Installation method for pump and piping around pump

Info

Publication number
JPH03983A
JPH03983A JP13274089A JP13274089A JPH03983A JP H03983 A JPH03983 A JP H03983A JP 13274089 A JP13274089 A JP 13274089A JP 13274089 A JP13274089 A JP 13274089A JP H03983 A JPH03983 A JP H03983A
Authority
JP
Japan
Prior art keywords
pump
pumps
piping
pipes
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP13274089A
Other languages
Japanese (ja)
Other versions
JP2711566B2 (en
Inventor
Kunio Oda
織田 邦男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takasago Thermal Engineering Co Ltd
Original Assignee
Takasago Thermal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takasago Thermal Engineering Co Ltd filed Critical Takasago Thermal Engineering Co Ltd
Priority to JP1132740A priority Critical patent/JP2711566B2/en
Publication of JPH03983A publication Critical patent/JPH03983A/en
Application granted granted Critical
Publication of JP2711566B2 publication Critical patent/JP2711566B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To carry out an installation work efficiently and accurately in installing facilities comprising a plurality of pumps and pipes by constituting a plurality of pump units with pumps and pipes arranged on a frame body, and connecting the pump units to each other at a work site. CONSTITUTION:In installing facilities comprising a plurality of pumps 8 and the pipes 6 thereof in the machine room of a building, the whole of the facilities are preliminarily divided into a plurality of constituent portions. Namely, the pipes 6 are housed within a frame body 5, and the pumps 8 are placed on the frame body 5 via a vibration-proof rack 7, thereby manufacturing a plurality of pump units in a factory in advance. In addition, a grating 9 as scaffolding is laid above the frame body 5 and a handrail 10 is added thereto. Thereafter, each pump unit is delivered to an installation work site and the pipes 6 thereof are connected to each other, thereby completing the installation work. According to the aforesaid construction, the installation of the whole facilities can be carried out efficiently and accurately.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、ビル等の空調用熱源機械室に設置されるポン
プ及びポンプ廻り配管設備の施工方法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a pump installed in an air conditioning heat source machine room of a building or the like and a method of constructing piping equipment around the pump.

(従来の技術) 冷凍機や熱交換機が設置されるビル等の空調用熱源機械
室においては、ポンプ及び該ポンプ廻りの配管設備が設
置されるが、建物規模が大きくなると、ポンプ及び該ポ
ンプ廻りの配管設備も大規模となる。而して、従来この
大規模なポンプ及びポンプ廻りの配管設備(例えばポン
プ20基以上)を施工する場合には、工事現場内にポン
プや配管材料等の構成部材を全て持ち込み、現場作業員
がその場で加工・取付けをおこなっていた。
(Prior art) Pumps and piping equipment around the pumps are installed in air conditioning heat source equipment rooms such as buildings where refrigerators and heat exchangers are installed. The piping equipment will also be large-scale. Conventionally, when constructing large-scale pumps and piping equipment around pumps (for example, 20 or more pumps), all of the pumps, piping materials, and other components must be brought to the construction site, and site workers must Processing and installation were carried out on the spot.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

しかしながら、大規模なポンプ及びポンプ廻り配管設備
の施工は、限られた現場スペース内で高密度且つ立体的
な配管・ポンプ設置を正確な順序で行なう必要があるの
で、従来の施工方法では。
However, when constructing large-scale pumps and piping equipment around pumps, it is necessary to install high-density, three-dimensional piping and pumps in a precise order within a limited site space, so conventional construction methods cannot be used.

現場作業員の熟練度により加工・取付の精度や品質が左
右さ、れ常に一定品質の施工をなし得ないという問題点
があった。また、現場における作業時間・作業人員も多
く必要であり、この結果、現場での工期が長期化しまた
現場作業の安全性を確保し得ないといった問題があった
The problem was that the accuracy and quality of processing and installation depended on the skill level of the on-site workers, making it impossible to always achieve a constant quality of construction. Further, a large amount of work time and a large number of workers are required at the site, resulting in a problem that the construction period at the site becomes long and the safety of the site work cannot be ensured.

本発明は、従来技術の上記問題点を解決するためになさ
れたもので、その目的とするところは現場作業員の熟練
度に左右されず、常に一定品質の施工をなし得2また現
場における作業時間・作業人員を省略し得る。ポンプ及
びポンプ廻り配管設備の施工方法を提供することにある
The present invention has been made in order to solve the above-mentioned problems of the prior art, and its purpose is to always achieve a constant quality of construction regardless of the skill level of site workers. Time and labor can be saved. The purpose of the present invention is to provide a construction method for a pump and piping equipment around the pump.

〔課題を解決するための手段〕[Means to solve the problem]

上記目的を達成するため3本発明のポンプ及びポンプ廻
り配管設備の施工方法は、現場施工前に予め、ポンプ及
びポンプ廻り配管設備全体を複数の構成部分に分け、各
構成部分ごとに、少なくとも配管を枠体内に配設すると
共にポンプを枠体上に防振手段を介して固設してなるポ
ンプユニットを工場生産し2次いで上記複数のポンプユ
ニ7トを現場において接続することを特徴とする。
In order to achieve the above object, the method for constructing the pump and the piping equipment around the pump of the present invention is to divide the entire pump and the piping equipment around the pump into a plurality of component parts in advance before on-site construction, and for each component part, at least the piping The present invention is characterized in that a pump unit is produced in a factory, in which a pump is disposed in a frame body, and a pump is fixed on the frame body via vibration isolating means, and then the plurality of pump units 7 are connected on-site.

[実施例] 以下に1本発明を図示の実施例に基づいて説明する。第
1図は1本発明の施工方法を適用したポンプ及びポンプ
廻り配管設備の全体平面図であり。
[Example] The present invention will be explained below based on the illustrated example. FIG. 1 is an overall plan view of a pump and piping equipment around the pump to which the construction method of the present invention is applied.

第2図はポンプユニットの一例を示す縦断面図である。FIG. 2 is a longitudinal sectional view showing an example of the pump unit.

而して1本実施例のポンプ及びポンプ廻り配管設備は4
つのポンプユニット1,2.3 4を接続して施工がな
されている。これらポンプユニット1,2.3.4には
第2図に示すように 金属製の鋼材により構成された枠
体5内には配管6が配設されると共に、枠体6上には防
振手段としての防振架台7上に載置したポンプ8が固設
されている。尚、この防振架台7があるため、ポンプ8
に配管6からの振動が伝わるのを防ぐことが出来る。ま
たポンプユニットの枠体5の天面には足場となる格子状
のグレーチング9が敷設され、さらに手摺10が取り付
けられており、ポンプ及びポンプ廻り配管設備の施工後
に、設備の保守・管理のため人が枠体5上を歩けるよう
になっている。またポンプユニット1及びポンプユニッ
ト4には昇降階段11も取り付けられている。
Therefore, the pump and piping equipment around the pump in this embodiment are 4.
Construction is carried out by connecting two pump units 1, 2, 3 and 4. As shown in FIG. 2, these pump units 1, 2, 3, 4 are provided with piping 6 in a frame 5 made of metal steel, and on the frame 6 are provided with vibration-proof A pump 8 placed on a vibration isolating frame 7 as a means is fixedly installed. In addition, because of this vibration-proof pedestal 7, the pump 8
It is possible to prevent vibrations from the pipe 6 from being transmitted to the pipe 6. In addition, a grid-like grating 9 is laid on the top surface of the frame 5 of the pump unit to serve as a foothold, and a handrail 10 is also attached. A person can walk on the frame body 5. Further, an elevating staircase 11 is also attached to the pump unit 1 and the pump unit 4.

なおポンプユニット1.2.3.4にはその地圧力計等
の各種計器類や冷却水等を系統別に分配して取り出すた
めのヘシダー等任意のものを組み込んで形成してもよい
Note that the pump unit 1.2.3.4 may be formed by incorporating various instruments such as a ground pressure gauge, a hesider for distributing and taking out cooling water, etc. to each system.

本実施例における本発明の施工方法の実施手順を説明す
ると、先ず施工されるべきポンプ及びポンプ廻り配管設
備全体をを4つの構成部分に分けたうえ、各構成部分に
ついて上記の構造からなるポンプユニット1.2,3.
4を工場において予め製造する。このように、工場でポ
ンプ8や配管6等の加工・取付けが行われるので、大型
工作機械の使用が可能となってポンプ8や配管6等の加
工・取付けの精度・品質を一定にでき、またポンプユニ
ット1,2,3.4の量産も可能となる。
To explain the implementation procedure of the construction method of the present invention in this example, first, the pump to be constructed and the entire piping equipment around the pump are divided into four component parts, and each component has a pump unit with the above structure. 1.2,3.
4 is manufactured in advance in a factory. In this way, since the pump 8, piping 6, etc. are processed and installed at the factory, it is possible to use large machine tools, and the accuracy and quality of the processing and installation of the pump 8, piping 6, etc. can be maintained at a constant level. It also becomes possible to mass produce pump units 1, 2, 3.4.

ポンプユニット1,2,3.4が完成したらこれらを施
工現場(建物の機械室)に搬入し、ポンプユニット相互
間の配管6を接続して施工は完了する。この場合、施工
現場での作業はポンプユニット相互間の配管6の接続の
みであり、ポンプ8や配管6等の加工・取付けの大部分
は工場でポンプユニット1,2,3.4を製造する際に
なされているので、現場作業を大幅に簡素化でき、その
結果1作業時間・作業人員を省略することが出来る。
Once the pump units 1, 2, 3.4 are completed, they are transported to the construction site (mechanical room of the building), and the piping 6 between the pump units is connected to complete the construction. In this case, the work at the construction site is only the connection of the piping 6 between the pump units, and most of the processing and installation of the pump 8, piping 6, etc. is done at the factory, where the pump units 1, 2, 3.4 are manufactured. Since it is done in detail, on-site work can be greatly simplified, and as a result, one work time and the number of workers can be saved.

〔発明の効果〕〔Effect of the invention〕

本発明は1以上の構成及び作用からなるもので現場作業
員が従来のようにポンプや配管材料等の構成部材を現場
で加工・取付けを行う必要がなく。
The present invention has one or more configurations and functions, and there is no need for field workers to process and install component parts such as pumps and piping materials on-site, unlike in the past.

その結果、現場作業員の熟練度に左右されず、常に一定
品質の施工をなし得る。
As a result, construction can always be of a constant quality, regardless of the level of skill of the on-site workers.

また、ポンプは防振手段を介して枠体上に固設されるの
で、配管の振動がポンプに伝わるのを防ぐことが出来る
Further, since the pump is fixedly installed on the frame via the vibration isolating means, it is possible to prevent vibrations of the piping from being transmitted to the pump.

さらに、現場では複数のポンプユニットを接続するだけ
で施工が完了するので、現場作業を大幅に簡素化でき、
その結果1現場における作業時間・作業人員を省略し得
る。
Furthermore, on-site work can be completed by simply connecting multiple pump units, greatly simplifying on-site work.
As a result, the work time and number of workers at one site can be saved.

【図面の簡単な説明】[Brief explanation of drawings]

第1図及び第2図は本発明の一実施例を示すもので、第
1図は1本発明の施工方法を適用したポンプ及びポンプ
廻り配管設備の全体平面図であり第2図はポンプユニッ
トの一例を示す縦断面図である。 1.2.3,4.  ・・・ポンプユニット枠体 配管 防振架台 (防振手段) ・ポンプ
Figures 1 and 2 show one embodiment of the present invention. Figure 1 is an overall plan view of a pump and piping equipment around the pump to which the construction method of the present invention is applied, and Figure 2 is a pump unit. It is a longitudinal cross-sectional view showing an example. 1.2.3,4. ... Pump unit frame piping vibration isolation stand (vibration isolation means) ・Pump

Claims (1)

【特許請求の範囲】[Claims] 建物内の機械室に複数のポンプとこれらポンプ回りの配
管を行うにあたり、該機械室での施工前に、予め、ポン
プ及びポンプ廻り配管設備全体を複数の構成部分に分け
、各構成部分ごとに、少なくとも配管を枠体内に配設す
ると共にポンプを枠体上に防振手段を介して固設してな
るポンプユニットを工場生産し、次いで上記複数のポン
プユニツトを該機械室において接続することを特徴とす
るポンプ及びポンプ廻り配管設備の施工方法。
When installing multiple pumps and piping around these pumps in a machine room in a building, before constructing the equipment in the machine room, divide the pumps and the entire piping system around the pumps into multiple components, and separate each component separately. , a pump unit is produced in a factory in which at least piping is disposed within a frame and a pump is fixed on the frame via vibration isolating means, and then the plurality of pump units are connected in the machine room. Features: Construction methods for pumps and piping equipment around pumps.
JP1132740A 1989-05-29 1989-05-29 Construction method of pump and piping around pump Expired - Lifetime JP2711566B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1132740A JP2711566B2 (en) 1989-05-29 1989-05-29 Construction method of pump and piping around pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1132740A JP2711566B2 (en) 1989-05-29 1989-05-29 Construction method of pump and piping around pump

Publications (2)

Publication Number Publication Date
JPH03983A true JPH03983A (en) 1991-01-07
JP2711566B2 JP2711566B2 (en) 1998-02-10

Family

ID=15088488

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1132740A Expired - Lifetime JP2711566B2 (en) 1989-05-29 1989-05-29 Construction method of pump and piping around pump

Country Status (1)

Country Link
JP (1) JP2711566B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02104521A (en) * 1988-10-14 1990-04-17 Kenji Nakajima Growth promoting substance for animal
JP4695747B2 (en) * 2000-10-05 2011-06-08 株式会社さん・おいけ Funeral equipment and funeral equipment set

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5487922A (en) * 1977-12-24 1979-07-12 Yuujirou Matsumoto Method of piping in machine room of building
JPS56113931A (en) * 1980-02-14 1981-09-08 Taku Seisakusho:Kk Air-conditioning unit for builidings

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5487922A (en) * 1977-12-24 1979-07-12 Yuujirou Matsumoto Method of piping in machine room of building
JPS56113931A (en) * 1980-02-14 1981-09-08 Taku Seisakusho:Kk Air-conditioning unit for builidings

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02104521A (en) * 1988-10-14 1990-04-17 Kenji Nakajima Growth promoting substance for animal
JP4695747B2 (en) * 2000-10-05 2011-06-08 株式会社さん・おいけ Funeral equipment and funeral equipment set

Also Published As

Publication number Publication date
JP2711566B2 (en) 1998-02-10

Similar Documents

Publication Publication Date Title
US4468911A (en) System for forming structural concrete
JPH03983A (en) Installation method for pump and piping around pump
CN108194702B (en) Method for installing pipeline in narrow pipe hoistway
JP3130411B2 (en) Drain pipe piping structure of air conditioner in unit type building and its piping method
Yao et al. Identification of earthquake damaged operational and functional components in hospital buildings
US4660349A (en) Method of erecting a building using preconstructed modular units
JPS62228975A (en) Method of construction of nuclear plant
JP2020041311A (en) Staircase structure and unit building
JP3083455B2 (en) Unit building ceiling structure
JPH0270848A (en) Floor slab
JP2743296B2 (en) Installation method of roof equipment and installation structure of roof equipment
JP7151961B2 (en) Piping installation structure and piping pit construction method
JPH05106353A (en) Building structure
JPS6355572B2 (en)
JP2002191715A (en) Wide angle movable unit, and piping method for sprinkler system
JP3045839B2 (en) Method and apparatus for installing floor slab in unit building
JPH0311623Y2 (en)
JPH06167067A (en) Deck plate construction method
JPH0792298A (en) Filter wall unit and air-conditoned filter room construction method
JP2003138748A (en) Steel plate form, steel plate form unit and building wall construction method using steel plate form unit
CN115907686A (en) Method for interacting BIM model information and project information
EP0134893A2 (en) System for composing heavy structure houses to disassemble
JP2005098079A (en) Unit construction building
JPS6055168A (en) Anchoring of embedded metal article
JPH0650011B2 (en) Hollow slab construction method

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081031

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091031

Year of fee payment: 12

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091031

Year of fee payment: 12