JPH0567621U - Precast concrete block for hodome - Google Patents

Precast concrete block for hodome

Info

Publication number
JPH0567621U
JPH0567621U JP559492U JP559492U JPH0567621U JP H0567621 U JPH0567621 U JP H0567621U JP 559492 U JP559492 U JP 559492U JP 559492 U JP559492 U JP 559492U JP H0567621 U JPH0567621 U JP H0567621U
Authority
JP
Japan
Prior art keywords
wall portion
concrete
cavity
front wall
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP559492U
Other languages
Japanese (ja)
Other versions
JP2538649Y2 (en
Inventor
勝一 本間
寿啓 笹
隆 五十嵐
政明 臼井
正市 柳
運治 諸橋
Original Assignee
建設省北陸地方建設局長
北日本ブロック工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 建設省北陸地方建設局長, 北日本ブロック工業株式会社 filed Critical 建設省北陸地方建設局長
Priority to JP1992005594U priority Critical patent/JP2538649Y2/en
Publication of JPH0567621U publication Critical patent/JPH0567621U/en
Application granted granted Critical
Publication of JP2538649Y2 publication Critical patent/JP2538649Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)
  • Revetment (AREA)

Abstract

(57)【要約】 【目的】 法留工の工期の短縮化と工事のコストダウン
を図る。 【構成】 法留用プレキャストコンクリートブロック11
は、その前壁部13に上部に法面の傾斜にほぼ対応して傾
斜した傾斜面12を設け、この前壁部13と所定間隔を持っ
て後壁部14を設け、これら両壁部13,14を連結部15によ
り連結し、これら連結部15間に空洞16を設ける。 【効果】 工場で製作した法留用プレキャストコンクリ
ートブロック11を、現場に搬入し吊り込み据付を行って
コンクリート基礎を構築し、これにより現場での型枠作
業、コンクリート打設作業が削減される。また、法留用
プレキャストコンクリートブロック11は空洞16を設ける
ことにより軽量化され、運搬作業,吊り込み据付作業も
容易に行える。
(57) [Summary] [Purpose] To shorten the construction period of the staying method and reduce the construction cost. [Constitution] Precast concrete block 11 for hodome
The front wall portion 13 is provided with an inclined surface 12 which is inclined at an upper portion substantially corresponding to the inclination of the slope, and a rear wall portion 14 is provided at a predetermined distance from the front wall portion 13, and both the wall portions 13 are provided. , 14 are connected by a connecting portion 15, and a cavity 16 is provided between these connecting portions 15. [Effect] The precast concrete block 11 for legal retaining produced in the factory is carried to the site and suspended and installed to construct a concrete foundation, which reduces formwork work and concrete placement work on site. Further, the precast concrete block 11 for legal retaining is made lighter by providing the cavity 16, and the transportation work and the hanging installation work can be easily performed.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は護岸のコンクリート基礎に用いられる法留用プレキャストコンクリー トブロックに関する。 The present invention relates to a precast concrete block for mooring used for a concrete foundation of a revetment.

【0002】[0002]

【従来の技術】[Prior Art]

従来、河川の護岸工事においては、岸壁一体にコンクリートブロックを張り詰 め護岸壁を築造し、河川の氾濫淪水の防止を図っており、図7に示すように河川 1に沿って法留工のコンクリート基礎2を打設し、法面3にブロック4を張り詰 め、このブロック4により法面3を保護するとともに、前記コンクリート基礎2 により法面3の滑動を防止するようにしている。 Conventionally, in the revetment work of rivers, concrete blocks have been clad together to construct revetment walls to prevent flooding and flooding of rivers. The concrete foundation 2 is placed, and the block 4 is tightly attached to the slope 3, the slope 3 is protected by the block 4, and the concrete foundation 2 prevents the slope 3 from sliding.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

上記従来技術のようにコンクリートを打設してコンクリート基礎2を施工する 場合では、現場にて型枠を組み、この型枠にコンクリートを流し込み、型枠外し を行うというように現場での手間及び工程数がかかり、工期の短縮が困難であっ た。特にコンクリートを現場打ちするため、雨天等では打設を延期しなければな らない上に、打設後コンクリートの養生期間が必要になり工期が長期化し工事費 が増加するという問題があった。さらにこの種の河川に沿って構築されるコンク リート基礎2は、施工条件により河川に埋没した箇所に型枠を組んで構築するこ とがあり、この場合構築場所を鋼矢板により囲み、内部の水抜きを行ってコンク リートを打設しなければならず工期及び工事費の増加が避けられなかった。 When the concrete foundation 2 is constructed by placing concrete as in the above-mentioned conventional technique, a formwork is assembled at the site, concrete is poured into this formwork, and the formwork is removed. It took a lot of steps and it was difficult to shorten the construction period. In particular, since the concrete is cast on site, the construction must be postponed in rainy weather, and the curing period for the concrete is required after the construction, which lengthens the construction period and increases the construction cost. Furthermore, the concrete foundation 2 constructed along this type of river may be constructed by forming a formwork at the place buried in the river depending on the construction conditions. In this case, the construction site is surrounded by steel sheet piles and Since water had to be drained and concrete was placed, an increase in construction period and construction cost was unavoidable.

【0004】 そこで本考案は工期の短縮化が可能で、工事のコストダウンを図ることができ る法留用プレキャストコンクリートブロックを提供することを目的とする。[0004] Therefore, an object of the present invention is to provide a precast concrete block for legal retaining, which can shorten the construction period and can reduce the construction cost.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

本考案は、上部が傾斜した前壁部と、この前壁部と所定間隔を置いて設けられ た後壁部と、これら前壁部と後壁部との間に形成された空洞とを具備するもので ある。 The present invention comprises a front wall portion having an inclined upper portion, a rear wall portion provided at a predetermined distance from the front wall portion, and a cavity formed between the front wall portion and the rear wall portion. It is something to do.

【0006】[0006]

【作用】[Action]

上記構成により、工場で製作した法留用プレキャストコンクリートブロックを 、現場に搬入し吊り込み据付を行ってコンクリート基礎を構築を行い、これによ り現場での型枠作業、コンクリート打設作業が削減される。 With the above configuration, the precast concrete block for legal retention produced at the factory is carried to the site and suspended for installation to build a concrete foundation, which reduces formwork work and concrete placement work at the site. It

【0007】[0007]

【実施例】【Example】

以下、本考案の実施例を添付図面を参照して説明する。図1ないし図5は本考 案の第1実施例を示し、前記図7と同一部分に同一符号を付しその説明を省略し て詳述する。本考案のコンクリート製からなる法留用プレキャストコンクリート ブロック(以下法留用ブロックという)11は、上部に法面3の傾斜にほぼ対応し て傾斜した傾斜面12を有する前壁部13と、この前壁部13と所定間隔を持って設け られた後壁部14と、これら両壁部13,14を連結する所定間隔に配置された連結部 15と、これら連結部15間に形成された空洞16と、法留用ブロック11の長手方向両 端に位置して両壁部13,14間に形成された半空洞17とからなり、前記連結部15の 下部には彎曲状の切欠き開口部18が形成され、また両壁13,14には前記空洞16に 連通する孔19が穿設されている。この法留用ブロック11は、工場にて予め型枠に コンクリートを流し込んで成型され、例えば流さ4メートル,高さ0.5 から1.5 メートルのものが成型される。 Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. 1 to 5 show a first embodiment of the present invention. The same parts as those in FIG. 7 are designated by the same reference numerals, and the description thereof will be omitted to be described in detail. The precast concrete block made of concrete according to the present invention for precast concrete (hereinafter referred to as “preserved block”) 11 has a front wall portion 13 having an inclined surface 12 at the upper portion which substantially corresponds to the inclination of the slope 3, and this front wall. A rear wall portion 14 provided at a predetermined distance from the portion 13, a connecting portion 15 arranged at a predetermined distance for connecting the both wall portions 13 and 14, and a cavity 16 formed between these connecting portions 15. , A half-cavity 17 formed between both wall portions 13 and 14 located at both longitudinal ends of the legal retention block 11, and a curved cutout opening 18 is formed in the lower portion of the connecting portion 15. Further, a hole 19 communicating with the cavity 16 is formed in both walls 13 and 14. The block 11 for legal distillation is molded by pouring concrete into a formwork in advance at a factory. For example, a block having a flow rate of 4 meters and a height of 0.5 to 1.5 meters is molded.

【0008】 そして前記法留用ブロック11を用いて河川護岸を構築する手順として、先ず河 川1の法留工箇所の地盤20の均し転圧を行い、法留用ブロック11の接合位置に棚 板21を敷設する。また図2に示すように法留用ブロック11の前記孔19には予め棒 材22を挿通し、この棒材22の両端に吊り金具23を掛止めし、クレーン(図示せず )等のワイヤー24により吊り上げ前記地盤20上に据え付けを行う。据付後は孔19 より棒材22を抜き取り、該孔19をガムテープ(図示せず)等により閉塞する。ま た法留用ブロック11,11相互の接続は図5に示すように、両壁部13,14の空洞16 側に設けられた埋込みボルト25を、長板状の連結板26に挿通して該ボルト25の先 端にナット27を螺合して隣合う法留用ブロック11,11を連結し、これにより相互 の前記半空洞17が位置合わされる。また据付後は図3に示すように法留用ブロッ ク11の上部から空洞16の下部にコンクリート28を流し込み、該中空部16の中間部 に砂利,土砂等の中詰材29を投入し、さらに空洞16の上部にコンクリート29を投 入し、かつ常法にて締め固める。この場合空洞16の下部に位置して切欠き開口部 18が設けられているから、この開口部18を通って外部から採光がなされ、下部に 流し込んだコンクリート28を確認することができ、かつコンクリート28が開口部 18を通って隣り合った空洞16相互が該コンクリート28により連結される。そして 法留工として法留用ブロック11の施工を完了したら、前壁部13側の法面3の埋め 戻しを行い、法面3にブロック4の施工をする。As a procedure for constructing a river revetment using the above-noted retaining block 11, first, the ground 20 at the reserving site of the river 1 is leveled and compacted, and the shelf plate is attached to the joining position of the retaining block 11. 21 is laid. Also, as shown in FIG. 2, a rod 22 is inserted in advance into the hole 19 of the block 11 for retaining the slant, and hanging metal fittings 23 are hooked at both ends of the rod 22, and a wire 24 such as a crane (not shown) is attached. It is hoisted and installed on the ground 20. After the installation, the rod 22 is pulled out from the hole 19 and the hole 19 is closed with gum tape (not shown) or the like. Further, as shown in FIG. 5, the mutual connection of the blocks 11 and 11 for hodome is carried out by inserting an embedded bolt 25 provided on the cavity 16 side of both wall portions 13 and 14 into a long plate-like connecting plate 26. A nut 27 is screwed on the front end of the bolt 25 to connect the adjacent blocks 11, 11 for retention, so that the half cavities 17 are aligned with each other. After the installation, concrete 28 is poured into the lower part of the cavity 16 from the upper part of the block 11 for legal retention after installation, and the filling material 29 such as gravel and earth and sand is put in the middle part of the hollow part 16, and further, Concrete 29 is poured into the upper part of the cavity 16 and compacted by a conventional method. In this case, since the notch opening 18 is provided at the bottom of the cavity 16, it is possible to confirm the concrete 28 that has been poured into the lower part through the opening 18 to allow daylighting from the outside. The cavities 16 adjacent to each other through the openings 18 are connected to each other by the concrete 28. Then, when the construction of the block 11 for the loop retaining is completed as the bank retaining work, the slope 3 on the front wall 13 side is backfilled, and the block 4 is constructed on the slope 3.

【0009】 このように本実施例では上部が傾斜した前壁部13と、この前壁部13と所定間隔 を置いて設けられた後壁部14と、これら前壁部13と後壁部14との間に形成された 空洞16とを具備するものであるから、従来のように現場にて型枠を組みコンクリ ートを打設するという手間のかかる作業を省くことができるとともに、雨天等に おいても作業を行うことができ、工期の短縮化および工事費の削減を図ることが できる。また、コンクリート28も空洞16,17の上,下部流し込む分だけで済み、 現場でのコンクリートの使用量も少なく済み、従来に比べコンクリート28の養生 期間も短縮される。さらに、河床などコンクリート基礎として水の接する箇所に 構築する場合にあっても、法留用コンクリート11をクレーン等により吊り込んで 据付することができ、従来のように矢板等を用いて水抜きする必要がなく工期及 び工事費を削減することができる。さらに法留用ブロック11に空洞16を形成する ことにより、その法留用ブロック11の軽量化が図られ運搬作業も容易となり、か つ据付に伴うクレーンなどの重機も比較的小型のもので可能となり、工事の省力 化が図れる。As described above, in this embodiment, the front wall portion 13 having an inclined upper portion, the rear wall portion 14 provided at a predetermined distance from the front wall portion 13, and the front wall portion 13 and the rear wall portion 14 are provided. Since it has a cavity 16 formed between and, it is possible to omit the labor-intensive work of assembling a formwork on site and placing concrete, as in the conventional method, and in the case of rain or the like. Even in this case, the work can be performed, and the construction period can be shortened and the construction cost can be reduced. In addition, the concrete 28 only needs to be poured into the cavities 16 and 17 above and below, the amount of concrete used at the site can be reduced, and the curing period of the concrete 28 can be shortened compared to the conventional case. Furthermore, even when constructing a concrete foundation such as a riverbed in a place in contact with water, it is possible to suspend and install the hoisting concrete 11 with a crane, etc., and it is necessary to drain water using a sheet pile as in the past. It is possible to reduce the construction period and the construction cost. Furthermore, by forming the cavity 16 in the legal retention block 11, the weight of the legal retention block 11 can be reduced and the transportation work can be facilitated, and heavy equipment such as a crane accompanying installation can be made relatively small. Labor saving can be achieved.

【0010】 また実施例上の効果として、連結部15の下部に切欠き開口部18を形成すること によって、その開口部18から空洞16内に採光を行い、流し込んだコンクリート28 の量を確認することができるとともに、開口部18により空洞16,17が流し込んで コンクリート28に連結され、法留用ブロック11を地盤20上に安定して据え付ける ことができる。Further, as an effect of the embodiment, by forming a cutout opening 18 in the lower portion of the connecting portion 15, light is drawn from the opening 18 into the cavity 16 and the amount of the poured concrete 28 is confirmed. At the same time, the cavities 16 and 17 are poured into the concrete 28 by the opening 18 and are connected to the concrete 28, so that the block 11 for mooring can be stably installed on the ground 20.

【0011】 図6は本考案の第2実施例を示し、前記第1実施例と同一部分に同一符号を付 しその詳細な説明を省略して詳述すると、この例では法留用コンクリートブロッ ク11Aは所定間隔を置いて設けられて前壁部13と後壁部14との間に、第1実施例 に比べて幅広な連結部15Aが設けられるとともに、長手方向両側には空洞たる半 空洞17Aが設けられ、この半空洞17Aは下方に向かって拡大するテーパ状をなし ている。また孔19は前壁部13,連結部15A,後壁部14を連通して設けられている 。FIG. 6 shows a second embodiment of the present invention, in which the same parts as those in the first embodiment are designated by the same reference numerals and detailed description thereof will be omitted. 11A are provided at a predetermined interval, a connecting portion 15A wider than that in the first embodiment is provided between the front wall portion 13 and the rear wall portion 14, and a semi-cavity which is a cavity on both sides in the longitudinal direction. 17A is provided, and this semi-cavity 17A has a tapered shape that expands downward. The hole 19 is provided to connect the front wall portion 13, the connecting portion 15A, and the rear wall portion 14 to each other.

【0012】 このように本実施例では上部が傾斜した前壁部13と、この前壁部13と所定間隔 を置いて設けられた後壁部14と、これら前壁部13と後壁部14との間に形成された 空洞たる半空洞17Aとを具備するものであるから、従来のように現場にて型枠を 組みコンクリートを打設するという手間のかかる作業を省くことができ、工期の 短縮化および工事費の削減を図ることができ、特に現場で使うコンクリートは半 空洞17の上,下部だけであり、コンクリートの使用量も少なく済み、またコンク リート基礎として水の接する箇所に構築する場合にあっても適したものとなり第 1実施例と同様な効果,作用を有する。As described above, in this embodiment, the front wall portion 13 having an inclined upper portion, the rear wall portion 14 provided at a predetermined interval from the front wall portion 13, and the front wall portion 13 and the rear wall portion 14 are provided. Since it is equipped with a semi-cavity 17A that is a cavity formed between and, it is possible to omit the labor-intensive work of assembling a formwork and placing concrete as in the conventional construction, which leads to a reduction in the construction period. The concrete can be shortened and the construction cost can be reduced. In particular, the concrete used on site is only the upper and lower parts of the semi-cavity 17, the amount of concrete used is small, and it is constructed as a concrete foundation at the place where water comes into contact. Even in such a case, it is suitable and has the same effect and action as the first embodiment.

【0013】 なお、本考案は上記実施例に限定されるものではなく本考案の要旨の範囲内に おいて種々の変形実施が可能であり、例えば法留用ブロック11の大きさ、形状は 適宜選定可能であり、その法留用ブロック11に設ける空洞16,17の数、大きさ、 形状等は適宜選定可能である。また前壁部13の傾斜面13は、施工場所の法面3に 対応して傾斜角度を変更することができる。The present invention is not limited to the above embodiment, and various modifications can be made within the scope of the present invention. For example, the size and shape of the legal retention block 11 can be appropriately selected. It is possible, and the number, size, shape, etc. of the cavities 16 and 17 provided in the legal retention block 11 can be appropriately selected. Further, the inclination angle of the inclined surface 13 of the front wall portion 13 can be changed according to the slope 3 of the construction site.

【0014】[0014]

【考案の効果】[Effect of the device]

本考案は、上部が傾斜した前壁部と、この前壁部と所定間隔を置いて設けられ た後壁部と、これら前壁部と後壁部との間に形成された空洞とを具備するもので あるから、工期の短縮化が可能で、工事のコストダウンを図ることができる法留 用プレキャストコンクリートブロックを提供することができる。 The present invention comprises a front wall portion having an inclined upper portion, a rear wall portion provided at a predetermined distance from the front wall portion, and a cavity formed between the front wall portion and the rear wall portion. Therefore, it is possible to provide a precast concrete block for legal retaining that can shorten the construction period and reduce the construction cost.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の第1実施例を示す斜視図である。FIG. 1 is a perspective view showing a first embodiment of the present invention.

【図2】本考案の第1実施例を示す断面図である。FIG. 2 is a sectional view showing a first embodiment of the present invention.

【図3】本考案の第1実施例を示す断面図である。FIG. 3 is a cross-sectional view showing a first embodiment of the present invention.

【図4】本考案の第1実施例を示す側面図である。FIG. 4 is a side view showing a first embodiment of the present invention.

【図5】本考案の第1実施例を示す要部の拡大平面図で
ある。
FIG. 5 is an enlarged plan view of an essential part showing the first embodiment of the present invention.

【図6】本考案の第2実施例を示す斜視図である。FIG. 6 is a perspective view showing a second embodiment of the present invention.

【図7】従来例を示す護岸の断面説明図である。FIG. 7 is a cross-sectional explanatory view of a seawall showing a conventional example.

【符号の説明】[Explanation of symbols]

11,11A 法留用プレキャストコンクリートブロック 12 傾斜面 13 前壁部 14 後壁部 16 空洞 17 半空洞(空洞) 11, 11A Precast concrete block for mooring 12 Slope 13 Front wall 14 Rear wall 16 Cavity 17 Semi-cavity (cavity)

───────────────────────────────────────────────────── フロントページの続き (72)考案者 臼井 政明 新潟県新潟市真砂1丁目17番17号 (72)考案者 柳 正市 新潟県新潟市坂井砂山3丁目3番12号 (72)考案者 諸橋 運治 新潟県新潟市南笹口1丁目12番12号 北日 本ブロック工業株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Masaaki Usui 1-17-17 Masago, Niigata City, Niigata Prefecture (72) Inventor Tadashi Yanagi-shi 3-12 Sakai Sunayama, Niigata City, Niigata Prefecture (72) Inventor Morohashi Unji 1-12-12 Minamisasaguchi Niigata City Niigata Kita Nichihon Block Industry Co., Ltd.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 上部が傾斜した前壁部と、この前壁部と
所定間隔を置いて設けられた後壁部と、これら前壁部と
後壁部との間に形成された空洞とを具備することを特徴
とする法留用プレキャストコンクリートブロック。
1. A front wall portion having an inclined upper portion, a rear wall portion provided at a predetermined distance from the front wall portion, and a cavity formed between the front wall portion and the rear wall portion. A precast concrete block for legal retaining characterized by being provided.
JP1992005594U 1992-02-13 1992-02-13 Precast concrete block for anchoring Expired - Lifetime JP2538649Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1992005594U JP2538649Y2 (en) 1992-02-13 1992-02-13 Precast concrete block for anchoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1992005594U JP2538649Y2 (en) 1992-02-13 1992-02-13 Precast concrete block for anchoring

Publications (2)

Publication Number Publication Date
JPH0567621U true JPH0567621U (en) 1993-09-07
JP2538649Y2 JP2538649Y2 (en) 1997-06-18

Family

ID=11615562

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1992005594U Expired - Lifetime JP2538649Y2 (en) 1992-02-13 1992-02-13 Precast concrete block for anchoring

Country Status (1)

Country Link
JP (1) JP2538649Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3439713B2 (en) * 2000-02-28 2003-08-25 水谷建設工業株式会社 Block laying method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4854426U (en) * 1971-10-22 1973-07-13
JPS57168545U (en) * 1981-04-20 1982-10-23
JPS61134442A (en) * 1984-12-05 1986-06-21 Kyowa Concrete Kogyo Kk Block for foundation concrete
JPH02186018A (en) * 1989-01-13 1990-07-20 Akagi Shokai:Kk Building method for retaining wall and foundation block thereof
JPH0422513U (en) * 1990-06-14 1992-02-25

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4854426U (en) * 1971-10-22 1973-07-13
JPS57168545U (en) * 1981-04-20 1982-10-23
JPS61134442A (en) * 1984-12-05 1986-06-21 Kyowa Concrete Kogyo Kk Block for foundation concrete
JPH02186018A (en) * 1989-01-13 1990-07-20 Akagi Shokai:Kk Building method for retaining wall and foundation block thereof
JPH0422513U (en) * 1990-06-14 1992-02-25

Also Published As

Publication number Publication date
JP2538649Y2 (en) 1997-06-18

Similar Documents

Publication Publication Date Title
JPH0598636A (en) Cylindrical shell foundation and construction method thereof
CN109750567A (en) Expressway extension structure and expressway extension method
JPH0610344A (en) Confirmation and increase method for support force of cast-in-place pile
US5551798A (en) Culvert end wall retainer system
JPH0567621U (en) Precast concrete block for hodome
KR100433653B1 (en) Constructing method for the filling out abutement of bridge
KR200203448Y1 (en) A pre-cast retaining wall
JP2784317B2 (en) Open caisson structure
JPS6124624Y2 (en)
JPS6124628Y2 (en)
JPH0138929B2 (en)
JPS6124623Y2 (en)
CN215483082U (en) Gravity type retaining wall
CN215483081U (en) Gravity type retaining wall
JP2000240075A (en) Penetration type retaining wall
JP3639084B2 (en) Retaining wall block having a coupling structure and method for constructing retaining wall using the retaining wall block
JPH1088592A (en) Concrete retaining wall
JP2876452B2 (en) Retaining wall construction method
JPS6124627Y2 (en)
KR960002378B1 (en) A working method for a protective structure
JPS6033941B2 (en) Method and device for creating a pole foundation
JP4437233B2 (en) Side groove block, side groove construction method
KR200224496Y1 (en) Structure for the filling out abutement of bridge
JPS6124625Y2 (en)
JPS6124626Y2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term