JPH0610359A - Construction method for foundation structure - Google Patents

Construction method for foundation structure

Info

Publication number
JPH0610359A
JPH0610359A JP15514492A JP15514492A JPH0610359A JP H0610359 A JPH0610359 A JP H0610359A JP 15514492 A JP15514492 A JP 15514492A JP 15514492 A JP15514492 A JP 15514492A JP H0610359 A JPH0610359 A JP H0610359A
Authority
JP
Japan
Prior art keywords
foundation
concrete
formwork
pile
beam bottom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15514492A
Other languages
Japanese (ja)
Inventor
Satoshi Kataoka
智 片岡
Masaki Kumagai
正樹 熊谷
Koji Watanabe
幸治 渡辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haseko Corp
Original Assignee
Haseko Corp
Hasegawa Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haseko Corp, Hasegawa Komuten Co Ltd filed Critical Haseko Corp
Priority to JP15514492A priority Critical patent/JPH0610359A/en
Publication of JPH0610359A publication Critical patent/JPH0610359A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE:To enhance the efficiency of construction work for a foundation structure of a building, save energy and reduce work period as well. CONSTITUTION:A ground 11 is excavated to a specified level so as to construct a foundation structure which comprises a foundation pile 12, a column 13 to be connected and a foundation beam 15 or the like and then, sub-slab concrete 16 is horizontally cast in order to contain the head of the pile 12. A groove 8b which receives a form 17 which forms both sides of the foundation beam 15 is installed at a specified position on the sub-slab concrete 16 while a precast concrete-made material A for the bottom of a beam is set where reinforcing bars 9 and 10 are partially installed projectively. After reinforcing bars 18 to 22 designed for the column 13 and the foundation beam 15 are assembled, the casting form 17 and the like are assembled and them concrete 23 is cast.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建物の基礎杭と接続す
る柱および基礎梁等からなる基礎構造物の構築方法に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a foundation structure including columns and foundation beams which are connected to foundation piles of a building.

【0002】[0002]

【従来の技術】図4は、従来の基礎構造物の構築方法の
一例を示すもので、図中1は地盤、2は建物の柱、3は
その柱2から突出している鉄筋、4は柱2の基部のフー
チング、5は柱2,2間に設置した従来の基礎梁用の型
枠、5aはその梁底用型枠、6はその梁底を支承する支
保工、7は基礎梁5上に突設した鉄筋である。
2. Description of the Related Art FIG. 4 shows an example of a conventional method of constructing a substructure. In the figure, 1 is the ground, 2 is a building pillar, 3 is a reinforcing bar protruding from the pillar 2, and 4 is a pillar. 2 is a footing at the base, 5 is a formwork for a conventional foundation beam installed between columns 2 and 2, 5a is a formwork for the beam bottom, 6 is a support for supporting the beam bottom, 7 is a foundation beam 5 It is a reinforcing bar protruding above.

【0003】すなわち、従来の基礎構造物の構築方法
は、杭(図示せず)を構築した後、その杭の周辺を所定
レベルまで掘削して杭頭処理を行い、つぎに基礎梁の構
築位置を掘削して、その基礎梁底との対向面1a上に捨
てコンクリート5bを打設すると共に、フーチング4の
底1bに捨てコンクリート4aを打って位置出しを行
う。その後、柱2の配筋用足場(図示せず)、基礎梁配
筋用足場(図示せず)を構築し、各部の配筋を行うとと
もに、配筋後型枠を組み立ててコンクリートを打設して
いた。
That is, in the conventional method of constructing a foundation structure, after constructing a pile (not shown), the periphery of the pile is excavated to a predetermined level to perform pile head treatment, and then the foundation beam construction position. Is excavated, the discarded concrete 5b is placed on the surface 1a facing the bottom of the foundation beam, and the concrete 1a is placed on the bottom 1b of the footing 4 to perform positioning. After that, a scaffold (not shown) for reinforcing the pillar 2 and a scaffold (not shown) for reinforcing the basic beam are constructed, and the reinforcement of each part is performed, and after the reinforcement, the formwork is assembled and concrete is placed. Was.

【0004】[0004]

【発明が解決しようとする課題】従来の基礎構造物の構
築方法は、図4に示すように、フーチング4,4間の地
盤1上に、梁底レベルに合わせて梁底用型枠5aを設置
すると共に、この型枠5aを支保工6等により支承する
ものであるから、作業が複雑であるという問題点があっ
た。また従来の工法は、基礎梁底5bとフーチング4の
底4aとの間に段差がある上に、配筋用の足場が必要で
あったため、資材の水平移動が困難であると共に、仮設
作業に多くの労力を要するという問題点があった。
As shown in FIG. 4, a conventional method of constructing a substructure is to construct a beam bottom form 5a on the ground 1 between the footings 4 and 4 in accordance with the beam bottom level. Since the formwork 5a is installed and supported by the support work 6 and the like, there is a problem that the work is complicated. Further, in the conventional construction method, since there is a step between the foundation beam bottom 5b and the bottom 4a of the footing 4 and a scaffold for reinforcing bars is required, it is difficult to move the material horizontally and it is necessary for temporary work. There is a problem that it requires a lot of labor.

【0005】[0005]

【課題を解決するための手段】上述の問題点を解決する
ため本発明の基礎構造物の構築方法としては、まず地盤
を所定のレベルまで根伐りしてから、杭頭を含むように
捨てコンクリートを水平に打設し、この捨てコンクリー
ト上の所定の位置に、基礎梁の両側面を形成する型枠の
受け溝を有すると共に、補強筋の一部を突設したプレキ
ャストコンクリート製の梁底用部材をセットし、ついで
柱用および基礎梁用の鉄筋を組み立ててから、打ち込み
型枠を組み立てた後、コンクリートを打設する。
As a method for constructing a substructure of the present invention in order to solve the above problems, first, the ground is root-cut down to a predetermined level, and then the concrete is discarded so as to include a pile head. For the beam bottom made of precast concrete that has the receiving groove of the formwork that forms both sides of the foundation beam at a predetermined position on this discarded concrete, and has some reinforcing bars protruding. After setting the members, and then assembling the reinforcing bars for columns and foundation beams, after assembling the driving form, concrete is poured.

【0006】[0006]

【作用】上述のように本発明においては、杭頭を含む捨
てコンクリートを段差を設けず水平に打設するから、資
材および作業員の移動が容易になると共に、排水処理も
容易になる。
As described above, in the present invention, since the discarded concrete including the pile head is placed horizontally without providing the steps, the materials and the workers can be easily moved, and the waste water can be easily treated.

【0007】また本発明によれば、柱の配筋は、前記捨
てコンクリート上に立てた柱筋自立用金物を介して行う
ことができ、また梁部の配筋もプレキャストコンクリー
ト製の梁底用部材の補強筋と接続することにより行える
と共に、型枠も打ち込み型枠を使用して、容易に組み立
てができるから、仮設足場が不要となって、省力化と工
期の短縮をはかることができる。
Further, according to the present invention, the reinforcement of the column can be performed through the column reinforcement self-supporting metal member which is erected on the aforesaid concrete, and the reinforcement of the beam portion is for the beam bottom made of precast concrete. This can be done by connecting to the reinforcing bar of the member, and the form can also be easily assembled by using the driven form, so temporary scaffolding is not required, and labor saving and shortening of the construction period can be achieved.

【0008】また本発明によれば、従来必要であった梁
底用型枠および支保工が不要となるため、作業が簡単に
なって作業能率が向上する。また一体に形成された梁底
用部材を使用するから、梁の位置出しが容易であると共
に、配筋精度も向上する。このため配筋の手直し作業が
なくなり省力化がはかれる。
Further, according to the present invention, since the beam bottom formwork and the supporting work which are conventionally required are not required, the work is simplified and the work efficiency is improved. Further, since the beam bottom member formed integrally is used, positioning of the beam is easy and the bar arrangement accuracy is improved. For this reason, the work of re-arranging the bar is eliminated and labor can be saved.

【0009】さらに本発明によれば、梁の側壁用の型枠
は、梁底用部材に設けた受け溝に打ち込み型枠の下端縁
を挿入して型枠をセットし、これら両側の型枠間にコン
クリートを打設し、型枠は取り外す必要がないため、作
業能率が向上すると共に、省力化も促進できる。
Further, according to the present invention, the formwork for the side wall of the beam is set by inserting the lower end edge of the driving formwork into the receiving groove provided in the beam bottom member and setting the formwork on both sides. Since it is not necessary to place concrete between them and remove the formwork, work efficiency is improved and labor saving can be promoted.

【0010】[0010]

【実施例】以下、図面について本発明の実施例を説明す
る。図3は本発明において使用する梁底用部材の実施例
を示すものであり、これは、基礎梁の梁底部分8を平面
形状が長方形の板状体としてプレキャストコンクリート
により形成し、その両側の長辺部をそれぞれ上方に突出
させると共に、この突条8aの上面の中央部に梁の両側
面を形成する型枠の受け溝8bを形成し、梁の補強筋
9,10の一部をコンクリート部材8より突設して基礎
梁の梁底用部材Aを一体的に形成する。なお8cはコン
クリート部材8の底面の四隅部に突設した支保工の代り
となる突起である。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 3 shows an embodiment of a beam bottom member used in the present invention, in which the beam bottom portion 8 of the foundation beam is formed from precast concrete as a plate-shaped body having a rectangular planar shape, and both sides thereof are The long side portions are respectively projected upward, and the receiving groove 8b of the form forming the both side surfaces of the beam is formed in the central portion of the upper surface of the protrusion 8a, and a part of the reinforcing bars 9 and 10 of the beam is made of concrete. The member A for the beam bottom of the foundation beam is integrally formed by projecting from the member 8. In addition, 8c is a projection which substitutes for the support work projecting at the four corners of the bottom surface of the concrete member 8.

【0011】図1および図2は、本発明の構築方法を示
すもので、図中11は地盤、12は基礎杭の頭部で、1
2aはその杭の鉄筋、13は基礎杭の頭部12と接続す
る柱、14はフーチング、15は基礎梁(地中梁)であ
る。
1 and 2 show the construction method of the present invention, in which 11 is the ground, 12 is the head of the foundation pile, and
2a is a reinforcing bar of the pile, 13 is a column connecting to the head 12 of the foundation pile, 14 is a footing, and 15 is a foundation beam (underground beam).

【0012】本実施例においては、基礎杭12と接続す
る柱13および基礎梁15からなる基礎構造物を構築す
るために、まず地盤11を所定のレベルまで根伐りして
から、杭頭12を含むように捨てコンクリート16を水
平に打設し、この捨てコンクリート16上の所定の位置
に、基礎梁15の両側面を形成する型枠17(図2参
照)の受け溝8bを有すると共に、補強筋9,10の一
部を突設したプレキャストコンクリート製の梁底用部材
Aをセットする。
In this embodiment, in order to construct a foundation structure consisting of columns 13 and foundation beams 15 connected to foundation piles 12, first, the ground 11 is root-cut down to a predetermined level, and then the pile heads 12 are removed. The waste concrete 16 is placed horizontally so as to include it, and at a predetermined position on the waste concrete 16, there is a receiving groove 8b for the formwork 17 (see FIG. 2) that forms both side surfaces of the foundation beam 15 and reinforcement is performed. A beam bottom member A made of precast concrete in which a part of the streaks 9 and 10 is provided is set.

【0013】ついで図1に示すように、杭頭12の上方
の捨てコンクリート16上の所定の位置に、ベース筋1
8をセットすると共に、その中央部に柱筋自立用金物1
9を立て、その周囲に柱13用の鉄筋20を組み立て
る。
Next, as shown in FIG. 1, the base reinforcement 1 is placed at a predetermined position on the waste concrete 16 above the pile head 12.
8 is set, and at the center of it is a column reinforcement self-supporting hardware 1
9 is set up, and the reinforcing bar 20 for the pillar 13 is assembled around it.

【0014】また図2に示すように、梁底用部材Aより
突出する補強筋9と接続して梁の鉄筋21,22を組み
立てた後、梁底用部材Aの前記受け溝8bに打ち込み型
枠17の下端縁を挿入して打ち込み型枠17をセットす
ると共に、その他柱13およびフーチング14等を形成
するための型枠(図示せず)をセットした後、これらの
型枠内にコンクリート23を打設する。
Further, as shown in FIG. 2, after assembling the reinforcing bars 21 and 22 of the beam by connecting to the reinforcing bar 9 protruding from the beam bottom member A, it is driven into the receiving groove 8b of the beam bottom member A. After inserting the lower edge of the frame 17 to set the driving form 17, and also to set other forms (not shown) for forming the pillars 13, the footings 14, etc., the concrete 23 is placed in these forms. To place.

【0015】なお図2中の24はトレンチピット、2
5,26はこのトレンチピット24を囲むプレキャスト
コンクリート板、27はトレンチピット24の反対側の
打ち込み型枠17上に設けたプレキャストコンクリート
板、28は埋め戻した土砂である。
Reference numeral 24 in FIG. 2 is a trench pit, 2
Reference numerals 5 and 26 are precast concrete plates surrounding the trench pits 24, 27 is a precast concrete plate provided on the driving mold 17 on the opposite side of the trench pits 24, and 28 is backfilled earth and sand.

【0016】[0016]

【発明の効果】上述のように本発明においては、杭頭1
2を含む捨てコンクリート16を段差を設けず水平に打
設するから、資材および作業員の移動が容易になると共
に、排水処理も容易になる。
As described above, in the present invention, the pile head 1
Since the waste concrete 16 including 2 is cast horizontally without providing a step, the material and the worker can be easily moved, and the wastewater treatment can be easily performed.

【0017】また本発明によれば柱13の配筋は、前記
捨てコンクリート16上に立てた柱筋自立用金物19を
介して行うことができ、また梁部の配筋21,22もプ
レキャストコンクリート製の梁底用部材Aの補強筋9と
接続することにより容易に行えると共に、型枠も打ち込
み型枠を使用して容易に組み立てができるから、仮設足
場が不要となって、省力化と工期の短縮をはかることが
できるという効果が得られる。
Further, according to the present invention, the reinforcement of the columns 13 can be performed through the column reinforcement self-supporting hardware 19 which is erected on the abandoned concrete 16, and the reinforcements 21 and 22 of the beam portion are also precast concrete. This can be easily done by connecting it to the reinforcing bar 9 of the beam bottom member A made of, and the formwork can also be easily assembled by using the driven formwork, so that a temporary scaffold is not required, which saves labor and construction period. It is possible to obtain the effect of shortening.

【0018】また本発明によれば、従来必要であった梁
底用型枠および支保工が不要となるため、作業が簡単に
なって作業能率が向上する。また一体に形成された梁底
用部材Aを使用するから、梁の位置出しが容易であると
共に、配筋精度も向上する。このため配筋の手直し作業
がなくなり省力化がはかれる。
Further, according to the present invention, since the beam bottom formwork and the supporting work which are conventionally required are not required, the work is simplified and the work efficiency is improved. Further, since the beam bottom member A formed integrally is used, positioning of the beam is easy and the bar arrangement accuracy is improved. For this reason, the work of re-arranging the bar is eliminated and labor can be saved.

【0019】さらに本発明によれば、梁の側壁用の型枠
17は、梁底用部材Aに設けた受け溝8bに打ち込み型
枠17の下端縁を挿入して型枠をセットし、これら両側
の型枠間にコンクリートを打設し、型枠は取り外す必要
がないため、作業能率が向上すると共に、省力化も促進
できるという効果も得られる。
Further, according to the present invention, the mold 17 for the side wall of the beam is set by inserting the lower end edge of the driving mold 17 into the receiving groove 8b provided in the member A for beam bottom. Since it is not necessary to pour concrete between the molds on both sides and remove the molds, the working efficiency is improved and labor saving can be promoted.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の基礎構造物の構築方法を示す立面図で
ある。
FIG. 1 is an elevational view showing a method for constructing a substructure of the present invention.

【図2】図1のA−A線による断面図である。FIG. 2 is a sectional view taken along the line AA of FIG.

【図3】本発明の梁底用部材の実施例を示す斜視図であ
る。
FIG. 3 is a perspective view showing an embodiment of a beam bottom member of the present invention.

【図4】従来の基礎梁工法の一例を示す立面図である。FIG. 4 is an elevation view showing an example of a conventional foundation beam construction method.

【符号の説明】[Explanation of symbols]

1 地盤 2 柱 3 鉄筋 4 フーチング 5 型枠 5a 梁底用型枠 6 支保工 7 鉄筋 8 梁底部分(コンクリート部材) 8a 突条 8b 受け溝 8c 突起 9,10 補強筋 A 梁底用部材 11 地盤 12 基礎杭の頭部(基礎杭、杭頭) 13 柱 14 フーチング 15 基礎梁(地中梁) 16 捨てコンクリート 17 型枠(打ち込み型枠) 18 ベース筋 19 柱筋自立用金物 20,21,22 鉄筋 23 コンクリート 24 トレンチピット 25,26,27 プレキャストコンクリート板 28 埋め戻した土砂 1 Ground 2 Pillar 3 Reinforcing bar 4 Footing 5 Formwork 5a Beam bottom formwork 6 Support work 7 Reinforcing bar 8 Beam bottom part (concrete member) 8a Projection 8b Receiving groove 8c Protrusion 9 and 10 Reinforcing bar A Beam bottom member 11 Ground 12 Head of foundation pile (foundation pile, pile head) 13 Column 14 Footing 15 Foundation beam (underground beam) 16 Abandoned concrete 17 Formwork (driving formwork) 18 Base reinforcement 19 Column reinforcement Self-supporting hardware 20, 21, 22 Reinforcing bar 23 Concrete 24 Trench pit 25, 26, 27 Precast concrete plate 28 Backfilled earth and sand

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 基礎杭と接続する柱および基礎梁等から
なる基礎構造物を構築するために、まず地盤を所定のレ
ベルまで根伐りしてから、杭頭を含むように捨てコンク
リートを水平に打設し、この捨てコンクリート上の所定
の位置に、基礎梁の両側面を形成する型枠の受け溝を有
すると共に、補強筋の一部を突設したプレキャストコン
クリート製の梁底用部材をセットし、ついで柱用および
基礎梁用の鉄筋を組み立ててから、打ち込み型枠を組み
立てた後、コンクリートを打設することを特徴とする基
礎構造物の構築方法。
1. In order to construct a foundation structure consisting of columns and foundation beams that are connected to foundation piles, first, the ground is cut to a predetermined level, and then the discarded concrete is leveled so as to include the pile heads. A beam bottom member made of precast concrete that is placed and has a receiving groove of a formwork that forms both side surfaces of the foundation beam at a predetermined position on this discarded concrete, and a part of the reinforcing bar is projected. Then, after assembling the reinforcing bars for columns and foundation beams, after assembling the driving formwork, the concrete is placed, and the method for constructing the foundation structure.
JP15514492A 1992-06-15 1992-06-15 Construction method for foundation structure Pending JPH0610359A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15514492A JPH0610359A (en) 1992-06-15 1992-06-15 Construction method for foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15514492A JPH0610359A (en) 1992-06-15 1992-06-15 Construction method for foundation structure

Publications (1)

Publication Number Publication Date
JPH0610359A true JPH0610359A (en) 1994-01-18

Family

ID=15599506

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15514492A Pending JPH0610359A (en) 1992-06-15 1992-06-15 Construction method for foundation structure

Country Status (1)

Country Link
JP (1) JPH0610359A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016186183A (en) * 2015-03-27 2016-10-27 三井住友建設株式会社 Construction method for building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016186183A (en) * 2015-03-27 2016-10-27 三井住友建設株式会社 Construction method for building

Similar Documents

Publication Publication Date Title
JP2797045B2 (en) Solid foundation method with stabilizer
JPH0579049A (en) Constructing method for beam and slab in underground body construction work
JPH0610359A (en) Construction method for foundation structure
JPH06264453A (en) Precast concrete-made permanent form for foundation, and foundation practice using its form
JPH0657710A (en) Construction of concrete main tower
JPH04330119A (en) Building foundation constructing method
JPH04330168A (en) Construction method for building with basement equipped with steel pipe pile foundation
JPH07138972A (en) Construction method for underground skeleton
JPH10299003A (en) Foundation work using precast concrete member
JPH06306874A (en) Concrete block for footing
JP2851463B2 (en) Construction method and cast-in hollow formwork of reinforced concrete diagonal roof.
JPS6290445A (en) Block for foundation and its manufacture
JPH07113220B2 (en) Beam construction method
JPH05311675A (en) Beam bottom member for foundation beam and foundation beam construction method
JPH06330507A (en) Abutment
JPS62253821A (en) Construction of concrete floor slab
JPH07197510A (en) Construction of regulating pondage
JPH0376929A (en) Steel-framed foundation
JPS5858503B2 (en) Construction method of reinforced concrete composite wall
JPH04247127A (en) Outer wall construction works for underground floor
JP3289163B2 (en) How to build underground structures
JPH0359223A (en) Foundation constructing method for reinforced concrete building
JPH07259106A (en) Constructing method for artificial ground on regulating reservoir
JPH03129018A (en) Pc base construction method
JPH02279822A (en) Construction of foundation and underground beam