JPH04319154A JP8674691A JP8674691A JPH04319154A JP H04319154 A JPH04319154 A JP H04319154A JP 8674691 A JP8674691 A JP 8674691A JP 8674691 A JP8674691 A JP 8674691A JP H04319154 A JPH04319154 A JP H04319154A
Authority
JP
Japan
Prior art keywords
steel frame
precast concrete
concrete beam
shaped steel
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8674691A
Other languages
Japanese (ja)
Other versions
JP2757080B2 (en
Inventor
Hiromi Murata
村田 光大實
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP3086746A priority Critical patent/JP2757080B2/en
Publication of JPH04319154A publication Critical patent/JPH04319154A/en
Application granted granted Critical
Publication of JP2757080B2 publication Critical patent/JP2757080B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

PURPOSE:To increase allowable stress for teh cross-ssectional area bending of a beam member and increase strength rigidity by composing U-shaped stel frame members set respectively orghogonally to the upper end surfaces of precaste concrete beams, integrally to be embedded on the central section leaving both the end sections in the longitudinal direction of the beam. CONSTITUTION:From an end surface in the longitudinal direction, the set end sections of beam lower-end main-reinforcements 2 are projected, and on the loss sections of slab cross-sectional-areas, the upper ends of reinforcements 3 are saliently arranged. Then, leaving both the end sections of a beam member 1, to the central section, U-shaped steel frame members 4 provided with horizontal flanges 4b at the upper ends of both side vertical-section pieces 4a are orghogonally embedded, and between the steel frame members 4, a hollow section 1a with the opened upper end is placed, and stud connectors 5 are erected. Besides, on the flanges 4b, stud connectors 6 are erected. As a result, allowable stress is increased more than that for conventional U-shaped steel frame material, and the cross-sectional area of a precast concrete beam can be diminished.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明は長大スパンのプレキヤス
トコンクリート梁に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a long span precast concrete beam.

【0002】0002

【従来の技術】本発明者は特願平2−122898号に
おいて、プレキヤストコンクリート梁部材の長手方向両
端部を残して中央部に、上端面が開口したU字型鉄骨材
を一体に埋設した長スパンプレキヤストコンクリート梁
を提案した。
[Prior Art] In Japanese Patent Application No. 2-122898, the present inventor integrally buried a U-shaped steel frame with an open top end in the center of a precast concrete beam member, leaving both longitudinal ends intact. A long span precast concrete beam was proposed.

【0003】0003

【発明が解決しようとする課題】前記プレキヤストコン
クリート梁に埋設される鉄骨材は、上端部が開口したU
字型断面部材に形成されているので、鉄骨材の曲げ許容
応力が十分でなく、梁部材の断面が増大することとなる
。本発明は前記従来技術の有する問題点に鑑みて提案さ
れたもので、その目的とする処は、梁部材に埋設された
鉄骨材の曲げ許容応力を増大し、梁部材の断面を低減す
るとともに、梁部材上部に施工されるスラブと一体化し
、同スラブの強度剛性を増大しうる長スパンプレキヤス
トコンクリート梁を提供する点にある。
[Problems to be Solved by the Invention] The steel frame embedded in the precast concrete beam has a U shape with an open upper end.
Since the beam is formed into a cross-sectional member, the bending allowable stress of the steel frame material is insufficient, and the cross-section of the beam member increases. The present invention has been proposed in view of the problems of the prior art, and its objectives are to increase the allowable bending stress of the steel frame embedded in a beam member, reduce the cross section of the beam member, and Another object of the present invention is to provide a long span precast concrete beam that can be integrated with a slab constructed on top of a beam member and increase the strength and rigidity of the slab.

【0004】0004

【課題を解決するための手段】前記の目的を達成するた
め、本発明に係る長スパンプレキヤストコンクリート梁
は、両側垂直部片の上端面に夫々同各部片と直交する上
部水平フランジを設けたU字状鉄骨部材を、プレキヤス
トコンクリート梁部材の長手方向両端部を残して中央部
に一体に埋設して構成されている。
[Means for Solving the Problems] In order to achieve the above object, the long span precast concrete beam according to the present invention is provided with upper horizontal flanges perpendicular to the upper end surfaces of both vertical parts. A U-shaped steel frame member is integrally buried in the center of a precast concrete beam member, leaving both ends in the longitudinal direction intact.

【0005】[0005]

【作用】本発明に係る長スパンプレキヤストコンクリー
ト梁においては、同梁の長手方向両端部を残して中央部
に、U字状断面部材における両側垂直部片の上端部に、
更に同垂直部片と直交する上部水平フランジを設けたU
字状鉄骨部材を一体に埋設したので、同U字状鉄骨部材
は、上部水平フランジのない前記従来のプレキヤストコ
ンクリート梁におけるU字型鉄骨材より許容応力が増大
する。
[Operation] In the long-span precast concrete beam according to the present invention, in the central part of the beam, leaving both ends in the longitudinal direction, and in the upper ends of both vertical parts of the U-shaped cross-sectional member,
Furthermore, a U is provided with an upper horizontal flange perpendicular to the vertical part.
Since the U-shaped steel frame member is buried as one piece, the allowable stress of the U-shaped steel frame member is higher than that of the U-shaped steel frame member in the conventional precast concrete beam without an upper horizontal flange.

【0006】また前記U字状鉄骨部材における両側垂直
部片の上端に設けた上部水平フランジを利用して、同フ
ランジ上面にスタツドボルトを植立することによって、
前記プレキヤストコンクリート梁と、同梁上に施工され
るスラブとを一体化し、同スラブの剛性を増大しうるも
のである。
[0006] Furthermore, by using the upper horizontal flanges provided at the upper ends of the vertical pieces on both sides of the U-shaped steel frame member, stud bolts are planted on the upper surfaces of the flanges.
The precast concrete beam and the slab constructed on the beam are integrated, and the rigidity of the slab can be increased.

【0007】[0007]

【実施例】以下本発明を図示の実施例について説明する
。1は相隣る柱間に亘る長さを有し、スラブ断面が欠損
された断面形状のプレキヤストコンクリート梁部材で、
長手方向端面より梁下端主筋2の定着端部2aが突設さ
れ、スラブ断面欠損部上に肋筋3の上端が突設されてい
る。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the illustrated embodiments. 1 is a precast concrete beam member that has a length spanning between adjacent columns and has a cross-sectional shape in which the slab cross section is missing;
The fixed end portion 2a of the beam lower end main reinforcement 2 is provided to protrude from the longitudinal end face, and the upper end of the rib 3 is provided to protrude above the slab cross-sectional defect.

【0008】前記梁部材1の長手方向両端部を残して中
央部に、両側垂直部片4aの上端に、同部片4aと直交
する上部水平フランジ4bを設けたU字状鉄骨部材4が
埋設され、同鉄骨部材4によって前記梁部材1に形成さ
れた、上端が開口した中空部1aを挟んで相対する前記
両側垂直部片4aの対向面にスタツドジベル5が溶接に
より植立され、更に前記上部水平フランジ4b上にはス
タツドジベル6、または鉄筋が溶接によって植立されて
いる。
A U-shaped steel frame member 4 is buried in the center of the beam member 1, leaving both ends in the longitudinal direction, and is provided with an upper horizontal flange 4b perpendicular to the vertical pieces 4a at the upper ends of the vertical pieces 4a on both sides. A stud dowel 5 is welded to the opposing surfaces of the vertical pieces 4a on both sides, which are formed in the beam member 1 by the same steel frame member 4 and are opposed to each other across the hollow portion 1a with an open upper end. A stud dowel 6 or a reinforcing bar is erected on the horizontal flange 4b by welding.

【0009】なお前記鉄骨部材4の長手方向両端面には
メタルラスの如き有孔板よりなるコンクリート止め板7
が配設される。而して施工に当っては、前記プレキヤス
トコンクリート梁部材1を梁断面が欠損された柱間に架
構し、相隣る同梁部材1間に半プレキヤストコンクリー
ト床板を架構し、柱頭部補強筋、梁上端主筋、スラブ補
強筋を配筋し、スラブ及び柱頭部コンクリートを打設す
る。
[0009] Concrete retaining plates 7 made of perforated plates such as metal lath are provided on both longitudinal end faces of the steel frame member 4.
will be placed. During construction, the precast concrete beam members 1 are constructed between columns with missing beam sections, and semi-precast concrete floor plates are constructed between adjacent beam members 1 to reinforce the column heads. Arrange reinforcement, main reinforcement at the top of the beam, and slab reinforcement, and pour concrete for the slab and column head.

【0010】この際、後打ちコンクリートはスタツドジ
ベル5介してU字状鉄骨部材4と一体化され、更にスラ
ブは前記スタツドジベル6を介して梁と一体化される。 このようにU字状鉄骨部材4と一体化された梁において
は、同U字状鉄骨部材4が鉄骨材と同様の働きをする。 しかも同U字状鉄骨部材4は、その両側垂直部片4aの
上端に同部片4aと直交する上部水平フランジ4bが設
けられているので、鉄骨部材の曲げ許容応力が上部水平
フランジ4bを欠くU字型鉄骨部材に比して増大し、プ
レキヤストコンクリート梁1の断面をより小さくするこ
とができ、これに伴って階高も下げることができる。
At this time, the post-cast concrete is integrated with the U-shaped steel frame member 4 via the stud dowel 5, and the slab is further integrated with the beam via the stud dowel 6. In the beam integrated with the U-shaped steel frame member 4 in this way, the U-shaped steel frame member 4 functions similarly to a steel frame member. Moreover, since the U-shaped steel frame member 4 is provided with upper horizontal flanges 4b perpendicular to the upper ends of the vertical pieces 4a on both sides thereof, the allowable bending stress of the steel frame member is lower than that of the upper horizontal flanges 4b. It is larger than the U-shaped steel frame member, and the cross section of the precast concrete beam 1 can be made smaller, and the floor height can be lowered accordingly.

【0011】また前記上部水平フランジ4b上にスタツ
ドボルト6を植立することによって、スラブとプレキヤ
ストコンクリート梁1とが一体化され、同スラブの剛性
が高まり、建物の強度が増大されるものである。
Furthermore, by installing stud bolts 6 on the upper horizontal flange 4b, the slab and precast concrete beam 1 are integrated, the rigidity of the slab is increased, and the strength of the building is increased. be.

【0012】0012

【発明の効果】本発明に係る長スパンプレキヤストコン
クリート梁においては、同梁の長手方向両端部を残して
中央部に、U字状断面部材における両側垂直部片の上端
部に、更に同垂直部片と直交する上部水平フランジを設
けたU字状鉄骨部材を一体に埋設したので、同U字状鉄
骨部材は、上部水平フランジのない前記従来のプレキヤ
ストコンクリート梁におけるU字型鉄骨材より許容応力
が増大し、プレキヤストコンクリート梁の断面を小さく
することができる。
[Effects of the Invention] In the long span precast concrete beam according to the present invention, the beam is placed in the center of the beam except for both ends in the longitudinal direction, and in the upper end of both vertical parts of the U-shaped cross-section member. Since the U-shaped steel frame member with the upper horizontal flange orthogonal to the upper part was buried as one piece, the U-shaped steel frame member is better than the U-shaped steel frame member in the conventional precast concrete beam without the upper horizontal flange. The allowable stress is increased and the cross section of the precast concrete beam can be reduced.

【0013】また前記U字状鉄骨部材における両側垂直
部片の上端に設けた上部水平フランジを利用して、同フ
ランジ上面にスタツドボルトを植立することによって、
前記プレキヤストコンクリート梁上に施工されるスラブ
の剛性を増大しうるものである。
[0013] Furthermore, by using the upper horizontal flanges provided at the upper ends of both vertical pieces of the U-shaped steel frame member, stud bolts are planted on the upper surfaces of the flanges.
The rigidity of the slab constructed on the precast concrete beam can be increased.

【図面の簡単な説明】[Brief explanation of the drawing]

【図1】本発明に係る長スパンプレキヤストコンクリー
ト梁の一実施例を示す斜視図である。
FIG. 1 is a perspective view showing an embodiment of a long span precast concrete beam according to the present invention.

【図2】前記プレキヤストコンクリート梁の側面図であ
る。
FIG. 2 is a side view of the precast concrete beam.

【図3】前記プレキヤストコンクリート梁の縦断側面図
である。
FIG. 3 is a longitudinal sectional side view of the precast concrete beam.

【符号の説明】[Explanation of symbols]

1    プレキヤストコンクリート梁部材4    
U字状鉄骨部材 4a  両側垂直部片 4b  上部水平フランジ 6    スタツドジベル
1 Precast concrete beam member 4
U-shaped steel frame member 4a Vertical pieces 4b on both sides Upper horizontal flange 6 Stud dowel

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】  両側垂直部片の上端面に夫々同各部片
と直交する上部水平フランジを設けたU字状鉄骨部材を
、プレキヤストコンクリート梁部材の長手方向両端部を
残して中央部に一体に埋設してなることを特徴とする長
スパンプレキヤストコンクリート梁。
Claim 1: A U-shaped steel frame member provided with upper horizontal flanges perpendicular to each vertical member on the upper end surfaces of the vertical members on both sides is integrated into the central part of the precast concrete beam member, leaving both longitudinal ends of the member intact. A long span precast concrete beam characterized by being buried in.
JP3086746A 1991-04-18 1991-04-18 Long span precast concrete beams Expired - Fee Related JP2757080B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3086746A JP2757080B2 (en) 1991-04-18 1991-04-18 Long span precast concrete beams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3086746A JP2757080B2 (en) 1991-04-18 1991-04-18 Long span precast concrete beams

Publications (2)

Publication Number Publication Date
JPH04319154A true JPH04319154A (en) 1992-11-10
JP2757080B2 JP2757080B2 (en) 1998-05-25

Family

ID=13895349

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3086746A Expired - Fee Related JP2757080B2 (en) 1991-04-18 1991-04-18 Long span precast concrete beams

Country Status (1)

Country Link
JP (1) JP2757080B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08232400A (en) * 1995-02-24 1996-09-10 Yasuhiro Matsuzaki Steel-framed concrete composite beam structure
CN105946099A (en) * 2016-05-19 2016-09-21 吉林省快构建筑科技有限公司 Grouted fabricated concrete beam and construction method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60230457A (en) * 1984-04-28 1985-11-15 三井プレコン株式会社 Precast reinforced concrete beam and wall with beam

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60230457A (en) * 1984-04-28 1985-11-15 三井プレコン株式会社 Precast reinforced concrete beam and wall with beam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08232400A (en) * 1995-02-24 1996-09-10 Yasuhiro Matsuzaki Steel-framed concrete composite beam structure
CN105946099A (en) * 2016-05-19 2016-09-21 吉林省快构建筑科技有限公司 Grouted fabricated concrete beam and construction method thereof
CN105946099B (en) * 2016-05-19 2018-08-17 中铁建设集团有限公司 Fill the method for construction of core assembly concrete beam

Also Published As

Publication number Publication date
JP2757080B2 (en) 1998-05-25

Similar Documents

Publication Publication Date Title
US5867960A (en) Dowel member for reinforcing concrete structures
KR102080594B1 (en) Couple girder
CN113356370A (en) Mutual anchoring connection construction method for shear wall, frame column and concrete beam bracket
JPH04319154A (en) Long span precast-concrete beam
JPH11166292A (en) Steel frame beam and floor execution using the beam
US4020132A (en) Construction joint for reinforced concrete structures
JPS60133146A (en) Construction of synthetic large beam using u-shaped precast beam material
JPH0788686B2 (en) Front cross beam method
JP3503760B2 (en) Method for reinforcing joint of PCa concrete plate and reinforcing bar composite
JPH0826615B2 (en) Long-span precast concrete beam with a hollow part in the center of the span
JP2560965Y2 (en) Column / beam joint structure
JP2729132B2 (en) How to join columns and precast concrete beams
JPH07252882A (en) Connecting method for building frame
WO1995016084A1 (en) Composite beam to be filled with concrete
JP3433496B2 (en) Precast concrete girder
JPH01137032A (en) Method of lap joint construction of main reinforcement in post and beam joining section
JPH0738485Y2 (en) Joint structure between reinforced concrete column and steel beam
JP2716634B2 (en) Column-beam joint structure
JP2732113B2 (en) PC column / beam joining method
JPH05230935A (en) Precase concrete made beam frame member
JPH0688393A (en) Flat plate construction
JPH03151429A (en) Reinforcement preassembled beam with formwork and working method thereof
JP2726606B2 (en) How to assemble beam reinforcement
JP3749935B2 (en) Column and beam construction method and enclosure
JPH06220942A (en) Composite floor board equipped with small beam

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees