JPH0464368B2 - - Google Patents
Info
- Publication number
- JPH0464368B2 JPH0464368B2 JP15659187A JP15659187A JPH0464368B2 JP H0464368 B2 JPH0464368 B2 JP H0464368B2 JP 15659187 A JP15659187 A JP 15659187A JP 15659187 A JP15659187 A JP 15659187A JP H0464368 B2 JPH0464368 B2 JP H0464368B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- foundation
- floor
- earthen
- cloth foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004744 fabric Substances 0.000 claims description 33
- 230000003014 reinforcing effect Effects 0.000 claims description 26
- 230000000630 rising effect Effects 0.000 claims description 16
- 238000000034 method Methods 0.000 claims description 10
- 238000009415 formwork Methods 0.000 description 20
- 238000010276 construction Methods 0.000 description 16
- 239000002184 metal Substances 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Foundations (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
【発明の詳細な説明】
〔産業上の技術分野〕
本発明は、主として住宅用の布基礎の立上り部
に、土間コンクリート、または付属基礎等を打継
ぐ際に、両者の鉄筋を強固に連結した状態で施工
するための布基礎と土間コンクリート等との打継
工法に関するものである。[Detailed Description of the Invention] [Industrial Technical Field] The present invention is mainly concerned with the construction of a method that firmly connects the reinforcing bars of the two when pouring earthen floor concrete or an attached foundation into the rising part of a cloth foundation for residential use. This relates to a method of joint construction between cloth foundations and earthen floor concrete, etc., for construction in the state of construction.
住宅用の基礎は、構造上建物の荷重を受けるも
のであるが、玄関、風呂場等、平面にコンクリー
トを打設して基礎の一部とすることがあり、これ
らを従来土間コンクリートと称しており、更に、
この土間コンクリートと同様に、建物の一部の部
材を受ける付属的な基礎、即ち付属基礎が設けら
れる場合がある。
Foundations for houses are structurally designed to bear the load of the building, but sometimes concrete is cast on a flat surface to form part of the foundation, such as for entrances, bathrooms, etc., and these are conventionally referred to as dirt floor concrete. Also, furthermore,
Similar to this earthen floor concrete, an accessory foundation, that is, an accessory foundation, may be provided to support some parts of the building.
この土間コンクリートも、付属基礎も、施工上
は第9図に示すように、布基礎1のコンクリート
を鉄筋2を中にして打設した後、別に鉄筋2を水
平に配筋し、型枠を組んでコンクリートを打設
し、土間コンクリート3等とするものであり、見
た目には布基礎1と違つて一体のように見える
が、布基礎1とは連つておらず、水平な鉄筋2で
両者が連結されていない場合には、土間コンクリ
ート3の部分だけ矢印Dの方向に沈下することが
あり、このことは付属基礎の場合も同様である。 In terms of construction, both the earthen floor concrete and the attached foundation are constructed by pouring the concrete for the foundation 1 with the reinforcing bars 2 inside, then placing the reinforcing bars 2 horizontally, and then building the formwork. It is assembled and concrete is poured to create soil floor concrete 3, etc. It looks like it is integrated unlike cloth foundation 1, but it is not connected to cloth foundation 1, and both are connected by horizontal reinforcing bars 2. If these are not connected, only the concrete floor 3 may sink in the direction of arrow D, and this also applies to the attached foundation.
そこで、土間コンクリート3や付属基礎が布基
礎1と遊離して沈下したり、傾いたりするのを防
ぐためには、布基礎1と一体となるように両者の
継ぎ目を貫通して鉄筋2を入れることが必要とな
る。 Therefore, in order to prevent the dirt floor concrete 3 and the attached foundation from becoming separated from the cloth foundation 1 and sinking or tilting, it is necessary to insert reinforcing bars 2 through the joint between the two so that they become integrated with the cloth foundation 1. Is required.
即ち、第10図は布基礎1と片側の土間コンク
リート3との間に鉄筋2を貫通したものであり、
第11図は布基礎1と両側の土間コンクリート3
との間に鉄筋2を貫通したものであり、更に、第
12図は布基礎1と片側の付属基礎4との間に鉄
筋2を貫通したものである。 In other words, Fig. 10 shows reinforcing bars 2 passing through between the cloth foundation 1 and the concrete floor 3 on one side.
Figure 11 shows the cloth foundation 1 and the concrete floor 3 on both sides.
Furthermore, in FIG. 12, the reinforcing bars 2 are passed through between the cloth foundation 1 and the attached foundation 4 on one side.
以上のごとく、布基礎1と土間コンクリート3
または付属基礎4とを貫通する鉄筋2を入れる際
に、その布基礎1の型枠が木製の場合には、第1
3図に示すごとく、型枠5に鉄筋2が入るだけの
孔6を設け、鉄筋2を型枠5からこの孔6を経由
して突き出したまま、まず布基礎1のコンクリー
トを打設して、型枠5を取外し、布基礎1の側面
上に突出した鉄筋2の位置に破線で示すごとく土
間コンクリート3を打設することになる。 As mentioned above, cloth foundation 1 and earthen floor concrete 3
Or, when inserting reinforcing bars 2 that penetrate the attached foundation 4, if the formwork of the cloth foundation 1 is made of wood, the first
As shown in Figure 3, a hole 6 is made in the formwork 5 to accommodate the reinforcing bar 2, and with the reinforcing bar 2 protruding from the formwork 5 through the hole 6, concrete for the cloth foundation 1 is first poured. , the formwork 5 is removed, and dirt floor concrete 3 is poured at the position of the reinforcing bars 2 protruding from the side surface of the cloth foundation 1 as shown by broken lines.
上記の場合は、型枠5に孔6をあけることにな
り、型枠5の修繕を度々しなくてはならないた
め、実際にはこの方式はあまり行われないのが現
状である。 In the above case, the holes 6 are made in the formwork 5, and the formwork 5 must be repaired frequently, so this method is not often used in practice.
次に、型枠5がメタルフオーム等の金属製の場
合は、木製の場合とは異なり、孔6を簡単に設け
るわけにはいかないので、どうしても鉄筋2で連
結しなければならない時は次のごとき方法を用い
る。 Next, when the formwork 5 is made of metal such as metal form, unlike when it is made of wood, holes 6 cannot be easily provided, so if it is absolutely necessary to connect it with reinforcing bars 2, do the following. Use methods.
即ち、布基礎1の部分に、第14図のように一
部が型枠5に沿つたクランク状に曲げた鉄筋2を
固定した後、コンクリートを打ち、型枠5を外す
と、コンクリート表面上の鉄筋2の一部が表われ
ているので、これを第15図の矢印Bのごとく曲
げ戻して水平にする。 That is, after fixing reinforcing bars 2 bent into a crank shape with a part of them along the formwork 5 as shown in Fig. 14 to a part of the cloth foundation 1, concrete is poured and the formwork 5 is removed. Since a part of the reinforcing bar 2 is exposed, bend it back as shown by arrow B in FIG. 15 and make it horizontal.
しかしながら、この方法の場合、布基礎1の表
面がぼろぼろになるので、後で矢印X部分の手直
しをしなければならず、更に鉄筋2も第15図の
ごとく真直ぐには戻らず、必ず矢印Sで示す段が
つく。 However, in the case of this method, the surface of the cloth foundation 1 becomes tattered, so the part indicated by the arrow There will be steps indicated by .
しかも、鉄筋2の性質上からも、所謂曲げ戻す
ことは極めて好ましくないこととされている。 Furthermore, in view of the properties of the reinforcing bars 2, so-called bending back is extremely undesirable.
以上に説明したごとく、布基礎1と打継ぐ土間
コンクリート3、または付属基礎4とを連結した
鉄筋2の配筋方法には、従来これといつた良いも
のがないのが現状であつた。 As explained above, there is currently no comparable method of arranging reinforcing bars 2 that connect the cloth foundation 1 and the earthen concrete floor 3 or the attached foundation 4.
本発明は、前記従来例で説明したごとく、布基
礎の立上り部に対し、土間コンクリートまたは付
属基礎を打継ぐ際に、これら両者を貫通して連結
する鉄筋を容易に、かつ安価な工費で配筋可能な
工法を提供することを目的としたものである。
As explained in the conventional example above, when pouring earth concrete or an attached foundation to the rising part of a cloth foundation, the present invention allows reinforcing bars to penetrate and connect both to be easily and inexpensively installed. The purpose is to provide a construction method that allows construction.
上記の目的を達成するための本発明の布基礎と
土間コンクリート等との打継工法は、主として住
宅用の布基礎の立上り部の片側面または両側面の
土間コンクリートまたは付属基礎等との打継部
に、その土間コンクリート等の内側に鉄筋として
設けられるねじバーの端部に設けたねじ部と螺着
可能なねじ部を有するソケツトを、上記の立上り
部内の鉄筋にジヨイントピン等を介して保持し
て、立上り部のコンクリートを打設した後、上記
ソケツトのねじ部にねじバーのねじ部を螺着して
土間コンクリート等の打設を行なうことを特徴と
したものである。
In order to achieve the above object, the method of jointing a cloth foundation with earthen floor concrete, etc. of the present invention is mainly for joining with earthen concrete floor or attached foundation, etc. on one or both sides of the rising part of a cloth foundation for residential use. A socket having a threaded part provided at the end of a threaded bar installed as a reinforcing bar inside the concrete floor, etc., and a threaded part that can be screwed is held to the reinforcing bar in the above-mentioned rising part via a joint pin, etc. After pouring concrete for the rising portion, the threaded portion of the screw bar is screwed into the threaded portion of the socket, and concrete for the dirt floor, etc. is poured.
このような工法を用いることにより、布基礎用
の型枠に、鉄筋貫通用の孔をあけたり、貫通用鉄
筋の曲げ戻しすることなく、容易に、かつ強固に
布基礎に対して土間コンクリート等を打継ぐこと
ができる。 By using this construction method, it is possible to easily and firmly attach earthen floor concrete, etc. to the cloth foundation without having to drill holes for reinforcing bars in the formwork for the cloth foundation or bending back the reinforcing bars for penetration. can be inherited.
以下図面を参照して本発明の工法による実施例
を説明するが、各実施例においてそれぞれ同じ部
品は同じ部品番号で示しており、第1図は本発明
の布基礎と土間コンクリート等との打継工法を説
明する実施例1の縦断面図、第2図は第1図の平
面図である。
Examples using the construction method of the present invention will be described below with reference to the drawings. In each example, the same parts are indicated by the same part numbers. FIG. 2 is a longitudinal cross-sectional view of Example 1 for explaining the joint construction method, and FIG. 2 is a plan view of FIG. 1.
まず、この実施例1は布基礎1を挾んで2個の
土間コンクリート3が左右同一平面に設けられた
場合を示しており、布基礎1の立上り部の両側面
の各土間コンクリート3との各打継ぎ部に、その
土間コンクリート3の内側の鉄筋として設けられ
る第8図に示すねじバー8の凸ねじ部8Aと螺着
可能な凹ねじ部9Aを有する第5図に示すソケツ
ト9の各端部を保持するように、これら左右のソ
ケツト9にそれぞれ螺着するねじ部10Aを両端
に設けた第6図に示すジヨイントピン10を螺着
する。 First, this Example 1 shows a case where two earthen concrete floors 3 are installed on the same plane on the left and right sides with a cloth foundation 1 in between, and each earthen floor concrete 3 on both sides of the rising part of the cloth foundation 1 is Each end of the socket 9 shown in FIG. 5 has a convex screw portion 8A of the threaded bar 8 shown in FIG. A joint pin 10 shown in FIG. 6 is screwed into each of the left and right sockets 9 so as to hold the parts.
この状態で立上り部の両側面に図示されていな
い型枠をセツトするが、この際、土間コンクリー
ト3の位置に合わせて印をつけてから、上記ソケ
ツト9を両側に付けたジヨイントピン10を上記
の印に合わせて水平に持ち、片方のソケツト9を
廻して両型枠一杯に広げて固定する。 In this state, formwork (not shown) is set on both sides of the rising part, but at this time, after marking the position of the concrete floor 3, insert the joint pins 10 with the sockets 9 on both sides. Hold it horizontally according to the marks, and turn one socket 9 to fully expand both formworks and fix it.
この場合、左右の型枠に上部幅止めをしておく
と、各ソケツト9の端部と型枠とがしつかり密着
する。 In this case, if upper width stoppers are applied to the left and right formworks, the ends of each socket 9 and the formworks will tightly adhere to each other.
以上のごとく、所定本数のソケツト9付きのジ
ヨイントピン10の配設及び固定が終了したら、
これらを立上り部の鉄筋2に針金で結束するか、
または溶接することにより強固に固定する。 As described above, once the predetermined number of joint pins 10 with sockets 9 have been installed and fixed,
Either tie these to the reinforcing bar 2 at the rising part with wire, or
Or fix it firmly by welding.
次に、布基礎1の立上り部のコンクリートを打
設し、その型枠を外すと、そのコンクリート面に
ソケツト9の凹ねじ部9Aがあらわれるので、こ
れに土間コンクリート3の各ねじバー8の凸ねじ
部8Aを螺着し、更に、図示されていない土間コ
ンクリート用型枠を用いて土間コンクリート3の
打設を行なうことになる。 Next, when concrete is poured for the rising part of the foundation 1 and the formwork is removed, the concave threaded part 9A of the socket 9 will appear on the concrete surface, and the convex part of each threaded bar 8 of the earthen floor concrete 3 will appear on the concrete surface. The screw portion 8A is screwed in, and then the concrete for the earthen floor 3 is cast using a formwork for concrete for the earthen floor (not shown).
このようにして、布基礎1とその両側の土間コ
ンクリート3には、ねじバー8、ソケツト9及び
ジヨイントピン10が貫通し、強固に連結され
る。 In this way, the screw bar 8, the socket 9, and the joint pin 10 penetrate the cloth foundation 1 and the earthen floor concrete 3 on both sides thereof, and are firmly connected.
次に、第3図の実施例2においては、布基礎1
の立上り部の片側面に土間コンクリート3を打継
ぐ例であり、この場合、実施例1のジヨイントピ
ン10の替りに第7図に示すL字形のアンカーピ
ン11を使用し、同様な機能をさせている。 Next, in Example 2 of FIG. 3, the cloth foundation 1
This is an example in which the earthen floor concrete 3 is connected to one side of the rising part of the concrete floor.In this case, the L-shaped anchor pin 11 shown in FIG. There is.
なお、この場合は、土間コンクリート3の位置
にアンカーピン11の一端のねじ部11Aに螺着
したソケツト9を合わせ、立上り部の鉄筋2にア
ンカーピン11を結束、または溶接し、ソケツト
9を廻して型枠に押し付けるものである。 In this case, align the socket 9 screwed onto the threaded part 11A of one end of the anchor pin 11 at the position of the concrete floor 3, tie or weld the anchor pin 11 to the reinforcing bar 2 at the rising part, and rotate the socket 9. It is pressed against the formwork.
更に、第4図の実施例3は、布基礎1の立上り
部の両側面に段差のある土間コンクリート3を打
継ぐ例であり、この場合も実施例2と同様な手順
でアンカーピン11及びソケツト9を型枠内に保
持してコンクリートの打設を行なうものである。 Furthermore, Embodiment 3 in FIG. 4 is an example in which a concrete floor 3 with steps on both sides of the rising part of the cloth foundation 1 is poured, and in this case, anchor pins 11 and sockets are installed in the same manner as in Embodiment 2. 9 is held in the formwork and concrete is poured.
なお、土間コンクリート3以外の第12図に示
すごとき付属基礎4に対しても本発明の工法を同
様な手順により有効に適用することができる。 Note that the construction method of the present invention can be effectively applied to an attached foundation 4 other than the earthen floor concrete 3 as shown in FIG. 12 by using the same procedure.
以上に説明したごとく、本発明の工法を採用す
れば、布基礎の立上り部に対し土間コンクリー
ト、または付属基礎を打継ぐ際に、これらの両者
を貫通して連結する鉄筋を容易に、かつ安価な工
費で配筋することができるという効果がある。
As explained above, if the construction method of the present invention is adopted, when pouring earthen concrete or an attached foundation to the rising part of a cloth foundation, it is possible to easily and inexpensively install reinforcing bars that pass through both to connect them. This has the advantage that reinforcement can be placed at a reasonable construction cost.
また、本発明を採用すれば、金属製型枠を使用
でき、しかも布基礎と土間コンクリート等との強
固な一体化ができるので、土間コンクリート等の
沈降を完全に防止できるという利点がある。 Further, if the present invention is adopted, metal formwork can be used, and the cloth foundation and the earthen floor concrete can be firmly integrated, so there is an advantage that settling of the earthen floor concrete, etc. can be completely prevented.
第1図は本発明の布基礎と土間コンクリート等
との打継工法を説明する実施例1の縦断面図、第
2図は第1図の平断面図、第3図及び第4図は他
の実施例の打継工法を説明する縦断面図で、第3
図はその実施例2を、そして第4図はその実施例
3を示しており、第5図から第8図までは本発明
の各実施例の工法にて使用する部品の図面で、第
5図はソケツトの側断面図、第6図はジヨイント
ピンの側面図、第7図はアンカーピンの側面図、
第8図はねじバーの側面図をそれぞれ示してお
り、更に第9図、第10図、第11図、第12
図、第13図、第14図及び第15図はそれぞれ
各従来例の布基礎に対する土間コンクリート等の
打継工法の説明図である。
1……布基礎、3……土間コンクリート、4…
…付属基礎、8……ねじバー、8A……凸ねじ
部、9……ソケツト、9A……凹ねじ部、10…
…ジヨイントピン、11……アンカーピン。
Fig. 1 is a vertical cross-sectional view of Example 1 explaining the method of joint construction between a cloth foundation and earthen floor concrete of the present invention, Fig. 2 is a plan cross-sectional view of Fig. 1, and Fig. 3 and Fig. 4 are other examples. This is a vertical cross-sectional view for explaining the joint construction method of the embodiment, and the third
The figure shows the second embodiment, and FIG. 4 shows the third embodiment. FIGS. 5 to 8 are drawings of parts used in the construction method of each embodiment of the present invention. The figure is a side sectional view of the socket, Figure 6 is a side view of the joint pin, Figure 7 is a side view of the anchor pin,
Figure 8 shows a side view of the threaded bar, and further Figures 9, 10, 11, and 12.
13, 14, and 15 are explanatory diagrams of conventional methods of pouring concrete, etc., onto cloth foundations according to the prior art. 1...Cloth foundation, 3...Earth floor concrete, 4...
...Accessory foundation, 8...Threaded bar, 8A...Convex threaded part, 9...Socket, 9A...Concave threaded part, 10...
...Joint pin, 11...Anchor pin.
Claims (1)
等との打継部に、該土間コンクリート等の内側に
鉄筋として設けられるねじバーのねじ部と螺着可
能なねじ部を有するソケツトを、上記立上り部の
鉄筋に固定して、立上り部のコンクリートを打設
した後、上記ソケツトに該ねじバーを螺着して土
間コンクリート等の打継ぎを行なう布基礎と土間
コンクリート等との打継工法。1 At the joint part of the rising part of the cloth foundation with the earthen floor concrete, etc., a socket having a threaded part that can be screwed into the threaded part of a threaded bar installed as a reinforcing bar inside the earthen floor concrete, etc. is attached to the said rising part. A method for joining cloth foundations with earthen floor concrete, etc., in which the concrete is fixed to the reinforcing bars of the foundation, concrete is poured at the rising part, and then the threaded bar is screwed into the socket to join the earthen floor concrete, etc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15659187A JPS646467A (en) | 1987-06-25 | 1987-06-25 | Cast splicing construction method of cloth base and concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15659187A JPS646467A (en) | 1987-06-25 | 1987-06-25 | Cast splicing construction method of cloth base and concrete |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS646467A JPS646467A (en) | 1989-01-11 |
JPH0464368B2 true JPH0464368B2 (en) | 1992-10-14 |
Family
ID=15631108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP15659187A Granted JPS646467A (en) | 1987-06-25 | 1987-06-25 | Cast splicing construction method of cloth base and concrete |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS646467A (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08308444A (en) * | 1995-05-16 | 1996-11-26 | Shimano Inc | Spinning reel |
JP2002206244A (en) * | 2001-01-10 | 2002-07-26 | Sanyo Homes Kk | Execution method for foundation of building and foundation of building |
-
1987
- 1987-06-25 JP JP15659187A patent/JPS646467A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS646467A (en) | 1989-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101962853B1 (en) | Joint for Precast Beam and Columns | |
JPH0464368B2 (en) | ||
KR101935460B1 (en) | Connection method for pc beam and pc column and pc structure therewith | |
JP2864906B2 (en) | Precast wall joining method | |
JPH0782753A (en) | Constructing method for continuous footing | |
JPS59192145A (en) | Fixing of iron pillar | |
JP2001098684A (en) | Structure for fixing form | |
JP6932348B2 (en) | Cloth foundation, cloth foundation construction method, solid foundation construction method, and formwork used for the construction method | |
JPH10140828A (en) | Enrooting metal fitting for concrete form and method for enrooting concrete form by using the same | |
JP2829626B2 (en) | Structure of concrete block and method of stacking concrete block on slope | |
JPH11107291A (en) | Coupling structure of precast concrete foundation block | |
JPH11293919A (en) | Retaining structure of form and method thereof | |
JPH0438039Y2 (en) | ||
JPS6168954A (en) | Construction of outer wall using precast truss plate | |
JP3143624B2 (en) | Panel mounting method | |
JPS649426B2 (en) | ||
JPH0528888Y2 (en) | ||
JPH0248546Y2 (en) | ||
JPH07216906A (en) | Building foundation and building method | |
JP2001026975A (en) | Construction method for lining plate for side ditch on farm road | |
JPS6231553Y2 (en) | ||
JPH0626195A (en) | Coupling device for structure execution | |
CN116733106A (en) | Connecting node of prefabricated column and construction method thereof | |
JP3656873B2 (en) | Foundation construction method | |
JPS62137338A (en) | Connection of precast wall and beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EXPY | Cancellation because of completion of term | ||
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071014 Year of fee payment: 15 |