JPH0584907B2 - - Google Patents
Info
- Publication number
- JPH0584907B2 JPH0584907B2 JP61012111A JP1211186A JPH0584907B2 JP H0584907 B2 JPH0584907 B2 JP H0584907B2 JP 61012111 A JP61012111 A JP 61012111A JP 1211186 A JP1211186 A JP 1211186A JP H0584907 B2 JPH0584907 B2 JP H0584907B2
- Authority
- JP
- Japan
- Prior art keywords
- error
- plant
- procedure
- state
- determined
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
- Testing And Monitoring For Control Systems (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP61012111A JPS62170994A (ja) | 1986-01-24 | 1986-01-24 | エラ−判定装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP61012111A JPS62170994A (ja) | 1986-01-24 | 1986-01-24 | エラ−判定装置 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS62170994A JPS62170994A (ja) | 1987-07-28 |
| JPH0584907B2 true JPH0584907B2 (enExample) | 1993-12-03 |
Family
ID=11796452
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP61012111A Granted JPS62170994A (ja) | 1986-01-24 | 1986-01-24 | エラ−判定装置 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS62170994A (enExample) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08161028A (ja) * | 1994-12-06 | 1996-06-21 | Mitsubishi Electric Corp | 運転支援システム |
| JPH09218285A (ja) * | 1996-02-08 | 1997-08-19 | Hitachi Ltd | 原子力プラントの監視装置および運転データ設定方法 |
| JP6596261B2 (ja) | 2015-08-19 | 2019-10-23 | 三菱重工業株式会社 | 原子力プラントの電子手順書表示装置、安全系制御監視システム、及び運転監視システム |
| JP6755370B2 (ja) * | 2019-08-05 | 2020-09-16 | 三菱重工業株式会社 | 原子力プラントの安全系制御監視システム |
| JP6796690B2 (ja) * | 2019-08-05 | 2020-12-09 | 三菱重工業株式会社 | 原子力プラントの運転監視システム |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS61148483A (ja) * | 1984-12-24 | 1986-07-07 | 株式会社東芝 | プラント運転訓練模擬装置 |
-
1986
- 1986-01-24 JP JP61012111A patent/JPS62170994A/ja active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS62170994A (ja) | 1987-07-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Roth et al. | Cognitive simulation as a tool for cognitive task analysis | |
| JP2655605B2 (ja) | 複雑なプロセスの手続きステップの機械支援実行方法 | |
| EP0235958B1 (en) | On line interactive execution of process operating procedures | |
| Park et al. | A framework to collect human reliability analysis data for nuclear power plants using a simplified simulator and student operators | |
| Kang et al. | Concept of an intelligent operator support system for initial emergency responses in nuclear power plants | |
| Macwan et al. | A methodology for modeling operator errors of commission in probabilistic risk assessment | |
| JPH0522241B2 (enExample) | ||
| Kletz et al. | Computer control and human error | |
| Kim et al. | SACADA and HuREX part 2: The use of SACADA and HuREX data to estimate human error probabilities | |
| Park et al. | Modeling Safety-II based on unexpected reactor trips | |
| JPH0584907B2 (enExample) | ||
| Chang et al. | Development of the on-line operator aid system OASYS using a rule-based expert system and fuzzy logic for nuclear power plants | |
| Swaton et al. | Human factors in the operation of nuclear power plants. | |
| Takizawa et al. | An intelligent man-machine system for future nuclear power plants | |
| Choi et al. | Development strategies of an intelligent human-machine interface for next generation nuclear power plants | |
| Lew et al. | Computerized operator support system for nuclear power plant hybrid main control room | |
| Park et al. | Simulator data analysis to inform digitalized environment impacts on human reliability | |
| Kim et al. | Monitoring | |
| Takizawa et al. | A post trip operational guidance system for BWR plants | |
| Yang et al. | Analysis of errors of commission for a CE type plant with the advanced control room in the full power condition | |
| Kang et al. | Development strategies on an integrated operator decision aid support system for nuclear power plants | |
| Lee et al. | Theoretical and Experimental Impact Analysis of Decision Support Systems for Advanced MCR Operators | |
| Roth et al. | Enhancing the training of cognitive skills for improved human reliability: lessons learned from the cognitive environment simulation project | |
| Kobare et al. | Expert systems for emergency alarms analysis during accident situations in nuclear reactors | |
| Holmberg et al. | Enhanced Bayesian THERP—Lessons learnt from HRA benchmarking |