JPH0518113A - Prefabricated reinforcing bar construction method for steel framed reinforced concrete structure - Google Patents

Prefabricated reinforcing bar construction method for steel framed reinforced concrete structure

Info

Publication number
JPH0518113A
JPH0518113A JP19568391A JP19568391A JPH0518113A JP H0518113 A JPH0518113 A JP H0518113A JP 19568391 A JP19568391 A JP 19568391A JP 19568391 A JP19568391 A JP 19568391A JP H0518113 A JPH0518113 A JP H0518113A
Authority
JP
Japan
Prior art keywords
column
steel frame
main
main bar
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP19568391A
Other languages
Japanese (ja)
Inventor
Koji Yamanobe
宏治 山野辺
Noboru Sakaguchi
昇 坂口
Takeshi Kawachi
武 河内
Yasuo Jinno
靖夫 神野
Hitoshi Kumagai
仁志 熊谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP19568391A priority Critical patent/JPH0518113A/en
Publication of JPH0518113A publication Critical patent/JPH0518113A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE:To simplify the arrangement of reinforcing bars and improve work efficiency by fixing pillar main reinforcements and beam main reinforcements to pillar steels and beam steels, arranging shear reinforcing bars around the main reinforcements, and prefabricating the pillar steels, beam steels, and the reinforcing bars. CONSTITUTION:End sections 5a..., 9a... of pillar main reinforcements 5... and beam main reinforcements 9... are fixed to flanges 4a..., 8a... of pillar steels 4, 4 and beam steels 8, 8 by welding, screwing, or with lap joints, Shear reinforcing bars 6..., 10... are arranged around the pillar main reinforcements 5 and the beam main reinforcements 9 to surround them, and steels of a pillar 2 and beams 3, 3 and reinforcing bars are prefabricated. The pillar steels 4 and the beam steels 8 are erected, a framework is fitted to them, and concrete W is placed to complete the pillar 2 and the beams 3. The connection of the steels in a connection section 7 is simplified, and the degree of freedom for designing a building can be improved.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉄骨鉄筋コンクリート
構造物における先組鉄筋工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pre-assembled reinforcing bar construction method for a steel frame reinforced concrete structure.

【0002】[0002]

【従来の技術】従来、鉄骨鉄筋コンクリート構造物を構
築する場合、柱と梁及びそれらの接合部の配筋は、柱鉄
骨及び梁鉄骨に所定位置に建て込んだ後、柱主筋及び梁
主筋を現場で取り付け、さらに柱主筋及び梁主筋の周囲
にこれら柱主筋及び梁主筋を巻くようにして剪断補強筋
を取り付けることにより現場組みされているのが一般的
であった。
2. Description of the Related Art Conventionally, when constructing a steel-framed reinforced concrete structure, the reinforcements of columns and beams and their joints have been installed at predetermined positions in the column steel beams and beam steel frames, and then the column main beams and beam main reinforcements have been constructed on site. It was generally assembled in the field by attaching the shear reinforcements around the column main reinforcement and the beam main reinforcement around the column main reinforcement and the beam main reinforcement.

【0003】[0003]

【発明が解決しようとする課題】本発明は、前記した従
来技術における次のような課題を解決せんとするもので
ある。
DISCLOSURE OF THE INVENTION The present invention is intended to solve the following problems in the prior art described above.

【0004】第1に、現場における配筋は、高く組み上
げた鉄骨への配筋を余儀なくされることとなり、危険が
伴うばかりか、足元が悪い状態で多数の鉄筋の取り付け
を行えば作業に手間取ることとなる。特に、柱と梁の接
合部付近は、鉄筋が込み合うため、作業能率の低下が顕
著であるほか、その取り合いが複雑となって設計に制約
が生じるといった問題があった。第2に、前記接合部付
近は、前記理由から設計が複雑となり、柱及び梁の剪断
補強筋の閉鎖性を確保することが困難となるといった問
題もある。
[0004] Firstly, in the field, the reinforcement is forced to be arranged on a steel frame that has been assembled high, which is not only dangerous but also troublesome if a large number of reinforcements are attached when the feet are in poor condition. It will be. In particular, since the reinforcing bars are crowded in the vicinity of the joints between the columns and the beams, the work efficiency is significantly reduced, and there is a problem that the joints are complicated and the design is restricted. Secondly, there is also a problem that the design in the vicinity of the joint becomes complicated for the above reason, and it becomes difficult to secure the closing property of the shear reinforcing bar of the column and the beam.

【0005】本発明は前記事情に鑑みてなされたもの
で、施工能率を向上することができる鉄骨鉄筋コンクリ
ート構造物における先組鉄筋工法を提供することを目的
とする。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a pre-assembled rebar construction method for a steel-framed reinforced concrete structure capable of improving the construction efficiency.

【0006】[0006]

【課題を解決するための手段】本発明の鉄骨鉄筋コンク
リート構造物における先組鉄筋工法では、柱鉄骨及び梁
鉄骨に予め柱主筋及び梁主筋を定着するとともに、これ
ら柱主筋及び梁主筋の周囲に柱主筋及び梁主筋を巻く形
態で剪断補強筋を配設して柱及び梁の鉄骨と鉄筋を先組
しておく工程と、前記各主筋と剪断補強筋の配設の完了
した柱鉄骨及び梁鉄骨を建て込む工程と、前記建て込み
工程の完了後、柱鉄骨及び梁鉄骨に型枠を取り付けてコ
ンクリートを打設し、柱及び梁を完成する工程とを備
え、前記柱主筋及び梁主筋の定着方法は、柱、梁の接合
部の手前の位置で、各主筋の端部を溶接、ねじ式または
重ね継手等により柱鉄骨及び梁鉄骨のフランジに固定す
ることにより行うことを前記課題の解決手段とした。
In the pre-assembled reinforcing bar construction method for a steel reinforced concrete structure of the present invention, a column main bar and a beam main bar are fixed in advance to the column steel beam and the beam steel frame, and a column around the column main beam and the beam main bar is provided. A step of arranging shear reinforcing bars in a form of winding the main bars and beam main bars to pre-assemble the steel frame and the reinforcing bars of the columns and beams, and the column steel frame and the beam steel frame in which the respective main bars and the shear reinforcing bars have been arranged And the step of mounting the concrete on the column steel frame and the beam steel frame and placing concrete after the completion of the building process to complete the column and the beam. The method is to solve the above-mentioned problems by performing welding, fixing the ends of each main bar to the flanges of the column steel frame and the beam steel frame by welding, screwing or lap joints, etc. And

【0007】[0007]

【作用】本発明の鉄骨鉄筋コンクリート構造物における
先組鉄筋工法によれば、柱主筋及び梁主筋を、柱、梁の
手前の位置で、その端部を溶接、ねじ式または重ね継手
等により柱鉄骨及び梁鉄骨のフランジに固定することよ
り、柱、梁の接合部内に挿通することなく定着させるこ
とが可能となる。また、前記接合部内の鉄筋の取り合い
を単純にして、その設計の自由度が向上する。
According to the prefabricated reinforcing bar construction method for the steel-framed reinforced concrete structure of the present invention, the column main bar and the beam main bar are welded at their ends in front of the column or beam, their ends are welded, screwed, or lap jointed to form the column steel frame. Also, by fixing to the flange of the beam steel frame, it is possible to fix the column without fixing the beam to the joint between the column and the beam. Further, the joint of the reinforcing bars in the joint is simplified, and the degree of freedom in design is improved.

【0008】[0008]

【実施例】以下本発明の第1実施例を、図1ないし図3
を参照して説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A first embodiment of the present invention will be described below with reference to FIGS.
Will be described.

【0009】図中符号1は、本実施例の鉄骨鉄筋コンク
リート構造物における先組鉄筋工法で施工された柱梁接
合部である。図1に示すように、柱梁接合部1は、垂直
に形成された柱2と、この柱2に垂直に取り付けられた
梁3とで構成されている。
Reference numeral 1 in the drawing denotes a beam-column joint portion of the steel-framed reinforced concrete structure of this embodiment, which is constructed by the pre-assembled reinforcing bar construction method. As shown in FIG. 1, the beam-column joint portion 1 includes a column 2 formed vertically and a beam 3 vertically attached to the column 2.

【0010】図1及び図2に示すように、柱2は、H型
鋼を垂直に立設してなる柱鉄骨4と、この柱鉄骨4の長
さ方向に略沿って延びる柱主筋5と、柱主筋5の周囲に
巻く形態で配設された柱用剪断補強筋6とからなる柱骨
組み2aにコンクリートWが打設されて断面略正方形に
構成されている。
As shown in FIGS. 1 and 2, a column 2 includes a column steel frame 4 formed by vertically standing H-shaped steel, and a column main bar 5 extending substantially along the length direction of the column steel frame 4. Concrete W is cast into a column skeleton 2a composed of column shear reinforcing bars 6 arranged in a form of being wound around the column main bars 5 to have a substantially square cross section.

【0011】柱主筋5は、柱鉄骨4の双方のフランジ4
aの両端部でその外面に所定間隔で略略平行に計4本が
配設されるとともに、図3に示すように、柱2と梁3と
の接合部7側の端部5aが屈曲されてフランジ4aに固
着されている。柱用剪断補強筋6は、各柱主筋5の外面
に接した状態でこれら柱主筋5を束ねるようにして卷装
され、柱主筋5の長さ方向に所定間隔で連設されてい
る。
The column main bars 5 are the flanges 4 on both sides of the column steel frame 4.
At both ends of a, a total of four are arranged on the outer surface thereof at a predetermined interval in a substantially parallel manner, and as shown in FIG. 3, the ends 5a on the joint 7 side of the pillar 2 and the beam 3 are bent. It is fixed to the flange 4a. The column shear reinforcement bars 6 are mounted so as to bundle the column main reinforcements 5 in a state of being in contact with the outer surface of each column main reinforcement 5, and are continuously provided at predetermined intervals in the longitudinal direction of the column main reinforcements 5.

【0012】図2に示すように、接合部7は、柱2の中
央部に形成され、平面視柱2の略中央から4方に均等に
延びるように接合部材7aを配設してなっている。接合
部材7aは、H型鋼であって、それぞれの先端に固定さ
れた当接板7bが接合部7の4方に接合された各梁3の
先端部に略当接する位置に固定されている。
As shown in FIG. 2, the joint portion 7 is formed in the central portion of the pillar 2, and the joint members 7a are arranged so as to extend uniformly from the substantial center of the pillar 2 in plan view in four directions. There is. The joining member 7a is an H-shaped steel, and is fixed at a position where the contact plates 7b fixed to the respective tips substantially come into contact with the tips of the beams 3 joined to the four sides of the joint 7.

【0013】図1及び図2に示すように、梁3は、H型
鋼を水平に配設してなる梁鉄骨8と、この梁鉄骨8の長
さ方向に略沿って延びる梁主筋9と、梁主筋9の周囲に
巻く形態で配設された梁用剪断補強筋10とからなる梁
骨組み3aにコンクリートWを打設することにより、柱
2と略等しく構成されている。
As shown in FIGS. 1 and 2, the beam 3 includes a beam steel frame 8 in which H-shaped steel is horizontally arranged, and a beam main bar 9 extending substantially along the length direction of the beam steel frame 8. The concrete structure W is formed substantially in the same manner as the column 2 by placing concrete W on the beam framework 3a including the beam shear reinforcements 10 arranged in the form of being wound around the beam main reinforcements 9.

【0014】図1に示すように、梁鉄骨8は、端部が前
記接合部7の側面に当設されるとともに、接合部7に溶
接されて外方に突出する帯プレート11で接合部7と固
定されている。そして、図2に示すように、梁鉄骨8
は、接合部7の四方の側面に固定されている。
As shown in FIG. 1, an end portion of the beam steel frame 8 is provided on the side surface of the joint portion 7, and the joint portion 7 is welded to the joint portion 7 and protrudes outwardly from the joint plate 7. Has been fixed. Then, as shown in FIG. 2, the beam steel frame 8
Are fixed to the four side surfaces of the joint 7.

【0015】梁主筋9は、梁鉄骨8の上下双方のフラン
ジ8aの両端部でその外面に所定間隔で略略平行に計4
本が配設されるとともに、図3に示すように、前記接合
部7側の端部9aが屈曲されてフランジ8aに固着され
ている。梁用剪断補強筋10は、各梁主筋9の外面に接
した状態でこれら梁主筋9を束ねるようにして卷装さ
れ、梁主筋9の長さ方向に所定間隔で連設されている。
The beam main bars 9 are substantially parallel to the outer surfaces of the upper and lower flanges 8a of the beam steel frame 8 at a predetermined interval.
A book is arranged and, as shown in FIG. 3, an end portion 9a on the joint portion 7 side is bent and fixed to a flange 8a. The beam shear reinforcing bars 10 are mounted so as to bundle the beam main bars 9 in a state of being in contact with the outer surface of each beam main bar 9, and are continuously provided at predetermined intervals in the length direction of the beam main bars 9.

【0016】前記柱梁接合部1を本実施例の鉄骨鉄筋コ
ンクリート構造物における先組鉄筋工法により構築する
には、以下のように行う。まず、工場で柱鉄骨4及び梁
鉄骨8にそれぞれ柱主筋5及び梁主筋9を配設する。次
いで、これら柱主筋5及び梁主筋9の周囲に柱主筋5及
び梁主筋9を巻く形態で柱用剪断補強筋6及び梁用剪断
補強筋10を配設して、柱2及び梁3の鉄骨と鉄筋を前
記形態に先組する。柱主筋5及び梁主筋9は、それぞれ
柱鉄骨4及び梁鉄骨8の接合部7の手前の位置で、それ
ぞれの端部5a、9aをフランジ4a、8aに溶接する
ことにより、図3に示すように、略緊張するようにして
固定する。前記溶接は、フレアー溶接等により行う。
The above-described beam-column joint 1 is constructed as follows by the pre-assembled reinforcing bar construction method for the steel frame reinforced concrete structure of this embodiment. First, in the factory, the column main rebar 5 and the beam main rebar 9 are arranged on the column steel frame 4 and the beam steel frame 8, respectively. Next, the column reinforcement bars 6 and the beam reinforcement bars 10 are arranged in such a manner that the column reinforcement bars 5 and the beam reinforcement bars 9 are wound around the column reinforcement bars 5 and the beam reinforcement bars 9, and the steel frames of the columns 2 and 3 are arranged. And rebar are assembled in the above-mentioned form. As shown in FIG. 3, the column main bar 5 and the beam main bar 9 are welded to the flanges 4a and 8a at their ends 5a and 9a at positions before the joint 7 of the column steel frame 4 and the beam steel frame 8, respectively. Then, fix it so that it is almost tense. The welding is performed by flare welding or the like.

【0017】前記工程の完了後、前記各鉄筋の配設が完
了した柱鉄骨4及び梁鉄骨5を作業位置に移送し、所定
位置に建て込む。
After the above steps are completed, the column steel frame 4 and the beam steel frame 5 on which the arrangement of the respective reinforcing bars has been completed are transferred to the work position and installed at a predetermined position.

【0018】そして前記建て込み工程の完了後、柱主筋
5及び梁主筋9と柱鉄骨4及び梁鉄骨8にそれぞれ柱2
及び梁3を構成する位置で型枠(図示せず)を取り付け
てコンクリートWを打設し、柱2及び梁3を完成する。
After the building process is completed, the pillar main bar 5 and the beam main bar 9 are connected to the pillar steel frame 4 and the beam steel frame 8, respectively.
Further, a mold (not shown) is attached at a position where the beam 3 and the beam 3 are formed, and concrete W is placed to complete the column 2 and the beam 3.

【0019】前記本実施例の鉄骨鉄筋コンクリート構造
物における先組鉄筋工法によれば、柱主筋5及び梁主筋
9を、柱2、梁3の手前の位置で、その端部5a、9a
を柱鉄骨4及び梁鉄骨8のフランジ4a、8aに固定す
ることより、柱2、梁3の接合部7内に挿通することな
く定着させることができ、接合部7内の各主筋、剪断補
強筋の取り合いを単純にして、柱梁接合部1の設計の自
由度が向上する。
According to the pre-assembled reinforcing bar construction method for the steel frame reinforced concrete structure of the present embodiment, the column main bar 5 and the beam main bar 9 are located in front of the columns 2 and 3 and their end portions 5a, 9a.
By fixing the to the flanges 4a, 8a of the column steel frame 4 and the beam steel frame 8, it can be fixed without being inserted into the joint 7 of the column 2 and the beam 3, and each main bar in the joint 7 and shear reinforcement. The design of the beam-column joint portion 1 is improved by simplifying the bracing.

【0020】また、柱鉄骨4及び梁鉄骨8への配筋を工
場で行って現場での配筋を省力化することが出来るか
ら、作業環境の整った場所で配筋することが出来、配筋
の作業能率が向上する。
Further, since the reinforcement of the column steel beams 4 and the beam steel frames 8 can be carried out in the factory to reduce the labor of the on-site reinforcement, it is possible to arrange the reinforcement in a place where the working environment is well prepared. Improves muscle work efficiency.

【0021】以下、本発明の第2実施例を図4及び図5
を参照して説明する。図中符号20は、本実施例の鉄骨
鉄筋コンクリート構造物における先組鉄筋工法により施
工された柱梁接合部である。なお、図4及び図5に示す
柱梁接合部20の前記図1ないし図3と異なる点は、図
中符号21ないし24の柱主筋及び梁主筋と、これらを
固定するための固定用治具及びナットのみである。
A second embodiment of the present invention will be described below with reference to FIGS.
Will be described. Reference numeral 20 in the drawing denotes a beam-column joint portion of the steel-framed reinforced concrete structure of this embodiment, which is constructed by the pre-assembled reinforcing bar method. It should be noted that the points different from those of FIGS. 1 to 3 of the beam-column joint portion 20 shown in FIGS. 4 and 5 are column main bars and beam main bars 21 to 24 in the drawings, and a fixing jig for fixing them. And nuts only.

【0022】図4及び図5に示すように、柱梁接合部2
0は、柱主筋21及び梁主筋22をフランジ4a、8a
において接合部7の手前に溶着された固定用治具23に
固定してなっている。
As shown in FIGS. 4 and 5, the beam-column joint 2
0 indicates that the column main bar 21 and the beam main bar 22 are flanges 4a and 8a.
In the above, it is fixed to the fixing jig 23 welded in front of the joint 7.

【0023】柱主筋21及び梁主筋22は、直線状に形
成され、フランジ4a、8aに略略平行に配設されてい
る。また、柱主筋21及び梁主筋22の接合部7側の端
部21a、22aには、ネジが螺刻されている。
The column main reinforcement 21 and the beam main reinforcement 22 are formed in a straight line and are arranged substantially parallel to the flanges 4a and 8a. Further, screws are threaded on the end portions 21a, 22a of the main column 21 and the main beam 22 on the joint 7 side.

【0024】固定用治具23は、正面視L字状に形成さ
れた鉄製の部材であって、底部23aがフランジ4a、
8aに接合部7の手前で溶接されることにより柱2及び
梁3に固定されている。図5に示すように、底部23a
は、平面視台形状であって、フランジ4a、8aの幅に
略等しい長さに形成された短辺側を接合部7側にすると
ともに、この短辺より長く形成された長辺側を短辺の反
対側でフランジ4a、8aから幅方向均等に突出するよ
うにして配設されている。また、底部23aの長辺側の
端部には、端部21a、22aが取り付けられてその引
っ張り力を支持する主筋取り付け部23bが上方に突出
して形成されている。主筋取り付け部23bは、底部2
3aの長辺側の端部に沿って延び、フランジ4a、8a
の幅方向両側面から外方に突出した両端部に、自身を厚
さ方向に貫通する主筋挿通孔23cが貫設されている。
主筋挿通孔23cには、端部21a、22aが、接合部
7の反対側から挿入され、端部21a、22aのそれぞ
れ接合部7側に突出した部分にナット24を螺合するこ
とにより取り付けられている。
The fixing jig 23 is an iron member formed in an L-shape when viewed from the front, and has a bottom portion 23a having a flange 4a,
It is fixed to the pillar 2 and the beam 3 by being welded to the joint portion 7 before being joined to 8a. As shown in FIG. 5, the bottom portion 23a
Is a trapezoidal shape in a plan view, and the short side formed to have a length substantially equal to the width of the flanges 4a and 8a is the joint 7 side, and the long side formed longer than the short side is short. It is arranged so as to uniformly project in the width direction from the flanges 4a and 8a on the opposite side of the side. Further, a main bar attachment portion 23b, to which the end portions 21a and 22a are attached and which supports the pulling force, is formed at the end portion on the long side of the bottom portion 23a so as to project upward. The main bar attaching portion 23b has a bottom portion 2.
3a extends along the long-side end of the flanges 4a, 8a
At both end portions projecting outward from both side surfaces in the width direction, a main-strip insertion hole 23c penetrating itself in the thickness direction is provided.
Ends 21a and 22a are inserted into the main muscle insertion hole 23c from the side opposite to the joint portion 7, and are attached by screwing nuts 24 into the portions of the end portions 21a and 22a protruding toward the joint portion 7 side. ing.

【0025】前記柱梁接合部20を本実施例の鉄骨鉄筋
コンクリート構造物における先組鉄筋工法により構築す
るには、以下のようにして行う。
The above-mentioned beam-column joint 20 is constructed as follows in the steel frame reinforced concrete structure of this embodiment by the pre-assembled reinforcing bar construction method.

【0026】まず、工場でフランジ4a、8aの外面に
固定用治具23を溶接して固定する。固定用治具23
は、前記要領で所定の向きとする。次いで、柱主筋21
及び梁主筋22の接合部7と反対側の端部を固定した
後、端部21a、22aを固定用治具23に挿入する。
そして、端部21a、22aの固定用治具23の7側に
突出した端部にナット24を螺合することにより、柱主
筋21及び梁主筋22を略緊張させ固定する。
First, a fixing jig 23 is welded and fixed to the outer surfaces of the flanges 4a and 8a at the factory. Fixing jig 23
Is in a predetermined orientation as described above. Next, the main pillar 21
After fixing the end portion of the beam main bar 22 on the side opposite to the joint portion 7, the end portions 21 a and 22 a are inserted into the fixing jig 23.
Then, the nuts 24 are screwed into the ends of the end portions 21a and 22a protruding toward the 7 side of the fixing jig 23, whereby the column main bar 21 and the beam main bar 22 are substantially tensioned and fixed.

【0027】取り付けの完了した柱鉄骨4及び柱主筋5
には、前記柱用剪断補強筋6及び梁用剪断補強筋10を
前記第1実施例の要領で取り付け、以下、前記第1実施
例と同様にして柱梁接合部20を施工する。
The column steel frame 4 and the column main bar 5 that have been installed
The column shear reinforcement 6 and the beam shear reinforcement 10 are attached in the same manner as in the first embodiment, and the column-beam joint 20 is constructed in the same manner as in the first embodiment.

【0028】前記本実施例の鉄骨鉄筋コンクリート構造
物における先組鉄筋工法によれば、柱主筋21及び梁主
筋22を、端部21a、22aにナット24を螺合する
ことにより取り付けるから、前記第1実施例に示すフラ
ンジ4a、8aに直接溶接する方法に比して、柱主筋2
1及び梁主筋22が略緊張するように取り付けることが
簡単となるといった効果を奏する。
According to the pre-assembled reinforcing bar construction method for the steel frame reinforced concrete structure of the present embodiment, the column main bar 21 and the beam main bar 22 are attached by screwing nuts 24 to the ends 21a, 22a. Compared with the method of directly welding to the flanges 4a and 8a shown in the embodiment, the column main bar 2
1 and the beam main bar 22 are easily tensioned so that they can be easily attached.

【0029】以下、本発明の第3実施例を図6を参照し
て説明する。図中符号30は、本実施例の鉄骨鉄筋コン
クリート構造物における先組鉄筋工法により施工された
柱梁接合部である。なお、図6に示す柱梁接合部30の
前記図1ないし図3と異なる点は、図中符号31ないし
34の柱主筋及び梁主筋と、これらを固定するためのコ
ンクリート及び鉄板のみである。
The third embodiment of the present invention will be described below with reference to FIG. Reference numeral 30 in the drawing denotes a beam-column joint portion of the steel-framed reinforced concrete structure of this embodiment, which is constructed by the pre-assembled reinforcement method. The column-beam joint portion 30 shown in FIG. 6 differs from the above-described FIGS. 1 to 3 only in the column main bars and beam main bars 31 to 34 in the figure, and in concrete and iron plate for fixing them.

【0030】図6に示すように、柱梁接合部30は、直
線状に形成された柱主筋31及び梁主筋32を、前記柱
鉄骨4及び梁鉄骨8のそれぞれフランジ4a、8aの外
面に接合部7の手前の位置で固定してなっている。
As shown in FIG. 6, in the beam-column joint portion 30, the column main reinforcement 31 and the beam main reinforcement 32, which are linearly formed, are joined to the outer surfaces of the flanges 4a and 8a of the column steel frame 4 and the beam steel frame 8, respectively. It is fixed at a position before the part 7.

【0031】柱主筋31及び梁主筋32は、それぞれ接
合部7側の端部31a、32aをフランジ4a、8aの
外面から突出して設置された支持コンクリート33内に
埋設して固定されるとともに、全体がフランジ4a、8
aに略略平行として配設されている。支持コンクリート
33は、フランジ4a、8aの外面に接合部7の手前で
溶接された鉄板34を介して取り付けられている。鉄板
34は、外面が目荒らしされて表面が粗く形成されると
ともに、この表面に支持コンクリート33が打設される
ことにより、支持コンクリート33を介して伝達される
柱主筋31及び梁主筋32の引っ張り力を支持可能とな
っている。
The column main bar 31 and the beam main bar 32 are fixed by embedding the end parts 31a, 32a on the joint 7 side in a supporting concrete 33 installed so as to project from the outer surfaces of the flanges 4a, 8a. Are flanges 4a, 8
It is arranged substantially parallel to a. The supporting concrete 33 is attached to the outer surfaces of the flanges 4a and 8a via an iron plate 34 welded in front of the joint 7. The iron plate 34 has a roughened outer surface and a rough surface, and when the support concrete 33 is cast on this surface, the tension of the column main bars 31 and the beam main bars 32 transmitted through the support concrete 33 is pulled. Power can be supported.

【0032】前記柱梁接合部30を本実施例の鉄骨鉄筋
コンクリート構造物における先組鉄筋工法により構築す
るには、以下のようにして行う。
The pillar-beam joint 30 is constructed as follows by the pre-assembled reinforcing bar construction method for the steel frame reinforced concrete structure of this embodiment.

【0033】まず、工場でフランジ4a、8aの外面に
接合部7の手前で鉄板34を溶接して固定する。次い
で、柱主筋31及び梁主筋32の接合部7と反対側の端
部を固定した後、全体を略緊張するようにして接合部7
側の端部31a、32aを固定位置に位置させる。そし
て、前記位置を保持したまま支持コンクリート33を打
設することにより柱主筋31及び梁主筋32の端部31
a、32aを固定する。
First, the iron plate 34 is welded and fixed to the outer surfaces of the flanges 4a and 8a in front of the joint 7 at the factory. Next, after fixing the ends of the column main bars 31 and the beam main bars 32 on the opposite side to the joints 7, the whole joints 7 are made substantially tensioned.
The side ends 31a and 32a are located at the fixed position. Then, by placing the supporting concrete 33 while maintaining the above position, the end portions 31 of the column main bar 31 and the beam main bar 32 are
a and 32a are fixed.

【0034】支持コンクリート33が強度を発現後、柱
主筋31及び梁主筋32に前記柱用剪断補強筋6及び梁
用剪断補強筋10を前記第1実施例の要領で取り付け、
以下、前記第1実施例と同様にして柱梁接合部30を施
工する。
After the supporting concrete 33 develops strength, the column shear reinforcements 6 and the beam shear reinforcements 10 are attached to the column main reinforcements 31 and the beam main reinforcements 32 in the same manner as in the first embodiment.
Hereinafter, the beam-column joint portion 30 is constructed in the same manner as in the first embodiment.

【0035】前記本実施例の鉄骨鉄筋コンクリート構造
物における先組鉄筋工法によれば、柱主筋31及び梁主
筋32に作用する引っ張り力を支持コンクリート33及
び鉄板34を介してフランジ4a、8aに伝達するか
ら、引っ張り力を支持する面積を大きく取ることがで
き、柱主筋31及び梁主筋32の引っ張りに対する支持
力が向上する。その結果、柱主筋31及び梁主筋32に
取り付ける柱用剪断補強筋6及び梁用剪断補強筋10な
ども強度の高い配設方法で配設することが出来るから、
柱梁接合部30の強度を向上することができる。
According to the pre-assembled reinforcing bar construction method in the steel frame reinforced concrete structure of the present embodiment, the tensile force acting on the column main bar 31 and the beam main bar 32 is transmitted to the flanges 4a, 8a via the supporting concrete 33 and the iron plate 34. Therefore, a large area for supporting the pulling force can be taken, and the supporting force for the pull of the column main bar 31 and the beam main bar 32 is improved. As a result, since the column shear reinforcing bar 6 and the beam shear reinforcing bar 10 to be attached to the column main bar 31 and the beam main bar 32 can be arranged by a high strength arrangement method,
The strength of the beam-column joint portion 30 can be improved.

【0036】[0036]

【発明の効果】以上説明したように、本発明の鉄骨鉄筋
コンクリート構造物における先組鉄筋工法によれば、柱
鉄骨及び梁鉄骨に予め柱主筋及び梁主筋を定着するとと
もに、これら柱主筋及び梁主筋の周囲に柱主筋及び梁主
筋を巻く形態で剪断補強筋を配設して柱及び梁の鉄骨と
鉄筋を先組しておく工程と、前記各主筋と剪断補強筋の
配設の完了した柱鉄骨及び梁鉄骨を建て込む工程と、前
記建て込み工程の完了後、柱鉄骨及び梁鉄骨に型枠を取
り付けてコンクリートを打設し、柱及び梁を完成する工
程とを備え、前記柱主筋及び梁主筋の定着方法は、柱、
梁の接合部の手前の位置で、各主筋の端部を溶接、ねじ
式または重ね継手等により柱鉄骨及び梁鉄骨のフランジ
に固定することにより行うことを特徴とするから、柱鉄
骨及び梁鉄骨への鉄筋の配設を簡単にして作業能率が向
上するほか、柱、梁の接合部内に挿通することなく定着
させることが可能となり、前記接合部内の鉄筋の取り合
いを単純にして、建物の設計の自由度が向上する。ま
た、その結果、建物の強度を向上する設計などが容易と
なる。
As described above, according to the pre-assembled reinforcing bar construction method for the steel frame reinforced concrete structure of the present invention, the column main bars and the beam main bars are fixed to the column steel frames and the beam steel frames in advance, and the column main bars and the beam main bars are provided. A step of arranging shear reinforcements around the column in the form of winding column reinforcements and beam reinforcements to preassemble the steel frames and reinforcements of the columns and beams, and the columns where the arrangement of each reinforcement and shear reinforcement is completed The method comprises the steps of erection of a steel frame and beam steel frame, and, after the completion of the erection process, a step of attaching a form to the column steel frame and the beam steel frame and placing concrete to complete the column and the beam. The main method of fixing the main beam is the pillar,
Since the end of each main bar is fixed to the column steel frame and the flange of the beam steel frame by welding, screw type or lap joint at a position before the beam joint, the column steel frame and the beam steel frame In addition to simplifying the arrangement of reinforcing bars in the joint to improve work efficiency, it is possible to fix them without inserting them into the joints of columns and beams, simplifying the joints of reinforcing bars in the joints and designing the building. The degree of freedom of is improved. Further, as a result, it becomes easy to design the building to improve its strength.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1実施例を示す全体図である。FIG. 1 is an overall view showing a first embodiment of the present invention.

【図2】前記平面図である。FIG. 2 is the plan view.

【図3】前記柱鉄骨及び梁鉄骨への柱主筋及び梁主筋の
取り付けを示す拡大側面図である。
FIG. 3 is an enlarged side view showing how the column main bars and the beam main bars are attached to the column steel frame and the beam steel frame.

【図4】本発明の第2実施例の柱鉄骨及び梁鉄骨への柱
主筋及び梁主筋の取り付けを示す拡大側面図である。
FIG. 4 is an enlarged side view showing the attachment of the column main bar and the beam main bar to the column steel frame and the beam steel frame of the second embodiment of the present invention.

【図5】前記拡大平面図である。FIG. 5 is the enlarged plan view.

【図6】本発明の第3実施例の柱鉄骨及び梁鉄骨への柱
主筋及び梁主筋の取り付けを示す拡大平面図である。
FIG. 6 is an enlarged plan view showing attachment of a column main bar and a beam main bar to a column steel frame and a beam steel frame of a third embodiment of the present invention.

【符号の説明】[Explanation of symbols]

2 柱 3 梁 4 柱鉄骨 4a フランジ 5 柱主筋 5a 端部 6 柱用剪断補強筋 7 接合部 8 梁鉄骨 8a フランジ 9 梁主筋 9a 端部 10 梁用剪断補強筋 21 柱主筋 21a 端部 22 梁主筋 22a 端部 31 柱主筋 31a 端部 32 梁主筋 32a 端部 2 columns 3 beams 4 columns steel frames 4a flanges 5 column main bars 5a ends 6 column shear reinforcement bars 7 joints 8 beam steel frames 8a flanges 9 beam main bars 9a ends 10 beam shear reinforcement bars 21 column main bars 21a ends 22 beam main bars 22a End part 31 Column main reinforcement 31a End part 32 Beam main reinforcement 32a End part

───────────────────────────────────────────────────── フロントページの続き (72)発明者 神野 靖夫 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 (72)発明者 熊谷 仁志 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Yasuo Jinno 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Hitoshi Kumagai 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Construction Within the corporation

Claims (1)

【特許請求の範囲】 【請求項1】 柱鉄骨及び梁鉄骨に予め柱主筋及び梁主
筋を定着するとともに、これら柱主筋及び梁主筋の周囲
に柱主筋及び梁主筋を巻く形態で剪断補強筋を配設して
柱及び梁の鉄骨と鉄筋を先組しておく工程と、 前記各主筋と剪断補強筋の配設の完了した柱鉄骨及び梁
鉄骨を建て込む工程と、 前記建て込み工程の完了後、柱鉄骨及び梁鉄骨に型枠を
取り付けてコンクリートを打設し、柱及び梁を完成する
工程とを備え、 前記柱主筋及び梁主筋の定着方法は、柱、梁の接合部の
手前の位置で、各主筋の端部を溶接、ねじ式または重ね
継手等により柱鉄骨及び梁鉄骨のフランジに固定するこ
とにより行うことを特徴とする鉄骨鉄筋コンクリート構
造物における先組鉄筋工法。
Claims: 1. A column main bar and a beam main bar are preliminarily fixed to a column steel beam and a beam steel frame, and a shear reinforcing bar is wound around the column main bar and the beam main bar in the form of winding the column main bar and the beam main bar. Arranging and pre-assembling the steel frames and reinforcing bars of columns and beams; building the pillar steel beams and beam steel frames in which the respective main bars and shear reinforcing bars have been installed; and completing the erection step After that, a process of attaching a formwork to the column steel frame and the beam steel frame, placing concrete, and completing the column and the beam, the method of fixing the column main bar and the beam main bar is as follows: At the position, the end of each main bar is fixed to the flange of the column steel frame and the beam steel frame by welding, screw type or lap joint, etc., and the pre-assembled reinforcing bar construction method in the steel frame reinforced concrete structure is characterized.
JP19568391A 1991-07-10 1991-07-10 Prefabricated reinforcing bar construction method for steel framed reinforced concrete structure Withdrawn JPH0518113A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19568391A JPH0518113A (en) 1991-07-10 1991-07-10 Prefabricated reinforcing bar construction method for steel framed reinforced concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19568391A JPH0518113A (en) 1991-07-10 1991-07-10 Prefabricated reinforcing bar construction method for steel framed reinforced concrete structure

Publications (1)

Publication Number Publication Date
JPH0518113A true JPH0518113A (en) 1993-01-26

Family

ID=16345267

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19568391A Withdrawn JPH0518113A (en) 1991-07-10 1991-07-10 Prefabricated reinforcing bar construction method for steel framed reinforced concrete structure

Country Status (1)

Country Link
JP (1) JPH0518113A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7362393B2 (en) 2003-03-24 2008-04-22 Samsung Electronics Co., Ltd. Four color liquid crystal display

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7362393B2 (en) 2003-03-24 2008-04-22 Samsung Electronics Co., Ltd. Four color liquid crystal display

Similar Documents

Publication Publication Date Title
JP2645365B2 (en) Beam-column joint
JP2000170285A (en) Connecting method for steel sheet concrete structural wall and junction structure
JP4264916B2 (en) End RC steel beam
JP2927402B2 (en) Column-beam joint structure of concrete building
JPH0711710A (en) Reinforced concrete column and steel frame beam jointing structure and building constructing method
JPH06212691A (en) Construction of building
JPH0518113A (en) Prefabricated reinforcing bar construction method for steel framed reinforced concrete structure
JP4318787B2 (en) Construction method of foundation structure
JP2000073448A (en) Connection method and structure for precast concrete beam and column
JP4085023B2 (en) Connection structure of steel column or steel pipe column and beam reinforcement
JP2600961B2 (en) Connection structure between reinforced concrete columns and steel beams
JP2614000B2 (en) Basics of steel frame
JP2004052389A (en) Panel zone constructing method and precast beam
JP2972962B2 (en) Connection structure
JP2893406B2 (en) Precast concrete beam-column joining method
JPH07113260A (en) Method for connecting column and beam
JPH10317684A (en) Fixing method of earthquake-resisting reinforcing brace
JP3284383B2 (en) Support hardware for SRC beam construction
JPH03275833A (en) Joint construction of column and beam
JPH073940A (en) Precast beam of steel frame reinforced concrete structure
JP3608086B2 (en) Column / beam joint structure
JPH07252882A (en) Connecting method for building frame
JPH10299260A (en) Earthquake-resistant improving method for existing building by square type frame
JPH0135986B2 (en)
JPH02256734A (en) Joint work of beam-column

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 19981008