (en) 1998-10-30

Similar Documents

Publication Publication Date Title
JP2683456B2 (en) Snow stopper
GB2177773A (en) Mounting for offset sign
JP2000336857A (en) Support metal fitting for folding-plate roof
JPH0610449A (en) Envelope
JPS6317771Y2 (en)
JP4105307B2 (en) Device for mounting panel-like structure on outer enclosure and outer enclosure surface
JP3968861B2 (en) Roof renovation method
JPH0520815Y2 (en)
JP2907423B2 (en) Roof repair method
JP4229407B2 (en) Base mounting device for enclosure
JPS5847051Y2 (en) Road sign board reinforcing material and metal fittings mounting material
JP2571454Y2 (en) Mounting fixtures for long objects
JPH0567687U (en) Grating connector
JP3295348B2 (en) Mounting tools such as pipes, control panels, boxes, cables, etc. that can be attached to the building, beams, haze, etc.
JP3042756B2 (en) Flat enclosure
JP3200529B2 (en) Metal fittings
JP3023552U (en) Base material support hanger fasteners
JP2583049B2 (en) Floor panel mounting equipment
JPH06173383A (en) Ceiling construction
JPH0433303Y2 (en)
JPS6348746Y2 (en)
JPS6015859Y2 (en) Net mounting bracket
JPH0137048Y2 (en)
JP2569886Y2 (en) Grating mounting fixture
JPH0736978Y2 (en) Cross connection fittings

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070828

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080828

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20090828

LAPS Cancellation because of no payment of annual fees