JPH0341004B2 - - Google Patents
Info
- Publication number
- JPH0341004B2 JPH0341004B2 JP58251434A JP25143483A JPH0341004B2 JP H0341004 B2 JPH0341004 B2 JP H0341004B2 JP 58251434 A JP58251434 A JP 58251434A JP 25143483 A JP25143483 A JP 25143483A JP H0341004 B2 JPH0341004 B2 JP H0341004B2
- Authority
- JP
- Japan
- Prior art keywords
- accident
- power system
- simulation
- power
- change
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000004088 simulation Methods 0.000 claims description 32
- 238000012545 processing Methods 0.000 claims description 27
- 230000001681 protective effect Effects 0.000 claims description 6
- 238000012544 monitoring process Methods 0.000 description 17
- 238000000034 method Methods 0.000 description 14
- 230000005540 biological transmission Effects 0.000 description 9
- 238000010586 diagram Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Testing And Monitoring For Control Systems (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Description
【発明の詳細な説明】
〔発明の技術分野〕
本発明は、電力系統シミユレータ装置、特に電
子計算機を用いて電力系統機器の状態変化の模擬
を行なう電力系統シミユレータ装置に関するもの
である。DETAILED DESCRIPTION OF THE INVENTION [Technical Field of the Invention] The present invention relates to a power system simulator device, and particularly to a power system simulator device that simulates state changes of power system equipment using an electronic computer.
一般に、電力系統シミユレータ装置はオペレー
タの訓練と事故のシミユレーシヨンによる事前解
析を行なうものであり、このうち事故のシミユレ
ーシヨンについては、予め事故状態を電力系統シ
ミユレータ装置に設定しておく必要がある。そこ
で従来のシミユレータ装置は電力系統の接続状態
と各機器毎の状変とを個々に設定する方法で行な
つていた。
In general, a power system simulator device is used to train operators and perform preliminary analysis by simulating an accident.For accident simulation, it is necessary to set the accident state in the power system simulator device in advance. Therefore, in conventional simulator devices, the connection state of the power system and the status changes of each device are individually set.
上記した従来方法によると事故を設定する場合
に、設定者が事故を想定して事故に必要な状変機
器を全て洗い出し、これを個々に状変設定する必
要があり、設定者にとつてかなりの労力と時間と
を要していた。又、設定数が多いために設定ミス
を起し易かつた。更に状変手順設定の作成は設定
者の判断により行なわれるために、電力系統に関
して熟練した設定者が必要であつた。しかも最近
の大型化、複雑化した電力系統においては、事故
状変の設定には益々多くの状変設定をしなければ
ならなくなつてきている。そして状変手順の作成
は模擬実行前に行なうため、一時的事故は発生可
能であるが、永久事故発生の場合は模擬実行中の
しや断器の入、切状態を想定して、永久事故点に
送電するしや断器の入操作後、直ちに保護リレー
の動作としや断器のトリツプ状変とを発生させな
ければならず、非常な困難を伴なつている。
According to the conventional method described above, when setting an accident, the person setting up the accident must identify all the state-changing devices necessary for the accident, and set the state-changing settings for each of them individually. This required a lot of effort and time. Furthermore, since there are a large number of settings, it is easy to make setting mistakes. Furthermore, since the creation of status change procedure settings is done at the discretion of the setter, a setter who is skilled in the field of power systems is required. Moreover, in recent power systems that have become larger and more complex, it has become necessary to set more and more accident conditions. Since the situation change procedure is created before the simulation is executed, it is possible for a temporary accident to occur, but in the case of a permanent accident, a permanent accident can be caused by assuming the on/off state of the disconnector during the simulation. After power is transmitted to a point, the protection relay must be operated immediately after the power is turned on, and the circuit breaker must be tripped, which is extremely difficult.
本発明は上記問題点を解決することを目的とし
てなされたものであり、設定方法を簡単にして設
定者の負担の軽減及び設定ミスの防止をはかつた
電力系統シミユレータ装置を提供することを目的
としている。
The present invention was made with the aim of solving the above-mentioned problems, and an object of the present invention is to provide a power system simulator device that has a simple setting method, reduces the burden on the setter, and prevents setting errors. It is said that
本発明では予め決められている電力系統接続情
報と電力系統保護リレー情報とを参照して事故状
変発生に必要な機器を求め、前記対象機器に対し
てトリツプ状変と保護リレーの動作状変とを発生
させ、永久事故の場合は再加圧してしや断器を開
放させ、一時事故の場合はトリツプ状変と保護リ
レーの動作状変の後、事故点を復旧させようとす
るものである。
In the present invention, equipment necessary for the occurrence of an accident is determined by referring to power system connection information and power system protection relay information that are determined in advance, and a trip state and an operational state of a protection relay are detected for the target equipment. In the case of a permanent accident, pressure is applied again to open the breaker, and in the case of a temporary accident, the fault point is restored after a trip and a change in the operation of the protective relay. be.
以下図面を参照して実施例を説明する。第1図
は本発明による電力系統シミユレータ装置の一実
施例ブロツク図である。第1図において、1は電
子計算機、2は模擬実行に際して入力するCRT
装置、3は監視制御用であつて操作員とのマン・
マシンインターフエースを行なうCRT装置、4
は実際の電力系統であつて計算機内の実電力系統
状変判定制御処理部(以下実電状変処理部と云
う)11を介して電力系統状変監視系統制御処理
部(以下状変監視処理部と云う)12へ接続され
ている。13は模擬用電力系統であり、電力系統
状態、例えばしや断器の入、切状態等の記憶部で
ある。事故状況保存部14はCRT装置2によつ
て設定された事故情報の記憶部、前記した状変監
視処理部12は電力系統4にも接続されていて、
実際の電力系統の監視、制御を行なう機能を有し
ている。電力系統接続状態保存部(以下状態保存
部と云う)15は電力系統の各機器間の接続情報
の記憶部、電力系統保護リレー情報保存部(以下
リレー情報保存部と云う)16は各保護リレーの
対象機器情報の記憶部、17は電力系統模擬処理
部(以下模擬処理部と云う)である。
Examples will be described below with reference to the drawings. FIG. 1 is a block diagram of an embodiment of a power system simulator device according to the present invention. In Figure 1, 1 is an electronic computer, and 2 is a CRT used for input during simulation execution.
The device 3 is for monitoring and control, and is for human communication with the operator.
CRT device for machine interface, 4
is an actual power system, and the power system status change monitoring system control processing unit (hereinafter referred to as the status change monitoring processing unit) is processed via the actual power system status change determination control processing unit (hereinafter referred to as the actual power status change processing unit) 11 in the computer. 12). Reference numeral 13 denotes a simulated power system, which is a storage unit for storing power system states, such as the on/off state of a power cutter. The accident situation storage unit 14 is a storage unit for accident information set by the CRT device 2, and the condition change monitoring processing unit 12 is also connected to the power system 4.
It has the function of monitoring and controlling the actual power system. A power system connection state storage unit (hereinafter referred to as the state storage unit) 15 is a storage unit for connection information between each device in the power system, and a power system protection relay information storage unit (hereinafter referred to as the relay information storage unit) 16 is a storage unit for each protection relay. 17 is an electric power system simulation processing section (hereinafter referred to as simulation processing section).
次に上記した各装置の関係を整理する。 Next, the relationships among the above-mentioned devices will be summarized.
実際の電力系統4の監視は実電状変処理部1
1と状変監視処理部12とにより、操作員との
マンマシンインターフエースを行なう監視制御
用CRT装置3へ表示する。 The actual power system 4 is monitored by the actual power status change processing unit 1.
1 and the status change monitoring processing unit 12, the information is displayed on the CRT device 3 for monitoring and control, which performs a man-machine interface with the operator.
実際の電力系統4の制御は監視制御用CRT
装置3より入力され、監視の場合と逆のルート
によつて行なう。 The actual power system 4 is controlled by a CRT for monitoring and control.
The information is input from the device 3 and is performed through the reverse route to that used for monitoring.
上記装置の他に以下に説明する電力系統模擬処
理部によつて本発明は構成されている。 In addition to the above-mentioned device, the present invention is configured by an electric power system simulation processing section described below.
模擬用系統は模擬用CRT装置2から入力し
模擬処理部17を介して模擬用電力系統13に
記憶することにより模擬用系統を作成する。 The simulation system is inputted from the simulation CRT device 2 and stored in the simulation power system 13 via the simulation processing section 17, thereby creating a simulation system.
事故の設定は模擬用CRT装置から、模擬の
事故点、事故種別、一時事故又は永久事故を設
定し、模擬処理部17を介して事故情報保存部
14へ記録する。 To set an accident, a simulated accident point, accident type, temporary accident or permanent accident is set from the simulation CRT device, and recorded in the accident information storage section 14 via the simulation processing section 17.
事故の発生は模擬用CRT装置2から模擬実
行を設定した時、模擬処理部17により事故情
報保存部14から事故情報を取出し、模擬用電
力系統13の中にしや断器のトリツプ状変と保
護リレーの動作状変を発生させる。 When an accident occurs, when simulation execution is set from the simulation CRT device 2, the simulation processing unit 17 retrieves the accident information from the accident information storage unit 14, and processes the simulation power system 13 into a trip state of the disconnection and protects it. Causes a change in relay operation.
その後、状変監視処理部12を起動すると、
状変監視処理部12は模擬用電力系統13を参
照して監視、制御用CRT装置3に事故発生を
表示する。 After that, when the status change monitoring processing unit 12 is started,
The state change monitoring processing unit 12 refers to the simulated power system 13 and displays the occurrence of an accident on the monitoring and control CRT device 3.
事故が永久事故設定の場合は、監視制御用
CRT装置3からの操作又は電子計算機内のソ
フトウエアによる自動的操作により、しや断器
の投入操作をすると、状変監視処理部12より
電力系統模擬処理部17に起動がかかり、電力
系統模擬処理部17は模擬用電力系統13内の
入、切状態を更新する。その後、事故発生の処
理を繰返し行ない、もし事故点が加圧状態とな
るなら、しや断器のトリツプ状変と保護リレー
の状変を発生させる。 If the accident is set as a permanent accident, the supervisory control
When the power supply circuit breaker is turned on by operation from the CRT device 3 or automatic operation by software in the computer, the power system simulation processing section 17 is activated by the state change monitoring processing section 12, and the power system simulation processing section 17 is activated. The processing unit 17 updates the on/off state in the simulated power system 13. Thereafter, the accident occurrence process is repeated, and if the accident point becomes pressurized, a trip-like deformation of the shingle breaker and a deformation of the protective relay are caused.
一時事故設定の場合は、初回の事故状変発生
後、事故点復旧、即ち、事故点の情報を消すた
め、再度の状変発生は行なわない。 In the case of temporary accident setting, after the first occurrence of the accident situation, the accident point is restored, that is, the information on the accident point is erased, so that the situation does not occur again.
第2図は送電線の模擬事故例であり、第5図の
フローチヤートによつて説明する。 FIG. 2 shows an example of a simulated accident on a power transmission line, which will be explained using the flowchart in FIG.
先ず、事故点J1を送電線L1とし、事故種別
を短絡の永久事故として模擬用CRT装置2より
設定し、模擬実行指令を入力する。この場合ステ
ツプ51において、事故設定点に送電している入
状態で事故種別に対応する保護リレーありのしや
断器をさがす、即ち、電力系統模擬処理部17
は、状態保存部15、リレー情報保存部16と模
擬用電力系統13から事故種別の短絡に対応した
保護リレーと送電線L1に対して送電を行なつて
いる母線B1に接続され、保護対象で入のしや断
器C1を求める。なお、しや断器C1を求めるに
は、汐流計算等のために用いられるノード・ブラ
ンチと云う概念を導入することにより容易に実現
可能である。ステツプ52において機器ありと判
断するとステツプ53へ移り、しや断器C1のト
リツプ状変と保護リレーの動作状変を発生させて
ステツプ51へ戻り、再度対象機器をさがす。そ
してしや断器C2を求めるとステツプ52におい
て機器ありとなつてステツプ53へ移り、しや断
器C2のトリツプ状変と保護リレーの動作状変を
発生させる。この場合はしや断器C1及びC2と
もに開放となつている。しかも永久事故設定であ
るため、監視制御用CRT装置3からの操作員に
よる操作又は、電子計算機内のソフトウエアによ
る自動的操作により、しや断器C1又はしや断器
C2のいずれかの投入操作をした場合に、状変監
視処理部12より、電力系統模擬処理部17に起
動がかかり、再投入によつて事故点J1が加圧状
態となる。しかし永久事故設定であるため、ステ
ツプ53においてしや断器が開放してステツプ5
1へ戻る。この状態では全てのしや断器が開放で
あるため、ステツプ52からステツプ54へ移
り、更にステツプ54において一時事故でないた
め終了する。 First, the accident point J1 is set to the power transmission line L1, the accident type is set as a short-circuit permanent accident from the simulation CRT device 2, and a simulation execution command is input. In this case, in step 51, the power system simulation processing unit 17 searches for a protective relay or a disconnection corresponding to the accident type in the ON state where power is being transmitted to the fault setting point.
is connected to the bus B1 that is transmitting power to the protection relay corresponding to the short circuit of the accident type and the power transmission line L1 from the state storage unit 15, relay information storage unit 16, and simulated power system 13, and is connected to the bus B1 that is transmitting power to the power transmission line L1. Find the opening and disconnection C1. It should be noted that finding the shear breaker C1 can be easily realized by introducing the concept of node/branch used for tidal current calculations and the like. If it is determined in step 52 that a device is present, the process moves to step 53, where a trip state change in the shield breaker C1 and a change in the operating state of the protection relay are generated, and the process returns to step 51 to search for the target device again. Then, when the shield breaker C2 is determined, it is determined in step 52 that there is a device, and the process moves to step 53, where a trip state change of the shield breaker C2 and a change in the operating state of the protection relay occur. In this case, both the breaker C1 and C2 are open. Moreover, since it is a permanent accident setting, either the breaker C1 or the breaker C2 can be turned on by an operator's operation from the monitoring and control CRT device 3 or automatically by software in the computer. When the operation is performed, the power system simulation processing section 17 is activated by the state change monitoring processing section 12, and the accident point J1 is put into a pressurized state by re-turning on the power system. However, since it is set as a permanent accident, the breaker opens in step 53 and the failure occurs in step 5.
Return to 1. In this state, all the shields and disconnectors are open, so the process moves from step 52 to step 54, and at step 54, there is no temporary accident, so the process ends.
次に、一時事故設定の場合は、前記した永久事
故の場合と同様にステツプ51において、事故設
定点に通電している入状態で事故種別に対応する
保護リレーありのしや断器をさがし、ステツプ5
2へ移つて機器ありであるため更にステツプ53
へ移つてしや断器の切状変を発生させる。この場
合は一時事故であるためステツプ51へ戻つても
対象機器は存在せず、ステツプ52からステツプ
54へ移る。ステツプ54では一時事故であるた
めステツプ55において事故点を復旧して事故点
J1の情報を消し、再度の状変発生は行なわな
い。 Next, in the case of a temporary accident setting, as in the case of a permanent accident described above, in step 51, the protection relay or disconnector corresponding to the accident type is searched for while the accident setting point is energized. Step 5
Move to step 2, and since there is a device, proceed to step 53.
This can lead to deterioration of the cut state of the disconnector. In this case, since it is a temporary accident, the target device does not exist even if the process returns to step 51, and the process moves from step 52 to step 54. In step 54, since it is a temporary accident, in step 55, the accident point is restored and the information on accident point J1 is erased, and the situation does not occur again.
以上は送電線の短絡事故の場合を説明したが地
絡事故についても同様に実施できることは明らか
である。又、送電線のみならず、母線事故及び変
圧器事故等についても以下により容易に行なえ
る。 The above explanation deals with short-circuit accidents in power transmission lines, but it is clear that the same method can be applied to ground faults as well. In addition, not only power transmission line accidents, but also busbar accidents, transformer accidents, etc. can be easily handled by the following.
母線事故について、
第3図は母線の模擬事故例であり、短絡事故
の場合である。 Regarding busbar accidents, Figure 3 shows an example of a simulated busbar accident, which is a short-circuit accident.
この場合も前記した送電線と同様に、事故点
を母線B3とし、事故種別を短絡の永久事故と
設定して実行する。そしてステツプ51におい
て、母線B3に送電を行なつているしや断器C
4と保護リレーとを求め、ステツプ53におい
てしや断器C4のトリツプ状変と保護リレーの
動作状変とを発生させる。この場合も前記同様
に送電を行なつているしや断器が複数の場合
は、全てのしや断器及び対象となる保護リレー
に対して状変を発生させると共に、その後の動
作も前記同様である。 In this case as well, similarly to the above-mentioned power transmission line, the fault point is set as the bus bar B3, the fault type is set as a short-circuit permanent fault, and the process is executed. Then, in step 51, the disconnector C that is transmitting power to the bus B3
4 and the protection relay, and in step 53, a trip state change in the shield breaker C4 and a change in the operating state of the protection relay are generated. In this case as well, if there are multiple disconnectors transmitting power, a change in status will occur for all disconnectors and the target protection relay, and the subsequent operation will be the same as above. It is.
変圧器事故について、
第4図は変圧器の模擬事故例であり、短絡事
故の場合である。 Regarding transformer accidents, Figure 4 shows an example of a simulated transformer accident, which is a short-circuit accident.
この場合も前記した送電線と同様に、事故点
を変圧器K1とし、事故種別を短絡の永久事故
と設定して実行する。そしてステツプ51にお
いて、変圧器K1に送電を行なつているしや断
器C5と保護リレーとを求め、ステツプ53に
おいてしや断器C5のトリツプ状変と保護リレ
ーの動作状変とを発生させる。その後の動作は
前記同様である。 In this case, as in the case of the power transmission line described above, the fault point is set as the transformer K1, and the fault type is set as a permanent short-circuit fault. Then, in step 51, the shield breaker C5 and the protective relay that are transmitting power to the transformer K1 are determined, and in step 53, a trip state change in the shield breaker C5 and a change in the operating state of the protective relay are generated. . The subsequent operations are the same as described above.
以上説明した如く、本発明によれば事故状変設
定点と事故種別との指定により、事故状変発生に
関与する機器を、電力系統接続情報と電力系統保
護リレー情報とを参照して求めるよう構成したの
で、事故状変発生に際して設定情報が少なくな
り、かつ事故状変に必要な機器を洗い出す必要も
なく、しかも一時的事故及び永久事故の発生の容
易な電力系統シミユレータ装置を提供できる。
As explained above, according to the present invention, by specifying the accident situation change set point and the accident type, the equipment involved in the occurrence of the accident situation can be determined by referring to the power system connection information and the power system protection relay information. With this structure, it is possible to provide a power system simulator device that requires less setting information when an accident occurs, eliminates the need to identify equipment necessary for an accident, and can easily cause temporary and permanent accidents.
第1図は本発明による電力系統シミユレータ装
置の一実施例ブロツク図、第2図は送電線の模擬
事故例図、第3図は母線の模擬事故例図、第4図
は変圧器の模擬事故例図、第5図は動作説明のた
めのフローチヤートである。
1……電子計算機、2……模擬用CRT装置、
3……監視制御用CRT装置、4……電力系統、
11……実電力系統状変判定制御処理部、12…
…電力系統状変監視系統制御処理部、13……模
擬用電力系統、14……事故状況保存部、15…
…電力系統接続状態保存部、16……電力系統保
護リレー情報保存部、17……電力系統模擬処理
部、C1〜C6……しや断器、B1〜B4……母
線、S1〜S4……開閉器、K1……変圧器。
Fig. 1 is a block diagram of an embodiment of the power system simulator device according to the present invention, Fig. 2 is an example of a simulated accident on a transmission line, Fig. 3 is an example of a simulated accident on a busbar, and Fig. 4 is an example of a simulated accident on a transformer. The example diagram, FIG. 5, is a flowchart for explaining the operation. 1...Electronic computer, 2...Simulation CRT device,
3...CRT device for monitoring and control, 4...Power system,
11...Actual power system state change determination control processing unit, 12...
...Power system status change monitoring system control processing unit, 13...Simulation power system, 14...Accident situation storage unit, 15...
...Power system connection state storage unit, 16...Power system protection relay information storage unit, 17...Power system simulation processing unit, C1-C6...Shipping switch, B1-B4...Bus bar, S1-S4... Switch, K1...Transformer.
Claims (1)
を模擬する電力系統シミユレータ装置において、
しや断器の入、切状態を記憶する模擬用電力系統
と、事故点、事故種別及び一時事故又は永久事故
を記憶する事故情報保存部と、電力系統の各機間
の接続情報を記憶する電力系統接続状態保存部
と、模擬用入力の設定により模擬用系統を作成す
る電力系統模擬処理部と、監視制御を行なう系統
制御処理部と、模擬用入力装置及び監視制御装置
とを夫夫そなえ、模擬用入力装置を介して事故状
変設定点と事故種別とを指定した際、電力系統接
続情報と電力系統保護リレー情報とを参照して事
故状変発生に必要な機器を求めると共に、当該機
器のトリツプ状変と保護リレーの動作状変とを発
生させることを特徴とする電力系統シミユレータ
装置。1. In a power system simulator device that simulates power system fault conditions using a simulated power system,
A simulated power system that stores the on and off states of power disconnectors, an accident information storage section that stores the accident point, accident type, temporary accident or permanent accident, and connection information between each machine in the power system. A power system connection state storage unit, a power system simulation processing unit that creates a simulation system by setting simulation inputs, a system control processing unit that performs supervisory control, a simulation input device, and a supervisory control device are provided. When specifying the accident situation change set point and accident type via the simulation input device, the equipment required for the accident situation occurrence is determined by referring to the power system connection information and the power system protection relay information, and the relevant A power system simulator device characterized by generating a trip state change in equipment and a change in the operation state of a protective relay.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58251434A JPS60144116A (en) | 1983-12-29 | 1983-12-29 | Power system simulator |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58251434A JPS60144116A (en) | 1983-12-29 | 1983-12-29 | Power system simulator |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS60144116A JPS60144116A (en) | 1985-07-30 |
| JPH0341004B2 true JPH0341004B2 (en) | 1991-06-20 |
Family
ID=17222778
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP58251434A Granted JPS60144116A (en) | 1983-12-29 | 1983-12-29 | Power system simulator |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS60144116A (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH03112324A (en) * | 1989-09-21 | 1991-05-13 | Mitsubishi Electric Corp | Distributed simulation device |
| JP2736133B2 (en) * | 1989-10-05 | 1998-04-02 | 株式会社東芝 | Power system training simulator |
| JPH05199647A (en) * | 1992-01-16 | 1993-08-06 | Mitsubishi Electric Corp | Simulation method for power system protective relay |
-
1983
- 1983-12-29 JP JP58251434A patent/JPS60144116A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS60144116A (en) | 1985-07-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0341004B2 (en) | ||
| JP2661434B2 (en) | Monitoring and control device for power system | |
| JP3392718B2 (en) | Simulator | |
| JPH0773409B2 (en) | Power system accident determination device | |
| CN113113971A (en) | Automatic remote control execution method and related device for distribution network feeder operation task | |
| JP2736133B2 (en) | Power system training simulator | |
| JP2921034B2 (en) | System failure section judgment device | |
| JP2577392B2 (en) | Pre-accident grid status creation method for automatic recovery in the event of a power grid accident | |
| JP5118439B2 (en) | Method for determining outage equipment in power system | |
| JPH0739075A (en) | Substation accident response support system | |
| JPS59188317A (en) | Power system accident equipment automatic determination device | |
| JP3177701B2 (en) | Accident recovery inference method at substation | |
| JPH1141783A (en) | Power system controller | |
| JPH07287507A (en) | Accident sequence automatic creation method in training scenario | |
| JPH06165378A (en) | System restoration operation procedure creation system | |
| JPH02299424A (en) | Trouble restoring operation for electric power system | |
| JPH0795726A (en) | System reliability automatic judgment method | |
| CN116526413A (en) | Small-current grounding line selection method and system based on network signaling system | |
| JPH067731B2 (en) | Automatic creation method of system operation command procedure in electric power system | |
| JPS6056378B2 (en) | How to determine the order of power system restoration | |
| JP2010141980A (en) | Electric power system monitor | |
| JP2000116002A (en) | Railway power management system simulator | |
| JPH02311128A (en) | Device for supporting recovery of power system from failure | |
| JPH0311170B2 (en) | ||
| JPH09191583A (en) | Automatic restoration equipment for electrical equipment |