JP3494900B2 - How to bury underwater cable - Google Patents

How to bury underwater cable

Info

Publication number
JP3494900B2
JP3494900B2 JP26174298A JP26174298A JP3494900B2 JP 3494900 B2 JP3494900 B2 JP 3494900B2 JP 26174298 A JP26174298 A JP 26174298A JP 26174298 A JP26174298 A JP 26174298A JP 3494900 B2 JP3494900 B2 JP 3494900B2
Authority
JP
Japan
Prior art keywords
cable
water
laying
burying
pollution prevention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP26174298A
Other languages
Japanese (ja)
Other versions
JP2000092643A (en
Inventor
典夫 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujikura Ltd
Original Assignee
Fujikura Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujikura Ltd filed Critical Fujikura Ltd
Priority to JP26174298A priority Critical patent/JP3494900B2/en
Publication of JP2000092643A publication Critical patent/JP2000092643A/en
Application granted granted Critical
Publication of JP3494900B2 publication Critical patent/JP3494900B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、水上を航行する敷
設台船及び水底を移動する埋設機により電力ケーブル等
のケーブルを水底に埋設すると共に、水中に設置される
汚濁防止幕により埋設時の掘削土砂等の拡散を防止する
水底ケーブル埋設方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is to bury a cable such as an electric power cable in the bottom of a water by a laying ship that travels on the water and a burial machine that moves on the bottom of the water, and at the time of burial by a pollution prevention curtain installed in the water. The present invention relates to a method for burying a submarine cable that prevents the diffusion of excavated earth and sand.

【0002】[0002]

【従来の技術】電力ケーブル等のケーブルを水底に埋設
する従来の水底ケーブル埋設方法では、図3に示すよう
に、敷設台船110を水上で航行させ、埋設機20を敷
設台船110の後方の水底で移動させて、敷設台船11
0上のケーブル収容装置13に収容されたコイル状のケ
ーブル3を敷設台船110の船尾からケーブル繰出装置
114により水中に繰り出し、埋設機20により水底を
掘削しつつケーブル3を水底に埋設している。
2. Description of the Related Art In a conventional method of burying a cable such as an electric power cable at the bottom of a water, as shown in FIG. 3, a laying ship 110 is made to sail on the water and the laying machine 20 is placed behind the laying ship 110. Move at the bottom of the water and lay barge 11
The coil-shaped cable 3 accommodated in the cable accommodation device 13 above 0 is fed into the water from the stern of the laying ship 110 by the cable feeding device 114, and the cable 3 is buried in the water bottom while excavating the water bottom by the embedding machine 20. There is.

【0003】また、可撓性を有する筒状の汚濁防止幕1
30をブイ131、131…により水上から支持するよ
うにして水中に設置し、補助台船100、100を埋設
機20の後方の水上で航行させ、ブイ131、131…
をワイヤー132、132…を介して敷設台船110及
び補助台船100、100により前後から引っ張るよう
にして汚濁防止幕130を筒状に広げ、汚濁防止幕13
0により埋設機20を包囲して埋設時の掘削土砂等の拡
散を防止している。
Also, a flexible cylindrical pollution control screen 1
The buoys 131, 131, ... are installed in the water so that the buoys 131, 131 ... Support the buoys 131, 131 ...
Is pulled from the front and back by the laying boat 110 and the auxiliary pontoons 100, 100 via the wires 132, 132 ..
The burial machine 20 is surrounded by 0 to prevent the excavated soil and the like from spreading during burial.

【0004】[0004]

【発明が解決しようとする課題】上述の水底ケーブル埋
設方法では、埋設機20を包囲するように汚濁防止幕1
30を水中に設置するために、埋設機20の前方を航行
する敷設台船110に加えて埋設機20の後方を航行す
る補助台船100、100が必要であり、また、敷設台
船110と補助台船100、100とを同一速度で航行
させる必要があるため、波浪、風等の影響が大きいと作
業が困難な場合もある。また、水深の変化に応じて汚濁
防止幕130の高さを変化させる必要があるが、上述の
ように支持された汚濁防止幕130の高さを変化させる
際には、ケーブル3の埋設作業を一時中断する必要があ
る。また、汚濁防止幕130、補助台船100、100
等により水面が広範囲に渡って占有されるため、他の船
舶の航行の支障になる等の問題がある。
In the above-mentioned method for burying a submarine cable, the pollution prevention curtain 1 is provided so as to surround the burying machine 20.
In order to install 30 in the water, in addition to the laying boat 110 that travels in front of the burying machine 20, auxiliary pedestals 100, 100 that navigate behind the burying machine 20 are required. Since it is necessary to travel at the same speed as the auxiliary pontoons 100, 100, the work may be difficult if the influence of waves, wind, etc. is large. Further, although it is necessary to change the height of the pollution prevention curtain 130 according to the change of the water depth, when changing the height of the pollution prevention curtain 130 supported as described above, the work of burying the cable 3 must be performed. You need to suspend it. Further, the pollution prevention curtain 130, the auxiliary barges 100, 100
Due to such reasons, the water surface is occupied over a wide area, which causes problems such as hindering the navigation of other ships.

【0005】本発明は、このような問題に鑑み、汚濁防
止幕を、補助台船等を使用せずに、かつ、水面を広範囲
に渡って占有することなく、埋設機を包囲するように水
中に設置することができ、また、汚濁防止幕の高さを、
埋設作業を中断せずに容易に変化させることができる水
底ケーブル埋設方法を提供することを目的とする。
In view of the above problems, the present invention is designed to enclose the pollution preventive curtain so as to surround the buried machine without using an auxiliary barge or the like and without occupying the water surface over a wide area. Can be installed at the height of the pollution control curtain,
An object of the present invention is to provide a method for burying a submarine cable that can be easily changed without interrupting the burying work.

【0006】[0006]

【課題を解決するための手段】請求項1に記載の発明
は、敷設台船を水上で航行させ、埋設機を水底で移動さ
せ、敷設台船上のケーブル収容装置に収容されたケーブ
ルを敷設台船上のケーブル繰出装置により水中に繰り出
して、埋設機により水底を掘削しつつケーブルを水底に
埋設すると共に、汚濁防止幕を埋設機を包囲するように
水中に設置して、掘削土砂等の拡散を汚濁防止幕により
防止する水底ケーブル埋設方法において、前記敷設台船
の船体の中央寄部分に、前記船体の底部を貫通したケー
ブル投入用開口部を設けておき、汚濁防止膜の上縁部を
ケーブル投入用開口部の内周側に配置し下方に伸延させ
下縁部を水底に達しさせてかつ埋設機を包囲するように
設置し、前記ケーブルを前記ケーブル投入用開口部を介
して前記敷設台船の航行速度に対応させて水中に繰り出
し、前記埋設機を前記敷設台船の下方の水底で前記敷設
台船と同一速度で走行するように制御し、埋設機により
水底を掘削しつつ繰り出されたケーブルを水底に埋設す
ことを特徴とする水底ケーブル埋設方法である。
According to a first aspect of the present invention, a cable is stored in a cable storage device on a laying ship by moving the laying ship on water and moving an burying machine on the water bottom. The cable is fed into the water by the cable feeding device on the ship, and the cable is buried in the water bottom while excavating the water bottom by the embedding machine, and the pollution prevention curtain is installed in the water so as to surround the embedding machine to disperse the excavated soil. In a method of burying a submarine cable to prevent with a pollution prevention curtain, a cable insertion opening penetrating the bottom of the hull is provided near the center of the hull of the laying carrier, and the upper edge of the pollution prevention film is
Placed on the inner circumference side of the cable insertion opening and extended downward
As the bottom edge reaches the bottom of the water and surrounds the burial machine
The cable is installed , the cable is fed into the water through the opening for inserting the cable in correspondence with the navigation speed of the laying carrier, and the burying machine is laid at the bottom of the water below the laying carrier.
It is controlled so that it travels at the same speed as the barge, and
Buried the cable while digging the bottom of the water and bury it in the bottom of the water.
A water bottom cable burying wherein the that.

【0007】 請求項1に記載の発明によれば、汚濁防
止膜の上縁部をケーブル投入用開口部の内周側に配置し
下方に伸延させ下縁部を水底に達しさせてかつ埋設機を
包囲するように設置し前記ケーブルを前記ケーブル投入
用開口部を介して前記敷設台船の航行速度に対応させて
水中に繰り出し、前記埋設機を前記敷設台船の下方の水
底で前記敷設台船と同一速度で走行するように制御し、
埋設機により水底を掘削しつつ繰り出されたケーブルを
水底に埋設することによって、補助台船等を使用せず
に、汚濁防止幕を埋設機を包囲するように水中に設置す
ることができる。従って、敷設台船の移動に伴って汚濁
防止幕を容易に移動させることができるため、波浪、風
等の影響を低減して埋設作業を効率的に行うことがで
き、また、敷設台船による水面の占有領域と汚濁防止幕
による水面の占有領域とが重なるため、水面の占有領域
を低減して他の船舶の航行の支障となることを防止する
ことができる。
According to the invention of claim 1, the pollution control
Place the top edge of the stop membrane inside the cable entry opening.
Extend it downwards so that the lower edge reaches the bottom of the water, and
Installed so as to surround and put the cable in the cable.
Corresponding to the navigation speed of the laying ship
Take it out into the water and place the burial machine under water below the laying ship.
Control at the bottom to run at the same speed as the laying ship,
The cable unwound while excavating the bottom of the water by the burying machine
By embedding it on the bottom of the water, it is possible to install the pollution prevention curtain in water so as to surround the embedding machine without using an auxiliary barge or the like. Therefore, the pollution control curtain can be easily moved along with the movement of the laying barge, so that the influence of waves, winds, etc. can be reduced and the burial work can be performed efficiently. Since the occupying area of the water surface and the occupying area of the water surface by the pollution prevention curtain overlap, it is possible to reduce the occupying area of the water surface and prevent the hindrance of navigation of other vessels.

【0008】 また、汚濁防止膜の上縁部をケーブル投
入用開口部の内周側に配置しているので、敷設台船の船
体上からケーブル投入用開口部を介して汚濁防止幕の上
部を容易に支持することができる。
In addition, the upper edge of the pollution prevention film is cabled.
Since it is arranged on the inner peripheral side of the entry opening, the upper portion of the pollution prevention curtain can be easily supported from above the hull of the laying ship via the cable entry opening.

【0009】 また、請求項に記載の発明は、敷設台
船の船体上の汚濁防止幕操作装置により汚濁防止幕を水
深の変化に応じて上下に移動させるように構成されてい
る。請求項に記載の発明によれば、ケーブルの埋設作
業を中断せずに汚濁防止膜の高さを調整することがで
き、起伏のある水底にケーブルを埋設する際に埋設作業
を効率的に行うことができる。
The invention according to claim 2 is configured so that the pollution control curtain operating device on the hull of the laying ship moves the pollution control curtain up and down in accordance with a change in water depth. According to the invention described in claim 2 , the height of the pollution prevention film can be adjusted without interrupting the cable burying work, and the burying work can be efficiently performed when the cable is buried in an uneven water bottom. It can be carried out.

【0010】[0010]

【発明の実施の形態】以下、図面を参照して本発明の実
施の形態を説明する。図1は、本発明の実施の形態に係
る水底ケーブル埋設方法の概略を示す立面図であり、図
2は、図1の平面図である。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is an elevational view showing an outline of a method for burying a submarine cable according to an embodiment of the present invention, and FIG. 2 is a plan view of FIG.

【0011】図1、2に示すように、本発明の実施の形
態に係る水底ケーブル埋設方法に使用される敷設台船1
0は、水上に浮揚する船体11を備え、水上を航行し得
るように構成されている。そして、船体11の中央寄部
分、即ち船尾又は船首よりも敷設台船10の重心に近い
部分には、ケーブル投入用開口部12が、船体11を甲
板から船底まで上下に貫通して、船体11の前部、後部
及び両横部により前後左右を包囲されるように形成され
ている。
As shown in FIGS. 1 and 2, a laying ship 1 used in a method for burying a submarine cable according to an embodiment of the present invention.
0 is equipped with a hull 11 that floats above water and is configured to be able to navigate above water. Then, at a portion near the center of the hull 11, that is, at a portion closer to the center of gravity of the laying ship 10 than the stern or the bow, the cable insertion opening 12 penetrates the hull 11 vertically from the deck to the bottom of the boat, The front portion, the rear portion, and both lateral portions are formed so as to be surrounded in the front, rear, left, and right.

【0012】そして、船体11の甲板上には、ターンテ
ーブル等からなるケーブル収容装置13が、コイル状の
ケーブル3を収容するように装備されており、船体11
の甲板上には、ケーブル投入用開口部12の上方の位置
に、キャタピラー型(無限軌道型)ブレーキ装置等のケ
ーブル繰出装置14が、ケーブル3を所定速度で繰り出
すように架台等を介して設置されている。また、船体1
1の甲板上には、シーブ等からなるケーブル案内装置1
5が、ケーブル3を無理に曲げずにケーブル収容装置1
3からケーブル繰出装置14、ケーブル投入用開口部1
2に案内するように、架台等を介して設置されている。
On the deck of the hull 11, a cable housing device 13 composed of a turntable or the like is installed so as to house the coiled cable 3, and the hull 11
On the deck of the above, a cable feeding device 14 such as a caterpillar type (endless track type) braking device is installed above the cable insertion opening 12 via a pedestal or the like so as to feed the cable 3 at a predetermined speed. Has been done. Also, the hull 1
Cable guide device 1 made of sheaves, etc. on the deck 1
5, the cable housing device 1 without forcibly bending the cable 3.
3 to the cable feeding device 14, the cable insertion opening 1
It is installed via a pedestal etc. so as to guide you to 2.

【0013】また、船体11の甲板上には、ケーブル投
入用開口部12の周囲に、ウィンチ等からなる汚濁防止
幕操作装置17、17…が、汚濁防止幕30の上縁部に
接続された吊下ワイヤーを巻き取り又は巻き出すように
設けられている。そして、汚濁防止幕30は、可撓性を
有する筒状に形成されており、汚濁防止幕30の上縁部
は、ケーブル投入用開口部12の内周側に配置され、水
面Sよりも上方に突出し且つ筒状に広げられるように、
吊下ワイヤーを介して汚濁防止幕操作装置17、17…
により支持され、汚濁防止幕30の下縁部は水底Bに達
するように構成されている。
Further, on the deck of the hull 11, around the cable insertion opening 12, pollution prevention curtain operating devices 17, 17 ... Composed of winches and the like are connected to the upper edge of the pollution prevention curtain 30. It is provided to wind or unwind the hanging wire. The pollution prevention curtain 30 is formed in a flexible tubular shape, and the upper edge of the pollution prevention curtain 30 is arranged on the inner peripheral side of the cable insertion opening 12 and is located above the water surface S. So that it protrudes and is expanded into a cylinder,
Contamination prevention curtain operating device 17, 17 ...
The bottom edge of the pollution prevention curtain 30 is configured to reach the water bottom B.

【0014】また、チェーンカッター式埋設機、鋤式埋
設機、ウォータージェット埋設機等の埋設機20は、自
力で走行し又は牽引ワイヤーを介して敷設台船10によ
り牽引されることによって水底Bを移動し、水底Bを掘
削しつつ、敷設台船10から繰り出されるケーブル3を
水底Bに埋設するように構成されている。
The burial machine 20, such as a chain cutter burial machine, a plow burial machine, a water jet burial machine, runs on its own or is towed by the laying ship 10 via a tow wire to move the water bottom B. While moving and excavating the water bottom B, the cable 3 fed from the laying ship 10 is buried in the water bottom B.

【0015】このような敷設台船10及び埋設機20に
よりケーブル3を水底Bに埋設するには、敷設台船10
を水上で所定速度で航行させると共に、埋設機20を水
底Bで敷設台船10と同一速度で移動させ、ケーブル3
を敷設台船10からケーブル投入用開口部12を介して
水中に投入し、ケーブル3をケーブル繰出装置14によ
り敷設台船10の航行速度に対応するように所定速度で
繰り出して、埋設機20により水底Bを掘削しつつ、繰
り出されたケーブル3を水底Bに埋設する。
In order to bury the cable 3 in the water bottom B by using the laying boat 10 and the burying machine 20, the laying boat 10
While traveling at a predetermined speed on the water, the burying machine 20 is moved on the water bottom B at the same speed as the laying ship 10, and the cable 3
Is put into the water from the laying ship 10 through the cable entry opening 12, and the cable 3 is paid out by the cable feeding device 14 at a predetermined speed so as to correspond to the navigation speed of the laying ship 10, and the burial machine 20 is used. The unrolled cable 3 is buried in the water bottom B while excavating the water bottom B.

【0016】この際、水底Bの埋設機20を敷設台船1
0のケーブル投入用開口部12の下方に配置するように
制御し、ケーブル投入用開口部12から下方に伸延した
汚濁防止幕30により埋設機20を包囲して、汚濁防止
幕30により埋設時の掘削土砂等の拡散を防止する。従
って、ブイ、補助台船等を使用せずに、汚濁防止幕30
を埋設機20を包囲するように水中に設置することがで
き、敷設台船10の移動に伴って汚濁防止幕30を容易
に移動させることができるため、波浪、風等の影響を低
減して埋設作業を効率的に行うことができる。また、敷
設台船10による水面の占有領域と汚濁防止幕30によ
る水面の占有領域とが重なるため、水面の占有領域を全
体として低減して他の船舶の航行の支障となること等を
防止することができる。なお、ケーブル3による水面S
の占有についても、ケーブル投入用開口部12を介して
ケーブル3を水中に繰り出すことによって防止すること
ができる。
At this time, the burial vessel 1 for laying the burying machine 20 on the water bottom B is installed.
It is controlled so as to be arranged below the cable insertion opening 12 of 0, the burying machine 20 is surrounded by the pollution prevention curtain 30 extending downward from the cable insertion opening 12, and the pollution prevention curtain 30 prevents Prevent the spread of excavated soil. Therefore, without using buoys, auxiliary barges, etc., the pollution control screen 30
Can be installed in the water so as to surround the burying machine 20, and the pollution control curtain 30 can be easily moved as the laying ship 10 moves, so that the influence of waves, wind, etc. can be reduced. The burial work can be performed efficiently. Further, since the water surface occupied area by the laying barge 10 and the water surface occupied area by the pollution prevention curtain 30 overlap, the water surface occupied area is reduced as a whole to prevent the hindrance of navigation of other ships. be able to. In addition, the water surface S by the cable 3
The occupation of the cable can also be prevented by feeding the cable 3 into the water through the cable insertion opening 12.

【0017】また、埋設箇所の水底Bに起伏がある場合
には、水底Bの起伏(水深の変化)に対応するように、
汚濁防止幕操作装置17、17…により吊下ワイヤーを
介して汚濁防止幕30を上下に移動させて、汚濁防止幕
30の高さを変化させる。従って、ケーブル3の埋設作
業を中断せずに汚濁防止膜30の高さを調整することが
でき、起伏のある水底Bにケーブル3を埋設する際に埋
設作業を効率的に行うことができる。
When the water bottom B of the burial site has undulations, the undulations of the water bottom B (changes in water depth) are dealt with.
The pollution prevention curtain operating device 17, 17 ... Moves the pollution prevention curtain 30 up and down through the hanging wire to change the height of the pollution prevention curtain 30. Therefore, the height of the pollution prevention film 30 can be adjusted without interrupting the burying operation of the cable 3, and the burying operation can be efficiently performed when the cable 3 is buried in the undulating water bottom B.

【0018】なお、波浪等により敷設台船10の船体1
1にはヨーイング等の揺れが生じるが、船体11の中央
寄部分の揺れは船首又は船尾と比較して小さくなる。従
って、汚濁防止幕30は船体11の中央寄部分のケーブ
ル投入用開口部12を介して支持されるので、汚濁防止
幕30の制御が容易になり、汚濁防止幕30により掘削
土砂等の拡散を効果的に防止することる。また、ケーブ
ル3はケーブル投入用開口部12を介して水中に繰り出
されるので、ケーブル3の埋設位置の精度を向上するこ
とができる。
It should be noted that the hull 1 of the laying barge 10 due to waves or the like
1 causes yawing and other shaking, but the shaking near the center of the hull 11 is smaller than that at the bow or stern. Therefore, since the pollution prevention curtain 30 is supported through the cable insertion opening 12 in the central portion of the hull 11, the pollution prevention curtain 30 can be easily controlled, and the pollution prevention curtain 30 can prevent the excavation soil from spreading. Effectively prevent it. Moreover, since the cable 3 is paid out into the water through the cable insertion opening 12, the accuracy of the burying position of the cable 3 can be improved.

【0019】 以上、本発明の実施の形態について述べ
たが、本発明は上述の実施の形態に限定されるものでは
ない。例えば、上述の実施の形態では、汚濁防止幕を敷
設台船により支持するために、汚濁防止幕の上部を敷設
台船の船体のケーブル投入用開口部の内周側に配置する
場合について述べまた、上述の実施の形態では、ケー
ブルの繰出を行うケーブル投入用開口部を、敷設台船の
船体の中央寄部分に配置した場合について述べ。ま
た、敷設台船上のケーブル収容装置、ケーブル繰出装
置、ケーブル案内装置等は、ケーブルをケーブル投入用
開口部を介して水中に繰り出すことができれば、どのよ
うに配置してもよい。
Although the embodiments of the present invention have been described above, the present invention is not limited to the above-mentioned embodiments. For example, in the above-described embodiment, in order to support the pollution prevention curtain by the laying ship, a case where the upper part of the pollution prevention curtain is arranged on the inner peripheral side of the cable insertion opening of the hull of the laying ship is described . Further, in the above embodiment, description has been made of the case where the cable is turned opening that performs feeding of the cable was placed in the center nearest portion of the hull of the lay barge. Further, the cable accommodation device, the cable feeding device, the cable guiding device, etc. on the laying ship may be arranged in any manner as long as the cable can be fed into the water through the cable insertion opening.

【0020】[0020]

【発明の効果】以上のように、請求項1に記載の発明に
よれば、汚濁防止膜の上縁部を敷設台船の中央寄部分に
設けられたケーブル投入用開口部の内周側に配置し下方
に伸延させ下縁部を水底に達しさせてかつ埋設機を包囲
するように設置し、前記ケーブルを前記ケーブル投入用
開口部を介して前記敷設台船の航行速度に対応させて
中に繰り出し、前記埋設機を前記敷設台船の下方の水底
で前記敷設台船と同一速度で走行するように制御し、
設機により水底を掘削しつつ繰り出されたケーブルを水
底に埋設することによって、補助台船等を使用せずに、
汚濁防止幕を埋設機を包囲するように水中に設置するこ
とができる。従って、敷設台船の移動に伴って汚濁防止
幕を容易に移動させることができるため、波浪、風等の
影響を低減して埋設作業を効率的に行うことができ、ま
た、敷設台船による水面の占有領域と汚濁防止幕による
水面の占有領域とが重なるため、水面の占有領域を低減
して他の船舶の航行の支障となることを防止することが
できる。また、敷設台船の船体上からケーブル投入用開
口部を介して汚濁防止幕の上部を容易に支持することが
できる。
As described above, according to the invention as set forth in claim 1, the upper edge portion of the pollution prevention film is provided at the central portion of the laying ship.
Located on the inner circumference side of the provided cable entry opening and below
To extend the bottom edge to the bottom of the water and surround the burial machine.
Is installed as described above, and the cable is fed into the water through the cable insertion opening in accordance with the navigation speed of the laying carrier, and the burying machine is placed on the bottom of the water below the laying carrier.
The controlled so as to run in laying barge and the same speed, buried in
The cable unwound while excavating the bottom of the water with the equipment
By burying in the bottom, without using an auxiliary barge ,
A pollution control screen can be installed underwater so as to surround the burial machine. Therefore, the pollution control curtain can be easily moved with the movement of the laying barge, so that the influence of waves, winds, etc. can be reduced and the burial work can be efficiently performed. Since the occupying area of the water surface and the occupying area of the water surface by the pollution prevention curtain overlap, it is possible to reduce the occupying area of the water surface and prevent the hindrance of navigation of other ships. In addition, an opening for cable insertion from the hull of the laying barge.
The upper part of the pollution control curtain can be easily supported through the mouth.
it can.

【0021】 また、請求項2に記載の発明によれば、
ーブルの埋設作業を中断せずに汚濁防止膜の高さを調
整することができ、起伏のある水底にケーブルを埋設す
る際に埋設作業を効率的に行うことができる。
According to the invention of claim 2 ,
It is possible to adjust the height of the contamination preventing film without interrupting the burying operation of cable, it is possible to perform the burying operation when embedding the cables into water bottom undulating efficiently.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施の形態に係る水底ケーブル埋設方
法の概略を示す立面図である。
FIG. 1 is an elevational view showing an outline of a method for burying a submarine cable according to an embodiment of the present invention.

【図2】図1の平面図である。FIG. 2 is a plan view of FIG.

【図3】従来の水底ケーブル埋設方法の概略を示す平面
図である。
FIG. 3 is a plan view showing an outline of a conventional method for burying a submarine cable.

【符号の説明】[Explanation of symbols]

3 ケーブル 10 敷設台船 11 船体 12 ケーブル投入用開口部 13 ケーブル収容装置 14 ケーブル繰出装置 15 ケーブル案内装置 17 汚濁防止幕操作装置 20 埋設機 30 汚濁防止幕 B 水底 S 水面 3 cables 10 laying barges 11 hull 12 Cable entry opening 13 Cable storage device 14 Cable feeding device 15 Cable guide device 17 Pollution prevention curtain operation device 20 buried machines 30 Pollution prevention curtain B bottom S water surface

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) H02G 1/10 ─────────────────────────────────────────────────── ─── Continuation of the front page (58) Fields surveyed (Int.Cl. 7 , DB name) H02G 1/10

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 敷設台船を水上で航行させ、埋設機を水
底で移動させ、前記敷設台船上のケーブル収容装置に収
容されたケーブルを前記敷設台船上のケーブル繰出装置
により水中に繰り出して、前記埋設機により水底を掘削
しつつ前記ケーブルを水底に埋設すると共に、汚濁防止
幕を前記埋設機を包囲するように水中に設置して、掘削
土砂等の拡散を前記汚濁防止幕により防止する水底ケー
ブル埋設方法において、 前記敷設台船の船体の中央寄部分に、前記船体の底部を
貫通したケーブル投入用開口部を設けておき、汚濁防止膜の上縁部をケーブル投入用開口部の内周側に
配置し下方に伸延させ下縁部を水底に達しさせてかつ埋
設機を包囲するように設置し 、 前記ケーブルを前記ケーブル投入用開口部を介して前記
敷設台船の航行速度に対応させて水中に繰り出し、 前記埋設機を前記敷設台船の下方の水底で前記敷設台船
と同一速度で走行するように制御し、埋設機により水底を掘削しつつ繰り出されたケーブルを
水底に埋設する ことを特徴とする水底ケーブル埋設方
法。
1. A laying pontoon sails on the water, an burying machine moves on the bottom of the water, and a cable accommodated in a cable accommodation device on the laying pier is fed into the water by a cable feeding device on the laying pier. While digging the bottom of the water by the burying machine, the cable is buried in the bottom of the water, and a pollution prevention curtain is installed in the water so as to surround the burying machine to prevent the diffusion of excavated earth and sand by the pollution prevention curtain. In the cable burying method, a cable insertion opening penetrating the bottom of the hull is provided near the center of the hull of the laying barge, and the upper edge of the pollution prevention film is set to the inner circumference of the cable insertion opening. On the side
Place it and extend it downwards so that the lower edge reaches the bottom and is buried.
Placed so as to surround the設機, the said cable through said cable-on opening
The laying ship is fed out into the water according to the navigation speed of the laying ship, and the burying machine is placed on the bottom of the water below the laying ship.
Control so that the vehicle runs at the same speed as the
A method for burying a submarine cable, which is characterized by burying it at the bottom of the water.
【請求項2】 敷設台船の船体上の汚濁防止幕操作装置
により汚濁防止幕を水深の変化に応じて上下に移動させ
ることを特徴とする請求項1に記載の水底ケーブル
方法。
2. A water bottom cables buried設方method according to claim 1, characterized in that moving the pollution control curtain vertically in response to changes in water depth by pollution curtain operating device on the hull of the lay barge.
JP26174298A 1998-09-16 1998-09-16 How to bury underwater cable Expired - Fee Related JP3494900B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26174298A JP3494900B2 (en) 1998-09-16 1998-09-16 How to bury underwater cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26174298A JP3494900B2 (en) 1998-09-16 1998-09-16 How to bury underwater cable

Publications (2)

Publication Number Publication Date
JP2000092643A JP2000092643A (en) 2000-03-31
JP3494900B2 true JP3494900B2 (en) 2004-02-09

Family

ID=17366087

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26174298A Expired - Fee Related JP3494900B2 (en) 1998-09-16 1998-09-16 How to bury underwater cable

Country Status (1)

Country Link
JP (1) JP3494900B2 (en)

Also Published As

Publication number Publication date
JP2000092643A (en) 2000-03-31

Similar Documents

Publication Publication Date Title
RU2527101C2 (en) System of dredge vessel
US4073078A (en) Adjustable dredging and trenching apparatus
EP3086424B1 (en) Method for offshore installing of power cables for wind turbine installations and seabed vehicle
KR101782456B1 (en) Submarine cable laying apparatus and laying method
JP2977175B2 (en) How to lay underwater cable
JP4590442B2 (en) Equipment for laying long objects such as cables on the bottom of water
JP2854080B2 (en) Submarine cable laying boat
JP3494900B2 (en) How to bury underwater cable
JP3499452B2 (en) How to bury underwater cable
JP2000134751A (en) Pollution preventing method for burying subaqueous cable
JP2791181B2 (en) Submarine cable laying method and apparatus
JPH07298441A (en) Laying and burying method for long element in shallow sea
JP3201834B2 (en) Submarine laid long body burying method
JP3499451B2 (en) Underwater cable laying barge and underwater cable laying method
JP2827536B2 (en) Sinking method for submerged boxes
JPH0488819A (en) Laying method of submarine cable
JP2833982B2 (en) Submarine cable
JPH053615A (en) Laying method for submarine line
JP2857644B2 (en) Submersible construction method
JPH02276411A (en) Simultaneous burial on laying submarine cable and its device
JP3373970B2 (en) Long body burying equipment in the water bottom
RU2175617C1 (en) Cable laying complex
JP3998312B2 (en) Sheet laying method
JPH0134834B2 (en)
JPS5833763B2 (en) How to bury submarine cables

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071121

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081121

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091121

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees