JPH05156816A - Unloading method for long member - Google Patents

Unloading method for long member

Info

Publication number
JPH05156816A
JPH05156816A JP35047591A JP35047591A JPH05156816A JP H05156816 A JPH05156816 A JP H05156816A JP 35047591 A JP35047591 A JP 35047591A JP 35047591 A JP35047591 A JP 35047591A JP H05156816 A JPH05156816 A JP H05156816A
Authority
JP
Japan
Prior art keywords
long
long member
members
horizontally
stopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP35047591A
Other languages
Japanese (ja)
Other versions
JP2747388B2 (en
Inventor
Tetsuo Mori
哲郎 森
Masaoki Warashina
全興 藁科
Masato Yamada
真人 山田
Hiroaki Ikeda
裕明 池田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP35047591A priority Critical patent/JP2747388B2/en
Publication of JPH05156816A publication Critical patent/JPH05156816A/en
Application granted granted Critical
Publication of JP2747388B2 publication Critical patent/JP2747388B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Loading Or Unloading Of Vehicles (AREA)

Abstract

PURPOSE:To automatically carry out unloading work with simple equipment, for unloading long members which are loaded in a vertical direction and are carried, and placing them in a horizontal direction at a load storage in an automatic building construction system. CONSTITUTION:The upper end side of a long member 1 in a vertically loaded state is unloaded in a vertically hoisting condition by an overhead traveling crane 52, and is moved in a horizontal direction toward a load storage place 55. A stopper engagement part 7 of the long member 1 is engaged with a stopper pin 54 of the load storage place 55, and the long member 1 is turned horizontally around the engagement point as a center to be placed horizontally.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、例えば省力化・自動
化されたビル建設システムの現場において、梁や柱ある
いはPC板などの長尺部材を縦積み状態でエレベータな
どで搬送し、その長尺部材を積み下ろして荷置き場に水
平に横積みする荷下ろし方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to, for example, at the site of a labor-saving and automated building construction system, long members such as beams, columns or PC boards are vertically stacked and conveyed by an elevator or the like, The present invention relates to an unloading method of loading and unloading members and horizontally loading them horizontally in a loading place.

【0002】[0002]

【従来の技術】最近では、高層ビル建設の自動化工法と
して次のようなシステムが開発されている。雨や風など
の天候の影響を受けずに施工できるように屋根と壁をも
つビル組立工場をビルの建設現場に設置する。ビル組立
工場は本体ビル(建設するビル)と同数、同スパンの柱
をもち、各柱にはリフトアップ機構が装備されている。
このリフトアップ機構はビル組立工場全体を構造的に支
持するとともに、工場を1フロアずつ上昇させる手段と
なる。つまり、ビル組立工場の直下で本体ビルを1フロ
ア分組立てて、その本体ビルを足場にしてビル組立工場
全体を1フロア分上昇させ、次のフロアを組立てるとい
う作業を繰り返す。
2. Description of the Related Art Recently, the following system has been developed as an automated construction method for high-rise building construction. A building assembly plant with a roof and walls will be installed at the building construction site so that construction can be performed without being affected by the weather such as rain and wind. The building assembly factory has the same number of pillars as the main building (the building to be constructed) and span, and each pillar is equipped with a lift-up mechanism.
This lift-up mechanism structurally supports the entire building assembly factory and is a means for raising the factory one floor at a time. That is, the work of assembling the main body building for one floor immediately below the building assembly factory, raising the entire building assembly factory by one floor using the main body building as a scaffold, and assembling the next floor are repeated.

【0003】ビル組立工場の内部には天井クレーンが装
備され、施工するフロア全域の荷さばき作業を行う。ま
た、天井クレーンには鉄骨組立ロボットや溶接ロボット
などの各種作業用ロボットが装備され、鉄骨部材の組立
て、溶接、溶接検査、床部材の組立て、内装部材配置な
どの作業を自動的に行う。
An overhead crane is installed inside the building assembly factory to carry out cargo handling work on the entire floor to be constructed. Further, the overhead crane is equipped with various work robots such as a steel frame assembly robot and a welding robot, and automatically performs operations such as assembling of steel frame members, welding, welding inspection, floor member assembly, and interior member arrangement.

【0004】ビル建設現場の敷地内や地下には自動倉庫
が設置され、あらかじめ工場生産された鉄骨柱、梁、床
スラブ、外装パネル、各種ユニットなどの部材が自動倉
庫に整理されて一時保管される。また、倉庫内には水平
・垂直方向の作動が可能なスタッカークレーンが装備さ
れ、プログラムに従って自動的に必要部材が取り出さ
れ、自動搬送車(台車)に積み込まれる。
An automatic warehouse is installed on the premises of a building construction site or in the basement, and members such as steel columns, beams, floor slabs, exterior panels, and various units that are factory-produced in advance are arranged and temporarily stored in the automatic warehouse. It In addition, a stacker crane that can be operated horizontally and vertically is installed in the warehouse, and the necessary parts are automatically taken out according to the program and loaded on the automatic carrier (truck).

【0005】自動倉庫から前記のビル組立工場まで各部
材は次のような搬送機構によって運搬される。自動倉庫
においてピックアップされた部材は台車に搭載され、こ
の台車によって水平方向に搬送されて本体ビルの最下部
に搬入され、ここで本体ビルに付設されているエレベー
タに移され、エレベータにより上方のビル組立工場内に
搬入される。
Each member is transported from the automated warehouse to the building assembly factory by the following transport mechanism. The members picked up in the automated warehouse are mounted on a trolley, transported horizontally by this trolley and carried in to the bottom of the main building, where they are transferred to an elevator attached to the main building, where they are lifted by the elevator to the upper building. It is brought into the assembly plant.

【0006】梁や柱あるいはPC床板といった長尺部材
は単体または複数のパッケージで搬送される。一般に、
長尺部材は台車上に安定な横積み状態で搭載されて水平
方向に搬送される。この横積みの長尺部材をエレベータ
に積み替えて垂直搬送するには、長尺部材がビル構造物
と緩衝しないように縦積み状態に姿勢を転回する。エレ
ベータに縦積みされた状態で長尺部材がビル組立工場に
搬入される。ビル組立工場内の天井クレーンによりエレ
ベータ上の長尺部材が積み下ろされ、所定の荷置き場に
仮置きされる。このとき長尺部材は縦置きでは不安定な
ので、水平に横置きするのが良い。したがって、エレベ
ータに縦積みされた長尺部材を荷置き場に積み下ろす際
に縦位置から横位置に姿勢を転回する。
A long member such as a beam, a pillar, or a PC floor plate is transported in a single package or a plurality of packages. In general,
The long members are mounted on a carriage in a stable horizontal stacking state and transported in the horizontal direction. In order to transfer the vertically stacked long members to the elevator for vertical transportation, the posture is inverted to the vertically stacked state so that the long members do not interfere with the building structure. The long members are loaded into the building assembly factory while being vertically stacked in the elevator. Long members on the elevator are loaded and unloaded by an overhead crane in a building assembly plant, and are temporarily placed in a predetermined loading place. At this time, since the long member is unstable when placed vertically, it is better to place it horizontally horizontally. Therefore, when the long members vertically stacked in the elevator are unloaded at the loading place, the posture is turned from the vertical position to the horizontal position.

【0007】[0007]

【発明が解決しようとする課題】前記のようなビル建設
システムの自動化率を高めて全自動に近づけるには、自
動倉庫からビル組立工場までの各種部材の搬送機構を自
動化することが重要である。従来においては、前記のよ
うにエレベータに縦積みされてビル組立工場まで搬送さ
れてきた長尺部材を積み下ろし、所定の荷置き場に水平
に横積みして仮置きする荷下ろし作業が自動化されてお
らず、天井クレーンで縦吊り状態でエレベータから積み
下ろした長尺部材を横置きする際に人手の補助作業が必
要であった。
In order to increase the automation rate of the above-mentioned building construction system and bring it closer to full automation, it is important to automate the transfer mechanism of various members from the automatic warehouse to the building assembly factory. .. Conventionally, the unloading work of loading and unloading the long members that have been vertically stacked in the elevator and transported to the building assembly factory as described above, and horizontally loading them horizontally at a predetermined loading place has been automated. Instead, manual assistance was required when horizontally placing long members that were unloaded vertically from an elevator by an overhead crane.

【0008】この発明は前述した従来の問題点に鑑みて
なされたもので、その目的は、縦積み状態で搬送されて
きた長尺部材を天井クレーンを用いて積み下ろし、所定
位置に横置きする作業を容易に自動化することができる
ようにした長尺部材の荷下ろし方法を提供することにあ
る。
The present invention has been made in view of the above-mentioned problems of the prior art, and its object is to unload long members conveyed in a vertically stacked state by using an overhead crane and place them horizontally at a predetermined position. It is an object of the present invention to provide a method for unloading a long member that can be easily automated.

【0009】[0009]

【課題を解決するための手段】そこでこの発明では、縦
積みされて搬送されてきた長尺部材の上端側を天井クレ
ーンの吊りワイヤに係合させて当該長尺部材を縦吊り状
態で荷置き場に向けて水平移動させ、その荷置き場に予
め設置してあるストッパに対し前記長尺部材に予め付設
してあるストッパ係合部を係合させ、その係合状態で前
記長尺部材の上端側を前記クレーンにより水平方向に移
動させながら前記吊りワイヤを繰り出し、前記係合点を
中心にして前記長尺部材を水平に転回させて前記荷置き
場に横置きするようにした。
Therefore, in the present invention, the upper end side of the long members that have been vertically stacked and conveyed is engaged with the suspension wire of the overhead crane so that the long members are vertically suspended. To the upper end side of the elongated member in the engaged state by engaging the stopper engaging portion previously attached to the elongated member with the stopper previously installed in the load storage area. The suspension wire is unwound while being horizontally moved by the crane, and the long member is horizontally turned around the engagement point so as to be horizontally placed in the loading place.

【0010】[0010]

【作用】1台の天井クレーンで縦積みされて搬送されて
きた長尺部材を縦吊り状態にし、その長尺部材を荷置き
場に向けて水平方向に移動させ、荷置き場で前記ストッ
パと前記ストッパ係合部を係合させることで、1台のク
レーンの操作だけで縦吊り状態の長尺部材を水平に転回
させて横置きすることができる。
[Operation] The long members vertically stacked and conveyed by one overhead crane are vertically suspended, and the long members are horizontally moved toward the loading place, and the stopper and the stopper are placed at the loading place. By engaging the engaging portion, the long member in the vertically suspended state can be horizontally turned and horizontally placed by operating only one crane.

【0011】[0011]

【実施例】まず、搬送対象である長尺部材の具体例につ
いて図1〜図4に従って説明する。この実施例の長尺部
材1は、2枚のPC床板2を向い合せにするなどして組
合せて一体化したパッケージである。PC床板2は片面
に長手方向に3本の平行なリブを有する。このリブの面
を向い合せにして2枚のPC床板2を組合せるが、その
際に、2本のパッケージ芯材3a、3bをPC床板2間
に挟み込む。
EXAMPLES First, a concrete example of a long member to be conveyed will be described with reference to FIGS. The elongate member 1 of this embodiment is a package integrated by combining two PC floor boards 2 such that they face each other. The PC floor board 2 has three parallel ribs on one side in the longitudinal direction. The two PC floor plates 2 are assembled with the ribs facing each other. At this time, the two package core members 3a and 3b are sandwiched between the PC floor plates 2.

【0012】パッケージ芯材3a、3bは角型の鋼管を
主材とするもので、PC床板2の幅寸法より長い。この
芯材3a、3bはPC床板2の長手方向に直交して(幅
方向)に配置されるが、2つの芯材3a、3bはPC床
板2の両端寄りの所定位置(後述)に配置され、両芯材
3a、3b間に大きな間隔があく。芯材3a、3bの所
定位置には芯材安定用のアーム4a、4bが突設されて
おり、アーム4a、4bを2枚のPC床板2で挟み込む
ことで、芯材3a、3bがPC床板2間で回転しないよ
うになっている。
The package core materials 3a and 3b are mainly made of square steel pipes and are longer than the width dimension of the PC floor board 2. The core members 3a and 3b are arranged orthogonally to the longitudinal direction of the PC floor plate 2 (width direction), but the two core members 3a and 3b are arranged at predetermined positions (described later) near both ends of the PC floor plate 2. There is a large gap between the core materials 3a and 3b. Arms 4a and 4b for stabilizing the core material are provided at predetermined positions of the core materials 3a and 3b. By sandwiching the arms 4a and 4b between two PC floor plates 2, the core materials 3a and 3b are connected to the PC floor board. It does not rotate between the two.

【0013】芯材3a、3bを2枚のPC床板2間の正
規の位置に挟み込むと、PC床板2に予め形成されてい
る貫通穴と芯材3a、3bの貫通穴13とが合致する。
これら貫通穴にアイボルト8を通し、その一端側にクラ
ンプ装置9を取り付け、このクランプ装置9により芯材
3a、3bを間に挟んだ状態で2枚のPC床板2を締結
して一体化する。これが長尺部材1のパッケージ構造の
基本である。
When the core members 3a and 3b are sandwiched between the two PC floor plates 2 at regular positions, the through holes previously formed in the PC floor plate 2 and the through holes 13 of the core members 3a and 3b are aligned with each other.
The eyebolt 8 is passed through these through holes, a clamp device 9 is attached to one end of the eyebolt 8, and the two PC floor plates 2 are fastened together by the clamp device 9 with the core materials 3a and 3b sandwiched therebetween. This is the basis of the package structure of the long member 1.

【0014】芯材3a、3bの両端部はPC床板2の両
側部より適宜長さ突出しており、その突出端にプレート
状の操作部材5a、5bが溶接により固着されている。
操作部材5a、5bにはクレーン吊りワイヤのオートク
ランプ装置に係合する係合穴6a、6bが形成されてい
る。また、一方の操作部材5bには縦位置から横位置に
転換する際に利用するフック状のストッパ係合部7が形
成されている。
Both end portions of the core members 3a, 3b are projected from both side portions of the PC floor plate 2 by an appropriate length, and plate-like operation members 5a, 5b are fixed to the protruding ends by welding.
Engagement holes 6a, 6b are formed in the operation members 5a, 5b to engage with an automatic clamp device for a crane suspension wire. Further, a hook-shaped stopper engaging portion 7 used when shifting from the vertical position to the horizontal position is formed on the one operation member 5b.

【0015】また、両芯材3aと3bのほぼ中間位置に
おいて、一方のPC床板2の下面側に当て板11が接合
され、芯材3a、3bと同様にアイボルト8とクランプ
装置9によって当て板11がPC床板2に締結されてい
る。この締結位置の両床板2間にはスペーサ10が挟み
込まれている。この当て板11には、長尺部材1を縦積
みするときの転倒防止用フック12が溶接により固着さ
れている。
A contact plate 11 is joined to the lower surface side of one of the PC floor plates 2 at an approximately intermediate position between the core members 3a and 3b, and the contact plate 11 is fixed by the eyebolt 8 and the clamp device 9 like the core members 3a and 3b. 11 is fastened to the PC floor board 2. A spacer 10 is sandwiched between both floor plates 2 at this fastening position. A hook 12 for preventing tipping when vertically stacking the long members 1 is fixed to the contact plate 11 by welding.

【0016】以上のような構造でパッケージされた長尺
部材1を本発明の方法で荷下ろしする作業手順を図5と
図6にしたがって説明する。
An operation procedure for unloading the long member 1 packaged with the above structure by the method of the present invention will be described with reference to FIGS. 5 and 6.

【0017】図5において、50は長尺部材1を縦積み
状態で垂直搬送するエレベータであり、長尺部材1の前
記縦位置転倒防止用フック12がエレベータ50の止め
金具51に引っ掛かった状態で長尺部材1がエレベータ
50に縦積みされている。図5の状態はエレベータ50
が最上部に達し、長尺部材1をビル組立工場内に搬入し
た状態であり、このときエレベータ50の床面がビル組
立工場内の作業フロア(建設途上の本体ビルの最上部)
に一致している。
In FIG. 5, reference numeral 50 denotes an elevator that vertically conveys the long members 1 in a vertically stacked state, in a state where the vertical position fall prevention hook 12 of the long members 1 is hooked on a stopper 51 of the elevator 50. The long members 1 are vertically stacked on the elevator 50. The state of FIG. 5 is the elevator 50.
Has reached the top and the long member 1 has been loaded into the building assembly plant, where the floor surface of the elevator 50 is the work floor in the building assembly plant (the top of the main building under construction).
Is consistent with.

【0018】ビル建設工場内に達したエレベータ50を
停止し、そこに縦積みされている長尺部材1に向けて工
場内の天井クレーン52の吊りワイヤ53を下降させ、
吊りワイヤ53の最下部に装備されたオートクランプ装
置を長尺部材1の上端側の操作部材5aに係合させ、ク
ランプ装置のピンを自動的に係合穴6aに挿入させる。
そして吊りワイヤ53を少し巻き上げると、長尺部材1
は縦吊り状態で上昇し、縦位置転倒防止用フック12が
エレベータ50の止め金具51から外れる。この状態で
エレベータ50が下降する。この後、天井クレーン52
を(イ)の位置から(ロ)の方へ走行させ、縦吊り状態
の長尺部材1を荷置き場55に向けて水平移動させる。
The elevator 50 that has reached the building construction factory is stopped, and the suspension wire 53 of the overhead crane 52 in the factory is lowered toward the long member 1 vertically stacked therein,
The automatic clamp device provided at the lowermost part of the hanging wire 53 is engaged with the operation member 5a on the upper end side of the elongated member 1, and the pin of the clamp device is automatically inserted into the engagement hole 6a.
Then, if the hanging wire 53 is slightly wound up, the long member 1
Rises in a vertically suspended state, and the vertical position fall prevention hook 12 is disengaged from the stopper 51 of the elevator 50. In this state, the elevator 50 descends. After this, the overhead crane 52
Is moved from the position (a) to the direction (b), and the long member 1 in the vertically suspended state is horizontally moved toward the loading place 55.

【0019】図のように、操作部材5aを支点として長
尺部材1を縦吊り状態にすると、他方の操作部材5bが
長尺部材1の下端近くに位置し、操作部材5bに一体に
設けてあるストッパ係合部7のフック状部分は進行方向
前方に向いている。そして荷置き場55の一番手前(左
端)には、縦吊り状態で水平搬送されてくる長尺部材1
におけるストッパ係合部7のフック状部分に引っ掛かる
位置にストッパピン54を取付けている。
As shown in the figure, when the elongated member 1 is vertically suspended with the operating member 5a as a fulcrum, the other operating member 5b is located near the lower end of the elongated member 1 and is provided integrally with the operating member 5b. A hook-shaped portion of a stopper engaging portion 7 faces forward in the traveling direction. At the forefront (left end) of the loading place 55, the long member 1 that is horizontally transported in a vertically suspended state.
The stopper pin 54 is attached to a position where the stopper pin 54 is caught by the hook-shaped portion of the stopper engaging portion 7.

【0020】したがって図5の状態から長尺部材1がさ
らに右側へ水平搬送されると、長尺部材1のストッパ係
合部7が荷置き場55のストッパピン54に引っ掛か
る。この後は図6に示すように、クレーン52を徐々に
右方向へ移動させながら吊りワイヤ53を適宜な速度で
繰り出していく。すると図6(A)(B)に示すよう
に、長尺部材1がストッパピン54を中心として時計方
向に転回し、ついには(C)のように水平になって荷置
き場55上に載置される。ここで吊りワイヤ53の下端
のオートクランプ装置を作動させて操作部材5aから吊
りワイヤ53を外す。これでエレベータ50から荷置き
場55への長尺部材1の荷下ろし作業が終ったことにな
る。
Therefore, when the elongated member 1 is further horizontally conveyed from the state shown in FIG. 5, the stopper engaging portion 7 of the elongated member 1 is caught by the stopper pin 54 of the load storage area 55. After that, as shown in FIG. 6, the hanging wire 53 is paid out at an appropriate speed while gradually moving the crane 52 to the right. Then, as shown in FIGS. 6A and 6B, the long member 1 turns clockwise around the stopper pin 54, and finally becomes horizontal as shown in FIG. 6C and is placed on the loading place 55. To be done. Here, the automatic clamp device at the lower end of the suspension wire 53 is operated to remove the suspension wire 53 from the operation member 5a. This completes the unloading work of the long member 1 from the elevator 50 to the loading place 55.

【0021】[0021]

【発明の効果】以上詳細に説明したように、この発明に
よれば、1台の天井クレーンの走行と吊りワイヤの繰り
出しとを適切に制御するだけで、縦積み状態で搬送され
てきた長尺部材を縦吊り状態で積み下ろし、荷置き場ま
で水平に移動させながら荷置き場上でこれを水平に転回
させて仮置きすることができる。この作業は人手による
補助は必要なく、容易に自動化することができる。
As has been described in detail above, according to the present invention, it is necessary to appropriately control the traveling of one overhead crane and the feeding of the suspension wire, and the long sheet conveyed in the vertically stacked state is conveyed. It is possible to unload the members in a vertically suspended state and horizontally move them to the loading place while horizontally moving them to the loading place for temporary placement. This work does not require manual assistance and can be easily automated.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の搬送・積み替え対象となる長尺部材
の具体例を示す斜視図である。
FIG. 1 is a perspective view showing a specific example of a long member which is an object of transportation / reloading according to the present invention.

【図2】同上長尺部材の平面図である。FIG. 2 is a plan view of the above long member.

【図3】同上長尺部材の正面図である。FIG. 3 is a front view of the above long member.

【図4】同上長尺部材の側面図であるFIG. 4 is a side view of the same elongated member.

【図5】この発明による長尺部材の荷下ろし方法を示す
作業手順図その1である。
FIG. 5 is a first working procedure diagram showing a method for unloading a long member according to the present invention.

【図6】同上作業手順図その2である。FIG. 6 is a second work procedure diagram of the above.

【符号の説明】[Explanation of symbols]

1 長尺部材 5a、5b 操作部材 7 ストッパ係合部 12 縦位置転倒防止用フック 50 エレベータ 51 止め金具 52 クレーン 53 吊りワイヤ 54 ストッパピン 55 荷置き場 DESCRIPTION OF SYMBOLS 1 Long member 5a, 5b Operation member 7 Stopper engaging part 12 Vertical position fall prevention hook 50 Elevator 51 Stopper 52 Crane 53 Suspending wire 54 Stopper pin 55 Loading place

───────────────────────────────────────────────────── フロントページの続き (72)発明者 池田 裕明 東京都千代田区神田司町2丁目3番地 株 式会社大林組東京本社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Hiroaki Ikeda 2-3 Kandajimachi, Chiyoda-ku, Tokyo Obayashi Corporation Tokyo Head Office

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 縦積みされて搬送されてきた長尺部材の
上端側を天井クレーンの吊りワイヤに係合させて当該長
尺部材を縦吊り状態で荷置き場に向けて水平移動させ、
その荷置き場に予め設置してあるストッパに対し前記長
尺部材に予め付設してあるストッパ係合部を係合させ、
その係合状態で前記長尺部材の上端側を前記クレーンに
より水平方向に移動させながら前記吊りワイヤを繰り出
し、前記係合点を中心にして前記長尺部材を水平に転回
させて前記荷置き場に横置きすることを特徴とする長尺
部材の荷下ろし方法。
1. An upper end side of long members that have been vertically stacked and conveyed is engaged with a hanging wire of an overhead crane to horizontally move the long members in a vertically suspended state toward a loading place,
By engaging a stopper engaging portion previously attached to the elongated member with a stopper previously installed in the cargo storage area,
In the engaged state, the hanging wire is paid out while horizontally moving the upper end side of the long member by the crane, and the long member is horizontally turned around the engagement point to be laterally placed in the cargo storage area. A method for unloading a long member, characterized by placing the member.
JP35047591A 1991-12-11 1991-12-11 How to unload long members Expired - Fee Related JP2747388B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35047591A JP2747388B2 (en) 1991-12-11 1991-12-11 How to unload long members

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35047591A JP2747388B2 (en) 1991-12-11 1991-12-11 How to unload long members

Publications (2)

Publication Number Publication Date
JPH05156816A true JPH05156816A (en) 1993-06-22
JP2747388B2 JP2747388B2 (en) 1998-05-06

Family

ID=18410748

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35047591A Expired - Fee Related JP2747388B2 (en) 1991-12-11 1991-12-11 How to unload long members

Country Status (1)

Country Link
JP (1) JP2747388B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1182396A (en) * 1997-09-01 1999-03-26 Mitsubishi Heavy Ind Ltd Vertical shaft overturning device
CN111058616A (en) * 2019-12-06 2020-04-24 上海建工集团股份有限公司 Plate turnover device and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1182396A (en) * 1997-09-01 1999-03-26 Mitsubishi Heavy Ind Ltd Vertical shaft overturning device
CN111058616A (en) * 2019-12-06 2020-04-24 上海建工集团股份有限公司 Plate turnover device and using method thereof

Also Published As

Publication number Publication date
JP2747388B2 (en) 1998-05-06

Similar Documents

Publication Publication Date Title
US4671724A (en) Multi-beam structure clip
JPH01117103A (en) Storing equipment for container
US3883013A (en) Apparatus of applying skids of grating structure and removing the same
US3827744A (en) Process and apparatus for handling bulk building materials at construction sites
JP2747388B2 (en) How to unload long members
CN114620400B (en) Intelligent stacking system
JP2747389B2 (en) Package structure of plate member
JPH05156815A (en) Transfer for long members during conveyance
JPS58202284A (en) Transporter for article
JPH079967Y2 (en) Clamp device for package of plate-shaped member
JPH0313403A (en) Control of reception and withdrawal in container storage facility
JPH05113026A (en) Temporary scaffold structure
CN211034859U (en) Hoisting device
JP3288352B2 (en) 3D automatic warehouse
JPH0432359Y2 (en)
JP2577832Y2 (en) Package structure of steel members
JPH08169507A (en) Pallet cargo handling method
JP3000062B2 (en) Temporary placing method and device for long material
JP4514277B2 (en) Product coil shipping method
JP3252713B2 (en) Operating method of overhead crane
JP2532297Y2 (en) Material lifting equipment
JPS5826191Y2 (en) Stansion for coils
JPH09328289A (en) Vertical heavy-load lift of overhead crane and conveying method using it
JP3298488B2 (en) Container crane
JP2001199512A (en) Storage system of container and holder device for container

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees