JPH05321481A - Master rope support for scaffold of framework - Google Patents

Master rope support for scaffold of framework

Info

Publication number
JPH05321481A
JPH05321481A JP4156095A JP15609592A JPH05321481A JP H05321481 A JPH05321481 A JP H05321481A JP 4156095 A JP4156095 A JP 4156095A JP 15609592 A JP15609592 A JP 15609592A JP H05321481 A JPH05321481 A JP H05321481A
Authority
JP
Japan
Prior art keywords
rod
building frame
vertical rod
blade
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4156095A
Other languages
Japanese (ja)
Other versions
JP2560592B2 (en
Inventor
Takahiro Nagahara
隆宏 長原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NAGAHARA SOGO KK
Original Assignee
NAGAHARA SOGO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NAGAHARA SOGO KK filed Critical NAGAHARA SOGO KK
Priority to JP4156095A priority Critical patent/JP2560592B2/en
Publication of JPH05321481A publication Critical patent/JPH05321481A/en
Application granted granted Critical
Publication of JP2560592B2 publication Critical patent/JP2560592B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Emergency Lowering Means (AREA)

Abstract

PURPOSE:To reduce the room for generating the fall of a worker at the time of work for standing master rope supports, between which a master rope is stretched outside over a gangboard of the top floor by installing the lower side of the master rope support to the upper side of a vertical rod of a framework of the top floor of the scaffold, which faces to the outside opposite to the building, so as to stand outside of the gangboard of the top floor. CONSTITUTION:A vertical rod of a framework 1 is inserted to the lower side of a support main body 4 in the vertical direction, and an upper installation part and a lower installation part for fixing this support main body 4 are provided in the upper and the lower with a space. A connection part of an upper turning vane and a lower turning vane is fixed to these upper installation part and the lower installation part freely to turn so that the connection part is pushed to be turned freely under the horizontal condition when the vertical rod of the framework 1 is inserted from the open side of the sides of the upper installation part and the lower installation part and that the connection part can be locked under the fixed condition to prevent the fall of the vertical rod of the framework 1 after the insertion of the vertical rod of the framework 1. The lower turning vane is provided so as to be fitted to a reinforcing rod of the framework 1 from over, and furthermore, an insertion part of a master rope 5 is provided in the upper side of the support main body 4.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、枠組足場、即ち一対の
間隔をあけた縦杆とこの上部側に架設した横杆の間に更
に補強杆を架設し、全体を門形に形成した建枠を間隔を
あけて立設させて、筋交で連結するとともに、建枠上に
道板を架設し、これらを建枠部分で上下多段に積段させ
て構成される枠組足場の最上階の建枠の建築物と反対側
の外側に向いた縦杆の上部側にその下部側を装着させて
最上階の道板の外側に立設させ、最上階の道板上方の外
側に親綱を張設させる親綱支柱の立設作業時に、最上階
から一階下で建枠の縦杆に外側側方から装着させること
を可能とすることで、作業者の墜落事故の発生の余地を
少なくできる枠組足場用親綱支柱に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a frame scaffold, that is, a construction in which a reinforcing rod is further installed between a pair of vertical rods spaced apart from each other and a horizontal rod installed on the upper side of the vertical rod. The frames are erected at intervals, are connected by braces, and the road boards are erected on the building frame. Attach the lower side to the upper side of the vertical rod facing the outer side of the building frame opposite to the building, and stand it on the outer side of the uppermost road plate, and install the master rope above the uppermost road plate. By allowing the vertical rod of the building frame to be mounted from the outer side from the top floor one floor below during the work of standing the main rope to be stretched, it is possible to reduce the possibility of a worker's crash. Regarding the main rope support for frame scaffolding.

【0002】[0002]

【従来の技術】従来から、特に中高層建築物の建築又は
改修作業をする場合には、枠組足場をその外側に対応す
る箇所に組立て、作業者がこれを利用して一連の作業を
行なっている。そして、この枠組足場は図20に示すよ
うなものである。図中aは建枠、bは筋交、cは道板付
布杆、dは親綱支柱、eは親綱である。図21には建枠
aを示しているが、これは、一対の間隔をあけた縦杆
f、fとこの上部側に架設した横杆gの間に補強本杆h
を架設するとともに、縦杆fと補強本杆hの間に横杆g
と平行に更に補強補助杆i…を架設して、全体を門形に
形成したものである。尚、図中jは縦杆f上端に設けた
建枠aを上下多段に積段させる連結ピン、kは縦杆f側
面に設けた筋交bの取付ピンを示している。そして、枠
組足場は、このような建枠a…を間隔をあけて立設させ
た後、これらを筋交b…で連結するとともに、建枠a…
上に通路を設けるために道板、例えば図示した例では道
板付布枠c…を架設し、これらを建枠a…部分で順次上
方に積段させて構成されている。
2. Description of the Related Art Conventionally, particularly in the case of constructing or repairing a medium-high-rise building, a frame scaffold is assembled at a position corresponding to the outside thereof, and a worker uses this to perform a series of operations. .. And this framework scaffold is as shown in FIG. In the figure, a is a building frame, b is a brace, c is a cloth rod with a road board, d is a main rope, and e is a main rope. A building frame a is shown in FIG. 21, which is a reinforcing main rod h between a pair of vertical rods f and f and a horizontal rod g erected on the upper side thereof.
And the horizontal rod g between the vertical rod f and the reinforcement rod rod h.
Further, a reinforcing auxiliary rod i ... Is further installed in parallel with the above, and the whole is formed in a gate shape. In the figure, j is a connecting pin for stacking the building frame a provided on the upper end of the vertical rod f in a multi-tiered manner, and k is a mounting pin for the brace b provided on the side face of the vertical rod f. Then, the frame scaffolding, after standing such building frames a ... at intervals, connects them by braces b ...
In order to provide a passage above, a road plate, for example, a cloth frame c with a road plate in the illustrated example is erected, and these are sequentially stacked at the building frame a ...

【0003】ところで、こうした枠組足場の組立作業を
行う過程では、解体作業も同様であるが、順次作業高さ
が高くなったり、当初作業高さが高かったりして、高所
作業を伴ってくる。このため、作業高さが所定の高さよ
り高くなると、例えば組立作業を行う過程では、他の一
連の組立作業の前に、図20に示すように最上階の道板
上方の建築物と反対側の外側に親綱eを緊張状態で張設
して、作業者は腰に巻いた安全帯とこの親綱eを命綱で
連結した状態で、一連の組立作業を行うことが法律で義
務づけられている。そして、この親綱eは最上階の建枠
aの外側に向いた縦杆fの上部側にその下部側を装着さ
せて立設させた親綱支柱d…を利用して緊張状態で張設
されている。
By the way, in the process of assembling such a frame scaffold, the dismantling work is also the same, but the work height becomes higher one by one, or the initial work height becomes higher, which involves work at a high place. .. Therefore, if the working height becomes higher than a predetermined height, for example, in the process of performing the assembly work, before the other series of assembly work, as shown in FIG. It is legally obligated to perform a series of assembly work in a state where the parent rope e is tensioned on the outside of the, and the worker is connected to the safety belt wrapped around the waist with the life rope. There is. The master rope e is stretched in a tensioned state by using the master rope pillars d ... Standing with the lower side attached to the upper side of the vertical rod f facing the outside of the uppermost building frame a. Has been done.

【0004】一方、親綱支柱dとしては、例えば図22
〜図27に示すような態様のものが提案されている。こ
れは、支柱本体lの下部側に建枠aの縦杆fの最上位の
補強補助杆iとの連接部近傍より上位を上下に挿通させ
て、この支柱本体lを位置固定する上位装着部mと下位
装着部nを上下に間隔をあけて設けたものである。そし
て、上位装着部mには縦杆f上端の連結ピンjを挿通さ
せて上方に突出させる挿通口oと横杆gの縦杆f寄りに
上方から係合する係合凹所pが設けられている。一方、
下位装着部nには縦杆f外周に外嵌されるクランプqが
設けられている。
On the other hand, as the main rope support d, for example, FIG.
~ Proposals have been made as shown in Fig. 27. This is an upper mounting portion for fixing the position of the pillar main body 1 by vertically inserting the upper part above and below the connecting portion of the vertical rod f of the building frame a with the uppermost reinforcement auxiliary rod i on the lower side of the pillar main body l. m and the lower mounting portion n are provided with a vertical interval. The upper mounting portion m is provided with an insertion opening o through which the connecting pin j at the upper end of the vertical rod f is inserted and which projects upward, and an engagement recess p which is engaged with the horizontal rod g toward the vertical rod f from above. ing. on the other hand,
The lower mounting portion n is provided with a clamp q which is fitted around the outer circumference of the vertical rod f.

【0005】このような親綱支柱dは、これらを利用し
て親綱eを緊張状態に張設して、枠組足場のこの階の、
例えば一連の組立作業が完了すると、親綱eを弛緩状態
にした後、下位装着部nのクランプqを開放させて上方
に引抜き、次にこれの一階上の建枠aの縦杆fに向けて
上方から順次、取付けて立設させるのである。
Such a master rope support column d is used to stretch the master rope e in a tensioned state, and
For example, when a series of assembling work is completed, the master rope e is set in a relaxed state, the clamp q of the lower mounting portion n is opened and pulled out upward, and then the vertical rod f of the building frame a on the first floor thereof is pulled out. It is attached and made to stand in order from the top toward the top.

【0006】[0006]

【発明が解決しようとする課題】ところで、こうした親
綱支柱dでは、建枠aの縦杆fに上方から取付けて立設
させる関係上、この親綱支柱dの立設作業時には、道板
の建築物と反対側の外側は完全な開放状態になって、作
業者の墜落事故の発生の余地が残され、危険である。
By the way, in such a main rope support column d, since it is attached to the vertical rod f of the building frame a from above and is erected, the main board support rod d is erected during the standing work of the main rope support column d. The outside of the building, which is on the opposite side of the building, is completely open, leaving room for a worker to fall and is dangerous.

【0007】このような従来の問題点に鑑みて発明され
たのが本発明に係る枠組足場用親綱支柱で、枠組足場の
最上階の建枠の建築物と反対側の外側に向いた縦杆の上
部側にその下部側を装着させて最上階の道板の外側に立
設させ、最上階の道板上方の外側に親綱を張設させる親
綱支柱の立設作業時に、作業者の墜落事故の発生の余地
を少なくすることを目的とする。
In view of the above-mentioned conventional problems, a master rope for a frame scaffold according to the present invention is a vertical column facing the outer side of the building frame of the top floor of the frame scaffold opposite to the building. The lower side of the rod is attached to the upper side of the rod so that it is erected on the outside of the road plate on the top floor, and the master rope is stretched outside the road plate on the top floor. The purpose is to reduce the possibility of the occurrence of a crash.

【0008】[0008]

【課題を解決するための手段】こうした目的を達成する
ため、本発明の請求項1では、一対の間隔をあけた縦杆
とこの上部側に架設した横杆の間に更に補強杆を架設
し、全体を門形に形成した建枠を間隔をあけて立設させ
て、筋交で連結するとともに、建枠上に道板を架設し、
これらを建枠部分で上下多段に積段させて構成される枠
組足場の最上階の建枠の外側に向いた縦杆の上部側にそ
の下部側を装着させて最上階の道板の外側に立設させ、
最上階の道板上方の外側に親綱を張設させる支柱で、支
柱本体の下部側に建枠の縦杆の補強杆との連設部近傍よ
り上位を上下に挿通させて、この支柱本体を位置固定す
る共に側方に開放した上位装着部と下位装着部を上下に
間隔をあけて設け、これら上位装着部と下位装着部に二
つの羽根片の先端側を少なくとも建枠の縦杆が位置でき
る開放角度で基端側を連設させた上位回動羽根と下位回
動羽根の連接部を、これら上位装着部と下位装着部の側
方開放側から建枠の縦杆が侵入当初はそれぞれの羽根片
の一方が押動されて水平状態で独自に回動可能で、しか
も建枠の縦杆が侵入後は羽根片の他方がこの建枠の縦杆
が脱落不能にこれらの側方開放側を横断的に固定状態で
閉止可能に枢着するとともに、下位回動羽根の羽根片の
他方を建枠の補強杆に上方から係合可能に設け、更には
支柱本体の上部側に親綱の挿通部を設けた枠組足場用親
綱支柱を開示した。
In order to achieve such an object, in claim 1 of the present invention, a reinforcing rod is further installed between a pair of vertical rods spaced apart from each other and a horizontal rod installed on the upper side thereof. , The building frames that are formed in the shape of a gate are erected at intervals, are connected by braces, and the road boards are erected on the building frames.
On the upper side of the vertical rod facing the outer side of the building frame on the uppermost floor of the frame scaffold configured by stacking these in the building frame part, the lower side is attached to the outside of the road board on the uppermost floor. Stand upright,
It is a strut that stretches the main rope outside the top of the road plate on the top floor, and the upper part of the strut body is inserted vertically above and below the connecting part with the reinforcing rod of the vertical rod of the building frame on the lower side of the strut body. The upper mounting part and the lower mounting part, both of which are fixed in position and open to the side, are provided with a space vertically between them, and at least the vertical rods of the building frame are attached to the upper mounting part and the lower mounting part so that the tip sides of the two blade pieces are at least. The vertical rod of the building frame was initially inserted from the side open side of the upper mounting part and the lower mounting part of the connecting part of the upper rotating blade and the lower rotating blade, the base end side of which is located at the open angle that can be positioned. One of the blade pieces can be pushed and rotated independently in the horizontal state, and after the vertical rod of the building frame has entered, the other of the blade pieces cannot vertically drop the vertical rod of this building frame. The open side is fixed in a fixed state so that it can be closed and the other side of the lower rotating blade is reinforced for the building frame. To provided to be engaged from above, further disclosed a lifeline column forming framework scaffolding provided with a insertion portion of Shintsuna the upper side of the strut body.

【0009】[0009]

【作用】而して、これら親綱支柱を利用して親綱を緊張
状態に張設して、枠組足場のこの階の、例えば一連の組
立作業が完了すると、親綱を弛緩状態にした後、この階
から下にある上位回動羽根と下位回動羽根の固定状態を
解除させて、支柱本体を持って建築物と反対側の外側側
方に移動させると、上位回動羽根と下位回動羽根が建枠
の縦杆に押動されて、これらを解放させる方向に回動
し、これをこの階の建枠、即ちこの階の道板の下にある
建枠から取外すことができる。次に、この親綱支柱をこ
の階の横にある建枠、即ち一階上の最上階の建枠の縦杆
の補強杆との連接部近傍より上位に対してこの階から再
度、上位装着部と下位装着部の側方開放側から押込む
と、上位回動羽根と下位回動羽根がこれらの羽根片の他
方がこれらの側方開放側を横断的に閉止する方向に回動
して、最後にはこれらが固定状態になるとともに、下位
回動羽根の羽根片の他方が補強杆に上方から係合して、
こうした親綱支柱を立設させることができる。
Then, the master rope is stretched in a tensioned state by using these master rope supports, and when a series of assembling work on this floor of the frame scaffold, for example, is completed, the master rope is relaxed. , Release the fixed state of the upper and lower rotating vanes below this floor, and move it to the outer side opposite to the building by holding the pillar body, The moving blades are pushed by the vertical rods of the building frame and rotate in the direction of releasing them, which can be removed from the building frame of this floor, that is, the building frame under the road board of this floor. Next, this main rope column is attached to the building frame next to this floor, that is, to the upper part of the uppermost building frame on the first floor, above the vicinity of the connection with the reinforcing rod of the vertical rod, again from this floor When pushed in from the side open side of the lower part and the lower mounting part, the upper rotary blade and the lower rotary blade rotate in the direction in which the other of these blade pieces closes the side open side transversely. , Finally, as they become fixed, the other blade piece of the lower rotary blade engages the reinforcing rod from above,
Such a master rope support can be erected.

【0010】[0010]

【実施例】本発明に係る枠組足場用親綱支柱の詳細を更
に添付の図面に基づき説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The details of the main rope column for a frame scaffold according to the present invention will be described with reference to the accompanying drawings.

【0011】図1には枠組足場を示しているが、図中1
は建枠、2は筋交、3は道板付布枠、4は親綱支柱、5
は親綱である。又、図2には建枠1を示しているが、図
中6は縦杆、7は横杆、8は補強本杆、9は補強補助
杆、10は連結ピン、11は取付ピンである。尚、補強杆12
は補強本杆8と補強補助杆9から構成される。そして、
これらは、従来のものと同態様のものであるから、詳細
な説明は省略する。
FIG. 1 shows a frame scaffold, but in FIG.
Is a building frame, 2 is a bracing, 3 is a cloth frame with a road board, 4 is a parent rope, 5
Is a master rope. 2, the building frame 1 is shown. In the figure, 6 is a vertical rod, 7 is a horizontal rod, 8 is a reinforcing main rod, 9 is a reinforcing auxiliary rod, 10 is a connecting pin, and 11 is a mounting pin. .. In addition, the reinforcing rod 12
Is composed of a reinforcing main rod 8 and a reinforcing auxiliary rod 9. And
Since these are the same as the conventional ones, detailed description will be omitted.

【0012】一方、親綱支柱4の詳細は、図3〜図15
に示している。この親綱支柱4は、支柱本体20の下部側
に建枠1の縦杆6の最上位の補強補助杆9との連接部近
傍より上位を上下に挿通させて、この支柱本体20を位置
固定する共に側方に開放した上位装着部21と下位装着部
22を上下に間隔をあけて設け、これら上位装着部21と下
位装着部22に二つの押動羽根片23、24と係合羽根片25、
26の先端側を少なくとも建枠1の縦杆6が位置できる開
放角度で基端側を連接させた上位回動羽根27と下位回動
羽根28の連接部を、これら上位装着部21と下位装着部22
の側方開放側から建枠1の縦杆6が侵入当初はそれぞれ
の押動羽根片23、24が押動されて水平状態で独自に回動
可能で、しかも建枠1の縦杆6が侵入後は係合羽根片2
5、26がこの建枠1の縦杆6が脱落不能にこれらの側方
開放側を横断的に固定状態で閉止可能に枢着するととも
に、下位回動羽根28の係合羽根片26を建枠1の最上位の
補強補助杆9に上方から係合可能に設け、更に支柱本体
20の上部側に親綱5の挿通部29を設けたものである。
On the other hand, details of the master rope support 4 are shown in FIGS.
Is shown in. The main rope support 4 is inserted into the lower part of the support main body 20 vertically above and below the connecting portion with the uppermost reinforcement auxiliary rod 9 of the vertical rod 6 of the building frame 1 to fix the support main body 20 in position. Upper mounting part 21 and lower mounting part that are both open to the side
The upper and lower mounting portions 21 and 22 are provided with two pressing blade pieces 23 and 24 and an engaging blade piece 25.
The connecting portion of the upper rotation blade 27 and the lower rotation blade 28, in which the base end side is connected at an opening angle where at least the vertical rod 6 of the building frame 1 can be positioned, is connected to the upper attachment portion 21 and the lower attachment portion 26. Part 22
At the beginning of the vertical rod 6 of the building frame 1 entering from the side open side, the respective pushing blade pieces 23, 24 are pushed and can be independently rotated in the horizontal state, and the vertical rod 6 of the building frame 1 is Engaging blade piece 2 after entering
The vertical rods 6 of the building frame 1 are fixed so that they can be closed in a fixed state across the laterally open sides in a fixed manner, and the lower blades 28 are fitted with the engaging blade pieces 26. The uppermost reinforcement auxiliary rod 9 of the frame 1 is provided so as to be engageable from above, and further the column body
The insertion part 29 of the master rope 5 is provided on the upper side of 20.

【0013】図示した実施例では、断面コ字形に形成し
た装着部材40を支柱本体20の側面下端部に取付けて、こ
の装着部材40の中央部分を残した上部側と下部側を上位
装着部21並びに下位装着部22として利用している。又、
これの中央部分に相対向させて設けた切欠部41は筋交2
を通過させるのに利用される。そして、上位回動羽根27
と下位回動羽根28は装着部材40の側面外側に回動可能に
配設した上位取付軸42と下位取付軸43に取付けられてい
る。尚、図中44は上位取付軸42の上端を折曲させて設け
た復帰操作部である。又、図中45はこれら上位取付軸42
と下位取付軸43の軸受を示している。更に、図中46、47
は上位回動羽根27の押動羽根片23の回動用開口、係合羽
根片25の回動用開口である。尚、図中48、49は係合羽根
片25の回動用開口47に連通させてそれの下位に形成した
側面を傾斜縁に形成した下動案内用開口、固定用開口で
ある。そして、図中50は押動羽根片23の回動用開口46の
下端口縁に設けた突部を示している。又、図中51、52は
下位回動羽根28の押動羽根片24の回動用開口、係合羽根
片26の回動用開口である。尚、図中53、54は係合羽根片
26の回動用開口52に連通させてそれの上位に形成した側
面を傾斜縁に形成した上動案内用開口、固定用開口であ
る。又、図中56は下位回動羽根28の係合羽根片26の下面
に設けた建枠1の最上位の補強補助杆9に係合する係合
凹所を示している。そして、図中55は押動羽根片24の回
動用開口51の下端口縁に設けた突部を示している。ここ
に示すものでは、上位装着部21と下位装着部22の側方開
放側から建枠1の縦杆6が侵入して上位回動羽根27と下
位回動羽根28の押動羽根片23、24を押動することで、両
者の回動用開口46、51の下端口縁に設けた突部50、55と
の係合関係が解除して、上位回動羽根27は回動しながら
自重で落下して、その係合羽根片25が固定用開口49に係
合して固定状態になるとともに、下位回動羽根28は回動
しながら建枠1の最上位の補強補助杆9に上方から係合
して、支柱本体20が自重で落下することに伴い、相対的
に上動して、その係合羽根片26が固定用開口54に係合し
て固定状態になるのである。一方、これらの固定状態
は、上位回動羽根27は復帰操作部44を持上げることで、
又下位回動羽根28は支柱本体20を持上げることでそれぞ
れ解除させることができる。ここで、固定用開口49、54
の開口幅は上位回動羽根27、下位回動羽根28が強制的に
係合する大きさ関係にすることが適宜考慮される。尚、
図中57は装着部材40の上端と下端の奥部側に設けたスペ
ーサーである。
In the illustrated embodiment, a mounting member 40 having a U-shaped cross section is attached to the lower end of the side surface of the column main body 20, and the upper side and the lower side of the mounting member 40 where the central portion is left are the upper mounting portions 21. It is also used as the lower mounting part 22. or,
The notch 41 provided in the central portion of this is opposed to the braces 2
Used to pass through. Then, the upper rotating blade 27
The lower rotation blade 28 is attached to an upper attachment shaft 42 and a lower attachment shaft 43 that are rotatably disposed on the outer side surface of the mounting member 40. Incidentally, reference numeral 44 in the figure denotes a return operation portion provided by bending the upper end of the upper mounting shaft 42. Also, in the figure, 45 is the upper mounting shaft 42
And the bearing of the lower mounting shaft 43. Furthermore, in the figure, 46, 47
Is an opening for rotation of the pressing blade piece 23 of the upper rotation blade 27, and an opening for rotation of the engagement blade piece 25. In the figure, reference numerals 48 and 49 are a downward movement guide opening and a fixing opening, respectively, which are formed to communicate with the rotation opening 47 of the engaging blade piece 25 and the side surface formed below the rotation opening 47 is formed as an inclined edge. Further, in the figure, reference numeral 50 denotes a protrusion provided on the lower end edge of the rotation opening 46 of the pressing blade piece 23. In addition, reference numerals 51 and 52 in the drawing denote a rotating opening of the pushing blade piece 24 of the lower rotating blade 28 and a rotating opening of the engaging blade piece 26. In the figure, 53 and 54 are engagement blade pieces.
26 are upper movement guide openings and fixing openings, which are formed to communicate with the rotation opening 52 of 26 and the side surface formed on the upper side thereof is formed as an inclined edge. In addition, reference numeral 56 in the drawing denotes an engaging recess provided on the lower surface of the engaging blade piece 26 of the lower rotary blade 28 to engage with the uppermost reinforcing auxiliary rod 9 of the building frame 1. Reference numeral 55 in the figure denotes a protrusion provided at the lower edge of the opening 51 for rotation of the pushing blade piece 24. In the structure shown here, the vertical rod 6 of the building frame 1 enters from the side opening sides of the upper mounting part 21 and the lower mounting part 22 to push the moving blade pieces 23 of the upper rotating blade 27 and the lower rotating blade 28. By pushing 24, the engagement relationship with the protrusions 50, 55 provided at the lower end rims of the rotation openings 46, 51 of both is released, and the upper rotation blade 27 rotates by its own weight. While falling, the engaging blade pieces 25 are engaged with the fixing openings 49 to be in a fixed state, and the lower rotation blades 28 rotate to the uppermost reinforcement auxiliary rod 9 of the building frame 1 from above. When the pillar body 20 is engaged and falls down by its own weight, the pillar body 20 is relatively moved upward, and the engaging blade piece 26 is engaged with the fixing opening 54 to be in a fixed state. On the other hand, in these fixed states, the upper rotation blade 27 lifts the return operation portion 44,
Further, the lower rotary vanes 28 can be released by raising the column body 20. Here, the fixing openings 49, 54
It is considered that the opening width is appropriately set so that the upper rotary blade 27 and the lower rotary blade 28 are forcibly engaged with each other. still,
Reference numeral 57 in the drawing denotes spacers provided on the inner side of the upper end and the lower end of the mounting member 40.

【0014】次に、図14、図15には支柱本体20の上部側
に設ける親綱5の挿通部29を示している。ここに示すも
のでは、支柱本体20上端に親綱5の保持部材60を相対向
させるとともに、両者の間に挿通空間61をあけて設けて
いる。尚、図中62は半円筒状突部で、これは親綱5に損
傷を与えないように設けられたものである。そして、図
中63は親綱5の端部を結着させる結着部を示している。
Next, FIGS. 14 and 15 show the insertion portion 29 of the master rope 5 provided on the upper side of the column main body 20. In the structure shown here, the holding members 60 of the master rope 5 are made to face each other at the upper ends of the pillar bodies 20, and an insertion space 61 is provided between them. Incidentally, reference numeral 62 in the drawing denotes a semi-cylindrical projection, which is provided so as not to damage the master rope 5. Further, 63 in the figure indicates a binding portion for binding the end portion of the master rope 5.

【0015】更に、図16〜図18には他の実施例を示して
いる。図16、図17に示すのは、上位回動羽根27と下位回
動羽根28を固定状態にする固定ブロック70、71をこれら
の移動手前側を傾斜面に形成して装着部材40側面に設け
たものである。一方、図18、図19に示すのは、上位回動
羽根27と下位回動羽根28の固定手段を装着部材40側に設
けることなく、上位回動羽根27並びに下位回動羽根28側
にそれぞれ設けたものである。
Further, FIGS. 16 to 18 show another embodiment. 16 and 17, fixed blocks 70 and 71 for fixing the upper rotary blade 27 and the lower rotary blade 28 in a fixed state are provided on the side surface of the mounting member 40 by forming the moving front side of the inclined surface into an inclined surface. It is a thing. On the other hand, FIGS. 18 and 19 show that the upper rotating blade 27 and the lower rotating blade 28 are not provided with fixing means for the upper rotating blade 27 and the lower rotating blade 28, respectively. It is provided.

【0016】[0016]

【発明の効果】以上のような本発明に係る枠組足場用親
綱支柱では、枠組足場の最上階の建枠の建築物と反対側
の外側に向いた縦杆の上部側にその下部側を装着させて
最上階の道板の外側に立設させ、最上階の道板上方の外
側に親綱を張設させる親綱支柱の立設作業時に、最上階
から一階下で建枠の縦杆に外側側方から装着させること
を可能とすることで、作業者の墜落事故の発生の余地を
少なくできる。
EFFECTS OF THE INVENTION In the above-described main rope prop for frame scaffolding according to the present invention, the lower side thereof is provided on the upper side of the vertical rod facing the outer side opposite to the building of the building frame on the uppermost floor of the frame scaffolding. Installed and erected on the outside of the top floor road plate, and laying the main rope on the outside above the top floor road plate. Since it can be attached to the outside from the side, the room for a worker to fall can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る枠組足場用親綱支柱を枠組足場に
立設させ、親綱を張設した状態を示す斜視図
FIG. 1 is a perspective view showing a state in which a master rope for a frame scaffold according to the present invention is erected on a frame scaffold and the master rope is stretched.

【図2】建枠を示す正面図[Figure 2] Front view showing the building frame

【図3】本発明に係る枠組足場用親綱支柱を示す斜視図FIG. 3 is a perspective view showing a master rope for a frame scaffold according to the present invention.

【図4】同じく正面図[Figure 4] Similarly, a front view

【図5】同じく要部を示す正面図FIG. 5 is a front view showing the main part of the same.

【図6】図4中のX−X拡大断面図6 is an enlarged sectional view taken along line XX in FIG.

【図7】図4中のY−Y拡大断面図FIG. 7 is an enlarged sectional view taken along line YY in FIG.

【図8】上位装着部を示す斜視図FIG. 8 is a perspective view showing an upper mounting portion.

【図9】下位装着部を示す斜視図FIG. 9 is a perspective view showing a lower mounting portion.

【図10】作動前後の図4中のX−X線に相当する状態を
示す拡大断面図
FIG. 10 is an enlarged cross-sectional view showing a state corresponding to line XX in FIG. 4 before and after operation.

【図11】作動前後の図4中のY−Y線に相当する状態を
示す拡大断面図
FIG. 11 is an enlarged cross-sectional view showing a state corresponding to the line YY in FIG. 4 before and after the operation.

【図12】作動前の上位装着部と下位装着部を示す拡大正
面図
FIG. 12 is an enlarged front view showing the upper mounting portion and the lower mounting portion before operation.

【図13】作動後の上位装着部と下位装着部を示す拡大正
面図
FIG. 13 is an enlarged front view showing the upper mounting portion and the lower mounting portion after the operation.

【図14】支柱本体上端に設けた親綱の挿通部を示す拡大
斜視図
FIG. 14 is an enlarged perspective view showing the insertion portion of the master rope provided at the upper end of the pillar body.

【図15】同じく拡大正面図[Figure 15] Similarly, an enlarged front view

【図16】上位装着部の他の実施例を示す斜視図FIG. 16 is a perspective view showing another embodiment of the upper mounting portion.

【図17】下位装着部の他の実施例を示す斜視図FIG. 17 is a perspective view showing another embodiment of the lower mounting portion.

【図18】上位装着部の他の実施例を示す斜視図FIG. 18 is a perspective view showing another embodiment of the upper mounting part.

【図19】下位装着部の他の実施例を示す斜視図FIG. 19 is a perspective view showing another embodiment of the lower mounting portion.

【図20】従来の枠組足場用親綱支柱を枠組足場に立設さ
せ、親綱を張設した状態を示す斜視図
FIG. 20 is a perspective view showing a state in which a conventional parent rope for frame scaffolding is erected on the frame scaffold and the parent rope is stretched.

【図21】建枠を示す正面図[Figure 21] Front view showing the building frame

【図22】従来の枠組足場用親綱支柱を示す正面図FIG. 22 is a front view showing a parent rope for a conventional scaffolding frame.

【図23】同じく側面図[Figure 23] Similarly, a side view

【図24】上位装着部を示す拡大正面図FIG. 24 is an enlarged front view showing the upper mounting part.

【図25】同じく拡大側面図[Figure 25] Similarly, an enlarged side view

【図26】図22中のX′−X′拡大断面図26 is an enlarged sectional view taken along the line X′-X ′ in FIG. 22.

【図27】図22中のY′−Y′拡大断面図FIG. 27 is an enlarged cross-sectional view taken along line Y′-Y ′ in FIG. 22.

【符合の説明】[Explanation of sign]

1 建枠 2 筋交 3 道板付布枠 4 親綱支柱 5 親綱 6 縦杆 7 横杆 8 補強本杆 9 補強補助杆 10 連結ピン 11 取付ピン 12 補強杆 20 支柱本体 21 上位装着部 22 下位装着部 23 押動羽根片 24 押動羽根片 25 係合羽根片 26 係合羽根片 27 上位回動羽根 28 下位回動羽根 29 挿通部 40 装着部材 41 切欠部 42 上位取付軸 43 下位取付軸 44 復帰操作部 45 軸受 46 回動用開口 47 回動用開口 48 下動案内用開口 49 固定用開口 50 突部 51 回動用開口 52 回動用開口 53 上動案内用開口 54 固定用開口 55 突部 56 係合凹所 57 スペーサー 60 保持部材 61 挿通空間 62 半円筒状突部 63 結着部 70 固定ブロック 71 固定ブロック 1 Building frame 2 Brace 3 Cloth frame with road board 4 Parent rope column 5 Parent rope 6 Vertical rod 7 Horizontal rod 8 Reinforcing main rod 9 Reinforcement auxiliary rod 10 Connecting pin 11 Mounting pin 12 Reinforcing rod 20 Strut body 21 Upper mounting part 22 Lower Mounting part 23 Pushing vane piece 24 Pushing vane piece 25 Engaging vane piece 26 Engaging vane piece 27 Upper turning vane 28 Lower turning vane 29 Insertion part 40 Mounting member 41 Notch 42 Upper mounting shaft 43 Lower mounting shaft 44 Return operation part 45 Bearing 46 Rotating opening 47 Rotating opening 48 Lower guide opening 49 Fixing opening 50 Protrusion 51 Rotating opening 52 Rotating opening 53 Upper moving guide opening 54 Fixing opening 55 Projecting 56 Engagement Recess 57 Spacer 60 Holding member 61 Insertion space 62 Semi-cylindrical protrusion 63 Bonding portion 70 Fixed block 71 Fixed block

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 一対の間隔をあけた縦杆とこの上部側に
架設した横杆の間に更に補強杆を架設し、全体を門形に
形成した建枠を間隔をあけて立設させて、筋交で連結す
るとともに、建枠上に道板を架設し、これらを建枠部分
で上下多段に積段させて構成される枠組足場の最上階の
建枠の外側に向いた縦杆の上部側にその下部側を装着さ
せて最上階の道板の外側に立設させ、最上階の道板上方
の外側に親綱を張設させる支柱で、支柱本体の下部側に
建枠の縦杆の補強杆との連設部近傍より上位を上下に挿
通させて、この支柱本体を位置固定する共に側方に開放
した上位装着部と下位装着部を上下に間隔をあけて設
け、これら上位装着部と下位装着部に二つの羽根片の先
端側を少なくとも建枠の縦杆が位置できる開放角度で基
端側を連設させた上位回動羽根と下位回動羽根の連接部
を、これら上位装着部と下位装着部の側方開放側から建
枠の縦杆が侵入当初はそれぞれの羽根片の一方が押動さ
れて水平状態で独自に回動可能で、しかも建枠の縦杆が
侵入後は羽根片の他方がこの建枠の縦杆が脱落不能にこ
れらの側方開放側を横断的に固定状態で閉止可能に枢着
するとともに、下位回動羽根の羽根片の他方を建枠の補
強杆に上方から係合可能に設け、更には支柱本体の上部
側に親綱の挿通部を設けた枠組足場用親綱支柱。
1. A reinforcing rod is further erected between a pair of vertical rods spaced apart from each other and a horizontal rod erected on the upper side of the vertical rods. , Connecting with braces, erection road boards on the building frame, and stacking these in the upper and lower multi-stages in the building frame part It is a strut that attaches its lower side to the upper side and stands it on the outside of the uppermost road plate, and stretches the main rope above the uppermost road plate. The upper part of the rod is inserted vertically above and below the connecting part with the reinforcing rod to fix the main body of the rod, and the upper mounting part and the lower mounting part, which are open to the side, are provided with a vertical gap between them. The upper part of the installation part and the lower part of the installation part, in which the tip ends of the two blade pieces are connected at the base end side at an opening angle that allows at least the vertical rod of the building frame to be positioned. At the beginning of the vertical rod of the building frame from the side opening side of the upper mounting part and the lower mounting part, the connecting part of the rotating blade and the lower rotating blade is pushed horizontally and one of the blade pieces is pushed. It is independently pivotable, and after the vertical rod of the building frame has entered, the other of the blade pieces is pivotally attached so that the vertical rod of this building frame cannot be removed and can be closed in a fixed state across these lateral open sides. In addition, the other one of the blade pieces of the lower rotation blade is provided so as to be engageable with the reinforcing rod of the building frame from above, and further, the main rope support for frame scaffolding is provided with the insertion portion of the master rope on the upper side of the support main body.
JP4156095A 1992-05-21 1992-05-21 Parent rope for frame scaffolding Expired - Lifetime JP2560592B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4156095A JP2560592B2 (en) 1992-05-21 1992-05-21 Parent rope for frame scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4156095A JP2560592B2 (en) 1992-05-21 1992-05-21 Parent rope for frame scaffolding

Publications (2)

Publication Number Publication Date
JPH05321481A true JPH05321481A (en) 1993-12-07
JP2560592B2 JP2560592B2 (en) 1996-12-04

Family

ID=15620205

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4156095A Expired - Lifetime JP2560592B2 (en) 1992-05-21 1992-05-21 Parent rope for frame scaffolding

Country Status (1)

Country Link
JP (1) JP2560592B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200472187Y1 (en) * 2012-06-07 2014-04-08 주식회사 현대미포조선 Apparatus for supporting utility line
KR200472179Y1 (en) * 2012-06-12 2014-04-08 주식회사 현대미포조선 Apparatus for supporting cable and hose
CN115463355A (en) * 2022-09-29 2022-12-13 中国五冶集团有限公司 Safety rope fixing device used during erection and dismantling of high-altitude frame body

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200472187Y1 (en) * 2012-06-07 2014-04-08 주식회사 현대미포조선 Apparatus for supporting utility line
KR200472179Y1 (en) * 2012-06-12 2014-04-08 주식회사 현대미포조선 Apparatus for supporting cable and hose
CN115463355A (en) * 2022-09-29 2022-12-13 中国五冶集团有限公司 Safety rope fixing device used during erection and dismantling of high-altitude frame body

Also Published As

Publication number Publication date
JP2560592B2 (en) 1996-12-04

Similar Documents

Publication Publication Date Title
JP2609170B2 (en) Scaffold
KR100841240B1 (en) Built-up scaffold for construction field
JP2012132157A (en) Preceding balustrade
JP2560592B2 (en) Parent rope for frame scaffolding
JP2002356989A (en) Device for attaching handrail to prefabricated scaffold
JPH1150653A (en) Supporting frame of scaffold plate and fitting and removing method therefor and construction for reinforced concrete wall by use thereof
JP2985161B2 (en) How to adjust the tip height of a cantilever roof
JPH05505Y2 (en)
JPH0453394Y2 (en)
JP2992882B2 (en) Beam formwork device
JP3788407B2 (en) Safety handrail
JP3638761B2 (en) H-framework scaffold
JP2001288883A (en) Precedent handrail for prefabricated scaffolding
KR200417988Y1 (en) Safety scaffold
JPH0311298Y2 (en)
JP2002275830A (en) Scaffold device for subsidiary work and subsidiary work method of elevated bridge
JPH0712541Y2 (en) Scaffolding equipment
CN219773544U (en) Scaffold for building engineering
JP4044874B2 (en) Safety handrail
CN215858609U (en) Plant reinforced concrete bent frame column capable of being simply constructed
JP4065835B2 (en) Leading handrail of frame scaffold
JP5632758B2 (en) Foldable L-shaped baseboard and temporary scaffold incorporating this L-shaped baseboard
CN218205555U (en) Movable operating platform for cornice construction
CN217232864U (en) Supplementary structure of basement crack repair material
JP2594490B2 (en) Beam formwork device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees