JPH04319136A - Assembly of balcony - Google Patents

Assembly of balcony

Info

Publication number
JPH04319136A
JPH04319136A JP8530291A JP8530291A JPH04319136A JP H04319136 A JPH04319136 A JP H04319136A JP 8530291 A JP8530291 A JP 8530291A JP 8530291 A JP8530291 A JP 8530291A JP H04319136 A JPH04319136 A JP H04319136A
Authority
JP
Japan
Prior art keywords
balcony
units
unit
assembled
site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8530291A
Other languages
Japanese (ja)
Other versions
JP3020298B2 (en
Inventor
Shogo Matsushita
松下 省吾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=13854802&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JPH04319136(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP3085302A priority Critical patent/JP3020298B2/en
Publication of JPH04319136A publication Critical patent/JPH04319136A/en
Application granted granted Critical
Publication of JP3020298B2 publication Critical patent/JP3020298B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

PURPOSE:To save the labor of construction work in site and improve the quality by executing assembling work in a factory, regarding the assembling type of a balcony to be combined with the building of a residential equipment or the like. CONSTITUTION:A balcony 1 to be combined with structures 11-13 is divided into two bodies of front and rear bodies 2, 3. The bodies 2, 3 are composed by combining floors 4, 7 and hand-rails 5, 6, 8, 9 with each body 2, 3 previously in the factory. Then, each body 2, 3 combined previously is set to be fixed at the specified positions of the structures 11-13 in site.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明は、ユニット住宅等の建物
に組み付けられるバルコニーの組立方式に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for assembling a balcony to be assembled into a building such as a unit house.

【0002】0002

【従来の技術】従来、建物に組み付けられるバルコニー
としては、例えば特開昭58−138842号公報,実
開昭56−14101号〜14106号公報等に示され
るようなものがあるが、これらのバルコニーは、いずれ
も現場で床,柱,手摺りを組み立てて完成されるもので
ある。
BACKGROUND OF THE INVENTION Conventionally, there are balconies installed in buildings, such as those shown in Japanese Patent Application Laid-open No. 58-138842, Japanese Utility Model Application No. 14101-14106, etc. All of these are completed on-site by assembling floors, columns, and handrails.

【0003】0003

【発明が解決しようとする課題】しかしながら、従来の
バルコニーの組立方式では、ある程度組み上げられた部
材を現場で組み立てることになるが、それでも現場にお
ける施工作業が多く、バルコニーの完成までにかなりの
時間を費やす必要がある。
[Problems to be Solved by the Invention] However, in the conventional balcony assembly method, members that have been assembled to a certain extent are assembled on site, but there is still a lot of construction work on site, and it takes a considerable amount of time to complete the balcony. need to spend.

【0004】さらに、バルコニー組立に要する部材が未
だばらばらの状態であるため、現場での組立に際して、
部材を紛失したり、間違った箇所に部材を取り付けたり
することもある。
[0004]Furthermore, since the components required for assembling the balcony are still in a separate state, it is difficult to assemble them on site.
Sometimes parts are lost or parts are installed in the wrong place.

【0005】本発明は、このような課題を解決しようと
するもので、工場における組立施工を行なうことで、現
場における施工作業の省力化,工期短縮および品質の向
上を実現したバルコニーの組立方式を提供することを目
的とする。
[0005] The present invention aims to solve these problems, and provides a balcony assembly method that saves labor, shortens the construction period, and improves the quality of construction work at the site by assembling and constructing at a factory. The purpose is to provide.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するため
に、本発明のバルコニーの組立方式は、建物に組み付け
られるバルコニーを少なくとも前後2つのユニットに分
割し、これらのユニットを、各ユニット毎に工場におい
て床,手摺りを予め組み立てて構成し、予め組み立てら
れた前記の各ユニットを、現場において前記建物の所定
位置に設置して固定することを特徴としている。
[Means for Solving the Problems] In order to achieve the above object, the balcony assembly method of the present invention divides a balcony to be assembled into a building into at least two units, the front and the front, and separates these units into separate units. It is characterized in that the floor and handrails are assembled in advance at a factory, and the pre-assembled units are installed and fixed at predetermined positions in the building on site.

【0007】また、前記の各ユニットの床面が、前記建
物の所定位置への設置時に連続的な水勾配を成すように
形成される。
[0007]Furthermore, the floor surface of each unit is formed so as to form a continuous water slope when installed at a predetermined position in the building.

【0008】[0008]

【作用】上述した本発明のバルコニーの組立方式では、
バルコニーが、少なくとも前後2つのユニットとして、
工場にて予め構成されているため、バルコニーの現場で
の組立は、各ユニットを現場まで搬送して建物の所定位
置に設置・固定するだけで行なわれる。従って、現場に
て、従来のごとく細かい部材からバルコニーを組み立て
る必要がなくなる。
[Operation] In the above-described balcony assembly method of the present invention,
The balcony is at least two units, front and rear.
Since it is preconfigured at the factory, on-site assembly of the balcony is accomplished by simply transporting each unit to the site and installing and fixing it in a predetermined position on the building. Therefore, there is no need to assemble the balcony from small parts on site as in the past.

【0009】また、各ユニットを建物の所定位置へ設置
した時に、その床面が連続的な水勾配を形成するため、
バルコニー組立後、このバルコニー床面上の雨水は、水
勾配に沿って円滑に流れる。
[0009] Furthermore, when each unit is installed at a predetermined location in a building, the floor surface forms a continuous water gradient, so
After the balcony is assembled, rainwater on the balcony floor flows smoothly along the water gradient.

【0010】0010

【実施例】以下、図面により本発明の一実施例としての
バルコニーの組立方式について説明すると、図1はその
組立方式を説明するための分解斜視図、図2は本実施例
のバルコニー組立後の状態を示す側面図である。
[Embodiment] The assembly method of a balcony as an embodiment of the present invention will be explained below with reference to the drawings. Fig. 1 is an exploded perspective view for explaining the assembly method, and Fig. 2 is an exploded perspective view of the balcony according to the present embodiment after assembly. It is a side view which shows a state.

【0011】本実施例では、図1に示すように、バルコ
ニー1(図2参照)は、前後2つのユニットつまり奥側
ユニット2と前側ユニット3とに分割され、これらのユ
ニット2,3が、各ユニット2,3毎に工場において予
め構成されている。
In this embodiment, as shown in FIG. 1, the balcony 1 (see FIG. 2) is divided into two units, front and rear, namely, a back unit 2 and a front unit 3. Each unit 2, 3 is configured in advance at the factory.

【0012】ここで、奥側ユニット2は、図2に示すご
とく1階居室ユニット11上に載置される床4と、この
床4両側に配置されアルミ外壁パネル(またはアルミ格
子パネル)5aおよび手摺り子6a等からなる手摺り5
,6とを工場において組み立てて構成されている。
As shown in FIG. 2, the rear unit 2 includes a floor 4 placed on the first floor living room unit 11, an aluminum outer wall panel (or aluminum lattice panel) 5a and Handrail 5 consisting of handrail 6a etc.
, 6 are assembled in a factory.

【0013】また、前側ユニット3は、図2に示すごと
く1階居室ユニット12上からオーバーハングして載置
される床7と、この床7周縁に沿ってコ字形状に配置さ
れアルミ外壁パネル(またはアルミ格子パネル)8aお
よび手摺り子9a等からなる手摺り8,9とを工場にお
いて組み立てて構成されている。
As shown in FIG. 2, the front unit 3 includes a floor 7 that overhangs from above the first floor living room unit 12, and an aluminum outer wall panel that is arranged in a U-shape along the periphery of the floor 7. (or aluminum lattice panel) 8a and handrails 8 and 9 consisting of handrails 9a and the like are assembled in a factory.

【0014】なお、手摺り5,8を構成するアルミ外壁
パネル(またはアルミ格子パネル)5a,8aとしては
、バルコニー1を組み付ける住宅外観に係るデザイン(
格子の形状,色,バランス;パネルの塗装,色,仕上げ
等)ものを選択する。
Note that the aluminum exterior wall panels (or aluminum lattice panels) 5a, 8a constituting the handrails 5, 8 are designed according to the design (
Select the grid shape, color, balance; panel painting, color, finish, etc.).

【0015】さらに、前側ユニット3においては、床7
のオーバーハング部分(バルコニー軒先)内に、図2に
示すように、軒樋10が工場にて取り付けられるほか、
手摺り8,9が倒れに対して強度不足である場合、工場
で控え柱14を適当な位置に立てておく。なお、控え柱
14を立てることができない場合には、仮梁など用いて
倒れ防止を行ない、工場から現場へ搬送してから、現場
で控え柱14を立ててもよい。
Furthermore, in the front unit 3, the floor 7
As shown in Fig. 2, an eave gutter 10 is installed in the overhang part (balcony eaves) at the factory.
If the handrails 8 and 9 do not have enough strength to withstand falling, a support post 14 is erected at an appropriate position at the factory. In addition, if the support pillar 14 cannot be erected, a temporary beam or the like may be used to prevent it from falling down, and the support pillar 14 may be erected at the site after being transported from the factory to the site.

【0016】そして、各ユニット2,3の床4,7の床
面4a,7aは、居室ユニット(建物)11,12の所
定位置への設置時に、ユニット2側からユニット3側へ
降傾斜する連続的な水勾配を成すように形成されている
。 また、各ユニット2,3の床4,7の立ち上げレベルは
、軒樋10のオーバーフロー時を考慮し、バルコニー1
と隣接する2階居室ユニット13の窓13a下縁位置よ
りも低く設定されている。
[0016]The floor surfaces 4a and 7a of the floors 4 and 7 of each unit 2 and 3 slope downward from the unit 2 side to the unit 3 side when the living room units (buildings) 11 and 12 are installed in a predetermined position. It is formed to form a continuous water gradient. In addition, the height of the floors 4 and 7 of each unit 2 and 3 is set in consideration of the overflow of the eaves gutter 10, and the height of the balcony 1
It is set lower than the lower edge position of the window 13a of the second floor living room unit 13 adjacent to the window 13a.

【0017】上述のごとく工場において予め組み立てら
れた各ユニット2,3は、工場から現場へ搬送され、現
場において、クレーン等によりそれぞれ1階居室ユニッ
ト11,12上の所定位置に設置された後、ボルト(図
示せず)により締付固定されて、バルコニー1の組立を
完了する。
The units 2 and 3, which have been assembled in advance at the factory as described above, are transported from the factory to the site, where they are installed at predetermined positions on the first floor living units 11 and 12, respectively, using a crane or the like. The assembly of the balcony 1 is completed by tightening and fixing with bolts (not shown).

【0018】このように、本実施例の組立方式によれば
、バルコニー1が前後2つのユニット2,3として工場
にて予め構成されるので、次のような効果が得られる。 ■現場でのバルコニー1の組立作業が少なくなり、1日
でバルコニー仕上げまで終了できる。 ■現場にて、従来のごとく細かい部材からバルコニー1
を組み立てる必要がなくなり、細かい部材を探す手間が
省け、部材の紛失や取付間違いが生じることもない。 ■バルコニー1のほとんどの部分が工場にて組立られる
ため、雨仕舞などの品質が大幅に工場する。 ■バルコニー1の外側に組み付けられる部品(軒樋10
等)も工場にて取り付けられるため、現場における高所
作業もほとんどなくなり、現場での足場が不要になるほ
か、作業の安全性が確保される。
As described above, according to the assembly method of this embodiment, the balcony 1 is constructed in advance as two front and rear units 2 and 3 at the factory, so that the following effects can be obtained. ■Assembling work for balcony 1 on site is reduced, and the balcony can be finished in one day. ■On-site, balcony 1 is manufactured from detailed parts as before.
There is no need to assemble the parts, the trouble of searching for small parts is eliminated, and parts are no longer lost or incorrectly installed. ■Since most parts of Balcony 1 are assembled at the factory, the quality of the rain cover, etc. is significantly improved by the factory. ■Parts assembled on the outside of balcony 1 (eaves gutter 10
etc.) can be installed at the factory, which eliminates most of the work at heights on site, eliminates the need for scaffolding on site, and ensures work safety.

【0019】また、本実施例では、手摺り5,6,8,
9を構成するに際して、アルミ外壁パネル(またはアル
ミ格子パネル)5a,8aおよび手摺り子6a,9aが
用いられ、比較的安価なものとすることができるほか、
アルミ外壁パネル(またはアルミ格子パネル)5a,8
aのデザインを適宜選択することにより、多種多様な住
宅に導入され組み付けられるバルコニーのユニットを製
造することができる。
Furthermore, in this embodiment, handrails 5, 6, 8,
9, aluminum outer wall panels (or aluminum lattice panels) 5a, 8a and handrails 6a, 9a are used, and it can be made relatively inexpensive.
Aluminum exterior wall panel (or aluminum lattice panel) 5a, 8
By appropriately selecting the design of a, it is possible to manufacture balcony units that can be introduced and assembled into a wide variety of houses.

【0020】さらに、各ユニット2,3を1階居室ユニ
ット11,12上の所定位置へ設置した時には、その床
面4a,7aが連続的な水勾配を形成するため、バルコ
ニー1の組立後、このバルコニー1の床面4a,7a上
の雨水は、水勾配に沿って円滑に流れ、軒樋10へ流れ
込む。
Furthermore, when the units 2 and 3 are installed at predetermined positions on the first floor living room units 11 and 12, the floor surfaces 4a and 7a form a continuous water gradient, so that after the balcony 1 is assembled, Rainwater on the floor surfaces 4a and 7a of the balcony 1 flows smoothly along the water gradient and flows into the eaves gutter 10.

【0021】なお、上記実施例では、前側ユニット3を
1階居室ユニット12上からオーバーハングさせて載置
する場合について説明しているが、前側ユニット3をオ
ーバーハングさせることなく、1階居室ユニット12上
に載置してもよく、上記実施例と同様の作用効果が得ら
れる。ただし、この場合、床7のオーバーハング部分内
に取り付けた軒樋10を、前側ユニット3の外側つまり
バルコニー1の軒先に取り付ける。
In the above embodiment, the case where the front unit 3 is placed so as to overhang from above the first floor living room unit 12 is explained, but the front unit 3 can be mounted on the first floor living room unit 12 without overhanging it. 12, the same effect as in the above embodiment can be obtained. However, in this case, the eaves gutter 10 installed within the overhang portion of the floor 7 is attached to the outside of the front unit 3, that is, to the eaves of the balcony 1.

【0022】また、上記実施例では、バルコニー1を前
後2のユニット2,3に分割した場合について説明した
が、本発明の方式はこれに限定されるものではない。例
えば、図3(a)〜(l)に示すように、バルコニー1
A〜1Lを組み付ける居室ユニットのサイズに応じて、
その分割ユニットをシステム化することができる。
Furthermore, in the above embodiment, a case has been described in which the balcony 1 is divided into two front and rear units 2 and 3, but the system of the present invention is not limited to this. For example, as shown in FIGS. 3(a) to (l), balcony 1
Depending on the size of the living room unit in which A to 1L will be assembled,
The divided units can be systemized.

【0023】つまり、図3(a)〜(l)に示すように
、居室ユニットの幅および広さに応じて、奥側ユニット
2A〜2Hと、前側ユニット3A〜3Dと、横方向に分
割されて前側ユニットを構成する各種のユニット3E〜
3Iとを工場製作することにより、各種居室ユニットに
対応したバルコニー1A〜1Lを、容易な現場作業によ
り組み立てることができる。
That is, as shown in FIGS. 3(a) to 3(l), the living room unit is divided into rear units 2A to 2H and front units 3A to 3D in the horizontal direction depending on the width and size of the living room unit. Various units 3E~ that make up the front unit
By manufacturing 3I in a factory, balconies 1A to 1L corresponding to various living room units can be assembled by easy on-site work.

【0024】図3(a)〜(d)に示すバルコニー1A
〜1Dは、それぞれ奥側ユニット2A〜2Dと前側ユニ
ット3A〜3Dとから組み立てられ、図3(e)〜(h
)に示すバルコニー1E〜1Hは、それぞれ奥側ユニッ
ト2E〜2Hと前側ユニット3A〜3Dとから組み立て
られている。また、図3(i)に示すバルコニー1Iは
、奥側ユニット2Aと、2つのユニット3E,3Fから
なる前側ユニットとから組み立てられ、図3(j)に示
すバルコニー1Jは、奥側ユニット2Bと、2つのユニ
ット3E,3Gからなる前側ユニットとから組み立てら
れ、図3(k)に示すバルコニー1Kは、奥側ユニット
2Cと、3つのユニット3E,3H,3Gからなる前側
ユニットとから組み立てられ、図3(l)に示すバルコ
ニー1Lは、奥側ユニット2Dと、3つのユニット3E
,3I,3Gからなる前側ユニットとから組み立てられ
ている。
Balcony 1A shown in FIGS. 3(a) to 3(d)
~1D are assembled from rear units 2A~2D and front units 3A~3D, respectively, and are shown in Figures 3(e)~(h).
) The balconies 1E to 1H shown in ) are assembled from rear units 2E to 2H and front units 3A to 3D, respectively. Furthermore, the balcony 1I shown in FIG. 3(i) is assembled from a back unit 2A and a front unit consisting of two units 3E and 3F, and the balcony 1J shown in FIG. 3(j) is assembled from a back unit 2B. , a front unit consisting of two units 3E, 3G, and the balcony 1K shown in FIG. 3(k) is assembled from a rear unit 2C and a front unit consisting of three units 3E, 3H, 3G, The balcony 1L shown in FIG. 3(l) includes a rear unit 2D and three units 3E.
, 3I, and 3G.

【0025】さらに、本発明は、上記実施例に限定され
ることなく、本発明の要旨を逸脱しない範囲での設計変
更等があっても、本発明の範囲に含まれる。
Furthermore, the present invention is not limited to the above-mentioned embodiments, and even if there are design changes and the like without departing from the gist of the present invention, the scope of the present invention still falls within the scope of the present invention.

【0026】[0026]

【発明の効果】以上詳述したように、本発明のバルコニ
ーの組立方式によれば、バルコニーを少なくとも前後2
つのユニットに分割し、これらのユニットを、各ユニッ
ト毎に工場において床,手摺りを予め組み立てて構成し
、予め組み立てられた前記の各ユニットを、現場におい
て前記建物の所定位置に設置して固定するという簡素な
構成により、現場における施工作業の省力化,工期短縮
および品質の向上を実現できる効果がある。
Effects of the Invention As detailed above, according to the balcony assembly method of the present invention, the balcony can be assembled into at least two
These units are constructed by pre-assembling floors and handrails in a factory for each unit, and each pre-assembled unit is installed and fixed at a predetermined position in the building on-site. This simple configuration has the effect of saving on-site construction work, shortening construction time, and improving quality.

【0027】また、各ユニットを建物の所定位置へ設置
した時に、その床面が連続的な水勾配を形成するため、
バルコニー組立後、このバルコニー床面上の雨水を、水
勾配に沿って円滑に流せる効果もある。
[0027] Furthermore, when each unit is installed at a predetermined location in a building, the floor surface forms a continuous water gradient;
After the balcony is assembled, rainwater on the balcony floor can flow smoothly along the water gradient.

【図面の簡単な説明】[Brief explanation of drawings]

【図1】本発明の一実施例としてのバルコニーの組立方
式を説明するための分解斜視図である。
FIG. 1 is an exploded perspective view for explaining an assembly method of a balcony as an embodiment of the present invention.

【図2】本実施例のバルコニー組立後の状態を示す側面
図である。
FIG. 2 is a side view showing the state of the balcony after assembly of the present embodiment.

【図3】(a)〜(l)はいずれも本発明の方式を適用
されるバルコニーの分割例を示す平面図である。
FIGS. 3A to 3L are plan views showing examples of dividing a balcony to which the method of the present invention is applied.

【符号の説明】[Explanation of symbols]

1,1A〜1L  バルコニー 2,2A〜2H  奥側ユニット 3,3A〜3I  前側ユニット 4              床 4a            床面 5,6          手摺り 5a            アルミ外壁パネル(また
はアルミ格子パネル) 6a            手摺り子7      
        床 7a            床面 8,9          手摺り 8a            アルミ外壁パネル(また
はアルミ格子パネル) 9a            手摺り子10     
       軒樋 11,12      1階居室ユニット13    
        2階居室ユニット13a      
    窓 14            控え柱
1, 1A to 1L Balcony 2, 2A to 2H Back unit 3, 3A to 3I Front unit 4 Floor 4a Floor surface 5, 6 Handrail 5a Aluminum outer wall panel (or aluminum lattice panel) 6a Handrail 7
Floor 7a Floor surface 8, 9 Handrail 8a Aluminum exterior wall panel (or aluminum lattice panel) 9a Handrail 10
Eaves gutters 11, 12 1st floor living room unit 13
2nd floor living unit 13a
Window 14 buttress

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】建物に組み付けられるバルコニーを少なく
とも前後2つのユニットに分割し、これらのユニットを
、各ユニット毎に工場において床,手摺りを予め組み立
てて構成し、予め組み立てられた前記の各ユニットを、
現場において前記建物の所定位置に設置して固定するこ
とを特徴とするバルコニーの組立方式。
Claim 1: A balcony to be assembled into a building is divided into at least two front and rear units, and each of these units is constructed by pre-assembling a floor and a handrail in a factory, and each of the above-mentioned units is assembled in advance. of,
A balcony assembly method characterized in that the balcony is installed and fixed at a predetermined position on the building on site.
【請求項2】前記の各ユニットの床面が、前記建物の所
定位置への設置時に連続的な水勾配を成すように形成さ
れていることを特徴とする請求項1記載のバルコニーの
組立方式。
2. The balcony assembly method according to claim 1, wherein the floor surface of each unit is formed so as to form a continuous water gradient when installed at a predetermined position in the building. .
JP3085302A 1991-04-17 1991-04-17 balcony Expired - Fee Related JP3020298B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3085302A JP3020298B2 (en) 1991-04-17 1991-04-17 balcony

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3085302A JP3020298B2 (en) 1991-04-17 1991-04-17 balcony

Publications (2)

Publication Number Publication Date
JPH04319136A true JPH04319136A (en) 1992-11-10
JP3020298B2 JP3020298B2 (en) 2000-03-15

Family

ID=13854802

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3085302A Expired - Fee Related JP3020298B2 (en) 1991-04-17 1991-04-17 balcony

Country Status (1)

Country Link
JP (1) JP3020298B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10140651A (en) * 1996-11-07 1998-05-26 Sekisui Chem Co Ltd Building
US12091872B2 (en) 2021-05-20 2024-09-17 Sano Development Limited Hybrid building system, building and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10140651A (en) * 1996-11-07 1998-05-26 Sekisui Chem Co Ltd Building
US12091872B2 (en) 2021-05-20 2024-09-17 Sano Development Limited Hybrid building system, building and method

Also Published As

Publication number Publication date
JP3020298B2 (en) 2000-03-15

Similar Documents

Publication Publication Date Title
JPH04319136A (en) Assembly of balcony
JPS6349443Y2 (en)
JPH0415846Y2 (en)
JPH0592320U (en) Mounting structure for blind members for assembled buildings
JP2002201714A (en) Unit building
KR20200016456A (en) Prefabricated building and method of constructing thereof
JPH054504B2 (en)
JPS626162Y2 (en)
JP3793467B2 (en) Unit building with skylight and construction method of unit building with skylight
JP4355244B2 (en) building
JPS625449Y2 (en)
JP2003336312A (en) Building
JP3902847B2 (en) Unit building with balcony
JP2000199347A (en) Structure for providing all dwelling units of multiple dwelling house with garden having large depth
JP2024051406A (en) Simple structure
JP2024051412A (en) Structure
JPS6328276Y2 (en)
JP2024051408A (en) Simple structure
RU107199U1 (en) WALL WOODEN COMPOSITION PANEL FOR MULTI-STOREY HOUSE
JP2024051413A (en) Simple structure
JPS627808Y2 (en)
JP2024051411A (en) Simple structure
JP2024051407A (en) Simple structure
JPH0610465A (en) Mounting structure of panel for set building
JP2500041B2 (en) DOMER

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080114

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090114

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees