JPH05179737A JP36029591A JP36029591A JPH05179737A JP H05179737 A JPH05179737 A JP H05179737A JP 36029591 A JP36029591 A JP 36029591A JP 36029591 A JP36029591 A JP 36029591A JP H05179737 A JPH05179737 A JP H05179737A
Authority
JP
Japan
Prior art keywords
curtain wall
wall unit
assembled
assembling
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP36029591A
Other languages
Japanese (ja)
Inventor
Takazo Okano
登三 岡野
Michiyoshi Ando
道義 安藤
Hidenori Kamoshita
栄紀 鴨下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Shin Nikkei Co Ltd
Original Assignee
Fujita Corp
Shin Nikkei Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp, Shin Nikkei Co Ltd filed Critical Fujita Corp
Priority to JP36029591A priority Critical patent/JPH05179737A/en
Publication of JPH05179737A publication Critical patent/JPH05179737A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

PURPOSE:To obtain a fitting method of a curtain wall by which labor-saving, safety, reduction of construction period, automatic construction, etc., are realized and tests of water-tightness, adjustment of images, or the like can be performed in advance before assemblying to the concrete body and the quality on the finishing external decoration can be increased. CONSTITUTION:When a curtain wall is fitted on a concrete wallbody, a plurality of vertical frames 5 and lateral beams 7 are previously assembled. And then glass plates 9 and fire-proof boards 13 are attached to the vertical frames 5 and the lateral beams 7 to assemble a curtain wall unit 3. And the curtain wall units 3 are fitted to the concrete body by turns.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明はカーテンウォールの組み
付け方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of assembling a curtain wall.

【0002】[0002]

【従来の技術】近年、建物の高層化に伴い、その外装仕
様としてカーテンウォールが急速に定着しつつある。一
方、建設工事費の中でも、外装工事の占める割合は非常
に高く、また、外装工事を如何に早く完成させるかは、
天候の影響を受けずに内装工事を行なう上で重要とな
る。しかしながら、従来のカーテンウォール仕様の外装
工事では、コンクリート躯体に方立、無目、押縁等を順
次個別に取り付けた後、ガラス板や耐火ボードを取り付
け、ガラス回りのシーリングやクリーニングを行なう
等、多職種の作業員が足場板やゴンドラ等に乗ってカー
テンウォールの各構成部材を施工階毎にノックダウン方
式で組み付けている。
2. Description of the Related Art In recent years, with the increase in the number of buildings, curtain walls are rapidly becoming established as exterior specifications. On the other hand, in the construction cost, the ratio of exterior work is very high, and how fast the exterior work is completed is
It is important for interior work without being affected by the weather. However, in the conventional curtain wall specification exterior work, after mounting upright, seamless, edging, etc. on the concrete skeleton one by one, glass plates and fireproof boards are attached, and sealing and cleaning around the glass are often performed. Workers of different occupations ride on scaffolding boards, gondola, etc. to assemble the components of the curtain wall by knockdown method for each construction floor.

【0003】[0003]

【発明が解決しようとする課題】そのため、従来のノッ
クダウン方式の施工法では、省力化、安全化、工期の短
縮化、無人化施工を図り難い問題があった。また、水密
性能や映像調整等の試験は、従来の施工法では、実際に
外装工事全体が完成したのちでないと行なえず、また、
多職種の作業員がカーテンウォールの各構成部材を施工
階毎に組み付けていくため、品質に対する責任範囲も不
明確となりがちで、外装仕上を高品質に維持し難い問題
もあった。本発明は前記事情に鑑み案出されたものであ
って、本発明の目的は、省力化、安全化、工期の短縮
化、無人化施工を図り、更には、コンクリート躯体に組
み付ける以前に水密性能や映像調整等の試験を行なえ、
外装仕上の品質を格段と高めることができるカーテンウ
ォールの組み付け方法を提供することにある。
Therefore, the conventional knockdown type construction method has a problem that it is difficult to achieve labor saving, safety, shortening of construction period, and unmanned construction. In addition, tests such as watertightness and image adjustment can be done by the conventional construction method only after the entire exterior work is actually completed.
Since workers of various occupations assemble each component of the curtain wall for each construction floor, the range of responsibility for quality tends to be unclear, and it is difficult to maintain a high quality exterior finish. The present invention has been devised in view of the above circumstances, the object of the present invention, labor-saving, safety, shortening the construction period, unattended construction, further, watertight performance before assembling to the concrete frame You can perform tests such as
It is an object of the present invention to provide a method of assembling a curtain wall that can remarkably improve the quality of exterior finish.

【0004】[0004]

【課題を解決するための手段】前記目的を達成するため
本発明は、コンクリート躯体にカーテンウォールを組み
付けるに際して、予め、複数の方立と複数の無目とを組
み付け、更に、これら方立と無目とにわたってガラス板
や耐火ボードを組み付けてカーテンウォールユニットを
組み立て、このカーテンウォールユニットを順次コンク
リート躯体に組み付けるようにしたことを特徴とする。
また、本発明は、前記カーテンウォールユニットの高さ
が、建物の階高分の大きさで形成されていることを特徴
とする。
[Means for Solving the Problems] To achieve the above object, in the present invention, when assembling a curtain wall to a concrete skeleton, a plurality of cubes and a plurality of blinds are assembled in advance, and further, these cubes and cubes are not assembled. The feature is that the curtain wall unit is assembled by assembling the glass plate and the fireproof board over the eyes, and the curtain wall unit is sequentially assembled on the concrete frame.
Further, the present invention is characterized in that the height of the curtain wall unit is formed to have a size corresponding to a floor height of a building.

【0005】[0005]

【実施例】以下、本発明によるカーテンウォールの組み
付け方法を図面を参照して説明する。図1は本発明方法
により外装工事が施された高層建物1の斜視図を示し、
建物1の5階から上方の外装はアルミカーテンウォール
仕様で、図2に正面図で、図3に断面側面図で示すカー
テンウォールユニット3が多数コンクリート躯体に組み
付けられている。カーテンウォールユニット3は水平方
向に間隔を置き上下に延出する3本の方立5と、上下方
向に間隔を置き水平方向に延出する4本の無目7と、こ
れら方立5及び無目7で形成される空間に嵌込まれた熱
線反射ガラス板9と、無目7の裏面に取着され水平方向
に延出する水平補強材11と、この水平補強材11を介
して取着された耐火ボード13等から構成され、ガラス
板回りはシーリングが施されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A method of assembling a curtain wall according to the present invention will be described below with reference to the drawings. FIG. 1 shows a perspective view of a high-rise building 1 that has been subjected to exterior work by the method of the present invention,
The exterior of the building 1 above the 5th floor has an aluminum curtain wall specification, and a large number of curtain wall units 3 shown in the front view of FIG. 2 and the sectional side view of FIG. 3 are assembled in a concrete skeleton. The curtain wall unit 3 has three uprights 5 which are horizontally spaced apart and extend vertically, and four blind eyes 7 which are vertically spaced apart and extend horizontally, and these uprights 5 and The heat ray reflective glass plate 9 fitted in the space formed by the eyes 7, the horizontal reinforcing member 11 attached to the back surface of the eyeless member 7 and extending in the horizontal direction, and the attachment through the horizontal reinforcing member 11. It is composed of the fireproof board 13 and the like, and the periphery of the glass plate is sealed.

【0006】カーテンウォールユニット3の高さは建物
1の階高分の大きさで形成され、また、長さは1スパン
分の大きさで形成されている。通常のカーテンウォール
では、方立5をコンクリート躯体に固定してはじめて面
としての強度、剛性が確保されるが、本発明では、複数
の方立5、無目7、ガラス板9、耐火ボード13等が組
み立てられたカーテンウォールユニット3としてコンク
リート躯体に組み付ける関係上、吊り上げ時や移動時に
カーテンウォールユニット3の品質が維持できる程度に
水平補強材11等によりその強度、剛性が確保されてい
る。この実施例では各方立5の下端は、最下位に位置す
る無目7よりも下方に突出しており、カーテンウォール
ユニット3のコンクリート躯体への取り付け時、各方立
5の下端と最下位に位置する無目7とにより形成された
下方に開放状の空間15に、換気窓が組み込まれる。ま
た、各方立5の上端には、アルミ型材製のジョイントス
リーブ17が上方に突設され、各方立5の下端には下方
に開放状の凹部19が形成されている。この実施例で
は、各方立5から突設された三つのジョイントスリーブ
17の高さは、50mm、60mm、70mmと互いに
異ならせて形成されている。また、各方立5の上部で耐
火ボート13が取り付けられる側には、カーテンウォー
ルユニット3をコンクリート躯体に固定するための結合
具20が溶着されている。
The height of the curtain wall unit 3 is formed to the size of the floor height of the building 1, and the length is formed to the size of one span. In an ordinary curtain wall, the strength and rigidity as a surface are ensured only after fixing the uprights 5 to the concrete frame, but in the present invention, the plurality of uprights 5, the blinds 7, the glass plate 9, the fireproof board 13 are provided. In order to assemble the curtain wall unit 3 into a concrete skeleton as an assembled curtain wall unit 3, its strength and rigidity are secured by the horizontal reinforcing member 11 etc. to such an extent that the quality of the curtain wall unit 3 can be maintained during lifting or moving. In this embodiment, the lower end of each cuboid 5 is projected below the bottomless eye-less 7, and when the curtain wall unit 3 is attached to the concrete frame, the lower end of each cuboid 5 and the lowest position are attached. A ventilation window is incorporated in the downwardly open space 15 formed by the eye-catching eyes 7 located. Further, a joint sleeve 17 made of an aluminum mold material is provided so as to project upward at the upper end of each cuboid 5, and an open concave portion 19 is formed below at the lower end of each cuboid 5. In this embodiment, the heights of the three joint sleeves 17 protruding from each of the uprights 5 are 50 mm, 60 mm, and 70 mm, which are different from each other. Further, a coupling tool 20 for fixing the curtain wall unit 3 to the concrete frame is welded to the side of the uprights 5 to which the fireproof boat 13 is attached.

【0007】このようなカーテンウォールユニット3を
コンクリート躯体に組み付けて建物1の外装工事を行な
えば、例えば、高層建物1の敷地内にカーテンウォール
ユニット組み立て装置を立設しておき、このカーテンウ
ォールユニット組み立て装置で組み立てたカーテンウォ
ールユニット3をコンクリート躯体に順次組み付けてい
くことができる。カーテンウォールユニット3を組み立
てるためのカーテンウォールユニット組み立て装置21
は、例えば、図4に正面図で、図5に側面図で示すよう
に、所定の前後幅、所定の高さで左右に延設された枠体
23等で構成することができる。カーテンウォールユニ
ット組み立て装置21について説明すると、枠体23
は、左右に間隔を置きカーテンウォールユニット3より
も大きな高さで多数立設された前後の縦材25と、前後
の縦材25に夫々上下に間隔を置いて左右に掛け渡され
た横材27と、前後の縦材25間に上下に間隔を置いて
前後に掛け渡された中間材29と、前後の縦材25の上
部間に前後に掛け渡された上材31とから構成されてい
る。
When such a curtain wall unit 3 is assembled to a concrete frame and exterior construction of the building 1 is performed, for example, a curtain wall unit assembling apparatus is installed upright in the site of the high-rise building 1, and the curtain wall unit is installed. The curtain wall unit 3 assembled by the assembling device can be sequentially assembled to the concrete skeleton. Curtain wall unit assembling device 21 for assembling the curtain wall unit 3
For example, as shown in the front view of FIG. 4 and the side view of FIG. 5, the frame can be configured by a frame body 23 and the like extending left and right with a predetermined front-back width and a predetermined height. Explaining the curtain wall unit assembling device 21, the frame 23
Are the front and rear vertical members 25, which are erected at a height larger than the curtain wall unit 3 with a space left and right, and the horizontal members which are vertically stretched over the front and rear vertical members 25, respectively. 27, an intermediate member 29 which is vertically spanned between the front and rear vertical members 25 and is vertically spaced, and an upper member 31 which is vertically spanned between upper portions of the front and rear vertical members 25. There is.

【0008】前記中間材29上には足場板が載置され、
この足場板上に作業員が乗ってカーテンウォールユニッ
ト3の組み立て作業がなされる。また、前記上材31の
前後の端部の下面には、左右に延出するクレーン走行用
レール33が取着され、このレール33に走行部が係合
されてクレーンが配設されている。
A scaffold plate is placed on the intermediate member 29,
An operator rides on the scaffolding board to assemble the curtain wall unit 3. A crane traveling rail 33 extending leftward and rightward is attached to the lower surfaces of the front and rear ends of the upper member 31, and the traveling portion is engaged with the rail 33 to dispose the crane.

【0009】また、枠体23の前後の地盤上には、該枠
体23に平行してI型鋼35が敷設され、図6に断面正
面図で、図7に平面図で、図8に断面側面図で示すよう
に、I型鋼35の上片3501上には、支持片37が脚
片39及びボルト41、ナット43を介して取着されて
いる。支持片37はI型鋼35の長手方向に所定の間隔
をおいて多数設けられ、各支持片37上に、方立5の下
端の凹部19に係合可能なアルミ型材製のジョイントス
リーブ45が立設されている。従って、この実施例で
は、方立5の下端が支持片37上に載置されて方立下端
の上下方向の位置決めがなされ、また、凹部19にジョ
イントスリーブ45が係合して水平方向における位置決
めがなされ、支持片37とジョイントスリーブ45によ
り方立下端の位置決め部47が構成されている。
Further, on the ground before and after the frame body 23, I type steel 35 is laid in parallel with the frame body 23, and FIG. 6 is a sectional front view, FIG. 7 is a plan view, and FIG. 8 is a sectional view. As shown in the side view, a support piece 37 is attached to an upper piece 3501 of the I-shaped steel 35 via a leg piece 39, a bolt 41, and a nut 43. A large number of supporting pieces 37 are provided at a predetermined interval in the longitudinal direction of the I-shaped steel 35, and on each supporting piece 37, a joint sleeve 45 made of an aluminum-shaped material that can be engaged with the recess 19 at the lower end of the upright 5 stands. It is set up. Therefore, in this embodiment, the lower end of the upright 5 is placed on the support piece 37 for vertical positioning of the upright lower end, and the joint sleeve 45 engages with the concave portion 19 for horizontal positioning. The support piece 37 and the joint sleeve 45 constitute a positioning portion 47 at the lower end of the vertical direction.

【0010】前記ジョイントスリーブ45の上方で、方
立5の高さに対応した横材27上には、図9に断面側面
図で、図10に平面図で示すように、方立5の上端を位
置決めする方立上端の位置決め部51が設けられてい
る。方立上端の位置決め部51は、横材27に取着され
た基板53と、基板53上でヒンジ55を中心として上
下に揺動可能に設けられた断面L字状の支片57と、こ
の支片57にボルト、ナット等を介して取着されたブラ
ケット59と、ブラケット59に固着されたケース61
と、ケース61にスライド可能に組み込まれたアルミ型
材製のジョイントスリーブ63と、ジョイントスリーブ
63の下端に設けられた位置決め部材65とからなる。
ジョイントスリーブ63の上端には、該ジョイントスリ
ーブ63の抜落を防止するためのフランジ67が形成さ
れ、位置決め部材65の下端には、方立5の上端のジョ
イントスリーブ17に係合可能な空間部69が形成され
ている。
Above the joint sleeve 45 and on the cross member 27 corresponding to the height of the upright 5, as shown in a sectional side view in FIG. 9 and a plan view in FIG. Is provided with a vertical upper end positioning portion 51 for positioning. The positioning portion 51 at the upper end of the vertical direction includes a substrate 53 attached to the cross member 27, a support piece 57 having an L-shaped cross section, which is provided on the substrate 53 so as to be vertically swingable around a hinge 55. A bracket 59 attached to the support piece 57 via bolts, nuts, etc., and a case 61 fixed to the bracket 59.
And a joint sleeve 63 made of an aluminum mold material slidably incorporated in the case 61, and a positioning member 65 provided at the lower end of the joint sleeve 63.
A flange 67 is formed at the upper end of the joint sleeve 63 to prevent the joint sleeve 63 from falling out, and a space portion at the lower end of the positioning member 65 that can be engaged with the joint sleeve 17 at the upper end of the upright 5. 69 is formed.

【0011】前記ケース61はヒンジ55の回転軸55
01を中心に揺動可能で、図9に仮想線で示すように、
方立5の上端上方から退避した退避位置と、図9に実線
で示すように、方立5の上端に臨む水平位置との間を上
下に揺動する。ケース61の水平位置は、支片57に設
けた調整ボルト5701の下端が基板53の上板530
1上に係止することで決定される。そして、方立5の下
端を前記位置決め部47で位置決めして方立5を立て、
ケース61を水平位置に揺動させてジョイントスリーブ
63を下降させ、方立5の上端のジョイントスリーブ1
7を位置決め部材65の空間部69に係合させること
で、方立5の上下及び水平方向の位置決め及び固定がな
される。尚、この実施例では建物1の1フロア分に対応
した18のカーテンウォールユニット3が枠体23の前
後において組み立てられる。
The case 61 is a rotary shaft 55 of a hinge 55.
It is possible to swing around 01, and as shown by the phantom line in FIG. 9,
It swings up and down between a retracted position retracted from above the upper end of the upright 5 and a horizontal position facing the upper end of the upright 5 as shown by the solid line in FIG. At the horizontal position of the case 61, the lower end of the adjusting bolt 5701 provided on the support piece 57 is the upper plate 530 of the substrate 53.
It is determined by locking on 1. Then, the lower end of the cube 5 is positioned by the positioning portion 47 to stand the cube 5,
The case 61 is swung to a horizontal position to lower the joint sleeve 63, and the joint sleeve 1 at the upper end of the cube 5 is moved.
By engaging 7 with the space 69 of the positioning member 65, the vertical 5 is positioned and fixed in the vertical and horizontal directions. In this embodiment, 18 curtain wall units 3 corresponding to one floor of the building 1 are assembled before and after the frame body 23.

【0012】次に、このようなカーテンウォールユニッ
ト組み立て装置21でカーテンウォールユニット3を組
み立てる方法について説明する。まず、方立下端の位置
決め部47と、方立上端の位置決め部51により多数の
方立5を位置決め固定し、立設させておく。次に、これ
ら方立5に無目7、水平補強材11を組み付ける。次
に、これら部材5,7,11が所定の精度で組み付けら
れたか否かを検査し、精度が出ていない場合には調整す
る。次に、ガラス板9が嵌込まれる部分にシーリングを
施し、ガラス板9を組み付ける。そして、映像試験を行
ない、映像調整後にガラス板回りのシーリングを行な
う。次に、水密性能試験を行ない、水密性能を備えてい
ないものには再度調整しシーリングを施す。そして、水
密性能を備えたものに耐火ボード13を取り付け、次
に、シール養生を行ない、クリーニングを施してカーテ
ンウォールユニット3が完成する。
Next, a method of assembling the curtain wall unit 3 with such a curtain wall unit assembling apparatus 21 will be described. First, the positioning portion 47 at the lower end of the upright position and the positioning portion 51 at the upper end of the upright position position and fix a large number of the uprights 5 to stand upright. Next, the blind 7 and the horizontal reinforcing member 11 are assembled to the uprights 5. Next, it is inspected whether these members 5, 7 and 11 are assembled with a predetermined accuracy, and if the accuracy is not obtained, adjustment is performed. Next, the portion into which the glass plate 9 is fitted is sealed and the glass plate 9 is assembled. Then, an image test is conducted, and after adjusting the image, sealing around the glass plate is performed. Next, a watertightness test is performed, and those that do not have watertightness are readjusted and sealed. Then, the refractory board 13 is attached to the one having watertightness, and then the seal wall is cured and the curtain wall unit 3 is completed.

【0013】尚、方立5や無目7等の組み付け時には、
作業員が中間材29上の足場板に乗って作業が行なわ
れ、また、方立5、無目7、水平補強材11等の組み付
け位置への運搬は、レール33を走行する走行クレーン
により行なわれる。カーテンウォールユニット3が完成
したならば、例えば、走行クレーンによりストックヤー
ドに運搬し、或は、建設現場に配置された起重機により
カーテンウォールユニット3を吊り上げ、コンクリート
躯体の所定の取り付け箇所に移動させる。
In addition, when assembling the cubic 5 and the blind 7, etc.,
The worker rides on the scaffolding board on the intermediate member 29 to carry out the work, and the vertical crane 5, the blind 7, the horizontal reinforcing member 11 and the like are transported to the assembly position by a traveling crane traveling on the rail 33. Be done. When the curtain wall unit 3 is completed, for example, it is transported to a stockyard by a traveling crane, or the curtain wall unit 3 is lifted by a hoist placed at a construction site and moved to a predetermined mounting position on the concrete frame.

【0014】次に、このようにして組み立てられたカー
テンウォールユニット3のコンクリート躯体への組み付
けについて説明する。先ず、図11に示すように、コン
クリート躯体Cに、ファスナー71を先付けし、通り・
出入りの基準墨を基に位置決めしてファスナー部の本溶
接まで終らせておく。次に、ストックヤードから、或は
組み立て装置21からカーテンウォールユニット3を吊
り上げてコンクリート躯体Cの所定箇所に移動させる。
Next, the assembling of the thus constructed curtain wall unit 3 to the concrete skeleton will be described. First, as shown in FIG. 11, a fastener 71 is attached to the concrete frame C in advance, and
Position the fastener based on the standard black ink that comes in and out, and finish the main welding of the fastener. Next, the curtain wall unit 3 is lifted from the stock yard or from the assembling device 21 and moved to a predetermined position on the concrete skeleton C.

【0015】そして、各方立5の下端の凹部19を既に
コンクリート躯体Cに組み付けられたカーテンウォール
ユニット3の方立5の上端のジョイントスリーブ17に
係合させ(コンクリート躯体Cに最初に組み付けるカー
テンウォールユニット3の場合は、例えば、コンクリー
ト躯体C側に取着したジョイントスリーブ等に各方立5
の下端の凹部19を係合させる)、また、方立5の上部
の結合具20をファスナー71にボルト73、ナット7
5で結合する。尚、凹部19とジョイントスリーブ17
との係合時には、既にコンクリート躯体Cに組み付けら
れたカーテンウォールユニット3のジョイントスリーブ
17の高さが夫々異なるので、3本の方立5の一本ずつ
を対応するジョイントスリーブ17に確実に係合させる
ことができ、係合作業が簡単になされる。次に、結合具
20に組み付けた自重受けボルト77でレベル調整を行
ない、レベル調整後、ボルト73、ナット75を締結し
てコンクリート躯体Cへの組み付けを終了する。そして
このようなカーテンウォールユニット3の組み付け作業
を、例えば1階毎に行ない、カーテンウォールユニット
3を順次上方階に組み付けていくことで外装工事を終了
する。
Then, the recess 19 at the lower end of each upright 5 is engaged with the joint sleeve 17 at the upper end of the upright 5 of the curtain wall unit 3 already assembled to the concrete skeleton C (the curtain to be first assembled to the concrete skeleton C). In the case of the wall unit 3, for example, each of the cubes 5 is attached to a joint sleeve or the like attached to the concrete skeleton C side.
Engaging the recesses 19 at the lower ends of the uprights), and connecting the fasteners 20 at the upper part of the upright 5 to the fasteners 71 to the bolts 73 and nuts 7.
Combine at 5. The recess 19 and the joint sleeve 17
Since the heights of the joint sleeves 17 of the curtain wall unit 3 already assembled to the concrete skeleton C are different at the time of engagement with each other, each one of the three cubes 5 is surely engaged with the corresponding joint sleeve 17. They can be combined, and the engaging work can be done easily. Next, the self-weight receiving bolt 77 assembled to the coupler 20 is used to adjust the level, and after the level adjustment, the bolt 73 and the nut 75 are fastened to complete the assembling to the concrete skeleton C. Then, such an assembling work of the curtain wall unit 3 is performed, for example, for each floor, and the curtain wall unit 3 is sequentially assembled on the upper floor, thereby completing the exterior work.

【0016】本実施例によれば、複数の方立5、無目
7、ガラス板9、耐火ボード13等からなる多数のカー
テンウォールユニット3を予め組み立て、これらカーテ
ンウォールユニット3を順次コンクリート躯体Cに組み
付けて外装工事を行なうので、方立5、無目7、ガラス
板9、耐火ボード13等の組み付けやガラス板回りのシ
ーリング等の作業を一か所で集中して行なえ、従って、
作業の効率を格段と高めることができ、省力化、工期の
短縮化を図ると共に安全化を図れ、無人化施工を行ない
易くなる。また、実施例のように、建設敷地内に簡単な
組み立て装置21を設け、この組み立て装置21で順次
カーテンウォールユニット3を組み立てていくようにす
れば、建物1から離れた工場等でカーテンウォールユニ
ット3を製作し、現場へ搬入する運搬する場合に比べて
コストの低減化を図ることが可能となる。
According to this embodiment, a large number of curtain wall units 3 including a plurality of uprights 5, blinds 7, glass plates 9, fireproof boards 13 and the like are preassembled, and these curtain wall units 3 are sequentially assembled into a concrete frame C. As the exterior work is done by assembling it on the stand, the work of assembling the stand 5, the blind 7, the glass plate 9, the fireproof board 13 and the sealing around the glass plate can be concentrated in one place.
The work efficiency can be remarkably improved, the labor can be saved, the construction period can be shortened, the safety can be achieved, and the unmanned construction can be easily performed. Further, as in the embodiment, if a simple assembling apparatus 21 is provided in the construction site and the curtain wall units 3 are sequentially assembled by this assembling apparatus 21, the curtain wall units can be installed in a factory or the like away from the building 1. It is possible to reduce the cost as compared with the case where 3 is manufactured and transported to the site.

【0017】また、コンクリート躯体Cに組み付ける前
の段階で、複数の方立5、無目7、ガラス板9を組み付
けた状態のカーテンウォールユニット3を得るので、予
め水密性能や映像調整等を行なった後にカーテンウォー
ルユニット3をコンクリート躯体Cに組み付けることが
でき、外装仕上の品質を格段と高めることができる。ま
た、カーテンウォールユニット3の高さが、建物1の階
高分の大きさで形成されているので、1階毎に外装工事
を完成させることができ、作業の効率を一層高めること
ができ、また、実施例のようにカーテンウォールユニッ
ト3の下部に換気窓等を組み込む場合に有利となる。
尚、カーテンウォールユニット自体の構造や、上下や左
右に位置するカーテンウォールどうしの結合構造、カー
テンウォールユニットのコンクリート躯体への組み付け
構造は種々考えられ、実施例の構造に限定されない。
In addition, since the curtain wall unit 3 in which a plurality of uprights 5, the blinds 7 and the glass plate 9 are assembled is obtained in the stage before being assembled to the concrete skeleton C, watertight performance and image adjustment are performed in advance. After that, the curtain wall unit 3 can be assembled to the concrete skeleton C, and the quality of the exterior finish can be significantly improved. Further, since the height of the curtain wall unit 3 is formed to have a size corresponding to the height of the floor of the building 1, the exterior work can be completed for each floor, and the work efficiency can be further improved. Further, it is advantageous when a ventilation window or the like is incorporated in the lower portion of the curtain wall unit 3 as in the embodiment.
The structure of the curtain wall unit itself, the connecting structure of the upper and lower curtain walls, the connecting structure of the upper and lower curtain walls, and the assembling structure of the curtain wall unit to the concrete skeleton are conceivable, and are not limited to the structures of the embodiments.

【0018】[0018]

【発明の効果】以上の説明で明らかなように本発明によ
れば、コンクリート躯体にカーテンウォールを組み付け
るに際して、予め、複数の方立と複数の無目とを組み付
け、更に、これら方立と無目とにわたってガラス板や耐
火ボードを組み付けてカーテンウォールユニットを組み
立て、このカーテンウォールユニットを順次コンクリー
ト躯体に組み付けるようにしたので、省力化、安全化、
工期の短縮化、無人化施工を図り、更には、コンクリー
ト躯体に組み付ける以前に水密性能や映像調整等の試験
を行なえ、外装仕上の品質を格段と高めることができ
る。
As is apparent from the above description, according to the present invention, when a curtain wall is assembled to a concrete skeleton, a plurality of cubes and a plurality of blinds are assembled in advance, and further, the cubes and the cubes are not assembled. As the curtain wall unit was assembled by assembling the glass plate and fireproof board over the eyes, and the curtain wall unit was sequentially assembled to the concrete frame, labor saving, safety,
The work period can be shortened, unmanned construction can be achieved, and further, the watertight performance and the image adjustment can be tested before it is assembled to the concrete frame, and the quality of the exterior finish can be significantly improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明方法により外装工事が施された高層建物
の斜視図である。
FIG. 1 is a perspective view of a high-rise building that has been subjected to exterior work by the method of the present invention.

【図2】カーテンウォールユニットの正面図である。FIG. 2 is a front view of a curtain wall unit.

【図3】カーテンウォールユニットの断面側面図であ
る。
FIG. 3 is a sectional side view of a curtain wall unit.

【図4】カーテンウォールユニット組み立て装置の正面
図である。
FIG. 4 is a front view of the curtain wall unit assembling apparatus.

【図5】カーテンウォールユニット組み立て装置の側面
図である。
FIG. 5 is a side view of the curtain wall unit assembling apparatus.

【図6】方立下端の位置決め部の断面正面図である。FIG. 6 is a sectional front view of a positioning portion at a lower end of the vertical direction.

【図7】方立下端の位置決め部の平面図である。FIG. 7 is a plan view of a positioning portion at a lower end of the cube.

【図8】方立下端の位置決め部の断面側面図である。FIG. 8 is a cross-sectional side view of the positioning portion at the lower end of the vertical direction.

【図9】方立上端の位置決め部の断面側面図である。FIG. 9 is a sectional side view of the positioning portion at the upper end of the vertical direction.

【図10】方立上端の位置決め部の平面図である。FIG. 10 is a plan view of the positioning portion at the upper end of the vertical direction.

【図11】ファスナー部分の側面図である。FIG. 11 is a side view of a fastener portion.

【符号の説明】[Explanation of symbols]

1 高層建物 3 カーテンウォールユニット 5 方立 7 無目 9 ガラス板 11 水平補強材 13 耐火ボード 21 カーテンウォールユニット組み立て装置 71 ファスナー 1 High-rise building 3 Curtain wall unit 5 Cubic 7 Invisible 9 Glass plate 11 Horizontal reinforcement 13 Fireproof board 21 Curtain wall unit assembling device 71 Fastener

───────────────────────────────────────────────────── フロントページの続き (72)発明者 鴨下 栄紀 東京都渋谷区千駄ヶ谷4丁目6番15号 株 式会社フジタ内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Eiki Kamoshita 4-6-15 Sendagaya, Shibuya-ku, Tokyo Fujita Co., Ltd.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート躯体にカーテンウォールを
組み付けるに際して、 予め、複数の方立と複数の無目とを組み付け、更に、こ
れら方立と無目とにわたってガラス板や耐火ボードを組
み付けてカーテンウォールユニットを組み立て、 このカーテンウォールユニットを順次コンクリート躯体
に組み付けるようにした、 ことを特徴とするカーテンウォールの組み付け方法。
1. When assembling a curtain wall to a concrete skeleton, a plurality of uprights and a plurality of blinds are assembled in advance, and a glass plate or a fireproof board is assembled over the ups and the blinds to form a curtain wall unit. The method of assembling the curtain wall is characterized in that the curtain wall unit is assembled into a concrete skeleton one by one.
【請求項2】 前記カーテンウォールユニットの高さ
は、建物の階高分の大きさで形成されている請求項1記
載のカーテンウォールの組み付け方法。
2. The method for assembling a curtain wall according to claim 1, wherein the curtain wall unit is formed to have a height corresponding to a floor height of a building.
JP36029591A 1991-12-27 1991-12-27 Fitting method of curtain wall Pending JPH05179737A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP36029591A JPH05179737A (en) 1991-12-27 1991-12-27 Fitting method of curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP36029591A JPH05179737A (en) 1991-12-27 1991-12-27 Fitting method of curtain wall

Publications (1)

Publication Number Publication Date
JPH05179737A true JPH05179737A (en) 1993-07-20

Family

ID=18468783

Family Applications (1)

Application Number Title Priority Date Filing Date
JP36029591A Pending JPH05179737A (en) 1991-12-27 1991-12-27 Fitting method of curtain wall

Country Status (1)

Country Link
JP (1) JPH05179737A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59195944A (en) * 1983-04-18 1984-11-07 ワイケイケイ株式会社 Attachment of curtain wall unit

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59195944A (en) * 1983-04-18 1984-11-07 ワイケイケイ株式会社 Attachment of curtain wall unit

Similar Documents

Publication Publication Date Title
US3364647A (en) Method for erecting tall buildings with balconies
JPH05179811A (en) Assembly device for curtain wall unit
JPH05179737A (en) Fitting method of curtain wall
JP2562398Y2 (en) Orientation fixing fixture
JPH05187083A (en) Curtain wall unit
JP2931761B2 (en) Fixing device for outer wall material and laminating method for middle and high-rise buildings using the fixing device
JP3177735B2 (en) An erect scaffold used to reinforce the perimeter of existing buildings
CN209907886U (en) Adjustable assembled stair construction platform
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
JPH0233530Y2 (en)
JPH0651994B2 (en) Curtain wall support equipment
GB1568355A (en) Building platform structures
JP2582842Y2 (en) Curing net for construction work
JPH0623651Y2 (en) Sash assembly device for curtain wall
JPS6243080Y2 (en)
CN215167840U (en) Overhanging scaffold
JPH06305657A (en) Elevator and its elevator shaft
JPH0874412A (en) Building scaffold and construction method thereof
JPH0616600U (en) Temporary scaffolding for construction
JPH0311298Y2 (en)
JPH051547Y2 (en)
JP2808448B2 (en) Roof construction method
JP2572353Y2 (en) Temporary scaffolding for construction
JPS624132Y2 (en)
KR200206946Y1 (en) Working stage