JPH03983A - Installation method for pump and piping around pump - Google Patents
Installation method for pump and piping around pumpInfo
- Publication number
- JPH03983A JPH03983A JP13274089A JP13274089A JPH03983A JP H03983 A JPH03983 A JP H03983A JP 13274089 A JP13274089 A JP 13274089A JP 13274089 A JP13274089 A JP 13274089A JP H03983 A JPH03983 A JP H03983A
- Authority
- JP
- Japan
- Prior art keywords
- pump
- pumps
- piping
- pipes
- frame body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title abstract description 9
- 238000000034 method Methods 0.000 title description 5
- 238000010276 construction Methods 0.000 claims abstract description 17
- 239000000470 constituent Substances 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000004378 air conditioning Methods 0.000 description 2
- 238000002955 isolation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000000498 cooling water Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Abstract
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は、ビル等の空調用熱源機械室に設置されるポン
プ及びポンプ廻り配管設備の施工方法に関する。DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a pump installed in an air conditioning heat source machine room of a building or the like and a method of constructing piping equipment around the pump.
(従来の技術)
冷凍機や熱交換機が設置されるビル等の空調用熱源機械
室においては、ポンプ及び該ポンプ廻りの配管設備が設
置されるが、建物規模が大きくなると、ポンプ及び該ポ
ンプ廻りの配管設備も大規模となる。而して、従来この
大規模なポンプ及びポンプ廻りの配管設備(例えばポン
プ20基以上)を施工する場合には、工事現場内にポン
プや配管材料等の構成部材を全て持ち込み、現場作業員
がその場で加工・取付けをおこなっていた。(Prior art) Pumps and piping equipment around the pumps are installed in air conditioning heat source equipment rooms such as buildings where refrigerators and heat exchangers are installed. The piping equipment will also be large-scale. Conventionally, when constructing large-scale pumps and piping equipment around pumps (for example, 20 or more pumps), all of the pumps, piping materials, and other components must be brought to the construction site, and site workers must Processing and installation were carried out on the spot.
しかしながら、大規模なポンプ及びポンプ廻り配管設備
の施工は、限られた現場スペース内で高密度且つ立体的
な配管・ポンプ設置を正確な順序で行なう必要があるの
で、従来の施工方法では。However, when constructing large-scale pumps and piping equipment around pumps, it is necessary to install high-density, three-dimensional piping and pumps in a precise order within a limited site space, so conventional construction methods cannot be used.
現場作業員の熟練度により加工・取付の精度や品質が左
右さ、れ常に一定品質の施工をなし得ないという問題点
があった。また、現場における作業時間・作業人員も多
く必要であり、この結果、現場での工期が長期化しまた
現場作業の安全性を確保し得ないといった問題があった
。The problem was that the accuracy and quality of processing and installation depended on the skill level of the on-site workers, making it impossible to always achieve a constant quality of construction. Further, a large amount of work time and a large number of workers are required at the site, resulting in a problem that the construction period at the site becomes long and the safety of the site work cannot be ensured.
本発明は、従来技術の上記問題点を解決するためになさ
れたもので、その目的とするところは現場作業員の熟練
度に左右されず、常に一定品質の施工をなし得2また現
場における作業時間・作業人員を省略し得る。ポンプ及
びポンプ廻り配管設備の施工方法を提供することにある
。The present invention has been made in order to solve the above-mentioned problems of the prior art, and its purpose is to always achieve a constant quality of construction regardless of the skill level of site workers. Time and labor can be saved. The purpose of the present invention is to provide a construction method for a pump and piping equipment around the pump.
上記目的を達成するため3本発明のポンプ及びポンプ廻
り配管設備の施工方法は、現場施工前に予め、ポンプ及
びポンプ廻り配管設備全体を複数の構成部分に分け、各
構成部分ごとに、少なくとも配管を枠体内に配設すると
共にポンプを枠体上に防振手段を介して固設してなるポ
ンプユニットを工場生産し2次いで上記複数のポンプユ
ニ7トを現場において接続することを特徴とする。In order to achieve the above object, the method for constructing the pump and the piping equipment around the pump of the present invention is to divide the entire pump and the piping equipment around the pump into a plurality of component parts in advance before on-site construction, and for each component part, at least the piping The present invention is characterized in that a pump unit is produced in a factory, in which a pump is disposed in a frame body, and a pump is fixed on the frame body via vibration isolating means, and then the plurality of pump units 7 are connected on-site.
[実施例]
以下に1本発明を図示の実施例に基づいて説明する。第
1図は1本発明の施工方法を適用したポンプ及びポンプ
廻り配管設備の全体平面図であり。[Example] The present invention will be explained below based on the illustrated example. FIG. 1 is an overall plan view of a pump and piping equipment around the pump to which the construction method of the present invention is applied.
第2図はポンプユニットの一例を示す縦断面図である。FIG. 2 is a longitudinal sectional view showing an example of the pump unit.
而して1本実施例のポンプ及びポンプ廻り配管設備は4
つのポンプユニット1,2.3 4を接続して施工がな
されている。これらポンプユニット1,2.3.4には
第2図に示すように 金属製の鋼材により構成された枠
体5内には配管6が配設されると共に、枠体6上には防
振手段としての防振架台7上に載置したポンプ8が固設
されている。尚、この防振架台7があるため、ポンプ8
に配管6からの振動が伝わるのを防ぐことが出来る。ま
たポンプユニットの枠体5の天面には足場となる格子状
のグレーチング9が敷設され、さらに手摺10が取り付
けられており、ポンプ及びポンプ廻り配管設備の施工後
に、設備の保守・管理のため人が枠体5上を歩けるよう
になっている。またポンプユニット1及びポンプユニッ
ト4には昇降階段11も取り付けられている。Therefore, the pump and piping equipment around the pump in this embodiment are 4.
Construction is carried out by connecting two pump units 1, 2, 3 and 4. As shown in FIG. 2, these pump units 1, 2, 3, 4 are provided with piping 6 in a frame 5 made of metal steel, and on the frame 6 are provided with vibration-proof A pump 8 placed on a vibration isolating frame 7 as a means is fixedly installed. In addition, because of this vibration-proof pedestal 7, the pump 8
It is possible to prevent vibrations from the pipe 6 from being transmitted to the pipe 6. In addition, a grid-like grating 9 is laid on the top surface of the frame 5 of the pump unit to serve as a foothold, and a handrail 10 is also attached. A person can walk on the frame body 5. Further, an elevating staircase 11 is also attached to the pump unit 1 and the pump unit 4.
なおポンプユニット1.2.3.4にはその地圧力計等
の各種計器類や冷却水等を系統別に分配して取り出すた
めのヘシダー等任意のものを組み込んで形成してもよい
。Note that the pump unit 1.2.3.4 may be formed by incorporating various instruments such as a ground pressure gauge, a hesider for distributing and taking out cooling water, etc. to each system.
本実施例における本発明の施工方法の実施手順を説明す
ると、先ず施工されるべきポンプ及びポンプ廻り配管設
備全体をを4つの構成部分に分けたうえ、各構成部分に
ついて上記の構造からなるポンプユニット1.2,3.
4を工場において予め製造する。このように、工場でポ
ンプ8や配管6等の加工・取付けが行われるので、大型
工作機械の使用が可能となってポンプ8や配管6等の加
工・取付けの精度・品質を一定にでき、またポンプユニ
ット1,2,3.4の量産も可能となる。To explain the implementation procedure of the construction method of the present invention in this example, first, the pump to be constructed and the entire piping equipment around the pump are divided into four component parts, and each component has a pump unit with the above structure. 1.2,3.
4 is manufactured in advance in a factory. In this way, since the pump 8, piping 6, etc. are processed and installed at the factory, it is possible to use large machine tools, and the accuracy and quality of the processing and installation of the pump 8, piping 6, etc. can be maintained at a constant level. It also becomes possible to mass produce pump units 1, 2, 3.4.
ポンプユニット1,2,3.4が完成したらこれらを施
工現場(建物の機械室)に搬入し、ポンプユニット相互
間の配管6を接続して施工は完了する。この場合、施工
現場での作業はポンプユニット相互間の配管6の接続の
みであり、ポンプ8や配管6等の加工・取付けの大部分
は工場でポンプユニット1,2,3.4を製造する際に
なされているので、現場作業を大幅に簡素化でき、その
結果1作業時間・作業人員を省略することが出来る。Once the pump units 1, 2, 3.4 are completed, they are transported to the construction site (mechanical room of the building), and the piping 6 between the pump units is connected to complete the construction. In this case, the work at the construction site is only the connection of the piping 6 between the pump units, and most of the processing and installation of the pump 8, piping 6, etc. is done at the factory, where the pump units 1, 2, 3.4 are manufactured. Since it is done in detail, on-site work can be greatly simplified, and as a result, one work time and the number of workers can be saved.
本発明は1以上の構成及び作用からなるもので現場作業
員が従来のようにポンプや配管材料等の構成部材を現場
で加工・取付けを行う必要がなく。The present invention has one or more configurations and functions, and there is no need for field workers to process and install component parts such as pumps and piping materials on-site, unlike in the past.
その結果、現場作業員の熟練度に左右されず、常に一定
品質の施工をなし得る。As a result, construction can always be of a constant quality, regardless of the level of skill of the on-site workers.
また、ポンプは防振手段を介して枠体上に固設されるの
で、配管の振動がポンプに伝わるのを防ぐことが出来る
。Further, since the pump is fixedly installed on the frame via the vibration isolating means, it is possible to prevent vibrations of the piping from being transmitted to the pump.
さらに、現場では複数のポンプユニットを接続するだけ
で施工が完了するので、現場作業を大幅に簡素化でき、
その結果1現場における作業時間・作業人員を省略し得
る。Furthermore, on-site work can be completed by simply connecting multiple pump units, greatly simplifying on-site work.
As a result, the work time and number of workers at one site can be saved.
第1図及び第2図は本発明の一実施例を示すもので、第
1図は1本発明の施工方法を適用したポンプ及びポンプ
廻り配管設備の全体平面図であり第2図はポンプユニッ
トの一例を示す縦断面図である。
1.2.3,4. ・・・ポンプユニット枠体
配管
防振架台
(防振手段)
・ポンプFigures 1 and 2 show one embodiment of the present invention. Figure 1 is an overall plan view of a pump and piping equipment around the pump to which the construction method of the present invention is applied, and Figure 2 is a pump unit. It is a longitudinal cross-sectional view showing an example. 1.2.3,4. ... Pump unit frame piping vibration isolation stand (vibration isolation means) ・Pump
Claims (1)
管を行うにあたり、該機械室での施工前に、予め、ポン
プ及びポンプ廻り配管設備全体を複数の構成部分に分け
、各構成部分ごとに、少なくとも配管を枠体内に配設す
ると共にポンプを枠体上に防振手段を介して固設してな
るポンプユニットを工場生産し、次いで上記複数のポン
プユニツトを該機械室において接続することを特徴とす
るポンプ及びポンプ廻り配管設備の施工方法。When installing multiple pumps and piping around these pumps in a machine room in a building, before constructing the equipment in the machine room, divide the pumps and the entire piping system around the pumps into multiple components, and separate each component separately. , a pump unit is produced in a factory in which at least piping is disposed within a frame and a pump is fixed on the frame via vibration isolating means, and then the plurality of pump units are connected in the machine room. Features: Construction methods for pumps and piping equipment around pumps.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1132740A JP2711566B2 (en) | 1989-05-29 | 1989-05-29 | Construction method of pump and piping around pump |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1132740A JP2711566B2 (en) | 1989-05-29 | 1989-05-29 | Construction method of pump and piping around pump |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH03983A true JPH03983A (en) | 1991-01-07 |
JP2711566B2 JP2711566B2 (en) | 1998-02-10 |
Family
ID=15088488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1132740A Expired - Lifetime JP2711566B2 (en) | 1989-05-29 | 1989-05-29 | Construction method of pump and piping around pump |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2711566B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02104521A (en) * | 1988-10-14 | 1990-04-17 | Kenji Nakajima | Growth promoting substance for animal |
JP4695747B2 (en) * | 2000-10-05 | 2011-06-08 | 株式会社さん・おいけ | Funeral equipment and funeral equipment set |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5487922A (en) * | 1977-12-24 | 1979-07-12 | Yuujirou Matsumoto | Method of piping in machine room of building |
JPS56113931A (en) * | 1980-02-14 | 1981-09-08 | Taku Seisakusho:Kk | Air-conditioning unit for builidings |
-
1989
- 1989-05-29 JP JP1132740A patent/JP2711566B2/en not_active Expired - Lifetime
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5487922A (en) * | 1977-12-24 | 1979-07-12 | Yuujirou Matsumoto | Method of piping in machine room of building |
JPS56113931A (en) * | 1980-02-14 | 1981-09-08 | Taku Seisakusho:Kk | Air-conditioning unit for builidings |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02104521A (en) * | 1988-10-14 | 1990-04-17 | Kenji Nakajima | Growth promoting substance for animal |
JP4695747B2 (en) * | 2000-10-05 | 2011-06-08 | 株式会社さん・おいけ | Funeral equipment and funeral equipment set |
Also Published As
Publication number | Publication date |
---|---|
JP2711566B2 (en) | 1998-02-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4468911A (en) | System for forming structural concrete | |
JPH03983A (en) | Installation method for pump and piping around pump | |
CN108194702B (en) | Method for installing pipeline in narrow pipe hoistway | |
JP3130411B2 (en) | Drain pipe piping structure of air conditioner in unit type building and its piping method | |
Yao et al. | Identification of earthquake damaged operational and functional components in hospital buildings | |
US4660349A (en) | Method of erecting a building using preconstructed modular units | |
JPS62228975A (en) | Method of construction of nuclear plant | |
JP2020041311A (en) | Staircase structure and unit building | |
JP3083455B2 (en) | Unit building ceiling structure | |
JPH0270848A (en) | Floor slab | |
JP2743296B2 (en) | Installation method of roof equipment and installation structure of roof equipment | |
JP7151961B2 (en) | Piping installation structure and piping pit construction method | |
JPH05106353A (en) | Building structure | |
JPS6355572B2 (en) | ||
JP2002191715A (en) | Wide angle movable unit, and piping method for sprinkler system | |
JP3045839B2 (en) | Method and apparatus for installing floor slab in unit building | |
JPH0311623Y2 (en) | ||
JPH06167067A (en) | Deck plate construction method | |
JPH0792298A (en) | Filter wall unit and air-conditoned filter room construction method | |
JP2003138748A (en) | Steel plate form, steel plate form unit and building wall construction method using steel plate form unit | |
CN115907686A (en) | Method for interacting BIM model information and project information | |
EP0134893A2 (en) | System for composing heavy structure houses to disassemble | |
JP2005098079A (en) | Unit construction building | |
JPS6055168A (en) | Anchoring of embedded metal article | |
JPH0650011B2 (en) | Hollow slab construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081031 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091031 Year of fee payment: 12 |
|
EXPY | Cancellation because of completion of term | ||
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091031 Year of fee payment: 12 |