JPH0424379Y2 - - Google Patents

Info

Publication number
JPH0424379Y2
JPH0424379Y2 JP2592286U JP2592286U JPH0424379Y2 JP H0424379 Y2 JPH0424379 Y2 JP H0424379Y2 JP 2592286 U JP2592286 U JP 2592286U JP 2592286 U JP2592286 U JP 2592286U JP H0424379 Y2 JPH0424379 Y2 JP H0424379Y2
Authority
JP
Japan
Prior art keywords
hot gas
ice
condenser
evaporator
refrigerant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP2592286U
Other languages
Japanese (ja)
Other versions
JPS62138172U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP2592286U priority Critical patent/JPH0424379Y2/ja
Publication of JPS62138172U publication Critical patent/JPS62138172U/ja
Application granted granted Critical
Publication of JPH0424379Y2 publication Critical patent/JPH0424379Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Production, Working, Storing, Or Distribution Of Ice (AREA)

Description

【考案の詳細な説明】 産業上の利用分野 この考案は自動製氷機に関し、特に除氷運転時
に循環させるホツトガス量を、周囲温度によつて
調整し得るよう構成した自動製氷機に関するもの
である。
[Detailed description of the invention] Industrial application field This invention relates to an automatic ice maker, and in particular to an automatic ice maker configured so that the amount of hot gas circulated during deicing operation can be adjusted according to the ambient temperature.

従来技術 第7図に示す従来公知に係る噴水式自動製氷機
の概略構成において、符号1は製氷部に配設した
下向きに開口する製氷室を示し、この製氷室1の
内部は、縦横に設けた仕切板によつて多数の製氷
小室2に画成されている。製氷室1の外側上面に
は、図示の冷凍系に接続する蒸発器3が密着的に
蛇行配置され、製氷室1の下方には水皿4が傾動
可能に配設されている。すなわち水皿4はその一
端が機枠に枢支され、他端部は第8図に示すアク
チユエータモータAMにレバーを介して連結さ
れ、製氷サイクル時には前記水皿4を水平姿勢に
保持して前記製氷室1を下方から閉成している。
そして除氷サイクル時にアクチユエータモータ
AMが回転し、水皿4を下方に傾動させることに
より製氷室1を開放する。また冷凍系の弁を切換
え、前記蒸発器3にホツトガスを供給して製氷室
1を加温し、製氷小室2で生成された角氷を落下
放出して貯水槽(図示せず)に貯留させるように
なつている。
Prior Art In the schematic configuration of a conventional fountain-type automatic ice maker shown in FIG. 7, reference numeral 1 indicates a downwardly opening ice making chamber disposed in the ice making section. A large number of ice-making compartments 2 are defined by partition plates. An evaporator 3 connected to the illustrated refrigeration system is closely arranged in a meandering manner on the outer upper surface of the ice-making compartment 1, and a water tray 4 is tiltably disposed below the ice-making compartment 1. That is, one end of the water tray 4 is pivotally supported by the machine frame, and the other end is connected to the actuator motor AM shown in FIG. 8 via a lever, so that the water tray 4 is held in a horizontal position during the ice making cycle. The ice making chamber 1 is closed from below.
and the actuator motor during the de-icing cycle.
The AM rotates and tilts the water tray 4 downward to open the ice making chamber 1. Also, the valve of the refrigeration system is switched, hot gas is supplied to the evaporator 3 to warm the ice making compartment 1, and the ice cubes produced in the small ice making compartment 2 are released and stored in a water storage tank (not shown). It's becoming like that.

水皿4には前記の各製氷小室2と対応する位置
に噴水孔7が穿設され、この噴水孔7は水皿裏面
に配設した分配管6に連通している。水皿4の下
方には製氷水タンク5が配設され、このタンク5
からポンプモータPMにより送水管8を経て圧力
室に送給された製氷水は、前記分配管6に圧送さ
れて多数の噴水孔7から対応の製氷小室2中に噴
水供給され、前記蒸発器3により氷点下に冷却さ
れた製氷小室2の内面に層状に氷結して角氷を次
第に形成する。また氷結するに至らなかつた製氷
残水は、各製氷小室2に対応して水皿4に穿設し
た戻り孔9を経てタンク5内に帰還回収される。
なお水タンク5には、製氷サイクルに必要な所要
量の製氷水が、外部水道系10から給水弁WVを
介して供給される。
A water fountain hole 7 is bored in the water tray 4 at a position corresponding to each of the ice-making compartments 2, and this fountain hole 7 communicates with a distribution pipe 6 arranged on the back surface of the water tray. An ice-making water tank 5 is provided below the water tray 4.
The ice-making water sent from the pump motor PM to the pressure chamber via the water pipe 8 is fed under pressure to the distribution pipe 6, and is fed into the corresponding ice-making chamber 2 from a large number of water fountain holes 7, and then the ice-making water is fed into the corresponding ice-making chamber 2 from the evaporator 3. As a result, ice cubes are gradually formed in layers on the inner surface of the ice-making chamber 2 which has been cooled to below freezing point. The ice-making residual water that has not yet frozen is returned to the tank 5 and collected through return holes 9 formed in the water tray 4 corresponding to each ice-making chamber 2.
Note that the water tank 5 is supplied with a required amount of ice-making water necessary for the ice-making cycle from an external water supply system 10 via a water supply valve WV.

蒸発器3の出口側は圧縮機20の吸入口に吸入
管17を介して接続され、前記圧縮機20の吐出
口に接続した吐出管14は、フアンモータFMを
備えた凝縮器11に接続されている。この凝縮器
11は液管15を経てドライヤ12に接続され、
ドライヤ12の出口側は液管16および膨張弁1
3を介して前記蒸発器3の入口側に接続されてい
る。なお吐出管14は凝縮器11の入口手前側で
分岐されて、ホツトガス弁HVを有するホツトガ
ス配管18に接続し、前記凝縮器3の入口側は前
記ホツトガス配管18にバイパス接続されてい
る。また製氷室1の適宜の上面位置には製氷検知
サーモTh1が配設され、製氷室1の側面位置には
除氷検知サーモTh2が設けてある。
The outlet side of the evaporator 3 is connected to the suction port of a compressor 20 via a suction pipe 17, and the discharge pipe 14 connected to the discharge port of the compressor 20 is connected to a condenser 11 equipped with a fan motor FM. ing. This condenser 11 is connected to a dryer 12 via a liquid pipe 15.
The outlet side of the dryer 12 is connected to a liquid pipe 16 and an expansion valve 1.
3 to the inlet side of the evaporator 3. The discharge pipe 14 is branched on the side near the inlet of the condenser 11 and connected to a hot gas pipe 18 having a hot gas valve HV, and the inlet side of the condenser 3 is connected to the hot gas pipe 18 by bypass. Further, an ice-making detection thermometer Th 1 is disposed at an appropriate upper surface position of the ice-making chamber 1, and a de-icing detection thermometer Th 2 is disposed at a side position of the ice-making chamber 1.

第8図は、前述した自動製氷機における電気系
統の接続図を示す。この第8図の切換スイツチ
SWは、除氷サイクル時にアクチユエータモータ
AMの回転により水皿4が所定角度傾動した際
に、製氷側接点aから除氷側接点bに切り換える
ために設けてある。またS1はリセツトスイツチを
示し、製氷検知サーモTh1は製氷完了状態を検知
して、その接点aを接点bに切り換え、除氷検知
サーモTh2は除氷完了状態を検知して接点を閉成
するようになつている。
FIG. 8 shows a connection diagram of the electrical system in the automatic ice making machine described above. This changeover switch in Figure 8
SW is the actuator motor during the de-icing cycle.
It is provided to switch from the ice making side contact a to the deicing side contact b when the water tray 4 is tilted by a predetermined angle due to the rotation of the AM. In addition, S 1 indicates a reset switch, ice making detection thermo Th 1 detects the completion of ice making and switches its contact a to contact b, and deicing detection thermo Th 2 detects the completion of ice making and closes the contact. It is starting to become a reality.

切換スイツチSWの接点aには製氷検知サーモ
Th1とリセツトスイツチS1とが並列接続され、ま
た製氷検知サーモTh1の接点aには冷却フアンモ
ータFMとポンプモータPMとが並列接続され、
更に製氷検知サーモTh1の接点bはリセツトスイ
ツチS1とアクチユエータモータAMとに接続され
ている。切換スイツチSWの接点bには、アクチ
ユエータモータAMに接続する除氷検知サーモ
Th2と、ホツトガス弁HVと、給水弁WVとが並
列に接続されている。
There is an ice-making detection thermometer at contact a of the changeover switch SW.
Th 1 and reset switch S 1 are connected in parallel, and a cooling fan motor FM and a pump motor PM are connected in parallel to contact a of ice-making detection thermo Th 1 .
Furthermore, the contact b of the ice-making detection thermometer Th1 is connected to the reset switch S1 and the actuator motor AM. Contact b of the changeover switch SW has a de-icing detection thermometer connected to the actuator motor AM.
Th 2 , hot gas valve HV, and water supply valve WV are connected in parallel.

この構成に係る従来の噴水式自動製氷機の動作
を次に説明する。前記水皿4に設けた切換スイツ
チSWは、製氷サイクル時には接点aを側に接続
され、製氷検知サーモTh1は接点a側に接続され
て、圧縮機20、冷却フアンモータFMおよびポ
ンプモータPMに通電している。圧縮機20で圧
縮された冷媒は、吐出管14を経て凝縮器11へ
吐出供給され、冷却フアンにより冷却されて高圧
液体となり、ドライヤ12を通過して水分除去さ
れ膨張弁13で減圧された後、蒸発器3に送給さ
れてここで蒸発し、製氷室1を冷却する。蒸発器
3で気化した冷媒ガスは、吸入管17を経て再び
圧縮機20に帰還して先の冷却サイクルを反復す
る。
The operation of the conventional fountain-type automatic ice maker having this configuration will be described next. The changeover switch SW provided on the water tray 4 is connected to the contact a side during the ice making cycle, and the ice making detection thermometer Th1 is connected to the contact a side, and is connected to the compressor 20, the cooling fan motor FM, and the pump motor PM. Power is on. The refrigerant compressed by the compressor 20 is discharged and supplied to the condenser 11 through the discharge pipe 14, cooled by a cooling fan to become a high-pressure liquid, passed through the dryer 12 to remove moisture, and after being depressurized by the expansion valve 13. , and is fed to the evaporator 3 where it evaporates to cool the ice making compartment 1. The refrigerant gas vaporized in the evaporator 3 returns to the compressor 20 again through the suction pipe 17 and repeats the previous cooling cycle.

製氷小室2中に角氷が生成され製氷が完了する
と、これを製氷検知サーモTh1が検知し、その接
点を「b」側に切り換えて除氷サイクルに入る。
これによりフアンモータFMとポンプモータPM
への通電が遮断される一方、アクチユエータモー
タAMが通電付勢されて水皿4が傾動する。そし
て該水皿4の支持枠に配置した切換スイツチSW
が、前記モータAMのアームと接触して接点b側
に切り換わり、ホツトガス弁HVと給水弁WVと
は通電付勢されて開弁する。この結果として、圧
縮機20で圧縮された冷媒は、凝縮器11で冷却
される前に、高温のホツトガスとして配管18を
介して蒸発器3に直接導入され、製氷室1を加温
してその脱氷を促進する。
When ice cubes are generated in the ice making compartment 2 and ice making is completed, the ice making detection thermo Th1 detects this and switches its contact to the "b" side to enter the deicing cycle.
This allows the fan motor FM and pump motor PM to
While the current is cut off, the actuator motor AM is energized and the water tray 4 is tilted. And a changeover switch SW arranged on the support frame of the water tray 4
contacts the arm of the motor AM and switches to the contact b side, and the hot gas valve HV and water supply valve WV are energized and opened. As a result, the refrigerant compressed by the compressor 20 is directly introduced into the evaporator 3 via the pipe 18 as a high-temperature hot gas before being cooled by the condenser 11, heating the ice-making compartment 1 and increasing its temperature. Promote de-icing.

考案が解決しようとする問題点 前述した従来の自動製氷機では、除氷サイクル
に入つて角氷が製氷室1から離脱するまでに要す
る時間(脱氷時間)は、一般に外気温等の製氷機
の周囲温度に依存し、例えば夏期には短くなり、
冬期には長くかかることが確認されている。すな
わち冷凍系の管路内における冷媒圧力は、夏期の
如く周囲温度が高い時は圧力が高くなつてホツト
ガス循環量が増大し、冬期の如く周囲温度が低い
時は逆にホツトガス循環量が減少する。従つて夏
期の温度条件に合わせて圧縮機20の低圧側(吸
入側)圧力を設定しておくと、冬期には圧縮機の
低圧側圧力が更に減少して、蒸発器3を循環する
ホツトガス量が少なくなる。このため製氷室1の
加温時間が長くなり、除氷時間も長期化して製氷
能力が大幅に低下すると共に、消費電力が増大す
るという問題がある。
Problems to be Solved by the Invention In the conventional automatic ice maker mentioned above, the time required for the ice cubes to leave the ice maker 1 after entering the deicing cycle (deicing time) generally depends on the outside temperature, etc. of the ice maker. depends on the ambient temperature, e.g. becomes shorter in summer,
It has been confirmed that it takes longer in winter. In other words, the refrigerant pressure in the pipes of the refrigeration system increases when the ambient temperature is high, such as in the summer, and the amount of hot gas circulated increases, and conversely, when the ambient temperature is low, such as in the winter, the amount of hot gas circulated decreases. . Therefore, if the pressure on the low pressure side (suction side) of the compressor 20 is set according to the temperature conditions in the summer, the pressure on the low pressure side of the compressor will further decrease in the winter, and the amount of hot gas circulating through the evaporator 3 will decrease. becomes less. For this reason, there are problems in that the heating time of the ice making chamber 1 becomes longer, the time for deicing becomes longer, the ice making capacity is significantly reduced, and the power consumption increases.

また冷媒の循環量は、製氷サイクル時より除氷
サイクル時の方が減圧手段13を介していないの
で多くなり、圧縮機20の負荷は除氷サイクル時
に増大する。そして同じ除氷サイクル時でも、ホ
ツトガス循環量が多くなる夏期等の高温時には、
圧縮機20の負荷は更に増大する。従つて圧縮機
20の低圧側圧力を冬期に合わせて設定すると、
夏期において除氷サイクル時に圧縮機が過負荷に
なり、モータ焼損等の故障を招来する問題があ
る。しかも実際に製氷機を永年使用すると、凝縮
器11の表面のホコリ等が付着して熱伝達が阻害
され、熱交換効率が低下する。これは更に冷媒循
環量を増大させる原因となり、圧縮機20の過負
荷を助長することになる。このため冷媒循環量
を、予め不必要に多く設定することはできない。
Further, the amount of refrigerant circulated is greater during the deicing cycle than during the ice making cycle because the refrigerant does not go through the pressure reducing means 13, and the load on the compressor 20 increases during the deicing cycle. Even during the same deicing cycle, during high temperatures such as summer when the amount of hot gas circulating increases,
The load on the compressor 20 further increases. Therefore, if the low pressure side pressure of the compressor 20 is set according to the winter season,
In the summer, there is a problem in that the compressor becomes overloaded during the deicing cycle, leading to failures such as motor burnout. Moreover, if the ice maker is actually used for a long time, dust and the like will adhere to the surface of the condenser 11, impeding heat transfer and reducing heat exchange efficiency. This further causes an increase in the amount of refrigerant circulation, which promotes overloading of the compressor 20. Therefore, the amount of refrigerant circulation cannot be set in advance to be unnecessarily large.

しかし冷媒循環量を少なくすると、次の様な問
題が指摘される。すなわち循環量の少ないホツト
ガスは、その熱容量が小さいために、蒸発器3の
入口側から出口側に至る管体を均一に加熱するこ
とができない。このため入口側は高温に加熱し得
ても、出口側に近付くに従つて高温を確保し得
ず、角氷を各製氷小室2から一斉に離脱させるこ
とが困難になつて、脱氷時間が長くなる。
However, when the amount of refrigerant circulation is reduced, the following problems are pointed out. In other words, the hot gas having a small amount of circulation cannot uniformly heat the tube from the inlet side to the outlet side of the evaporator 3 because its heat capacity is small. For this reason, even if the inlet side can be heated to a high temperature, the closer you get to the outlet side, the higher the temperature cannot be ensured, making it difficult to remove the ice cubes from each ice making compartment 2 all at once, and deicing time becomes longer. become longer.

そこで時間的に遅延することなく一挙に全ての
氷を離脱させるため、一般に製氷室1の下端と水
皿4の表面との間に予め隙間を形成しておき、こ
の隙間に各角氷を連結するリブ状の氷が生成され
るようにしてある。従つて脱氷時間が長いと、蒸
発器3の入口付近にある製氷小室2内の角氷の融
解量が、蒸発器3の出口付近にある製氷小室2内
の角氷融解量より多くなり、各角氷が一斉に自重
により離脱した際に、形状の不均一な角氷が大量
に生産されることになる。
Therefore, in order to remove all the ice at once without any time delay, a gap is generally formed in advance between the lower end of the ice-making compartment 1 and the surface of the water tray 4, and each ice cube is connected to this gap. It is designed so that rib-shaped ice is generated. Therefore, if the deicing time is long, the amount of ice cubes melted in the ice making chamber 2 near the inlet of the evaporator 3 will be larger than the amount of ice cubes melting in the ice making chamber 2 near the outlet of the evaporator 3. When all the ice cubes are separated by their own weight, a large amount of ice cubes with non-uniform shapes are produced.

以上述べた自動製氷機の諸問題は、噴水式に限
らず他の型式の製氷機、例えば流下式製氷機でも
起こり得るものである。かかる諸問題は、第9図
に示すように、1個しか設けていないホツトガス
弁を周囲温度とは無関係に除氷サイクル時に開弁
する方式であるため、ホツトガス循環量を周囲温
度によつて調整することができないことに起因す
る。
The above-mentioned problems with automatic ice makers are not limited to fountain type ice makers, but can also occur with other types of ice makers, such as falling type ice makers. These problems can be solved by adjusting the amount of hot gas circulation depending on the ambient temperature because the system uses only one hot gas valve, which is opened during the deicing cycle regardless of the ambient temperature, as shown in Figure 9. This is due to the inability to do so.

発明の目的 本考案は、従来技術に係る自動製氷機に内在し
ている前記の問題を解決するため、ホツトガス循
環量を周囲温度によつて調整することができる自
動製氷機を提供することを目的とする。
Purpose of the Invention The object of the present invention is to provide an automatic ice maker that can adjust the hot gas circulation amount depending on the ambient temperature, in order to solve the above-mentioned problems inherent in the conventional automatic ice maker. shall be.

問題点を解決するための手段 前記の問題点を好適に解決するため本考案は、
製氷部に配設した蒸発器と、この蒸発器に減圧手
段を介して液化冷媒を供給する凝縮器と、前記蒸
発器からの気化冷媒を圧縮して前記凝縮器に送出
す圧縮機とからなる冷凍回路を備えた自動製氷機
において、 前記凝縮器に流入する前の圧縮された気化冷媒
を前記蒸発器の入口側に直接バイパスする第1配
管と、 この第1配管を開閉する第1ホツトガス弁と、 前記凝縮器から流出する冷媒を前記蒸発器の入
口側に直接バイパスする第2配管と、 この第2配管を開閉する第2ホツトガス弁と、 除氷運転開始から所定時間だけ前記第2ホツト
ガス弁を開弁して前記凝縮器内の液化冷媒をホツ
トガス循環系に導入するタイマとを配設し、 前記タイマに設定される所定時間を可変とした
ことを特徴とする。
Means for Solving the Problems In order to suitably solve the above problems, the present invention has the following features:
It consists of an evaporator disposed in the ice making section, a condenser that supplies liquefied refrigerant to the evaporator via a pressure reducing means, and a compressor that compresses the vaporized refrigerant from the evaporator and sends it to the condenser. In an automatic ice maker equipped with a refrigeration circuit, the first piping directly bypasses the compressed vaporized refrigerant before flowing into the condenser to the inlet side of the evaporator, and the first hot gas valve opens and closes the first piping. a second piping that directly bypasses the refrigerant flowing out of the condenser to the inlet side of the evaporator; a second hot gas valve that opens and closes the second piping; A timer for opening a valve to introduce the liquefied refrigerant in the condenser into the hot gas circulation system is provided, and the predetermined time set in the timer is variable.

作 用 前述した構成に係る本考案の自動製氷機では、
除氷運転時に凝縮器内の液化冷媒がホツトガス循
環経路内に導入され、ホツトガス循環量が増加す
る。この増加量はタイマの所定時間に依存するた
め、外気温が高く冷凍回路内の冷媒圧力が高い時
は前記所定時間を零に設定し、外気温が低い時は
前記所定時間を適宜設定する。
Function The automatic ice maker of the present invention having the above-mentioned configuration has the following features:
During deicing operation, the liquefied refrigerant in the condenser is introduced into the hot gas circulation path, increasing the amount of hot gas circulation. Since this amount of increase depends on the predetermined time of the timer, when the outside temperature is high and the refrigerant pressure in the refrigeration circuit is high, the predetermined time is set to zero, and when the outside temperature is low, the predetermined time is set appropriately.

実施例 次に本考案に係る自動製氷機につき、好適な実
施例を挙げて、第1図〜第6図を参照して説明す
る。第1図は本考案の一実施例に係る噴水式自動
製氷機の製氷部における概略構成図、第2図はそ
の冷凍回路図である。なお第1図において、第7
図で説明した構成要素と同一の構成要素について
は、同一符号を付してその説明を省略する。
Embodiments Next, preferred embodiments of the automatic ice maker according to the present invention will be described with reference to FIGS. 1 to 6. FIG. 1 is a schematic diagram of the ice making section of a fountain-type automatic ice maker according to an embodiment of the present invention, and FIG. 2 is a refrigeration circuit diagram thereof. In addition, in Figure 1, the seventh
Components that are the same as those explained in the figures are given the same reference numerals and their explanations will be omitted.

本実施例の冷凍回路において、従来からのホツ
トガス配管およびホツトガス弁は、夫々第1配管
18および第1ホツトガス弁HV1として図示し
てある。この構成に加えて本実施例では新たに、
凝縮器11から流出する液化冷媒を蒸発器3の入
口側に直接バイパスする第2配管19と、この第
2配管19を開閉する第2ホツトガス弁HV2
が設けられている。
In the refrigeration circuit of this embodiment, the conventional hot gas piping and hot gas valve are shown as first piping 18 and first hot gas valve HV1 , respectively. In addition to this configuration, this embodiment newly includes:
A second pipe 19 that directly bypasses the liquefied refrigerant flowing out of the condenser 11 to the inlet side of the evaporator 3, and a second hot gas valve HV2 that opens and closes the second pipe 19 are provided.

なお第1図および第2図に示す実施例では、第
1配管18および第2配管19が蒸発器3に接続
する側を1本の管体に纒めてあるが、別々に蒸発
器3の入口側に接続するよう構成してもよい。ま
た第3図および第4図に示すように、受液器30
を有する冷凍回路にあつては、前記の第2配管1
9は受液器30の前後何れの側から導出してもよ
い。
In the embodiment shown in FIGS. 1 and 2, the sides where the first pipe 18 and the second pipe 19 connect to the evaporator 3 are combined into one pipe, but the sides of the evaporator 3 are connected separately. It may be configured to be connected to the entrance side. Further, as shown in FIGS. 3 and 4, a liquid receiver 30
In the case of a refrigeration circuit having
9 may be led out from either the front or rear side of the liquid receiver 30.

第5図は、本実施例に係る自動製氷機の電気系
統の接続図を示す。この実施例の電気接続によれ
ば、第8図に示す従来の接続構成に加えて、開閉
スイツチを直列に接続した第2ホツトガス弁
HV2が第1ホツトガス弁HV1に並列に配設され、
更に通電開始から設定時間をカウントし、カウン
トアツプしたとき前記開閉スイツチを開成するタ
イマTが配設されている。
FIG. 5 shows a connection diagram of the electrical system of the automatic ice maker according to this embodiment. According to the electrical connection of this embodiment, in addition to the conventional connection configuration shown in FIG.
HV 2 is arranged in parallel with the first hot gas valve HV 1 ,
Furthermore, a timer T is provided which counts a set time from the start of energization and opens the on/off switch when the count is up.

この構成に係る自動製氷機の作動につき、次に
説明する。なお製氷運転時の作動については、第
7図および第8図を参照して説明した従来例の作
動と同じであるので、除氷運転時の作動例につい
てのみ説明する。製氷が完了すると、これを製氷
完了検知サーモTh1が検知して接点を「a」側か
ら「b」側に切り換え、前記アクチユエータモー
タAMを駆動して水皿4を傾動させる。これによ
り切換スイツチSWが接点bに切り換わり、第1
ホツトガス弁HV1および第2ホツトガス弁HV2
に通電されて両弁HV1,HV2が共に開弁すると
共に、タイマTが設定時間をカウントし始める。
これにより圧縮機20から吐出された高温のホツ
トガスは、第1図において、第1配管18と凝縮
器11とに分岐して供給され、第1ホツトガス弁
HV1を介して第1配管18に分流したホツトガ
スは蒸発器3に流入する。一方、凝縮器11内に
貯留されていた液化冷媒(従来この液化冷媒は除
氷運転時に凝縮器内に滞留し、冷凍回路内を循環
することはなかつた)は、液管15から第2ホツ
トガス弁HV2を介して第2配管19に流入し、
前記蒸発器3に流入する。これによつて短時間で
脱氷を行なうことができる。
The operation of the automatic ice maker according to this configuration will be explained next. Note that the operation during the ice making operation is the same as the operation in the conventional example described with reference to FIGS. 7 and 8, so only the example of the operation during the deicing operation will be described. When ice making is completed, the ice making completion detection thermo Th1 detects this and switches the contact from the "a" side to the "b" side, driving the actuator motor AM to tilt the water tray 4. As a result, the changeover switch SW switches to contact b, and the first
Hot gas valve HV 1 and second hot gas valve HV 2
is energized, both valves HV 1 and HV 2 open, and timer T starts counting the set time.
As a result, the high temperature hot gas discharged from the compressor 20 is branched and supplied to the first piping 18 and the condenser 11 in FIG.
The hot gas branched into the first pipe 18 via the HV 1 flows into the evaporator 3. On the other hand, the liquefied refrigerant stored in the condenser 11 (conventionally, this liquefied refrigerant remained in the condenser during deicing operation and was not circulated in the refrigeration circuit) is transferred from the liquid pipe 15 to the second hot gas. flows into the second pipe 19 via the valve HV 2 ,
It flows into the evaporator 3. This makes it possible to remove ice in a short time.

タイマTが設定時間をカウントアツプすると、
第2ホツトガス弁HV2は閉弁される。この設定
時間が長い場合には、凝縮器11内に貯留してい
た液化冷媒は循環を繰り返すうちに全て気相冷媒
となり、短い場合には設定時間の長さに応じた液
化冷媒が凝縮器11内から流出することになる。
設定時間がタイムアツプした後は、ホツトガスは
第1配管18を介してのみ循環されるが、前記設
定時間中に凝縮器11内から流出した液化冷媒が
ホツトガスとして循環するため、その分だけホツ
トガス循環量が増加する。従つて、外気温が低い
場合には、タイマTの設定時間を長くしてホツト
ガス循環量を増やし、脱氷までの時間を短縮す
る。また外気温が高い場合には、タイマTの設定
時間を零にして第2ホツトガス弁HV2が開弁し
ないようにし、ホツトガス循環量の増大に起因す
る圧縮機20の過負荷を回避する。
When timer T counts up the set time,
The second hot gas valve HV 2 is closed. If this set time is long, all of the liquefied refrigerant stored in the condenser 11 becomes gas-phase refrigerant while repeating circulation, and if it is short, the liquefied refrigerant corresponding to the length of the set time is transferred to the condenser 11. It will flow from within.
After the set time has expired, the hot gas is circulated only through the first pipe 18, but since the liquefied refrigerant that has flowed out from the condenser 11 during the set time is circulated as hot gas, the amount of hot gas circulation is reduced accordingly. increases. Therefore, when the outside temperature is low, the set time of the timer T is lengthened to increase the hot gas circulation amount and shorten the time until deicing. Furthermore, when the outside temperature is high, the set time of the timer T is set to zero to prevent the second hot gas valve HV2 from opening, thereby avoiding overload of the compressor 20 due to an increase in the amount of hot gas circulation.

この脱氷が終了して製氷小室2の冷却負荷がな
くなると、製氷室1の温度がホツトガス循環によ
り急上昇し、これを除氷検知サーモTh2が検出し
てその接点を閉成する。これによりアクチユエー
タモータAMが逆付勢され、水皿4を元の水平位
置に戻して製氷室1を閉成すると共に、切換スイ
ツチSWを接点aに切り換えて次の製氷運転に移
行する。
When this deicing is completed and the cooling load on the ice making compartment 2 is removed, the temperature of the ice making compartment 1 rises rapidly due to hot gas circulation, and the deicing detection thermo Th2 detects this and closes its contact. As a result, the actuator motor AM is reversely energized, the water tray 4 is returned to the original horizontal position, the ice making chamber 1 is closed, and the changeover switch SW is switched to contact a to proceed to the next ice making operation.

第6図は本考案の第2実施例に係る自動製氷機
の電気系統の接続図を示す。本実施例では、並列
に配設した第1ホツトガス弁HV1および第2ホ
ツトガス弁HV2を電源母線に切り換え接続する
スイツチSW1をタイマTによつて制御可能に構成
してある。そしてタイマTがその時限時間をタイ
ムアツプするまでは、前記スイツチSW1を接点a
側に接続して第2ホツトガス弁HV2を開弁し、
前記タイマTがタイムアツプすると、スイツチを
接点b側に切り換えて第1ホツトガス弁HV1
開弁するよう設定してある。そして切換スイツチ
SWが接点bに切り換わつて除氷運転が開始され
ると、タイマTがその時限時間の計数を開始する
と共に、第2ホツトガス弁HV2が開弁して凝縮
器11内の液化冷媒の幾分かが循環してホツトガ
スとなる。またタイマTがタイムアツプすると、
第2ホツトガス弁HV2が閉弁されると共に、第
1ホツトガス弁HV1が開弁され、従つてホツト
ガスが第1ホツトガス弁HV1を介して循環され
る。
FIG. 6 shows a connection diagram of an electrical system of an automatic ice maker according to a second embodiment of the present invention. In this embodiment, a switch SW1 that switches and connects the first hot gas valve HV1 and the second hot gas valve HV2 , which are arranged in parallel, to the power bus line is configured to be controllable by a timer T. Then, until the timer T times out the time limit, switch SW1 is connected to contact a.
Connect to the side and open the second hot gas valve HV 2 ,
When the timer T times out, the switch is set to the contact b side to open the first hot gas valve HV1 . and a changeover switch
When the SW is switched to contact b and deicing operation is started, the timer T starts counting the time limit, and the second hot gas valve HV 2 opens to drain the liquefied refrigerant in the condenser 11. Some of it circulates and becomes hot gas. Also, when timer T times out,
The second hot gas valve HV 2 is closed and the first hot gas valve HV 1 is opened, so that the hot gas is circulated through the first hot gas valve HV 1 .

前述した第1実施例および第2実施例は、タイ
マTの設定時間を調整することによつて、凝縮器
11内に貯留されている液化冷媒のうち、ホツト
ガスとして気化させて循環させる量を制御でき、
しかも外気温検知サーモが不要なため製氷機を安
価に製造し得る利点を有する。なお前記タイマT
の設定時間は、外気温の変化に応じて自動的に補
正するようにしてもよい。
In the first and second embodiments described above, the amount of the liquefied refrigerant stored in the condenser 11 that is vaporized and circulated as hot gas is controlled by adjusting the set time of the timer T. I can,
Moreover, since an outside temperature detection thermometer is not required, the ice making machine has the advantage of being able to be manufactured at a low cost. Note that the timer T
The set time may be automatically corrected according to changes in outside temperature.

以上の各実施例では、下向きに開口した製氷室
を備える噴水式自動製氷機に本考案を適用した構
成について説明したが、本考案はこれに限定され
るものではなく、傾斜配置した製氷板に板状氷を
氷結させるプレート方式、製氷小室が独立して下
向きに開口するオープンセル方式、その他貯水槽
内の水を氷結させるブロツク方式等の何れであつ
ても、脱氷時にホツトガスを蒸発器に循環させて
製氷部と生成した氷との氷結を融解させるもので
あれば、全ての製氷方式に好適に使用し得るもの
である。また凝縮器は、空冷式に限らず水冷式と
してもよい。
In each of the above embodiments, a configuration in which the present invention is applied to a fountain-type automatic ice maker equipped with an ice maker that opens downward has been described. Whether it is a plate method that freezes sheet ice, an open cell method that has an independent ice-making chamber that opens downward, or a block method that freezes water in a water tank, hot gas is pumped into the evaporator during deicing. As long as it circulates to melt the ice formed between the ice making section and the ice produced, it can be suitably used in all ice making methods. Further, the condenser is not limited to an air-cooled type, but may be a water-cooled type.

考案の効果 本考案によれば、製氷機の周囲温度によりホツ
トガス循環量を制御できるので、以下の効果を奏
する。
Effects of the invention According to the invention, the amount of hot gas circulation can be controlled based on the ambient temperature of the ice maker, resulting in the following effects.

(1) 低温時においても除氷時間を短く設定し得る
ため、製氷能力が向上する。
(1) Since the deicing time can be set short even at low temperatures, ice making capacity is improved.

(2) 消費電力が減少し、省エネルギー化が図れ
る。
(2) Reduces power consumption and saves energy.

(3) 高温時における圧縮機の過負荷が防止され
る。
(3) Compressor overload at high temperatures is prevented.

(4) 低温時においてもホツトガス循環量が多く熱
容量が大きいため、除氷サイクル時の製氷室の
加熱が均一になり、従つて形状の安定した品質
の良好な氷が得られる。
(4) Even at low temperatures, the amount of hot gas circulated is large and the heat capacity is large, so the heating of the ice making chamber during the deicing cycle is uniform, and therefore ice of good quality and stable shape can be obtained.

(5) 構造が簡易なため安価に製造でき、メンテナ
ンスも容易となる。
(5) Since the structure is simple, it can be manufactured at low cost and maintenance is easy.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本考案に係る自動製氷機の実施例を示す
ものであつて、第1図は本考案の一実施例に係る
噴水式自動製氷機の製氷部の概略構成図、第2図
は第1図に示す自動製氷機の冷凍回路図、第3図
および第4図は夫々別実施例に係る冷凍回路図、
第5図は第1実施例の電気系統の接続図、第6図
は第2実施例の電気系統の接続図、第7図は従来
の噴水式製氷機の概略構成図、第8図は従来の噴
水式自動製氷機の電気系統の接続図、第9図は従
来のホツトガス弁の作動説明図である。 1……製氷室、3……蒸発器、11……凝縮
器、13……膨張弁、18……第1配管、19…
…第2配管、20……圧縮機、HV1……第1ホ
ツトガス弁、HV2……第2ホツトガス弁、T…
…タイマ。
The drawings show an embodiment of the automatic ice maker according to the present invention, in which FIG. The refrigeration circuit diagram of the automatic ice maker shown in the figure, FIGS. 3 and 4 are refrigeration circuit diagrams according to different embodiments, respectively.
Fig. 5 is a connection diagram of the electrical system of the first embodiment, Fig. 6 is a connection diagram of the electrical system of the second embodiment, Fig. 7 is a schematic configuration diagram of a conventional fountain ice maker, and Fig. 8 is a conventional FIG. 9 is a diagram illustrating the operation of a conventional hot gas valve. 1... Ice making room, 3... Evaporator, 11... Condenser, 13... Expansion valve, 18... First piping, 19...
...Second piping, 20...Compressor, HV 1 ...First hot gas valve, HV 2 ...Second hot gas valve, T...
...Timer.

Claims (1)

【実用新案登録請求の範囲】 〔1〕 製氷部1に配設した蒸発器3と、この蒸
発器3に減圧手段13を介して液化冷媒を供給
する凝縮器11と、前記蒸発器3からの気化冷
媒を圧縮して前記凝縮器11に送出す圧縮機2
0とからなる冷凍回路を備えた自動製氷機にお
いて、 前記凝縮器11に流入する前の圧縮された気
化冷媒を前記蒸発器3の入口側に直接バイパス
する第1配管18と、 この第1配管18を開閉する第1ホツトガス
弁HV1と、前記凝縮器11から流出する冷媒
を前記蒸発器3の入口側に直接バイパスする第
2配管19と、 この第2配管19を開閉する第2ホツトガス
弁HV2と、 除氷運転開始から所定時間だけ前記第2ホツ
トガス弁HV2を開弁して前記凝縮器11内の
液化冷媒をホツトガス循環系に導入するタイマ
Tとを配設し、 前記タイマTに設定される所定時間を可変と
した ことを特徴とする自動製氷機。 〔2〕 前記タイマTの設定時間は、外気温の変
化に応じて自動的に補正し得るようになつてい
る実用新案登録請求の範囲第1項記載の自動製
氷機。
[Claims for Utility Model Registration] [1] An evaporator 3 disposed in the ice making section 1, a condenser 11 that supplies liquefied refrigerant to the evaporator 3 via a pressure reducing means 13, and a a compressor 2 that compresses vaporized refrigerant and sends it to the condenser 11;
0, a first pipe 18 that directly bypasses the compressed vaporized refrigerant before flowing into the condenser 11 to the inlet side of the evaporator 3; a first hot gas valve HV 1 that opens and closes 18; a second pipe 19 that bypasses the refrigerant flowing out from the condenser 11 directly to the inlet side of the evaporator 3; and a second hot gas valve that opens and closes the second pipe 19. HV 2 , and a timer T that opens the second hot gas valve HV 2 for a predetermined time from the start of deicing operation to introduce the liquefied refrigerant in the condenser 11 into the hot gas circulation system, and the timer T An automatic ice maker characterized in that the predetermined time set for the ice maker is variable. [2] The automatic ice maker according to claim 1, wherein the set time of the timer T can be automatically corrected according to changes in outside temperature.
JP2592286U 1986-02-25 1986-02-25 Expired JPH0424379Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2592286U JPH0424379Y2 (en) 1986-02-25 1986-02-25

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2592286U JPH0424379Y2 (en) 1986-02-25 1986-02-25

Publications (2)

Publication Number Publication Date
JPS62138172U JPS62138172U (en) 1987-08-31
JPH0424379Y2 true JPH0424379Y2 (en) 1992-06-09

Family

ID=30826524

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2592286U Expired JPH0424379Y2 (en) 1986-02-25 1986-02-25

Country Status (1)

Country Link
JP (1) JPH0424379Y2 (en)

Also Published As

Publication number Publication date
JPS62138172U (en) 1987-08-31

Similar Documents

Publication Publication Date Title
US6134907A (en) Remote ice making machine
JP2008514895A (en) Reverse Peltier defrost system
JPH0532668B2 (en)
JP3347907B2 (en) Refrigerant circulation circuit for ice machines, etc.
JP2957415B2 (en) Refrigerator refrigerator ice making unit
JPS58217133A (en) Heat pump system
JPH0424379Y2 (en)
JPH0347178Y2 (en)
JPH0347176Y2 (en)
JPH0424378Y2 (en)
JPH0347177Y2 (en)
JP3050114B2 (en) Control method of ice storage type chiller
JPS6363833B2 (en)
JPS6216625Y2 (en)
JPH0643658Y2 (en) Ice machine
JPH05126440A (en) Freezer
JPH11237163A (en) Cooling storage chamber
JP3412677B2 (en) How to operate an automatic ice maker
JP3213147B2 (en) Refrigerant circulation circuit for ice machines, etc.
US3962883A (en) Slab completion time delay relay
JPH11248321A (en) Operation control method for automatic ice maker
JPS5939571Y2 (en) automatic ice maker
JPH0512686Y2 (en)
JP2004077031A (en) Device and method for defrosting and deicing cooler in cooling facility
JPH0638299Y2 (en) Automatic ice machine