JPH0557026U - Legal frame unit for embankment method - Google Patents

Legal frame unit for embankment method

Info

Publication number
JPH0557026U
JPH0557026U JP11313791U JP11313791U JPH0557026U JP H0557026 U JPH0557026 U JP H0557026U JP 11313791 U JP11313791 U JP 11313791U JP 11313791 U JP11313791 U JP 11313791U JP H0557026 U JPH0557026 U JP H0557026U
Authority
JP
Japan
Prior art keywords
frame
slope
embankment
frame body
law
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11313791U
Other languages
Japanese (ja)
Other versions
JP2570601Y2 (en
Inventor
誠 鳥井原
弘 古屋
邦興 平間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP1991113137U priority Critical patent/JP2570601Y2/en
Publication of JPH0557026U publication Critical patent/JPH0557026U/en
Application granted granted Critical
Publication of JP2570601Y2 publication Critical patent/JP2570601Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

(57)【要約】 【目的】 法面に対する施工が簡単,確実で、法枠の内
側に土圧に対する拘束力をあらかじめ持たせることによ
って土砂の流出を未然に防止する。 【構成】 法枠ユニット10は、矩形状の法枠本体12
と、法枠本体12の背面両側の底部にヒンジ支持された
一対の支持バー14と、支持バー14と法枠本体12間
に懸架された調整バー16と、法枠本体12の背面内側
に張設され、周縁を法枠本体12に複数のボルト18を
介して固定された高強度ネット20と、このネット20
の背面に配置され、かつ周縁を前記ボルト18によって
法枠本体12に共締めされた不織布22とからなってい
る。
(57) [Summary] [Purpose] Construction on slopes is simple and reliable, and the outflow of sediment is prevented by giving a binding force against soil pressure inside the slope in advance. [Structure] The law frame unit 10 includes a rectangular law frame body 12
A pair of support bars 14 hingedly supported on the bottoms of both sides of the back surface of the law frame body 12, an adjustment bar 16 suspended between the support bar 14 and the law frame body 12, and a tension bar inside the back surface of the law frame body 12. A high-strength net 20 having a peripheral edge fixed to the main frame body 12 through a plurality of bolts 18, and the net 20.
The non-woven fabric 22 is disposed on the back surface of the non-woven fabric and the peripheral edge of which is fastened together with the law frame main body 12 by the bolt 18.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial application]

この考案は、法面からの土砂流出や法面の崩壊を防止できるようにした盛土工 法における法枠ユニットに関する。 The present invention relates to a slope frame unit in an embankment method capable of preventing sediment outflow from the slope and collapse of the slope.

【0002】[0002]

【従来の技術】[Prior Art]

盛土工法の一つに、従来、図6に示すように、盛土層1aを形成した上面に補 強ネット2(一般にジオテキスタイルと称される合成樹脂製のグリッド状または 不織布状の補強部材)を敷設する工程を繰り返して所定高さの盛土1を造成する 工法がある。この盛土工法では、前記補強ネット2が抵抗体となるため、単なる 盛土に比べて強度が高い。また、前記補強ネット2の端末処理方法としては、法 面に土のう3を積み上げるとともに、補強ネット2の端末2aを土のう3の背面 に巻き込んで拘束している。 As one of the embankment methods, conventionally, as shown in FIG. 6, a reinforcing net 2 (a synthetic resin grid-like or non-woven fabric-like reinforcing member generally called geotextile) is laid on the upper surface where the embankment layer 1a is formed. There is a construction method in which the embankment 1 having a predetermined height is formed by repeating the above steps. In this embankment method, since the reinforcing net 2 serves as a resistor, the strength is higher than that of simple embankment. In addition, as a method of treating the end of the reinforcing net 2, the sandbag 3 is stacked on the slope and the end 2a of the reinforcing net 2 is wound around the back of the sandbag 3 to be restrained.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

しかしながら、この土のう巻き込み方式にあっては、施工性が悪い上に安定性 に欠け、さらには美観上も好ましくないという種々の問題点があった。そこで、 土のう3に代わるものとして法枠を法面に敷き詰める工法が提案されているが、 この工法では法枠内側の開口部は土圧に対する拘束力がないため土砂流出の惧れ があるという問題点があった。 However, this sandbag winding method has various problems in that it is poor in workability, lacks in stability, and is aesthetically unfavorable. Therefore, as an alternative to the sandbag 3, a method of laying a legal frame on the slope has been proposed. However, in this method, the opening inside the legal frame has no binding force against earth pressure, so there is a risk of sediment outflow. There was a point.

【0004】 この考案は前記問題点に鑑みなされたもので、法面に対する施工が簡単,確実 であり、法枠内側の開口部に土圧に対する拘束力をあらかじめ持たせることによ って土砂の流出を未然に防止できるようにした盛土工法における法枠ユニットを 提供することを目的とする。The present invention has been made in view of the above problems, and the construction on the slope is simple and reliable, and the opening inside the slope is provided with a binding force against earth pressure in advance, so It is an object of the present invention to provide a legal framework unit for the embankment method that can prevent runoff.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

前記目的を達成するため、この考案に係る法枠ユニットは、盛土層を盛り立て る工程と、その盛土層の上面に補強ネットを敷設する工程とを交互に繰り返して 所定高さの盛土を造成するとともに、該盛土の法面に法枠ユニットを敷き詰めて 法面を覆う盛土工法において、前記法枠ユニットは枠状の法枠本体と、前記法枠 本体の枠内開口部を覆うべくこれに固定された土留部材とからなることを特徴と する。 In order to achieve the above-mentioned object, the method frame unit according to the present invention constructs an embankment with a predetermined height by alternately repeating the process of raising the embankment layer and the process of laying a reinforcing net on the upper surface of the embankment layer. In addition, in the embankment method of covering the slope by laying a slope frame unit on the slope of the embankment, the slope frame unit covers the slope-shaped slope frame main body and the opening in the frame of the slope frame main body. It is characterized by consisting of a fixed retaining member.

【0006】 また、前記法枠ユニットは、前記法枠本体の背部に設けられて該法枠本体を支 持する一対の支持部材を有することが望ましい。Further, it is preferable that the law frame unit has a pair of support members provided on a back portion of the law frame body and supporting the law frame body.

【0007】 さらに、前記土留部材は、前記法枠本体の枠内開口部を覆うべくこれに張設さ れる網状部材と、該網状部材に重ねて固定された布材とからなることが望ましい 。Further, it is preferable that the soil retaining member is composed of a mesh member stretched over the opening in the frame of the law frame body and a cloth material fixed to the mesh member.

【0008】 あるいは、前記土留部材は、前記法枠本体の枠内開口部を覆うべくこれに固定 された板状部材であることが望ましい。Alternatively, the earth retaining member is preferably a plate-like member fixed to the opening in the frame of the law frame main body so as to cover the opening.

【0009】[0009]

【作用】[Action]

前記構成を有する本考案によれば、法面に加わる土圧は、法枠ユニットを構成 する法枠本体と、この法枠本体の内側の開口部に設けられた土留部材により拘束 される。 According to the present invention having the above-mentioned configuration, the earth pressure applied to the slope is restrained by the law frame main body constituting the law frame unit and the earth retaining member provided in the opening inside the law frame main body.

【0010】 また、法枠本体とこれに固定された支持部材とがなす角度に応じた法面の傾斜 角度を設定できるとともに、補強ネットはその上下に配設される法枠ユニット間 に挾持させることによって端末処理される。In addition, the inclination angle of the slope can be set according to the angle formed by the law frame main body and the support member fixed thereto, and the reinforcing net is held between the law frame units arranged above and below it. The terminal is processed by

【0011】 さらに、土留部材として網状部材と布材との組み合わせを用いると、土砂の流 出を防止できるとともに、法枠本体の内側開口部に植生して緑化できる。Furthermore, when a combination of a net-like member and a cloth material is used as the soil retaining member, it is possible to prevent the outflow of earth and sand and to vegetate the inside opening of the legal frame body to be green.

【0012】 加えて、土留部材として板状部材を用いると、土砂の流出を防止できるととも に、その表面を化粧板とすることで、色彩や模様など人工的な美観を作り出すこ とができる。[0012] In addition, when a plate-shaped member is used as the soil retaining member, it is possible to prevent the outflow of earth and sand and to create an artificial aesthetic such as colors and patterns by using the surface as a decorative plate. ..

【0013】[0013]

【実施例】【Example】

以下、この考案の好適実施例を図面を用いて詳細に説明する。図1,図2は この考案の第一実施例を示すものである。なお、従来例と同一箇所には同一符号 を付して説明するものとする。法枠ユニット10は、あらかじめ工場生産などに よって形成されたもので、矩形状の法枠本体12と、法枠本体12の背面両側の 底部にヒンジ支持された支持部材である一対の支持バー14と、支持バー14と 法枠本体12との間に懸架された調整バー16と、法枠本体12の背面内側に張 設され、周縁を法枠本体12に複数のボルト18を介して固定された比較的大き なメッシュを有するエキスパンドメタルなどの網状部材である高強度ネット20 と、このネット20の背面に配置され、かつ周縁を前記ボルト18によって法枠 本体12に共締めされた布材としての不織布22とからなっている。法枠本体1 2は、金属,プラスチック,繊維補強コンクリートなどのように、軽量な素材で 形成される。なお、この法枠本体12の各辺12aにはボルト挿通孔23が穿設 され、各法枠ユニット10を法面に敷き詰めた状態でボルト挿通孔23に連結用 ボルト24を挿通し、相手側突出端を図示しないナットで締め付けることにより 各ユニット10間を上下左右に一体に連結できるようにしている。 Hereinafter, a preferred embodiment of the present invention will be described in detail with reference to the drawings. 1 and 2 show a first embodiment of the present invention. The same parts as those of the conventional example will be described with the same reference numerals. The law frame unit 10 is formed in advance by factory production or the like, and has a rectangular law frame main body 12 and a pair of support bars 14 that are hinge-supported support members on the bottoms on both sides of the back surface of the law frame main body 12. An adjusting bar 16 suspended between the support bar 14 and the law frame body 12, and a tension bar that is stretched on the inside of the back surface of the law frame body 12 and has its peripheral edge fixed to the law frame body 12 via a plurality of bolts 18. A high-strength net 20 which is a mesh member such as expanded metal having a relatively large mesh, and a cloth material which is arranged on the back surface of the net 20 and whose peripheral edge is fastened together to the method frame main body 12 by the bolt 18. Non-woven fabric 22 of. The method frame body 12 is made of a lightweight material such as metal, plastic, or fiber reinforced concrete. A bolt insertion hole 23 is formed on each side 12a of the law frame main body 12, and a connecting bolt 24 is inserted into the bolt insertion hole 23 with each law frame unit 10 spread on the slope. By tightening the protruding end with a nut (not shown), the units 10 can be integrally connected vertically and horizontally.

【0014】 以上の法枠ユニット10を用いた盛土工法では、盛土層1aの高さピッチと法 枠ユニット10の敷設ピッチとを同一とし、まず、図3(a)に示すように、調 整バー16によって法枠本体12の傾斜角度を定め、法面の勾配を設定した状態 で、法面となる位置の最底部に法枠ユニット10を一列に配列する。In the embankment method using the method frame unit 10 described above, the height pitch of the embankment layer 1a and the laying pitch of the method frame unit 10 are the same, and first, as shown in FIG. With the bar 16 defining the inclination angle of the main frame 12 and setting the slope of the slope, the normal frame units 10 are arranged in a line at the bottom of the position to be the slope.

【0015】 次に、同図(b)に示すように、盛土層1aを最下層に配置された法枠本体1 2の上縁まで盛り上げ、敷き均し後に補強ネット2を盛土層1aの上面に敷設し 、その端末2aを法枠本体10の上面に被せる。Next, as shown in FIG. 2B, the embankment layer 1a is piled up to the upper edge of the law frame main body 12 arranged in the lowermost layer, and after laying the reinforcement net 2 the reinforcement net 2 is placed on the upper surface of the embankment layer 1a. And the terminal 2a is covered on the upper surface of the method frame body 10.

【0016】 次いで、同図(c)に示すように、第一段目の法枠ユニット10の上部に第二 段目の法枠ユニット10を設置し両者間をボルト締めすれば、補強ネット12は 上下の法枠ユニット10間に挾持され、ボルト24による締め付け圧力に応じて 拘束され、全ての工事完了後にはみ出した端部を切除することで端末処理される ことになる。また、法枠ユニット10と補強ネット12とをこのように組み合わ せることによって、法面の安定性を高め、従来は困難であった急勾配の法面でも 施工することが可能である。Next, as shown in FIG. 1C, the second-stage method frame unit 10 is installed on top of the first-step method frame unit 10 and bolted between the two, whereby the reinforcing net 12 Is clamped between the upper and lower legal frame units 10 and restrained according to the tightening pressure of the bolts 24, and the end portion protruding after all the construction work is cut off to be processed. Further, by combining the slope frame unit 10 and the reinforcing net 12 in this way, the stability of the slope can be enhanced, and it is possible to perform construction on a steep slope which was difficult in the past.

【0017】 第二段目においても前記と同様の作業を行い、これを予定段数まで繰り返せば 、同図(d)に示すように盛土1が完成する。The same work as described above is performed on the second stage, and when this is repeated up to the planned number of stages, the embankment 1 is completed as shown in FIG.

【0018】 完成状態において法面に加わる土圧は、主として前記高強度ネット20が支持 する。この高強度ネット20としては、軽量化のために大きなメッシュのものが 採用されているので、その背面の不織布22も各メッシュ間に加わる土圧を支持 すると同時に土砂流出を防止する。この不織布22は透水性および通気性に富む ため、播種,植生による緑化が可能であり、これにより人工構造物が隠蔽され、 美観を高めることができる。なお、前記不織布22の代わりに織布を用いてもよ い。Earth pressure applied to the slope in the completed state is mainly supported by the high-strength net 20. Since the high-strength net 20 has a large mesh for weight reduction, the non-woven fabric 22 on the back side also supports the earth pressure applied between the meshes and at the same time prevents the outflow of sediment. Since the non-woven fabric 22 is highly water-permeable and breathable, it can be planted and vegetated so that it can be greened, which conceals the artificial structure and enhances its aesthetic appearance. A woven fabric may be used instead of the non-woven fabric 22.

【0019】 図4,図5はこの考案の第二実施例を示すものである。図において、法枠本体 12の背面には板状の土留部材としてプレート30が固設されている。このプレ ート30は、所要の強度や耐久性が確保されていればどのような材質でもよく、 法枠本体12と一体に形成されるか、あるいはボルト,ナットの螺合手段等によ って法枠本体12に固設される。この実施例にあっても盛土施工方法は前記実施 例と同様である。工事完了状態では、前記実施例の高強度ネット20と不織布2 2との組み合わせに代わって、前記プレート30が法面に加わる土圧に対抗する 。なお、この実施例では、前記プレート30の表面に色彩や模様などを付与した 化粧パネルとしてもよく、このようにすれば、人工造形物による美観をもたらす ことができる。4 and 5 show a second embodiment of the present invention. In the figure, a plate 30 is fixedly installed as a plate-shaped earth retaining member on the back surface of the method frame body 12. The plate 30 may be made of any material as long as the required strength and durability are secured, and it is formed integrally with the method frame body 12 or by means of screwing means such as bolts and nuts. And is fixed to the legal frame body 12. In this embodiment as well, the embankment construction method is the same as in the previous embodiment. In the construction completed state, the plate 30 counters the earth pressure applied to the slope instead of the combination of the high-strength net 20 and the non-woven fabric 22 of the embodiment. In this embodiment, the surface of the plate 30 may be a decorative panel having a color or a pattern. By doing so, it is possible to bring about an aesthetic effect of the artificially shaped object.

【0020】[0020]

【考案の効果】[Effect of the device]

以上各実施例によって詳細に説明したように、この考案に係る盛土工法におけ る法枠ユニットにあっては、法面に加わる土圧は法枠本体内側の開口部に設けら れた土留部材により拘束され、支持部材によって設定された各法枠ユニットの角 度に応じた法面の傾斜角度を設定できる。 As described above in detail with reference to each embodiment, in the case frame unit in the embankment method according to the present invention, the earth pressure applied to the slope is the earth retaining member provided in the opening inside the case body. The slope angle of the slope can be set according to the angle of each slope frame unit constrained by the support member and set by the support member.

【0021】 また、補強ネットは各上下の法枠ユニット間に挾持されることによって端末処 理されるので、従来の土のうを用いて法面を補強し補強ネットの端末処理をする 方式に比べて、施工が簡単かつ確実であるとともに法面の安定性が高まり急勾配 の法面であっても施工可能となり、仕上がり状態における見栄えも向上する。Further, since the reinforcing net is subjected to the terminal treatment by being sandwiched between the upper and lower slope frame units, as compared with the conventional method in which the slope is reinforced by using sandbags and the terminal treatment of the reinforcing net is performed. The construction is simple and reliable, and the stability of the slope is improved, making it possible to construct even steep slopes and improving the appearance in the finished state.

【0022】 特に、土留部材として網状部材と布材との組み合わせを用いた場合、法枠本体 の内側を緑化でき、また、土留部材として板状部材を用いた場合、その表面を化 粧パネルとすることで、色彩や模様など人工的な美観を作り出すことができるな ど、美観上の配慮もできるなどの利点がある。In particular, when the combination of the mesh member and the cloth material is used as the soil retaining member, the inside of the method frame main body can be greened, and when the plate member is used as the soil retaining member, its surface is used as a cosmetic panel. By doing so, it is possible to create artificial aesthetics such as colors and patterns, and there are advantages such as aesthetic considerations.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案の第一実施例による法枠ユニットの背
面斜視図である。
FIG. 1 is a rear perspective view of a method frame unit according to a first embodiment of the present invention.

【図2】図1のA−A線断面図である。FIG. 2 is a sectional view taken along the line AA of FIG.

【図3】(a)〜(d)は同法枠ユニットを用いた盛土
の施工手順を示す説明図である。
3 (a) to 3 (d) are explanatory views showing a procedure for constructing an embankment using the same legal frame unit.

【図4】この考案の第二実施例による法枠ユニットの斜
視図である。
FIG. 4 is a perspective view of a method frame unit according to a second embodiment of the present invention.

【図5】図4のB−B線断面図である。5 is a cross-sectional view taken along the line BB of FIG.

【図6】従来の土のうを用いた盛土工法を示す説明図で
ある。
FIG. 6 is an explanatory view showing a conventional embankment method using sandbags.

【符号の説明】[Explanation of symbols]

10 法枠ユニット 12 法枠本体 14 支持バー 16 調整バー 20 高強度ネット 22 不織布 30 プレート 10 Law Frame Unit 12 Law Frame Main Body 14 Support Bar 16 Adjustment Bar 20 High Strength Net 22 Nonwoven Fabric 30 Plate

Claims (4)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 盛土層を盛り立てる工程と、その盛土層
の上面に補強ネットを敷設する工程とを交互に繰り返し
て所定高さの盛土を造成するとともに、該盛土の法面に
法枠ユニットを敷き詰めて法面を覆う盛土工法におい
て、 前記法枠ユニットは枠状の法枠本体と、 前記法枠本体の枠内開口部を覆うべくこれに固定された
土留部材と、 からなることを特徴とする盛土工法における法枠ユニッ
ト。
1. An embankment having a predetermined height is formed by alternately repeating a step of raising the embankment layer and a step of laying a reinforcing net on the upper surface of the embankment layer, and a slope unit on the slope of the embankment. In the embankment method for covering the slope by laying the slope, the slope frame unit includes a frame-shaped slope frame body, and an earth retaining member fixed to the slope frame body to cover the opening in the frame. The legal framework unit for the embankment method.
【請求項2】 前記法枠本体の背部に設けられて該法枠
本体を支持する一対の支持部材を有することを特徴とす
る請求項1に記載の盛土工法における法枠ユニット。
2. The method frame unit in the embankment method according to claim 1, further comprising a pair of support members provided on a back portion of the method frame body to support the method frame body.
【請求項3】 前記土留部材は、前記法枠本体の枠内開
口部を覆うべくこれに張設される網状部材と、該網状部
材に重ねて固定された布材とからなることを特徴とする
請求項1または請求項2に記載の盛土工法における法枠
ユニット。
3. The earth retaining member comprises a mesh member stretched over the opening in the frame of the law frame main body so as to cover the opening, and a cloth material fixed to the mesh member in an overlapping manner. The method frame unit in the embankment method according to claim 1 or 2.
【請求項4】 前記土留部材は、前記法枠本体の枠内開
口部を覆うべくこれに固定された板状部材であることを
特徴とする請求項1または請求項2に記載の盛土工法に
おける法枠ユニット。
4. The embankment method according to claim 1, wherein the earth retaining member is a plate-like member fixed to an opening in the frame of the method frame body so as to cover the opening in the frame. Legal unit.
JP1991113137U 1991-12-27 1991-12-27 Legal unit in embankment method Expired - Lifetime JP2570601Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1991113137U JP2570601Y2 (en) 1991-12-27 1991-12-27 Legal unit in embankment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1991113137U JP2570601Y2 (en) 1991-12-27 1991-12-27 Legal unit in embankment method

Publications (2)

Publication Number Publication Date
JPH0557026U true JPH0557026U (en) 1993-07-30
JP2570601Y2 JP2570601Y2 (en) 1998-05-06

Family

ID=14604500

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1991113137U Expired - Lifetime JP2570601Y2 (en) 1991-12-27 1991-12-27 Legal unit in embankment method

Country Status (1)

Country Link
JP (1) JP2570601Y2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0532440U (en) * 1991-09-30 1993-04-27 タキロン株式会社 Filling frame

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0532440U (en) * 1991-09-30 1993-04-27 タキロン株式会社 Filling frame

Also Published As

Publication number Publication date
JP2570601Y2 (en) 1998-05-06

Similar Documents

Publication Publication Date Title
JPS58106020A (en) Slope frame
JPH0557026U (en) Legal frame unit for embankment method
KR100966512B1 (en) Vegetion earths retaining wall and construction method of the same
JP2836489B2 (en) Cut slope stabilization method
JPH0351424A (en) Banking forming method and forming material
WO2006025657A1 (en) Vegetation type non woven fabric, revetment structure and revetment construction method using thereof
JP2718293B2 (en) Embankment method
JP2002176849A (en) Vegetation net for greening of building and greening structure of building
JP2698563B2 (en) Construction method of surface natural stone, back concrete casting structure
JPH054494B2 (en)
JPH08253934A (en) Wall face structure of reinforced soil construction
JPH1132580A (en) System for preventing runoff of soil and prevention of runoff of soil
JPH07119153A (en) Method of forming face of slope and slope form
JP3091829B2 (en) Landscape panel and method of constructing landscape using the panel
JP3140391B2 (en) Wall body
JPH05112939A (en) Filling formation method and wire net with frame
JP2003245913A (en) Manufacturing method for imitation stone, and imitation stone
KR200253330Y1 (en) Reinforced Earth Retaining-Wall for using Steel-Frame and Geogrid
JP3117403U (en) Artificial greening fence
JPH0728344Y2 (en) Work-type three-dimensional parking lot
JPH07119457B2 (en) Manufacturing method of matrix-like pseudo rock block
JP2004156319A (en) Slope face reinforcement filling construction method
JPS63289120A (en) Construction of slope-stabilizing slope frame
JP2000265438A (en) Stone-filled structural body for revetment
JP2533434Y2 (en) Legal structure

Legal Events