JPH0534450B2 - - Google Patents
Info
- Publication number
- JPH0534450B2 JPH0534450B2 JP14413085A JP14413085A JPH0534450B2 JP H0534450 B2 JPH0534450 B2 JP H0534450B2 JP 14413085 A JP14413085 A JP 14413085A JP 14413085 A JP14413085 A JP 14413085A JP H0534450 B2 JPH0534450 B2 JP H0534450B2
- Authority
- JP
- Japan
- Prior art keywords
- sheet pile
- vertical hole
- sheet
- casing
- drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000005452 bending Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 description 9
- 238000005553 drilling Methods 0.000 description 4
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 210000001015 abdomen Anatomy 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は、両脇に他の矢板に結合する曲成結合
部を有するU字形矢板を、アースオーガを用いて
地中に打込むことにより、矢板列を形成する工法
に関する。Detailed Description of the Invention (Industrial Application Field) The present invention is achieved by driving a U-shaped sheet pile having curved joints on both sides to be connected to other sheet piles into the ground using an earth auger. , relates to a construction method for forming rows of sheet piles.
(従来の技術)
アースオーガを用いて矢板を打込む工法は、発
生する騒音が小さいことから、多用されている。
しかし、この工法は、第7図に示すように、スク
リユー羽根1aを回転軸1bの周囲に設けたアー
スオーガドリル1を回転自在に収容してなるケー
シング2の側面にコ字形枠3を固設し、該コ字形
枠3を矢板4の腹面に固設して係合突起5に掛
け、アースオーガドリル1を杭打機のリーダに昇
降自在に装着したドリル駆動装置(いずれも図示
せず)により回転させて地中に縦穴6を掘削しな
がら矢板4を打込む工法である。(Prior Art) The method of driving sheet piles using an earth auger is widely used because it generates little noise.
However, as shown in Fig. 7, this construction method involves fixing a U-shaped frame 3 to the side of a casing 2 that rotatably houses an earth auger drill 1 with screw blades 1a installed around a rotating shaft 1b. The U-shaped frame 3 is fixed to the belly surface of the sheet pile 4 and hung on the engagement protrusion 5, and the earth auger drill 1 is attached to the leader of a pile driver so that it can be raised and lowered (none of these are shown). This is a construction method in which the sheet pile 4 is driven while rotating the vertical hole 6 in the ground.
(発明が解決しようとする問題点)
しかしこの従来工法によると、矢板4が挿入さ
れる個所は縦穴6そのものではなく、縦穴6の近
傍であるため、矢板4が挿入される際の挿入抵抗
が大きく、その結果矢板の打込み速度が小さく、
能率が悪いという問題点がある。(Problem to be solved by the invention) However, according to this conventional construction method, the sheet pile 4 is inserted not into the vertical hole 6 itself, but near the vertical hole 6, so the insertion resistance when the sheet pile 4 is inserted is As a result, the driving speed of the sheet pile is low,
The problem is that it is inefficient.
(問題点を解決するための手段)
本発明は、上記問題点に鑑み、矢板列を形成す
る場合、まずアースオーガドリルにより矢板の配
列方向の幅に相応する第1の縦穴を掘削し、続い
てアースオーガドリルを回転自在に収容したケー
シングに第1の矢板を添設し、前記第1の縦穴の
側にアースオーガドリルにより第2の縦穴を掘削
しながら前記第1の縦穴に前記ケーシングに添設
した第1の矢板を挿入し、続いて前記ケーシング
に第2の矢板を添設し、かつ該第2の矢板の一方
の曲成結合部を前記第1の矢板の一方の曲成結合
部に嵌合させた状態として、前記第2の縦穴の側
にアースオーガドリルにより第3の縦穴を掘削し
ながら前記第2の縦穴に第2の矢板を挿入すると
いう作業を第3、第4、…の矢板について繰返え
し行なうことにより、地中に埋め込まれた矢板列
を形成することを特徴とするものであり、矢板の
挿入は、既に穿設されている縦穴に対して行なわ
れるので、矢板の挿入抵抗が小さくなり、矢板の
打込み作業を能率良く行なうことができる。(Means for Solving the Problems) In view of the above problems, the present invention, when forming a row of sheet piles, first drills a first vertical hole corresponding to the width in the arrangement direction of the sheet piles using an earth auger drill, and then A first sheet pile is attached to a casing rotatably housing an earth auger drill, and while a second vertical hole is being drilled by the earth auger drill on the side of the first vertical hole, the earth auger drill is inserted into the casing into the first vertical hole. The attached first sheet pile is inserted, and then a second sheet pile is attached to the casing, and one bending joint part of the second sheet pile is connected to one bending joint part of the first sheet pile. While the third vertical hole is drilled on the side of the second vertical hole with an earth auger drill, the second sheet pile is inserted into the second vertical hole. , ... is characterized by forming a row of sheet piles embedded in the ground by repeatedly performing the sheet piles, and the sheet piles are inserted into vertical holes that have already been drilled. Therefore, the insertion resistance of the sheet pile is reduced, and the work of driving the sheet pile can be carried out efficiently.
(実施例)
第1図は本発明による工法の一実施例を示す工
程図であり、まずAに示すようにアースオーガド
リル1により矢板の配列方向の幅に相応する第1
の縦穴7aを掘削する。アースオーガドリル1
は、第2図に示すように、杭打機8のリーダ9に
沿つて昇降自在に装着されたドリル駆動装置10
に装着され、回転されるものであり、第2図およ
び第6図に示すように、下端部にはケーシング2
より突出した掘削用ヘツドドリル1cを有するも
のである。前述のように、ケーシング2は、アー
スオーガドリル1を回転自在に収容してなり、ド
リル駆動装置10の下部に取付けられるモータ1
1によつて回転される回転体12に着脱自在に結
合される。そして、アースドリル1をドリル駆動
装置10によつて回転させながらケーシング2と
共に徐々に下降させ、掘削した土砂は、ケーシン
グ2内を上昇させ、ケーシング2に設けた排土用
開口部2aより地上に排出するものである。(Example) Fig. 1 is a process diagram showing an embodiment of the construction method according to the present invention. First, as shown in A, an earth auger drill 1 is used to drill a first
A vertical hole 7a is excavated. Earth auger drill 1
As shown in FIG.
As shown in Figures 2 and 6, there is a casing 2 at the lower end.
It has a more protruding drilling head drill 1c. As mentioned above, the casing 2 rotatably houses the earth auger drill 1, and the motor 1 attached to the lower part of the drill drive device 10.
It is detachably connected to a rotary body 12 rotated by a rotor 1 . Then, the earth drill 1 is gradually lowered together with the casing 2 while being rotated by the drill drive device 10, and the excavated earth and sand are raised inside the casing 2 and are deposited on the ground through the earth removal opening 2a provided in the casing 2. It is something that is discharged.
第1の縦穴7aを掘削した後は、第1図Bに示
すように、ケーシング2に第1の矢板4Aを添設
し、前記第1の縦穴7aの側にアースオーガドリ
ル1により第2の縦穴7bを掘削しながら前記第
1の縦穴7aに前記ケーシング2に添設した第1
の矢板4Aを挿入する。 After drilling the first vertical hole 7a, as shown in FIG. 1B, the first sheet pile 4A is attached to the casing 2, and the second While drilling the vertical hole 7b, a first hole attached to the casing 2 is inserted into the first vertical hole 7a.
Insert the sheet pile 4A.
本実施例においては、ケーシング2の下端部側
面に矢板の両脇の曲成結合部4a,4bのいずれ
かに摺動自在に嵌合可能な対称形の結合部a,b
を有する嵌合片13を設け、矢板4Aの保持は、
矢板4Aの一方の曲成結合部4bの下端部に嵌合
片13の一方の結合部aを嵌合させ、矢板4Aの
上端部を第3図ないし第5図に示す把持装置15
により把持することにより行なつている。 In this embodiment, symmetrical joints a and b are provided on the side surface of the lower end of the casing 2 and can be slidably fitted into either of the curved joints 4a and 4b on both sides of the sheet pile.
The fitting piece 13 having the following is provided, and the holding of the sheet pile 4A is as follows.
One joint part a of the fitting piece 13 is fitted to the lower end part of one curved joint part 4b of the sheet pile 4A, and the upper end part of the sheet pile 4A is held by the gripping device 15 shown in FIGS. 3 to 5.
This is done by grasping the object with a hand.
ここで、本実施例の把持装置15を第3図ない
し第5図により説明しておく。17はケーシング
2に着脱自在にかつ回転自在にされる分割形バン
ドであり、該分割バンド17は、その上下に該バ
ンド17の位置決め用の分割バンド18,19を
着脱自在に固定して取付ける。該分割バンド17
には縦方向にガイド枠28を有し、把持装置15
の枠16には該ガイド枠28に摺動自在に嵌まる
摺動枠29を有し、上方の分割バンド18と前記
枠16との間に枠16を昇降させる油圧シリンダ
30を介装して油圧シリンダ31の伸縮により枠
16を昇降させることを可能とし、また、上部の
分割バンド18には油圧モータ33を取付け、そ
の出力歯車32を分割バンド17に取付けた歯車
31に噛合させ、油圧モータ33の作動によつて
限定範囲について枠16を回動させることが可能
となつている。また、枠16内にはバンド17の
接線方向に向けて2本のレール20を固設し、該
レール20に沿つて転動するローラ21を有する
可動枠22を、前記枠16の端面に取付けた油圧
シリンダ23のピストンロツド23aに連結し、
油圧シリンダ23の伸縮によつて枠16に沿つて
可動枠22が移動するように構成し、可動枠22
には枢着軸24を中心として油圧シリンダ26に
より開閉可能に鋏状のホルダー25を取付け(2
7はホルダー25の姿勢を垂直に保持する引張り
ばねである)、油圧シリンダ26を伸縮させるこ
とによつてホルダー25により矢板4の把持、解
放ができるように構成されている。 Here, the gripping device 15 of this embodiment will be explained with reference to FIGS. 3 to 5. Reference numeral 17 denotes a split band that is detachably and rotatably attached to the casing 2, and split bands 18 and 19 for positioning the band 17 are detachably fixed and attached above and below the split band 17. The divided band 17
has a guide frame 28 in the vertical direction, and the gripping device 15
The frame 16 has a sliding frame 29 that is slidably fitted into the guide frame 28, and a hydraulic cylinder 30 for raising and lowering the frame 16 is interposed between the upper split band 18 and the frame 16. The frame 16 can be moved up and down by expanding and contracting the hydraulic cylinder 31. A hydraulic motor 33 is attached to the upper split band 18, and its output gear 32 is meshed with the gear 31 attached to the split band 17. 33 makes it possible to rotate the frame 16 within a limited range. Furthermore, two rails 20 are fixed in the frame 16 in the tangential direction of the band 17, and a movable frame 22 having rollers 21 that roll along the rails 20 is attached to the end surface of the frame 16. connected to the piston rod 23a of the hydraulic cylinder 23,
The movable frame 22 is configured to move along the frame 16 by the expansion and contraction of the hydraulic cylinder 23.
A scissor-shaped holder 25 is attached (2
Reference numeral 7 designates a tension spring that holds the holder 25 vertically.) By expanding and contracting a hydraulic cylinder 26, the holder 25 can grip and release the sheet piles 4.
この把持装置15を利用して矢板4を把持する
場合は、まず油圧モータ33を作動させて枠16
を矢板4の打込み位置から退避させておき、矢板
4を杭打機8の補助吊り機構(図示せず)を利用
して吊り上げ、矢板4を降ろしながらケーシング
2の下端部の嵌合片13の結合部aに矢板4の曲
成結合部bを嵌合し、油圧モータ33を作動させ
て枠16が矢板4の上になるようにし、かつホル
ダー25が矢板4の真上に位置するように油圧シ
リンダ23を作動させ、次に油圧シリンダ30を
伸長させてホルダー25が矢板4を挟むことがで
きる位置に下降させ、油圧シリンダ26を伸長さ
せて矢板4をホルダー25により挟む。 When gripping the sheet pile 4 using this gripping device 15, first, the hydraulic motor 33 is activated and the frame 16 is
is evacuated from the driving position of the sheet pile 4, the sheet pile 4 is lifted using the auxiliary lifting mechanism (not shown) of the pile driver 8, and while lowering the sheet pile 4, the fitting piece 13 at the lower end of the casing 2 is removed. The curved joint part b of the sheet pile 4 is fitted into the joint part a, and the hydraulic motor 33 is operated so that the frame 16 is placed above the sheet pile 4 and the holder 25 is positioned directly above the sheet pile 4. The hydraulic cylinder 23 is operated, and then the hydraulic cylinder 30 is extended to lower the holder 25 to a position where the sheet pile 4 can be held between them, and the hydraulic cylinder 26 is extended to hold the sheet pile 4 between the holders 25.
また、本実施例においては、ケーシング2の下
端部に、前記ヘツドドリル1cのケーシング2か
らの突出幅と同様の突出幅の弧状をなす縦穴崩壊
防止板14を取付け、矢板4Aを第1の縦穴7a
に挿入し、かつドリル1によつて第2の穴7bを
掘削する際に該板14を第1の縦穴7aに挿入し
て既に掘削されている縦穴7aの崩壊を防止する
ようにしている。 Further, in this embodiment, a vertical hole collapse prevention plate 14 having an arc shape with a protruding width similar to the protruding width from the casing 2 of the head drill 1c is attached to the lower end of the casing 2, and the sheet pile 4A is inserted into the first vertical hole 7a.
When the second hole 7b is drilled by the drill 1, the plate 14 is inserted into the first vertical hole 7a to prevent the already drilled vertical hole 7a from collapsing.
このような作業によつて第1の縦穴7aに第1
の矢板4Aを打込んだ後は、前記ケーシング2お
よびドリル1を引抜き、第1図Cに示すように、
ケーシング2に第2の矢板4Bを前述した機構に
より添設し、かつ該第2の矢板4Bの一方の曲成
結合部4aを前記第1の矢板4Aの一方の曲成結
合部4bに嵌合させた状態として、前記第2の縦
穴7bの側にアースオーガドリル1により第3の
縦穴7cを掘削しながら前記第2の縦穴7bに第
2の矢板4Bを挿入するという作業を第3の矢板
4C、第4の矢板4D、…の矢板について繰返え
し行なう。これにより、地中に埋め込まれた矢板
列を形成する。 Through such work, a first hole is formed in the first vertical hole 7a.
After driving the sheet pile 4A, the casing 2 and drill 1 are pulled out, and as shown in FIG. 1C,
A second sheet pile 4B is attached to the casing 2 by the above-described mechanism, and one curved joint portion 4a of the second sheet pile 4B is fitted into one curved joint portion 4b of the first sheet pile 4A. In this state, while drilling a third vertical hole 7c on the side of the second vertical hole 7b with the earth auger drill 1, insert the second sheet pile 4B into the second vertical hole 7b. The process is repeated for sheet piles 4C, 4th sheet pile 4D, and so on. This forms a row of sheet piles embedded in the ground.
なお、本実施例のように、矢板4をホルダー2
5および嵌合片13により保持し、モータ11に
よつて矢板4の向きを制御して矢板4A,4B,
4C,…が整然と並ぶように打込み前に位置制御
を行なうことにより、アースオーガドリルを用い
た従来工法の欠点である矢板列の不揃いをなくす
ることができる。 Note that, as in this embodiment, the sheet piles 4 are held in the holder 2.
5 and a fitting piece 13, and the direction of the sheet pile 4 is controlled by the motor 11 to rotate the sheet piles 4A, 4B,
By controlling the position before driving so that the 4C, .
なお本発明を実施する場合、前記把持装置15
等はドリル駆動装置10側に取付けることもでき
る等、具体的な機械的構成は種々に変更しうるこ
とはいうまでもない。 Note that when carrying out the present invention, the gripping device 15
It goes without saying that the specific mechanical configuration can be changed in various ways, such as being able to be attached to the drill drive device 10 side.
(発明の効果)
以上述べたように、本発明によれば、既に掘削
されている縦穴に矢板を挿入することによつて矢
板の打込みが行なわれるので、矢板の挿入抵抗が
小さくなり、従来の約半分の時間で矢板の打込み
を行なうことができる。従つて、アースオーガ使
用の工法の難点であつた能率の問題を解消でき、
発生する騒音が小さいという長所を生かすことが
できる。(Effects of the Invention) As described above, according to the present invention, the sheet pile is driven by inserting the sheet pile into a vertical hole that has already been excavated, so the insertion resistance of the sheet pile is reduced, which is different from the conventional one. You can drive sheet piles in about half the time. Therefore, the problem of efficiency, which was a drawback of the construction method using earth augers, can be solved.
It is possible to take advantage of the advantage that the generated noise is small.
第1図A,B,Cは本発明による工法の一実施
例を示す平面図、第2図は本発明による工法の一
実施例を示す全体図、第3図は本実施において用
いられる矢板保持装置の一例を示す側面図、第4
図は該矢板保持装置を示す水平断面図、第5図は
該矢板保持装置のホルダーを示す縦断面図、第6
図は本実施例において用いるアースオーガドリル
およびケーシングの下端部を示す側面図、第7図
は従来工法を説明する平面図である。
Figure 1 A, B, and C are plan views showing an embodiment of the construction method according to the present invention, Figure 2 is an overall view showing an embodiment of the construction method according to the present invention, and Figure 3 is a sheet pile holder used in this implementation. Side view showing an example of the device, No. 4
The figure is a horizontal cross-sectional view showing the sheet pile holding device, FIG. 5 is a vertical cross-sectional view showing the holder of the sheet pile holding device, and FIG.
The figure is a side view showing the lower end of the earth auger drill and casing used in this embodiment, and FIG. 7 is a plan view illustrating the conventional construction method.
Claims (1)
るU字形矢板を地中に打込む場合、まずアースオ
ーガドリルにより矢板の配列方向の幅に相応する
第1の縦穴を掘削し、続いてアースオーガドリル
を回転自在に収容したケーシングに第1の矢板を
添設し、前記第1の縦穴の側にアースオーガドリ
ルにより第2の縦穴を掘削しながら前記第1の縦
穴に前記ケーシングに添設した第1の矢板を挿入
し、続いて前記ケーシングに第2の矢板を添設
し、かつ該第2の矢板の一方の曲成結合部を前記
第1の矢板の一方の曲成結合部に嵌合させた状態
として、前記第2の縦穴の側にアースオーガドリ
ルにより第3の縦穴を掘削しながら前記第2の縦
穴に第2の矢板を挿入するという作業を第3、第
4、…の矢板について繰返えし行なうことによ
り、地中に埋め込まれた矢板列を形成することを
特徴とするU字形矢板の打込み工法。1 When driving a U-shaped sheet pile into the ground that has curved joints on both sides that connect to other sheet piles, first use an earth auger drill to drill a first vertical hole corresponding to the width of the sheet pile in the direction in which the sheet piles are arranged, and then A first sheet pile is attached to a casing rotatably housing an earth auger drill, and while a second vertical hole is being drilled by the earth auger drill on the side of the first vertical hole, the earth auger drill is inserted into the casing into the first vertical hole. The attached first sheet pile is inserted, and then a second sheet pile is attached to the casing, and one bending joint part of the second sheet pile is connected to one bending joint part of the first sheet pile. While the third vertical hole is drilled on the side of the second vertical hole with an earth auger drill, the second sheet pile is inserted into the second vertical hole. A driving method for U-shaped sheet piles, characterized by forming rows of sheet piles embedded in the ground by repeatedly performing the driving on the sheet piles of ,....
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14413085A JPS626019A (en) | 1985-07-01 | 1985-07-01 | Driving work of u-shaped sheet pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14413085A JPS626019A (en) | 1985-07-01 | 1985-07-01 | Driving work of u-shaped sheet pile |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS626019A JPS626019A (en) | 1987-01-13 |
JPH0534450B2 true JPH0534450B2 (en) | 1993-05-24 |
Family
ID=15354901
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP14413085A Granted JPS626019A (en) | 1985-07-01 | 1985-07-01 | Driving work of u-shaped sheet pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS626019A (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62121228A (en) * | 1985-11-21 | 1987-06-02 | Toa Harbor Works Co Ltd | Executing method for work for sheet pile into rubble-mound layer |
JP7002888B2 (en) * | 2017-08-23 | 2022-01-20 | 株式会社技研製作所 | Steel sheet pile continuous wall construction method |
JPWO2019187438A1 (en) * | 2018-03-27 | 2021-03-18 | 有限会社 村上工業 | Sheet pile construction method, sheet pile construction equipment and holder |
-
1985
- 1985-07-01 JP JP14413085A patent/JPS626019A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS626019A (en) | 1987-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2077373B1 (en) | Extruding and expanding drill equipment and the drilling method thereof | |
US4526242A (en) | Drilling device | |
JPH0534450B2 (en) | ||
CA2210442C (en) | A cutter head, boring jig and device and process for sea bottom boring | |
JPS6135356B2 (en) | ||
JP4863343B2 (en) | Drilling device and press-fitting machine | |
JP2794447B2 (en) | Drilling rod pushing device of kelly bar type excavator | |
JP2006125000A (en) | Auxiliary equipment for penetration of cutting edge of caisson, and caisson construction method using it | |
JP3921299B2 (en) | Pile press-fitting device | |
JP7253455B2 (en) | Drilling rig and drilling method | |
JPH07139285A (en) | Drill | |
KR200366406Y1 (en) | Excavating Apparatus | |
JP2011140876A (en) | Drilling machine and press fitting machine | |
JP2002004280A (en) | High toque rotary press in auger | |
JP3947304B2 (en) | Drilling rig | |
JPH07301074A (en) | Method and equipment for improving auger excavation | |
JP3229488B2 (en) | Pile driver leader | |
JPH0526148Y2 (en) | ||
JPH066863B2 (en) | Deep rock drilling equipment | |
JP3794516B2 (en) | Drilling and sheath tube insertion method and apparatus for natural mountain | |
JPS6235750Y2 (en) | ||
JPH02236389A (en) | Drilling rod push device for kelly-bar type drilling machine | |
JPH10280852A (en) | Auger driving device | |
JPH07127060A (en) | Pile pressing-in machine and pile pressing-in and drawing-out construction method | |
JP2000204874A (en) | Excavator |