JPH04130331U - anchor bolt set - Google Patents

anchor bolt set

Info

Publication number
JPH04130331U
JPH04130331U JP4415691U JP4415691U JPH04130331U JP H04130331 U JPH04130331 U JP H04130331U JP 4415691 U JP4415691 U JP 4415691U JP 4415691 U JP4415691 U JP 4415691U JP H04130331 U JPH04130331 U JP H04130331U
Authority
JP
Japan
Prior art keywords
anchor
anchor bolt
nut
tube
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4415691U
Other languages
Japanese (ja)
Inventor
賢次郎 緒方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP4415691U priority Critical patent/JPH04130331U/en
Publication of JPH04130331U publication Critical patent/JPH04130331U/en
Pending legal-status Critical Current

Links

Abstract

(57)【要約】 【目的】 鉄骨構造物等の基礎などに使用するアンカー
ボルトを基礎等の所定位置へ正確に据付られる様にする
為。 【構成】 定着板2にチューブ3とナットカバー4を取
付けそのチューブ3にアンカーボルト1を挿入させ座金
6とナット5に固定して支圧板7でアンカーボルト1を
固定したアンカーセット。 【効果】 支持金物なしで技術者によらず基礎等の所定
位置へ正確にアンカーボルトを据付けられる。
(57) [Summary] [Purpose] To enable anchor bolts used for the foundations of steel structures, etc. to be accurately installed at specified positions on the foundations, etc. [Structure] An anchor set in which a tube 3 and a nut cover 4 are attached to a fixing plate 2, an anchor bolt 1 is inserted into the tube 3 and fixed to a washer 6 and a nut 5, and the anchor bolt 1 is fixed with a bearing plate 7. [Effect] Anchor bolts can be installed accurately at specified positions on foundations, etc., without the need for supporting hardware and by engineers.

Description

【考案の詳細な説明】[Detailed explanation of the idea]

【0001】0001

【産業上の利用分野】[Industrial application field]

この考案は鉄骨構造物等の基礎などに使用する、アンカーボルトを基礎の所定 位置へ正確に据付けるために、定着板にチューブやナットカバー及び基盤等をセ ットしたアンカーボルトセットに関するものである。 This idea is used for the foundations of steel structures, etc., and uses anchor bolts to secure the foundation. Set the tube, nut cover, base, etc. on the fixing plate in order to install it in the correct position. This relates to a set of anchor bolts.

【0002】0002

【従来の技術】[Conventional technology]

これまでは (1)アンカーボルト自体をコンクリートの基礎等に埋込む方法 (2)アンカーボルトにアンカーフレームや定着板等を固定してコンクリート の基礎に埋込む方法等がある。 近年のアンカーボルトは口径が大きくまた高強度の材質を使用するので設計通 りに正確に埋込まなければ構造性能がおちる。だがアンカーボルトを基礎の所定 位置へ正確に据付けるには、かなりの熟練工により時間と労力及びアンカーボル ト支持材等を費やしても、コンクリート打設時に起るアンカーボルトの位置移動 を『日本建築学会建築工事標準仕様書(JASS6)の鉄骨精度検査基準のアン カーボルト据付精度(1)通り心とアンカーボルトの差は±3mm以内(2)通 り心間隔の差は±1mm以内』にアンカーボルトを据付けるのは技術者不足の折 、大変困難な作業である。またアンカーボルトの位置移動を修正出来ない時は、 ベースプレート等を移動分だけ切欠ぐか、鉄骨柱脚等を移動したアンカーボルト に合せて建設する為、傾斜した構造物が出来、高強度の鋼材を使用する最近の鉄 骨構造物などは構造性能を損ない大問題になっている。 until now (1) Method of embedding the anchor bolt itself into concrete foundation etc. (2) Fix the anchor frame, fixing plate, etc. to the anchor bolts and concrete There are methods of embedding it in the foundation of In recent years, anchor bolts have a large diameter and are made of high-strength materials, so they cannot be easily designed. If it is not embedded accurately in the hole, the structural performance will deteriorate. However, the anchor bolts are fixed on the foundation. It takes time, effort, and anchor bolts to install it in the correct position, requiring highly skilled workers. Even if you use extra support materials, the position of anchor bolts will not shift during concrete pouring. ``The Architectural Institute of Japan Architectural Work Standard Specifications (JASS6) Steel Frame Accuracy Inspection Standards Annex'' Car bolt installation accuracy (1) The difference between the center of the anchor bolt and the anchor bolt is within ±3 mm (2) It is difficult to install anchor bolts with a difference in center spacing within ±1 mm due to a lack of engineers. , is a very difficult task. Also, if you cannot correct the position movement of the anchor bolt, Anchor bolts that have been moved by cutting out the base plate, etc. or moving the steel column base, etc. Due to the construction, the structure is sloping, and the recent construction using high-strength steel Bone structures have become a major problem as they impair their structural performance.

【0003】0003

【考案が解決しようとする課題】[Problem that the idea aims to solve]

従来のやり方には (1)基礎の所定位置へアンカーボルトを正確に据付けることは鉄筋及び型枠 やコンクリート打設等における位置移動が起る為困難 (2)コンクリート打設後のアンカーボルトの位置移動修正が困難 (3)コンクリート打設前の支持材及組立費用等が費む (4)アンカーボルトを支持材でセットするのに高度な技術が必要 (5)アンカーボルトが位置移動したままベースプレートを切欠いて柱等を組 立てる時、ベースプレート補強の費用がかかるし、構造性能を損なう (6)アンカーボルトが位置移動したまま鉄骨構造物を建設すると構造性能が 損なうばかりでなく仕上工事費等も費む (7)アンカーボルトが鉄筋及び型枠組立やコンクリート打設中に破損したり 、錆が発生して精度が損なわれるし養生も大変 等の欠点があった。 この考案が解決しようとする課題は、上記の欠点をなくし基礎の所定位置へ正 確にアンカーボルトを据付けるにはどの様な手段を講じればよいかという点であ る。 In the traditional way (1) Accurately installing anchor bolts at specified positions on the foundation requires reinforcing bars and formwork. Difficult due to positional movement during concrete pouring, etc. (2) Difficult to correct anchor bolt position after concrete placement (3) Expenses for supporting materials and assembly costs before concrete placement (4) Advanced technology is required to set anchor bolts with supporting materials (5) Cut out the base plate and assemble the pillar etc. while the anchor bolt remains in position. When erecting, base plate reinforcement is expensive and structural performance is compromised. (6) If a steel structure is constructed with the anchor bolts moved, the structural performance will deteriorate. Not only will it cause damage, but it will also cost you finishing work, etc. (7) Anchor bolts may be damaged during reinforcing bars and formwork assembly or concrete pouring. , rust occurs, impairing accuracy, and curing is difficult. There were drawbacks such as. The problem that this invention aims to solve is to eliminate the above-mentioned drawbacks and to correct the foundation in its designated position. In terms of what measures should be taken to install anchor bolts accurately, Ru.

【0004】0004

【課題を解決するための手段】[Means to solve the problem]

以上の様な課題を解決するために、この考案では、次の様なチューブとナット カバーを付けたアンカーボルトとした。定着板2にチューブ3とナットカバー4 を取付けそのチューブ3にアンカーボルト1を挿入させ座金6とナット5に固定 して支圧板7でアンカーボルト1を固定した、アンカーボルトセット。 なおナットカバー4にはナット固定装置9や基盤固定装置10を取り付けられ る様にしておく。またアンカーボルト1を正逆回転させる事が出来る様にアンカ ーボルトの頭部を加工しておく(図1・4・5参照)。 In order to solve the above problems, this idea uses the following tubes and nuts. An anchor bolt with a cover attached. Tube 3 and nut cover 4 on fixing plate 2 Install the anchor bolt 1 into the tube 3 and fix it to the washer 6 and nut 5. Anchor bolt set in which anchor bolt 1 is fixed with bearing plate 7. Note that a nut fixing device 9 and a base fixing device 10 can be attached to the nut cover 4. Make it so that Also, the anchor bolt 1 can be rotated in forward and reverse directions. - Machining the head of the bolt (see Figures 1, 4, and 5).

【0005】[0005]

【作用】[Effect]

まず定着板2にチューブ3を取り付けて基礎の所定の位置に固定してコンクリ ート8を打設し、チューブ3の中へアンカーボルト1を挿入し座金6とナット5 にセットして、そのアンカーボルト1を所定位置に合せて支圧板7で固定する( 図1参照)。 First, attach the tube 3 to the fixing plate 2, fix it in place on the foundation, and then concrete it. 8, insert the anchor bolt 1 into the tube 3, and tighten the washer 6 and nut 5. , set the anchor bolt 1 to the specified position and fix it with the bearing plate 7 ( (see Figure 1).

【0006】[0006]

【実施例】 実施例1 図1は実施例1を示す断面図である。 (1)定着板2の上部にチューブ3を固定して下部には座金6とナット5をセ ットしたナットカバー4を固定し、これを基礎のアンカー位置に据付けて、コン クリート8を打設して固定する (2)コンクリート打設後チューブ3にアンカーボルト1を挿入してナットカ バー4内の座金6とナット5にセットしてアンカーボルト1を正回転でナット5 を締めつけて行くと、ナット5がナット固定装置9からはずれ、アンカーボルト 1がチューブ3内で水平移動出来るようになる (3)水平移動出来る様になったアンカーボルト1を基礎のアンカー位置に正 確にセットして支圧板7で固定したアンカーセット。 実施例2 実施例2としては実施例1のアンカーボルト1をコンクリート8打設前にセッ トしておき、打設後、支圧板7で固定した、実施例1のアンカーセット。 実施例1及び2の様にセットすることにより基礎の所定位置へ正確にアンカー ボルト1を据付ける事が出来るし、修正したいときも簡単に修正が出来る。 実施例3 図5は実施例3の立面図。実施例1のアンカーボルトセットの下部に基盤固定 装置10と高さの高低が出来るようにした基盤12を取り付け図6基盤12の平 面図の様に墨あわせ兼固定用釘やボルト用の穴13をもうけた実施例1のアンカ ーセット。アンカーセットを所定位置及所定高に簡単に固定出来るので、従来の アンカーボルトの様に支持金物や熟練工によらず組立が出来る。 実施例4 図7は実施例4の斜視図。実施例1のチューブ3を金属管で据付け鋼材14等 で複数のチューブどうしを固定した実施例1のアンカーセット。大口径や長さが 長いアンカーセットの据付を、さらに正確に据付けられる。 実施例5 図8は実施例5の立面図。実施例1の定着板2を形鋼製のアンカーフレーム1 5に置き換えた実施例1のアンカーセット。アンカーフレームの巾や長さで応力 を調整出来るし応力も分散出来るので基礎を小さくする事が出来る。 実施例6 図9は実施例6の断面図。実施例1のチューブ3にアンカーボルトをセット後 セメントペースト16を注入した、実施例1のアンカーセット。注入口17をも うけセメントペースト等を注入する事により、基礎の剪断力がましアンカーボル トの錆の防止につながる。 実施例7 図10は実施例7の平面図。実施例1の支圧板7に対角線状に墨あわせ兼支圧 固定用穴13とセメントペースト等を流す事が出来るようにした溝18をもうけ た実施例1〜6の支圧板。セメントペーストが通りやすく、アンカー位置も穴1 3で簡単に出せるし釘等で固定できる。 溝18を柱心方向に向けてセットすると実施例6のセメントペーストでベース プレート下のモルタル詰が容易に出来る。 実施例8 図11は実施例8の立面図。実施例1のチューブ3に支柱フランジ19を取り 付けた実施例1のアンカーセット。支圧フランジ19でコンクリートに応力を分 散出来るので基礎や定着板等を小さく出来る。 実施例9 図3は実施例9の断面図。実施例1のナットカバー4をナットカバー自体で固 定出来る様に成形したナットカバー。 実施例10 図4は実施例10の平面及立面図。実施例1のアンカーボルト1の頭部に正逆 回転させる為のスパナ等がセット出来る様成形したアンカーボルトの一例。 実施例11 実施例1の支圧板7をナット5に置き換えた、実施例1のアンカーセット。 チューブが小口径の時は簡単に処理出来る。【Example】 Example 1 FIG. 1 is a sectional view showing the first embodiment. (1) Fix the tube 3 on the upper part of the fixing plate 2, and set the washer 6 and nut 5 on the lower part. Fix the bolted nut cover 4, install it at the anchor position of the foundation, and install the controller. Install and fix cleat 8 (2) After concrete is poured, insert the anchor bolt 1 into the tube 3 and cover the nut. Set the washer 6 and nut 5 in the bar 4, and rotate the anchor bolt 1 in the forward direction until the nut 5 As the nut 5 is tightened, the nut 5 comes off from the nut fixing device 9, and the anchor bolt 1 becomes able to move horizontally within tube 3 (3) Adjust the anchor bolt 1, which can now be moved horizontally, to the anchor position on the foundation. Anchor set set accurately and fixed with bearing plate 7. Example 2 As Example 2, the anchor bolt 1 of Example 1 was set before concrete 8 was poured. The anchor set of Example 1 was fixed with a bearing plate 7 after casting. By setting as in Examples 1 and 2, the anchor can be accurately placed at the specified position on the foundation. You can install bolt 1, and if you want to make corrections, you can easily make them. Example 3 FIG. 5 is an elevational view of the third embodiment. Fixing the base to the bottom of the anchor bolt set of Example 1 Attach the base 12 that can be adjusted in height to the device 10. Anchor of Example 1 with holes 13 for marking and fixing nails and bolts as shown in the plan view - set. The anchor set can be easily fixed at a specified position and height, so Like anchor bolts, it can be assembled without the need for supporting hardware or skilled workers. Example 4 FIG. 7 is a perspective view of the fourth embodiment. Install the tube 3 of Example 1 with a metal tube, such as steel material 14. The anchor set of Example 1 in which a plurality of tubes are fixed to each other. Large diameter and length Long anchor sets can be installed more accurately. Example 5 FIG. 8 is an elevational view of the fifth embodiment. The fixing plate 2 of Example 1 was replaced with the anchor frame 1 made of shaped steel. The anchor set of Example 1 replaced with 5. Stress due to width and length of anchor frame The foundation can be made smaller because it can be adjusted and the stress can be dispersed. Example 6 FIG. 9 is a sectional view of Example 6. After setting the anchor bolt to tube 3 of Example 1 Anchor set of Example 1 injected with cement paste 16. Also fill inlet 17. By injecting cement paste etc., the shearing force of the foundation is reduced and the anchor bolt is This helps prevent rust on the parts. Example 7 FIG. 10 is a plan view of Example 7. Diagonal alignment and bearing pressure on bearing plate 7 of Example 1 A fixing hole 13 and a groove 18 through which cement paste, etc. can be poured are provided. The pressure bearing plates of Examples 1 to 6. The cement paste can easily pass through, and the anchor position is hole 1. Step 3: It can be easily taken out and fixed with nails, etc. When the groove 18 is set toward the center of the column, the cement paste of Example 6 is used as the base. Mortar filling under the plate can be easily done. Example 8 FIG. 11 is an elevational view of Example 8. Attach the strut flange 19 to the tube 3 of Example 1. Anchor set of Example 1 attached. The bearing flange 19 distributes stress to the concrete. Since it can be dispersed, the foundation, anchor plate, etc. can be made smaller. Example 9 FIG. 3 is a sectional view of Example 9. The nut cover 4 of Example 1 is fixed with the nut cover itself. A nut cover that is molded so that it can be fixed. Example 10 FIG. 4 is a plan view and an elevation view of Example 10. Forward and reverse to the head of anchor bolt 1 of Example 1 An example of an anchor bolt that is molded so that a spanner etc. can be set for rotation. Example 11 The anchor set of Example 1 in which the bearing plate 7 of Example 1 is replaced with the nut 5. When the tube has a small diameter, it can be easily processed.

【0007】[0007]

【考案の効果】[Effect of the idea]

支持金物なしで技術者によらず基礎等の所定位置へ正確にアンカーボルトを据 付けられる。 Anchor bolts can be installed accurately in specified positions on foundations, etc. without support hardware and without the need of engineers. Can be attached.

【提出日】平成3年7月24日[Submission date] July 24, 1991

【手続補正1】[Procedural amendment 1]

【補正対象書類名】明細書[Name of document to be amended] Specification

【補正対象項目名】0005[Correction target item name] 0005

【補正方法】変更[Correction method] Change

【補正内容】[Correction details]

【0005】[0005]

【作用】[Effect]

定着板2に、チューブ3とナット5,座金6,ナット固定装置9を設けたナッ トカバー4を取り付けて基礎の所定位置に固定して、コンクリート8を打設し、 チューブ3の中へアンカーボルト1を挿入し座金6とナット5にセットしてアン カーボルト1を所定位置に合わせて支圧板7で固定する工法だから、基礎の所定 位置へ正確にアンカーボルトを据付ける事が出来るし、芯ずれが生じても簡単に 、芯ずれ誤差を吸収出来るので鉄骨建方の作業性が良く施工不良も解消出来る( 図1参照)。 A fixing plate 2 is provided with a nut 3, a nut 5, a washer 6, and a nut fixing device 9. Attach the cover 4 and fix it in place on the foundation, pour concrete 8, Insert the anchor bolt 1 into the tube 3, set it on the washer 6 and nut 5, and unscrew it. Since the construction method involves aligning the car bolts 1 with the predetermined positions and fixing them with the bearing plates 7, it is possible to The anchor bolt can be installed accurately in the position, and even if misalignment occurs, it can be easily installed. Since it can absorb misalignment errors, it improves the workability of steel frame erection and eliminates construction defects ( (see Figure 1).

【図面の簡単な説明】[Brief explanation of drawings]

【図1】本考案の断面図。FIG. 1 is a cross-sectional view of the present invention.

【図2】図1のA−A´の断面図。FIG. 2 is a cross-sectional view taken along line AA' in FIG. 1;

【図3】図1のナットカバーを置き換えた断面図の一
例。
FIG. 3 is an example of a sectional view in which the nut cover in FIG. 1 is replaced.

【図4】図1のアンカーボルトの頭部の平面と立面図の
一例。
FIG. 4 is an example of a plan and elevation view of the head of the anchor bolt of FIG. 1;

【図5】図1に基盤を取り付けた立面図。FIG. 5 is an elevational view of FIG. 1 with the base attached.

【図6】図5の基盤の平面図。FIG. 6 is a plan view of the base of FIG. 5;

【図7】図1の複数のアンカーセットを鋼材で固定した
斜視図。
FIG. 7 is a perspective view of the plurality of anchor sets shown in FIG. 1 fixed with steel materials.

【図8】図1の定着板をアンカーフレームに置き換えた
立面図。
FIG. 8 is an elevational view in which the fixing plate in FIG. 1 is replaced with an anchor frame.

【図9】図1にセメントペーストを注入した断面図。FIG. 9 is a cross-sectional view of FIG. 1 in which cement paste is injected.

【図10】図1の支圧板の平面図。FIG. 10 is a plan view of the bearing plate of FIG. 1;

【図11】図1のチューブにフランジを付けた立面図。FIG. 11 is an elevational view of the tube of FIG. 1 with a flange.

【符号の説明】[Explanation of symbols]

1 アンカーボルト 2 定着板 3 チューブ 4 ナットカバー 5 ナット 6 座金 7 支圧板 8 コンクリート 9 ナット固定装置 10 11 基盤固定装置 12 基盤 13 穴 14 鋼材 15 アンカーフレーム 16 セメントペースト 17 注入口 18 溝 19 支圧フランジ 1 Anchor bolt 2 Fixing plate 3 tube 4 Nut cover 5 Nut 6 Washer 7 Bearing plate 8 Concrete 9 Nut fixing device 10 11 Base fixing device 12 Foundation 13 holes 14 Steel materials 15 Anchor frame 16 Cement paste 17 Inlet 18 Groove 19 Bearing flange

【手続補正書】[Procedural amendment]

【提出日】平成3年7月24日[Submission date] July 24, 1991

【手続補正2】[Procedural amendment 2]

【補正対象書類名】明細書[Name of document to be amended] Specification

【補正対象項目名】符号の説明[Correction target item name] Explanation of code

【補正方法】変更[Correction method] Change

【補正内容】[Correction details]

【符号の説明】 1 アンカーボルト 2 定着板 3 チューブ 4 ナットカバー 5 ナット 6 座金 7 支圧板 8 コンクリート 9 ナット固定装置10 基盤固定装置 12 基盤 13 穴 14 鋼材 15 アンカーフレーム 16 セメントペースト 17 注入口 18 溝 19 支圧フランジ[Explanation of symbols] 1 Anchor bolt 2 Fixing plate 3 tube 4 Nut cover 5 Nut 6 Washer 7 Bearing plate 8 Concrete 9 Nut fixing device10 Base fixing device 12 Foundation 13 holes 14 Steel materials 15 Anchor frame 16 Cement paste 17 Inlet 18 Groove 19 Bearing flange

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 定着板2にチューブ3とナットカバー4
を取り付けそのチューブ3にアンカーボルト1を挿入さ
せて座金6と、ナット5に固定し、それを支圧板7で固
定した、アンカーボルトセット。
[Claim 1] A tube 3 and a nut cover 4 are attached to the fixing plate 2.
This is an anchor bolt set in which the anchor bolt 1 is inserted into the tube 3 and fixed to the washer 6 and nut 5, and then fixed with the bearing plate 7.
【請求項2】 ナットカバー4の下に基盤12を取り付
けた請求項1のアンカーボルトセット。
2. The anchor bolt set according to claim 1, wherein a base 12 is attached under the nut cover 4.
JP4415691U 1991-05-16 1991-05-16 anchor bolt set Pending JPH04130331U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4415691U JPH04130331U (en) 1991-05-16 1991-05-16 anchor bolt set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4415691U JPH04130331U (en) 1991-05-16 1991-05-16 anchor bolt set

Publications (1)

Publication Number Publication Date
JPH04130331U true JPH04130331U (en) 1992-11-30

Family

ID=31924356

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4415691U Pending JPH04130331U (en) 1991-05-16 1991-05-16 anchor bolt set

Country Status (1)

Country Link
JP (1) JPH04130331U (en)

Similar Documents

Publication Publication Date Title
JP4558785B2 (en) How to set up a tower
US7802409B2 (en) System of concrete structures having panel and column portions with rigid member and end of panel portion of one structure received in slot of column portion of adjacent structure
JP2007535634A (en) How to set up a tower
CN106758787B (en) A kind of Precast Pier Columns mounting and positioning device
JP4844926B2 (en) Column base joint structure and construction method
JP2006322154A (en) Foundation construction method of building
JPH04130331U (en) anchor bolt set
JPH02164931A (en) Foundation construction method for building
JP3659766B2 (en) Surface plate construction method and apparatus for building pillars
JP3824932B2 (en) Installation work for air conditioning equipment in underground space
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it
JP2001311247A (en) Construction method for concrete structure
JP7288390B2 (en) Foundation construction method and foundation
JP3072294B1 (en) Formwork equipment for manufacturing hollow PCa members
JPH063878Y2 (en) Anchor frame level adjustment structure
JPH08158341A (en) Joining structure of pile and beam
JPH08120638A (en) Connecting structure of pile and beam and execution method of structure using connecting structure
KR102441003B1 (en) Construction method and structure of pre-embedded anchor set for installation of bridge inspection facilities using form tie
JPS5941530A (en) Installation of foundation bolt for apparatus setting
JP3878945B2 (en) Method of installing a plate on the top end of concrete columns or column base concrete
JP4872301B2 (en) Construction method of RC structure
JP2782111B2 (en) Steel framing construction method
JP2592742Y2 (en) Anchor bolt fixing device
JP2006022510A (en) Anchor bolt anchoring device for column base, using sheath pipes
CN106013603A (en) SRC (Steel Reinforced Concrete) column bottom plate positioning method