JPH057519B2 - - Google Patents
Info
- Publication number
- JPH057519B2 JPH057519B2 JP62319216A JP31921687A JPH057519B2 JP H057519 B2 JPH057519 B2 JP H057519B2 JP 62319216 A JP62319216 A JP 62319216A JP 31921687 A JP31921687 A JP 31921687A JP H057519 B2 JPH057519 B2 JP H057519B2
- Authority
- JP
- Japan
- Prior art keywords
- frame
- face plate
- curved frame
- tunnel
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009415 formwork Methods 0.000 claims description 28
- 238000004804 winding Methods 0.000 claims description 13
- 125000006850 spacer group Chemical group 0.000 description 7
- 230000003028 elevating effect Effects 0.000 description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 5
- 229910052751 metal Inorganic materials 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 229920001875 Ebonite Polymers 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229920003002 synthetic resin Polymers 0.000 description 1
- 239000000057 synthetic resin Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は、トンネルの2次覆工用又は3次覆工
用の移動型枠に関する。DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a movable formwork for secondary or tertiary lining of tunnels.
トンネルの2次覆工用又は3次覆工用のコンク
リートの打設には、鋼製移動型枠が使用され、第
6図はこのうちトラベルフオームと称せられる型
枠で、下面にレール1を敷設し、このレール1上
を架台2が転走する。そして、架台2の上方の伸
縮支柱3から左右にトンネルの曲率とほぼ同形の
湾曲フレーム4をヒンジに吊下し、該フレーム4
の外側面に型枠面板5を一体的に張設している。
Steel movable formwork is used to cast concrete for the secondary or tertiary lining of tunnels, and Figure 6 shows a formwork called a travel form, which has rails 1 on its bottom surface. The pedestal 2 rolls on this rail 1. Then, a curved frame 4 having approximately the same shape as the tunnel curvature is suspended from the left and right sides from the telescopic support 3 above the pedestal 2, and the frame 4 is suspended from the hinges.
A formwork face plate 5 is integrally stretched on the outer surface of the frame.
そして、前記フレーム4の下部を架台2からの
ジヤツキアーム6で支承することにより型枠はセ
ツトされる。 Then, the formwork is set by supporting the lower part of the frame 4 with the jack arms 6 from the pedestal 2.
一方、移動を行うには、ジヤツキアーム6を縮
めて、フレーム4相互を近接させるように閉じ、
さらに支柱3を縮めれば、型枠面板5はコンクリ
ート面から離れその間に隙間ができるので、架台
2を含めて型枠面板をレール1に沿つて前進させ
る。 On the other hand, in order to move, the jack arm 6 is retracted and the frames 4 are closed so as to be close to each other.
If the support column 3 is further shortened, the form face plate 5 will be separated from the concrete surface and a gap will be created between them, so the form face plate including the frame 2 will be moved forward along the rail 1.
このトラベルフオームの他にも、図示は省略す
るが、セントルフオーム、ニードルビームと称せ
られる型枠もあるが、すべて移動可能な架台から
型枠を吊下し、アーム等何らかの支持手段でこれ
を支承する構造である。 In addition to this travel form, there are also formworks called centor form and needle beam (not shown), but all of them are suspended from a movable frame and supported by some kind of support means such as an arm. It has a structure that allows
前記従来の移動用型枠では、移動は型枠を支承
する架台ごと行なわなければならず、重量がある
ので人力での移動は困難となる。また、中央に架
台が位置し、この架台ごと移動するのでトンネル
内にすでにケーブルが配設されているときには使
用できず、三次巻型枠としては利用できない。
In the conventional movable formwork, the frame supporting the formwork must be moved together, and the weight makes it difficult to move it manually. Furthermore, since the pedestal is located in the center and moves together with the pedestal, it cannot be used when cables are already installed in the tunnel, and cannot be used as a tertiary winding form.
本発明の目的は前記従来例の不都合を解消し、
移動部分は軽量なので人力でも容易に移動作業を
行うことができ、しかも二次巻型枠としてのみな
らず、三次巻型枠として既設のケーブルを防護し
ながら移動でき、しかも再セツトも簡単なトンネ
ルの覆工用移動型枠を提供することにある。 The purpose of the present invention is to eliminate the disadvantages of the conventional example,
The movable part is lightweight, so it can be easily moved by hand, and it can be moved not only as a secondary winding form but also as a tertiary winding form while protecting the existing cable, and is easy to reset. The purpose of the present invention is to provide a movable formwork for lining.
本発明は前記目的を達成するため、トンネル巾
方向に並び、かつトンネル長さ方向に適宜間隔で
立設され、上部にトンネル長さ方向に伸びるレー
ルを上下動自在に設けた支柱と、巾方向に並ぶ支
柱間に前記レールに係合するローラにより滑動可
能に設けた面板付きの天端フレームと、同じくレ
ールに係合するローラからヒンジに吊下がり、分
割体の組合せからなる湾曲フレームと、上端を湾
曲フレームの上端に係止し、該湾曲フレームの外
側に沿つて張設するすだれ状の可撓性面板と、支
柱、湾曲フレーム間に介在させるジヤツキアーム
と、湾曲フレームの内側に取付ける前記すだれ状
の可撓性面板の巻取装置とからなることを要旨と
するものである。
In order to achieve the above object, the present invention includes pillars arranged in the tunnel width direction and erected at appropriate intervals in the tunnel length direction, and having rails on the top that extend in the tunnel length direction so as to be movable up and down; A top frame with a face plate provided between the columns lined up so as to be slidable by a roller that engages with the rail, a curved frame that is suspended from a hinge from a roller that also engages with the rail and is composed of a combination of split bodies, and an upper end. a flexible face plate in the shape of a blind that is fixed to the upper end of the curved frame and stretched along the outside of the curved frame; a jack arm that is interposed between the pillar and the curved frame; The gist of the invention is to consist of a flexible face plate winding device.
本発明によれば、型枠を移動するには湾曲フレ
ーム、支柱間のジヤツキアームを縮め、さらにこ
れを撤去して、かつ支柱に設けたレールを下降さ
せ、また湾曲フレームの先端分割体を撤去して該
フレームを短くして相互に近接させて脱型を行
う。このようにした場合、可撓性面板はその先端
を巻取装置で湾曲フレーム端を巻回して内側に引
込んでおける。
According to the present invention, in order to move the formwork, the jack arm between the curved frame and the support column is retracted, this is removed, the rail provided on the support column is lowered, and the tip split body of the curved frame is removed. Then, the frames are shortened, brought close to each other, and demolded. In this case, the tip of the flexible face plate can be pulled inward by winding the end of the curved frame with a winding device.
そして、天端フレーム及び可撓性面板を取付け
た湾曲フレームをローラの作用でトンネルの長さ
方向に滑動させて前進を行う。 Then, the curved frame to which the top frame and the flexible face plate are attached is slid in the longitudinal direction of the tunnel by the action of rollers to move forward.
また、前進した型枠をセツトするには可撓性面
板先端の引張を解除し、ジヤツキアームを取付け
て湾曲フレームを広げた状態で支承するとともに
該フレームの先端に撤去してある分割体を接続
し、さらにレールを上昇させて天端フレーム及び
その面板と湾曲フレーム及び可撓性面板をセツト
位置におく。 In addition, to set the advanced formwork, release the tension on the tip of the flexible face plate, attach the jack arm to support the curved frame in an expanded state, and connect the removed split body to the tip of the frame. Then, the rail is further raised to place the top frame, its face plate, the curved frame, and the flexible face plate in the set position.
以下、図面について本発明の実施例を詳細に説
明する。
Embodiments of the present invention will be described in detail below with reference to the drawings.
第1図は、本発明のトンネルの覆工用移動型枠
の1実施例を示す正面図で、3次巻型枠として型
枠セツト時の状態を示すものである。 FIG. 1 is a front view showing one embodiment of the movable formwork for tunnel lining according to the present invention, and shows the state when the formwork is set as a tertiary winding formwork.
図中7はトンネル内に立設する支柱であり、ジ
ヤツキベース7aとその上部の継ぎ足し可能な本
体7bとさらに上部のネジ部7cとからなり、ジ
ヤツキベース7aはトンネル底部にアンカーで固
定し、ネジ部7cの上部先端は突起7dとしてト
ンネル天井部に取付けた支柱取付ブロツク8に係
合させる。さらに、前記ネジ部7cはネジジヤツ
キを構成するもので、ネジリング9と組合わされ
る。図中9′は、ジヤツキベース7aに設けて本
体7bを上下動するネジリングである。 Reference numeral 7 in the figure denotes a support column that stands in the tunnel, and consists of a jack base 7a, a main body 7b on the top that can be supplemented, and a threaded part 7c on the top.The jack base 7a is fixed to the bottom of the tunnel with an anchor, and the threaded part 7c The upper end of the shaft is engaged with a support mounting block 8 attached to the tunnel ceiling as a projection 7d. Further, the threaded portion 7c constitutes a threaded jack and is combined with the threaded ring 9. In the figure, reference numeral 9' denotes a screw ring provided on the jack base 7a to move the main body 7b up and down.
該支柱7はトンネル内で2本巾方向に並び、か
つトンネルの長さ方向に適宜間隔で立設されるも
ので、相並ぶ支柱7同士は横材11,11′,1
1″で連結して枠組み、その内部にケーブル(ト
ンネル内に通す電気、電話線等のケーブル)収納
用のラツク10を収め、いわゆるケーブル防護を
行うものである。 Two of the pillars 7 are lined up in the width direction in the tunnel, and are erected at appropriate intervals in the length direction of the tunnel.
The racks 10 for storing cables (electrical, telephone, etc. cables to be passed through the tunnel) are housed inside the framework, which provides so-called cable protection.
図中12,12′は側面を開口としたC型チヤ
ンネル状のレールで、支柱7に嵌装する昇降リン
グ13上に支柱7をはさんで左右1対取付く。こ
のレール12はトンネルの長さ方向に伸びるもの
であり、支柱1の昇降リング13間に架設され、
前記側面開口は支柱7と反対の向きになり、また
昇降リング13の直下には前記ネジリング9が係
合する。 In the figure, reference numerals 12 and 12' denote C-shaped channel-shaped rails with openings on the sides, and a pair of left and right rails are mounted on an elevating ring 13 fitted to the support 7, with the support 7 sandwiched therebetween. This rail 12 extends in the length direction of the tunnel, and is installed between the lifting rings 13 of the support columns 1.
The side opening faces opposite to the column 7, and the threaded ring 9 engages directly below the lifting ring 13.
図中14は型枠フレームのうち面板14b付き
の水平な天端フレームであり、その左右端に取付
部材14aを下方に突出させてローラ15をけ設
け、このローラ15を前記開口を介してレール1
2′内に転走可能に収めた。 In the figure, 14 is a horizontal top frame with a face plate 14b among the formwork frames, and a roller 15 is provided at the left and right ends of the frame with mounting members 14a projecting downward, and the roller 15 is inserted into the rail through the opening. 1
It was able to roll within 2'.
また、図中16はもう一方のレール12内に開
口を介して転走可能に収納させるローラで、この
ローラ16を設けた支承部材17に、分割体18
a,18b,18cの組合せによる湾曲フレーム
18の上端をピン19によりヒンジに連結する。 In addition, 16 in the figure is a roller that is accommodated in the other rail 12 through an opening so that it can roll, and a divided body 18
The upper end of the curved frame 18 formed by the combination of a, 18b, and 18c is connected to the hinge by a pin 19.
なお、支柱7の上端の突起7dの直下にこの支
承部材17とは天端フレーム14のローラ15の
取付部材14aとの間に挿入可能なスペーサ20
を配設した。該スペーサ20は、前記レール1
2,12′と同じようにトンネルの長さ方向に配
設した長尺部材である。 In addition, a spacer 20 that can be inserted between the support member 17 and the mounting member 14a of the roller 15 of the top frame 14 is installed directly below the protrusion 7d at the upper end of the support column 7.
was installed. The spacer 20 is connected to the rail 1
Like 2 and 12', it is a long member arranged in the longitudinal direction of the tunnel.
図中21は型枠の面板であり、これは第2図に
示すようにアルミ鋼管等の金属パイプ21a間に
硬質ゴム製の断面鼓形のスペーサ21bを介在さ
せてワイヤー21cで縦に縫着したすだれ状の可
撓性面板で、上端を前記支承部材17に固着して
湾曲フレーム18の外側面に配置する。前記スペ
ーサ21bの材質は、合成樹脂や金属であつても
よい。さらに、必要に応じて面板21の面に剥離
シート27を配設することもある。 In the figure, 21 is the face plate of the formwork, which is vertically sewn with a wire 21c between metal pipes 21a such as aluminum steel pipes with a spacer 21b made of hard rubber interposed in the shape of a drum in cross section. A flexible face plate in the form of a blind is fixed to the support member 17 at its upper end and is disposed on the outer surface of the curved frame 18. The material of the spacer 21b may be synthetic resin or metal. Furthermore, a release sheet 27 may be provided on the surface of the face plate 21 if necessary.
湾曲フレーム18のうち、中央の分割体18b
と支柱7の本体7bとの間にジヤツキアーム22
をボルト、ピン等で着脱自在に取付けられるよう
にし、また下部の分割体18cには下方に向けて
支承枠23を取付け、左右に該支承枠23同士の
間にネジ式ジヤツキ24を介在できるようにす
る。図中25は支柱7の本体7bの下部に設けた
ローラで、後述するように脱型時の湾曲フレーム
18の先端を支えるものである。 The central divided body 18b of the curved frame 18
and the main body 7b of the support 7.
can be detachably attached with bolts, pins, etc., and a support frame 23 is attached to the lower divided body 18c facing downward, and screw type jacks 24 can be interposed between the support frames 23 on the left and right sides. Make it. In the figure, 25 is a roller provided at the lower part of the main body 7b of the support 7, which supports the tip of the curved frame 18 during demolding, as will be described later.
また、湾曲フレーム18の中央の分割体18b
の内側にウインチによる巻取装置26を設け、巻
取装置26に前記可撓性面板21のワイヤー21
cの先端を巻取れるようにした。 In addition, the central divided body 18b of the curved frame 18
A winding device 26 using a winch is provided inside the wire 21 of the flexible face plate 21.
The tip of c can be rolled up.
次に、使用法について説明する。 Next, how to use it will be explained.
まず、型枠をセツトする場合について説明する
と、先に述べたように支柱7が立設されていて、
レール12,12′を介して天端フレーム14や
湾曲フレーム18が連結している。 First, to explain the case of setting the formwork, as mentioned earlier, the supports 7 are erected,
A top frame 14 and a curved frame 18 are connected via rails 12, 12'.
ネジリング9を回動してネジ部7cに沿つて上
昇させれば、昇降リング13及びレール12,1
2′が上昇し、天端フレーム14及び湾曲フレー
ム18も上昇する。そして、支承部材17と取付
部材14a間にスペーサ20が嵌入し、天端フレ
ーム14、湾曲フレーム18は一体化する。 If the threaded ring 9 is rotated and raised along the threaded portion 7c, the elevating ring 13 and the rails 12,1
2' rises, and the top frame 14 and curved frame 18 also rise. Then, the spacer 20 is fitted between the support member 17 and the mounting member 14a, and the top frame 14 and the curved frame 18 are integrated.
また、湾曲フレーム18は分割体18a,18
b,18cの3つが組合わされ、下端は支承枠2
3でトンネルの底部に当接し、かつ支承枠23相
互間はジヤツキ24で固定される。さらに湾曲フ
レーム18の分割体18bと支柱7の本体7b間
にジヤツキアーム22をピン又ボルトで取付けて
湾曲フレーム18の全体を支承する。 Moreover, the curved frame 18 has divided bodies 18a, 18
b, 18c are combined, and the lower end is the support frame 2
3 makes contact with the bottom of the tunnel, and the support frames 23 are fixed with jacks 24. Further, a jack arm 22 is attached between the divided body 18b of the curved frame 18 and the main body 7b of the support column 7 with a pin or bolt to support the entire curved frame 18.
このジヤツキアーム22は、その上に板を載せ
て歩道を形することができる。 This jack arm 22 can be used to form a sidewalk by placing a board on it.
湾曲フレーム18の外側にはすだれ状の可撓性
面板21及び必要に応じて剥離シート27が張設
され、さらに、天端フレーム14は面板14bを
有するので、その外側にコンクリートを打設する
ことができる。 A blind-shaped flexible face plate 21 and a release sheet 27 are stretched as needed on the outside of the curved frame 18, and since the top frame 14 has a face plate 14b, concrete cannot be poured on the outside thereof. I can do it.
一方、型枠を脱型するには第5図に示すよう
に、湾曲フレーム18の先端の分割体18cを撤
去し、中央の分割体18bの先端に半円のアダプ
ター28を取付け、かつ分割体18bに取付けた
巻取装置26にワイヤー21cの先端を取付け
る。 On the other hand, in order to demold the formwork, as shown in FIG. The tip of the wire 21c is attached to the winding device 26 attached to the wire 18b.
そして、ネネジリング9を逆方向に回動してネ
ジ部7cに沿つてこれを下降させれば、昇降リン
グ13及びレール12,12′も下降し、該レー
ル12,12′とともに天端フレーム14や湾曲
フレーム18も下降し、面体14bや可撓性面板
21が覆工したコンクリートBの面より離れる。 When the threaded ring 9 is rotated in the opposite direction and lowered along the threaded portion 7c, the elevating ring 13 and the rails 12, 12' are also lowered, and the top frame 14 and the rails 12, 12' are lowered. The curved frame 18 is also lowered, and the face piece 14b and the flexible face plate 21 are separated from the surface of the covered concrete B.
この湾曲フレーム18の下降とともにジヤツキ
アーム22を徐々に縮めれば、湾曲フレーム18
の下端は支柱7側に近づき、同時に巻取装置26
によりワイヤー21cの先端を巻取れば可撓性面
板21はその先端がアダプター28を介して湾曲
フレーム18の内側に引込まれていく。 If the jack arm 22 is gradually retracted as the curved frame 18 descends, the curved frame 18
The lower end approaches the support 7 side, and at the same time the winding device 26
When the tip of the wire 21c is wound up, the tip of the flexible face plate 21 is pulled into the inside of the curved frame 18 via the adapter 28.
そして、前記アダプター28の部分の面板21
の途中がローラ25に当接して湾曲フレーム18
の下降は停止する。そして、ジヤツキアーム22
を撤去する。このようにしてから、天端フレーム
14をローラ15によりレール12′に沿つて前
進させ、また、湾曲フレーム18を可撓性面板2
1を取付けたままでローラ16によりレール12
に沿つて前進させることができる。 Then, the face plate 21 of the adapter 28 portion
The middle part of the curved frame 18 comes into contact with the roller 25.
stops descending. And Jyatsuki arm 22
to be removed. After doing so, the top frame 14 is advanced along the rail 12' by the rollers 15, and the curved frame 18 is moved along the flexible face plate 12'.
1 with the roller 16 still attached to the rail 12.
can be advanced along.
所要長だけ前進後、再度型枠をけセツトするに
は、巻取装置をゆるめ、ジヤツキアーム22を取
付けてこれを徐々に伸長し、かつレール12,1
2′を上昇させて天端フレーム14や湾曲フレー
ム18を上昇し、また湾曲フレーム18は分割体
18cを取付たものとする。 To set the formwork again after moving forward by the required length, loosen the winding device, attach the jacking arm 22 and gradually extend it, and then tighten the rails 12, 1.
2' is raised to raise the top end frame 14 and the curved frame 18, and the curved frame 18 is assumed to have the divided body 18c attached thereto.
以上述べたように本発明のトンネルの覆工用移
動型枠は、移動を行うのは面板を取付けた天端フ
レームや湾曲フレームだけなので、従来のように
型枠フレーム支承の架台すべてを移動せずにす
み、移動部分が少なく人力でも簡単に行えるもの
である。
As mentioned above, in the movable formwork for tunnel lining of the present invention, only the top frame and curved frame to which the face plate is attached are moved, so it is not necessary to move all the formwork frame supporting frames as in the conventional case. There are no moving parts, and it can be easily done by hand.
さらに、架台若しくは支柱を移動しないで型枠
の前進を行えるので、トンネル内にケーブルが施
設してあつても支障なく、ケーブルの保護を行い
ながら型枠を移送できる。その結果、トンネルの
2次覆工用のみならず、3次覆工用の型枠として
利用できるものである。 Furthermore, since the formwork can be advanced without moving the trestle or support, even if cables are installed in the tunnel, the formwork can be transferred while protecting the cables. As a result, it can be used not only as a formwork for secondary lining of tunnels but also for tertiary lining.
第1図は本発明のトンネルの覆工用移動型枠の
1実施例を示すセツト時の正面図、第2図は可撓
性面板の部分正面図、第3図は型枠の昇降機構部
分の正面図、第4図は同上一部省略した側面図、
第5図は説型及び移動時の正面図、第6図は従来
例を示す正面図である。
1……レール、2……架台、3……伸縮支柱、
4……湾曲フレーム、5……型枠面板、6……ジ
ヤツキアーム、7……支柱、7a……ジヤツキベ
ース、7b……本体、7c……ネジ部、7d……
突起、8……支柱取付ブロツク、9,9′……ネ
ジリング、10……ケーブル収納用のラツク、1
1,11′,11″……横材、12,12′……レ
ール、13……昇降リング、14……天端フレー
ム、14a……取付部材、14b……面板、1
5,16……ローラ、17……支承部材、18…
…湾曲フレーム、18a,18b,18c……分
割体、19……ピン、20……スペーサ、21…
…可撓性面板、21a……金属パイプ、21b…
…スペーサ、21c……ワイヤー、22……ジヤ
ツキアーム、23……支承枠、24……ネジ式ジ
ヤツキ、25……ローラ、26……巻取装置、2
7……剥離シート、28……アダプター。
Fig. 1 is a front view of one embodiment of the movable formwork for tunnel lining of the present invention when set, Fig. 2 is a partial front view of the flexible face plate, and Fig. 3 is a portion of the elevating mechanism of the formwork. 4 is a side view with some parts omitted from the same as above.
FIG. 5 is a front view of the model and its movement, and FIG. 6 is a front view of a conventional example. 1... Rail, 2... Frame, 3... Telescopic support,
4... Curved frame, 5... Formwork face plate, 6... Jacket arm, 7... Pillar, 7a... Jacket base, 7b... Main body, 7c... Threaded part, 7d...
Protrusion, 8... Prop mounting block, 9, 9'... Screw ring, 10... Cable storage rack, 1
1, 11', 11''...Horizontal member, 12, 12'...Rail, 13...Elevating ring, 14...Top frame, 14a...Mounting member, 14b...Front plate, 1
5, 16...Roller, 17...Supporting member, 18...
...Curved frame, 18a, 18b, 18c...Divided body, 19...Pin, 20...Spacer, 21...
...Flexible face plate, 21a...Metal pipe, 21b...
... Spacer, 21c ... Wire, 22 ... Jacket arm, 23 ... Support frame, 24 ... Screw type jack, 25 ... Roller, 26 ... Winding device, 2
7... Release sheet, 28... Adapter.
Claims (1)
向に適宜間隔で立設され、上部にトンネル長さ方
向に伸びるレールを上下動自在に設けた支柱と、
巾方向に並ぶ支柱間に前記レールに係合するロー
ラにより滑動可能に設けた面板付きの天端フレー
ムと、同じくレールに係合するローラからヒンジ
に吊下がり、分割体の組合せからなる湾曲フレー
ムと、上端を湾曲フレームの上端に係止し、該湾
曲フレームの外側に沿つて張設するすだれ状の可
撓性面板と、支柱、湾曲フレーム間に介在させる
ジヤツキアームと、湾曲フレームの内側に取付け
る前記すだれ状の可撓性面板の巻取装置とからな
ることを特徴とするトンネルの覆工用移動型枠。1. Supports lined up in the tunnel width direction and erected at appropriate intervals in the tunnel length direction, and having rails on the top that extend in the tunnel length direction so as to be movable up and down;
A top frame with a face plate is provided between columns arranged in the width direction so as to be slidable by a roller that engages with the rail, and a curved frame that is suspended from a hinge from a roller that also engages with the rail and is made up of a combination of split bodies. , a blind-shaped flexible face plate whose upper end is locked to the upper end of the curved frame and stretched along the outside of the curved frame; a support column; a jack arm interposed between the curved frame; A movable formwork for tunnel lining, characterized by comprising a winding device for a blind-shaped flexible face plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP62319216A JPH0230899A (en) | 1987-12-16 | 1987-12-16 | Movable formwork for tunnel covering work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP62319216A JPH0230899A (en) | 1987-12-16 | 1987-12-16 | Movable formwork for tunnel covering work |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0230899A JPH0230899A (en) | 1990-02-01 |
JPH057519B2 true JPH057519B2 (en) | 1993-01-28 |
Family
ID=18107708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP62319216A Granted JPH0230899A (en) | 1987-12-16 | 1987-12-16 | Movable formwork for tunnel covering work |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0230899A (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103334773A (en) * | 2013-07-16 | 2013-10-02 | 王博 | Drift template tractor |
JP6468605B2 (en) * | 2016-01-13 | 2019-02-13 | 有限会社 伊藤 | Method for attaching traveling device in concrete formwork support device |
JP6468604B2 (en) * | 2016-01-13 | 2019-02-13 | 有限会社 伊藤 | How to assemble concrete formwork |
-
1987
- 1987-12-16 JP JP62319216A patent/JPH0230899A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPH0230899A (en) | 1990-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES448543A1 (en) | Climbing scaffolding assemblies with associated shuttering | |
KR20060118066A (en) | A scaffolding | |
JPH057519B2 (en) | ||
JP2000087316A (en) | Method and device for construction of floor slab | |
JP3218314B2 (en) | Beam formwork equipment | |
CN214939318U (en) | Construction formwork for bridge construction joint | |
JPH0639878B2 (en) | Moving mechanism for mobile formwork for lining | |
JPH03275803A (en) | Moving construction device for high level structure | |
JPH0396598A (en) | Movable form for tunnel | |
JPS6218694B2 (en) | ||
JPH0663364B2 (en) | Mobile formwork method and its equipment | |
KR200159796Y1 (en) | Elevating device of form for underground building construction work in the underground | |
JP2992882B2 (en) | Beam formwork device | |
JPH07158255A (en) | Elevatable working scaffold device | |
CN218405053U (en) | Shed frame device for construction of movable formwork | |
JP3843300B2 (en) | Sheet laying device | |
JPH059918A (en) | Form installing device | |
JP2000087314A (en) | Method and device for construction of floor slab | |
SU866083A1 (en) | Movable scaffold | |
JPH0765299B2 (en) | Temporary support device for hand girder | |
JP2619560B2 (en) | Concrete casting formwork | |
JP2662331B2 (en) | Concrete casting method | |
JP2609204B2 (en) | Pillar-based support device | |
SU903535A1 (en) | Form for concrete-coating of inclined and curving edges of hydraulic engineering structures | |
JPS603360A (en) | Construction of hollow concrete structure |