JPH05342220A JP14923592A JP14923592A JPH05342220A JP H05342220 A JPH05342220 A JP H05342220A JP 14923592 A JP14923592 A JP 14923592A JP 14923592 A JP14923592 A JP 14923592A JP H05342220 A JPH05342220 A JP H05342220A
Authority
JP
Japan
Prior art keywords
data
order
product number
unit
month
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP14923592A
Other languages
Japanese (ja)
Inventor
Masato Hamahashi
真人 浜橋
Kenji Sekoguchi
謙二 世古口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP14923592A priority Critical patent/JPH05342220A/en
Publication of JPH05342220A publication Critical patent/JPH05342220A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PURPOSE:To provide a process plan evaluating system which can quantatively evaluate a process plan by calculating the stock quantity and the sold-out rate of a product in term of cost. CONSTITUTION:This system is provided with a process plan preparing part 1 preparing manufacture schedule data, order reception predicting data and stock predicting data, a pattern storage part 4 assigning plural order reception predicting patterns by the unit of a month to each month within a prescribed period at every product number and storing it and a by-date/by-product-number order reception predicting part 3 assigning the order reception predicting quantity of optional product number and optional month to each day in accordance with the order reception predicting pattern assigned to a corresponding product number and a corresponding month. The system is also providing with a simulation part 5 simulating the stock quantity and the sold-out rate from order reception predicting data of the corresponding product number and the corresponding month assigned by date and manufacture schedule data of the corresponding product number and corresponding month, and a cost calculation part 6 calculating the stock quantity and the sold-out rate obtained by the simulation part 5 in term of the cost in accordance with a prescribed expression.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、前倒し生産方式によっ
て生産されている製品の在庫量と品切れ率との推移をシ
ミュレーションすることにより、最適な日々の生産計
画、工程計画の作成を可能とした工程計画評価システム
に関する。
BACKGROUND OF THE INVENTION The present invention makes it possible to create an optimal daily production plan and process plan by simulating changes in the inventory quantity and out-of-stock rate of products produced by the advanced production method. Process planning evaluation system.

【0002】[0002]

【従来の技術】出荷変動の大きい製品(例えば、春先に
よく出るが、夏以降はほとんど出ないといった季節製
品)を生産する場合、予め出荷計画を立て、出荷量の少
ない時期に前もって生産し在庫として管理しておくこと
により、製造装置の稼働率を高めようとする前倒し生産
方式が従来より行われている。
2. Description of the Related Art When a product with large fluctuations in shipment (for example, a seasonal product that often appears in early spring but rarely appears after summer) is planned in advance and produced in advance when the shipment volume is small, and inventories. In order to increase the operating rate of the manufacturing equipment, the accelerated production method has been used conventionally.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記し
た従来の前倒し生産方式では、当初の計画に基づいて以
後の生産を行うため、出荷実績が出荷計画に対して大き
くずれたり、また不測の事故等で製造装置を稼働させる
ことができなかった場合において、品切れや過剰在庫を
発生させてしまうといった問題があった。また、前倒し
生産方式において出荷量の増加等による品切れを回避し
ようとすると平均在庫量を多く設定しなければならず、
在庫管理上好ましくないといった問題もあった。
However, in the above-mentioned conventional advance production method, since the subsequent production is carried out based on the original plan, the shipping record is largely deviated from the shipping plan, and an unexpected accident or the like occurs. When the manufacturing equipment could not be operated in, there was a problem that out-of-stock and overstock were generated. In addition, in order to avoid out-of-stock due to an increase in shipping volume in the front-running production method, the average inventory quantity must be set large,
There was also a problem that it was not good for inventory management.

【0004】そこで、近時では、過剰在庫の削減やそれ
に伴う品切れ率の削減を達成するような計算ロジックに
より工程計画を自動立案するシステムが開発されてい
る。
Therefore, recently, there has been developed a system for automatically drafting a process plan by a calculation logic which achieves reduction of excess inventory and reduction of out-of-stock rate.

【0005】しかしながら、このような従来のシステム
により立案した工程計画においても、実際に工程割り付
けを行った結果は、機械制約や段取り替え制約等によ
り、理論通りの在庫量、品切れ率を必ずしも達成できる
とは限らなかった。
However, even in the process planning made by such a conventional system, the result of actual process allocation can always achieve the theoretical inventory amount and out-of-stock rate due to machine constraints, setup change constraints, and the like. Not necessarily.

【0006】本発明はかかる実情に鑑みてなされたもの
で、その目的は、立案した工程計画と受注予測とから在
庫量、品切れ率の推移を予測し、これを所定の計算式に
よりコスト換算することで、工程計画を定量的に評価す
ることのできる工程計画評価システムを提供することに
ある。
The present invention has been made in view of the above circumstances, and an object thereof is to predict changes in the stock amount and out-of-stock rate from a planned process plan and order forecast, and convert the cost into a predetermined calculation formula. Therefore, it is to provide a process plan evaluation system capable of quantitatively evaluating a process plan.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するた
め、本発明の工程計画評価システムは、前年度の生産実
績に基づく今年度の生産計画データ及び前年度の受注実
績に基づく今年度の受注予測データを作成するととも
に、前記生産計画データと前記受注予測データとから今
年度の在庫予測データを作成する工程計画作成部と、オ
ペレータによる入力操作により、前記工程計画作成部に
おいて作成された各データの修正を行う入力部と、月単
位の受注予測パターンを複数パターン用意するととも
に、これら受注予測パターンを、品番毎に所定期間内の
各月に割り当てて記憶するパターン記憶部と、前記工程
計画作成部により作成された任意の品番の任意の月の受
注予測量を、前記パターン記憶部に記憶された当該品番
の該当月に割り当てられた受注予測パターンに従って日
別に割り当てていく日別・品番別受注予測部と、この日
別・品番別受注予測部により割り当てられた当該品番の
当該月の受注予測データと前記工程計画作成部により作
成された当該品番の該当月の生産計画データとから在庫
量、品切れ率のシミュレーションを行うシミュレーショ
ン部と、このシミュレーション部により得られた在庫量
及び品切れ率を所定の計算式に従ってコスト換算するコ
スト換算部と、このコスト換算部により求められたコス
トを評価値として表示する表示部とを備えた構成とす
る。
[Means for Solving the Problems] In order to solve the above problems, the process plan evaluation system of the present invention uses the production plan data of the current year based on the production results of the previous year and the orders of the current year based on the order results of the previous year. A process plan creation section that creates forecast data and inventory forecast data for the current year from the production plan data and the order forecast data, and each data created in the process plan creation section by an operator's input operation. And an input section for correcting the order forecast pattern for each month, and a pattern storage section for allocating and storing the forecast order patterns for each product number in each month within a predetermined period, and the process plan creation. The forecasted quantity of orders for any month for any product number created by the department is assigned to the corresponding month for the product number stored in the pattern storage unit. It is created by the daily / part number-specific order forecasting section that allocates by day according to the order forecasting pattern, the order forecast data for the month of the part number assigned by this day / part number-specific order forecasting section, and the process plan creation section. A simulation unit that simulates the stock amount and out-of-stock rate from the production plan data for the relevant month of the relevant product number, and a cost conversion unit that converts the inventory amount and out-of-stock rate obtained by this simulation unit into costs according to a predetermined calculation formula. A display unit that displays the cost calculated by the cost conversion unit as an evaluation value.

【0008】[0008]

【作用】工程計画作成部では、前年度の生産実績に基づ
く今年度の生産計画データ及び前年度の受注実績に基づ
く今年度の受注予測データを作成するとともに、前記生
産計画データと前記受注予測データとから今年度の在庫
予測データを作成する。
[Operation] In the process plan preparation section, the production plan data of this year based on the production result of the previous year and the order forecast data of this year based on the order record of the previous year are produced, and the production plan data and the order forecast data are created. From this, inventory forecast data for this year will be created.

【0009】パターン記憶部には、月単位の受注予測パ
ターンを複数パターン用意するとともに、これら受注予
測パターンが、品番毎に所定期間(例えば上半期、下半
期等)内の各月に割り当てて記憶されている。受注予測
パターンは、各品番の各月の実際の受注パターンを参考
にしてオペレータにより複数種類が作成される。
In the pattern storage unit, a plurality of monthly order forecast patterns are prepared, and these order forecast patterns are stored for each product number by being assigned to each month within a predetermined period (for example, the first half and the second half). There is. A plurality of types of order forecast patterns are created by the operator with reference to the actual order patterns of each product number in each month.

【0010】日別・品番別受注予測部は、工程計画作成
部により作成された任意の品番の任意の月の受注予測量
を、パターン記憶部に記憶された当該品番の該当月に割
り当てられた受注予測パターンに従って日別に割り当て
ていく。例えば、品番Aの該当月の1日は5t分、2日
は7t分、3日は8t分・・・というように、各日別に
割り当てていく。
The daily-by-product / order-by-product-order order forecasting unit allocates the forecasted order quantity for the given product number for the given month, which is created by the process plan creation unit, to the relevant month of the product number stored in the pattern storage unit. Allocate by day according to the order forecast pattern. For example, 1st of the corresponding month of product number A is 5t, 2nd is 7t, 3rd is 8t, and so on.

【0011】シミュレーション部は、この日別・品番別
受注予測部により割り当てられた当該品番の該当月の受
注予測データと工程計画作成部により求められた当該品
番の該当月の生産計画データとから在庫量、品切れ率の
シミュレーションを行う。
[0011] The simulation section uses the order forecast data of the relevant month of the relevant product number assigned by the daily / product number order forecasting section and the production plan data of the relevant month of the relevant product number obtained by the process plan preparing section to make an inventory. Simulate the quantity and out-of-stock rate.

【0012】コスト換算部は、このシミュレーション部
により得られた在庫量及び品切れ率を所定の計算式に従
ってコスト換算し、その結果を評価値として表示部に表
示する。オペレータは、この表示部に表示された評価値
をみて、必要があれば入力部を操作し、工程計画作成部
で作成した工程計画の修正を行う。そして、再び上記処
理手順を経て表示部に表示された新たな評価値をみて、
再び工程計画の評価を行うことになる。
The cost conversion unit converts the inventory quantity and the out-of-stock rate obtained by the simulation unit into costs according to a predetermined calculation formula, and displays the result as an evaluation value on the display unit. The operator views the evaluation value displayed on the display unit, operates the input unit if necessary, and corrects the process plan created by the process plan creation unit. Then, again looking at the new evaluation value displayed on the display unit through the above processing procedure,
The process plan will be evaluated again.

【0013】[0013]

【実施例】以下、本発明の一実施例を図面を参照して説
明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.

【0014】図1は、本発明の工程計画評価システムの
電気的構成を示すブロック図である。
FIG. 1 is a block diagram showing the electrical construction of the process plan evaluation system of the present invention.

【0015】同図において、今年度の生産計画データ、
受注予測データ及び在庫予測データの作成を行う工程計
画作成部1には、作成された工程計画の修正を行うとと
もに、各種データの入力を行うデータ入力部2の出力が
導かれており、工程計画作成部1の出力は、日別・品番
別受注予測部3とシミュレーション部5とに導かれてい
る。また、日別・品番別受注予測部3には、パターン記
憶部4の出力が導かれている。そして、シミュレーショ
ン部5の出力は、コスト換算部6に導かれており、コス
ト換算部6の出力は、表示部7に導かれた構成となって
いる。
In the figure, the production plan data for this year,
The process plan creation unit 1 that creates the order forecast data and the inventory forecast data is guided to the output of the data input unit 2 that inputs the various data while correcting the created process plan. The output of the creating unit 1 is guided to the daily / part number-specific order forecasting unit 3 and the simulation unit 5. Further, the output of the pattern storage unit 4 is guided to the order forecasting unit 3 for each day / product number. The output of the simulation unit 5 is guided to the cost conversion unit 6, and the output of the cost conversion unit 6 is guided to the display unit 7.

【0016】パターン記憶部4には、複数パターン用意
された月単位の受注予測パターンが、品番毎に所定期間
内の各月に割り当てて記憶されている。本実施例では、
受注パターンとして図2に示す3つの受注予測パターン
が用意されているものとする。すなわち、Xパターンは
上旬と下旬にほぼ同じペースでの受注があり、中旬に受
注の無いいわゆる中だるみのパターンであり、Yパター
ンは上旬から中旬にかけて受注のペースが上がり、中旬
から下旬にかけて受注が減少するパターンであり、Zパ
ターンは上旬、中旬、上旬と徐々に受注が増加してゆく
パターンである。
In the pattern storage unit 4, a plurality of prepared monthly order forecast patterns are stored by being assigned to each month within a predetermined period for each product number. In this example,
It is assumed that three order forecast patterns shown in FIG. 2 are prepared as the order patterns. In other words, the X pattern is a so-called slack pattern in which there are orders at the same pace in the beginning and the end and there are no orders in the middle. The Z pattern is a pattern in which orders are gradually increased from early, mid, and early.

【0017】このような3つの受注予測パターンが各品
番の所定期間内の各月に割り当てられている。例えば、
図3に示すように品番Aについては、その上期、下期の
各月共にXパターンが割り当てられており、品番Bにつ
いては、その上期の各月にYパターンが、下期の各月に
Zパターンが割り当てられている。パターン記憶部4に
は、図3に示すような各品番毎に割り当てられた受注予
測パターンが記憶されている。ただし、図3では、上期
と下期に分けてパターン割り当てを行っているが、もち
ろん各月毎に細かくパターンの割り当てを行ってよいも
のである。
Such three order forecast patterns are assigned to each month within a predetermined period of each product number. For example,
As shown in FIG. 3, an X pattern is assigned to each of the first half and the second half of the product number A, and a Y pattern is assigned to each month of the first half of the product number B and a Z pattern is assigned to each month of the second half. It is assigned. The pattern storage unit 4 stores an order forecast pattern assigned to each product number as shown in FIG. However, in FIG. 3, the pattern allocation is divided into the first half and the second half, but of course, the pattern allocation may be finely made every month.

【0018】日別・品番別受注予測部3は、工程計画作
成部1により作成された任意の品番の任意の月の受注予
測量を、パターン記憶部4に記憶された当該品番の該当
月に割り当てられた受注予測パターンに従って日別に割
り当てていく。また、シミュレーション部5は、日別・
品番別受注予測部3により割り当てられた当該品番の該
当月の受注予測データと工程計画作成部1により求めら
れた当該品番の該当月の生産計画データとから在庫量、
品切れ率のシミュレーションを行う。
The day-by-day / part number-specific order forecasting unit 3 sets the forecast order quantity of the arbitrary item number created by the process plan creating unit 1 in the month corresponding to the item number stored in the pattern storage unit 4. Allocate by day according to the assigned order forecast pattern. In addition, the simulation unit 5
From the order forecast data of the relevant month of the relevant product number assigned by the product number order forecasting unit 3 and the production plan data of the relevant month of the relevant product number obtained by the process plan creation unit 1, the stock amount,
Simulate out-of-stock rate.

【0019】コスト換算部6は、シミュレーション部に
より得られた在庫量及び品切れ率を所定の計算式に従っ
てコスト換算する。表示部7は、コスト換算部6により
求められたコストを評価値として表示する。また、表示
部7は、シミュレーション部5においてシミュレーショ
ンされた在庫量、品切れ率の推移をグラフ表示するよう
になっている。
The cost conversion unit 6 converts the inventory quantity and the out-of-stock rate obtained by the simulation unit into costs according to a predetermined calculation formula. The display unit 7 displays the cost calculated by the cost conversion unit 6 as an evaluation value. Further, the display unit 7 is adapted to display the transition of the stock amount and the out-of-stock rate simulated by the simulation unit 5 in a graph.

【0020】工程計画作成部1は、前年度の生産実績に
基づく今年度の生産計画データ及び前年度の受注実績に
基づく今年度の受注予測データを作成するとともに、作
成した生産計画データと受注予測データとから、今年度
の在庫予測データを作成する。この工程計画作成部1の
構成及び各データの作成手順について、以下具体的に説
明する。
The process plan preparing section 1 prepares the production plan data of this year based on the production result of the previous year and the order forecast data of this year based on the order record of the previous year, and the produced production plan data and order forecast. Inventory data for this year is created from the data. The configuration of the process plan creation unit 1 and the procedure for creating each data will be specifically described below.

【0021】図9は、この工程計画作成部1のより具体
的な構成を示している。
FIG. 9 shows a more specific structure of the process plan creation unit 1.

【0022】この工程計画作成部1は、大別すると前年
度の受注実績に基づく今年度の受注予測データ及び今年
度の受注実績に基づく過去数か月間の受注実績データか
ら今後の受注予測を行う受注予測手段11と、前年度の
生産実績に基づく今年度の生産計画データ及び今年度の
生産実績に基づく過去数か月間の生産実績データから今
後の生産予測を行う生産予測手段12と、この生産予測
手段12によって予測した今後の生産予測の累積から受
注予測手段11によって予測した今後の受注予測の累積
を引くことによって今後の在庫予測を行う在庫予測手段
13とで構成されている。
When roughly classified, the process plan preparing unit 1 forecasts future orders from the order forecast data of this year based on the order achievements of the previous year and the order achievement data of the past several months based on the order achievements of this year. The order forecasting means 11, the production forecasting means 12 for forecasting future production from the production plan data of this year based on the production performance of the previous year and the production performance data for the past several months based on the production performance of this year, and this production The stock forecasting means 13 performs a stock forecast in the future by subtracting the cumulative future order forecast predicted by the order forecasting means 11 from the cumulative future production forecast predicted by the forecasting means 12.

【0023】受注予測手段11は、前年度の受注実績に
基づく今年度の受注予測データを品番毎に記憶する第1
の記憶部111と、今年度の受注実績データを品番毎に
記憶する第2の記憶部112と、受注予測データと受注
実績データとから係数を演算する係数演算部113と、
受注予測の処理を行う受注予測処理部114とで構成さ
れており、第1の記憶部111、第2の記憶部112及
び係数演算部113と受注予測処理部114とはそれぞ
れが双方向性の接続となっている。また、第2の記憶部
112には、1か月毎に品番毎の受注実績データが与え
られるようになっている。
The order forecasting means 11 stores the order forecast data for this year based on the order record of the previous year for each product number.
Storage unit 111, a second storage unit 112 that stores the actual order data for this year for each product number, a coefficient calculation unit 113 that calculates a coefficient from the predicted order data and the actual order data,
The order forecasting processing unit 114 that performs the order forecasting process is provided. The first storage unit 111, the second storage unit 112, the coefficient calculation unit 113, and the order forecasting processing unit 114 are bidirectional. It is connected. Further, the second storage unit 112 is provided with order record data for each product number every month.

【0024】生産予測手段12は、前年度の生産実績に
基づく今年度の生産計画データを品番毎に記憶する第3
の記憶部121と、今年度の生産実績データを品番毎に
記憶する第4の記憶部122と、生産計画データと生産
実績データとから係数を演算する係数演算部123と、
生産予測の処理を行う生産予測処理部124とで構成さ
れており、第3の記憶部121、第4の記憶部122及
び係数演算部123と生産予測処理部124とはそれぞ
れが双方向性の接続となっている。また、第4の記憶部
122には、1か月毎に品番毎の生産実績データが与え
られるようになっている。
The production predicting means 12 stores the production plan data of this year based on the production results of the previous year for each product number.
Storage unit 121, a fourth storage unit 122 that stores the production performance data of this year for each product number, a coefficient calculation unit 123 that calculates a coefficient from the production plan data and the production performance data,
The production prediction processing unit 124 that performs the production prediction process, and the third storage unit 121, the fourth storage unit 122, the coefficient calculation unit 123, and the production prediction processing unit 124 are bidirectional. It is connected. Further, the fourth storage unit 122 is provided with production performance data for each product number every month.

【0025】在庫予測手段13は、受注予測処理部11
4から与えられる今後の受注予測データを品番毎に記憶
する第5の記憶部131と、生産予測処理部124から
与えられる今後の生産予測データを品番毎に記憶する第
6の記憶部132と、これらの各データに基づいて今後
の在庫予測の処理を行う在庫予測処理部133とで構成
されており、第5の記憶部131及び第6の記憶部13
2と在庫予測処理部133とはそれぞれが双方向性の接
続となっている。また、在庫予測処理部133には、1
か月毎に品番毎の実在庫データが与えられるようになっ
ている。
The stock forecasting means 13 is an order forecasting processing section 11
A fifth storage unit 131 for storing the future order forecast data given from No. 4 for each product number; and a sixth storage unit 132 for storing the future production forecast data given by the production prediction processing unit 124 for each product number; It is composed of an inventory prediction processing unit 133 that performs future inventory prediction processing based on each of these data, and includes a fifth storage unit 131 and a sixth storage unit 13.
2 and the inventory prediction processing unit 133 are bidirectionally connected. In addition, the inventory prediction processing unit 133 has 1
Actual inventory data for each product number is given every month.

【0026】そして、在庫予測処理部133の出力は、
CRT等からなる表示部又はプリンタ等を備えた出力手
段14に導かれた構成となっている。
Then, the output of the inventory prediction processing unit 133 is
The configuration is such that it is led to the output means 14 provided with a display unit such as a CRT or a printer, or the like.

【0027】次に、上記構成の工程計画作成部1の動作
を、図10乃至図16に示す各データを参照して説明す
る。ただし、ここでは一つの品番(例えばC)のみにつ
いて説明を行うものとする。
Next, the operation of the process plan creation unit 1 having the above configuration will be described with reference to each data shown in FIGS. However, here, only one product number (for example, C) will be described.

【0028】受注予測手段11の第1の記憶部111に
は、図10に示す品番Cの今年度の受注予測データが記
憶されている。この受注予測データは、前年度の品番C
の受注実績に基づいて作成されている。すなわち、最も
簡単な場合には、前年度の品番Cの受注実績をそのまま
今年度の品番Cの受注予測データとする。ただし、前年
度の受注実績に何らかの条件(例えば、重み付けを行う
等)を付加して修正したものを今年度の受注予測データ
とすることも可能である。
The first storage unit 111 of the order forecasting means 11 stores the order forecast data for the current year of the product number C shown in FIG. This order forecast data is part number C of the previous year.
It is created based on the actual orders received. That is, in the simplest case, the order receipt data of the product number C of the previous year is used as it is as the order forecast data of the product number C of the current year. However, it is also possible to use the order forecast data of this year that is obtained by modifying the order record of the previous year by adding some condition (for example, weighting).

【0029】また、受注予測手段11の第2の記憶部1
12には、図11に示す今年度の現在までの品番Cの受
注実績データが記憶されている。また、第2の記憶部1
12には、1か月経過時にその経過月の品番Cの受注実
績データが与えられ、所定領域に順次書き込まれていく
ようになっている。ただし、本実施例では現在を9月と
している。
The second storage unit 1 of the order forecasting means 11
12, the order record data of the product number C up to the present year shown in FIG. 11 is stored. In addition, the second storage unit 1
12 is given the order record data of the product number C of the elapsed month when one month has passed, and sequentially written in a predetermined area. However, in this embodiment, the present is set to September.

【0030】受注予測処理部114では、第1の記憶部
111に記憶されている品番Cの受注予測データの中の
7月から9月までの3か月間のデータを読み出し、これ
を係数演算部113に出力する。また、第2の記憶部1
12に記憶されている品番Cの受注実績データの中の7
月から9月までの3か月間のデータを読み出し、これを
係数演算部113に出力する。
The order forecasting processor 114 reads out the data for three months from July to September in the order forecasting data of the product number C stored in the first memory 111, and uses it as a coefficient calculator. Output to 113. In addition, the second storage unit 1
7 in the order record data of product number C stored in 12
The data for three months from the month to September is read out and output to the coefficient calculation unit 113.

【0031】係数演算部113では、第1の記憶部11
1から読み出されたデータの合計(50+90+60=
200)と、第2の記憶部112から読み出されたデー
タの合計(50+125+75=250)とを求め、次
に250÷200の演算を行って係数(1.25)を求
める。
In the coefficient calculation unit 113, the first storage unit 11
Total of data read from 1 (50 + 90 + 60 =
200) and the total (50 + 125 + 75 = 250) of the data read from the second storage unit 112, and then the calculation of 250/200 is performed to obtain the coefficient (1.25).

【0032】次に受注予測処理部114は、第1の記憶
部111に記憶されている品番Cの受注予測データの中
の10月以降の各データを読み出し、このデータに係数
演算部13において求めた係数(1.25)を乗じて、
図12に示す10月以降の品番Cの新たな受注予測デー
タを求める。この新たな受注予測データは、在庫予測処
理部133に出力され、第5の記憶部131に記憶され
る。
Next, the order forecast processing unit 114 reads each data from October of the order forecast data of the product number C stored in the first storage unit 111, and obtains this data in the coefficient calculation unit 13. Multiplied by the coefficient (1.25)
New order forecast data for product number C after October shown in FIG. 12 is obtained. The new order forecast data is output to the inventory forecast processing unit 133 and stored in the fifth storage unit 131.

【0033】一方、生産予測手段12の第3の記憶部1
21には、図13に示す品番Cの今年度の生産計画デー
タが記憶されている。この生産計画データは、前年度の
品番Cの生産実績に基づいて作成されている。すなわ
ち、最も簡単な場合には、前年度の品番Cの生産実績を
そのまま今年度の品番Cの生産計画データとする。ただ
し、前年度の生産実績に何らかの条件(例えば、重み付
けを行う等)を付加して修正したものを今年度の生産計
画データとすることも可能である。
On the other hand, the third storage section 1 of the production predicting means 12
21 stores the production plan data of the product number C shown in FIG. 13 for this year. This production plan data is created based on the production record of the product number C in the previous year. That is, in the simplest case, the production record of the product number C of the previous year is directly used as the production plan data of the product number C of this year. However, it is also possible to use the production plan data for the current year by modifying the production performance of the previous year by adding some condition (for example, weighting).

【0034】また、生産予測手段12の第4の記憶部1
22には、図14に示す今年度の現在までの品番Cの生
産実績データが記憶されている。第4の記憶部122に
は、1か月経過時にその経過月の生産実績データが与え
られ、所定領域に順次書き込まれていくようになってい
る。ただし、本実施例では現在を9月としている。
The fourth storage section 1 of the production predicting means 12
22 stores the production performance data of the product number C up to the present year shown in FIG. The production result data of the elapsed month is given to the fourth storage unit 122 when one month has passed, and is sequentially written in a predetermined area. However, in this embodiment, the present is set to September.

【0035】生産予測処理部124では、第3の記憶部
121に記憶されている品番Cの生産計画データの中の
7月から9月までの3か月間のデータを読み出し、これ
を係数演算部123に出力する。また、第4の記憶部1
22に記憶されている品番Cの生産実績データの中の7
月から9月までの3か月間のデータを読み出し、これを
係数演算部123に出力する。
The production prediction processing unit 124 reads out the data for three months from July to September in the production plan data of the product number C stored in the third storage unit 121, and uses this as the coefficient calculation unit. Output to 123. In addition, the fourth storage unit 1
7 in the production performance data of product number C stored in No. 22
The data for the three months from the month to September are read and output to the coefficient calculation unit 123.

【0036】係数演算部123では、第3の記憶部12
1から読み出されたデータの合計(120+180+2
00=500)と、第4の記憶部122から読み出され
たデータの合計(120+150+130=400)と
を求め、次に400÷500の演算を行って係数(0.
8)を求める。
In the coefficient calculation unit 123, the third storage unit 12
Total of data read from 1 (120 + 180 + 2
00 = 500) and the total of the data read from the fourth storage unit 122 (120 + 150 + 130 = 400), and then 400/500 is calculated to obtain the coefficient (0.
8) is calculated.

【0037】次に生産予測処理部124は、第3の記憶
部121に記憶されている品番Cの生産計画データの中
の10月以降の各データを読み出し、このデータに係数
演算部123において求めた係数(0.8)を乗じて、
図15に示す10月以降の新たな品番Cの生産計画デー
タを求める。この新たな生産計画データは、在庫予測処
理部133に出力され、第6の記憶部132に記憶され
る。
Next, the production prediction processing unit 124 reads each data after October in the production plan data of the product number C stored in the third storage unit 121, and obtains this data in the coefficient calculation unit 123. Multiplied by the coefficient (0.8)
The production plan data for a new part number C after October shown in FIG. 15 is obtained. The new production planning data is output to the inventory prediction processing unit 133 and stored in the sixth storage unit 132.

【0038】在庫予測処理部133では、第5の記憶部
131に記憶された品番Cの受注予測データと第6の記
憶部132に記憶された品番Cの生産計画データとに基
づき、10月以降の品番Cの在庫予測を行うことにな
る。
Based on the order forecast data of the product number C stored in the fifth storage unit 131 and the production plan data of the product number C stored in the sixth storage unit 132, the inventory prediction processing unit 133 will start from October. The stock forecast of the product number C will be performed.

【0039】在庫予測処理部133には、9月末時点で
の品番Cの実在庫データが与えられている。9月末時点
での実在庫量は、図14に示す生産実績データの累積か
ら図11に示す受注実績データの累積を引くことによっ
て求めることができ、本実施例では210個である。た
だし、今年度の3月末時点での在庫を0としている。
The inventory prediction processing unit 133 is provided with the actual inventory data of the product number C as of the end of September. The actual inventory amount as of the end of September can be obtained by subtracting the accumulated order result data shown in FIG. 11 from the accumulated production result data shown in FIG. 14, and is 210 in this embodiment. However, the inventory at the end of March of this year is set to 0.

【0040】したがって、10月の在庫予測量は、Therefore, the inventory forecast for October is

【0041】[0041]

【数1】210(実在庫量)+120(生産予測)−2
00(出荷予測)=130個 となる。
[Equation 1] 210 (actual inventory amount) + 120 (production forecast) -2
00 (shipping forecast) = 130.

【0042】また、11月の在庫予測量は、The inventory forecast for November is as follows:

【0043】[0043]

【数2】130(在庫予測)+80(生産予測)−22
5(出荷予測)=−15個 となる。
[Equation 2] 130 (stock forecast) +80 (production forecast) -22
5 (shipping forecast) =-15.

【0044】以上のような演算を順次行うことによっ
て、図16に示す品番Cの在庫予測データを得ることが
できる。
By sequentially performing the above calculation, the stock forecast data of the product number C shown in FIG. 16 can be obtained.

【0045】この在庫予測データは、出力手段4に出力
されている。
This inventory forecast data is output to the output means 4.

【0046】また、在庫予測処理部133には、第1の
記憶部111に記憶されている前年度の品番Cの受注予
測データと第3の記憶部121に記憶されている前年度
の品番Cの生産計画データとが、それぞれ受注予測処理
部114及び生産予測処理部124を介して与えられて
いる。在庫予測処理部133では、前年度の生産計画デ
ータの累積から前年度の受注予測データの累積を引くこ
とにより、前年度の品番Cの在庫実績の推移を求めてお
り、この前年度の在庫実績データも出力手段14に出力
されている。
Further, the stock forecast processing unit 133 stores the forecast order data of the product number C of the previous year stored in the first storage unit 111 and the product number C of the previous year stored in the third storage unit 121. And the production plan data of the above are given via the order forecast processing unit 114 and the production forecast processing unit 124, respectively. The stock forecast processing unit 133 obtains the transition of the stock performance of the product number C of the previous year by subtracting the cumulative of the order forecast data of the previous year from the cumulative value of the production plan data of the previous year. The data is also output to the output means 14.

【0047】出力手段14は、例えばCRT等からなる
表示部を備えている場合には、そのCRT画面上に在庫
予測データと前年度の在庫実績データとをグラフ表示す
る。
When the output means 14 is equipped with a display section such as a CRT, the output means 14 graphically displays the inventory forecast data and the actual inventory data of the previous year on the CRT screen.

【0048】図17は、CRT画面上にグラフ表示され
た各データを示している。
FIG. 17 shows each data displayed as a graph on the CRT screen.

【0049】同図において、実線で示した折れ線グラフ
が前年度の在庫実績に基づく今年度の在庫計画データ、
破線で示す折れ線グラフが今年9月までの在庫実績デー
タ、この破線で示す折れ線グラフに続く1点鎖線で示す
折れ線グラフが上記在庫予測によって求めた10月以降
の在庫予測推移データである。
In the figure, the line graph shown by the solid line is the inventory plan data of this year based on the inventory performance of the previous year,
The line graph shown by the broken line is the actual inventory data until September of this year, and the line graph shown by the one-dot chain line following this line graph shown by the broken line is the stock forecast transition data after October obtained by the above stock forecast.

【0050】図16に示す在庫予測データ、及び図17
に示す在庫予測推移の折れ線グラフから明らかなよう
に、今年9月を現在とした過去3か月間のデータに基づ
いて10月以降の生産計画と受注予測とを修正したので
は、11月以降在庫がマイナスに転じることが判る。こ
れにより、生産を増やすような生産計画の修正が行え
る。
Inventory prediction data shown in FIG. 16 and FIG.
As can be seen from the line graph of the inventory forecast change shown in, the production plan and order forecast for October and later are revised based on the data for the past three months, with September as the present. It turns out that is turned negative. As a result, it is possible to modify the production plan so as to increase the production.

【0051】ここで、在庫がマイナスとなることを回避
する1つの方法として、実線で示した前年度の在庫実績
データの10月以降の在庫推移がそのまま今年度の10
月以降の在庫推移となるように平行移動させて生産計画
を修正する方法が考えられる。この修正後の在庫予測推
移データを2点鎖線で示す。このような在庫推移データ
の修正は、CRT画面上において適宜行うことができ
る。
Here, as one method for avoiding a negative inventory, the inventory transition data from October of the previous year's inventory actual data indicated by the solid line is the same as that of this year's 10.
A possible method is to move the items in parallel so that the inventory changes after the month and modify the production plan. The inventory forecast transition data after this correction is shown by a two-dot chain line. Such correction of inventory transition data can be appropriately performed on the CRT screen.

【0052】なお、この工程計画作成部1は、生産予測
と受注予測の両方を今後の在庫予測に利用しているが、
生産予測は計画通りとし、受注予測のみを利用するよう
にしてもよい。また、現在から過去3か月間のデータに
基づいて生産予測及び受注予測を行っているが、過去に
さかのぼる月数は3か月に限定されるものではない。
Although the process plan preparing section 1 uses both the production forecast and the order forecast for future inventory forecast,
The production forecast may be as planned, and only the order forecast may be used. Further, although the production forecast and the order forecast are made based on the data for the past three months from the present, the number of months going back to the past is not limited to three months.

【0053】次に、このようにして工程計画作成部1に
おいて作成された品番別の工程計画データ(生産計画デ
ータ)と、品番別の在庫データとを日別・品番別受注予
測部3に与えることにより、日別品番別受注予測量の算
出を行う。
Next, the process plan data for each product number (production plan data) created by the process plan creating unit 1 and the inventory data for each product number are given to the order forecasting unit 3 for each day / product number. By doing so, the forecasted order quantity for each product number by day is calculated.

【0054】例えば、日別・品番別受注予測部3に、図
6に示す任意の月(具体的には、当月が9月であれば1
0月)の品番別の受注予測データが工程計画作成部1か
ら与えられる。日別・品番別受注予測部3では、この受
注予測データ(A:100、B:50)を、パターン記
憶部4に記憶されている図3に示す品番別受注パターン
(該当月が10月であれば各品番の下期の受注パター
ン)に従って日別に割り当ててゆくことにより、該当月
の品番別、日別の受注予測を算出する。この算出結果の
一例を図7に示す。
For example, the order forecasting section 3 for each day / part number is provided with an arbitrary month shown in FIG. 6 (specifically, 1 if the current month is September).
Order forecast data for each product number (for October) is given from the process plan creation unit 1. The order forecasting section 3 by day / product number stores this order forecasting data (A: 100, B: 50) in the pattern storing section 4 as shown in FIG. If so, the order forecast is calculated for each product number and day in the relevant month by allocating by day according to the order pattern in the second half of each product number. An example of this calculation result is shown in FIG.

【0055】図7では、品番Aは該当月の1日に5t
分、2日に7t分、3日に8t分…31日に7t分の受
注を割り当てており、品番Bは該当月の1日に2t分、
2日に2t分、3日に2t分…31日に3t分の受注を
割り当てている。
In FIG. 7, the product number A is 5t on the first day of the relevant month.
Minutes, 7th on 2nd, 8t on 3rd ... 7t on 31st, and part number B is 2t on 1st of the relevant month.
Orders for 2t on 2nd, 2t on 3rd ... 3t on 31st are allocated.

【0056】このようにして割り当てた受注予測データ
は、シミュレーション部に与えられる。また、シミュレ
ーション部5には、図4に示す該当月の品番別工程計画
データと、図5に示す該当月の品番別在庫データとが与
えられたとする。
The order forecast data thus assigned is given to the simulation section. Further, it is assumed that the simulation unit 5 is provided with the process plan data for each product number shown in FIG. 4 and the inventory data for each product number shown in FIG.

【0057】シミュレーション部5は、これらのデータ
に基づいて全品番又は指定品番の在庫、品切れシミュレ
ーションを行う。
The simulation section 5 carries out a stock or out-of-stock simulation of all product numbers or designated product numbers based on these data.

【0058】図8は、このようにしてシミュレーション
した例えば品番Aの在庫及び品切れ率の推移を該当月に
ついて表したものである。図8に示す推移では、18日
から20日にかけて品切れが発生している。
FIG. 8 shows changes in the stock and out-of-stock rate of, for example, the product number A simulated in this way for the corresponding month. In the transition shown in FIG. 8, the product is out of stock from 18th to 20th.

【0059】このような在庫及び品切れ率の推移データ
は、コスト換算部6に与えられるとともに、表示部7に
与えられてグラフ表示される。
Such transition data of the stock and the out-of-stock rate are given to the cost conversion section 6 and the display section 7 and displayed in a graph.

【0060】コスト換算部6では、この在庫及び品切れ
率の推移データに基づき、在庫保持によるコスト及び品
切れによる売上機会損失コストを計算し、集計して、そ
の工程計画の評価値とする。
On the basis of the transition data of the inventory and the out-of-stock rate, the cost conversion unit 6 calculates the cost of holding the inventory and the cost of loss of sales opportunity due to the out-of-stock, and sums them to obtain the evaluation value of the process plan.

【0061】ここで、在庫保持によるコストは、売値の
20%として、次式を用いて計算を行う。
Here, the cost for holding the inventory is calculated by using the following equation, assuming that the cost is 20% of the selling price.

【0062】[0062]

【数3】1日の在庫コスト=該当品番の1個当たりの売
値×0.2×在庫個数 上式により求めた1日の在庫コストを該当月にわたって
加算することにより、該当月の総在庫コストが得られ
る。
[Equation 3] Daily inventory cost = Selling price per piece of the relevant product number x 0.2 x Number of stocks By adding the daily inventory cost obtained by the above formula over the relevant month, the total inventory cost for the relevant month Is obtained.

【0063】一方、品切れによる売上機会損失コスト
は、品切れ量の1割として、次式を用いて計算を行う
On the other hand, the sales opportunity loss cost due to out of stock is calculated using the following equation, assuming 10% of the out of stock quantity.

【0064】[0064]

【数4】1日の売上機会損失コスト=該当品番の1個当
たりの売値×品切れ量 上式により求めた1日の売上機会損失コストを品切れの
発生した日分だけ加算することにより、該当月の総売上
機会損失コストが得られる。
[Equation 4] Daily lost opportunity cost = Selling price per item of the relevant product number x Out-of-stock amount By adding the daily lost opportunity cost calculated by the above formula for the days when the out-of-stock occurred, the corresponding month The total cost of lost sales is obtained.

【0065】コスト換算部6では、このようにして求め
た総在庫コストと総売上機会損失コストとをさらに加算
して、該当する品番の最終的な評価値とする。
The cost conversion unit 6 further adds the total inventory cost and the total sales opportunity loss cost obtained in this way to obtain the final evaluation value of the corresponding product number.

【0066】また、コスト換算部6では、上記のような
コスト換算処理を全品番について行い、その総合計を工
程計画の最終的な評価値とする。すなわち、その工程計
画の評価値が金額に換算されたことになる。
Further, the cost conversion unit 6 performs the above-described cost conversion processing for all product numbers, and sets the total sum as the final evaluation value of the process plan. That is, the evaluation value of the process plan is converted into the amount of money.

【0067】このようにして求められた評価値は表示部
7に表示されるので、これを見たオペレータがその工程
計画は不十分であり、修正の必要があると判断したとき
には、データ入力部2を操作して、工程計画作成部1に
おいて作成された生産計画データ(工程計画データ)の
修正を行う。また、修正の必要がないときには、その工
程計画データを最適なものとして評価する。
Since the evaluation value thus obtained is displayed on the display unit 7, when the operator who sees this evaluation determines that the process plan is insufficient and correction is necessary, the data input unit 2 is operated to correct the production plan data (process plan data) created by the process plan creation unit 1. When there is no need for correction, the process plan data is evaluated as optimal.

【0068】[0068]

【発明の効果】本発明の工程計画評価システムは、従来
人手によって行っていた工程計画の評価を、在庫量、品
切れ率の面からグラフ表示するとともに、これらをコス
ト換算した値を評価値として使用するように構成したの
で、その作成された工程計画を評価する側の経験の有無
に係わりなく、常に定量的な評価を行うことができると
いった効果を奏する。
EFFECT OF THE INVENTION The process plan evaluation system of the present invention graphically displays the process plan evaluation, which was conventionally performed manually, in terms of the stock amount and the out-of-stock rate, and uses these values converted into costs as evaluation values. Since it is configured to do so, there is an effect that the created process plan can always be quantitatively evaluated regardless of the experience of the side evaluating the process plan.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の工程計画評価システムの電気的構成を
示すブロック図である。
FIG. 1 is a block diagram showing an electrical configuration of a process plan evaluation system of the present invention.

【図2】基本となる受注パターンの一例を示す図であ
る。
FIG. 2 is a diagram showing an example of a basic order receiving pattern.

【図3】品番別の受注パターンの一例を示す図である。FIG. 3 is a diagram showing an example of an ordering pattern for each product number.

【図4】工程計画作成部において作成された品番別工程
計画の一例を示す図である。
FIG. 4 is a diagram showing an example of a product number-specific process plan created by a process plan creation unit.

【図5】工程計画作成部において作成された品番別在庫
データの一例を示す図である。
FIG. 5 is a diagram illustrating an example of product number-specific inventory data created by a process plan creation unit.

【図6】任意の月の受注予測データの一例を示す図であ
る。
FIG. 6 is a diagram showing an example of order forecast data for an arbitrary month.

【図7】日別・品番別受注予測部により算出された日別
品番別受注予測データの一例を示す図である。
FIG. 7 is a diagram showing an example of daily order forecast data by product number calculated by a daily order / part number order forecasting unit.

【図8】シミュレーション部における在庫及び品切れ率
の推移データをグラフ表示した図である。
FIG. 8 is a graph showing transition data of stock and out-of-stock rate in the simulation unit.

【図9】工程計画作成部のより具体的な電気的構成を示
すブロック図である。
FIG. 9 is a block diagram showing a more specific electrical configuration of a process plan creation unit.

【図10】前年度の受注実績に基づく今年度の受注予測
データを示す図である。
FIG. 10 is a diagram showing order forecast data of this year based on the order receipt of the previous year.

【図11】今年度の9月までの受注実績データを示す図
である。
FIG. 11 is a diagram showing order result data up to September of this year.

【図12】10月以降の新たな受注予測データを示す図
である。
FIG. 12 is a diagram showing new order forecast data for October and thereafter.

【図13】前年度の生産実績データに基づく今年度の生
産計画データを示す図である。
FIG. 13 is a diagram showing production plan data for this year based on production performance data for the previous year.

【図14】今年度の9月までの生産実績データを示す図
である。
FIG. 14 is a diagram showing production performance data up to September of this year.

【図15】10月以降の新たな生産計画データを示す図
である。
FIG. 15 is a diagram showing new production planning data for October and thereafter.

【図16】今年度10月以降の在庫予測データを示す図
である。
FIG. 16 is a diagram showing inventory forecast data for October of this year onward.

【図17】在庫推移を示すグラフである。FIG. 17 is a graph showing changes in inventory.

【符号の説明】[Explanation of symbols]

1 工程計画作成部 2 データ入力部 3 日別・品番別受注予測部 4 パターン記憶部 5 シミュレーション部 6 コスト換算部 7 表示部 1 Process planning part 2 Data input part 3 Daily / part number order forecast part 4 Pattern storage part 5 Simulation part 6 Cost conversion part 7 Display part

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 前年度の生産実績に基づく今年度の生産
計画データ及び前年度の受注実績に基づく今年度の受注
予測データを作成するとともに、前記生産計画データと
前記受注予測データとから今年度の在庫予測データを作
成する工程計画作成部と、 オペレータによる入力操作により、前記工程計画作成部
において作成された各データの修正を行う入力部と、 月単位の受注予測パターンを複数パターン用意するとと
もに、これら受注予測パターンを、品番毎に所定期間内
の各月に割り当てて記憶するパターン記憶部と、 前記工程計画作成部により作成された任意の品番の任意
の月の受注予測量を、前記パターン記憶部に記憶された
当該品番の該当月に割り当てられた受注予測パターンに
従って日別に割り当てていく日別・品番別受注予測部
と、 この日別・品番別受注予測部により割り当てられた当該
品番の当該月の受注予測データと前記工程計画作成部に
より作成された当該品番の該当月の生産計画データとか
ら在庫量、品切れ率のシミュレーションを行うシミュレ
ーション部と、 このシミュレーション部により得られた在庫量及び品切
れ率を所定の計算式に従ってコスト換算するコスト換算
部と、 このコスト換算部により求められたコストを評価値とし
て表示する表示部とを備えたことを特徴とする工程計画
評価システム。
[Claim 1] Production plan data for the current year based on the production results for the previous year and order forecast data for the current year based on the order results for the previous year are created, and the production plan data and the order forecast data are used for the current year. In addition to preparing a process plan creation unit that creates inventory forecast data, an input unit that corrects each data created in the process plan creation unit by an operator's input operation, and multiple monthly order forecast patterns. , A pattern storage unit for allocating and storing each of these order forecast patterns to each month within a predetermined period for each product number, and an order forecast amount for any month of an arbitrary product number created by the process plan creation unit, the pattern An order forecasting section for each day / part number that is assigned by day according to the order forecast pattern assigned to the relevant month of the relevant part number stored in the storage section , The stock quantity and out-of-stock rate are calculated from the order forecast data for the relevant month of the relevant product number assigned by this daily / product number order forecasting unit and the production plan data for the relevant month of the relevant product number created by the process plan creation unit. A simulation unit that performs a simulation, a cost conversion unit that converts the inventory amount and the out-of-stock rate obtained by this simulation unit into costs according to a predetermined calculation formula, and a display unit that displays the cost obtained by this cost conversion unit as an evaluation value. And a process plan evaluation system characterized by including.
JP14923592A 1992-06-09 1992-06-09 Process plan evaluating system Pending JPH05342220A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14923592A JPH05342220A (en) 1992-06-09 1992-06-09 Process plan evaluating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14923592A JPH05342220A (en) 1992-06-09 1992-06-09 Process plan evaluating system

Publications (1)

Publication Number Publication Date
JPH05342220A true JPH05342220A (en) 1993-12-24

Family

ID=15470836

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14923592A Pending JPH05342220A (en) 1992-06-09 1992-06-09 Process plan evaluating system

Country Status (1)

Country Link
JP (1) JPH05342220A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6226561B1 (en) * 1997-06-20 2001-05-01 Hitachi, Ltd. Production planning system
JP2007323680A (en) * 2007-09-10 2007-12-13 Hitachi Ltd Management decision support system
WO2016203879A1 (en) * 2015-06-16 2016-12-22 株式会社日立製作所 Forecast calculation device and forecast calculation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6226561B1 (en) * 1997-06-20 2001-05-01 Hitachi, Ltd. Production planning system
JP2007323680A (en) * 2007-09-10 2007-12-13 Hitachi Ltd Management decision support system
WO2016203879A1 (en) * 2015-06-16 2016-12-22 株式会社日立製作所 Forecast calculation device and forecast calculation method

Similar Documents

Publication Publication Date Title
US7933793B2 (en) Constraint-based production planning and scheduling
JP2000511118A (en) Method and apparatus for identifying and obtaining bottleneck cost information
KR20010053593A (en) Computer-implemented value management tool for an asset intensive manufacturer
Malik et al. Impact of ABC information on product mix and costing decisions
Tavaghof-Gigloo et al. Planning approaches for stochastic capacitated lot-sizing with service level constraints
US7925365B2 (en) Rough-cut capacity planning with production constraints and dynamic bottleneck considerations
JP2002504726A (en) Process control method and system
JP4754894B2 (en) Production plan creation method, production plan creation device, and program
JPH05342220A (en) Process plan evaluating system
Badri A simulation model for multi-product inventory control management
JPH0973491A (en) Component inventory planning support system
JP2013122733A (en) Production planning program and production planning device
JP3976640B2 (en) Information processing apparatus, information processing method, and program
US20060009989A1 (en) Method, apparatus, data structure and system for scheduling work consistent with an entity's strategic objectives
JPH08147358A (en) Device for preparing order plan of raw material
Spencer Economic theory, cost accounting and theory of constraints: an examination of relationships and problems
JP2000132619A (en) Supply chain evaluation system
JP2006331459A (en) Integrated management method for production, sales and distribution
JP2004013295A (en) Supply chain evaluation support system and method for constructing it
McGee et al. Periodic production scheduling at a fastener manufacturer
Jaggi et al. Periodic inventory model with unstable lead-time and setup cost with backorder discount
Meybodi Integrating production activity control into a hierarchicalproduction‐planning model
JP3976641B2 (en) Information processing apparatus, information processing method, and program
Dawood Developing a production management modelling approach for precast concrete building products
JP2006244470A (en) Delivery date reply system, delivery date reply method, and delivery date reply program