JPH05338810A - Stacker reclaimer used in bulk storage place - Google Patents

Stacker reclaimer used in bulk storage place

Info

Publication number
JPH05338810A
JPH05338810A JP17019992A JP17019992A JPH05338810A JP H05338810 A JPH05338810 A JP H05338810A JP 17019992 A JP17019992 A JP 17019992A JP 17019992 A JP17019992 A JP 17019992A JP H05338810 A JPH05338810 A JP H05338810A
Authority
JP
Japan
Prior art keywords
girder
elevator
belt conveyor
bucket
tripper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17019992A
Other languages
Japanese (ja)
Other versions
JP2971668B2 (en
Inventor
Takeyoshi Nakao
武義 中尾
Yoshio Kada
芳夫 嘉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Ltd
Original Assignee
Sumitomo Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Ltd filed Critical Sumitomo Heavy Industries Ltd
Priority to JP4170199A priority Critical patent/JP2971668B2/en
Publication of JPH05338810A publication Critical patent/JPH05338810A/en
Application granted granted Critical
Publication of JP2971668B2 publication Critical patent/JP2971668B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

PURPOSE:To achieve the cost reduction by simplifying a stacker reclaimer. CONSTITUTION:A girder 6 is arranged across a bulk storage place having walls 1, 2, and an elevator truck 13 and a tripper truck 36 are transversely traveled on this girder 6. A bucket elevator 10 is suspended from this elevator truck 13, and a belt conveyor 43 to receive the bulk cargo delivered from this bucket elevator 10 is provided along the girder 6. A head pulley 37 of this belt conveyor 43 is mounted on the tripper truck 36 to constitute this belt conveyor 43 to be a shuttle conveyor, leading to common use of the girder 6, and common use of the belt conveyor 43 in loading and delivering. Thus, the whole stacker reclaimer is simplified and the cost is reduced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ばら物貯蔵場に用いる
スタッカリクレ−マに関し、詳しくは、トリッパ式スタ
ッカとバケットエレベ−タ式リクレ−マとを組合せて、
一つの橋形ガ−ダに取付けたスタッカリクレ−マに関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a stacker reclaimer used in a bulk storage, and more specifically, a combination of a tripper type stacker and a bucket elevator type reclaimer,
The present invention relates to a stacker reclaimer attached to one bridge-type girder.

【0002】[0002]

【従来の技術とその課題】一般に、ベルトコンベアで送
られてきた、石炭や鉱石等のばら物を貯蔵場に積付ける
装置をスタッカと称し、貯蔵場に積付けられたばら物を
掻取ってベルトコンベアに払出す装置をリクレ−マと称
している。そして、一つの装置で、積付けと払出しを行
なう装置をスタッカリクレ−マと称している(例えば、
実公昭44−3774号公報、実公昭48−13581
号公報、特公昭48−632号公報、特公平2−785
1号公報等参照)。
2. Description of the Related Art Generally, a stacker is a device for stacking bulk materials such as coal and ore sent by a belt conveyor into a storage space. The stacker is used to scrape the bulk materials stored in the storage space. The device that dispenses to the belt conveyor is called a reclaimer. Then, a device for stacking and paying out with one device is called a stacker reclaimer (for example,
JP-B-44-3774, JP-B-48-13581
Japanese Patent Publication, Japanese Patent Publication No. 48-632, Japanese Patent Publication No. 2-785.
No. 1, etc.).

【0003】そして、かかる公報に示されたスタッカリ
クレ−マはいずれも、ブ−ムの先端にバケットホイルを
設け、このブ−ムをスタッカリクレ−マ本体(ポ−タ
ル)に俯仰可能に支持し、このポ−タルをクレ−ン本体
に取付けると共に、地上コンベアを斜め上方に持上げ
て、この地上コンベアのばら物を前記クレ−ン本体のシ
ュ−トに払い出すトリッパを設け,これらのクレ−ン本
体とトリッパとを同一のレ−ル上で走行させるようにし
ている。
All of the stacker reclaimers disclosed in these publications are provided with bucket wheels at the tips of the booms, and the booms are supported on the stacker reclaimer body (portal) so that they can be lifted up. Along with mounting this portal on the crane body, a tripper for lifting the ground conveyor obliquely upward and discharging the loose material of the ground conveyor to the shoot of the crane body is provided. The main body and the tripper are run on the same rail.

【0004】一方、ばら物貯蔵場の一種に、図7に示す
ような貯蔵場が知られている。同図において、前部に低
い前よう壁1が、後部に高い後よう壁2がそれぞれ立設
され、これらのよう壁1,2に直交して複数の隔壁3が
立設されている。そして、これらの壁1,2,3で囲ま
れた所に、それぞれ種類を異にするばら物を貯蔵してそ
れぞれが混ざり合うのを防止している。
On the other hand, as one type of bulk storage, a storage shown in FIG. 7 is known. In the figure, a low front wall 1 is erected at the front part, and a high rear wall 2 is erected at the rear part, and a plurality of partition walls 3 are erected orthogonally to the walls 1 and 2. Then, in the place surrounded by these walls 1, 2 and 3, the different kinds of bulk materials are stored to prevent them from being mixed with each other.

【0005】かかる貯蔵場に、例えば、前記公報で示さ
れたスタッカリクレ−マを設置した場合、後よう壁2側
のばら物は比較的容易に払い出すことが可能であるが、
前よう壁1側のばら物は容易に払い出すことができな
い。それは、後よう壁2側のばら物を払い出すために、
バケットホイルを支持するブ−ムを長く形成して後よう
壁2近傍まで伸ばす必要上、クレ−ン本体の近傍にある
前よう壁1側のばら物を払い出す場合には、ブ−ムを走
行レ−ルと略平行になる程度まで旋回させることとな
り、その場合、前よう壁1に直交した隔壁3が邪魔にな
り、前よう壁1側のばら物を容易に払い出すことができ
なくなる。
[0005] For example, when the stacker reclaimer disclosed in the above publication is installed in such a storage space, the loose material on the rear wall 2 side can be discharged relatively easily.
The loose material on the front wall 1 side cannot be easily dispensed. That is, in order to pay out the loose material on the wall 2 side,
Since it is necessary to form a long boom for supporting the bucket wheel and extend it to the vicinity of the rear wall 2, when the loose material on the front wall 1 side near the crane body is discharged, the boom is It is turned to the extent that it is substantially parallel to the traveling rail, in which case the partition wall 3 orthogonal to the front wall 1 becomes an obstacle, and the loose material on the front wall 1 side cannot be easily discharged. ..

【0006】したがって、かかるスタッカリクレ−マに
はこのような問題があり、更に、バケットのホイル径が
大きいため、貯蔵場の隅部に残ったばら物を確実に払い
出すことができない、という問題があった。
Therefore, such a stacker creamer has such a problem, and further, since the wheel diameter of the bucket is large, it is impossible to reliably discharge the loose material remaining in the corner of the storage area. there were.

【0007】本発明は、従来の技術の有するこのような
問題点に鑑みてなされたものであり、その目的とすると
ころは、壁を有するばら物貯蔵場内のばら物を確実に払
い出すことができ、しかも、スタッカとリクレ−マを同
一の橋形ガ−ダに横行可能に設けて、構造が簡単で安価
なスタッカリクレ−マを提供しようとするものである。
The present invention has been made in view of the above problems of the prior art, and an object of the present invention is to reliably dispose of bulk material in a bulk material storage area having a wall. In addition, a stacker and a reclaimer are provided in the same bridge-shaped girder so as to be traversable, and a stacker reclaimer having a simple structure and a low cost is provided.

【0008】[0008]

【課題を解決するための手段】かかる目的を達するため
の本発明の要旨は、壁を有するばら物貯蔵場に沿って平
行なレ−ルを敷設し、該レ−ルにガ−ダを走行可能に設
け、該ガ−ダに、ガ−ダ走行方向と直交して横行するエ
レベ−タ台車とトリッパ台車とを並設し、前記エレベ−
タ台車にエレベ−タフレ−ムを設け、該エレベ−タフレ
−ムのガ−ダ近傍に、下端が貯蔵場の床近くになるよう
な平行リンクを枢着し、該平行リンクの下端に連結リン
クを介して前、後方のスプロケットを設け、これらの
前、後方スプロケットと前記エレベ−タフレ−ムに設け
た上方スプロケットとに、バケットを有する無端チェ−
ンをL字状に装着すると共に、前記平行リンクを俯仰さ
せる俯仰装置を設け、前記ガ−ダの長手方向に沿って、
前記バケットで掻き取られたばら物を払い出すガ−ダ側
搬出入用ベルトコンベアを設け、該ガ−ダ側搬出入用ベ
ルトコンベアのヘッドプ−リを前記トリッパ台車に設け
て、ガ−ダ側搬出入用ベルトコンベアをシヤットルコン
ベアに形成して積付けを行うようにしたことを特徴とす
るばら物貯蔵場に用いるスタッカリクレ−マにある。
SUMMARY OF THE INVENTION In order to achieve the above object, the gist of the present invention is to lay parallel rails along a bulk storage having a wall and run a girder on the rails. A lifter carriage and a tripper carriage, which are provided so that they can traverse in a direction orthogonal to the direction of travel of the guarder, are arranged side by side in the girder.
An elevator frame is provided on the trolley and a parallel link is pivotally mounted near the girder of the elevator frame so that the lower end is near the floor of the storage area. The lower end of the parallel link is a connecting link. Front and rear sprockets are provided through the endless chain having buckets on the front and rear sprockets and the upper sprocket provided on the elevator frame.
And an elevating device for elevating the parallel link, and is installed along the longitudinal direction of the girder.
A girder-side loading / unloading belt conveyor for discharging the loose material scraped by the bucket is provided, and a head pulley of the girder-side loading / unloading belt conveyor is provided on the tripper carriage, and a girder side is provided. In a stacker reclaimer used for a bulk storage, which is characterized in that a carrying-in / carrying-out belt conveyor is formed as a shuttle conveyor for stacking.

【0009】[0009]

【実施例】本発明の構成を添付図面に示す実施例により
詳細に述べる。図1は本発明の実施例の全体側面図、図
2は図1のA矢視要部拡大断面図、図3は図2のB矢視
図、図4はトリッパ台車およびガ−ダ側搬出入用ベルト
コンベアの図、図5は図1のC矢視図、図6は本実施例
の作動説明図である。
Embodiments of the present invention will be described in detail with reference to the embodiments shown in the accompanying drawings. FIG. 1 is an overall side view of an embodiment of the present invention, FIG. 2 is an enlarged sectional view of an essential part taken along the arrow A in FIG. 1, FIG. 3 is a view taken along the arrow B of FIG. 2, and FIG. FIG. 5 is a view of an input belt conveyor, FIG. 5 is a view taken in the direction of arrow C in FIG. 1, and FIG. 6 is an operation explanatory view of this embodiment.

【0010】本実施例のスタッカリクレ−マが設置され
たばら物貯蔵場は、前部に低い前よう壁1、後部に高い
後よう壁2がそれぞれ立設され、これらのよう壁1,2
に直交して複数の隔壁3が立設されている。これらの
前、後よう壁1,2に沿ってそれぞれレ−ル(不図示)
が敷設され、これらのレ−ル上を、高さを異にする脚
4,5を介して橋形ガ−ダ6が積山7を跨いで走行す
る。また、前よう壁1の前面には、架設用スタンド8が
立てられ、この架設用スタンド8上に地上側搬出入用ベ
ルトコンベア9が設置されている。
In the bulk storage in which the stacker creamer of this embodiment is installed, a low front wall 1 and a high rear wall 2 are erected at the front and the walls 1 and 2, respectively.
A plurality of partition walls 3 are erected orthogonally to. Rails (not shown) along the front and rear walls 1 and 2 respectively
The bridge girder 6 travels over these rails over the piles 7 via legs 4 and 5 having different heights. A erection stand 8 is erected on the front surface of the front wall 1, and a ground side loading / unloading belt conveyor 9 is installed on the erection stand 8.

【0011】その橋形ガ−ダ6には、このガ−ダ6に沿
って走行するバケットエレベ−タ式リクレ−マ部10と
クレ−ン側トリッパ式スタッカ部11とが取付けられ、
互に連動するか、または、後述の横行用駆動装置40に
よって、一体となって横行する。
A bucket elevator type reclaimer section 10 and a crane side tripper type stacker section 11 which run along the girder 6 are attached to the bridge type girder 6,
They interlock with each other, or they traverse as a unit by a traverse drive device 40 described later.

【0012】先ず、橋形ガ−ダ6とバケットエレベ−タ
式リクレ−マ部10について述べる。橋形ガ−ダ6は、
脚4,5で支持された第1ビ−ム6aと第2ビ−ム6b
と第3ビ−ム6cとで構成され、これらのビ−ム6a,
6b,6cは前よう壁1と後よう壁2を跨ぐように配置
されている。そして、これらのビ−ム6a,6b,6c
の長手方向に沿ってレ−ル(不図示)が敷設されてい
る。
First, the bridge girder 6 and the bucket elevator type reclaimer section 10 will be described. Hashigata Gardener 6
First beam 6a and second beam 6b supported by legs 4 and 5
And a third beam 6c, and these beams 6a,
6b and 6c are arranged so as to straddle the front wall 1 and the rear wall 2. And these beams 6a, 6b, 6c
A rail (not shown) is laid along the longitudinal direction.

【0013】次に、バケットエレベ−タ式リクレ−マ部
10は、第1ビ−ム6aと第2ビ−ム6bのレ−ル上を
車輪12を介して横行するエレベ−タ台車13と、この
台車13に支持されたバケットエレベ−タ部14とで構
成されている。このバケットエレベ−タ部14の上方に
は上部スプロケット15が配置され、下方には下部前方
スプロケット16と下部後方スプロケット17とがばら
物貯蔵場の床面に近接できるように配置されている。こ
れらのスプロケット15,16,17には、多数のバケ
ット18が等ピッチで取付けられたチェ−ン19が巻回
されている。したがって、このチェ−ン19は、側面視
でL字状に形成されている。なお、このチェ−ン19は
下方側に弛みをもたせて底ざらいができるようにしてい
る。
Next, the bucket elevator type reclaimer section 10 is provided with an elevator truck 13 traversing the rails of the first beam 6a and the second beam 6b via wheels 12. , And a bucket elevator unit 14 supported by the carriage 13. An upper sprocket 15 is arranged above the bucket elevator 14, and a lower front sprocket 16 and a lower rear sprocket 17 are arranged below the bucket elevator 14 so as to be close to the floor of the bulk storage. A chain 19 having a large number of buckets 18 mounted at equal pitches is wound around these sprockets 15, 16 and 17. Therefore, the chain 19 is formed in an L shape in a side view. The chain 19 has a slack on its lower side so that it can be roughened.

【0014】下部前方スプロケット16と下部後方スプ
ロケット17とは、一つの連結リンク20で連結支持さ
れており、この連結リンク20に、等長の平行リンク2
1,22の各下端がピン結合により連結されている。こ
れらの平行リンク21,22の各上端は、エレベ−タフ
レ−ム23にピン結合により連結されている。また、こ
れらの平行リンク21,22の間には、一端がエレベ−
タフレ−ム23に、他端が平行リンク21,22のいず
れか一方の中間部に連結された油圧シリンダ−24が斜
めに配置されている。この油圧シリンダ−24の伸縮作
動により、平行リンク21,22は上下面において回動
しながら平行移動するので、下部前方スプロケット16
と下部後方スプロケット17とを水平に保ちながら平行
リンク21,22は俯仰運動を行なう。
The lower front sprocket 16 and the lower rear sprocket 17 are connected and supported by a single connecting link 20, and the connecting link 20 has parallel links 2 of equal length.
The lower ends of 1 and 22 are connected by pin coupling. The upper ends of the parallel links 21 and 22 are connected to the elevator frame 23 by pin connection. In addition, between these parallel links 21 and 22, one end is an elevator.
A hydraulic cylinder 24, the other end of which is connected to an intermediate portion of either one of the parallel links 21 and 22, is obliquely arranged on the tough frame 23. By the expansion and contraction operation of the hydraulic cylinder-24, the parallel links 21 and 22 move in parallel while rotating on the upper and lower surfaces, so that the lower front sprocket 16
While keeping the lower rear sprocket 17 horizontal, the parallel links 21 and 22 perform a vertical motion.

【0015】前記エレベ−タ台車13には、前記エレベ
−タフレ−ム23が水平状に旋回できるように貫通して
取付けられている。すなわち、エレベ−タフレ−ム23
には、上下1対の旋回台車26,26aが一体的に取付
けられており、これらの旋回台車26,26aが、上下
1対の車輪27,27aを介して、エレベ−タ台車13
を挟持している。そして、上方の旋回台車26には大歯
車28が一体的に取付けられ、この大歯車28に小歯車
29が噛合っている。この小歯車29は旋回用モ−タ3
0によって駆動され、この旋回用モ−タ30は、エレベ
−タ台車13に設けられたブラケット31に取付けられ
ている。したがって、旋回用モ−タ30を正逆駆動すれ
ば、小歯車29および大歯車28を介して、旋回台車2
6,26aがエレベ−タ台車13を挟んで旋回するの
で、エレベ−タフレ−ム23が旋回して、バケット18
の掻き取る向きを変更する。
The elevator frame 23 is attached to the elevator carriage 13 so as to pass therethrough so as to be horizontally rotatable. That is, the elevator frame 23
A pair of upper and lower swivel carriages 26, 26a are integrally attached to the vehicle, and these swivel carriages 26, 26a are mounted on the elevator carriage 13 via a pair of upper and lower wheels 27, 27a.
Is sandwiched between. A large gear 28 is integrally attached to the upper rotating carriage 26, and a small gear 29 meshes with the large gear 28. This small gear 29 is used for the turning motor 3
The turning motor 30 is mounted on a bracket 31 provided on the elevator carriage 13. Therefore, when the turning motor 30 is driven in the forward and reverse directions, the turning carriage 2 is driven through the small gear 29 and the large gear 28.
6, 26a turn while sandwiching the elevator carriage 13, so that the elevator frame 23 turns and the bucket 18
Change the scraping direction of.

【0016】また、エレベ−タ台車13上には複数の駆
動ユニット32を介して回転トラフ33が取付けられて
いる。この回転トラフ33は、バケット18が前記旋回
駆動により、いずれの方向に向いても、反転したバケッ
ト18からばら物を受取るようにしている。この回転ト
ラフ33は、上方の旋回台車26の上側に配置されてい
て、駆動ユニット32の駆動により常時回転している。
この回転トラフ33にはスクレ−パ34が臨んでおり、
このスクレ−パ34はシュ−ト35に一体的に取付けら
れている。したがって、回転トラフ33で運ばれきたば
ら物は、スクレ−パ34によってシュ−ト35へ掻き落
とされる。
A rotary trough 33 is mounted on the elevator carriage 13 via a plurality of drive units 32. The rotating trough 33 is adapted to receive the loose material from the inverted bucket 18 regardless of the direction in which the bucket 18 is driven by the turning drive. The rotary trough 33 is arranged on the upper side of the upper swing carriage 26 and is constantly rotated by the drive of the drive unit 32.
The scraper 34 faces the rotary trough 33,
The scraper 34 is integrally attached to the shoe 35. Therefore, the loose material carried by the rotary trough 33 is scraped off by the scraper 34 to the shoe 35.

【0017】このシュ−ト35はエレベ−タ台車13に
取付けられ、その下方開口部は後述のガ−ダ側搬出入用
ベルトコンベア43上に臨んでいる。なお、前記駆動ユ
ニット32は、不図示の駆動モ−タと、その先端に直結
された支持ロ−ラ32aとで構成されている。
The shoe 35 is attached to the elevator carriage 13, and its lower opening faces a later-described girder-side loading / unloading belt conveyor 43. The drive unit 32 is composed of a drive motor (not shown) and a support roller 32a directly connected to the tip of the drive motor.

【0018】次に、クレ−ン側トリッパ式スタッカ部1
1について述べる。前記ガ−ダ6の第2ビ−ム6bと第
3ビ−ム6c上には、トリッパ台車36が車輪36aを
介して横行するように設けられている。このトリッパ台
車36にはヘッドプ−リ37と、このヘッドプ−リ37
が臨んでいる防塵式伸縮シュ−ト38とが取付けられて
いる。また、このトリッパ台車36は、横行用駆動装置
40によって走行し、この横行用駆動装置40は、第2
ビ−ム6bまたは第3ビ−ム6c上に張られたチェ−ン
39に噛合う駆動用スプロケット40aの回転により往
復動するようになっている。なお、この駆動用スプロケ
ット40aは、不図示のモ−タにより正逆駆動される。
41,41は縦動スプロケットを示す。
Next, the crane side tripper type stacker unit 1
1 will be described. A tripper truck 36 is provided on the second beam 6b and the third beam 6c of the girder 6 so as to traverse through wheels 36a. This tripper carriage 36 has a head pulley 37 and a head pulley 37.
And a dust-proof expansion and contraction shoe 38 facing the front. Further, the tripper cart 36 is driven by the traverse drive device 40, and the traverse drive device 40 is driven by the second drive device 40.
The drive sprocket 40a meshes with the chain 39 stretched on the beam 6b or the third beam 6c to reciprocate. The driving sprocket 40a is driven forward and backward by a motor (not shown).
Reference numerals 41 and 41 denote vertical motion sprockets.

【0019】一方、第2ビ−ム6bと第3ビ−ム6cの
架設用スタンド8側には、テ−ルプ−リ42が設けら
れ、このテ−ルプ−リ42と前記トリッパ台車36のヘ
ッドプ−リ37とにガ−ダ側搬出入用ベルトコンベア4
3が巻回されている。このガ−ダ側搬出入用ベルトコン
ベア43は、前記バケットエレベ−タ式リクレ−マ部1
0の払出し用コンベアを兼用している。
On the other hand, a tail pulley 42 is provided on the erection stand 8 side of the second beam 6b and the third beam 6c, and the tail pulley 42 and the tripper carriage 36 are provided. Belt pulley 4 for loading and unloading on the girder side with head pulley 37
3 is wound. The belt conveyor 43 for loading and unloading on the girder side is the bucket elevator type reclaimer unit 1.
It is also used as a 0 delivery conveyor.

【0020】このガ−ダ側搬出入用ベルトコンベア43
には、ベルト緊張装置44が取付けられており、このベ
ルト緊張装置44は、複数のテ−クアッププ−リ45,
45……と、これらのテ−クアッププ−リ45にそれぞ
れ吊設された重錘46とから構成されている。このテ−
クアッププ−リ45の個数nは、図4において、プ−リ
の上下移動距離をSとすれば、 nS≧L になるように決める。なお、このLは、隔壁3の水平部
の長さと略等しくしている。
This girder-side loading / unloading belt conveyor 43
A belt tensioning device 44 is attached to the belt tensioning device 44. The belt tensioning device 44 includes a plurality of take-up pulleys 45 ,.
.. and a weight 46 suspended from each of these take-up pulleys 45. This test
The number n of the pull-up pulleys 45 is determined so that nS ≧ L, where S is the vertical movement distance of the pulleys in FIG. Note that this L is substantially equal to the length of the horizontal portion of the partition wall 3.

【0021】このガ−ダ側搬出入用ベルトコンベア43
は多数のキャリアロ−ラ56で支持され、これらのキャ
リアロ−ラ56は、不図示のパンタグラフで互に連結さ
れており、このパンタグラフの伸縮によってキャリアロ
−ラ56は互に近接離間してガ−ダ側搬出入用ベルトコ
ンベア43をシヤットルコンベアに形成している。な
お、キャリアロ−ラ56はブラケット57で支持されて
いる。
This girder-side loading / unloading belt conveyor 43
Are supported by a large number of carrier rollers 56, and these carrier rollers 56 are connected to each other by a pantograph (not shown). The expansion and contraction of this pantograph causes the carrier rollers 56 to be closely spaced from each other. The girder-side loading / unloading belt conveyor 43 is formed as a shuttle conveyor. The carrier roller 56 is supported by a bracket 57.

【0022】前記ガ−ダ側搬出入用ベルトコンベア43
の架設用スタンド8側には、上部シュ−ト47が臨んで
いて、ばら物を搬入するようになっている。また、前記
テ−ルプ−リ42は下部シュ−ト48に臨んでいて、ば
ら物を搬出するようになっている。
A belt conveyor 43 for loading and unloading on the girder side
An upper shoe 47 faces the erection stand 8 side for carrying in bulk items. Further, the tail pulley 42 faces the lower shoe 48 so as to carry out the bulky material.

【0023】次に、地上側搬出入用ベルトコンベア9に
ついて述べる。前記上部および下部シュ−ト47,48
は、地上側トリッパフレ−ム49に一体的に取付けられ
ている。この地上側トリッパフレ−ム49は架設スタン
ド8上に敷設された1対のトリッパ用レ−ル50,50
上を車輪51を介して走行するようになっている。ま
た、この地上側トリッパフレ−ム49は、橋形ガ−ダ6
の前よう壁1側に連結されており、したがって、ガ−ダ
6と一体となって走行する。
Next, the ground side loading / unloading belt conveyor 9 will be described. The upper and lower shoes 47, 48
Are integrally attached to the ground side tripper frame 49. The ground side tripper frame 49 is a pair of tripper rails 50, 50 laid on the erection stand 8.
It is adapted to travel above via wheels 51. The ground side tripper frame 49 is a bridge type girder 6
Is connected to the wall 1 side so that it travels integrally with the girder 6.

【0024】この地上側トリッパフレ−ム49には、上
部プ−リ52と下部プ−リ53とが設けてあり、この上
部プ−リ52は前記上部シュ−ト47内に設けられてい
る。
The ground side tripper frame 49 is provided with an upper pulley 52 and a lower pulley 53, and the upper pulley 52 is provided in the upper shoe 47.

【0025】また、架設用スタンド8の片側にはヘッド
プ−リ54が、他の片側にテ−ルプ−リ55が設けてあ
って、これらのプ−リ54,55と、前記上部および下
部プ−リ52,53とには、前記地上側搬出入用ベルト
コンベア9が巻回されている。
Further, a head pulley 54 is provided on one side of the erection stand 8 and a tail pulley 55 is provided on the other side thereof, and these pulleys 54, 55 and the upper and lower pulleys are provided. The above-mentioned ground side loading / unloading belt conveyor 9 is wound around the reels 52 and 53.

【0026】次に、本実施例の作用を述べる。先ず、ば
ら物の払出し作業は、次のように行われる。不図示の駆
動装置により上部スプロケット15を駆動すると、チェ
−ン19が回動してバケット18によりばら物を次々と
掻き取って持上げる。ばら物を掻き取ったバケット18
が上部スプロケット15を廻ると反転し、ばら物は回転
トラフ33へ搬出される。次いで、ばら物は、回転トラ
フ33上のばら物、スクレ−パ34の所にきてシュ−ト
35へ掻き落される。次いで、シュ−ト35からガ−ダ
側搬出入用ベルトコンベア43に排出され、ガ−ダ側搬
出入用ベルトコンベア43から下部シュ−ト48を介し
て地上側搬出入用ベルトコンベア9に排出され、払出し
が行われる。
Next, the operation of this embodiment will be described. First, the operation of dispensing the bulk material is performed as follows. When the upper sprocket 15 is driven by a driving device (not shown), the chain 19 rotates and the bucket 18 scrapes up the loose objects one after another and lifts them. Bucket 18 scraped loose
Turns around when it goes around the upper sprocket 15, and the loose material is carried out to the rotary trough 33. Next, the bulk material comes to the bulk material on the rotary trough 33, the scraper 34, and is scraped off to the shoot 35. Then, it is discharged from the shoe 35 to the girder-side loading / unloading belt conveyor 43, and discharged from the girder-side loading / unloading belt conveyor 43 to the ground-side loading / unloading belt conveyor 9 through the lower shoe 48. The payment is made.

【0027】次に、本実施例の払出し操作方法を述べ
る。先ず、払出しを行なう積山7へバケットエレベ−タ
式リクレ−マ10を移動させるには、図6の左方2点鎖
線で示すように、バケットエレベ−タ部14の下部前、
後方スプロケット16,17が前よう壁1の上方にくる
ようにエレベ−タ台車13を横行させると共に、油圧シ
リンダ−24によりバケットエレベ−タ部14を上方に
持上げておく。続いて、ガ−ダ6を走行させて希望する
積山7へ移動させる。希望する積山7にくれば、積山7
の上層部分を切出すために、油圧シリンダ−24を伸縮
させて平行リンク21,22の俯仰角度を決定する。
Next, the dispensing operation method of this embodiment will be described. First, in order to move the bucket elevator type reclaimer 10 to the pile 7 to be dispensed, as shown by the two-dot chain line on the left side of FIG. 6, in front of the lower portion of the bucket elevator unit 14,
The elevator truck 13 is traversed so that the rear sprockets 16 and 17 are located above the front wall 1 and the bucket elevator portion 14 is lifted upward by the hydraulic cylinder 24. Then, the girder 6 is run to move to the desired pile 7. If you come to the desired Mt.
In order to cut out the upper layer portion, the hydraulic cylinder -24 is expanded and contracted to determine the elevation angle of the parallel links 21 and 22.

【0028】そこで、図6に示すように第1のステップ
の作業として、バケットエレベ−タ部14の、決定した
俯仰角度を維持したままエレベ−タ台車13を前よう壁
1側から後よう壁2側へ移動させる。その移動量は、バ
ケット18がばら物の中に3分の1から半分程度突っ込
まれる程度でよい。
Therefore, as shown in FIG. 6, as the work of the first step, the elevator truck 13 is moved from the front wall 1 side to the rear wall while keeping the determined elevation angle of the bucket elevator portion 14. Move to 2 side. The amount of movement may be such that the bucket 18 is thrust into the bulk by about one third to half.

【0029】次いで、ばら物は、バケット18が上昇す
る過程(平行リンク21,22に沿って移動する過程)
で掻き取られる。この掻き取り状態で、ガ−ダ6を縦方
向aに走行させることにより、積山7の前よう壁1側の
傾斜面のばら物が掻き取られて行く。バケットエレベ−
タ部14が一方の隔壁3まで移動すれば、掻き取り作業
を行なっているバケット18がばら物の中に3分の1か
ら半分程度突っ込まれた状態でエレベ−タ台車13を停
止させ、ガ−ダ6を反対側(図7中、反a矢方向)の隔
壁3へ移動させながら掻き取って行く。上記動作を繰り
返して、積山7の上層部分のばら物を全て払出す。
Next, the bulk material moves up the bucket 18 (moves along the parallel links 21 and 22).
Is scraped off with. By moving the girder 6 in the vertical direction a in this scraped state, the loose material on the inclined surface on the side of the wall 1 such as the front of the pile 7 is scraped off. Bucket elevator
When the slider portion 14 moves to one of the bulkheads 3, the elevator truck 13 is stopped with the bucket 18 that is performing the scraping work being thrust into the bulk by about one third to half. -Scraping is done by moving the da 6 to the partition 3 on the opposite side (the direction opposite to the arrow a in FIG. 7). By repeating the above operation, all the loose material in the upper layer portion of the pile 7 is discharged.

【0030】次に、下端にきているバケット18がばら
物の中に半分程度突っ込まれる迄、油圧シリンダ−24
を伸ばす。その状態で、エレベ−タ台車13を後よう壁
2側から前よう壁1側へ移動させる。前よう壁1側のバ
ケット18が積山7の前よう壁側の傾斜面迄くると、エ
レベ−タ台車13の横行を止め、続いて、ガ−ダ6を走
行させて第2のステップの作業を行なう。
Next, the hydraulic cylinder 24 is moved until the bucket 18 at the lower end is thrust halfway into the bulk.
Stretch out. In that state, the elevator carriage 13 is moved from the rear wall 2 side to the front wall 1 side. When the bucket 18 on the front wall 1 side reaches the slope on the wall side in front of the pile 7, the traverse of the elevator carriage 13 is stopped, and then the girder 6 is run to perform the second step work. Do.

【0031】すなわち、第2のステップの作業では、バ
ケットエレベ−タ部14の下端水平部にきているバケッ
ト18によりばら物を掻き取って行く。
That is, in the work of the second step, the loose object is scraped off by the bucket 18 which is located at the lower end horizontal part of the bucket elevator part 14.

【0032】したがって、第2のステップの作業では、
エレベ−タ台車13の1回の横行移動量は、下端にきた
バケット18がばら物に接触している程度の距離になっ
ている。ここで第2のステップも第1のステップと同
様、ガ−ダ6の走行→エレベ−タ台車13の横行→ガ−
ダ6の反対側への走行と繰り返しながら作業を行なう。
Therefore, in the work of the second step,
The amount of traverse movement of the elevator truck 13 once is such that the bucket 18 coming to the lower end is in contact with a bulk object. Here, in the second step as well as in the first step, the traveling of the girder 6 → the traverse of the elevator carriage 13 → the girder
Do the work by repeatedly running to the opposite side of da 6.

【0033】ばら物が貯蔵場の最下層の手前迄、払い出
されれば、第3のステップの作業として、バケットエレ
ベ−タ部14の下端を貯蔵場の床付近迄、到達させるた
めに油圧シリンダ−24を伸ばしながらばら物を掻き取
るが、この掻き取りは、バケットエレベ−タ部14の平
行リンク21,22が垂直状になる迄行なう。
If the bulk material is discharged to the bottom of the storage floor, as a third step, a hydraulic cylinder for moving the lower end of the bucket elevator 14 to near the floor of the storage floor. The loose object is scraped while extending 24. This scraping is carried out until the parallel links 21 and 22 of the bucket elevator section 14 become vertical.

【0034】バケットエレベ−タ部14の下端が貯蔵場
の床付近に迄到達すれば、エレベ−タ台車13を後よう
壁2側から前よう壁1側へ横行させて最下層のばら物を
払出す。バケットエレベ−タ部14の下端側前端が、前
よう壁1側迄くれば、ガ−ダ6を走行させ、第2のステ
ップ作業と同様な作業を繰り返して払出しを行なう。
When the lower end of the bucket elevator section 14 reaches near the floor of the storage area, the elevator truck 13 is made to traverse from the rear wall 2 side to the front wall 1 side to remove the lowermost bulk material. Pay out. When the front end on the lower end side of the bucket elevator 14 reaches the front wall 1 side, the girder 6 is run, and the work similar to the second step work is repeated to perform payout.

【0035】第4のステップ作業として、貯蔵場の床面
と後よう壁2との隅部に残った断面三角状のデッドパイ
ルを払出す。
As a fourth step work, the dead pile having a triangular cross section remaining at the corners of the floor of the storage and the rear wall 2 is discharged.

【0036】したがって、本実施例によれば、デッドパ
イルを残すことなく掻き取ることができ、更に、床上の
ばら物は、L字状チェ−ン19の下方が弛んでいるの
で、良好に掻き取ることができる。
Therefore, according to this embodiment, it is possible to scrape without leaving dead piles, and furthermore, since the loose material on the floor is slack in the lower part of the L-shaped chain 19, it can be scraped well. Can be taken.

【0037】次に、本実施例のバケットエレベ−タ式リ
クレ−マ10隔壁3を越えて隣接の貯蔵場へ移動させる
には、図1に示すように油圧シリンダ−24を縮み作動
させて、平行リンク21,22を上方に持上げ、ガ−ダ
6を縦方向aに走行させる。したがって、L字状チェ−
ン19の下方は隔壁3に当たることはない。
Next, in order to move the bucket elevator type reclaimer 10 of this embodiment over the bulkhead 3 to the adjacent storage area, the hydraulic cylinder 24 is contracted as shown in FIG. The parallel links 21 and 22 are lifted upward and the girder 6 is run in the vertical direction a. Therefore, the L-shaped chain
The lower part of the window 19 does not hit the partition wall 3.

【0038】次に、ばら物の積付け作業は、次のように
して行われる。防塵式伸縮シュ−ト38の下端を上方に
移動させておきガ−ダ6を走行させると、このガ−ダ6
と共に地上側トリッパフレ−ム49も同行し、希望する
貯蔵場へくれば、ガ−ダ6を停止させる。そこで、地上
側搬出入用ベルトコンベア9およびガ−ダ側搬出入用ベ
ルトコンベア43を、前記払出し作業時と逆方向に駆動
させる。したがって、地上側搬出入用ベルトコンベア9
で送られてきたばら物は、地上側トリッパフレ−ム49
の上部シュ−ト47からガ−ダ側搬出入用ベルトコンベ
ア43へ移され、このガ−ダ側搬出入用ベルトコンベア
43上のばら物は、トリッパ台車36のヘッドプ−リ3
7、防塵式伸縮シュ−ト38から積山7へ放出される。
Next, the operation of stacking the bulk materials is performed as follows. When the lower end of the dustproof telescopic shoe 38 is moved upward and the girder 6 is run, the girder 6
At the same time, the tripper frame 49 on the ground side accompanies and stops the girder 6 when it comes to the desired storage location. Therefore, the ground side loading / unloading belt conveyor 9 and the girder side loading / unloading belt conveyor 43 are driven in a direction opposite to the direction of the payout operation. Therefore, the ground side loading / unloading belt conveyor 9
The loose goods sent by the ship are on the ground side tripper frame 49.
Is transferred from the upper shoe 47 to the girder-side loading / unloading belt conveyor 43, and the loose material on the girder-side loading / unloading belt conveyor 43 is transferred to the head pulley 3 of the tripper carriage 36.
7. Dust-proof telescopic shoe 38 is discharged to pile 7.

【0039】[0039]

【発明の効果】本発明によれば、バケットエレベ−タを
吊設した橋形ガ−ダに、トリッパ式スタッカを設けたの
で、ガ−ダが共用できると共に、このガ−ダに設けられ
たベルトコンベアを積付けと払出しとに兼用できて、全
体の構造がきわめて簡単となり、著しくコストダウンと
なる。
According to the present invention, since the bridge type girder on which the bucket elevator is suspended is provided with the tripper type stacker, the girder can be shared and the girder is provided on this girder. Since the belt conveyor can be used for both loading and unloading, the overall structure is extremely simple and the cost is significantly reduced.

【0040】その上、スタッカリクレ−マは、とかく大
型となって、壁を有するばら物貯蔵場では、取残しが多
発しがちであるが、本発明のバケットエレベ−タ式リク
レ−マでは、平行リンクの下端に連結リンクを設け、こ
の連結リンクの前、後方にスプロケットを設けて、バケ
ット付無端チェ−ンをL字状に形成し、しかも、平行リ
ンクを平行状態で俯仰させたので、ばら物の取残しが防
止できる。
Moreover, the stacker reclaimer is so large in size that it tends to be left behind in a bulk storage space having a wall. A connecting link is provided at the lower end of the link, and sprockets are provided in front of and behind this connecting link to form an endless chain with a bucket in an L shape, and the parallel links are raised in a parallel state. Leftovers can be prevented.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例の全体側面図である。FIG. 1 is an overall side view of an embodiment of the present invention.

【図2】図1のA矢視要部拡大断面図である。FIG. 2 is an enlarged cross-sectional view of a main part of FIG.

【図3】図2のB矢視図である。3 is a view on arrow B of FIG. 2. FIG.

【図4】トリッパ台車およびガ−ダ側搬出入用ベルトコ
ンベアの図である。
FIG. 4 is a diagram of a tripper carriage and a girder-side loading / unloading belt conveyor.

【図5】図1のC矢視図である。5 is a view on arrow C of FIG. 1. FIG.

【図6】本実施例の作動説明図である。FIG. 6 is an operation explanatory diagram of the present embodiment.

【図7】一般のばら物貯蔵場の斜視図である。FIG. 7 is a perspective view of a general bulk storage.

【符号の説明】[Explanation of symbols]

1…前よう壁、2…後よう壁、3…隔壁、13…エレベ
−タ台車、15,16,17…スプロケット、18…バ
ケット、19…チェ−ン、20…連結リンク、21,2
2…平行リンク、23…エレベ−タフレ−ム、36…ト
リッパ台車、37…ヘッドプ−リ、43…ガ−ダ側搬出
入用ベルトコンベア
1 ... Front wall, 2 ... Rear wall, 3 ... Partition wall, 13 ... Elevator trolley, 15, 16, 17 ... Sprocket, 18 ... Bucket, 19 ... Chain, 20 ... Connection link 21, 21,
2 ... Parallel link, 23 ... Elevator frame, 36 ... Tripper truck, 37 ... Head pulley, 43 ... Girder side loading / unloading belt conveyor

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 壁を有するばら物貯蔵場に沿って平行な
レ−ルを敷設し、該レ−ルにガ−ダを走行可能に設け、
該ガ−ダに、ガ−ダ走行方向と直交して横行するエレベ
−タ台車とトリッパ台車とを並設し、前記エレベ−タ台
車にエレベ−タフレ−ムを設け、該エレベ−タフレ−ム
のガ−ダ近傍に、下端が貯蔵場の床近くになるような平
行リンクを枢着し、該平行リンクの下端に連結リンクを
介して前、後方のスプロケットを設け、これらの前、後
方スプロケットと前記エレベ−タフレ−ムに設けた上方
スプロケットとに、バケットを有する無端チェ−ンをL
字状に装着すると共に、前記平行リンクを俯仰させる俯
仰装置を設け、前記ガ−ダの長手方向に沿って、前記バ
ケットで掻き取られたばら物を払い出すガ−ダ側搬出入
用ベルトコンベアを設け、該ガ−ダ側搬出入用ベルトコ
ンベアのヘッドプ−リを前記トリッパ台車に設けて、ガ
−ダ側搬出入用ベルトコンベアをシヤットルコンベアに
形成して積付けを行うようにしたことを特徴とするばら
物貯蔵場に用いるスタッカリクレ−マ。
1. A parallel rail is laid along a bulk storage having a wall, and a girder is movably provided on the rail.
An elevator trolley and a tripper trolley, which are transverse to each other in the direction perpendicular to the traveling direction of the yard, are installed side by side on the girder, and the elevator trolley is provided with an elevator frame. A parallel link is pivotally mounted near the girder so that the lower end is close to the floor of the storage area, and front and rear sprockets are provided at the lower end of the parallel link via connecting links. And an upper sprocket provided on the elevator frame, an endless chain having a bucket L
A girder-side loading / unloading belt conveyor that is mounted in a letter shape and is provided with a lifting / lowering device that lifts / lowers the parallel link, and discharges the loose material scraped by the bucket along the longitudinal direction of the girder. And the head pulley of the girder-side loading / unloading belt conveyor is provided on the tripper carriage, and the girder-side loading / unloading belt conveyor is formed as a shuttle conveyor for stacking. A staccari creamer used for a bulk storage facility characterized by the above.
JP4170199A 1992-06-03 1992-06-03 Stacker reclaimer for bulk storage Expired - Lifetime JP2971668B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4170199A JP2971668B2 (en) 1992-06-03 1992-06-03 Stacker reclaimer for bulk storage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4170199A JP2971668B2 (en) 1992-06-03 1992-06-03 Stacker reclaimer for bulk storage

Publications (2)

Publication Number Publication Date
JPH05338810A true JPH05338810A (en) 1993-12-21
JP2971668B2 JP2971668B2 (en) 1999-11-08

Family

ID=15900509

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4170199A Expired - Lifetime JP2971668B2 (en) 1992-06-03 1992-06-03 Stacker reclaimer for bulk storage

Country Status (1)

Country Link
JP (1) JP2971668B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5232541U (en) * 1975-08-27 1977-03-07
JPS5723387U (en) * 1980-07-15 1982-02-06
JPS6415447A (en) * 1987-07-07 1989-01-19 Toyota Motor Corp Air-fuel ratio control device for internal combustion engine
JPH0242675U (en) * 1988-09-16 1990-03-23

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5232541U (en) * 1975-08-27 1977-03-07
JPS5723387U (en) * 1980-07-15 1982-02-06
JPS6415447A (en) * 1987-07-07 1989-01-19 Toyota Motor Corp Air-fuel ratio control device for internal combustion engine
JPH0242675U (en) * 1988-09-16 1990-03-23

Also Published As

Publication number Publication date
JP2971668B2 (en) 1999-11-08

Similar Documents

Publication Publication Date Title
US3837510A (en) Method of loading bagged mail from a loading dock into a highway vehicle
JPH10129472A (en) Bulk cargo loading wagon
RU2093447C1 (en) Device for reloading the unit loads in form of shipment packages
CA1135222A (en) Cantilever straddle carrier
GB1559258A (en) Travellin machine arrangements
US5131798A (en) Railroad car conveyor
US4681205A (en) Displaceable inclined hoist
JP3402948B2 (en) Portal reclaimer
JP2971668B2 (en) Stacker reclaimer for bulk storage
JP2991156B2 (en) Cargo handling equipment using cranes
JP2004175568A (en) Storage conveyance method in vein physical distribution, and transfer equipment used for the same
JP2653384B2 (en) Marine loader or unloader
JPH09150918A (en) Three dimensional storage facility for container
US2751100A (en) Transporting and dumping equipment
JP5174767B2 (en) Reclaimer
JPH0586937U (en) Stacker creamer for bulk storage
US3464572A (en) Apparatus for loading bagged mail from a loading dock into a highway vehicle
US3819065A (en) Vessel unloader
JPH09315582A (en) Delivering machine
JP3185123B2 (en) Lifting equipment for slopes
US4094419A (en) Handling plant for dumping and discharging bulk materials
US2344742A (en) Apparatus for loading and unloading wheeled vehicles
JP2556043Y2 (en) Bulk cargo handling equipment
JPH0581144U (en) Bucket elevator type reclaimer
JPH08192925A (en) Horizontal main girder type continuous unloader