JPH053615A - Laying method for submarine line - Google Patents

Laying method for submarine line

Info

Publication number
JPH053615A
JPH053615A JP15468491A JP15468491A JPH053615A JP H053615 A JPH053615 A JP H053615A JP 15468491 A JP15468491 A JP 15468491A JP 15468491 A JP15468491 A JP 15468491A JP H053615 A JPH053615 A JP H053615A
Authority
JP
Japan
Prior art keywords
cable
submarine
laying
line
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15468491A
Other languages
Japanese (ja)
Inventor
Shinji Kusaka
眞二 日下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Cable Ltd
Original Assignee
Hitachi Cable Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Cable Ltd filed Critical Hitachi Cable Ltd
Priority to JP15468491A priority Critical patent/JPH053615A/en
Publication of JPH053615A publication Critical patent/JPH053615A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/46Processes or apparatus adapted for installing or repairing optical fibres or optical cables
    • G02B6/50Underground or underwater installation; Installation through tubing, conduits or ducts
    • G02B6/506Underwater installation

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Electric Cable Installation (AREA)

Abstract

PURPOSE:To reduce the laying cost and to control the burying of cables directly according to the conditions of the submarine ground. CONSTITUTION:This invention is characterized by pulling a cable carrying ship 1a with a subaqueous work tractor 10 which can run freely on the submarine ground and has a cable-burying plough 12 fitted through a hydraulic operation arm 11, when the bottom 4 of water is excavated with the subaqueous tractor 10, and a submarine line 7 is drawn out and laid from the cable carrying ship 1a loaded with cable coils 2 through the medium of a control section and a control cable 9. Accordingly, a cable-laying ship of special specifications as before becomes unnecessary.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、海底線の布設方法に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of laying a submarine wire.

【0002】[0002]

【従来の技術】図2には海底線の布設方法の従来例が示
されている。同図に示されているように、ケーブル布設
船1のケーブルタンクまたはケーブルコンテナ内の線条
コイル(またはドラム)2をキャプスタンまたはキャタ
ピラ3の駆動と船速のコントロールにより、水底4に布
設する。海底に埋設する場合は、主鋤5をケーブル布設
船1が索引ロープ6で牽引して水底地面下にケーブル
(海底線)7を直接埋設する方法が一般的である。な
お、同図において8は水面、9は制御部および制御ケー
ブルである。
2. Description of the Related Art FIG. 2 shows a conventional example of a method for laying a submarine wire. As shown in the figure, the wire coil (or drum) 2 in the cable tank or cable container of the cable laying ship 1 is laid on the bottom 4 of the water by controlling the capstan or caterpillar 3 and controlling the boat speed. . When burying on the seabed, the cable laying ship 1 pulls the main plow 5 with the index rope 6 to directly bury the cable (seabed line) 7 under the water bottom ground. In the figure, 8 is a water surface, and 9 is a control unit and a control cable.

【0003】[0003]

【発明が解決しようとする課題】上記従来技術は次に述
べるような問題があった。
The above-mentioned prior art has the following problems.

【0004】(1)ケーブル布設船が特殊仕様、大型施
設のため、布設費用が非常にかかる。
(1) Since the cable laying ship has a special specification and a large facility, the laying cost is very high.

【0005】(2)水底面に凹凸や段差がある場合、ま
たは埋設ルートに岩礁がある時、船上からの監視、制御
により、埋設深さをコントローしているが、制御作動遅
延時間(タイムラグ)が大きく、非常に困難な予測制御
が必要である。
(2) When there are irregularities or steps on the bottom of the water, or when there is a reef on the buried route, the buried depth is controlled by monitoring and control from the ship, but the control operation delay time (time lag). Is large and requires very difficult predictive control.

【0006】(3)障害物の迂回に大きな迂回ルートが
必要である。
(3) A large detour route is required to detour obstacles.

【0007】本発明は以上の点に鑑みなされたものであ
り、布設費用の低減ができ、水底地盤の状況に応じた直
接ケーブル埋設、制御ができることを可能とした海底線
の布設方法を提供することを目的とするものである。
The present invention has been made in view of the above points, and provides a method for laying a submarine wire which can reduce the laying cost and can directly bury and control the cable according to the situation of the submarine ground. The purpose is that.

【0008】[0008]

【課題を解決するための手段】上記目的は、海底地面上
を走行自在で、かつ油圧作動アームを介して取付けられ
た線条埋設用鋤函を有する水底作業トラクタで水底を掘
削し、線条コイルを搭載した水面上の線条積載台船から
制御部および制御ケーブルを介して海底線を引出し布設
するに際し、水底作業トラクタで線条積載台船を引っ張
るようにすることにより、達成される。
The above object is to excavate the water bottom with a water bottom working tractor that can travel freely on the seabed and has a wire burial plow box attached via a hydraulically actuated arm. This is achieved by pulling the submarine line from the filament-loaded carrier on the surface of the water on which the coil is mounted via the control unit and the control cable so as to pull the filament-loaded carrier by the underwater working tractor.

【0009】[0009]

【作用】上記手段を設けたので、従来のように特殊仕様
のケーブル布設船が不要となる。
Since the above-mentioned means is provided, a cable laying ship with special specifications as in the conventional case is not required.

【0010】[0010]

【実施例】次に本発明を実施例により具体的に説明す
る。
EXAMPLES Next, the present invention will be specifically described by way of examples.

【0011】〔実施例1〕図1には本発明の一実施例が
示されている。なお従来と同じ部品には同じ符号を付し
たので説明を省略する。同図に示されているように、海
底地面上を走行自在で、かつ油圧作動アーム11を介し
て取付けられた線条埋設用鋤函12を有する水底作業ト
ラクタ10で水底4を掘削し、線条コイル2を搭載した
水面8上の線条積載台船1aから制御部および制御ケー
ブル9を介して海底線7を引出し布設するに際し、水底
作業トラクタ10で線条積載台船1aを引っ張るように
した。このようにすることにより、従来のように特殊仕
様のケーブル布設船が不要となって、布設費用の低減が
でき、水底地盤の状況に応じた直接ケーブル埋設、制御
ができることを可能とした海底線の布設方法を得ること
ができる。
[Embodiment 1] FIG. 1 shows an embodiment of the present invention. Note that the same parts as those of the related art are denoted by the same reference numerals, and the description thereof will be omitted. As shown in the figure, the water bottom 4 is excavated by a water bottom working tractor 10 which is freely movable on the seabed and has a line embedding plow box 12 mounted via a hydraulically actuated arm 11. When the submarine wire 7 is drawn from the filament loading carrier 1a on the water surface 8 on which the filament coil 2 is mounted via the control unit and the control cable 9 and laid, the water loading work tractor 10 pulls the filament loading carrier 1a. did. By doing so, it is not necessary to use a cable laying vessel with special specifications as in the past, the laying cost can be reduced, and it is possible to directly bury and control the cable according to the situation of the submarine ground. Can be obtained.

【0012】すなわち主要構成要素の水底作業トラクタ
10、線条埋設用鋤函12、線条積載台船1a、制御部
および制御ケーブル9の水底作業トラクタ10は、水底
タイプキャタピラ駆動車で線条埋設用鋤函12を油圧作
動アーム11で埋設深度を調整しながら線条埋設用鋤函
12で地面を裂くと同時に、ケーブル7を埋める動作を
制御部及びおよび制御ケーブル9を通し、鋤函12を牽
引して行なう。この際、本実施例では線条積載台船1a
を索引ロープ6を介して牽引するようにしたが、海底線
駆動キャタピラまたはキャプスタン3により、ケーブル
7を駆動送り出すことにより、ケーブル7の布設張力は
著しく低減できる。
That is, the water bottom work tractor 10, which is a main component, the line-filling plow box 12, the line loading carrier 1a, the control section and the control cable 9 is a water-bottom type caterpillar drive vehicle. At the same time as tearing the ground with the wire-filling plow box 12 while adjusting the burying depth of the plow box 12 with the hydraulically operating arm 11, the operation of filling the cable 7 is performed by passing the plow box 12 through the control section and the control cable 9. Tow it. At this time, in the present embodiment, the linear loading carrier 1a
Although the cable 7 is pulled through the index rope 6, the cable 7 can be driven out by the submarine wire drive caterpillar or the capstan 3 to significantly reduce the laying tension of the cable 7.

【0013】このように本実施例によれば所期の目的が
達成できると共に、下記の効果も奏することができる。
As described above, according to this embodiment, the intended purpose can be achieved, and the following effects can be obtained.

【0014】(1)海底線として光ケーブル海底線も考
えられる。光海底線としては迂回ルートの需要、中継距
離の大スパン化により、陸づたい、島づたいの海岸地帯
を、半ループ状に連結するルートが考えられる。本実施
例の方法はこの海底線ルートの布設の効率、経済性向上
に役立てることができる。
(1) An optical cable submarine line is also conceivable as the submarine line. As an optical submarine line, due to demand for detour routes and widening of relay distance, routes that connect the coastal areas of land and islands in a half-loop are conceivable. The method of this embodiment can be used to improve the efficiency and economy of laying this submarine route.

【0015】(2)水底作業トラクタで線条積載台船を
引っ張るようにしたので、砂地、岩礁地帯が混じったル
ートでも、ルートを迂回しないで、一連作業として容易
に鋤埋設作業が行なえる。
(2) Submarine work Since the line carrier barge is pulled by the tractor, the plow burying work can be easily carried out as a series of work without bypassing the route even on the route where the sandy land and the reef area are mixed.

【0016】[0016]

【発明の効果】上述のように本発明は、海底地面上を走
行自在で、かつ油圧作動アームを介して取付けられた線
条埋設用鋤函を有する水底作業トラクタで水底を掘削
し、線条コイルを搭載した水面上の線条積載台船から制
御部および制御ケーブルを介して海底線を引出し布設す
るに際し、水底作業トラクタで線条積載台船を引っ張る
ようにしたので、従来のように特殊仕様のケーブル布設
船が不要となり、布設費用の低減ができ、水底地盤の状
況に応じた直接ケーブル埋設、制御ができることを可能
とした海底線の布設方法を得ることができる。
As described above, according to the present invention, the water bottom is excavated by the water bottom working tractor which is free to travel on the seabed ground and has the wire burial plow box attached via the hydraulically actuated arm. When pulling out and laying a submarine wire from a line-carrying barge on the water surface equipped with coils via the control unit and control cable, the line-carrying barge was pulled by a water-bottom work tractor. It is possible to obtain a method of laying a submarine cable that enables a cable laying ship of the specification to be unnecessary, a laying cost can be reduced, and a cable can be directly buried and controlled according to the situation of the submarine ground.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の海底線の布設方法の一実施例による布
設状態を示す説明図である。
FIG. 1 is an explanatory view showing a laying state according to an embodiment of a method for laying a submarine wire of the present invention.

【図2】従来の海底線の布設方法による布設状態を示す
説明図である。
FIG. 2 is an explanatory view showing a laying state by a conventional method of laying a submarine wire.

【符号の説明】[Explanation of symbols]

1a 線条積載台船 2 線条コイル(またはドラム) 4 水底 7 海底線(ケーブル) 8 水面 9 制御部および制御ケーブル 10 水底作業トラクタ 11 油圧作動アーム 12 線条埋設用鋤函 1a Strand loading carrier 2 Strand coil (or drum) 4 Water bottom 7 Submarine wire (cable) 8 Water surface 9 Control and control cable 10 Bottom working tractor 11 Hydraulic actuating arm 12 Spare box for embedding the wire

Claims (1)

【特許請求の範囲】 【請求項1】海底地面上を走行自在で、かつ油圧作動ア
ームを介して取付けられた線条埋設用鋤函を有する水底
作業トラクタで水底を掘削し、線条コイルを搭載した水
面上の線条積載台船から制御部および制御ケーブルを介
して海底線を引出し布設するに際し、前記水底作業トラ
クタで前記線条積載台船を引っ張るようにしたことを特
徴とする海底線の布設方法。
Claim: What is claimed is: 1. A water bottom is excavated by a water bottom working tractor having a spade box for embedding a wire, which is freely movable on the seabed and is attached via a hydraulically actuated arm. A submarine line characterized in that, when a submarine line is drawn out and installed from a mounted line-shaped carrier on a water surface via a control unit and a control cable, the line-shaped carrier is pulled by the submarine work tractor. Laying method.
JP15468491A 1991-06-26 1991-06-26 Laying method for submarine line Pending JPH053615A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15468491A JPH053615A (en) 1991-06-26 1991-06-26 Laying method for submarine line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15468491A JPH053615A (en) 1991-06-26 1991-06-26 Laying method for submarine line

Publications (1)

Publication Number Publication Date
JPH053615A true JPH053615A (en) 1993-01-08

Family

ID=15589663

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15468491A Pending JPH053615A (en) 1991-06-26 1991-06-26 Laying method for submarine line

Country Status (1)

Country Link
JP (1) JPH053615A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106774123A (en) * 2016-12-23 2017-05-31 中英海底系统有限公司 The Artificial Intelligence Control of sea plough under water
CN111391985A (en) * 2020-04-01 2020-07-10 杭州瑞晟博科技有限公司 Submarine cable laying device suitable for underwater remote control operation robot
CN113075772A (en) * 2021-03-24 2021-07-06 刘祯祥 Underwater optical fiber installation device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106774123A (en) * 2016-12-23 2017-05-31 中英海底系统有限公司 The Artificial Intelligence Control of sea plough under water
CN106774123B (en) * 2016-12-23 2019-05-07 中英海底系统有限公司 The Artificial Intelligence Control of underwater sea plough
CN111391985A (en) * 2020-04-01 2020-07-10 杭州瑞晟博科技有限公司 Submarine cable laying device suitable for underwater remote control operation robot
CN111391985B (en) * 2020-04-01 2021-02-05 杭州瑞晟博科技有限公司 Submarine cable laying device suitable for underwater remote control operation robot
CN113075772A (en) * 2021-03-24 2021-07-06 刘祯祥 Underwater optical fiber installation device
CN113075772B (en) * 2021-03-24 2022-12-27 陕西中科启智科技有限公司 Underwater optical fiber installation device

Similar Documents

Publication Publication Date Title
US5722793A (en) Method and device for continuously laying and burying a flexible submarine conduit
JPH07231528A (en) Submarine cable laying machine
JPH1038144A (en) Underwater cable burying machine using single traction cable for traction and lifting
JPH053615A (en) Laying method for submarine line
JPH0731042A (en) Laying method of underwater cable
JP2854080B2 (en) Submarine cable laying boat
JP2005121077A (en) Submarine pipe laying method
JP4065208B2 (en) Construction method for laying long objects such as cables
CN1039442C (en) Barge-loading type seabeach pipeline excavator
JPS5910128B2 (en) How to install flexible bodies underwater
JP3201834B2 (en) Submarine laid long body burying method
WO2021116148A1 (en) Installation of a line between two structures
JPH07298441A (en) Laying and burying method for long element in shallow sea
JPS62249108A (en) Cable burying machine
JP3494900B2 (en) How to bury underwater cable
US4545139A (en) Under ice pipelay apparatus and method
JPH0488819A (en) Laying method of submarine cable
JP3360906B2 (en) Drilling method for buried undersea pipe
JP2827536B2 (en) Sinking method for submerged boxes
CN113964736A (en) Submarine cable long-distance intertidal zone landing construction process
JP3499452B2 (en) How to bury underwater cable
JPH01148012A (en) Cable burying machine
JPS5850483B2 (en) Method and device for burying long objects under the sea
Takashima et al. Video Information Control Cable Burying System
De Panafieu et al. The simultaneous installation and burial of flowlines-an innovative and cost effective solution to line protection